Department of Information TechnologyOffice of Business Continuity
Disaster Recovery Assessment Disaster Recovery Assessment and and
Feasibility StudyFeasibility StudyClose Out Certification RequestClose Out Certification Request
July 28, 2010July 28, 2010
Presented by:Mary Wanda Anaya, Business Continuity Manager
Stephanie Gallegos, Business Continuity Analyst
Enterprise BCM
Program
Offi ce of Business Continuity
Mission Statement Provide the planning methodology for how the Department of Information
Technology will recover and restore partially or completely interrupted critical function(s) within a predetermined time after a disaster or
extended disruption.
Prepare for future incidents that could jeopardize the State’s core mission critical systems.
Vision StatementA Business Continuity Program that strives to maintain continuity of
operations for the State’s mission critical services by sustaining a high level of standards and excellence.
Business Continuity Program
3
The Department of Information Technology received $250,000 for a Disaster Recovery (DR) Assessment and Feasibility Study to determine the best approach for redundancy for its most critical Information Technology (IT) based services and applications. The purpose of this project was to determine the most cost effective means of providing this service.
FY 2008 C2 Appropriation
DR Assessment -Threat and Risk AssessmentEnterprise Applications
(Email, Share, Mainframe)Site Visits – Colorado, Arizona, & Oregon
Feasibility Study – Critical Applications AssessmentBC-DR Questionnaire to Executive AgenciesDetermine 12 Top Critical ApplicationsInterview 10 Agencies (Business & IT Staff)Provided the BC and DR Recommendations
Training – Business Continuity ClassesFormal BC Class and Certification
Business Continuity Awareness (2 Classes) – Agencies
Business Continuity Planning (1 Class) - Agencies
Result of the Study - DoIT released a RFP for Data Resilience and Disaster Recovery Site Service
4
Project Time Line
2009August Site Visit (Colorado, Arizona, Oregon)March Contracted POD Inc. August Conduct DR Assessment and Feasibility
StudyApril Office of BC formal training and attain
certification. November Develop and Release an RFP for
Enterprise BC/DR Site Services.2010
January Vendor prepare and submit RFP proposals.April Evaluate RFP proposals and select finalistMay Conduct Agency and DoIT staff BC trainingJune Close Out ContractJuly Award Price AgreementAugust Contract Enterprise BC/DR Site
5
Project Deliverables Received
Del #1 Discovery DocumentDel #2 Threat Analysis ReportDel #3 Risk Analysis ReportDel #4 Threat & Risk Recommendations DocumentDel #5 Critical Applications DeterminationDel #6 Evaluate Selected agencies BC & DR PlansDel #7 Evaluate Twelve Critical Applications ArchitectureDel #8 Critical Applications RecommendationsDel #9 Determine Disaster Recovery efforts for Developing Linkage of Like Applications and Platforms ReportDel #10 Overall Disaster Recovery Recommendations
6
Project Cost
AMOUNT VENDOR DESCRIPTION
Feasibility Study $199,974.80 POD Associates
DR assessment and feasibility study to establish requirements for DR services. Contract No. 09-361-3025 Extended through - 3/30/10
Staff Training $19,459.06 ABBA BC Training Business Continuity Training
Colorado Site Visit $6,495.39 Aquila Travel Airfare & Per Diem to fly to Denver for site visits
Arizona Site Visit $5,380.37 Aquila Travel Airfare & Per Diem to fly to Phoenix for site visits
Oregon Site Visit $6,401.31 Aquila Travel Airfare & Per Diem to Portland for site visits
New Mexico Site Visits $44.80 In-state mileage to travel to CYFD
Washington Training $5,390.00 Sentryx Bus Continuity Training for Mary & Stephanie
Washington Travel $4,183.19 Aquila TravelAirfare for Stephanie & Mary to fly to Washington DC to attend a Training
Misc. $2,464.39 Amazon.com Bus Continuity Planning Books, Online Course
$250,000.00 TOTAL BUDGETED
$249,793.31 TOTAL EXPENDED
$206.69 TOTAL REMAINING
7
Lessons Learned1. When the product of the project is a study, it is critical to
the project to include a requirement in the contract for a technical writer.
2. When critical information is gathered through an interview process, note gathering should extend to include voice recording to assure all important information is documented.
3. Even in small projects It is difficult for the Project Manager and the Project Team Leader to be the same individual.
8
Price AgreementRFP# 00-361-00-01416DoIT Disaster Recovery and Data Resilience Data Center Site(s)
Category-1 Resilience Data Center Site (GOLD) Production/Failover Available 24x7x365
Category-2 Hot Data Center Site (SILVER) Host Equipment Operating System Application Software Copy of Data – test Available within 8 hrs
Category-3 Warm Data Center Site (BRONZE) Racks, Power, Data Available within 24 hrs
Category-4 Cold Data Center Site (PAPER) only floor space Available within 72 hrs