SLAC Self-Assessment Programsmeeting ASO Requirements
David Schultz LCLS Program Division Director
SLAC National Accelerator Laboratory
2 David [email protected]
Outline The (new) SLAC Accelerator Directorate SLAC Accelerator Safety Self-Assessment Recent ASO Self-Assessment
The Four Operational SLAC Accelerators:Linac Accelerator Facility (incl. LCLS)SPEAR3NLCTAASTA (Accelerator Structure Test Area)
3 David [email protected]
New SLAC Organization
Research Directorates User operations, Future capabilities
Accelerator Directorate Common standards and practices for SLAC accelerators
Specifies performance expectations for user programs
Meets specified performance expectations
4 David [email protected]
The Accelerator Directorate Contains the operations and maintenance for all four SLAC accelerators. The Accelerator Operations and Safety Division is responsible for safe operations inside the ASEs. The Configuration Control Department (in the Accelerator Engineering Division) is responsible for Document Control.
One organization providing uniform standards and processes for accelerators across the Laboratory.
The Accelerator Directorate
5 David [email protected]
Periodic Self-AssessmentSafety Overview Committee (An ES&H Committee)
One of the committee Core Roles is to: “Assign accelerator safety audits for each accelerator facility … Each SLAC accelerator facility will be audited at least once every five years. Audit reports will be provided to the ES&HCC ...
Audits include Assessment of the facility’s safety systems Assessment of compliance with SLAC ES&H policies and procedures Evaluation of ES&H training programs and records Evaluation of conduct of operations”
Accelerator Safety Self-Assessment
From the SLAC ES&H Manual, Chapter 31: Institutional ES&H Committees
6 David [email protected]
Periodic Self-Assessments
Safety Overview Committee Periodic Self-Assessments NLCTA – June 2006 SPEAR3 – August 2007 ASTA – August 2008 LCLS – Recent ARRs 3/07, 12/08 and 8/09
Linac reviewed 4/2005
7 David [email protected]
After the December meeting we anticipated having theAccelerator Safety Order Implementation Assessment .Following the Lines of Inquiry, we collected documentation for posting.When the review was cancelled we decided to proceed with a self-assessment in anticipation of a similar review sometime in the future.
Current ASO Self-Assessment
8 David [email protected]
ASO Self-Assessment Documents
9 David [email protected]
Status:The Committee has posted and collated all documents.Individuals are assigned to write a draft assessment for a category of ASO implementation across all SLAC accelerators. (e.g. I am writing an assessment of all SADs.)
Identify differences, deficiencies, and best practices.The assessments will be reviewed by the committee and a report released.
Current ASO Self-Assessment Status
10 David [email protected]
Summary
SLAC Accelerator Safety Self-AssessmentA process exists to periodically audit
the facility’s safety systems compliance with SLAC ES&H policies and procedures training programs and records conduct of operations
A Self-Assessment of SLAC Accelerators’ compliance with the ASO is underway.The new SLAC Accelerator Directorate will bring uniform standards and practices for all SLAC accelerators.