NEC Confidential 2

Recent Changes in the Enterprise Environment

TCO reduction, flexibility and agility are critical for companies in this turbulent environment

The enterprise business environment has been getting worse since the financial crisis

GlobalizationGlobalization

Internal ControlInternal Control

ComplianceCompliance

Sales/production decline*1

Shrinking Markets

Shrinking Markets

*1 Nikkei Business March issue 2009

Stock market crash*1

Worst since the bubble burst

Nikkei average and NYSE Dow

$/\

Nikkei Average

NYSE Dow

2009 Jan Feb Mar$6763

Page 3: 1 Data Center Green IT Presentation UK

NEC Confidential 3

Diversified needs for IT systems spread cloud computing with speed.

IT systems now face new requirements.

FlexibilityFlexibility ReliabilityReliability ManageabilityManageability

NEC’s View on Requirements for IT systems

Environmental measuresEnvironmental measures++

The Ever Diverse Needs for IT Systems

Reduced Cost

Reduced Cost

Page 4: 1 Data Center Green IT Presentation UK

NEC Confidential 4

Power Consumption of Data Centers

0

200 000

400 000

600 000

800 000

1 000 000

1 200 000

2006 2007 2008 2009 2010 2011 2012

517,000569,000

655,000

740,000836,000

945,000

1,068,000

The power consumption of enterprises and data centers in Japan will increase by 10% every year

The power consumption of enterprises and data centers in Japan will increase by 10% every year

Source: MIC Research Institute Ltd. : Survey on Datacenter Electricity Consumption and Green IT (FY2008 edition)Source: MIC Research Institute Ltd. : Survey on Datacenter Electricity Consumption and Green IT (FY2008 edition)

10tho. kWh

Page 5: 1 Data Center Green IT Presentation UK

NEC Confidential 5

What is your focus to achieve low power IT? What is your focus to achieve low power IT?

11% 4%

37%

2%

29%

17%Green devicesGreen devices

Efficient useEfficient useTotal green operationTotal green operation

new power supplynew power supply

Not of concernNot of concern No ideaNo idea

Source: June 2008 JEITA Report on the trend of energy conscious IT and Green IT (250 responses)Source: June 2008 JEITA Report on the trend of energy conscious IT and Green IT (250 responses)

Use of green devices:  ・ Servers, air conditioning, PCs and storage Efficient use  ・ Balancing and integrating resources

Total green operation:  ・ Reconsidering non-IT equipment as air conditioning and power supply

Use of green devices:  ・ Servers, air conditioning, PCs and storage Efficient use  ・ Balancing and integrating resources

Total green operation:  ・ Reconsidering non-IT equipment as air conditioning and power supply

   Optimization of the whole IT system    ・ Balancing resources by virtualization    ・ Focus not only on IT devices but total green operation including

air conditioning and power source etc.

   Optimization of the whole IT system    ・ Balancing resources by virtualization    ・ Focus not only on IT devices but total green operation including

air conditioning and power source etc.

The Trend of Green IT –Actions–

Page 6: 1 Data Center Green IT Presentation UK

NEC Confidential 6

Reduce energy consumption of

peripheral facilities

Reduce energy consumption of IT devices

Fan4%Power

supply 13%

Air conditioning44%

UPS Power distribution7%

CPU, memory, HDD  32%

Maximize energy efficiency to reduce power consumption

Minimize cooling by integrating measures with

IT devices

Power Consumption Breakdown of Data Centers  

15%

85%

Well informedWell informed

50%

16%

23%

12%Assessment scheduledAssessment scheduled

Assessment to be scheduledAssessment to be scheduled

status quostatus quo

Don’t knowDon’t know

Don’t know wellDon’t know well

Do you know the how much power your IT devices and entire DC consumes?Do you know the how much power your IT devices and entire DC consumes?

Source: June 2008 JEITA Report on the trend of energy conscious IT and Green IT   (252 responses)

The Initial Step of Green IT  ~ Visualization ~

Future plans?

85%

15%

23%

16% 12%

50%

Page 7: 1 Data Center Green IT Presentation UK

NEC Confidential 7

Under the REAL IT PLATFORM vision, NEC formulates activities to save power consumption in customer’ IT environment by delivering

energy saving technologies, products and services.

Energy Saving Platform Energy Saving Control Software

Server and storage products that employ advanced low power and energy conscious technologies

Software products that effectively control power saving functions of IT

devices

Service that achieves lower cost of operation by orchestrating IT equipments and facilities as

air conditioning and power distribution equipment

Energy Saving Facility Service

NEC promotes energy-savings in customers’ IT environment from three areas through the REAL IT COOL PROJECT.

NEC’s   REAL IT COOL PROJECT

Page 8: 1 Data Center Green IT Presentation UK

NEC Confidential 8

D Series NV Series HS series T Series

NEC’s Energy Saving Platforms

DataCenterLine DataStationLine

Drastic energy saving, space saving and weight reductionby high density mounting and cooling technologies based on

NEC’s mainframe and super computer development.Server Products : Cutting-edge energy-saving technology and reduce energy consumption

Storage products :Large capacity HDD and semi-conductor DISK, and reduction in energy consumption for holding unused data

Page 9: 1 Data Center Green IT Presentation UK

NEC Confidential

Our Approach in 3 steps

▐ Analyze the existing Infrastructure

▐ Improve the infrastructure

▐ Manage and Monitor

Page 10: 1 Data Center Green IT Presentation UK

NEC Confidential

Business model

Analyze the existing and define the objective

Building Infra IT

Process

Personnalized Audti processus

Page 11: 1 Data Center Green IT Presentation UK

NEC Confidential 11

Design Construction

Design Construction MigrationMigration OperationOperation

Consolidation and summaryConsolidation and summary

Analyze information gathered by survey and build optimal method •Heat issues, power consumption, imbalance of resources, complex operation

The Green IT Cycle

Visualization(Survey)

Visualization(Survey)

【 Step2 】Survey servers and system environment with sensors and simulations

【 Step1 】Clarify issues and provide solutions based on on-site audit by specialists

Set goalsPlanningSet goalsPlanning

【 Short-term measures 】•Change layout of IT infrastructure •Rearrange under floor cables•Adjust air-conditioning of servers

【 Mid-term measures 】•Replace with green servers •Reduce servers •Transversal consolidation

Regular feedbacks and reviews utilizing 24 x 365 monitoring following implementation and migration

Analyze the present IT environment to clarify issues, then provide and perform the solutions

Page 12: 1 Data Center Green IT Presentation UK

NEC Confidential 12

Operation

Provide services as 24 x 365 monitoring, support for failure and energy-saving operation etc.

Plan / Build

Based on survey results, design and deploy facilities optimized for the customer’s environment

Energy-saving Operation support

Various services to achieve lower energy consumption and green operation for peripheral

facilities as air conditioners of machine rooms and data centers

【 Proposal 】Design proposal

Site survey

【 Proposal 】Design proposal

Site survey

【 Plan / Build 】

Facility designFacility

construction

【 Plan / Build 】

Facility designFacility

construction

【 Survey 】Environmental

survey

【 Survey 】Environmental

survey

【 Operation】

MonitoringImprovements

【 Operation】

MonitoringImprovements

Thermal simulation at all stagesThermal simulation at all stages

Survey

Examine customer’s existing facility, implement environmental survey and thermal simulation.

Thermal simulation

Environmental survey

Energy Saving Facility ServiceEnergy Saving Facility Service

Future ServiceFuture Service

Page 13: 1 Data Center Green IT Presentation UK

NEC Confidential

Our Aproach in 3 steps

▐ Analyze the existing Infrastructure

▐ Improve the infrastructure

▐ Manage and Monitor

Page 14: 1 Data Center Green IT Presentation UK

NEC Confidential

VPCC

Oracle Database11g

SQLServer2008

Database ServerDatabase Server

AP/Web ServerAP/Web ServerClientsClients

BackupBackup ArchivageArchivage

Page 15: 1 Data Center Green IT Presentation UK

NEC Confidential

Datacenter in the Rack

Virtualization

Automatisation

Infrastructure

ESX 4.0ESX 4.0

V.5V.5

Page 16: 1 Data Center Green IT Presentation UK

NEC Confidential

Green Data Center

CASESTUDY

▐ Academic Center for Computing and Media Studies, Kyoto University

Customer needs :• Rationalisation of the IT

• Reduction of environmental impact

• TCO reduction through flexible distribution of server resources

• Full Secure service 24/365

Solution : • Virtualization

• SigmaSystemCenter

• Eco Center

• Storage D3

Page 17: 1 Data Center Green IT Presentation UK

NEC Confidential

Green Data CenterCASE

STUDY

Customer gains : • Environment impact reduction

• Energy cost saving 55%

• One room for all the departments

• Provisioning on demand

• Flexible and dynamic resources allocation through sigma system center and full virtualization

• All data’s secured on san storage

▐ Academic Center for Computing and Media Studies, Kyoto University

Page 18: 1 Data Center Green IT Presentation UK

NEC Confidential

Kyoto University Green infrastructureCASE

STUDY

Page 19: 1 Data Center Green IT Presentation UK

NEC Confidential

ECO CENTER

Electrical Power Saving 50%• Efficient power supply• Efficient airflow• Platform management workload optimization sw

Feature 1

Feature 2

Feature 3

50% Weight reduction and Space saving•80 servers in one bay• Low weight design / aluminium 650kg

Modular investment and easy management• Standard design• Compatible with any 19” Bay

The Optimized Energy saving and virtualization platform

Powerful.Intelligent

.

Page 20: 1 Data Center Green IT Presentation UK

NEC Confidential© NEC Corporation 200820

‘80 PLUS Gold’ certified highly efficient PSU

ECO CENTER

20%

40%

60%

80%

100%

Effi

cienc

yPOWER 

Limited efficiency

92%92%92%92%

STANDARD SERVER

Low power components and fluid air flow

Page 21: 1 Data Center Green IT Presentation UK

NEC Confidential 21

Monitoring of load / running condition

The optimize engine buildsbest reallocation plan Move the VMs

Virtualization SWVirtualization SW

Virtualization SWVirtualization SW

Virtualization SWVirtualization SW

Virtualization SWVirtualization SW・ High load・ Hot spot

・ Optimized load・ No Hot spot

TASK A TASK B TASK C

TASK D TASK E

VM VM VM

VM VM

VM VM VM

VM VM

TASK A TASK D

TASK ETASK B

TASK C

Virtualization + Optimized Platform Operation = Energy Saving

Virtual machines survey and workload balancing

Page 22: 1 Data Center Green IT Presentation UK

NEC Confidential 22

Monitoring of load / running condition

Consolidation of virtual machines in the range of

effective load level

Shut down inactive servers

Appropriate Load Level

on on on on on

CPU usage rate

on on on offoffTurnOff

Appropriate Load Level

Virtualization + Optimized Platform Operation = Energy Saving

Servers survey and workload balancing

Page 23: 1 Data Center Green IT Presentation UK

NEC Confidential 23

Number of racks: 2Weight: approx. 1660kg(16kg x 80 units + 191kg x 2 racks)

Number of racks: 1Weight: 655kg

Highly-efficient power supply

Light weight realized by optimized placement of components and

aluminum material

220mm

85mm650mm

Space Savings and Weight Reduction

Server#2

Server#1

Former1U rack servers

42Urack

Space savings by two servers in one module sharing components as power supply unit

Two servers are modularized

weight9.5 kg

Comparison of 80 servers

Space: 50% less ----- Weight: 60% less

ECO CENTER

40 modules per rack

Page 24: 1 Data Center Green IT Presentation UK

NEC Confidential

server×40storage×2switch×8

Under 500 kg/m 2 floor load

storage

storage

management switch

switchswitchswitch

switchswitchswitch

management switch

40 servers

ECO CENTER

server×20storage×1switch×4 (per 1 rack)

Under 500 kg/m 2 floor load

management switch

switch

server

storage

20 servers

serverserver

serverserver

・・・

switchswitch

Space lost due to weight limit

Standard solution based on 1U racks

Under 500 kg/m 2 floor load

management switch

switch

server

storage

serverserver

serverserver

・・・

switchswitch

Datacenter in the Rack : All in One Bay

floor load= Whole weight÷(rack/cabinet bottom area + maintenance area)

Page 25: 1 Data Center Green IT Presentation UK

NEC Confidential

Old DC • 6.5M bops

• 7 rooms

• 9 racks

• 160 servers

• 62 kWh

• 543MW.year

• 45.5T-CO2

Kyoto Data Center Refresh

Performance increase

X6

AnnualEnergy Costs

50%Reduction2

Floor Space

85%Reduction1

The Bottom Line Benefits for IT

Eco center• 38M bops

• 1 room

• 2 racks

• 128 servers

• 30 kW

• 262Mw.year

• 22T-CO2

Page 26: 1 Data Center Green IT Presentation UK

Express5800/Storage D-series

Reduce the Foot print and the Energy consumption of massive backup

Page 27: 1 Data Center Green IT Presentation UK

NEC Confidential

Direct Connection to server / DAS

SAN storage arrays

Scalability

Per

form

ance

s /

Ava

ilab

ilit

y

D8-30

D1-10

D3-10

ST1230

Centralized storage

management

NEC Storage

NEC Storage ManagerClient

NEC Storage ManagerServer

•Storage Resource Management - iStorage Manager

•Point in Time Snapshot - SynamicSnapVolume

•Intra Bay Replication - DynamicDataReplication

•Inter Bay Replication - Remote Data Replication

Overview of the NEC storage range 31 % Energy saving

Page 28: 1 Data Center Green IT Presentation UK

NEC Confidential

NEC Storage D Series Scalable Models

Pe

rform

an

ce

/Fe

atu

re

Pe

rform

an

ce

/Fe

atu

re

Expandability Expandability

Petabyte class scalable storage solution with flexible expansion

High cost performance storage solution for small-mid size systems

NEC Storage D3

NEC Storage D8

Entry model

Low-end model

Scalable model1 node1 node

2 nodes2 nodes

4 nodes4 nodes

Online Scale up

NEC Storage D1

Page 29: 1 Data Center Green IT Presentation UK

NEC Confidential

Economy-MAID Technology-Phoenix Technology

Performance- Up to 64 FC 4Gbps ports- Up to 128GB cache- 15K RPM SAS

Availability- RAID-6, Triple Mirror- Dual redundant cache- Path failover, load balancing

Manageability- Virtualization- Enterprise software suite

•Replication•Snapshots

Scalability- 5,260 to 1 scale factor- 216GB to 1,152,000GB

Flexibility- Modular expansion- Non-disruptive- Dynamic Pools

Data Value

Capacity

ComplexityBudgets

D-Series Enterprise Modular Storage

Page 30: 1 Data Center Green IT Presentation UK

Express5800/i120Ra-1E

Reduce the Hosting Farms Energy consumption

Page 31: 1 Data Center Green IT Presentation UK

NEC Confidential

Lower power-consuming components and distant energy contrôl

Low thermal dissipation

Mount into short Rack

Outstanding maintainability improves ease of use

Fonctions PrincipalesFonctions Principales

EXPRESSSCOPE Engine 2

2 x CPU XeonQuad-Core/ Dual-Core

Up to 48GB memory

SATA hot plug 4 x 2TB 3.5”

8 x 500GB 2.5”

SAS hot plug 8 x 300GB 2.5”

i120Ra-1E: Performance +65% Vs previous model

•CPU 80W with power contrôl

•Low power consuming chipset

and memory

•Automatic Fan speed

optimization

•Power supply 80+ silver

•Power consumption contrôl

Linux

Powerful.Intelligent

.

Page 32: 1 Data Center Green IT Presentation UK

NEC Confidential

Pull Out Tab Front Ports

Tool free guide rails

Push Attach

Shorter depth, lighter weight

72 CM60 CM

Max.21kg Max. 14kgi120Rg-1

i120Ra-e1

VGA USB 2.0

NEC Confidential

Quick and Easy Service and Support : TCO saving

leds

Page 33: 1 Data Center Green IT Presentation UK

NEC Confidential

More servers per rack (32A – 6KVa)

R120a-1 (Classic/1U)2x Xeon E5520

2x 1GB Memory2x 160GB HDD(3.5”)

with HW RAID (Ruchbah)

i120Ra-1E2x Xeon L5520

2x 1GB Memory2x 500GB HDD(3.5”)

with HW RAID (Ruchbah)

315W 228W

i120Ra-e12x Xeon L5410 (2.33GHz)

4GB memory2x 80GB HDD

(RAID1 configuration)

239W

19 Servers 25 Servers 26 Servers

Page 34: 1 Data Center Green IT Presentation UK

NEC Confidential

AnnualCO-2

92%Reduction2

2004 Servers • 6.5M bops

• 9 racks

• 160 servers

• 62 kWh

• 543Mw.year

• 45.5T-CO2.year

The perfect model to replace old park

AnnualEnergy Costs

92%Reduction2

Floor Space

88%Reduction1

iModel• 6.5M bops

• 1 Racks

• 22 servers

• 5 kWh

• 43.8MW.year

• 3.6T Co2.year

Page 35: 1 Data Center Green IT Presentation UK

NEC Confidential

Our Aproach in 3 steps

▐ Analyze the existing Infrastructure

▐ Improve the infrastructure

▐ Manage and Monitor

Page 36: 1 Data Center Green IT Presentation UK

NEC Confidential 36

MCOperations

Advanced autonomous operationmanageme

nt

Masterscope effectively controls energy-saving technology of the hardware in consistency with workload to realize low-power

operation of total system

1. Control power

Pow

er consumption

Power limit

2. Shut-down inactive servers

Appropriate workload

3. Eliminate hot spots

Air C

onditionerComprehensively visualize

workload, power, and temperature of servers

Command optimal low power operation under the

datacenter policy

Monitor and control the IT infrastructure

Policy / Knowledge Scenario

Virtualization TechnologyVirtualization Technology

Energy Saving Control Software with VirtualizationEnergy Saving Control Software with Virtualization

Page 37: 1 Data Center Green IT Presentation UK

NEC Confidential

Visualization

Visualization

DecisionDecision

ImprovementImprovement

Entire Integration

Visualize

Decision

Improvement

Easy to visualize the system and its risk

Friendly GUI for various functionality

By autonomic operation,to improve it for

comfortable managementAutomatic resource

optimization with various senarios

Navigate appropriate decision Support with system

management knowledge

Simple VisualizationVisualization

Simple DecisionDecision

Simple ImprovementImprovement

Concept of MasterScope

Page 38: 1 Data Center Green IT Presentation UK

NEC Confidential

Individual management for each system

Service

AP-log

Sys-logEvent-log

performance

Process

Takes TOO MUCH TIMEfor the system

operation

Daily management Know-how for the nonce

Only Ms. A knows about 

what we should refer to…

I know Mr. B fixed this problem before, but no documents left!!

System administrator

Cannot notice the problem

Cannot access the systemWhat !?

System User

System administrator

Identifying the affects

12

6

3912

6

39

12

6

39

12

6

39

・ Hardware problem?・ Software problem? ・ Function problem?

I have to retrieve it soonWhat is wrong..?

Master Scope Operation Navigator

Uniform the management

・・・LOG

Pinpointing the

failure point by single display

monitor.

LOG

LOG

Early detection of failures

・・・E-mail

notification

Sharing Know-how

cause

solution

immediately identifying the affected area by categorizing business

operation messages

Business System

Business View

DB

AP server

monitor report

analyse

support

Base de donnée Base de donnée 

Prevent failure events and supports the early detection, analysis and recovery

Page 39: 1 Data Center Green IT Presentation UK

NEC Confidential

OperationsNavigator is simple by using one display to fix monitoring

Topology ViewMonitoring for each server

Business Viewmonitoring

for each business operationCategorize threshold values

into “Warning” and “Abnormal”.

Event Console

Same console can be fixed Visual monitoring

Monitoring status

Pinpoint display of failure view   and simple operation

Page 40: 1 Data Center Green IT Presentation UK

NEC Confidential

Systems Management

Energy Saving

SecurityAvailability

Computing Performance

►Automation : simplified routine tasks & processes. easy definition of policies

•OS / AP installation•Patch distribution•Backup/restore operation

►Dynamic Pools of Resources.►Automatic Load Balancing

►Shared Spare Servers►case of failure, automatic operation restoration►Detailed HW monitoring In

Provisioning Tool from SMB to Enterprise

►Optimize Servers load►Automatic switch off and switch on

Page 41: 1 Data Center Green IT Presentation UK

NEC Confidential

Energy saving and performance management

ON ON ON ON ON

Appropriate workload 85%

ON ON ON OFF OFF

Appropriate workloadCPU utilization

Monitoring workload

Planning deployments

Optimizing workloads

Page 42: 1 Data Center Green IT Presentation UK

NEC Confidential

transversal Integration : Investments Protected

© NEC Corporation 2005

VirtualServer

VirtualServer

VirtualServer

VirtualServer

VirtualServer

VirtualServer

XenMotion VMotion

vCentervCenterXen Center

ESX ServerESX Server

Vir

tual

Vir

tual

En

viro

nm

ent

En

viro

nm

ent

Vir

tual

Vir

tual

En

viro

nm

ent

En

viro

nm

ent

Psy

sic

alP

sysi

cal

En

viro

nm

ent

En

viro

nm

ent

Psy

sic

alP

sysi

cal

En

viro

nm

ent

En

viro

nm

ent

XenServerEE XenServerEE

XenServer vSphere

Page 43: 1 Data Center Green IT Presentation UK

NEC Confidential 43

Server and storage products that employ

advanced low power and energy conscious

technologies Energy Saving Control Software

Software products that effectively control power

saving functions of IT devices

Service that achieves lower power by orchestrating IT

equipments and facilities as air conditioning and power distribution equipment

Energy Saving Facility Service

GREEN ITGREEN IT

NEC is devoted to support your IT environment go NEC is devoted to support your IT environment go GREEN through its expertise in technology and rich GREEN through its expertise in technology and rich

experience as an solution provider experience as an solution provider

NEC is devoted to support your IT environment go NEC is devoted to support your IT environment go GREEN through its expertise in technology and rich GREEN through its expertise in technology and rich

experience as an solution provider experience as an solution provider

Energy Saving Platform

Page 44: 1 Data Center Green IT Presentation UK

NEC Confidential

OFFICIAL LABELS

Page 45: 1 Data Center Green IT Presentation UK

NEC Confidential