1 CTS 2 Status Update and Report Out OMG Technical Meeting CTS 2 Community Support HL7 Working Group...

9
1 CTS 2 Status Update and Report Out OMG Technical Meeting CTS 2 Community Support HL7 Working Group Meeting CTS 2 Submission Team July 21, 2011

Transcript of 1 CTS 2 Status Update and Report Out OMG Technical Meeting CTS 2 Community Support HL7 Working Group...

Page 1: 1 CTS 2 Status Update and Report Out OMG Technical Meeting CTS 2 Community Support HL7 Working Group Meeting CTS 2 Submission Team July 21, 2011.

1

CTS 2 Status Update and Report Out

OMG Technical Meeting

CTS 2 Community Support

HL7 Working Group Meeting

CTS 2 Submission Team

July 21, 2011

Page 2: 1 CTS 2 Status Update and Report Out OMG Technical Meeting CTS 2 Community Support HL7 Working Group Meeting CTS 2 Submission Team July 21, 2011.

Agenda

• Harmonization Meeting Updates

• OMG Technical Meeting

• Community Support Session

• HL7 Working Group Meeting

• OMG Submission Report Out

Page 3: 1 CTS 2 Status Update and Report Out OMG Technical Meeting CTS 2 Community Support HL7 Working Group Meeting CTS 2 Submission Team July 21, 2011.

Object Management Group Meeting

Held in Arlington, VA from March 21 – March 25, 2011

Attendees: Harold Solbrig, Craig Stancl

• Presented the submission status to the Analysis and Design Task Force (ADTF) and made motion to extend the submission date by one OMG cycle to May 23, 2011. (Motion Passed)

• Met with the Healthcare Domain Task Force to present an outline and status of the submission.

• Met with the Ontology PSIG to provide a CTS 2 walkthrough to review the model and present the issues we were facing for discussion.

3

Page 4: 1 CTS 2 Status Update and Report Out OMG Technical Meeting CTS 2 Community Support HL7 Working Group Meeting CTS 2 Submission Team July 21, 2011.

Community Support Session

Held in Rockville, MD from March 28 – March 30, 2011

Attendees: Harold Solbrig, Craig Stancl

• Representatives from:

• Apelon, Inc.

• Mayo Clinic

• UK National Health Service (NHS)

• Provided a CTS 2 walkthrough to review the approach and the model and presented the issues the team was facing for submission.

4

Page 5: 1 CTS 2 Status Update and Report Out OMG Technical Meeting CTS 2 Community Support HL7 Working Group Meeting CTS 2 Submission Team July 21, 2011.

HL7 Working Group Meeting

Held in Orlando, Florida from May 16 – May 20, 2011

Attendees: Craig Stancl, Kevin Peterson

• Presented the submission to Vocabulary working group and discussed specific HL7 related issues.

• Met with the HL7 SOA working group to present the submission and get advice on how to organize and structure the submission.

• Detailed discussions with IHTSDO to resolve issues with CTS 2 usage and SNOMED.

5

Page 6: 1 CTS 2 Status Update and Report Out OMG Technical Meeting CTS 2 Community Support HL7 Working Group Meeting CTS 2 Submission Team July 21, 2011.

Submission Report Out

• Revised submission sent to OMG on May 23, 2011.

• … (To be updated during the June OMG meeting)

6

Page 7: 1 CTS 2 Status Update and Report Out OMG Technical Meeting CTS 2 Community Support HL7 Working Group Meeting CTS 2 Submission Team July 21, 2011.

CTS 2 Timeline

Event or Activity Date Purpose

OMG Technical Meeting (Salt Lake City, UT) June 20-24, 2011 To present final revised submission to OMG and numerous votes.

 

Revised Submission Presentation June 20-24, 2011 Present CTS 2 final submission.

Final evaluation and selection by TF / Recommendation to AB and TC

June 20 and 23, 2011 OMG Process

TC Vote to recommend specification June 20, 2011 OMG Process

[Anticipated] Approval of recommendation by Architecture Board / Review by TC

June 23, 2011 OMG Process

Platform Technical Committee Adoption Vote

June 24, 2011

OMG Process

Charter Finalization Task Force Following the passing of the spec, a finalization task force is chartered (FTF) to address technical issues that arise from implementation feedback based upon the publicly available spec.

Publication of Beta Specification to OMG website July 2011 Specification available for implementers.

OMG Technical Meeting (Cambridge, MA) June 18-22, 2012 FTF Report.

  Finalization Task Force Report to AB June 18-22, 2012 The FTF produces a report and a set of deltas to the specification that are defended to the AB. Following a successful AB vote, an implementation questionnaire must be completed by two business entities indicating that the spec has been implemented. That is the precondition to the BoD vote.

OMG Technical Meeting (Jacksonville, FL) September 10-14, 2012

Attend Healthcare DTF and Ontology PSIG meetings. Attend final vote.

  BoD Vote to adopt specification September 10-14, 2012

Vote to adopt specification.

Page 8: 1 CTS 2 Status Update and Report Out OMG Technical Meeting CTS 2 Community Support HL7 Working Group Meeting CTS 2 Submission Team July 21, 2011.

Resources

• CTS 2 Submission Wiki• http://informatics.mayo.edu/cts2/index.php/Main_Page

• HL7 CTS 2 SFM (DSTU)• http://www.hl7.org/documentcenter/ballots/2009may/downloads/V3_CTS_R2_DST

U_2009OCT.pdf

• OMG RFP for CTS 2• http://www.omg.org/cgi-bin/doc?ad/2009-9-17