1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves...

36
1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm duration

Transcript of 1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves...

Page 1: 1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm duration.

1

CTC 440 Review

Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm

duration

Page 2: 1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm duration.

2

CTC 440 Sizing Structures

Hydraulic Devices Pipes Culverts Inlets Ditch &/or gutter flow Storm drainage systems Detention structures

Page 3: 1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm duration.

3

Subjects

Open Channel Flow Ditch flow Gutter flow Pipe flow (non-pressurized)

Page 4: 1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm duration.

4

Objectives

Know how to use Manning’s equation for uniform flow calculations

Know how to calculate Normal Depth

Page 5: 1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm duration.

5

Open Channel Flow Open to the atmosphere

Creek/ditch/gutter/pipe flow Uniform flow-EGL/HGL/Channel

Slope are parallel velocity/depth constant

Varied flow-EGL/HGL/Channel Slope not parallel velocity/depth not constant

Page 6: 1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm duration.

6

Uniform Flow in Open Channels

Water depth, flow area, Q and V distribution at all sections throughout the entire channel reach remains unchanged

The EGL, HGL and channel bottom lines are parallel to each other

No acceleration or deceleration

Page 7: 1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm duration.

7

Manning’s Equation Irish Engineer On the Flow of Water in Open Channels

and Pipes Empirical equation See more:

http://manning.sdsu.edu/\ http://el.erdc.usace.army.mil/elpubs/pdf/

sr10.pdf#search=%22manning%20irish%20engineer%22

Page 8: 1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm duration.

8

Manning’s Equation-Metric

Q=AV=(1/n)(A)(Rh)2/3S1/2

Where:Q=flow rate (cms)A=wetted cross-sectional area (m2)Rh=Hydraulic Radius=A/WP (m)

WP=Wetter Perimeter (m)S=slope (m/m)n=friction coefficient (dimensionless)

Page 9: 1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm duration.

9

Manning’s Equation-English

Q=AV=(1.486/n)(A)(Rh)2/3S1/2

Where:Q=flow rate (cfs)A=wetted cross-sectional area (ft2)Rh=Hydraulic Radius=A/WP (ft)

WP=Wetter Perimeter (ft)S=slope (ft/ft)n=friction coefficient (dimensionless)

Page 10: 1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm duration.

10

Manning’s Friction Coefficient

http://www.lmnoeng.com/manningn.htm

Typical values: Concrete pipe: n=.013 CMP pipe: n=.024

Page 11: 1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm duration.

11

Example-Find Q

Find the discharge of a rectangular channel 5’ wide w/ a 5% grade, flowing 1’ deep. The channel has a stone and weed bank (n=.035).

A=5 sf; WP=7’; Rh=0.714 ft

S=.05Q=38 cfs

Page 12: 1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm duration.

12

Example-Find S

A 3-m wide rectangular irrigation channel carries a discharge of 25.3 cms @ a uniform depth of 1.2m. Determine the slope of the channel if Manning’s n=.022

A=3.6 sm; WP=5.4m; Rh=0.667m

S=.041=4.1%

Page 13: 1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm duration.

13

Triangular/Trapezoidal Channels

Must use trigonometry to determine area and wetted perimeters

Page 14: 1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm duration.

14

Pipe Flow

Hydraulic radii and wetted perimeters are easy to calculate if the pipe is flowing full or half-full

If pipe flow is at some other depth, then tables, figures, or software (flowmaster) are usually used

Page 15: 1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm duration.

15

Page 16: 1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm duration.

16

Using Manning’s equation to estimate pipe size Size pipe for Q=39 cfs Assume full flow Assume concrete pipe on a 2%

grade Put Rh and A in terms of Dia. Solve for D=2.15 ft = 25.8” Choose a 27” or 30” RCP Velocity is approx. 9.8 ft/sec

Page 17: 1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm duration.

17

Using Manning’s equation to estimate pipe size Size pipe for Q=220 cfs Assume full flow Assume concrete pipe on a 2% grade Put Rh and A in terms of Dia. Solve for D=4.1 ft = 49.5” Choose a 54” RCP Velocity is approx. 13.8 ft/sec

===high

Page 18: 1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm duration.

18

Normal Depth

Given Q, the depth at which the water flows uniformly

Use Manning’s equation Must solve by trial/error (depth is in

area term and in hydraulic radius term)

Page 19: 1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm duration.

19

Normal Depth Example

Find normal depth in a 10.0-ft wide concrete rectangular channel having a slope of 0.015 ft/ft and carrying a flow of 400 cfs.

Assume: N=0.013

Page 20: 1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm duration.

20

Normal Depth Example 7-3

Assumed D (ft)

Area (sqft)

Peri. (ft)

Rh (ft)

Rh^.66 Q (cfs)

2.00 20 14 1.43 1.27 356

3.00 30 16 1.88 1.52 640

2.15 21.5 14.3 1.50 1.31 396

Page 21: 1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm duration.

Inlets

Capacity usually estimated using orifice or weir equations

21

Page 22: 1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm duration.

22

Froude Number F=Vel/(g*D).5

F=Froude # V=Velocity (fps or m/sec) D=hydraulic depth=a/T (ft or m) g=gravitational constant

F=1 (critical flow) F<1 (subcritical; tranquil flow) F>1 (supercritical; rapid flow)

Page 23: 1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm duration.

23

Stormwater Definitions SWPPP-Stormwater Pollution Prevention Plan NPDES-National Pollutant Discharge

Elimination System SPDES-State Pollutant Discharge Elimination

System MS4-Municipal Separate Storm Sewer System NOI-Notice of Intent Blue Book-”New York Standards and

Specification for Erosion and Sediment Control”

Page 24: 1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm duration.

24

History Water Quality Act-1987

First regulations dealing with discharge of stormwater

Phase I Stormwater Regulations-1990 NYSDEC is local permitting authority NYSDEC issued 2 general permits-1993

Industrial Site Runoff Construction Projects > 5 acres (Phase I)

Phase II Stormwater Regulations-1999 Apply to Construction Projects > 1 acre

Page 25: 1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm duration.

25

SWPPP-Contents Standards for Construction Activities Background project info Site Map Soil Description Construction Phasing Plan Pollution Prevention Measures Description of Construction and Waste

Materials Temporary and Permanent Structural and

Vegetative Measures

Page 26: 1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm duration.

26

SWPPP-Contents (contents) Map showing control measures Details of control measures Identify temporary measures to be converted

to permanent control measures Maintenance Schedule Name of receiving water Description of structural practices used to

divert flows Description of existing data that describes the

stormwater runoff characteristics at the site

Page 27: 1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm duration.

27

Commonly Used SWPPP Measures

Construction Entrance Mulching/Seeding Silt Fences Straw Bale Dikes Drop Inlet Protection Stone Check Dams Prefabricated Check Dams

Page 28: 1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm duration.

28

Construction Entrance

http://www.harfordcountymd.gov/dpw/eng&const/WaterResources/Images/Sedimentcont2.jpg

http://pasture.ecn.purdue.edu/~sedspec/sedspec/images/construction.jpg

Page 29: 1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm duration.

29

Erosion Control (Mulching/Seeding)

http://www.terra-mulch.com/photos/11-11.JPG

http://www.ssseeds.com/ecb/photos/WS05/images/WS05%202-1%20Over%20Mulch.jpg

Page 30: 1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm duration.

30

Silt fences

www.acfenvironmental.com/ bmp_siltfence.htm

www.forestry.state.ar.us/ bmp/appn_soil.html

Page 31: 1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm duration.

31

Straw Bale Dikes

http://www.salmonhabitat.org/images/v3f52b.gif

http://www.forester.net/images/ec_0103_p78_top.jpg

Page 32: 1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm duration.

32

Drop Inlet Protection

http://unix.eng.ua.edu/~rpitt/Class/Erosioncontrol/Module8/Module8_files/image050.gif

http://www.greatamericantec.com/images/inlet.jpg

Page 33: 1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm duration.

33

Stone Check Dams

http://www.ncc-swnpdes.com/images/stone_creek_dam.jpghttp://www.dfr.state.nc.us/images/wq/glossary/rockcheckdam.jpg

Page 34: 1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm duration.

34

Other Check Dams

http://www.wsdot.wa.gov/NR/rdonlyres/BA478915-1B80-4188-BB59-37358244CBDF/0/CheckDam_Jan05.jpg

http://www.lakemac.infohunt.nsw.gov.au/erosion/images/09051.gif

Page 35: 1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm duration.

Detention Structures

Designed for water quality, attenuation of peak flows, infiltration, aesthetics

35

Page 36: 1 CTC 440 Review Determining peak flows Rational method Q=CIA Intensity determined from IDF curves Set time of concentration=storm duration.