COUNTRY REPORT
KEC TECHNICAL TRAINING PROGRAMME, 2011
![Page 2: 1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649ea15503460f94ba51ea/html5/thumbnails/2.jpg)
2
![Page 3: 1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649ea15503460f94ba51ea/html5/thumbnails/3.jpg)
1) ROAD DEVELOPMENT IN MALAYSIA
2) PRIVATISATION POLICY
3) ROLE OF MALAYSIAN HIGHWAY
AUTHORITY
4) ISSUES AND CHALLENGES
5) TOLL SYSTEM IN MALAYSIA
6) FUTURE HIGHWAY 3
![Page 4: 1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649ea15503460f94ba51ea/html5/thumbnails/4.jpg)
4
![Page 5: 1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649ea15503460f94ba51ea/html5/thumbnails/5.jpg)
Implement a number of projects across the country
Increasing Investments in Transport Capacity to Keep Pace with Urban Growth
Increasing Privatisation and Public-Private Partnerships
Continuing to Upgrade Physical infrastructure to Enhance Access and Connectivity (Multimodal Transport Network)
Implement a number of projects across the country
Increasing Investments in Transport Capacity to Keep Pace with Urban Growth
Increasing Privatisation and Public-Private Partnerships
Continuing to Upgrade Physical infrastructure to Enhance Access and Connectivity (Multimodal Transport Network)
5
ROAD DEVELOPMENT IN MALAYSIA5 YEARS MALAYSIA PLAN
10th Malaysia Plan Period (2011 - 2015)10th Malaysia Plan Period (2011 - 2015)
![Page 6: 1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649ea15503460f94ba51ea/html5/thumbnails/6.jpg)
TOTAL ROAD LENGTH IN MALAYSIA
6
Until Dec 2009 by DOS
![Page 7: 1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649ea15503460f94ba51ea/html5/thumbnails/7.jpg)
7
Until Aug 2011 by LLM
![Page 8: 1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649ea15503460f94ba51ea/html5/thumbnails/8.jpg)
8
![Page 9: 1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649ea15503460f94ba51ea/html5/thumbnails/9.jpg)
The privatization policy was introduced in 1983
To stimulating the growth of the private sector and promote overall efficiency in the economy
Reducing government’s financial burden in road infrastructure
Increase private sector’s role in infrastructure development.
Method of road privatisation used in Malaysia is:-Built - Operate - Transfer (BOT)
The privatization policy was introduced in 1983
To stimulating the growth of the private sector and promote overall efficiency in the economy
Reducing government’s financial burden in road infrastructure
Increase private sector’s role in infrastructure development.
Method of road privatisation used in Malaysia is:-Built - Operate - Transfer (BOT)
9
![Page 10: 1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649ea15503460f94ba51ea/html5/thumbnails/10.jpg)
Grant of a concession to a companyGrant of a concession to a company
The company assumes the responsibility The company assumes the responsibility to finance, maintain and operate the to finance, maintain and operate the facility for a specified period.facility for a specified period.
The government retains legal ownership The government retains legal ownership of the facilityof the facility
Grant of a concession to a companyGrant of a concession to a company
The company assumes the responsibility The company assumes the responsibility to finance, maintain and operate the to finance, maintain and operate the facility for a specified period.facility for a specified period.
The government retains legal ownership The government retains legal ownership of the facilityof the facility
10
![Page 11: 1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649ea15503460f94ba51ea/html5/thumbnails/11.jpg)
PRIVATISATION OF ROAD PROJECTS
Privatised HighwaySubmitted for
proposal
Privatisation Committee Meeting
(Central Agency)
Technical Committee Meeting(MHA)
Technical Committee
Report
Privatisation Committee
Endorsement
Concession Agreement
Signed
Approved by Government
FORMULATION OF A
CONCESSION AGREEMENT
11
Project Initiated by Government
Tender
![Page 12: 1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649ea15503460f94ba51ea/html5/thumbnails/12.jpg)
12
![Page 13: 1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649ea15503460f94ba51ea/html5/thumbnails/13.jpg)
13
![Page 14: 1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649ea15503460f94ba51ea/html5/thumbnails/14.jpg)
14
THE ROLE OF MHA
Involvement at 4 different levels :
![Page 15: 1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649ea15503460f94ba51ea/html5/thumbnails/15.jpg)
Design & Construction
Completion
Operation & Maintenance
Regulate &
Monitor
Regulate &
Monitor
Concession Agreement
Signed
Concession Agreement
Signed
HIGHWAY REVERT TO GOVERNMENT
Concession Period Expiry
PRE-CONSTRUCTION, CONSTRUCTION &
POST CONSTRUCTION STAGE
15
![Page 16: 1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649ea15503460f94ba51ea/html5/thumbnails/16.jpg)
DESIGN STAGEDESIGN STAGE To approve design brief and detailed design of works
To approve design brief and detailed design of works
Review reports on qualitycontrol tests & work progress
Review reports on qualitycontrol tests & work progress
Make site visits, witness quality control test & inspect site recordsMake site visits, witness quality
control test & inspect site records
Acquisition of land for the project
Requisition of material information for monitoringe.g. contracts, specifications & drawings
REGULATORY & MONITORING FUNCTIONS
16
CONSTRUCTION
STAGE
CONSTRUCTION
STAGE
Carry out safety audit & gazette for highway opening
Carry out safety audit & gazette for highway opening
![Page 17: 1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649ea15503460f94ba51ea/html5/thumbnails/17.jpg)
OPERATION &
MAINTENANCE
OPERATION &
MAINTENANCE
Review of maintenance &inspection reports during operation
Direct further investigations & thecarrying out of maintenance & repair works
Traffic management & operation and roadside development control
Inspect the highway & its facilities & monitor the traffic volume
REGULATORY & MONITORING FUNCTIONS
17
![Page 18: 1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649ea15503460f94ba51ea/html5/thumbnails/18.jpg)
5 projects under
construction
STATUS OF THE HIGHWAY’S PROJECTS
28 projects in operation28 projects
in operation
18
![Page 19: 1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649ea15503460f94ba51ea/html5/thumbnails/19.jpg)
NORTH - SOUTH EXPRESSWAY - 823 KM
KUALA LUMPUR - KARAK TOLL HIGHWAY
(Highway Taken Over From PWD - 1982)
TOLL PLAZAS - OPEN 7 NOS., CLOSED - 60 NOS.INTERCHANGES - 76 NOS. CON. PERIOD - 50 YRS (5/88-12/2038)
19
![Page 20: 1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649ea15503460f94ba51ea/html5/thumbnails/20.jpg)
20
PENANG BRIDGE
![Page 21: 1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649ea15503460f94ba51ea/html5/thumbnails/21.jpg)
21
MALAYSIA-SINGAPORE CAUSEWAY
![Page 22: 1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649ea15503460f94ba51ea/html5/thumbnails/22.jpg)
22
WESTERN KUALA LUMPUR TRAFFIC
DISPERSAL SCHEME
![Page 23: 1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649ea15503460f94ba51ea/html5/thumbnails/23.jpg)
23
SMART TUNNEL
(The Stormwater Management and Road Tunnel)
![Page 24: 1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649ea15503460f94ba51ea/html5/thumbnails/24.jpg)
24
![Page 25: 1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649ea15503460f94ba51ea/html5/thumbnails/25.jpg)
25
TOLL RATE AND TOLL INCREMENT UNBURDEN THE
HIGHWAY USER
TOLL RATE
REVIEW
CUSTOMER STATISFACTIO
N
CONCESSION AGREEMENT
FAIRNESS DURING OFFERING PROJECT
TENDER
SAFETY AND MAINTENANCE
![Page 26: 1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649ea15503460f94ba51ea/html5/thumbnails/26.jpg)
26
Enable the public to get the latest information on expressway via:
• Short messaging system (SMS)• Multimedia messaging system
(MMS)• variable message signboards
(VMS)• Traffic information could be obtained real-time with
the presence of 195 cameras, 88 VMS displays and 131 vehicle detector stations along expressways.
• Also, by applying an ITS concepts, this centre is able to collect, store and analyze traffic data and disseminate them to road users through various medium
![Page 27: 1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649ea15503460f94ba51ea/html5/thumbnails/27.jpg)
TOLL SYSTEM IN MALAYSIATOLL SYSTEM IN MALAYSIA
27
![Page 28: 1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649ea15503460f94ba51ea/html5/thumbnails/28.jpg)
28
TOLL SYSTEM IN MALAYSIA
a. Closed toll systems
• Users pay toll charges based on the distance travelled and the class of vehicle used.
• Well suited to inter-urban highways on which long distance traffic volumes are high.
![Page 29: 1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649ea15503460f94ba51ea/html5/thumbnails/29.jpg)
b. Open Toll System
– Users to pay a fixed toll charge at the toll plaza based on the class of vehicle used.
– User free to exit the expressway at any junction or to continue on to the next toll plaza
– Well suited in semi urban highways with numerous junctions or intersections
29
TOLL SYSTEM IN MALAYSIA
![Page 30: 1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649ea15503460f94ba51ea/html5/thumbnails/30.jpg)
3030
1. Manual Toll Collection System Open toll system - User pay cash to the toll
operator at the toll plaza and toll collection point Closed Toll System – Transit ticket surrended to the
toll operator at the exit toll plaza and user pay the amount payable toll based on distance travel.
2. Electronic Toll Collection SystemGenerally ETC methods comes into 2 forms :-
The prepaid stored value contactless smart card with barrier
The non-barrier electronic on board tag system First ETC system introduced in 1995.
![Page 31: 1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649ea15503460f94ba51ea/html5/thumbnails/31.jpg)
31
![Page 32: 1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649ea15503460f94ba51ea/html5/thumbnails/32.jpg)
PRIVATIZATION NEW MODEL
FLEXIBEL TOLL SYSTEM
FIXED TOLL RATE
‘GREEN HIGHWAY’
‘MULTI LANE FREE FLOW (MLFF)’
NATIONAL TRAFFIC CENTRE
FUTURE HIGHWAY
![Page 33: 1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649ea15503460f94ba51ea/html5/thumbnails/33.jpg)
MULTI LANE FREE FLOW (MLFF)
33
Decrease congestion at
toll plaza
Shorten travel time
Increase safety in highway
Environment friendly
Multi Lane Free Flow
![Page 34: 1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.](https://reader036.fdocuments.us/reader036/viewer/2022062423/56649ea15503460f94ba51ea/html5/thumbnails/34.jpg)
34
34
THANK YOU