1. Click on the link below, this will open your web browser http://aucache.autodesk.com/social/visualization.html 2. Use “Extended Display” to project the website on screen if you plan to work on your computer – or use “Duplicate” to display same image on screen and computer. Autodesk University 2014 Social Media Feed

Transcript of 1. Click on the link below, this will open your web...

Page 1: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

1. Click on the link below, this will open your web

browser

http://aucache.autodesk.com/social/visualization.html

2. Use “Extended Display” to project the website on

screen if you plan to work on your computer – or use

“Duplicate” to display same image on screen and

computer.

Autodesk University 2014 Social Media Feed

Page 2: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling
Page 3: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

Join us on Twitter: #AU2014

Integrating Design to Fabrication Workflows

for Industrial Projects

Geoff Butt, BA, CETLead Civil Designer, Gemini Engineered Solutions

Adam TravisSr. Civil Designer, Gemini Engineered Solutions

Page 4: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� The fast-paced Design-Build part of the oil and gas

industry has typically used two types of design

software:

� one for producing civil engineering 3D models & drawings and

� a different one for steel fabrication 3D models & drawings

� This session will present a mid-sized engineering,

procurement, and construction management

(EPCM) company’s experience-based case for using

only Advance Steel to successfully produce both sets

of drawings.

Class summary

Page 5: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� The presentation will describe:

� The business case for the decision

� The transition process

� Lessons learned

� Recommended path for success

� We’ll conclude with about 5 -10 minutes of questions

and answers.

Class summary

Page 6: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

At the end of this class, you will be able to:

� Understand the business case for using Advance Steel to produce both

civil engineering and steel fabrication drawings from the same model.

� Know the transitional steps for a civil drafting department to become a

successful contributor in a Design-Build company.

� Use valuable lessons learned to leap frog straight to success in

integrating drafting with fabrication.

� Measure success.

Key learning objectives

Page 7: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling
Page 8: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

Gemini Corporation

GEMINI Corporation

GEMINI Engineering Solutions LP

(GES)

GEMINIField Solutions LP

(GFS)

GEMINIEnvironmental Solutions LTD

(GEN)

Page 9: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� Public company: GKX-V

� Operating for more than 32 years

� Professional services firm

� Engineering, Fabrication, Construction & Sustaining

Projects, Land, Environmental, Regulatory, Reclamation &

Remediation

� Currently employ over 800 people

Corporate Overview

Page 10: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� Head office in Calgary, Alberta

� Satellite engineering office in Sherwood Park, Alberta

� Fabrication facilities in Ponoka & Fort Saskatchewan

� Project management office in Fort St. John, BC

Gemini

Page 11: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� Midsize oil and gas EPCM

� Midstream client base

� Transportation, storage, and wholesale marketers of crude or refined

petroleum and gas products

� Primarily Western Canada

� Some projects into the US part of the Bakken Formation (Montana and

the Dakotas).

Gemini

Page 12: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

Bakken Formation

Page 13: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling
Page 14: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� Work with other disciplines, mainly Plant Layout & Piping

(PL&P) and Electrical to produce engineering drawings.

� Our civil engineering deliverables include earthworks/roadworks, piling

and foundations, concrete, steel, and buildings.

� Work with our steel fabrication shops to produce steel

fabrication drawings.

� We usually receive Engineering Issued For Construction (IFC) drawings

from our own department, or from other Engineering consultants. Then we

produce steel Issued For Fabrication (IFF) shop drawings.

� Distinction between engineering and fabrication drawings

� Sincere apologies to those of you who already know!

Civil Design Department

general role and deliverables

Page 15: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� Engineering drawings:

� direct the fabricator in all design aspects, materials, coatings,

specifications, and governing codes.

� specify delegated connection engineering loading.

� provide just enough dimensions for the fabricator (minimize duplicated

dimensions).

� packages vary greatly in the amount of detail provided.

� almost never contain Mark Numbers.

� identify temporary members.

� identify erection and assembly constraints.

Main distinction between

engineering and fabrication drawings

Page 16: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� Engineering drawings:

� identify temporary members.

Page 17: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� Engineering drawings:

� identify erection and assembly constraints.

Page 18: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� Fabrication drawings:� always contain Mark Numbers.

� set includes erection, assembly, single parts, and Bill Of Materials (BOM).

� show every dimension (includes tolerances, and adjust to field measurements).

� should stand alone. The fabrication personnel should not have to refer back to the

engineering drawings. (This is more important on large projects, but the rule is

sometimes broken on small projects to save drafting duplication and cost).

� package can include numerical control (NC) files that are used by a machine’s

software to cut steel.

Page 19: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

PythonX

Page 20: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� Fabrication drawings:� always contain Mark Numbers.

� set includes erection, assembly, single parts, and Bill Of Materials (BOM).

� show every dimension (includes tolerances, and adjusted to field

measurements).

� should stand alone. The fabrication personnel should not have to refer back to the

engineering drawings. (This is more important on large projects, but the rule is

sometimes broken on small projects to save drafting duplication and cost).

� package can include numerical control (NC) files that are used by a machine’s

software to cut steel.

� alert the Engineer Of Record (EOR) of any proposed deviation from their specified

design.� The clouded note usually states “Approver confirm” or “Approver provideE”.

� The Canadian translation of that is “Approver please confirm” or “Approver please provideE”.

Page 21: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling
Page 22: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

Business Case for why we use Advance

Steel to produce both engineering and steel

fabrication models and drawings

Page 23: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� Schedule

� Quality

� Cost

is primarily based on improvements in:

Page 24: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� SCHEDULE improvements:

� We produce one model to produce both engineering and fabrication drawings.

The advantages are that we:

� can advance the model to a fabrication level detail during the engineering modeling stage

when the designers have any kind of downtime.

� can engage our fabrication checkers to check the model earlier.

� do not have to take time to export the engineering model and import into the fabrication

software.

� don’t have to wait for the IFC drawings bid period, bids review and selection, and award.

� Sometimes we can actually start slightly before IFC is issued as long as the Engineering model is

deemed to be complete and released to the fab team.

Business Case for Advance Steel

Page 25: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� QUALITY is better because we:

� lower any chance of a discrepancy between the engineering model and the

fabrication model, because it’s the same model.

� have standardized the 3 types of fabrication drawings and BOMs using drawing

templates, so that each designer’s drawings have the same presentation.

� Library include standard assemblies and settings.

� Erection drawings are currently built by the designers, however assembly and single part

drawings are automatically generated.

� spend less time checking the drawings and more time making sure that the

model is perfectly correct.

� The checkers know which drawing items are automatically generated, and therefore should

be correct if the model is correct.

Business Case for Advance Steel

Page 26: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� COST is lower because we:

� do not have to create 2 models.

� do not have to take time to export the engineering model and import into the

fabrication software.

� have improved the automated standardization.

� spend less time checking.

Business Case for Advance Steel

Page 27: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

Business Case for Advance Steel

Page 28: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling
Page 29: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

Transitioning the Civil Design Department

to the new workflow

Page 30: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� Brief Description of our previous workflow

� Brief Description of the new workflow

� Working with other disciplines

� Working with our two remote fabrication shops

� Designer training

� Creating Advance Steel 3D blocks

� Customizing and automating drawing production

Transitioning the Civil Design Department

to the new workflow

Page 31: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� Brief Description of our previous workflow:

� Produced the model in CADWorx and then IFC drawings also in CADWorx

� Recreated the model in Advance Steel and then produced IFF drawings also in

Advance Steel

� BOMs required substantial checking time

� We did not have a beam profiler

Transitioning the Civil Design Department

to the new workflow

Page 32: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� Brief Description of the new workflow:

� Produce engineering model and drawings using Advance Steel.

� Make a copy of the same model to produce fabrication drawings using Advance

Steel.

� Automatically generate BOMs and nc files for the fab shop

Transitioning the Civil Design Department

to the new workflow

Page 33: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� Working with other disciplines:

� The other disciplines are currently using CADWorx.

� Our Advance Steel Model is xreffed in to the full model.

Transitioning the Civil Design Department

to the new workflow

Page 34: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling
Page 35: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� Working with our two remote fabrication shops:

� Fab shop representatives are invited to model reviews to verify constructability

and cost efficiency.

� Fabrication drawings are sent through our Document Control to the fab shops.

� nc files are sent up to the Fort Saskatchewan shop to feed the PythonX robotic

computer numerical control (CNC) plasma cutting system.

� Cut steel is also assembled and welded there, or trucked to our Ponoka fab shop.

� We have one designer on site in Fort Saskatchewan who:

� takes care of drafting standard products (ex. pipe shoes)

� adds heat numbers to the nc files (scribed on to the individual steel parts when required)

� trouble shoots any nc file issues at the PythonX.

Transitioning the Civil Design Department

to the new workflow

Page 36: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

PythonX

Page 37: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� Designer training:

� We used a 30 hour Advance Steel basic course put on by Graitec

(www.graitec.com). It is offered online 3 hours/day over 10 days, which worked

best for most users. They had Advance Steel actual projects to work on for the

remainder of the day.

� We have also tried using Graitec’s trainer at Gemini over 3 full days. Users

found this more difficult to absorb.

� We had a half day course for the checkers using the Advance Steel read-only

version.

� We selected one designer for advanced training in order to be able to

customize and create templates. This consisted of 2 full days at Gemini.

� More courses are available, but the above is what we used.

Transitioning the Civil Design Department

to the new workflow

Page 38: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� Customizing and automating drawing production:

� Creating a block library of Advance Steel 3D objects

� Using templates to automate drawing production

� Erection drawing example

� Assembly drawing example

� Single Part drawing example

� BOM example

Transitioning the Civil Design Department

to the new workflow

Page 39: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� Creating a block library of Advance Steel 3D objects

� Block models are thoroughly checked for future use.

Page 40: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� Example of automated drawing production:

Page 41: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� Customizing and automating

drawing production

Page 42: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� Customizing and automating drawing production

� Erection drawing example:

Page 43: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� Customizing and automating drawing production

� Assembly drawing example:

Page 44: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� Customizing and automating drawing production

� Single part drawing example:

Page 45: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� Customizing and automating drawing production

� Bill Of Materials example:

Page 46: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

Lessons Learned

Page 47: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� Advance Steel

� PythonX

� From the fabrication shops

� Designer training

Lessons Learned:

Page 48: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� Advance Steel:

� Research the available software options and get first-hand accounts of the

implementation process.

� Train and transition a spearhead team first in order to work through any issues.

� Put your best customizer through advanced training.

� Begin customization of blocks and templates.

� When the workflow and drafting system is proven to be more efficient than the

current system, then train the remainder of the operators.

� Put “click by click” instructions in a CAD Manual.

� Keep on top of any Advance Steel fixes and versions.

� Unfortunately it takes time to switch all the software versions over to 2015, especially if

some of them are not previously tested for compatibility by Autodesk.

Lessons Learned

Page 49: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� PythonX:

� See the CNC machine in action and know what issues crop up.

� Visit a fab shop that is using the brand of CNC machine you want, and that has its own fab

drafting department. Ask the manager, machine operator, and designer(s) what issues they

had to face and how they overcame them.

� Train each designer regarding what each line of nc code does.

� If you cannot resolve a file, send it to the machine’s help desk.

� In our case, Burlington Automation

� We get back redmarked files with an email explanation of what was wrong.

Lessons Learned

Page 50: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� PythonX:

� See the CNC machine in action and know what issues crop up.

� Visit a fab shop that is using the brand of CNC machine you want, and that has its own fab

drafting department. Ask the manager, machine operator, and designer(s) what issues they

had to face and how they overcame them.

� Train each designer regarding what each line of nc code does.

� If you cannot resolve a file, send it to the machine’s help desk;

� in our case, Burlington Automation.

� We get back redmarked files with an explanation of what was wrong.

� Document every problem and its resolution.

� Start a file structure for storing repeatable standard products (ex. pipe shoes).

� Categorize by product, and by client for client-specific requirements.

Lessons Learned

Page 51: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� From the fabrication shops:

� Know their workflow and drawing requirements. Every shop is different; for

example:

� Crane capacity affects size of assembly that can be flipped for welding from above.

� Rat holes can be drafted and nc sent to the PythonX, or cut at the fab shop. What do they

prefer?

� Visit the shop floor and ask what they like and do not like about the fab

drawings.

� Where they have a choice of handrail type, what connections are the most cost-

effective and best?

� For example they prefer flat plate midrail versus an angle.

� Advance Steel renumbers Mark Numbers (ex. for re-issue of revised items).

This can cause the fab shop a lot of confusion and extra work. “Lock down” any

part numbers that have been issued.

Lessons Learned

Page 52: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling
Page 53: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

Measuring success

Page 54: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

If you have integrated the new workflow correctly,

what does that success look like?

Page 55: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� Satisfied internal and external clients

� Schedule

� Quality

� Cost

� Designers’ morale

Measuring success

Page 56: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� Satisfied internal and external clients:

� Usually on time, error-free, and under budget does the trick!

� Let it be known up front that feedback is requested

� Track Lessons Learned along the way and conduct a Lessons Learned review

at the end. Action any improvements needed for the next project(s).

� Communicate any improvements learned for the next project(s) with the fab

shops and the client as needed.

Measuring success

Page 57: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� Schedule:

� Start an IFF drawing deliverables schedule before the IFC engineering

drawings are even provided, and keep it up to date.

� Communicate any IFC potential date slippage with all concerned.

Measuring success

Page 58: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� Quality:

� Drafting memos are distributed to all so that not just one designer learns.

� New items get put into the Civil Department’s CAD Manual.

� Quality concerns are also discussed for resolution at monthly civil designers’

meetings.

� Regular checkers’ meeting to resolve any differences in checkers’ redmarks.

� We escalate any problem issues

� Important to have an escalation path that every designer knows

� Our own CAD Support

� Advance Steel issues go to our in-house guru, then to Graitec and Autodesk

� PythonX issues go to Burlington Automation (24 hr hotline, or email for less time-sensitive)

Measuring success

Page 59: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� Cost:

� We track all fab project drafting hours with kg of steel per hour of drafting.

� Steel can be categorized into light, medium, heavy, and extra heavy.

Measuring success

Page 60: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� Cost:

� We keep standard estimating spreadsheets with typical hours per unit

(ex. a tank base). We multiply that by both a complexity factor and

quantity of tank base types.

Measuring success

Page 61: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling
Page 62: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� Designers’ morale:

� Standardization and bug removal (or work-arounds) is key.

Measuring success

Page 63: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

� Designers’ morale:

� Must communicate expectations

� Show estimates to the designers and obtain agreement that they are achievable.

� The above results in quick communication when anything slows down a designer.

� Must communicate bigger picture and how designers are an integral part of

success

� Project drivers are important (ex. Schedule versus Quality versus Cost)

� Communicate the “why” for any change in priorities.

� Tracking productivity gives everyone a goal and purpose for improving.

Provides proof of success.

Measuring success

Page 64: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

Questions?

� Q1:

� A1:

� Q2:

� A2:

Page 65: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

Session Feedback

� Via the Survey Stations, email or mobile device

� AU 2014 passes given out each day!

� Best to do it right after the session

� Instructors see results in real-time

Page 66: 1. Click on the link below, this will open your web ...aucache.autodesk.com/au2014/sessionsFiles/8577/4918... · Our civil engineering deliverables include earthworks/roadworks, piling

Autodesk is a registered trademark of Autodesk, Inc., and/or its subsidiaries and/or affiliates in the USA and/or other countries. All other brand names, product names, or trademarks belong to their respective holders. Autodesk reserves the right to alter product and services offerings, and specifications and pricing at any time without notice, and is not responsible for typographical or graphical errors that may appear