CCCCCCPPPGGG
Senate Bill 100 requiresDesignate “Energy Resource Zones”Develop plans for expansion of transmission for
delivering power from beneficial energy resource in or near such zones
Submit proposed projects for CPCN
Senate Bill 07-100
3
CCCCCCPPPGGG
New Lamar-Comanche 345 kV & Lamar - Missile Site 345 kV ISD 2016
New San Luis Valley-Calumet-Comanche 230 & 345 kV lines ~ ISD 2013
New Midway-Waterton 345 kV ~ISD 2011
New Lamar –Vilas 345 kV ISD 2016
New Pawnee-Daniels Park 345 kV -2nd circuit ~ISD 2016
New Missile Site 230 kV ISD 2010) & 345 kV (ISD 2013)
New Ault-Cherokee 230 kV ~ISD 2015
New Pawnee-Smoky Hill 345 kV, ISD 2013
2009 SB-100 Transmission Plan
4
CCCCCCPPPGGG *Generation values are not simultaneous
Item Project Generation (MW)*
In Service Date*
Project Status Mileage(kV,mi)
1. Missile Site 230kV Switching Station 250 12/10 Project Initiated, no CPCN necessary
n/a
2. Midway-Waterton 345kV Transmission Project
6/11 CPCN confirmed May 2009 345 , 82
3. Pawnee-Smoky Hill 345kV Transmission project
500 6/13 CPCN granted Feb. 27, 2009 230 , 95
4. San Luis Valley-Calumet-Comanche Transmission Project
750 - 1400 5/13 Joint CPCN filing May 14, 2009 by PSCo and TSG&T
230 , 95345 , 45
5. Missile Site 345kV Switching Station 5/13 Petition for Declaratory Order n/a
6. Lamar/Vilas-Front Range 345/500kV•Lamar-Comanche•Lamar-Missile Site
800 - 1000 16–17 Studies / CPCN 2010 345 , 330
7. Ault-Cherokee 230kV Transmission Project
300 - 600 15–16 TBD 230 , 85
8. Pawnee-Daniels Park 345kV Transmission Project
300 - 500 16–17 TBD 230 , 15345 , 95
2009 SB-100 Transmission Plan
5
CCCCCCPPPGGG 5
Lamar – Front Range Scope
Purpose: evaluate transmission alternatives to reliably alleviate existing constraints that inhibit potential resource development in southeast and east central Colorado from reaching electrical customer loads along the Front Range.
Accommodate resource development in ERZ #3 (GDA 6) and ERZ #2 (GDA 5, 7)
Interconnect Lamar/Vilas to Comanche & Missile Site
Two Primary AlternativesEastern CorridorCentral Corridor
6
CCCCCCPPPGGG
Lamar – Front Range Alternative 1
Comanche
Calumet
Boone
LamarPlanned/Proposed
345 kV
230 kV
115 kV
Burlington
Big Sandy
Missile Site
Pawnee
Daniels Park
Smoky Hill
Midway
2
Alternative 1
Vilas
Segment 1Burlington – Missile Site
Segment 2Lamar - Burlington
Segment 3Lamar - Comanche
Segment 4Lamar - Vilas
100-500
500-1500
100-300
100-200
7
CCCCCCPPPGGG
Resource Injection
ScenarioLamar/Energy Center
Vilas BurlingtonCheyenne
/KiowaWray Big Sandy
CLRTPG (A) 1420 0 0 0 0
CLRTPG (C) 2500 0 1150 100 200
C Scaled 1382 0 630 55 110
HPX 650 150 50 150 250
LFR (1)GDA 5
Burlington - MS100-500
LFR (2)GDA 6-5
Lamar – Burl-MS
LFR (3)GDA 6
Lamar - Comanche
8
CCCCCCPPPGGG
Lamar – Front Range Alternative 2
Comanche
Calumet
Boone
Lamar
Planned/Proposed
345 kV
230 kV
115 kV
Burlington
Big Sandy
Missile Site
Pawnee
Daniels Park
Smoky Hill
Midway
2
Alternative 2
Vilas
Segment 1Burlington – Missile Site
Segment 2Lamar – Missile Site
Segment 3Lamar - Comanche
Segment 4Lamar - Vilas
9
CCCCCCPPPGGG 9
Lamar – Front Range Scope - Studies
BenchmarkSegment Analysis
Potential PhasingVoltage
345/500Circuits
Single/Double2020 Base CasePSCo/Tri-State Lead
10
CCCCCCPPPGGG
Questions