Transcript of 1 Appendix B Initial Briefing Template. 2 Site X Vulnerability Assessment (VA) Presenter name...
1
Appendix BInitial Briefing Template
2
Site X Vulnerability Assessment (VA)
Presenter namePresenter organization
Presenter phonePresenter phone/email
3
Overview
Purpose Scope Assumptions VA Methodology Schedule Questions
4
Purpose & Scope
Complete a VA of Site X Evaluate the PPS as required by <insert
policy reference or other basis> Establish baseline performance of the
system and propose functional upgrades if not effective
5
Assumptions/Limitations (examples)
Uses previously defined threats and assets
Risk level must be less than <specify level>
Considers installed system, not planned upgrades
Limited time for VA—5 days
6
Defined Threat Describe threat spectrum or single defined threat. For example:
Level Tactic Weapons/Equipment Number
Low Theft Unarmed, Hand Tools 1-2, no insider
Medium Sabotage handguns, Hand & Power Tools
2-4, possible insider
High Sabotage Armed, Hand/Power Tools, Thermal tools, Explosive Charges
3-5, possible insider
7
Assets
List assets that are targets of VA: Target 1 Target 2 etc
8
VA Methodology
9
ConceptsDefined protection objectivesPerformance-basedEvaluate PPS
Detection DelayResponse
Analyze integrated system, not individual components
10
Benefits of Performance-based Assessments
Based on performance, not mere presence, of components
Clearly shows effects of vulnerabilities Links solutions to effectiveness Better risk management and resource
utilization
11
Protection Principles
Detection before delay Alarm assessment ends detection Balanced protection Protection-in-depth Immediate response required for critical
assets
12
Relationship of PPS Functions
BeginAction
TaskComplete
FirstAlarm
Detect Respond
T0 A
TC
TTI
Time
Ala
rm A
sses
sed
Ad
vers
ary
Inte
rru
pte
d
Adversary Task Time
PPS Time Required
Delay
13
Analysis
Qualitative or quantitative analysis Performance measure
Interruption, neutralization, system effectiveness, risk
Tools used Data collection Tests Path analysis Scenario analysis
14
VA Schedule
Day 1 Initial briefing Facility tour Workspace setup
Day 2 Collect necessary maps & drawings Data collection—sensors, video system
Day 3 Data collection—entry control and AC&D Begin analysis
15
VA Schedule
Day 4 Data collection—delay and response Finish analysis Prepare briefing
Day 5 Brief results Depart site
16
Questions/Discussion
???