1 API SC2 Offshore Structures Report API SC2 Offshore Structures Report P. O’Connor – Chair June...
-
Upload
marjorie-chapman -
Category
Documents
-
view
230 -
download
0
Transcript of 1 API SC2 Offshore Structures Report API SC2 Offshore Structures Report P. O’Connor – Chair June...
![Page 1: 1 API SC2 Offshore Structures Report API SC2 Offshore Structures Report P. O’Connor – Chair June 26, 2009.](https://reader036.fdocuments.us/reader036/viewer/2022082402/56649f0e5503460f94c22ba3/html5/thumbnails/1.jpg)
1
API SC2 Offshore API SC2 Offshore Structures ReportStructures Report
P. O’Connor – ChairP. O’Connor – ChairJune 26, 2009June 26, 2009
![Page 2: 1 API SC2 Offshore Structures Report API SC2 Offshore Structures Report P. O’Connor – Chair June 26, 2009.](https://reader036.fdocuments.us/reader036/viewer/2022082402/56649f0e5503460f94c22ba3/html5/thumbnails/2.jpg)
Document Document Portfolio StatusPortfolio Status
2
![Page 3: 1 API SC2 Offshore Structures Report API SC2 Offshore Structures Report P. O’Connor – Chair June 26, 2009.](https://reader036.fdocuments.us/reader036/viewer/2022082402/56649f0e5503460f94c22ba3/html5/thumbnails/3.jpg)
3
Status ReportStatus Report RP 2MET, Derivation of Metocean Design and RP 2MET, Derivation of Metocean Design and
Operating Conditions – Operating Conditions – in progressin progress RP 2FPS, Floating Production Systems – RP 2FPS, Floating Production Systems – in in
progressprogress RP 2EQ, RP 2EQ, Seismic Design Procedures and Seismic Design Procedures and
Criteria for Offshore Structures –Criteria for Offshore Structures – in in progressprogress
RP 2GEO, RP 2GEO, Geotechnical and foundation Geotechnical and foundation design considerationsdesign considerations – – in progress in progress
RP 2A WSD, Fixed Steel Offshore Structures–RP 2A WSD, Fixed Steel Offshore Structures–Working Stress Design – Working Stress Design – in progressin progress
![Page 4: 1 API SC2 Offshore Structures Report API SC2 Offshore Structures Report P. O’Connor – Chair June 26, 2009.](https://reader036.fdocuments.us/reader036/viewer/2022082402/56649f0e5503460f94c22ba3/html5/thumbnails/4.jpg)
Status Report (cont.)Status Report (cont.) Spec 2C, Offshore Cranes – Spec 2C, Offshore Cranes – in progressin progress RP 2GEN, General Requirements for RP 2GEN, General Requirements for
Offshore Structures – Offshore Structures – starting upstarting up RP 2SIM, Structural Integrity Management RP 2SIM, Structural Integrity Management
of Fixed Offshore Structures – of Fixed Offshore Structures – in progressin progress RP 2SM, Design, Manufacture, Installation, RP 2SM, Design, Manufacture, Installation,
and Maintenance of Synthetic Fiber Ropes and Maintenance of Synthetic Fiber Ropes for Offshore Mooring – for Offshore Mooring – in progressin progress
RP 2T, Tension-leg Platforms – RP 2T, Tension-leg Platforms – ballot ballot completed; awaiting publicationcompleted; awaiting publication
4
![Page 5: 1 API SC2 Offshore Structures Report API SC2 Offshore Structures Report P. O’Connor – Chair June 26, 2009.](https://reader036.fdocuments.us/reader036/viewer/2022082402/56649f0e5503460f94c22ba3/html5/thumbnails/5.jpg)
Active Research ProjectsActive Research Projects
Rig tie-down study ) Rig tie-down study )
** Require $25,000 to update Bulletin 2TD **
Steel yield studySteel yield study
Wave-in-deck studyWave-in-deck study
Mooring components toughness surveyMooring components toughness survey
Synthetic hurricane databaseSynthetic hurricane database
5
![Page 6: 1 API SC2 Offshore Structures Report API SC2 Offshore Structures Report P. O’Connor – Chair June 26, 2009.](https://reader036.fdocuments.us/reader036/viewer/2022082402/56649f0e5503460f94c22ba3/html5/thumbnails/6.jpg)
ISO StatusISO Status
6
![Page 7: 1 API SC2 Offshore Structures Report API SC2 Offshore Structures Report P. O’Connor – Chair June 26, 2009.](https://reader036.fdocuments.us/reader036/viewer/2022082402/56649f0e5503460f94c22ba3/html5/thumbnails/7.jpg)
7
2010 Vision – Q1 2009 Status
![Page 8: 1 API SC2 Offshore Structures Report API SC2 Offshore Structures Report P. O’Connor – Chair June 26, 2009.](https://reader036.fdocuments.us/reader036/viewer/2022082402/56649f0e5503460f94c22ba3/html5/thumbnails/8.jpg)
8
API/ISO CoordinationAPI/ISO Coordination
Developed by adopting back ISO Developed by adopting back ISO documents using a “core and wrapper” documents using a “core and wrapper” approach approach (i.e. modified adoption)(i.e. modified adoption) RP 2FPS 2RP 2FPS 2ndnd Ed./ISO 19904-1 – Floating Ed./ISO 19904-1 – Floating
StructuresStructures
RP 2MET/ISO 19901-1 – MetoceanRP 2MET/ISO 19901-1 – Metocean
RP 2EQ/ISO 19901-2 – Seismic DesignRP 2EQ/ISO 19901-2 – Seismic Design
RP 2GEO/ISO 19901-4 - GeotechnicalRP 2GEO/ISO 19901-4 - Geotechnical
![Page 9: 1 API SC2 Offshore Structures Report API SC2 Offshore Structures Report P. O’Connor – Chair June 26, 2009.](https://reader036.fdocuments.us/reader036/viewer/2022082402/56649f0e5503460f94c22ba3/html5/thumbnails/9.jpg)
9
Developed by Parallel ISO/API Developed by Parallel ISO/API Adoption process (i.e. identical Adoption process (i.e. identical adoption)adoption)
RP 2MOP/ISO 19901-6 – Marine RP 2MOP/ISO 19901-6 – Marine OperationsOperations
RP 2N 2RP 2N 2ndnd Ed./ISO 19906 – Arctic Ed./ISO 19906 – Arctic StructuresStructures
RP 2RD 2RP 2RD 2ndnd Ed./ISO 13628 - Risers Ed./ISO 13628 - Risers
API/ISO CoordinationAPI/ISO Coordination
![Page 10: 1 API SC2 Offshore Structures Report API SC2 Offshore Structures Report P. O’Connor – Chair June 26, 2009.](https://reader036.fdocuments.us/reader036/viewer/2022082402/56649f0e5503460f94c22ba3/html5/thumbnails/10.jpg)
10
Adoption approach under considerationAdoption approach under consideration RP 2GEN/ISO 19900 – Gen. ConsiderationsRP 2GEN/ISO 19900 – Gen. Considerations
RP 2A LRFD 2RP 2A LRFD 2ndnd Ed./ISO 19902 – Fixed Ed./ISO 19902 – Fixed Steel StructuresSteel Structures
RP 2TOP/ISO 19901-3 – TopsidesRP 2TOP/ISO 19901-3 – Topsides
RP 2WGT/ISO 19901-5 – Weight ControlRP 2WGT/ISO 19901-5 – Weight Control
RP 2SK/ISO 19901-7 - StationkeepingRP 2SK/ISO 19901-7 - Stationkeeping
API/ISO CoordinationAPI/ISO Coordination
![Page 11: 1 API SC2 Offshore Structures Report API SC2 Offshore Structures Report P. O’Connor – Chair June 26, 2009.](https://reader036.fdocuments.us/reader036/viewer/2022082402/56649f0e5503460f94c22ba3/html5/thumbnails/11.jpg)
Important IssuesImportant Issues Acceptance criteria for fixed structuresAcceptance criteria for fixed structures
Consequence-based designConsequence-based design Assessment of existing structuresAssessment of existing structures
** may need budget for 2010 to validate ** may need budget for 2010 to validate selected values **selected values **
Changes in metocean criteria Changes in metocean criteria ( MMS ( MMS Reliability concerns)Reliability concerns)
Sudden hurricanesSudden hurricanes Post-hurricane inspectionsPost-hurricane inspections Rig Tie-downs Rig Tie-downs ** Require $25,000 to update
Bulletin 2TD **April 23, 2009 11
![Page 12: 1 API SC2 Offshore Structures Report API SC2 Offshore Structures Report P. O’Connor – Chair June 26, 2009.](https://reader036.fdocuments.us/reader036/viewer/2022082402/56649f0e5503460f94c22ba3/html5/thumbnails/12.jpg)
12
ENDEND