    D

    ate:

    Revisedby:

    Rev.

    Description

    ProjectName:

    THISDRAWING ISTHEPROPERTYOF M.TUCKER,a divisionof SINGER NYC,LLC.ITSHALL NOTBE COPIEDOR DUPLICATEDIN ANYMANNER OR FORM.

    THISDRAWING SHALLNOTBE SUBMITTEDTO ANYOTHER PARTYFOR REVIEW OR EXAMINATION WITHOUTOUR EXPRESSCONSENT.

    THISDRAWING SHALLONLYBEUSED WITHREFERENCETO WORKUNDER CONTRACTOR PROPOSALSSUBMITTEDBY M.TUCKER.

    ProjectNo.:

    ProjectName:

    Scale:

    Drawn

    Date:

    M.TUCK

    ER

    a d i v i s i o n o f S I N G E R N Y L L C

    I n d u r a G o

    l f & B e a c h R e s o r t

    1

    Finalrevisionmatchquoteforfutureequipment.

    06/

    20/13

    1

    dmbmg

    dmb/mg

    Revisetomatchquoteandcorrections

    Revise&AddedInfoperRequest&FieldConditions

    23

    08/

    01/13

    08/13/13

    -

    R

    B

    Q

    R Main Restaurant & Bar

    B Lobby Bar

    Q Banquet Staging

    GardeManger

    SolidFuelGrill

    CookLine

    AL

    aCarte

    ServiceCounter

    ServiceCounter

    POS

    PrepArea

    3-Meal/Banquet

    WareWashing

    Ice

    Production

    Glass/China

    BuffetService

    Storage

    Ice

    Production

    China,Linen,GLossBanquet Service

    Storage BeverageStation

    Banquet Staging&Service

    Cooler

    2.2

    BanquetHolding

    TS30I C

    Bar

    Wine

  • 8/10/2019 1-8-30463-Indura-LobbyLevel.pdf

    2/9

  • 8/10/2019 1-8-30463-Indura-LobbyLevel.pdf

    3/9

  • 8/10/2019 1-8-30463-Indura-LobbyLevel.pdf

    4/9

  • 8/10/2019 1-8-30463-Indura-LobbyLevel.pdf

    5/9THISDRAWING ISTHEPROPERTYOF M.TUCKER,a divisionof SINGER NYC,LLC.ITSHALLNOT BECOPIEDOR DUPLICATEDIN ANYMANNER OR FORM.

    THISDRAWING SHALLNOTBE SUBMITTEDTO ANYOTHER PARTYFOR REVIEW OR EXAMINATION WITHOUTOUR EXPRESS CONSENT.

    THISDRAWING SHALLONLYBEUSED WITHREFERENCETO WORKUNDER CONTRACTOR PROPOSALSSUBMITTEDBYM. TUCKER.

    R

    R

    Scale: 1/2" = 1'-0"

    Cooking & Pick-up Line Section

    Beam Type & Dimensions

    TBD by Architect/Engineer

    Structural L-Bracket

    at same level as Top of Beam

    Cross Structure to Attach

    Hood Hanger Rods

    Minimum Clearance

    Inside Soffit

    at 55" Off Center

    CL

    Minimum Clearance

    Inside Soffit

    at 55" Off Center

    Beam

    Soffit Line

    3

    3

    3

    3

    3

    3

    3

    1"

    3"

    314"

    Per Spec

    1"

    Per Spec

    34

    "

    1"

    34"

    Trough Detail Section

    Per Spec

    63"

    Plywd. Backing

    from 36" to 84" AFF

    19"

    19"

    145"

    122"

    Plywd. Backing

    from 36" to 84" AFF

    9"

    Plywd. Backing

    from 36" to 84" AFF

    109"

    Plywd. Backing

    from 36" to 84" AFF

    Cutout for Floor Trough

    per Equip. Spec Detail,Configure as Shown

    using Drain Center

    per Plumbing Rough-ins

    39"

    9"

    122"

    83"

    55"

    95"

    Plywd. Backing

    from 36" to 84" AFF

    5"

    50"

    5"

    14"

    59"

    Supply &Exhaus t Vents (typ.)

    See Venders Drawing

    for Dimensions &Lo cations

    95"+1/2"-0"

    Critical

    Finished Dim.

    Minimum

    Finished Dim.

    240"+1/2"-0"

    Critical

    Finished Dim.

    88"+1/2"

    -0"

    R460

    "

    Remote Location to be Determined

    Refrigeration Lines Path from Condensers

    to Evaporator Unit to be Determined

    by:

    mg

  • 8/10/2019 1-8-30463-Indura-LobbyLevel.pdf

    6/9

    B

    Date:

    Revisedb

    Rev.

    Description

    ProjectName:

    THISDRAWING ISTHEPROPERTYOF M.TUCKER,a divisionof SINGER NYC,LLC.ITSHALL NOTBE COPIEDOR DUPLICATEDIN ANYMANNER OR FORM.

    THISDRAWING SHALLNOTBE SUBMITTEDTO ANYOTHER PARTYFOR REVIEW OR EXAMINATION WITHOUTOUR EXPRESSCONSENT.

    THISDRAWING SHALLONLYBEUSED WITHREFERENCETO WORKUNDER CONTRACTOR PROPOSALSSUBMITTEDBY M.TUCKER.

    ProjectNo.:

    ProjectName:

    Scale:

    Drawn

    Date:

    M.TUCK

    ER

    adivisionofSINGE

    RNYLLC

    I n d u r a G o l f & B e a c h R e s o r t

    Finalrevisionmatchquoteforfutureequipment.

    06/20/13

    1

    dmbmg

    dmb/m

    Revisetomatchquoteandcorrections

    Revise&AddedInfoperRequest&FieldConditions

    23

    08

    /01/13

    08

    /13/13

    S

    Text

    B

    B

    Typical Floor Sink Detail

    Model by Plumbing ContractorSee Plumbing Rough-in Drawing for Locations

    PERLICK

    BOTTLECOOLER

    2 FT. FLAT TOP

    12 LIQUOR

    DISPLAY

    TS30IC

    Equipment ScheduleItem No. Quantity Equipment Catagory Manufacture Model Number Remark

    101 2 Back Bar Equipment Perlick BS60**L

    102 4 Underbar Dry Storage Perlick 7055A-D

    103 2 Underbar Ice Chest Perlick TS30IC

    104 2 Underbar Liquor Display Perlick TS12LS

    105 2 Cooler, Bottle Perlick BC24

    106 2 Underbar Dry Waste Perlick TS12TRA

    107 1 Underbar Fillers & Drainboards Perlick TSD30

    108 1 Froster/Chiller, Glass/Mug/Plate Perlick FR24

    109 1 Underbar Blender Station Perlick TS18BLW

    110 1 Blender, Beverage Blendtec Q-Series WS-ICB4

    111 1 Underbar Handsink Perlick TS12HSN

    112 1 Underbar Fillers & Drainboards Perlick TSD42

    113 1 Spare Number - -

    114 1 Warewasher, Undercounter, High Temp Meiko USA FV40.2 G

    115 1 Glasswasher Accessory Perlick 7057-3

    116 1 Bac k Ba r Gl or if ie r & Ba se S to ra ge By Ot he rs Millwork, Fabricated

    54" 24" 138" 32"

    70"

    24"

    36"

    42" 138" 68"

    31" 16" 11" 67" 123"

    15"

    21"

    65"

    137" 111"

    12

    "

    12"

    12"

    Equipment Electrical ScheduleI tem No. Quan. Description Connection "E00 1 120V/60Hz/1Ph, 15 Amp General Use Duplex @ 9" AFF NEMA 5-15P

    E000 1 120V/60Hz/1Ph, 15 Amp General Use Duplex @ 9" AFF NEMA 5-15P

    E101 2 115V/60Hz/1Ph, 6.3 Amp 1/4 HP @ 14" AFF NEMA 5-15P

    E105 2 115V/60Hz/1Ph, 3.2 Amp 1/5 HP @ 9" AFF NEMA 5-15P

    E108 1 115V/60Hz/1Ph, 5.8 Amp 1/3 HP @ 9" AFF NEMA 5-15P

    E114 1 208V/60Hz/1Ph, 38.8 Amp 3/4 HP @ 8" AFF Direct Connect .

    P103A 2 Floor Sink for I.D. Waste

    P109 1

    P109A 1

    P111 1

    P111A 1

    P112A 1 Floor Sink for I.D. Waste

    P114 1

    P114A 1

    P115 1

    P115A 1

    Plumbing ScheduleItem No. Quantity Rough-in Description " "

    dby:

    b g mg

  • 8/10/2019 1-8-30463-Indura-LobbyLevel.pdf

    7/9

    Date:

    Revised

    Rev.

    Description

    ProjectName:

    THISDRAWING ISTHEPROPERTYOF M.TUCKER,a divisionof SINGER NYC,LLC.ITSHALL NOTBECOPIED OR DUPLICATEDIN ANYMANNER OR FORM.

    THISDRAWING SHALLNOTBE SUBMITTEDTO ANYOTHER PARTYFOR REVIEW OR EXAMINATION WITHOUTOUR EXPRESSCONSENT.

    THISDRAWING SHALLONLYBEUSED WITHREFERENCETO WORKUNDER CONTRACTOR PROPOSALSSUBMITTEDBY M.TUCKER.

    ProjectNo.:

    ProjectName:

    Scale:

    Drawn

    Date:

    M.TUCK

    ER

    a d i v i s i o n o f S I N G E

    R N Y L L C

    I n d u r a G o l f & B e a c h R e s o r t

    Finalrevisionmatchquoteforfutureequipment.

    06

    /20/13

    1

    dmbmg

    dmb/m

    Revisetomatchquoteandcorrections

    Revise&AddedInfoperRequest&FieldConditions

    23

    08

    /01/13

    08/13/13

    3

    201 1 Ice Maker w/o Bin Hoshizaki America KM-1301SAH Future

    201.1 1 Bin, Ice Hos hi za ki Ame ri ca B-1 15 0SS

    202 1 Floor Drain Advance Tabco FRG-48

    203 1 C on ti ne nt al Re fr ig er at or C on ti ne nt al R ef ri ge ra to r DL2RI Future

    204 1 C on ti ne nt al Re fr ig er at or C on ti ne nt al R ef ri ge ra to r DL1FI Future

    205 1 Cabinet, Mobile, Warming & Holding Alto-Shaam 1200-UP

    205 1 Cabinet, Mobile, Warming & Holding Alto-Shaam 1200-UP Future

    206 3 Rack, Pan Advance Tabco PR20-3W

    207 2 Cart, Banquet Service Metro MBQ-120

    208 2 Cart, Banquet Service InterMetro Industries MQ-512F

    209 1 Spare Number - -

    210 2 Table, Work, Mobile w/ U ndershelf M. Tucker Fabricated

    211 1 Table, Beverage, Enclosed Base M. Tucker Fabricated

    211.1 1 Faucet, Deck Mount T & S Brass B-0226

    211.2 1 Basket Drain Fisher 6556

    212 4 Shelf, Wall M. Tucker Fabricated

    213 1 Espresso Machines, Automatic Rancilio Epoca E2

    214 1 Coffee Urn, Automatic Grind Master FE75N-1

    215 1 Filler, Glass T & S Brass B-0102-B

    216 1 Drop-In, Ice Station Delfield 203

    217 1 Spare Number - -

    218 1 Refrigerator, Reach-In, Shallow Depth Continental Refrigerator DL1RXS

    219 3 Shelving, Wire InterMetro Industries Pro Series NK3 as Shown

    220 5 Dolly, Dishrack InterMetro Industries DH2020N Future221 4 Dolly, Dishrack InterMetro Industries PCD11A Future

    Equipment ScheduleItem No. Quantity Equipment Catagory Manufacture Model Number Remark

    50"

    34" Plywd. Backing

    from 36" to 84" AFF

    46"50"37"

    42" 14"

    6"

    50"

    1"

    3"

    314"

    Per Spec

    1"

    Per Spec

    34"

    1"

    34"

    Trough Detail Section

    Per Spec

    edby:

    mbg /

    mg

  • 8/10/2019 1-8-30463-Indura-LobbyLevel.pdf

    8/9

    Date:

    Revise

    Rev.

    Description

    ProjectName:

    THISDRAWING ISTHEPROPERTYOF M.TUCKER,a divisionof SINGER NYC,LLC.ITSHALL NOTBE COPIEDOR DUPLICATEDIN ANYMANNER OR FORM.

    THISDRAWING SHALLNOTBE SUBMITTEDTO ANYOTHER PARTYFOR REVIEW OR EXAMINATION WITHOUTOUR EXPRESSCONSENT.

    THISDRAWING SHALLONLYBEUSED WITHREFERENCETO WORKUNDER CONTRACTOR PROPOSALSSUBMITTEDBY M.TUCKER.

    ProjectNo.:

    ProjectName:

    Scale:

    Drawn

    Date:

    M.TUCK

    ER

    a d i v i s i o n o f S I N G E

    R N Y L L C

    I n d u r a G o l f & B e a c h R e s o r t

    Finalrevisionmatchquoteforfutureequipment.

    06

    /20/13

    1

    dmm

    dmb/

    Revisetomatchquoteandcorrections

    Revise&AddedInfoperRequest&FieldConditions

    23

    08

    /01/13

    08/13/13

    S

    Text

    Typical Floor Sink DetailModelbyPlumbing Contractor

    See Plumbing Rough-in Drawing for Locations

    3

    3

    Equipment Electrical ScheduleItem No. Quan. Description Connection

    23" 84" 42"

    42"

    24"

    26"

    18"

    48"

    36"

    60"

    22"

    38"

    62" 15" 21" 30" 17"

    24"

    7"

    49"

    9"33"

    E201 1 208-230V/60Hz/1Ph, 12.4 Amp @ 72" AFF Direct ConnectE203 1 115V/60Hz/1Ph, 14.7 Amp, 4.01 Kw, 1/2 HP @ 84" AFF NEMA 5-15P

    E204 1 115/208-230V/60Hz/1Ph, 11.6 Amp, 3.53 Kw, 3/4 HP @ 84" AFF NEMA 5-15P

    E205 2 120V/60Hz/1Ph, 16.0 Amp, 2.0 kW @ 74" AFF NEMA 5-20P

    E207 2 120V/60Hz/1Ph, 13.8 Amp. 1.7 kW @ 48" AFF NEMA 5-15P

    E213 1 220V/60Hz/1Ph, 20.0 Amp. 4.3 kW @ 48" AFF NEMA L 6-30P

    E214 1 240V/60Hz/1Ph, 30.0 Amp. 7.0 kW, 2W @ 48" AFF Direct Connect

    E218 1 115V/60Hz/1Ph, 7.2 Amp, 1/4 HP @ 78" AFF NEMA 5-15P

    P201 1 P202A 1 3" Waste Drain for Floor Trough

    P211 1

    P211A 1 2" Direct Waste @ 14" AFF

    P213 1

    P214 1

    P 21 4A 1 F lo or S in k f or 2 " I nd ir ec t W as te D ra in

    P215 1

    P215A 1

    Plumbing ScheduleItem No. Quantity Rough-in Description

    " "