1, 3 & 4 School Model Options
April 9, 2013
Restructuring of Keene Elementary Schools
Over the winter, the Board of Education decided to move toward a 4-school, wide grade span model, with Daniels housing the Preschool program
Following this, we received a Board request to provide a more detailed evaluation of several variations of 1, 3 and 4-school models
Today, we will be answering those questions
04/21/23 2KES restructuring – Marinace Architects
Where We Are Now
Provide cost analysis of creating 3 EQUALLY-sized K-5 schools, including Fuller & Symonds, with long-term expandability
Provide breakout cost of Preschool in that option Provide cost to close Daniels, Franklin, OR
Wheelock in the 4-school, wide grade span model Provide cost of building one large elementary
school and closing all existing schools
04/21/23 3KES restructuring – Marinace Architects
School Board Questions
Option 1A: 1-School, 1,200 student option Options 3A & 3B: 3-School, wide grade span options Options 4A, 4B, 4C, 4D: 4-School, wide grade span
options, each with a different combination of closed and expanded schools
04/21/23 4KES restructuring – Marinace Architects
Scope of This Presentation
Location of Keene Elementary Schools
04/21/23 5KES restructuring – Marinace Architects
Construct a new 1,200 student, 198,000 square foot P-5 school at the Daniels site
Existing Daniels school demolished Other 4 existing schools closed and sold
04/21/23 6KES restructuring – Marinace Architects
Option 1A
04/21/23 7KES restructuring – Marinace Architects
SchoolTypical no. of sections per gradeK 1 2 3 4 5
Total sections / school
Daniels 11 11 11 11 9 9 62 + P
Franklin 0 0 0 0 0 0 0
Fuller 0 0 0 0 0 0 0
Symonds 0 0 0 0 0 0 0
Wheelock 0 0 0 0 0 0 0
Total 11 11 11 11 9 9 62
Class distribution – Total Capacity: 1,188 Students
Option 1A
04/21/23 8KES Restructuring - Marinace Architects
Option 1A – Daniels Floor Plan
04/21/23 9KES restructuring – Marinace Architects
Option 1A – Site Plan
04/21/23 10KES restructuring – Marinace Architects
Option 1A – Summary
Significant operating cost savings, but a large capital investment is required
New, state-of-the-art space for all students High performance building heated from wood chip plant,
with low long-term maintenance costs Neighborhood schools replaced by one large school Maple Street site maxed out with 2,200 students on site,
creates traffic and access issues, congestion Another site needed for possible long-term expansion
04/21/23 11KES restructuring – Marinace Architects
Option 1A – Pros & Cons
Fuller & Symonds expanded from 3-section to 4/3-section schools. Capacity of each rises from 324 to 426 students
Daniels expanded from a 2-section to 3-section school. Capacity rises from 216 to 324 students
Preschool moves to Daniels Franklin & Wheelock closed and sold Total district capacity of 1,188 students K-5
04/21/23 12KES restructuring – Marinace Architects
Option 3A
04/21/23 13KES restructuring – Marinace Architects
SchoolTypical no. of sections per gradeK 1 2 3 4 5
Total sections / school
Daniels 3 3 3 3 3 3 18 + P
Franklin 0 0 0 0 0 0 0
Fuller 4 4 4 4 3 3 22
Symonds 4 4 4 4 3 3 22
Wheelock 0 0 0 0 0 0 0
Total 11 11 11 11 9 9 62
Class distribution – Total Capacity: 1,188 Students
Option 3A
04/21/23 14KES Restructuring - Marinace Architects
Option 3A – Daniels Floor Plan
04/21/23 15KES Restructuring - Marinace Architects
Option 3A – Daniels Site Plan
04/21/23 16KES Restructuring - Marinace Architects
Option 3A – Fuller Floor Plan
04/21/23 17KES Restructuring - Marinace Architects
Option 3A – Symonds Floor Plan
04/21/23 18KES Restructuring - Marinace Architects
Option 3A – Summary
Significant staff operating cost savings, but a large capital investment is required
Avoid CIP, maintenance and utility costs by closing two schools
Offers long-term expansion potential Neighborhood school model diminished More pressure placed on larger school cores
04/21/23 19KES restructuring – Marinace Architects
Option 3A – Pros & Cons
Same as Option 3A except Preschool is eliminated from Daniels School
Since Preschool is not accounted for elsewhere in this option, the difference in cost between Option 3A and Option 3B can be seen as a breakout cost for the preschool program
04/21/23 20KES restructuring – Marinace Architects
Option 3B
04/21/23 21KES restructuring – Marinace Architects
SchoolTypical no. of sections per gradeK 1 2 3 4 5
Total sections / school
Daniels 3 3 3 3 3 3 18 + P
Franklin 0 0 0 0 0 0 0
Fuller 4 4 4 4 3 3 22
Symonds 4 4 4 4 3 3 22
Wheelock 0 0 0 0 0 0 0
Total 11 11 11 11 9 9 62
Class distribution – Total Capacity: 1,188 Students
Option 3B
04/21/23 22KES Restructuring - Marinace Architects
Option 3B – Daniels Floor Plan
04/21/23 23KES Restructuring - Marinace Architects
Option 3B – Summary
This is the 4-school, wide grade span option favored up to this point Fuller & Symonds remain 3-section, 324 student schools, and receive small
additions Franklin expanded from a 2-section to 3-section school. Capacity rises from
216 to 324 students Preschool only at Daniels Wheelock remains a 2-section school Total district capacity of 1,188 students K-5
04/21/23 24KES restructuring – Marinace Architects
Option 4A
04/21/23 25KES restructuring – Marinace Architects
SchoolTypical no. of sections per gradeK 1 2 3 4 5
Total sections / school
Daniels 0 0 0 0 0 0 Preschool
Franklin 3 3 3 3 3 3 18
Fuller 3 3 3 3 3 3 18
Symonds 3 3 3 3 3 3 18
Wheelock 2 2 2 2 2 2 12
Total 11 11 11 11 9 9 66
Class distribution – Total Capacity: 1,188 Students
Option 4A
04/21/23 26KES Restructuring - Marinace Architects
Option 4A – Daniels Floor Plan
04/21/23 27KES Restructuring - Marinace Architects
Option 4A – Fuller Floor Plan
04/21/23 28KES Restructuring - Marinace Architects
Option 4A – Symonds Floor Plan
04/21/23 29KES Restructuring - Marinace Architects
Option 4A – Franklin Floor Plan
04/21/23 30KES Restructuring - Marinace Architects
Option 4A – Wheelock Floor Plan
04/21/23 31KES Restructuring - Marinace Architects
Option 4A – Summary
Similar to Option 4A, except Wheelock closed instead of Daniels
Fuller & Symonds remain 3-section, 324 student schools, and receive small additions
Franklin remains a 2-section, 216 student school Daniels expanded from a 2-section to a 3-section,
324 student school, and receives a large addition. Preschool moves from Wheelock to Daniels
Total district capacity of 1,188 students K-5
04/21/23 32KES restructuring – Marinace Architects
Option 4B
04/21/23 33KES restructuring – Marinace Architects
SchoolTypical no. of sections per gradeK 1 2 3 4 5
Total sections / school
Daniels 3 3 3 3 3 3 18 + P
Franklin 2 2 2 2 2 2 12
Fuller 3 3 3 3 3 3 18
Symonds 3 3 3 3 3 3 18
Wheelock 0 0 0 0 0 0 0
Total 11 11 11 11 9 9 66
Class distribution – Total Capacity: 1,188 Students
Option 4B
04/21/23 34KES Restructuring - Marinace Architects
Option 4B – Daniels Floor Plan
04/21/23 35KES Restructuring - Marinace Architects
Option 4B – Fuller Floor Plan
04/21/23 36KES Restructuring - Marinace Architects
Option 4B – Symonds Floor Plan
04/21/23 37KES Restructuring - Marinace Architects
Option 4B – Franklin Floor Plan
04/21/23 38KES Restructuring - Marinace Architects
Option 4B – Summary
Similar to Option 4A, except Franklin closed instead of Daniels
Fuller & Symonds remain 3-section, 324 student schools, and receive small additions
Wheelock remains a 2-section, 216 student school Daniels expanded from a 2-section to a 3-section, 324
student school, and receives a large addition. Preschool moves from Wheelock to Daniels, and collaborative programs move from Franklin to Daniels
Total district capacity of 1,188 students K-5
04/21/23 39KES restructuring – Marinace Architects
Option 4C
04/21/23 40KES restructuring – Marinace Architects
SchoolTypical no. of sections per gradeK 1 2 3 4 5
Total sections / school
Daniels 3 3 3 3 3 3 18 + P
Franklin 2 2 2 2 2 2 12
Fuller 3 3 3 3 3 3 18
Symonds 3 3 3 3 3 3 18
Wheelock 0 0 0 0 0 0 0
Total 11 11 11 11 9 9 66
Class distribution – Total Capacity: 1,188 Students
Option 4C
04/21/23 41KES Restructuring - Marinace Architects
Option 4C – Daniels Floor Plan
04/21/23 42KES Restructuring - Marinace Architects
Option 4C – Fuller Floor Plan
04/21/23 43KES Restructuring - Marinace Architects
Option 4C – Symonds Floor Plan
04/21/23 44KES Restructuring - Marinace Architects
Option 4C – Wheelock Floor Plan
04/21/23 45KES Restructuring - Marinace Architects
Option 4C – Summary
Similar to Option 4B, except Franklin is expanded to a 3-section school instead of Daniels
Fuller & Symonds remain 3-section, 324 student schools, and receive small additions
Wheelock Closed Preschool moves from Wheelock to Daniels, and
Daniels received a medium-sized addition Total district capacity of 1,188 students K-5
04/21/23 46KES restructuring – Marinace Architects
Option 4D
04/21/23 47KES restructuring – Marinace Architects
SchoolTypical no. of sections per gradeK 1 2 3 4 5
Total sections / school
Daniels 2 2 2 2 2 2 12 + P
Franklin 3 3 3 3 3 3 18
Fuller 3 3 3 3 3 3 18
Symonds 3 3 3 3 3 3 18
Wheelock 0 0 0 0 0 0 0
Total 11 11 11 11 9 9 66
Class distribution – Total Capacity: 1,188 Students
Option 4D
04/21/23 48KES Restructuring - Marinace Architects
Option 4D – Daniels Floor Plan
04/21/23 49KES Restructuring - Marinace Architects
Option 4D – Fuller Floor Plan
04/21/23 50KES Restructuring - Marinace Architects
Option 4D – Symonds Floor Plan
04/21/23 51KES Restructuring - Marinace Architects
Option 4D – Franklin Floor Plan
04/21/23 52KES Restructuring - Marinace Architects
Option 4D – Summary
Analysis of staffing requirements for each option. Increases in staffing efficiencies are the most important factor in overall savings
CIP Tabulation for each option Budget for each option broken down by Additions,
Renovation, CIP and Operational costs
04/21/23 53KES restructuring – Marinace Architects
Cost Analysis
04/21/23 54KES restructuring – Marinace Architects
1-School Staffing Tabulation
04/21/23 55KES restructuring – Marinace Architects
3-School Staffing Tabulation (3A Shown)
04/21/23 56KES restructuring – Marinace Architects
4-School Staffing Tabulation (4A Shown)
04/21/23 57KES restructuring – Marinace Architects
5-School Staffing Tabulation (Existing)
Include three categories: 1. (Shown in red) Items required by building code +
building heat conversion from steam to hot water included in the project budgets
2. (Shown in blue) Long-term CIP items that will need to be done in the next 10-20 years to maintain the buildings, not included in the project budgets
3. (Shown in black) Items the school district will complete outside of the building program not included in the project budgets
04/21/23 58KES restructuring – Marinace Architects
CIP Budgets
04/21/23 59KES restructuring – Marinace Architects
CIP - Daniels
04/21/23 60KES restructuring – Marinace Architects
CIP - Fuller
04/21/23 61KES restructuring – Marinace Architects
CIP - Wheelock
04/21/23 62KES restructuring – Marinace Architects
CIP - Franklin
04/21/23 63KES restructuring – Marinace Architects
Overall Project Budgets
CIP heat conversion is included, at a cost of $3,386,000 to the budget of 3 and 4-school options, and reduces the annual savings by up to $267,000
1 and 3-school options assume that unused buildings will be sold at a price of $750,000 each
Staffing figures and salaries have been updated. Preschool staffing has increased in all new configurations by $121,000 (1 teacher, 1 para)
04/21/23 64KES restructuring – Marinace Architects
Budgets Notes
04/21/23 65KES Restructuring - Marinace Architects
Option 1A - Budget
04/21/23 66KES Restructuring - Marinace Architects
Option 3A - Budget
04/21/23 67KES Restructuring - Marinace Architects
Option 3B - Budget
04/21/23 68KES Restructuring - Marinace Architects
Option 4A - Budget
04/21/23 69KES Restructuring - Marinace Architects
Option 4B - Budget
04/21/23 70KES Restructuring - Marinace Architects
Option 4C - Budget
04/21/23 71KES Restructuring - Marinace Architects
Option 4D - Budget
04/21/23 72KES Restructuring - Marinace Architects
Budget Summary
For a copy of this presentation visit
www.KeeneSchoolSolutions.org