11 April 2005 1

The CESG-CMCThe CESG-CMCWork Planning ProcessWork Planning Process

Adrian J. HookeChairman, CCSDS Engineering Steering Group

09 April 2005

Joint Meeting of the CESG and CMCAthens, Greece, 08 April 2005

Page 2: 1 11 April 2005 The CESG-CMC Work Planning Process Adrian J. Hooke Chairman, CCSDS Engineering Steering Group 09 April 2005 Joint Meeting of the CESG and.

11 April 2005 2

ASI/Italy

BNSC/UKCNES/FranceCSA/Canada

DLR/Germany

JAXA/Japan

ESA/Europe

INPE/Brazil

NASA/USARSA/Russia

ASA/Austria

CAST/China

CRC/Canada

CRL/Japan

CSIR/South Africa

CSIRO/Australia

IKI/Russia

ISAS/Japan

ISRO/India

KARI/Korea

KFKI/Hungary

MOC/IsraelNOAA/USA

NSPO/Taipei

SSC/Sweden

TsNIIMash/Russia

USGS/USA

CTA/Brazil

DSRI/Denmark

EUMETSAT/Europe

EUTELSAT/Europe

FSST&CA/Belgium

HNSC/Greece

Consultative Committee forSpace Data Systems (CCSDS)

Page 3: 1 11 April 2005 The CESG-CMC Work Planning Process Adrian J. Hooke Chairman, CCSDS Engineering Steering Group 09 April 2005 Joint Meeting of the CESG and.

11 April 2005 3

Cross SupportServices

SpacecraftOnboardInterfaceServices

SpaceInternetworking

Services

SpaceLink

Services

Mission Operationsand Information

Management Services

Systems Engineering

CCSDS Technical Organization

Page 4: 1 11 April 2005 The CESG-CMC Work Planning Process Adrian J. Hooke Chairman, CCSDS Engineering Steering Group 09 April 2005 Joint Meeting of the CESG and.

11 April 2005 4

1.1 Systems Architecture WG1.2 Security WG1.3 Information Architecture WG1.4 SANA BOF

2.1 Data Archive Ingestion WG2.2 Navigation WG2.3 Info. Pack. & Registries WG2.4 S/C Mon + Control WG

3.1 SLE Ref. Model WG3.2 SLE Data Trans. Services WG3.3 SLE Service Mgmt. WG3.6 Cross Support Transfer Services

BOF

4.1 Onboard Bus + LAN WG4.2 Time Critical O/B Net Svc WG4.3 Time Critical O/B Apps. WG4.4 Onboard plug-play BOF4.5 Onboard Transducer BOF4.6 Wireless BOF

5.1 RF & Modulation WG5.2 Space Link Code/Sync. WG5.3 Data Comp. WG5.4 Space Link Protocols WG5.5 TC Channel Coding WG5.6 Ranging WG5.7 Proximity-1 Build-2 WG5.8 Long Eras. Codes BOF

6.1 CFDP Interop. Testing WG6.2 Unack. CFDP Extensions WG6.3 Packet Protocol WG6.4 Cislunar Internetworking WG6.5 Delay Tolerant Network BOF6.6 Asynchronous Messaging BOF

SYSTEMSENGINEERINGAREA (SEA)

MISSION OPERATIONS AND INFORMATION

MANAGEMENT SERVICES (MOIMS) AREA

CROSSSUPPORTSERVICES

(CSS) AREA

SPACECRAFT ONBOARD

INTERFACE SERVICES

(SOIS) AREA

SPACELINK

SERVICES(SLS) AREA

SPACEINTERNETWORKING

SERVICES(SIS) AREA

24WorkingGroups

8 Birds Of

a FeatherGroups

CCSDS Working Structure, Spring 2005

Page 5: 1 11 April 2005 The CESG-CMC Work Planning Process Adrian J. Hooke Chairman, CCSDS Engineering Steering Group 09 April 2005 Joint Meeting of the CESG and.

11 April 2005 5

MeetingMeeting Meeting

N-1 N N+1

~ 6 monthswork period “N”

Meeting

CCSDS OPERATING PLAN

CCSDS A01.2-Y-(N-1)

CMC MEETING:CMC confirms

resource commitment for work period N

CCSDS OPERATING PLANCCSDS A01.2-Y-(N)

CMC MEETING:CMC confirms

resource commitment for work period N+1

CCSDS OPERATING PLAN

CCSDS A01.2-Y-(N+1)

CCSDS Theoretical Work CycleCCSDS Theoretical Work Cycle

C C S D S O P E R A T I N G P L A N

F O R S T A N D A R D S D E V E L O P M E N T

C C S D S A 0 1 . 2 - Y - 3

D R A F T Y E L L O W B O O K

N o v e m b e r 2 0 0 4

Contains the current charter and working plan for every approved CCSDS Working Group:

• GOALS• SCHEDULE AND DELIVERABLES• RISK MANAGEMENT STRATEGY

- Technical Risks- Management Risks

• RESOURCE REQUIREMENTS

Page 6: 1 11 April 2005 The CESG-CMC Work Planning Process Adrian J. Hooke Chairman, CCSDS Engineering Steering Group 09 April 2005 Joint Meeting of the CESG and.

11 April 2005 6

CCSDS Theoretical Resource AllocationCCSDS Theoretical Resource Allocation

Page 7: 1 11 April 2005 The CESG-CMC Work Planning Process Adrian J. Hooke Chairman, CCSDS Engineering Steering Group 09 April 2005 Joint Meeting of the CESG and.

11 April 2005 7

• Frequent (6-month) update of Operating Plan is not occurring, often because:

- It’s not perceived that the resource allocation is being affected, because:

- In reality, Agencies allocate resources on a longer timescale:

- Typically, yearly

CCSDS Theoretical ProblemsCCSDS Theoretical Problems

Page 8: 1 11 April 2005 The CESG-CMC Work Planning Process Adrian J. Hooke Chairman, CCSDS Engineering Steering Group 09 April 2005 Joint Meeting of the CESG and.

11 April 2005 8

• CCSDS Requested Operating Plan, along with a resource request matrix, will be drafted in May after the Spring meeting to cover the 12 month work Fall to Fall work period

• CMC will respond in a timely manner (June) with a draft resource allocation matrix for the upcoming 12 month work period

• CESG will reflect the allocations in an updated draft Allocated Operating Plan (July) that covers the upcoming 12 month work period

• CMC will confirm this at the Fall meeting

• After than point (September), the only changes for the upcoming 1-year period will be:• If a new WG is requested to be chartered

• If an existing WG needs to request a change in its resources or schedule

• The cycle repeats each Spring

Proposed New Work CycleProposed New Work Cycle

Page 9: 1 11 April 2005 The CESG-CMC Work Planning Process Adrian J. Hooke Chairman, CCSDS Engineering Steering Group 09 April 2005 Joint Meeting of the CESG and.

11 April 2005 9

CCSDS Practical Work CycleCCSDS Practical Work Cycle

MeetingMeeting Meeting

~ 12 months work period “N”

Meeting

CMC MEETING:

CMC confirms resource

commitment for work period N

C C S D S O P E R A T I N G P L A N

F O R S T A N D A R D S D E V E L O P M E N T

C C S D S A 0 1 . 2 - Y - 3

D R A F T Y E L L O W B O O K

N o v e m b e r 2 0 0 4

Contains the current charter and working plan for every approved CCSDS Working Group:

• GOALS• SCHEDULE AND DELIVERABLES• RISK MANAGEMENT STRATEGY

- Technical Risks- Management Risks

• RESOURCE REQUIREMENTS

FALL

CCSDS REQUESTEDOPERATING PLANCCSDS A01.2-Y-(N)

CCSDS REQUESTEDOPERATING PLAN

CCSDS A01.2-Y-(N+1)

CCSDS ALLOCATEDOPERATING PLANCCSDS A01.2-Y-(N)

SPRINGSPRING

FALL

Page 10: 1 11 April 2005 The CESG-CMC Work Planning Process Adrian J. Hooke Chairman, CCSDS Engineering Steering Group 09 April 2005 Joint Meeting of the CESG and.

11 April 2005 10

OperatingPlan

CMC

Resourcerequestletter to

each Agency

AgencyDelegate

AgencyBudgetingprocess

AgencyCommitment

Letter

CESG

Commitment CycleCommitment Cycle

•Tech. Scope•Deliverables•Schedule•Funding Level