11 April 2005 1
The CESG-CMCThe CESG-CMCWork Planning ProcessWork Planning Process
Adrian J. HookeChairman, CCSDS Engineering Steering Group
09 April 2005
Joint Meeting of the CESG and CMCAthens, Greece, 08 April 2005
11 April 2005 2
ASI/Italy
BNSC/UKCNES/FranceCSA/Canada
DLR/Germany
JAXA/Japan
ESA/Europe
INPE/Brazil
NASA/USARSA/Russia
ASA/Austria
CAST/China
CRC/Canada
CRL/Japan
CSIR/South Africa
CSIRO/Australia
IKI/Russia
ISAS/Japan
ISRO/India
KARI/Korea
KFKI/Hungary
MOC/IsraelNOAA/USA
NSPO/Taipei
SSC/Sweden
TsNIIMash/Russia
USGS/USA
CTA/Brazil
DSRI/Denmark
EUMETSAT/Europe
EUTELSAT/Europe
FSST&CA/Belgium
HNSC/Greece
Consultative Committee forSpace Data Systems (CCSDS)
11 April 2005 3
Cross SupportServices
SpacecraftOnboardInterfaceServices
SpaceInternetworking
Services
SpaceLink
Services
Mission Operationsand Information
Management Services
Systems Engineering
CCSDS Technical Organization
11 April 2005 4
1.1 Systems Architecture WG1.2 Security WG1.3 Information Architecture WG1.4 SANA BOF
2.1 Data Archive Ingestion WG2.2 Navigation WG2.3 Info. Pack. & Registries WG2.4 S/C Mon + Control WG
3.1 SLE Ref. Model WG3.2 SLE Data Trans. Services WG3.3 SLE Service Mgmt. WG3.6 Cross Support Transfer Services
BOF
4.1 Onboard Bus + LAN WG4.2 Time Critical O/B Net Svc WG4.3 Time Critical O/B Apps. WG4.4 Onboard plug-play BOF4.5 Onboard Transducer BOF4.6 Wireless BOF
5.1 RF & Modulation WG5.2 Space Link Code/Sync. WG5.3 Data Comp. WG5.4 Space Link Protocols WG5.5 TC Channel Coding WG5.6 Ranging WG5.7 Proximity-1 Build-2 WG5.8 Long Eras. Codes BOF
6.1 CFDP Interop. Testing WG6.2 Unack. CFDP Extensions WG6.3 Packet Protocol WG6.4 Cislunar Internetworking WG6.5 Delay Tolerant Network BOF6.6 Asynchronous Messaging BOF
SYSTEMSENGINEERINGAREA (SEA)
MISSION OPERATIONS AND INFORMATION
MANAGEMENT SERVICES (MOIMS) AREA
CROSSSUPPORTSERVICES
(CSS) AREA
SPACECRAFT ONBOARD
INTERFACE SERVICES
(SOIS) AREA
SPACELINK
SERVICES(SLS) AREA
SPACEINTERNETWORKING
SERVICES(SIS) AREA
24WorkingGroups
8 Birds Of
a FeatherGroups
CCSDS Working Structure, Spring 2005
11 April 2005 5
MeetingMeeting Meeting
N-1 N N+1
~ 6 monthswork period “N”
Meeting
CCSDS OPERATING PLAN
CCSDS A01.2-Y-(N-1)
CMC MEETING:CMC confirms
resource commitment for work period N
CCSDS OPERATING PLANCCSDS A01.2-Y-(N)
CMC MEETING:CMC confirms
resource commitment for work period N+1
CCSDS OPERATING PLAN
CCSDS A01.2-Y-(N+1)
CCSDS Theoretical Work CycleCCSDS Theoretical Work Cycle
C C S D S O P E R A T I N G P L A N
F O R S T A N D A R D S D E V E L O P M E N T
C C S D S A 0 1 . 2 - Y - 3
D R A F T Y E L L O W B O O K
N o v e m b e r 2 0 0 4
Contains the current charter and working plan for every approved CCSDS Working Group:
• GOALS• SCHEDULE AND DELIVERABLES• RISK MANAGEMENT STRATEGY
- Technical Risks- Management Risks
• RESOURCE REQUIREMENTS
11 April 2005 6
CCSDS Theoretical Resource AllocationCCSDS Theoretical Resource Allocation
11 April 2005 7
• Frequent (6-month) update of Operating Plan is not occurring, often because:
- It’s not perceived that the resource allocation is being affected, because:
- In reality, Agencies allocate resources on a longer timescale:
- Typically, yearly
CCSDS Theoretical ProblemsCCSDS Theoretical Problems
11 April 2005 8
• CCSDS Requested Operating Plan, along with a resource request matrix, will be drafted in May after the Spring meeting to cover the 12 month work Fall to Fall work period
• CMC will respond in a timely manner (June) with a draft resource allocation matrix for the upcoming 12 month work period
• CESG will reflect the allocations in an updated draft Allocated Operating Plan (July) that covers the upcoming 12 month work period
• CMC will confirm this at the Fall meeting
• After than point (September), the only changes for the upcoming 1-year period will be:• If a new WG is requested to be chartered
• If an existing WG needs to request a change in its resources or schedule
• The cycle repeats each Spring
Proposed New Work CycleProposed New Work Cycle
11 April 2005 9
CCSDS Practical Work CycleCCSDS Practical Work Cycle
MeetingMeeting Meeting
~ 12 months work period “N”
Meeting
CMC MEETING:
CMC confirms resource
commitment for work period N
C C S D S O P E R A T I N G P L A N
F O R S T A N D A R D S D E V E L O P M E N T
C C S D S A 0 1 . 2 - Y - 3
D R A F T Y E L L O W B O O K
N o v e m b e r 2 0 0 4
Contains the current charter and working plan for every approved CCSDS Working Group:
• GOALS• SCHEDULE AND DELIVERABLES• RISK MANAGEMENT STRATEGY
- Technical Risks- Management Risks
• RESOURCE REQUIREMENTS
FALL
CCSDS REQUESTEDOPERATING PLANCCSDS A01.2-Y-(N)
CCSDS REQUESTEDOPERATING PLAN
CCSDS A01.2-Y-(N+1)
CCSDS ALLOCATEDOPERATING PLANCCSDS A01.2-Y-(N)
SPRINGSPRING
FALL
11 April 2005 10
OperatingPlan
CMC
Resourcerequestletter to
each Agency
AgencyDelegate
AgencyBudgetingprocess
AgencyCommitment
Letter
CESG
Commitment CycleCommitment Cycle
•Tech. Scope•Deliverables•Schedule•Funding Level