Transcript of 1 1 Status of WATERSHED PROJECTS WATERSHED PROJECTSIn JHARKHAND STATE ByB.Nijalingappa CEO,JSWM-SLNA...
11
Status ofStatus of
WATERSHED PROJECTSWATERSHED PROJECTSIn In
JHARKHAND STATEJHARKHAND STATEByBy
B.Nijalingappa B.Nijalingappa CEO ,JSWM-SLNACEO ,JSWM-SLNA20-21 May 201020-21 May 2010
New DelhiNew Delhi
22
ABSTRACT OF IWMP-JHARKHAND STATEABSTRACT OF IWMP-JHARKHAND STATE
S. No.
ItemDetails
No. Area (ha)
1 Total no. of micro-watersheds in the State
10,798 7,970,080
2Total no. of untreatable micro-watersheds(Reserved Forest, Barren Rocky, flow irrigation)
2,519
1,439,801
3Total no. of treatable micro-watersheds in the State
8,279
6,530,279
4No. of micro-watersheds covered under different schemes
1,026*
784,334
5Balance no. of micro-watersheds not covered till date
7,253
5,745,945
6Plan for covering balance micro-watersheds
11th Plan
761 745,181
12th Plan
809 631,091
13th Plan
2,638 2,233,691
14th Plan
3,045 2,135,982
Total
7,253 5,745,945
33
Details of sanctions under IWMP, Details of sanctions under IWMP, 2009-102009-10
S. No.
ItemDetails
No. Area (ha)
Micro-watersheds sanctioned during 2009-10
189117824.0
5No. of projects (clusters) 20Estimated project cost (Rs. in lakhs) for the sanctioned projects:14138.85• Central share• State share• Total
12724.961413.89 14138.85
Amount of 1st installment of Central & State Share (20 %) (Rs. in lakhs)2827.77
6%14%
Total
Central State Total Share Share 763.49 84.83 848.32
1781.50 197.94 1979.44 2544.99
282.77 2827.77
4
Annual action plan and DPRAnnual action plan and DPR• 16-17 April 2010, a workshop was organized on preparation
of PPR/DPR/MIS• 13 experts/staff have been engaged on contract basis at
SLNA level.• Preparation of Annual action plan and DPR for 2010-11 are
in the process. • Project fund release to PIAs are in the process.• PG Diploma / Certificate courses will be organized by R K
Mission in collaboration with university.• PIAs are in the Process of organizing PRA and EPA .• JSAC – are in the process of digitization of Cadastral sheets.• UNDP – is assisting for preparation of process mechanism
manual / financial manual / technical manual / MIS /Capacity Building and Technical support to SLNA.
5
CAPACITY BUILDING INTERVENTIONS PROPOSED CAPACITY BUILDING INTERVENTIONS PROPOSED BY THE STATEBY THE STATE
The state has UNDP assisted Jharkhand State support programmes which comprehensively, interalia, would be addressing the issue of capacity building on watershed management in Jharkhand Institutes of eminence, specifically, situated in Jharkhand shall be utilized in the SLNA’s endeavor to develop the capacity of villagers, SHGs, Users’ group, watershed committee, PIAs as well personnel in the government involved in the watershed management
5
6
Project Proposed by Soil Conservation Project Proposed by Soil Conservation Department for the Year 2010-11Department for the Year 2010-11
S.no. Name of the
District
Weightage Total no. of
Cluster
No. Microwatershed
Proposed
Total Project
Area(hac.)
Total Proposed Treatable
Area
Total Cost Rs. In lakh
1 Dumka 125.5 1 11 6047.71 5617.00 674.04
2 E.Singhbhum
105 1 9 5899.00 5725.00 687.00
3 Giridih 118 1 9 6568.00 6375.00 765.00
4 Koderma 118 1 8 4336.00 4000.00 480.00
5 Latehar 108 1 7 7080.00 7000.00 840.00
6 Simdega 120.5 1 10 5326.00 4588.00 550.00
Total 6 54 35256.71 33305.00 3996.60
7
Project Proposed by Forest Deptt. For the year 2010-11Project Proposed by Forest Deptt. For the year 2010-11S.no. Name of the
DistrictBlock Total no. of
ClusterNo.
Microwatershed
Proposed
Total Proposed Treatable
Area
Total Cost Rs. In lakh
1 Chatra Chandawa, huntergang
2 11 8529.69 1023.5628
2 Deoghar madhupur 1 3 1976.86 237.2232
3 East Singhbhum Bairagoda 1 3 2922.72 350.7264
4 Garwah Meral, Mazhiaon,
Ranka
3 11 14393.55 1727.226
5 Giridhi Gawan 1 1 974.56 116.9472
6 Godda Sunderpahadi 1 4 9050.71 1086.0852
7 Gumla Basia 1 4 3116.31 373.9572
8 Hazaribagh Sadar 1 7 4829.2 579.504
9 Latehar sadr 1 5 6863.87 823.6644
10 Palamu Vishrampur, Chainpur
2 3 8747.29 1049.6748
11 Ranchi Bundu, Namkum
2 10 10823.82 1298.8584
12 West singhbhum Sonava 1 4 3193.91 383.2692
Total 17 66 75422.49 9050.6988
8
Status of IWDP/DPAPStatus of IWDP/DPAP
• Total no. of project sanctioned under DPAP during (2000-01 to 2006-07): 1332
• No. of Projects to be foreclosed under DPAP: 1000
• No. of Projects to be continued :332• Total no. of project sanctioned under
IWDP: 25• FIR has been filed under IWDP in Giridhi
Dist.• Two projects of IWDP has merged as single
project in GUMLA Distt.
9
Status of the projects under DPAPStatus of the projects under DPAPRs. in Lakh
Sno.
Name of the
districts
Total no.
of Projects
Projects to be
contineud
Projects to be foreclos
ed
Unspent Balance (To Be Returned)
RemarksCentral State Total
1 Bokaro 31 XI & XII (8) VI to X (23) 98.08 33.15 131.23 Refunded
2 Chatra 76 0 VI to XII (76) 15.60 5.20 20.80
3 Deoghar 105 XII (17) VI to XII (88) 49.58 16.53 66.11Refunded by
PIAs
4 Dumka 108 XI & XII (34) VI to X (74) 67.28 22.43 89.71
5 Dhanbad 115 X to XII (43) VI to IX(72) 3.47 1.16 4.62
6 Garhwa 182 XI & XII (64) VI to X (118) 58.40 19.46 77.86
7 Godda 77 XI & XII (23) VI to X (54) 11.01 3.67 14.68
8 Hazaribag 72 0 VII to XII(72) 43.04 14.35 57.39
9 Jamtara 56 IX to XII (30) VI to VIII(26) 0.36 0.12 0.48
10 Koderma 75 IX & XII (30) VI to VIII(45) 22.91 7.63 30.54
11 Latehar 80 0 VI to XII (80) 64.31 21.44 85.75
12 Pakur 74 0 VI to XII(74) 20.27 6.76 27.03 Refunded 27.03
13 Palamu 162 XI & XII (48) VI to X (114) 49.07 16.36 65.42
14 Ramgarh 45 XII (4) VII toXI (41) 2.21 0.74 2.94
15 Sahebganj 74 X to XII (31) VI to IX(43) 11.91 3.97 15.89
Total 1332 332 1000 517.50 172.96 690.45
10
Status of the projects under DPAPStatus of the projects under DPAP
contd.contd.
Sno.Name of the
districts
MTER UCs ASACriminal
Cases/FIRQPR MPR
1 Bokaro Yes Yes No No No Not Avail.
2 Chatra No Yes No No No Not Avail.
3 Deoghar March,09 April,10 No 2008-09 March,2009 FIR on PIAs
4 Dumka No March,10 No No No Not Avail.
5 Dhanbad No April,10 No Sept,09/XI No Not Avail.
6 Garhwa No No No 2008-09 No Not Avail.
7 Godda No April,10 No 2008-09 No Not Avail.
8 Hazaribag No March,10 No No No Not Avail.
9 Jamtara No March,10 No No No Not Avail.
10 Koderma No April,10 No 2008-09 2008-09B.-VI matter in
vigilence
11 Latehar No April,10 No 2009-10 No Not Avail.
12 Pakur No March,10 yes 2009-10 2009-10 Not Avail.
13 Palamu No April,10 No No No Not Avail.
14 Ramgarh No March,10 No No No Not Avail.
15 Sahebganj March,10 March,10 No 2009-10 No Not Avail.
Total
11
Status of the projects under IWDPStatus of the projects under IWDPRs. in LakhRs. in Lakh
Sno.
Name of the
districts
No. of Clust
er projects
Total Central Share
Released
Total State Share Releas
ed
others reciept
Total Available fund
Total Exoendit
ureBalance
1 Bokaro 1 41.25 3.75 0 45 40.96 4.04
2 Chatra 1 41.25 3.75 0 45 45 0
3Ramnchi and
Khunti2 244.94 7.5 0.87 253.31 172.31 81
4Saraikela
Kharsawan
3 514.26 39.86 14.24 568.36 449.43 118.93
5 E.Singhbhum 2 295.19 20.07 0 315.26 312.89 2.37
6 Giridih 3 399.57 37.5 11.25 448.32 386.52 61.8
7 Palamu 1 123.01 11.33 0 134.34 85.67 48.67
8 Lohardaga 1 146.41 13.5 2.94 162.85 145.24 17.61
9W.Singhbhu
m3 152.85 8.25 5.34 166.44 131.16 35.28
10 Gumla 2 82.5 7.5 3.26 93.26 93.26 0
11 Simdega 2 246.07 15 0 261.07 159.25 101.82
12 Godda 1 122.29 11.25 0.77 134.31 111.21 23.1
13 Hazaribag 1 122.62 11.25 1.23 135.10 132.65 1.12
Total 25 2532.21 190.51 39.9 2762.62 2265.55 497.07
12
Status of the projects under IWDPStatus of the projects under IWDP
contd.contd.Sno.
Name of the districts
MTER UCs ASACriminal
Cases/FIRQPR MPR
1 Bokaro March,2010 March,2010 No 2009-10 No Not Avail.
2 Chatra No No No No No Not Avail.
3Ramnchi and
KhuntiNo April,2010 No No No Not Avail.
4Saraikela
KharsawanMarch,2010 March,2010
In Process
2008-09 March,10 Not Avail.
5 E.Singhbhum No April,2010 No No No Not Avail.
6 Giridih March,2010 March,2010 No No No Not Avail.
7 Palamu No April,2010 No No No Not Avail.
8 Lohardaga No March,2010 No No No Not Avail.
9 W.Singhbhum No April,2010 No No No Not Avail.
10 Gumla No No No No No Not Avail.
11 Simdega No April,2010 No No No Not Avail.
12 Godda No April,2010 No No No Not Avail.
13 Hazaribag No April,2010 No No No Not Avail.
13
ORGANOGRAM FOR IMPLEMENTATION OF IWMP
Institutional Structure
Development Commissioner
CEO (SLNA)
DWDU (DRDA)
PIA
Watershed Committee
GoI
Secretary Rural Development
1414
SELECTION CRITERIA FOLLOWED BY THE STATE WHILE SELECTING NEW PROJECTS
S. No.
Criteria Applied or Not
i Poverty index (% of poor to population) Applied
ii % of SC/ ST population Applied iii Actual wages Applied iv % of small and marginal farmers Applied v Ground water status Applied vi Moisture index/ DPAP/ DDP Block Appliedvii Area under rain-fed agriculture Applied viii Drinking water Applied ix Degraded land Applied x Productivity potential of the land Applied xi Contiguity to another watershed that has
already been developed/ treatedApplied
xii Cluster approach in the plains (more than one contiguous micro-watersheds in the project)
Applied
1515
Activities Sub activities
Preparation of Strategic
plans for IWMP
• Local systems of planning, capacity building, implementation and reporting.• Preparing basic data tables at Jharkhand with help from JSAC & other departments (Secondary data) as per the requirement of the GoI.• Taking a view on the closer of previous watershed development projects.•Preparation of the perspective , Strategic & Annual action plans.
CAPACITY BUILDING INTERVENTIONS PROPOSED BY THE STATE:
Continued……
1616
Activities Sub activities
Identification of CB institutions
• Preparation of a process document including criteria for selection of the organizations for capacity building need of all stakeholders at different levels.
• Establishment of procedures for selection of organizations for capacity building.
• Selection of organizations for CB.
• Initial orientation of the CB organizations.
Jharkhand –state specific
process guidelines for
IWMP
• Sharing of experiences workshop-exploring local experiences & innovations related to watershed development programme and evolving broad frame work for process guidelines.
•Identification of experts agency for preparation of state specific process guidelines for Jharkhand
CAPACITY BUILDING INTERVENTIONS PROPOSED BY THE STATE:
Continued……
1717
Activities Sub activities
Evolving monitoring, evaluation &
learning systems
• Evolving a frame work for on line monitoring and identification of an institutions for developing the online monitoring & reporting systems.
Evolving a planning frame
work for conversant
livelihood action plans
• Identification of four block based on different agro climatic regions/Zones.
•Understanding the context of blocks identified in each Zone.
• Identification of one representative in each agro-eco situation for preparation of action plan.
• Orientation of field staff about the frame work.
• Field testing in one village per block.
CAPACITY BUILDING INTERVENTIONS PROPOSED BY THE STATE:
Continued……
1818
Activities Sub activities
Evolving a planning
frame work for
conversant livelihood
action plans
• Preparation of detailed action plans for all major component of the rain fed farming systems in above representative villages.• Synthesis of above information into a block level plan with clarity about convergence of funds from different schemes.• Consolidation of above proposal into a district level plan with clarity about convergence of various schemes.
CAPACITY BUILDING INTERVENTIONS PROPOSED BY THE STATE:
Continued……
1919
CAPACITY BUILDING INTERVENTIONS PROPOSED BY THE STATE:
Sl. Name of Institutions Type Specialization
1 Horticulture Agro forestry Research Programme, Palandu, Ranchi
Research station(Indian Council for
Agriculture Research)
Horticulture, Watershed management etc.
2. Jharkhand Space Application Centre (JSAC)
State Govt. Institute Space Application, GIS, Watershed etc.
3 Birsa Agriculture university
Technical university Agriculture, Animal Husbandry, Horticulture, Watershed management etc.
4. Watershed training Institute (Nagri)
State Govt. Institute Watershed management, Soil conservation etc.
5 Training Institute on Soil conservation, Demotand, Hazaribagh
State Govt. field training / production cum / agro tourism institute etc.
Soil conservation and watershed management etc.
6 Soil conservation directorate, Damodar Valley Corporation, Hazaribagh
Training Institute River valley management
7 Indian School of mines-Dhanbad
Central Govt. Institute
Mining, Mine disaster, Soil ,water & other natural resource management.
The expertise & specialization of the following state and national level institutions shall be involved Continued……
2020
CAPACITY BUILDING INTERVENTIONS PROPOSED BY THE STATE:
8 Indianl Institute of Natural Resin & Gums, Ranchi, (IINRG)
Central Govt. Institute
Gums & resins, natural resource and lac based livelihood management.
9 Institute of forest productivity (ICFRE)
Regional research station
Aforestation, silviculture, watershed management etc.
10 Central Ground Water board, Ranchi
Central Govt. Institute
Ground water management
11 MANAGE, Hyderabad Non-Govt. organization
Watershed Management
12 WASSAN Non-Govt. organization
Watershed Management
13 National Institute of Rural Development (NIRD), Hyderabad
Central Govt. Institute
Integrated Rural Development Management
14 Central Land use survey Institute
Central Govt. Institute
Water & Land management
15 Central soil survey, Kolkata
Central Govt. Institute
Soil & watershed management
The expertise & specialization of the following state and national level institutions shall be involved:
2121
Livelihoods interventions proposed by the State:
21
Livelihoods
proposed for Asset
less
Livestock based livelihoods: Promotion of improved breed, improved rearing practices (such as broiler poultry) along with improved feeding practices, health and re-production
Forest and tree based activities such as lac cultivation, Tasar silk worm rearing, etc.
Non Timber Forest Produce collection, aggregation and primary processing
Micro enterprises development such Tasar reeling and spinning
Handicraft development
Services required for the area and livelihoods (product collecting, sorting -grading, marketing of produces, trading, other skill based services )
2222
Livelihoods interventions proposed by the State:
22
Livelihoods
proposed for
Farmers
Production and productivity enhancement : Introduction of new & improved varieties of cereal, pulses, oilseed and vegetable crops, crop demonstration, farm mechanization, new production processes such as Systematic rice intensification (SRI) promotion of bio-fertilizer, integrated nutrient and pest management, vermi composting, promotion of organic farming , etc.
Area nearby upper ridges or upland under fruit and vegetables crops
Promotion of production clusters for specified crops
Promotion of pisciculture in water bodies created or rejuvenated
Establishment of Infrastructure such as sorting grading centers, mini cold storage , etc. through convergence
Conducting Value chain study for Agricultural produce and setting up primary processing units
Improved livestock mainly dairy Promotion of people’s collectives for
dealing with inputs – aggregation – marketing
2323
Expected OutcomesS. No.
Item Unit Pre-project StatusExpected Post-project
Status
1 Status of water table
Meter 10mtr 8 -9 mtr (facilitating infiltration of 300-400
mm additional rain water into soil per unit
area)
2 Water Harvesting structures repaired/
rejuvenated
No. Approx. 2,400 structures require
repair / rejuvenation/Structures not in use
All structures would be repaired / rejuvenated & brought under use,
etc..
3 Quality of drinking
water
Safe drinking
water
Unsanitized/collecting
drinking water from farther
places in summer
shortening the distance for water collection and
making it safe by providing roof etc.
4 Availability of drinking
water
Months in a year
8 months 10-12 months
2424
Expected Outcomes
S. No
Item Unit Pre-project
StatusExpected Post-project
Status
5 Increase in irrigation potential
Ha. 15,550 30,000
6 Change in cropping/ land use pattern
Percentage
Cropping intensity 110%• Fallow land • Uncultivable wasteland
Cropping intensity 125 -135 % fallow land uncultivable
wasteland converted as cultivable land
7 Area under agricultural crop
i Area under single crop
Ha. 40,183 30,000 -35,000
ii Area under double crop
Ha. 2,500 20,000 - 25,000 (nearly 80 % irrigated area would be under
double crop.)
8 Increase in area under vegetation
Ha. 1,250 3,500 – 4,000
2525
Expected Outcomes S. No.
Item Unit Pre-project
StatusExpected Post-project
Status
9 Increase in area under
horticulture
Ha. NA @15 hectare/ Micro watershed
10 Increase in area under fuel &
fodder
Ha. NA @ 15ha / Micro watershed
11 Increase in milk production
Lt/day Per
animal
.5 – 1.0 (on an Average)
1.0-3.0 (Breed improvement,
productivity enhancement with the support of BAIF
and NDDB)
12 No. of SHGs No. Approx. 2000 functional
SHGs
More than 3500 SHGs would be functional and
linked with livelihood activities or delivering
services.
13 Increase in no. of livelihoods
No. Approx. 45,000 households
require livelihoods support.
45,000 households will get the benefit of
increased livelihood support from expanded
basket of livelihood through activities based
on land, water, forest and livestock.
2626
Expected Outcomes in farming system
S. No.
Item Unit Pre-project
StatusExpected Post-project Status
14 Increase in income
Rs. per
annum per capita
Own agricultural produce + Rs. 9,000 –
10,000
Year round food sufficiency + Rs. 12,000 – 18,000
(4000-12000 from cereal and another 5000-10000 from
forest & enterprise)
15 SHG Federations
formed
No. 1 10-14(Based on one federation per
block)
16 Credit linkage with
banks
No. 3000 Additional 15,00 SHGs with credit linkage
17 Resource use
agreements
Nil Planning will incorporate use of assets created.
Facilitation/training would be imparted by PIA to ensure the same (As a process, User
Groups may sign an agreement with WC
regarding utilization of resources and maintenance
of assets). Similar arrangements shall be made for developed/treated land
and plantation related activities. )
2727
Thanks