BOUNDARY BOUNDARY BOUNDARY BOUNDARY BOUNDARY BOUNDARY BOUNDARY BUILDING B01 BUILDING B02 BUILDING B04 BUILDING B05 BUILDING B03 E9 7.00 E 9 7 . 0 0 E9 6.00 E9 5.00 E 9 4 . 0 0 E 9 6 . 0 0 E95.00 E94.00 E93.00 E92.00 E 91.00 E92.00 E93.00 COLLEGIUM AVENUE STRADA CRESENT BRANDON PARK DRIVE BOUNDARY BOUNDARY BOUNDARY P1 P2 P3 P9 P10 P11 P12 P8 P7 P6 P5 P4 P13 300 DIA 300 DIA 300 DIA 600 DIA 600 D I A 450 DIA 375 DIA 300 DIA 300 DIA 300 DIA 300 DIA 300 DIA 300 DIA GROUND LEVEL DRAINAGE INCLUDING SEEPAGE TO BE GRAVITY FED TO DETENTION SYSTEM GROUND LEVEL DRAINAGE INCLUDING SEEPAGE TO BE GRAVITY FED TO DETENTION SYSTEM GROUND LEVEL DRAINAGE INCLUDING SEEPAGE TO BE GRAVITY FED TO DETENTION SYSTEM 12m WIDE x 30m LONG x 1.1m DEEP UNDERGROUND DETENTION TANK FORM SWALE IN LANDSCAPING TO DIRECT OVERLAND FLOW AROUND BUILDINGS PUMP SYSTEM TO DISCHARGE SEEPAGE WATER AND RAMP RUNOFF. GROUND LEVEL DRAINAGE TO BE GRAVITY FED TO DETENTION SYSTEM PUMP SYSTEM TO DISCHARGE SEEPAGE WATER AND RAMP RUNOFF. GROUND LEVEL DRAINAGE TO BE GRAVITY FED TO DETENTION SYSTEM 300 DIA 450 DIA 450 DIA P14 P15 P16 P17 P18 ORIFICE TO CONTROL PIT TO RESTRICT DISCHARGE TO PSD EASEMENT E-1 EAS EMENT E- 1 EASEMENT E-1 EASEMENT E-1 450 DIA 450 DIA P19 EXISTING 375 DIA PIPE TO BE UPGRADED TO NEW 450 DIA RCP UNDER ACADAMY AV BREAK INTO EXISTING COUNCIL SEP AND MAKE GOOD Ex SEWER PIT Ex SEWER PIT Ex SEWER PIT Ex SEWER PIT Ex SEWER PIT Ex SEWER PIT E9 1. 00 E90.00 E89.00 E88.00 E87.00 E86.00 E85.00 E85.00 E86.00 E87.00 E88.00 E89.00 E90.00 Ex SEP Ex SEP Ex SEP Ex SEP Ex SEP Ex SEP Ex SEP Ex SEWER PIT Ex SEWER PIT Ex 300 DIA Ex PIT Ex PIT Ex PIT Ex POLE Ex POLE Ex POLE Ex POLE Ex SEP Ex 450 DIA ACADEMY AVENUE GENERATOR NEW CONCRETE CROSSOVER CONSTRUCTED TO MONASH CITY COUNCILS REQUIREMENTS EXISTING VEGITATION TO REMAIN PROTECT DURING CONSTRUCTION PARALLEL CARPARKING TO COLLEGIUM AVENUE FRONTAGE CONSTRUCTED IN ACCORDANCE WITH MONASH CITY COUNCILS REQUIREMENTS NEW CONCRETE CROSSOVER CONSTRUCTED TO MONASH CITY COUNCILS REQUIREMENTS PARALLEL CARPARKING TO COLLEGIUM AVENUE FRONTAGE CONSTRUCTED IN ACCORDANCE WITH MONASH CITY COUNCILS REQUIREMENTS POWER KIOSK EXISTING VEGITATION TO REMAIN PROTECT DURING CONSTRUCTION INTERNAL DRAINAGE ALIGNMENT INDICATIVE ONLY TO BE CONFIRMED Designed TITLE CLIENT Melbourne Sydney Geelong Level 10, 620 Bourke Street Melbourne Victoria 3000 t +61 3 8600 9700 e [email protected] w www.adamseng.com.au These drawings plans & specifications and the copyright therein are the property of Adams Consulting Engineers Pty. Ltd. & must not be used, reproduced or copied wholly or in part without the written permission of Adams Consulting Engineers Pty. Ltd. All rights reserved. COPYRIGHT c 2015 Drawing Revision Project Leader Project Director Drawn Certified Sheet Size Printed North Project No. Stage No. Block No. Sheet No. Amendment PDF Name Int Project No. 140213 C 21/07/2016 1:14:32 PM C LEVEL 1 AND SITE DRAINAGE PLAN R E T I R E M E N T V I L L A G E , 6 - 3 0 B R A N D O N P A R K D R I V E , W H E E L E R S H I L L 0C1-050 CONCEPT ISSUE NOT FOR CONSTRUCTION - - DM RJ 102 401 RCT 0C1-050 102- 401_ RCT_ 0C1-050 C.PDF SCALE 1 : 500 GROUND FLOOR GENERAL ARRANGEMENT PLAN DETENTION REQUIREMENTS: PSD=385L/s (USING CONTROL PIT) DETENTION VOLUME = 400m³ (USING UNDERGROUND TANK) NOTE: DETENTION REQUIREMENTS ARE TENTATIVE ONLY AND TO BE CONFIRMED AT DESIGN DEVELOPMENT STAGE. PIT No. TYPE INTERNAL DIMENSION S L x W (mm) SURFACE LEVEL (m) DEPTH INLET PIPE FROM DIA IL OUTLET PIPE DIA IL COVER TYPE PIT SCHEDULE P1 - - - GP 96.10 600 x 600 300 TBC P2 P1 300 TBC GP 96.10 600 x 600 300 TBC P3 P2 300 TBC GP P94.80 600 x 600 300 TBC P4 - - - GP 96.10 600 x 600 300 TBC P5 P4 300 TBC GP 96.10 600 x 600 300 TBC P6 P5 300 92.00 GP 93.60 600 x 600 300 92.00 P7 P3 300 91.00 GP 92.60 600 x 600 375 91.00 P6 300 P8 P7 375 90.10 GP 91.60 600 x 600 450 90.10 P9 - - - GP TBC 600 x 600 300 TBC P10 P9 300 TBC GP TBC 600 x 600 300 TBC P11 P10 300 92.80 GP 93.50 600 x 600 300 92.80 P12 P8 450 89.60 GP 91.40 600 x 600 600 89.60 P11 300 89.60 P13 P12 600 89.30 GP 90.70 600 x 600 600 89.30 P14 - - - GP 600 x 600 300 TBC P15 P14 300 88.50 GP 90.30 600 x 600 450 88.50 CONTROL PIT TANK 600 88.50 P16 P15 450 83.90 JP 87.80 600 x 600 450 83.90 P17 P16 450 83.20 JP 85.30 600 x 600 450 83.20 P18 P17 450 82.95 JP 84.40 600 x 600 450 82.95 P19 P18 450 TBC JP TBC EXISTING Ex TBC ISSUE REVISION DATE A CONCEPT ISSUE 04/11/15 B CONCEPT ISSUE 19/11/15 C CONCEPT ISSUE 21/07/16

Transcript of 0C1-050 · 0c1-050 concept issue not for construction--dm rj 102 401 rct 0c1-050 102- 401_ rct_...

Page 1: 0C1-050 · 0c1-050 concept issue not for construction--dm rj 102 401 rct 0c1-050 102- 401_ rct_ 0c1-050 c.pdf scale 1 : 500 ground floor general arrangement plan ... p13 gp 90.70600

BOUNDARY

BO

UN

DA

RY

BO

UN

DA

RY

BO

UN

DA

RY

BOUNDARY

BO

UN

DA

RY

BOUNDARY

BUILDING B01BUILDING B02

BUILDING B04

BUILDING B05

BU

ILD

ING

B03

E97.00

E97.00

E96.00E95.00

E94

.00

E96.00

E95

.00

E94

.00

E93

.00

E92

.00

E91.00

E92.00

E93.00

COLLEGIUM AVENUE

STR

AD

A C

RE

SE

NT

BR

AN

DO

N P

AR

K D

RIV

E

BOUNDARY

BO

UN

DA

RY

BO

UN

DA

RY

P1P2

P3

P9P10P11

P12

P8P7 P6

P5

P4

P13

300 DIA 300 DIA

300

DIA

600

DIA

600

DIA

450 DIA 375 DIA 300 DIA 300 DIA

300

DIA

300 DIA300 DIA

300

DIA

GROUND LEVEL DRAINAGE INCLUDINGSEEPAGE TO BE GRAVITY FED TO

DETENTION SYSTEM

GROUND LEVEL DRAINAGE INCLUDINGSEEPAGE TO BE GRAVITY FED TO

DETENTION SYSTEM

GR

OU

ND

LE

VE

L D

RA

INA

GE

INC

LUD

ING

SE

EP

AG

E T

O B

E G

RA

VIT

Y F

ED

TO

DE

TEN

TIO

N S

YS

TEM

12m WIDE x 30m LONG x 1.1m DEEPUNDERGROUND DETENTION TANK

FORM SWALE IN LANDSCAPINGTO DIRECT OVERLAND FLOWAROUND BUILDINGS

PUMP SYSTEM TO DISCHARGE SEEPAGEWATER AND RAMP RUNOFF.

GROUND LEVEL DRAINAGE TO BE GRAVITYFED TO DETENTION SYSTEM

PUMP SYSTEM TO DISCHARGE SEEPAGEWATER AND RAMP RUNOFF.

GROUND LEVEL DRAINAGE TO BE GRAVITYFED TO DETENTION SYSTEM

300

DIA

450

DIA

450

DIA

P14

P15

P16

P17

P18

ORIFICE TO CONTROL PIT TORESTRICT DISCHARGE TO PSD

EA

SE

ME

NT

E-1

EASEMENT E-1

EASEMENT E-1

EA

SE

ME

NT

E-1

450 DIA

450

DIA

P19

EXISTING 375 DIA PIPE TO BE UPGRADEDTO NEW 450 DIA RCP UNDER ACADAMY AV

BREAK INTO EXISTING COUNCIL SEPAND MAKE GOOD

Ex SEWERPIT

Ex SEWERPIT

Ex SEWERPIT

Ex SEWERPIT

Ex SEWERPIT

Ex SEWERPIT

E91.00

E90.

00E8

9.00

E88.00

E87.00

E86.00E85.00

E85.00

E86.00E87.00

E88.00E89.00

E90.00

Ex SEPEx SEP

Ex SEP

Ex SEP

Ex SEP Ex SEP Ex SEP

Ex SEWERPIT Ex SEWER

PIT

Ex

300

DIA

Ex PIT

Ex PIT

Ex PIT

Ex POLE Ex POLE Ex POLE

Ex POLE

Ex SEP

Ex 450 DIAACADEMY AVENUE

GENERATOR

NEW CONCRETE CROSSOVERCONSTRUCTED TO MONASH CITYCOUNCILS REQUIREMENTS

EXISTING VEGITATION TO REMAINPROTECT DURING CONSTRUCTION

PARALLEL CARPARKING TO COLLEGIUM AVENUEFRONTAGE CONSTRUCTED IN ACCORDANCE WITHMONASH CITY COUNCILS REQUIREMENTS

NEW CONCRETE CROSSOVERCONSTRUCTED TO MONASH CITYCOUNCILS REQUIREMENTS

PARALLEL CARPARKING TO COLLEGIUM AVENUEFRONTAGE CONSTRUCTED IN ACCORDANCE WITHMONASH CITY COUNCILS REQUIREMENTS

POWER KIOSK

EXISTING VEGITATION TO REMAINPROTECT DURING CONSTRUCTION

INTERNAL DRAINAGE ALIGNMENT INDICATIVE ONLYTO BE CONFIRMED

Designed

TITLE

CLIENT

Melbourne Sydney Geelong

Level 10, 620 Bourke StreetMelbourne Victoria 3000t +61 3 8600 9700 e [email protected] w www.adamseng.com.au

These drawings plans & specifications and the copyright therein are the property of Adams Consulting Engineers Pty. Ltd. & must not beused, reproduced or copied wholly or in part without the written permission of Adams Consulting Engineers Pty. Ltd. All rights reserved.

COPYRIGHT c 2015

Drawing Revision

Project Leader

Project Director

Drawn

Certified

Sheet Size

Printed

North

Project No.

Stage No.

Block No.

Sheet No.

Amendment

PDF Name

Int Project No. 140213

C

21/07/2016 1:14:32 PM

C

LEVEL 1 AND SITE DRAINAGE PLAN

RE

TIR

EM

EN

T V

ILLA

GE

, 6 -

30 B

RA

ND

ON

PA

RK

DR

IVE

, WH

EE

LER

S H

ILL

0C1-050

CONCEPT ISSUENOT FOR CONSTRUCTION

-

-

DM

RJ

102

401

RCT

0C1-050

102- 401_ RCT_ 0C1-050 C.PDF

SCALE 1 : 500

GROUND FLOOR GENERAL ARRANGEMENT PLAN

DETENTION REQUIREMENTS:

PSD=385L/s (USING CONTROL PIT)DETENTION VOLUME = 400m³ (USING UNDERGROUND TANK)

NOTE:DETENTION REQUIREMENTS ARE TENTATIVE ONLY AND TOBE CONFIRMED AT DESIGN DEVELOPMENT STAGE.

PITNo.

TYPEINTERNAL

DIMENSIONS L x W (mm)

SURFACELEVEL (m)

DEPTHINLET PIPE

FROM DIA IL

OUTLET PIPE

DIA ILCOVER TYPE

PIT SCHEDULE

P1 - - -GP 96.10600 x 600 300 TBC

P2 P1 300 TBCGP 96.10600 x 600 300 TBC

P3 P2 300 TBCGP P94.80600 x 600 300 TBC

P4 - - -GP 96.10600 x 600 300 TBC

P5 P4 300 TBCGP 96.10600 x 600 300 TBC

P6 P5 300 92.00GP 93.60600 x 600 300 92.00

P7 P3 300 91.00GP 92.60600 x 600 375 91.00

P6 300

P8 P7 375 90.10GP 91.60600 x 600 450 90.10

P9 - - -GP TBC600 x 600 300 TBC

P10 P9 300 TBCGP TBC600 x 600 300 TBC

P11 P10 300 92.80GP 93.50600 x 600 300 92.80

P12 P8 450 89.60GP 91.40600 x 600 600 89.60

P11 300 89.60

P13 P12 600 89.30GP 90.70600 x 600 600 89.30

P14 - - -GP 600 x 600 300 TBC

P15 P14 300 88.50GP 90.30600 x 600 450 88.50 CONTROL PIT

TANK 600 88.50

P16 P15 450 83.90JP 87.80600 x 600 450 83.90

P17 P16 450 83.20JP 85.30600 x 600 450 83.20

P18 P17 450 82.95JP 84.40600 x 600 450 82.95

P19 P18 450 TBCJP TBCEXISTING Ex TBC