Advanced technologies of CDQ plantAdvanced technologies of CDQ plant
TATA Steel CDQTATA Steel CDQ
Minerals, Metals, Metallurgy and MaterialsMinerals, Metals, Metallurgy and Materials ExhibitionExhibition
September 29, 2012, Delhi, IndiaSeptember 29, 2012, Delhi, India
Copyright (C) 2012 NIPPON STEEL ENGINEERING CO., LTD. All right reserved.
Nippon Steel
Engineering
-
8/13/2019 08YusukeUrata_29Sept2012
2/12
ContentContent
The process outline of CDQThe process outline of CDQ
Advanced technologiesAdvanced technologies
Supply recordsSupply records
Copyright (C) 2012 NIPPON STEEL ENGINEERING CO., LTD. All right reserved.
-
8/13/2019 08YusukeUrata_29Sept2012
3/12
Crane
Charging Facility
Primary
Pre-
ChamberElectric Power
1000
980 The steam isused for
The process outline of CDQ
Bucket Dischargingfacility
Sub
Economizer
Blower
Secondary
Dust Catcher
Dust catcherCoolingChamberEx. 100t/h CDQ
18MW
130
Cooled Coke200Copyright (C) 2012 NIPPON STEEL ENGINEERING CO., LTD. All right reserved.
-
8/13/2019 08YusukeUrata_29Sept2012
4/12
duction/b
attery
ton-coke/year)
Technology development history
Range of our CDQ capacity 56t/h ~ 280t/h* Plots are delivery records of our CDQ
Max 280t/h
56t/h
(1976)
Worlds largest
Cokepr
(millio
CDQ Capacity (t/h)Provide the best CDQ suited to the coke oven production.Provide the best CDQ suited to the coke oven production.
Our CDQ meritsOur CDQ merits :: CompactCompact
Reduction of initial costReduction of initial cost
Reduction of operation costReduction of operation cost
280t/h (2009)
Copyright (C) 2012 NIPPON STEEL ENGINEERING CO., LTD. All right reserved.
-
8/13/2019 08YusukeUrata_29Sept2012
5/12
Advanced technologies
Technological problemsand their solutions.
Coke through put is increased.
Gas velocity is increasedGas velocity is increased
Boiler
Cooling gas volume is also increased.
Coke is floated.Coke is floated.
Gas flue is blocked.Gas flue is blocked.
Pressure drop of coolingPressure drop of cooling
gas is increased.gas is increased.
Shut down.Shut down.
Copyright (C) 2012 NIPPON STEEL ENGINEERING CO., LTD. All right reserved.
-
8/13/2019 08YusukeUrata_29Sept2012
6/12
To avoid coke floating
Advanced technologies
Gas flow analysis by
3-D Simulation model
Coke floating problemCoke floating problem has been solvedhas been solved
Comprehension of gas and dustComprehension of gas and dust
flowflow
Optimization of gas flow byOptimization of gas flow by
improvement of gas flue shapeimprovement of gas flue shape
Copyright (C) 2012 NIPPON STEEL ENGINEERING CO., LTD. All right reserved.
-
8/13/2019 08YusukeUrata_29Sept2012
7/12
Problems on the scale-up, and contents of the development
Coke through put is increased.
Advanced technologies of NSEC
Boiler
Temp. of dischargingTemp. of discharging
coke is higher.coke is higher.
Coke cooling time isCoke cooling time is
uneven.uneven.Coke does not getCoke does not get
cold easily.cold easily.
Copyright (C) 2012 NIPPON STEEL ENGINEERING CO., LTD.All right reserved.
Coke descending velocityCoke descending velocity
is uneven.is uneven.
-
8/13/2019 08YusukeUrata_29Sept2012
8/12
To avoid uneven coke descending
Test plant is
By small scale chamber model experimentBy small scale chamber model experiment
Comprehension of coke descendingComprehension of coke descending
behavior in the chamber.behavior in the chamber.
Optimization of coke flow byOptimization of coke flow by
improvement of chamber shape.improvement of chamber shape.
Uneven coke descendin roblemUneven coke descendin roblem
Advanced technologies of NSEC
Full-sized test plant
cons ruc e
in Kitakyushucity, Japan.
By full sized model experimentBy full sized model experiment
Confirmation of operation withoutConfirmation of operation without
coke floating and uneven coke descending.coke floating and uneven coke descending.
has been solvedhas been solved
Copyright (C) 2012 NIPPON STEEL ENGINEERING CO., LTD. All right reserved.
-
8/13/2019 08YusukeUrata_29Sept2012
9/12
Charging facilityCharging facilityeffcient cooling
Heat recovery boilerHeat recovery boilerLow abrasion
Advanced technologies
SubSub EconomizerEconomizerDecrease the gas
consumptionDischarging deviceDischarging device continuously
discharging
u cyc oneu cyc oneincrease dust
collecting
Copyright (C) 2012 NIPPON STEELENGINEERING CO., LTD. All right reserved.
-
8/13/2019 08YusukeUrata_29Sept2012
10/12
K o r e aK o r e a
ChinaChina
GermanyGermany
J a p a nJ a p a n
NSECs Record (units)
Japan 24
Abroad 76
Total 100
NSECs Supply records - Strong market sharing in world
supply records
BrazilBrazil
Supply record of 10 unitsNote:
I n d i aI n d i a
BE3: Our chinese joint company
to expand CDQ business in China.
Installation of
NSECs CDQ in India
JSW Ltd. : 120t/h 4units
(Under construction)
TATA Steel Ltd. : 135t/h 1unit
(Operation start : August, 2011)
-
8/13/2019 08YusukeUrata_29Sept2012
11/12
Nippon Steel Engineering has
Summary
Nippon Steel Engineering has
a wide range of CDQ capacitya wide range of CDQ capacity ((280t/h)280t/h)..
Copyright (C) 2012 NIPPON STEEL ENGINEERING CO., LTD. All right reserved.
supplied a great number of CDQsupplied a great number of CDQ (100units)(100units)all over the world .all over the world .
Nippon Steel Engineering adapt
advanced technologiesadvanced technologies of CDQ plant.
-
8/13/2019 08YusukeUrata_29Sept2012
12/12
The world
largest CDQconstructed by
Nippon Steel