March 2012 D. Jonis
Distributed Generation from an Operator Point of Vieuw”
![Page 2: 07. jonis](https://reader030.fdocuments.us/reader030/viewer/2022020400/568c53801a28ab4916bb0cb7/html5/thumbnails/2.jpg)
2
Topics of thought
•PLAN
•DO •CHECK
•ACT
![Page 3: 07. jonis](https://reader030.fdocuments.us/reader030/viewer/2022020400/568c53801a28ab4916bb0cb7/html5/thumbnails/3.jpg)
3
Topic definition
![Page 4: 07. jonis](https://reader030.fdocuments.us/reader030/viewer/2022020400/568c53801a28ab4916bb0cb7/html5/thumbnails/4.jpg)
4
Challenges of Distributed Generation
![Page 5: 07. jonis](https://reader030.fdocuments.us/reader030/viewer/2022020400/568c53801a28ab4916bb0cb7/html5/thumbnails/5.jpg)
5
Technical Aspects of a Distributor
![Page 6: 07. jonis](https://reader030.fdocuments.us/reader030/viewer/2022020400/568c53801a28ab4916bb0cb7/html5/thumbnails/6.jpg)
6
Technical Perspectives
![Page 7: 07. jonis](https://reader030.fdocuments.us/reader030/viewer/2022020400/568c53801a28ab4916bb0cb7/html5/thumbnails/7.jpg)
7
Conclusion(s)
• Challenges for the full scale realization of Distributed Generation for island system is immense;
• Initial regulation is in place but grid connection code needs to be established on short notice for consumer protection;
• Investment for protection in Distribution Grid is necessary;
• Mind shift in grid operations and control is essential.