![Page 1: 06-04-2019 MT PARK 63(1) Newsletter · 2019-06-04 · Matt Bean - WFL PE (360) 607-4061 matthew.bean@dot.gov CONTRACT NO: 69056718C000009 AWARDED TO: Pavkov Contracting Corp Sumter,](https://reader030.fdocuments.us/reader030/viewer/2022040306/5ec8ae7e561092029a33e039/html5/thumbnails/1.jpg)
Week of June 4, 2019
MT PARK 63(1) Tom Miner Creek Road Capital Improvements Project Construction Newsletter
For questions regarding the project contact:
Matt Bean - WFL PE
(360) 607-4061
CONTRACT NO: 69056718C000009 AWARDED TO: Pavkov Contracting Corp Sumter, SC 29150
TheTomMinerCreekRoadCapitalImprovementsProjectislocatedapproxi-mately40milesSouthwestofLivingston,MontanainParadiseValley.Thepro-jectworkconsistsofremovalandreplacementofthetwodeterioratingshortspanconcretebridgesoverTomMinerCreekandRockCreek.TheexistingbridgeswillbereplacedwithlongerandwiderGRS-IBSbridges,riprapprotec-tion,andguardrail.TheprojectwillalsoincludesomerehabilitationworkontheCarbellaTrussBridgeconsistingofreplacingtheexistingbridgedeckandrepairingsomeofthetrussmembers.
Traf icControl
CurrentOperations
ConstructionsignsareinplacedfortheRockCreekandTomMinerworksites.Flaggersmaybeutilizedtocontroltheworkzones,ifnecessary.Forlargervehicletraf icutilizingtheRockCreekBridgebeawareofconstructiontraf icandpersonnelattheworksiteduringworkinghours.Pleaseslowdownanddrivesafelythroughtheworkareas.
WorkontheTomMinerprojectissettoresumeJune10,2019.TheContractorwillberemobilizingtotheprojecttocompletetheremainingroadworkattheRockCreekandTomMinersites.BeginningnextMondaytheContractorwillbegintheroadwayexcavation, inalriprap,culvertinstallation,andaggregateplacementworkfortheRockCreeksite.WorkattheTomMinersitewillalsobeoccurringintermittentlyorwhentheRockCreeksiteiscompleted.Workontheprojectisanticipatedtobecom-pletedbythebeginningofJuly.TheContractorisscheduledtoworkMondaythroughSaturdayfrom7:00a.m.to5:30p.m.untilworkiscompleted.TheRockCreekBridgewillremainopentotraf icthroughoutthecompletionoftheremainingwork.Lightvehicletraf icisencouragedtousetheCarbellaBridgetoavoidconstructiondelays.LargervehicleswillbeabletoutilizetheRockCreekBridgeduringworkhoursbutareencouragedtousethebridgeoutsideofworkhoursasmuchaspossibletoavoidconstructiondelays.
![Page 2: 06-04-2019 MT PARK 63(1) Newsletter · 2019-06-04 · Matt Bean - WFL PE (360) 607-4061 matthew.bean@dot.gov CONTRACT NO: 69056718C000009 AWARDED TO: Pavkov Contracting Corp Sumter,](https://reader030.fdocuments.us/reader030/viewer/2022040306/5ec8ae7e561092029a33e039/html5/thumbnails/2.jpg)
Construction Photos
Page 2 MT PARK 63(1)
The Tom Miner Creek site where riprap, ap-proach construction, ag-gregate placement and finishing, and other mi-nor items of work re-main to be completed.
The Rock Creek Bridge site where riprap, road-way excavation, aggregate placement, culvert instal-lation, and other minor items of work remain to be completed.