05_moum.ppt

download 05_moum.ppt

of 13

Transcript of 05_moum.ppt

  • 8/14/2019 05_moum.ppt

    1/13

    anita moum, phd-candidate, department of architectural design and management, NTNU 29

    nordic construction ITpost-graduate seminar

    29-30 march in helsinki

    SHORT PRESENTATION PHD PROJECT

    tentative title march 2006:

    EXPLORING THE ICT IMPACT ON THE ARCHITECTURAL

    DESIGN PROCESS

    with a special eye on the architects work and interactions

    anita moum

    phd-candidate/M.Arch

    department of architectural design and management

    norwegian university of science and technology (ntnu)

    main supervisor: tore i. haugen

    advisory supervisors: birgit sudb and bjrn otto braaten

    C.F. Mller Architects

  • 8/14/2019 05_moum.ppt

    2/13

    anita moum, phd-candidate, department of architectural design and management, NTNU 29

    design in general can be seen to pass through phases of relative certainty

    and doubt. B. Lawson

    a good architectural design process is based on the successful interplay

    between unpredictable and iterative processes and actors

    the architect has traditionally a central position in the design process -his work and interaction with the other participants are essential for

    developing good architectural design solutions and building projects

    the AEC-industry face a rapid development within the field of ICT -

    both definition of processes and roles are affected -

    also the architects position and working conditions are in change

    BACKDROP

    b. lawson

    cost

    impact

    TIME

    EFFORT

    CONSTRUCTION

    DESIGN

    OPERATION

    PROGRAM

  • 8/14/2019 05_moum.ppt

    3/13

    anita moum, phd-candidate, department of architectural design and management, NTNU 29

    AIM AND FOCUS

    OVERALL AIM

    to contribute to more knowledge about how ICT impact on central processes

    and actors within architectural design

    FOCUS

    work and interactions/collaboration within the design team

    special focus on the architect

    WHY IMPORTANT

    much research focus on technology development and improvement

    but: also research about technology impact on processes and roles within

    architectural design important

    APPROACHrelation-/process-oriented, not technology-oriented!

    ?

  • 8/14/2019 05_moum.ppt

    4/13

    anita moum, phd-candidate, department of architectural design and management, NTNU 29

    RESEARCH STRATEGY

    flexible design strategy (evolves during data collection)

    explorative purposemainly qualitative approach

    MAIN METHODOLOGICAL TOOLS

    reviews of contemporary literature and research

    workshops with actors from both research and practice

    multiple case studies of reference and building projects

    MAIN SOURCES OF EVIDENCE IN CASE STUDIES

    open-ended interviews with key-actors

    documentary analysis

    eventually small interview- or questionnaire survey

    RESEARCH BASED ON TWO PARTS..a top-down approach the starting point

    RESEARCH STRATEGY AND METHODS

    1 2

  • 8/14/2019 05_moum.ppt

    5/13 anita moum, phd-candidate, department of architectural design and management, NTNU 29

    OVERVIEW OF THE PHD PROJECTS TWO MAIN PARTS

    PART 1 PART 2

    APPROACH

    broad scope

    AIM

    contribute to better understanding and

    overview of how ICT impact on the

    complex processes and relations within

    architectural design

    THROUGH

    development and application

    of a framework for exploration of the topic

    BASED ON - the interplay between

    1) review of contemporary literature/research

    2) workshops and discussions

    3) broad case studies of building projectsAHUS project

    ilsvika projects

    APPROACHlimited scopediving

    AIM

    gain knowledge about interdisciplinary use of

    BIM and its impact on central processes within

    the design team -

    especially the architects work and interactions

    THROUGH

    exploration of real life projects

    BASED ON

    application of framework for data collection,

    analysis, pattern matching

    WHY FOCUS ON INTERDISCIPLINARY USEOF BIM?

    quite new and untested in practice

    impact on processes and roles expected

  • 8/14/2019 05_moum.ppt

    6/13 anita moum, phd-candidate, department of architectural design and management, NTNU 29

    SHORT ABOUT FRAMEWORK: FOCUS AND PURPOSE

    framework needed as a support for

    - getting overview of a complex topic

    - carrying out, analyzing and comparing case-studies

    - analyzing and organizing literature/theory

    - narrowing and limiting scope/focus

    the framework focuses on four central aspects of the architectural design

    process

    the generation of design solutions

    communication

    the evaluation of design solutions

    decision-making

    design generation

    communication

    design evaluation

    decision-making

  • 8/14/2019 05_moum.ppt

    7/13 anita moum, phd-candidate, department of architectural design and management, NTNU 29

    SHORT ABOUT FRAMEWORK: FOCUS AND PURPOSE

    ..and is based on the definition of 3 hierarchical levels

    designer/

    architect

    micro-level

    macro-level

    meso-level

    design team

    contractors

    users

    legislatorsdesign team

    client

    macro-

    level

    meso-

    level

    micro-

    level

    design

    generation

    communicat

    ion

    design

    evaluation

    decision-

    making

    THE ICT IMPACT MA TRIX

    summ arizes the explored key benefi ts and

    chal lenges from imp lementation and use of ICT in

    the archi tectural design process, from bo th theory

    and practice supports the comp aring of empirical

    data from di fferent case studies

    the l ines between

    the boxes in thematrix are a

    breathing

    screen between

    interconnected,

    interdependent

    and i terative

    elements

    another metaphor:

    puzzle

  • 8/14/2019 05_moum.ppt

    8/13 anita moum, phd-candidate, department of architectural design and management, NTNU 29

    CASE STUDIESSAMPLE STRATEGY

    large-/middle scaled

    building projects

    trying out

    implementation

    and interdisciplinary

    use of BIM within

    design team

    being part of..

    focus:

    BIM impact on interaction between

    architects and consultants

    exploring:

    - experiences from

    implementation/use > lessons learnt

    - challenges/barriers and benefits/potentialsprogramming

    production

    design

    BUILDING PROCESS

    case-studie del 1 case-studie del 2

    B

    UILDINGP

    ROJECT

    ME

    SO-/MICRO-LEVEL

    R&D initiativeson AEC-industry

    level

    focus:

    back-drop/context building project and

    design team interactions

    exploring:

    - visions, aims, experiences

    - guidelines implementation/useREF.PRO

    JECT

    MACRO-L

    EVEL

  • 8/14/2019 05_moum.ppt

    9/13 anita moum, phd-candidate, department of architectural design and management, NTNU 29

    CONSIDERED CASE STUDY PROJECTS - DRAFT

    The case study

    method

    al lows investigators

    to retain the hol ist ic

    and meaningful

    characterist ics

    of real-l i fe events.

    (Yin, 2003)

    building smart / IAI

    building down barriers

    IDM-project

    AHUS - new university hospital

    HITOS - troms university

    college (retrospective case)

    REFERENCE PROJECTS

    MACRO-LEVEL

    BUILDING PROJECTS

    MESO/MICRO-LEVEL

    digital construction reykjavik concert- and congresscenter

    building smart / IAI

    arkos-project?

    berlin-brandenburg international

    airport

    proIT?

    C.F. Mller Architects

    HLT

  • 8/14/2019 05_moum.ppt

    10/13 anita moum, phd-candidate, department of architectural design and management, NTNU 29

    RESEARCH PLAN

    2004 2008200701.0

    2.0

    4

    01.0

    4.0

    8

    2005 2006

    cases

    tudiespar

    t1

    ques

    tionna

    ire

    cases

    tudy

    desig

    n

    cases

    tudiespar

    t1

    ana

    lys

    is

    ana

    lys

    is

    tes

    t/p

    ilo

    tcases

    review literature& research

    theoreticalstudies

    frameworkdevelopment

    works

    hop

    frameworkdevelopment/improvement

    literature review

    th

    es

    iswri

    ting

    res

    earc

    hdes

    ign

    div.

    conference

    papers

    project

    reports/

    assignm.

    paper 1

    theoretical

    fundament

    paper 2

    BIM

    context

    initiatives/

    implement.

    paper 3

    BIM

    and

    design

    team

    processes

    paper 4

    BIM

    and thearchitects

    work

    paper 5

    reporting

    research

    results

    PART1

    PART2

    works

    hop

  • 8/14/2019 05_moum.ppt

    11/13 anita moum, phd-candidate, department of architectural design and management, NTNU 29

    CONTRIBUTION OF RESEARCH

    CONTRIBUTION TO

    more knowledge

    better understanding and overview

    THROUGH EXPLORATION OF

    relevant literature/research/theory

    lessons learnt from practice

    AND A REFLECTING ON THE IMPLICATIONS

    for processes-/role definitions

    SUPPORTED BY

    application developed framework

    FINDINGS FOUNDATION FOR

    defining propositions/hypothesis/questions for further research

    improving management and design-related processes

    AND FURTHER DISCUSSIONS REGARDINGfuture work and role of architect > re-thinking needed?

    design team processes > re-definition needed?

    relation new technology vs. established processes?

    ?

    ?

    ?

  • 8/14/2019 05_moum.ppt

    12/13 anita moum, phd-candidate, department of architectural design and management, NTNU 29

    THE NEXT STEPS - CHALLENGES

    RESEARCH DESIGN

    definition research questions

    further narrowing of scopeensuring methodological reliability and validity

    THESIS STRUCTURE/PLAN

    level of ambition vs. what is actually possible

    definition content/relation articles

    DEVELOPMENT FRAMEWORK

    definition hierarchical levels

    interconnectedness of framework components

    CASE STUDIES

    case-study plan/design

    sample (projects/respondents)

    questionstime plan

    practical limitations vs. appropriate methods (> research questions)

    So little done, so much to do.

    Cecil Rhodes, last words

    Die zwei grssten Tyrannen der

    Erde der Zufall und die Zeit.

    Johann Gottfried Herder

  • 8/14/2019 05_moum.ppt

    13/13

    anita moum, phd-candidate, department of architectural design and management, NTNU 29

    graduated as a master of architecture in 1995 on the norwegian university of

    science and tehnology (NTNU)

    eight years experience from working as an architect and building designmanager in different architectural companies in munich, germany

    CONTACT

    department of architectural design and management

    faculty of architecture and fine arts

    NTNU

    alfred getz vei 3

    n-7491 trondheim

    visiting phd-candidate:

    lehrstuhl fr baurealisierung undinformatik

    TU mnchen

    arcisstrasse 21

    d-80333 mnchen

    fon: +49 89 28922166 (r+d lab)

    fax: +49 89 28922163

    e-mail: [email protected]

    cell phone: +49 175 6633378/+47 9360340

    publications: http://www.metamorfose.ntnu.no/english/publications.shtml

    BACKGROUND - CONTACT

    terminal 2, munich airport. K+P architekten und stadtplanerarchitectural competition, building design and -management

    1997-2000

    headquarters t-online darmstadt. SIAT gmbh

    building design and - management 2002-2003

    SIAT GmbH