05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016...

43
CHAMPLIN - CORCORAN - DAYTON - MAPLE GROVE - MEDINA - PLYMOUTH - ROGERS elm creek Watershed Management Commission ADMINISTRATIVE OFFICE 3235 Fernbrook Lane Plymouth, MN 55447 PH: 763.553.1144 FAX: 763.553.9326 email: [email protected] www.elmcreekwatershed.org TECHNICAL OFFICE Hennepin County Dept. of Environment & Energy 701 Fourth Ave S Suite 700 Minneapolis, MN 55415-1600 PH: 612.596.1171 FAX: 612.348.8532 email: [email protected] May 4, 2016 Representatives Elm Creek Watershed Management Commission Hennepin County, MN The meeting packet for this meeting may be found on the Commission’s website: http://elmcreekwatershed.org/pages/Meetings/ Dear Representatives: A regular meeting of the Elm Creek Watershed Management Commission will be held on Wednesday, May 11, 2016, at 11:30 a.m. in the Mayor’s Conference Room at Maple Grove City Hall, 12800 Arbor Lakes Parkway, Maple Grove, MN. The Commission will suspend its regular meeting at 11:30 a.m. for the purpose of conducting a public meeting on a proposed Minor Plan Amendment to adopt revisions to its Capital Improvement Program. The regular meeting will resume immediately after the public meeting concludes. Please email Beverly at [email protected] to confirm whether you or your Alternate will be attending the meeting. Thank you. Regards, Judie A. Anderson Administrator JAA:tim Encls: Meeting Packet cc: Alternates Joel Jamnik TRPD Diane Spector HCES Third Gen TAC TMDL TAC BWSR Met Council Clerks MPCA DNR Official Newspaper Z:\Elm Creek\Meetings\Meetings 2016\05 Notice_reg meeting_public meeting.doc Item 1

Transcript of 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016...

Page 1: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

CHAMPLIN - CORCORAN - DAYTON - MAPLE GROVE - MEDINA - PLYMOUTH - ROGERS

elm creek Watershed Management Commission

ADMINISTRATIVE OFFICE 3235 Fernbrook Lane Plymouth, MN 55447 PH: 763.553.1144 FAX: 763.553.9326 email: [email protected] www.elmcreekwatershed.org

TECHNICAL OFFICE Hennepin County

Dept. of Environment & Energy 701 Fourth Ave S Suite 700

Minneapolis, MN 55415-1600 PH: 612.596.1171

FAX: 612.348.8532 email: [email protected]

 

 

May 4, 2016  

Representatives Elm Creek Watershed Management Commission Hennepin County, MN 

The meeting packet for this meeting may be found on the Commission’s website: http://elmcreekwatershed.org/pages/Meetings/ 

Dear Representatives: 

A regular meeting of the Elm Creek Watershed Management Commission will be held on Wednesday, May 11, 2016, at 11:30 a.m.  in  the Mayor’s Conference Room at Maple Grove City Hall, 12800 Arbor Lakes Parkway, Maple Grove, MN.   

The Commission will suspend  its regular meeting at 11:30 a.m. for the purpose of conducting a public meeting on a proposed Minor Plan Amendment to adopt revisions to its Capital Improvement Program. The regular meeting will resume immediately after the public meeting concludes.  Please email Beverly at [email protected] to confirm whether you or your Alternate will be attending the meeting.  

Thank you. 

Regards,    

Judie A. Anderson Administrator JAA:tim  Encls:  Meeting Packet  

cc:     Alternates Joel Jamnik TRPD Diane Spector 

HCES  Third Gen TAC TMDL TAC  

BWSR Met Council Clerks 

MPCA DNR Official Newspaper  

 

Z:\Elm Creek\Meetings\Meetings 2016\05 Notice_reg meeting_public meeting.doc 

Item 1

Page 2: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

*in meeting packet **available at meeting

CHAMPLIN - CORCORAN - DAYTON - MAPLE GROVE - MEDINA - PLYMOUTH - ROGERS

elm creek Watershed Management Commission ADMINISTRATIVE OFFICE TECHNICAL OFFICE 3235 Fernbrook Lane Hennepin County Plymouth, MN 55447 Dept. of Environment and Energy PH: 763.553.1144 701 Fourth Ave S Suite 700 FAX: 763.553.9326 Minneapolis, MN 55415-1600 Email: [email protected] PH: 612.596.1171 www.elmcreekwatershed.org FAX: 612.348.8532 Email: [email protected]

AGENDA May 11, 2016 

 1.  Call Regular Meeting to Order.   a.  Approve Agenda.* 2.  Consent Agenda.   a.   Minutes last Meeting.*    b.   Treasurer’s Report and Claims.**  Suspend regular meeting 3.  Public Meeting for Minor Plan Amendment to SCWM Third Generation Plan.   a.  Staff Report.*   b.  Commissioner Discussion.   c.  Open Public Meeting.     1)  Receive written comments.     2)  Receive comments from public.   d.  Close Public Meeting.   e.  Commission Discussion.   f.  Consider Resolution 2016‐01.*  Resume regular meeting. 4.  Open Forum. 5.  Action Items. 

a.  Adopt 2017 Operating Budget.*   1)  Member Assessments.* b.  Final selection CAMP lakes.   

  c.  Project Reviews – also see Staff Report.*  6.  Watershed Management Plan. 7.  Elm Creek Watershed‐wide TMDL.   8.  New Business. 9.   Communications.   a.  Biennial Budget Request (BBR) submittal.*  10.  Education.     a.  WMWA Update.** 11.  Grant Opportunities.   a.   12.   Other Business.    a.  Commissioner appointments received from Dayton, Maple Grove, Medina, Plymouth, Rogers. 13.  Project Updates – see Staff Report.* 14.  Adjourn.             Z:\Elm Creek\Meetings\Meetings 2016\05 Agenda.doc 

Item 1a

Page 3: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

*in meeting packet **available at meeting

CHAMPLIN - CORCORAN - DAYTON - MAPLE GROVE - MEDINA - PLYMOUTH - ROGERS

   

Project Reviews.  (See Staff Report.*)     R  a.  2012‐021W  Kreps Wetland Violation, Corcoran.       b.  2013‐041W  Jomico, Corcoran.       c.  2013‐046  Woods of Medina, Medina.       d.  2014‐015  Rogers Drive Extension, Rogers.       e.  2015‐001  Hwy 47 & Troy Lane Elementary School Site, Plymouth.       f.  2015‐004  Kinghorn Outlet A, Rogers.       g.  2015‐006  Veit Building Expansion, Rogers. 

      h.  2015‐013  Wayzata High School, Plymouth.       i.  2015‐016  Brockton PUD, Plymouth.       j.  2015‐020  Strehler Estates, Corcoran.       k  2015‐025  OP3 Outdoor Storage, Rogers.     R  l  2015‐028  Sundance Woods Phase II, Dayton.     R  m.  2015‐029  Enclave at Rush Creek, Maple Grove.       n.  2015‐030  Kiddiegarten Child Care Center, Maple Grove.       o.  2015‐032  Rogers High School Auditorium Addition. A  E    p.  2015‐038  Wealshire of Medina.     R  q.  2015‐039  The Enclave at Dunlavin Woods, Maple Grove.       r.  2016‐001  CSAH 115/CR116, Medina.       s.  2016‐002  The Markets at Rush Creek, Maple Grove.       t.  2016‐003W  Park Storage Place, Corcoran.       u.  2016‐004  Park Storage Place, Corcoran.       v.  2016‐005W  Ravinia Wetland Bank Plan, Corcoran.   E  R  w.  2016‐006  Mississippi River Shoreline Repair, Champlin.       x.  2016‐007W  Beacon Academy, Corcoran.     R  y.  2016‐008  Northwest Greenway Trail Phase II, Plymouth.     R  z.  2016‐009W  Chris Butek Pond Excavation, Corcoran.     R  aa.  2016‐011W  2016 Downtown Corcoran Utility and Street Improvements     R  ab.  2016‐012W  Corcoran Community Solar Gardens     R  ac.  2016‐013  Arrowhead Drive Trail, Medina.       ad.  2016‐014  Balsam Apartments, Dayton.     R  ae.  2016‐016  Wayzata High School Varsity Baseball Improvements, Plymouth.        af.  2016‐017  The Preserve at Meadow Ridge, Plymouth.       ag.  2016‐018  Cambridge Park, Maple Grove.       ah.  2016‐019  Just for Kix, Medina.       ai.  2016‐020  Ryan Meadows, Rogers.       aj.  2016‐021  Diamond View Estates, Dayton. 

      ak.      A = Action item    E = Enclosure provided    I = Informational update will be provided at meeting    RPFI ‐  removed pending further information R = Will be removed   RP= Information will be provided in revised meeting packet….. D = Project is denied  

Item 1a

Page 4: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

*in meeting packet 

CHAMPLIN  ‐  CORCORAN  ‐  DAYTON  ‐  MAPLE GROVE  ‐  MEDINA  ‐  PLYMOUTH  ‐  ROGERS 

elm creek Watershed Management Commission ADMINISTRATIVE OFFICE 3235 Fernbrook Lane Plymouth, MN 55447 PH: 763.553.1144 • FAX: 763.553.9326 Email: [email protected] www.elmcreekwatershed.org

TECHNICAL OFFICE Hennepin County

Dept. of Environment and Energy 701 Fourth Ave S Suite 700

Minneapolis, MN 55415-1600 PH: 612.596.1171 • FAX: 612.348.8532 Email: [email protected]

Regular and TAC Meeting Minutes 

April 13, 2016 

I.  A meeting of the Technical Advisory Committee (TAC) for the Elm Creek Watershed Management Commission was called to order at 9:36 a.m., Wednesday, April 13, 2016, in the Mayor’s Conference Room, Maple Grove City Hall, 12800 Arbor Lakes Parkway, Maple Grove, MN by Doug Baines. 

  Present were: Todd Touminen, Champlin; Doug Baines, Dayton; Liz Weir and Kaci Fisher, Medina; Mark Lahtinen and Rick  Lestina,  Maple  Grove;  Ben  Scharenbroich,  Plymouth;  Andrew  Simmons,  Rogers;  Jeff  Weiss,  Barr  Engineering;  Ali Durgunoğlu and  James Kujawa, Hennepin County Dept. of Environment and Energy  (HCEE); Rich Brasch, Three Rivers Park District (TRPD); and Judie Anderson and Amy Juntunen, JASS. 

  Also present: Steve Christopher, Board of Water and Soil Resources (BWSR);  

  A.  Motion by Kujawa, second by Scharenbroich to approve the TAC agenda.*  Motion carried. 

  B.  Consider proposed 2016 Capital Projects. 

    1.  Fish Lake Alum Treatment, Phase I, Maple Grove.*  Sediment cores were collected from Fish Lake and the alum dosage has been determined.   The sediment cores prove that 70% of the  lake’s phosphorus  load comes from internal loading.  The project will be contingent on grant funding from BWSR.  The alum treatment will treat sediment at 30 feet and deeper.   Motion by Kujawa,  second by Scharenbroich  to  recommend Commission approval of  the project at a  cost of $75,000 in 2017.  Motion carried unanimously.  BWSR grants will be open July‐August and awarded in December 2016. 

    2.  Rush Creek Main Stem Restoration, Maple Grove.*   This project  involves the stabilization of the erosion‐prone sites in a 2900 linear foot portion of Rush Creek within The Enclave on Rush Creek project. The initial erosion was likely due to increased flows from the developing watershed. Erosion has caused encroachment into the adjacent woods and trees and other debris to fall into the creek. The debris in the creek has resulted in diversion of flows causing accelerated erosion in most outside bend locations.  Motion by Kujawa, second by Scharenbroich to recommend Commission approval the project at a $75,000 cost share.  Motion carried unanimously. 

    3.  Elm Creek Dam at the Mill Pond.*  This project is a portion of a $7+ million project to replace the Elm Creek dam and bridge, public access construction, and  flood mitigation at  the Mill Pond  in Champlin.   The project will construct a new spillway capable of conveying the 100‐year peak discharge.  A new exterior weir will also be constructed.  A 105 foot  interior weir will contain low flows in a rock‐lined channel.   The project addresses several safety  issues with the existing dam and allow  for  the drawdown of Mill Pond  for maintenance of  the  impoundment and management of aquatic  invasive species.   Motion by Lestina, second by Scharenbroich to recommend Commission approval of the project at a cost share of $187,500.  Motion carried unanimously. 

    4.  Mississippi Point Park Riverbank Repair, Champlin.*  Champlin is requesting up to $75,000 for this project.  The project is located in a city‐owned park on the Mississippi River and is eligible for up to $180,000 in state funding.  Staff determined that this section of the Mississippi River Bank is in the Elm Creek Watershed.  Motion by Kujawa, second by Scharenbroich to recommend conditional Commission approval of the project at a cost not to exceed $75,000 or 25% of the remaining cost after state funding. Motion carried unanimously. 

    5.  Fox  Creek  Restoration,  Rogers.*    This  is  the  second  phase  of  the  Fox  Creek  stream  bank stabilization.    This  section  includes  a  residential  and  industrial  section  of  Rogers.    The  stream  experiences  extensive  bank failures, undercutting, and brush in the stream due to runoff from a housing development built in the early 1990s.  This project is on private property, but residents are unlikely to disturb the restoration area.   The City Engineer, WSB, has completed the 

Item 2a

Page 5: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

elm creek Watershed Management Commission  Minutes – April 13, 2016 Page 2 

 

*in meeting packet 

CHAMPLIN  ‐  CORCORAN  ‐  DAYTON  ‐  MAPLE GROVE  ‐  MEDINA  ‐  PLYMOUTH  ‐  ROGERS 

application.  Buffer between the residential lots and the stream, as well as signage, should be included in the plans.  Project cost at 25% is $80,312.  The project will require a DNR permit.  Motion by Touminen, second by Kujawa to recommend conditional Commission approval based on the results of the feasibility study.  Motion carried unanimously. 

  C.  Met  Council  Stormwater  Grants.    Christopher  noted  that  the  deadline  for  these  grants  is May  11  and encouraged that all projects in the approved CIP should apply for this grant.  Grants must be submitted by the watershed.   

  D.  Adjourn.  The TAC meeting was adjourned at 10:48 a.m. 

 

II.  A  regular  meeting  of  the  Elm  Creek  Watershed  Management  Commission  was  called  to  order  at  11:31  a.m., Wednesday, April 13, 2016, in the Mayor’s Conference Room, Maple Grove City Hall, 12800 Arbor Lakes Parkway, Maple Grove, MN by Chairman Doug Baines. 

  Present were: Gerry Butcher,  Champlin;  Jon  Bottema, Corcoran; Doug Baines, Dayton;  Joe  Trainor, Maple Grove; Elizabeth Weir, Medina; Fred Moore, Plymouth; Ali Durgunoğlu and James Kujawa, Hennepin County Dept. of Environment and Energy  (HCEE);  Rich  Brasch,  Three  Rivers  Park District  (TRPD);  Jeff Weiss,  Barr  Engineering;  and  Judie  Anderson  and  Amy Juntunen, JASS.  

  Not represented: Rogers. 

Also  present:  Todd  Tuominen,  Champlin;  Mark  Lahtinen,  Maple  Grove;  Ben  Scharenbroich,  Plymouth;  Andrew Simmons, Rogers; and George Schneider, Rice Lake Association. 

A.  Motion by Weir, second by Moore to approve the agenda.* Motion carried unanimously. 

B.  Motion by Weir, second by Moore to approve the minutes* of the March 9, 2016 meeting. Motion carried unanimously. 

C.  Motion by Moore, second by Weir to approve the April Treasurer’s Report and Claims* totaling $15,317.21. Motion carried unanimously. 

III.  Open Forum. No one was present to speak to matters not on the agenda. 

IV.  Action Items. 

A.  Select CAMP Lakes.  Cowley and Jubert lakes, along with either Laura or Dubay, will be monitored dependent on volunteer availability. 

[Butcher arrived 11:32 a.m.] 

B.  Project Reviews.*   

    1.  2015‐039, The Enclave at Dunlavin Woods, Maple Grove.*   This  is an 18‐acre parcel  located  in the  southeast  intersection of CSAH 101 and 101st Avenue. The applicant  is proposing  to  subdivide  this parcel  into 29 single‐family residential lots. Water reuse from the pond to irrigate areas is planned to meet the abstraction requirement.  Two  ponds  provide  treatment  for  rate  and  nutrient  control.    Staff  recommends  approval  of  the  site  plan  with  the condition that the City confirms the emergency overflow of the eastern wetland to allow one foot freeboard to the homes on the east side of the development.  Motion by Weir, second by Butcher to approve Staff findings dated March 18 with the condition stated.  Motion carried unanimously. 

    2.  2016‐001, CSAH 115/County Road 116, Medina.*   This project  is  located on County State Aid Highway (CSAH) 115 and County Road 116. The project will include reconstruction of the roadway, including widening of the  road  from  the  existing  two‐lane  roadway,  constructing  dedicated  turn  lanes,  drainage  improvements,  and  the construction of a paved pedestrian and bicycle trail. The purpose of the project is to increase capacity of the intersection and  improve mobility and  safety  for all  transportation  system users. Construction  is anticipated  in  the  spring of 2017.  Based on soil types and water table elevations, infiltration is not feasible within the project area.  Abstraction credits of 0.84 acre feet are proposed for use of an iron‐enhanced filtration system.  Staff recommends approval contingent upon 1) modifications  to  the  final  design  to  reduce  the  two‐year  peak  runoff  to  below  existing  conditions;  2)  the  wetland mitigation  plan  being  finalized  and  approved  prior  to  wetland  impacts;  and  3)  receipt  of  recorded  and  approved 

Item 2a

Page 6: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

elm creek Watershed Management Commission  Minutes – April 13, 2016 Page 3 

 

*in meeting packet 

CHAMPLIN  ‐  CORCORAN  ‐  DAYTON  ‐  MAPLE GROVE  ‐  MEDINA  ‐  PLYMOUTH  ‐  ROGERS 

operations and maintenance plans for all stormwater management features, including the enlarged pond, iron‐enhanced biofiltration  system,  and  SAFL  baffles.   Motion  by Weir,  second  by Moore  to  approve  Staff  findings  dated  April  7 contingent upon the four conditions listed.  Motion carried unanimously. 

    3.  2016‐008, Northwest Greenway Trail Phase II, Plymouth.*  The City Of Plymouth is proposing to construct a 1.3 mile long, 12‐foot wide paved trail lane on 3.4 acres running from Vicksburg Lane westward to Plymouth Dog Park near the County Road 47 and Elm Creek. The proposed project will place 254 cubic yards of fill and 258 cubic yards of  cut within  the designated  floodplains.    Site plans meet with  the Commission’s  standards.    Staff  recommends approval of the project.  Motion by Weir, second by Moore to approve Staff findings dated April 7 as presented.  Motion carried unanimously. 

  4.  2016‐014, Balsam Apartments, Dayton.*  This is an existing 2.5 acre commercial lot within the Dayton River Commercial Park Addition (Lot 3, Block 1), located near the SE corner of Balsam Lane and Dayton River Road (CSAH 12). This area was reviewed as Northeast Dayton Utility & Street Improvements (ECWMC #2006‐075). The project will consist of a multi‐story apartment complex, an underground parking garage, a parking  lot, two rain gardens and all the related utilities.  Staff recommends approval contingent on 1) A sequencing plan for the infiltration basin being added to  the  erosion  control  plans;  2)  Drainage  and  utility  easements  provided  over  the  rain  gardens;  and  3)  A  recorded operations and maintenance plan agreement with the City of Dayton, unless the City agrees to maintain the rain gardens.  Motion by Weir, second by Trainor to approve Staff findings dated April 6 with the three conditions listed.  Motion carried unanimously. 

    5.  2016‐16, Wayzata High School Varsity Baseball Field Improvement, Plymouth.*    In their findings dated April 6, 2016, Staff approved this project administratively with two conditions.  Staff recommends adding a rain garden for additional treatment, but the City of Plymouth does not encourage rain gardens on public property.  The City is working with the school to use an iron‐enhanced bio‐char filtration system instead. 

  C.  2015 Annual Activity Report.**  The report is due to BWSR on April 30.  Commissioners should submit any comments to Staff by April 22.  Motion by Moore, second by Weir to accept the 2015 Annual Activity Report.  Motion carried unanimously. 

D.  2015  Audit  Report.*    Staff  has  reviewed  the  audit  report with  the  auditor  and  recommends  approval.  Motion by Weir, second by Butcher to accept the 2015 Audit Report.  Motion carried unanimously. 

  E.  2016 USGS Agreement.*  The Commission’s share of the agreement is $19,960 is within budget.  Motion by Moore, second by Weir to approve the 2016 USGS Agreement.  Motion carried unanimously. 

V.  Action Items – Watershed Management Plan. 

A.  Revised  table 4.5.*    Items  in yellow  represent changes Staff was directed  to make at  the March 9, 2016 meeting prior  to  submitting  the BBR  to BWSR.    The  changes  shift projects  to match  the $500,000  annual  cap.   No  action necessary. 

B.  March 2 memo update.*  The updated memo outlines the CIP process.  The additional paragraph describes adjustments made for the BBR.  No action necessary. 

C.  Consider  recommendations  of  TAC  re  2016  Capital  Projects.    The  TAC  recommends  approval  to move forward with the following five projects, with the understanding that items may change in September after the completion of feasibility reports. 

  1)  Fish Lake Alum Treatment Phase I, Maple Grove.*    2)  Rush Creek Main Stem Restoration, Maple Grove.*    3)  Elm Creek Dam at the Mill Pond, Champlin.*    4)  Mississippi River Shoreline Repair and Stabilization, Champlin.*    5)  Fox Creek at Creekview Restoration Project, Rogers. 

  Motion by Weir, second by Butcher to approve moving the five projects forward in the CIP process.  Motion carried unanimously. 

VI.  Elm  Creek Watershed‐wide  TMDL.    Responses  to  comments  received  on  the  draft  TMDL  report  were  sent  to Corcoran, Medina, and Plymouth.*  The comments were submitted during the informal review process.  Staff will inform the 

Item 2a

Page 7: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

elm creek Watershed Management Commission  Minutes – April 13, 2016 Page 4 

 

*in meeting packet 

CHAMPLIN  ‐  CORCORAN  ‐  DAYTON  ‐  MAPLE GROVE  ‐  MEDINA  ‐  PLYMOUTH  ‐  ROGERS 

Commission when the  formal 30‐day period  is established by MPCA.   Corcoran expressed concern regarding ability to meet regulation due to their budget constraints and  inability to regulate ag practices.   The Commission understands that the best opportunities to reduce pollution is as development occurs. 

[Butcher departed 12:32 p.m., Trainor departed 12:38 p.m.] 

 

VII.  New Business.  None. 

VIII.  Communications. 

A.  Biennial Budget Requests (BBRs) submittal.  The BBR will be submitted prior to the deadline of April 15 and provided in the May meeting packet. 

B.  Evolution to Cleaner Water and Greener Water Companies, April 13.* 

C.  2015 Buffer Legislation.* 

IX.  Education. 

  A.  WMWA Update.**   WMWA met April 12, 2016  and discussed  the  relationship with Blue  Thumb/Metro Blooms, and the deliverables for the Pledge to Plant campaign.  Staff is in process of screening two potential new educators for the Watershed PREP program. 

  B.  MWCA Workshop – Protecting Farmland and Improving Water Quality – April 19, 2016. 

VII.  Other Business.   

  A.  Grant Opportunities.  Metropolitan Council has opened a Stormwater Grant Program.  The deadline for grant applications  is May 11.   This type of grant must be submitted by the watershed organization.   Cities can complete the grant applications and Staff will sign and submit on behalf of the watershed. 

  B.  Other Business. 

    1.  Commissioner appointments have are needed from Champlin, Corcoran, and Dayton.   

  2.  The following projects are discussed in the April Staff Report.* ("W" denotes wetland project.) 

    a.  2012‐021W Kreps Wetland Violation, Corcoran.     b.  2013‐041 Jomico, Corcoran.      c.  2013‐046 Woods of Medina, Medina.      d.  2014‐015 Rogers Drive Extension, Rogers.     e.   2014‐033 Kinghorn Industrial Park Spec Building, Rogers     f.  2014‐042 Launch Park Addition (Outlot B), Rogers.      g.  2015‐001 Highway 47/Troy Lane School, Plymouth.     h.  2015‐004 Kinghorn Outlet A, Rogers.     i.  2015‐006 Veit Building and Parking Lot Addition, Rogers.     j.  2015‐007 Parkway Preserve, Rogers.     k.  2015‐013 Wayzata High School, Plymouth.     l.  2015‐016 Brockton PUD, Plymouth.     m.  2015‐020 Strehler Estates, Corcoran.     n.  2015‐025 OP3 Outdoor Storage, Rogers.     o.  2015‐028 Sundance Woods Phase II, Dayton.     p.  2015‐029 Enclave at Rush Creek, Maple Grove.     q.  2015‐030 Kiddiegarten Child Care Center, Maple Grove.     r.  2015‐032 Rogers High School Auditorium Addition, Rogers.     s.  2015‐033W Corcoran Community Solar Garden – Oakdale Lane.     t.  2015‐038 Wealshire of Medina, Medina.     u.  2015‐039 The Enclave at Dunlavin Woods, Maple Grove.*     v.  2016‐001 CSAH 115/CR 116 Reconstruction, Medina.* 

Item 2a

Page 8: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

elm creek Watershed Management Commission  Minutes – April 13, 2016 Page 5 

 

*in meeting packet 

CHAMPLIN  ‐  CORCORAN  ‐  DAYTON  ‐  MAPLE GROVE  ‐  MEDINA  ‐  PLYMOUTH  ‐  ROGERS 

    w.  2016‐002 The Markets at Rush Creek, Maple Grove.     x.  2016‐003W Park Place Storage Wetland Replacement Plan, Corcoran.     y.  2016‐004 Park Place Storage Site Plans, Corcoran.     z.  2016‐005W Ravinia Wetland Bank, Corcoran.     aa.  2016‐006 Mississippi River Shoreline Stabilization , Champlin.     ab.  2016‐007 Beacon Academy, Corcoran.     ac.  2016‐008 NW Greenway Trail Phase II, Plymouth.*     ad.  2016‐009 Chris Butek Pond Excavation, Corcoran.     ae.  2016‐010 Park Nicollet at the Grove, Maple Grove.      af.  2016‐011W Downtown Corcoran Utility Improvements, Corcoran.     ag.  2016‐012W Corcoran Community Solar Garden, Corcoran.     ah.  2016‐013 Arrowhead Drive Trail, Medina.       ai.  2016‐014 Balsam Apartments, Dayton.*     aj.  2016‐015 Lawndale Trail, Maple Grove.     ak.  2016‐016 Wayzata High School Varsity Baseball Field Improvement, Plymouth.*    3.  Adjournment.   There being no  further business, motion by Weir, second by Bottema to adjourn.  

Motion carried unanimously.  The meeting was adjourned at 12:49 p.m. 

 Respectfully submitted,     Amy Juntunen Recording Secretary AAJ:tim Z:\Elm Creek\Meetings\Meetings 2016\04 Reg Meeting Minutes.docx 

 

Item 2a

Page 9: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

3235 Fernbrook LanePlymouth, MN 55447

(763) 553-1144Fax: (763) 553-9326

[email protected]

Z:\Elm Creek\Third Generation Plan\Minor Plan Amendment Spring 2016\M‐Public Meeting‐Staff Report.docx 

To:    Elm Creek Commissioners 

From:   Judie Anderson   

Date:     May 11, 2016 

Subject:  Public Meeting – Minor Plan Amendment 

 On April 13, 2016  the Elm Creek Watershed Management Commission, upon  recommendation of  the Technical Advisory Committee, approved a motion to move forward with a Minor Plan Amendment to its Third Generation Watershed Management Plan to revise the Capital Improvement Program as follows: 

A.  Add the following projects:   1.  Fish Lake Alum Treatment Ph 1, Maple Grove, est cost $300,000, Comm share in 2016 $75,000   2.  Rush Creek Main Stem Restoration, Maple Grove, est cost $1,650,000, Comm share 2016‐2019 

  $250,000   3.  Ranchview Wetland Restoration, Maple Grove, est cost $2,000,000, Comm share in 2017 

  $250,000   4.  Rush Creek South Stem Restoration, Maple Grove, est cost $675,000, Comm share in 2018 

  $168,750   5.  Downtown Pond Expansion & Reuse, Rogers, est cost $406,000, Comm share in 2018 $101,500  B.  Revise the following project:   1.  Fox Creek at Creekview Restoration Project, Rogers, increase cost from $150,000 to $321,250,      Comm share in 2016 from $37,500 to $80,312  C.  Shift the funding for the following projects as indicated:   1.  Tree Thinning and Bank Stabilization, $50,000 annually, shift $50,000 from 2016 to 2020   2.  Stonebridge Storm Sewer Retrofit, Maple Grove, est cost $200,000, shift $50,000 from 2016 to      2017   3.  Rain Garden at Independence Ave, Champlin, est cost $300,000, shift $75,000 from 2016 to      2017   4.  Mill Pond Raingardens, Champlin, est cost $400,000, shift $100,000 from 2017 to 2018   5.  Agricultural BMPs Cost Share, $50,000 annually, shift $50,000 from 2016 to 2020  D.  The remaining fifteen projects on the CIP are unchanged.  

COMMISSION ACTION The  purpose  of  the  public meeting  is  to  present  the  proposed  amendment  and  to  take  comment  from  the member cities and the public.  The purpose of the public meeting is NOT to approve going forward with any of these projects. The recommended order of business is as follows: 

  1.  Suspend regular meeting   2.  Staff report    

Item 3a

Page 10: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

  3.  Commission discussion   4.  Open public meeting   5.  Take comments from member cities   6.  Take comments from public   7.  Close public meeting   8.  Commission discussion   9.  Consider approving Resolution 2016‐01   10.  Resume regular meeting 

  

COMMENTS RECEIVED THROUGH MAY 4, 2016 MPCA has reviewed the Elm Creek WMC minor plan amendment. There is a discrepancy for the estimated project cost for the Rush Creek Main Stem Restoration (CIP‐20160MG‐02) in the Notice of Public Meeting ($1,650,000) and the CIP table ($300,000).  Thank you for updating the plan and incorporating projects identified in TMDL and WRAPS projects.   MDA has no comments on the proposed Elm Creek WMO’s Minor Plan amendments.  The Metropolitan Council does not have any comments on this minor plan amendment.   RECOMMENDATION The Technical Advisory Committee has reviewed the proposed revisions to the Capital Improvement Program and found them to be consistent with the Commission’s requirements.  At their March 9, 2016 meeting the Commission approved the revisions and directed Staff to move forward with a Minor Plan Amendment. Staff recommends that the Commission approve the amendment and adopt Resolution 2016‐01.  The Resolution will be effective upon approval of the amendment by the Hennepin County Board of Commissioners.        

Item 3a

Page 11: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

Legal Notice NOTICE OF PUBLIC MEETING

Elm Creek Watershed Management Commission TO WHOM IT MAY CONCERN: Notice is hereby given that the Elm Creek Watershed Management Commission will meet at Maple Grove City Hall, 12800 Arbor Lakes Parkway, Maple Grove, MN, on Wednesday, May 11, 2016, at 11:30 a.m., or as soon thereafter as the matter may be heard, for a public meeting on a proposed management plan amendment. The Commission proposes to amend its Third Generation Watershed Management Plan to adopt revisions to its 2015 Capital Improvement Program (CIP). The following five projects would be added: Fish Lake Alum Treatment Ph 1, Maple Grove, est cost $300,000, Comm share in 2016 $75,000 Rush Creek Main Stem Restoration, Maple Grove, est cost $1,650,000, Comm share 2016-2019 $250,000 Ranchview Wetland Restoration, Maple Grove, est cost $2,000,000, Comm share in 2017 $250,000 Rush Creek South Stem Restoration, Maple Grove, est cost $675,000, Comm share in 2018 $168,750 Downtown Pond Expansion & Reuse, Rogers, est cost $406,000, Comm. share in 2018 $101,500 The following project would be revised: Fox Creek at Creekview Restoration Project, Rogers, increase cost from $150,000 to $321,250, Comm share in 2016 from $37,500 to $80,312 Funding for the following projects would be shifted: Tree Thinning and Bank Stabilization, $50,000 annually, shift $50,000 from 2016 to 2020 Stonebridge Storm Sewer Retrofit, Maple Grove, est cost $200,000, shift $50,000 from 2016 to 2017 Rain Garden at Independence Ave, Champlin, est cost $300,000, shift $75,000 from 2016 to 2017 Mill Pond Raingardens, Champlin, est cost $400,000, shift $100,000 from 2017 to 2018 Agricultural BMPs Cost Share, $50,000 annually, shift $50,000 from 2016 to 2020 The remaining fifteen projects on the CIP are unchanged. The Elm Creek watershed includes parts of the cities of Champlin, Corcoran, Dayton, Maple Grove, Medina, Plymouth and Rogers. Persons who desire to be heard with reference to the proposed amendment will be heard at this meeting. Written comments may be submitted to Doug Baines, chair of the Elm Creek Commission, c/o JASS, 3235 Fernbrook Lane, Plymouth, MN 55447, or emailed to

Item 3a-1

Page 12: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

[email protected]. Auxiliary aids for persons with handicaps are available upon request at least seven days in advance. Please contact Judie Anderson at 763-553-1144 to make arrangements. ________________________________ /s/ Doug Baines, Chair Elm Creek Watershed Management Commission By order of the Elm Creek Watershed Management Commission

Item 3a-1

Page 13: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

1  Elm Creek Watershed Management Commission Third Generation Watershed Management Plan 

    

Table 4.5. Elm Creek Third Generation Plan Capital Improvement Program. 

Description  Location  Priority  Est Proj Cost  Partners  Funding Source(s) Estimated Commission Cost

2015 2016  2017  2018 2019 2020‐2024Special Studies                        TMDL implementation special study  Watershed  H  50,000  Cities, HCEED  Operating budget  0  25,000  25,000  25,000  25,000  125,000  Stream segment prioritization  Watershed  H  10,000  Cities, HCEED, TRPD  Operating budget 10,000  0  0  0  10,000  0 High Priority Stream Restoration Projects      Cities, TRPD Cities, TRPD, cty levy, grants    Elm Cr Reach E  Plymouth  H  1,086,000 Commission, Plymouth County Levy 250,000 Levied in 2015

CIP‐2016‐RO‐01 Fox Cr, Creekview  Rogers  H  150,000321,250

    0 37,500  80,312  0  0  0  0 

Mississippi Point Park  Riverbank Repair  Champlin  M  300,000      0  75,000  0  0  0  0 Elm Creek Dam  Champlin  H  7,001,220      0  187,500  0  0  0  0 

Tree Thinning and Bank Stabilization Project  Watershed  H  50,000      0  50,000  50,0000  50,000  50,000 250,000300,000 

Fox Cr, Hyacinth  Rogers  M  360,000      0  0  90,000  0  0  0 Fox Cr, South Pointe, Rogers  Rogers  M  90,000      0  0  22,500  0  0  0 Other High Priority Stream Project  Watershed  H  500,000      0  0  0  125,000  125,000  250,000 

CIP‐2016‐MG‐02 Rush Creek Main  Maple Grove    1,650,000300,000

      75,000  75,000  75,000  25,000   CIP‐2016‐MG‐03 Rush Creek South   Maple Grove    675,000      168,750      168,750     CIP‐2016‐RO‐02 Rush & Fox Ck Mon Stations  Rogers    Operating budget    

High Priority Wetland Improvements        Cities  Cities, commission             DNR #27‐0437  Maple Grove  L  75,000 0 0  0  0 0 18,750Stone’s Throw Wetland  Corcoran  M  450,000 0 0  112,500  112,500 0 0Other High Priority Wetland Projects  Watershed  L  100,000 0 0  0  0 0 25,000

CIP‐2016‐MG‐01 Ranchview Wetland Restor  Maple Grove    200,0002,000,000      50,000    250,000  250,000     

Lake TMDL Implementation Projects        Cities, lake assns.  Cities, Comm, grants, owners             

Mill Pond Fishery and Habitat Restoration  Champlin  H  5,000,000      0  0  250,000  0  0  0 Other Priority Lake Internal Load Projects  Watershed  M  100,000      0  0  0  0  0  25,000 CIP‐2016‐MG‐04 Fish Lake alum treatment‐Phase 1 (2017) and Phase 2 (2020 or after)  Maple Grove  H  300,000  City, TPRD, Comm, lake assn  City, TRPD, grants, Comm, 

cty levy, lake association    75,000         Stonebridge  Maple Gr  M  200,000      0  50,000  50,000  0  0  0 Rain Garden at Independence Avenue  Champlin  L  300,000      0  75,000  75,000  0  0  0 

CIP‐2016‐CH‐01 Mill Pond Rain Gardens  Champlin  M  400,000      0  0  100,000  100,000  0  0 Other Priority Urban BMP Projects  Watershed  L  200,000 0 0  0  0 0 50,000Other                       Livestock Exclus, Buffer & Stabilized Access  Watershed  M  50,000 Cities, owners, Exten, NRCS Cities, owners, comm, NRCS 0 0  0  50,000 0 50,000

Agricultural BMPs Cost Share  Watershed  H  50,000  Cities, owners, Exten, NRCS  Cities, owners, comm, NRCS  0  50,000  50,000  50,0000  50,000 100,000

150,0000 CIP‐2016‐RO‐04 Ag BMPs  Rogers        Operating budget             CIP‐2016‐RO‐03 D’town Pond Exp & Reuse  Rogers    406,000            101,500     Hydrologic & Hydraulic Modeling  Watershed  L  25,000  HCEE  Commission  0  0  0  25,000  0  0 Fourth Generation Plan  Watershed  H  70,000    Commission  0  0  0  0  0  $70,000 

TOTAL STUDIES      TOTAL STUDIES 10,000 25,000  25,000  25,000 35,000 125,000TOTAL CIPS      $16,617,220 $260,000 $550,000  $875,000  $275,000 $260,000 $963,750

Z:\Elm Creek\CIPs\2016 submittals\4 5_1 following March 9 meeting.docx  $20,469,470    TOTAL CIPS  250,000  492,812  1,025,000  745,250  250,000  838,750 

            562,500  1,107,750    938,750  

Item 3a-2

Page 14: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

   Hennepin County Public Works

Environment and Energy Department 612-348-3777, Phone 701 Fourth Avenue South, Suite 700 612-348-8532, Fax

Minneapolis, Minnesota 55415-1842    hennepin.us/environment  

April 25, 2016  

Mr. Doug Baines, Chair Elm Creek Watershed Management Commission c/o Judie Anderson, JASS 3235 Fernbrook Lane N Plymouth, MN 55346  

Re: Minor Plan Amendment  

Dear Mr. Baines:  

I request that Hennepin County’s review deadline for the proposed plan amendment be extended to July 28, 2016. The need for the extension is due to the County’s 2016 meeting dates, formal review process and the lead time required to place the item on the County Board’s meeting schedule. I have attached the schedule for Board action on the proposed amendment for your reference.  

BAR for amendment approval and maximum levy submitted to Department Administration: May 26 Department Administration reviews and forwards BAR to Public Works Administration: June 23 Public Works Administration reviews and forwards BAR to County Administration: July 5 BAR is communicated to Board on: July 12 BAR in committee on: June 19 Board action on amendment: July 28  

Sincerely,

Randy Anhorn, Supervisor, Land & Water Unit

 

  

Cc: Judie Anderson, ECWMC Administrator Steve Christopher, BWSR

 Z:\Elm Creek\Third Generation Plan\Minor Plan Amendment Spring 2016\2016 HennCoRequestfor‐ECWMC plan amendment review extension.docx             An Equal Opportunity Employer   

Recycled Paper 

Item 3a-3

Page 15: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

RESOLUTION 2016‐01 ADOPTING AN AMENDMENT TO ITS THIRD GENERATION WATERSHED MANAGEMENT PLAN 

ELM CREEK WATERSHED MANAGEMENT COMMISSION STATE OF MINNESOTA 

 RESOLUTION NO. 2016‐01 

 ADOPTING A MINOR AMENDMENT TO THE THIRD GENERATION PLAN  

  

  WHEREAS, on October 14, 2015,  the Elm Creek Watershed Management Commission (Commission)  adopted  the  Elm Creek Watershed Management Commission  Third Generation Watershed Management Plan, (hereinafter, “Plan”); and      WHEREAS, the Plan includes a Capital Improvement Program (CIP); and    WHEREAS, the Commission has proposed a Minor Plan Amendment that would add five projects to the CIP; and    WHEREAS, the Commission has also proposed that the Minor Plan Amendment would revise the scope of one project and shift the timing of funding of five projects currently listed on the CIP; and   

 WHEREAS, Table 4.5 of the Capital Improvement Program will be revised to reflect these 

changes; and    

  WHEREAS, the proposed Minor Plan Amendment has been reviewed in accordance with the requirements of Minnesota Statutes, Section 103B.231; and    WHEREAS, the Minnesota Board of Water and Soil Resources did approve proceeding to adoption by a Minor Plan Amendment; and    WHEREAS, on May 11, 2016, after  legal and written notice duly given, the Commission held a public informational meeting to explain the proposed revisions; and    WHEREAS,  the  Commission  has  determined  that  it  would  be  reasonable  and appropriate and in the public interest to adopt the Minor Plan Amendment;    NOW, THEREFORE, BE  IT RESOLVED, by the Board of Commissioners of the Elm Creek Watershed Management Commission that: 

 1.  The Minor Plan Amendment  is approved and adopted  contingent upon 

approval by the Hennepin County Board of Commissioners, said approval anticipated in July, 2016. 

 

Item 3f

Page 16: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

RESOLUTION 2016‐01 ADOPTING AN AMENDMENT TO ITS THIRD GENERATION WATERSHED MANAGEMENT PLAN 

2.  Commission  staff  is  directed  to  notify  appropriate  parties  of  the Amendment to the Plan. 

   Adopted  by  the  Board  of  Commissioners  of  the  Elm  Creek Watershed Management Commission this eleventh day of May, 2016.                  ____________________________________               Doug Baines, Chair ATTEST:   _____________________________ Judie Anderson, Recording Secretary      STATE OF MINNESOTA  COUNTY OF HENNEPIN  

  I,  Judie A. Anderson,  do  hereby  certify  that  I  am  the  custodian  of  the minutes  of  all proceedings had and held by the Board of the Elm Creek Watershed Management Commission, that I have compared the above resolution with the original passed and adopted by the Board of  said Commission at a  regular meeting  thereof held on  the eleventh day of May, 2016, at 11:30 a.m., that the above constitutes a true and correct copy thereof, that the same has not been amended or rescinded and is in full force and effect.  

  IN WITNESS WHEREOF, I have hereunto placed my hand and signature this eleventh day of May, 2016.    ______________________________         (NO SEAL) Judie A. Anderson Recording Secretary  

 

Item 3f

Page 17: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

Elm Creek Watershed Management Commission - Proposed 2017 Operating Budget

34567891011121314151617181920212223242526272930313233343536373839404142434445474850515253545960616263

A B C D AD AE AF AQ2015

Budget2015 Final

2016 Budget

2017 Proposed

ExpensesAdministrative 89,000 75,616 90,000 90,000

60,000 43,240 24,406Grant Writing 5,000 0 5,100 5,000Website 5,000 2,569 6,000 6,000Legal Services 2,000 464 2,000 2,000Audit 5,000 4,500 5,000 5,000Insurance 3,500 2,349 3,800 3,800Contingency 1,000 0 2,000 2,000

Subtotal 170,500 128,738 138,306 113,800Project Reviews

Technical - HCES 77,500 88,509 105,500 98,000Technical Support - Consultant 3,000 13,408 6,000 15,000Admin Support 8,000 8,731 11,000 11,000

88,500 110,648 122,500 124,000Wetland Conservation Act

WCA Expense - HCES 12,500 11,889 12,500 12,000WCA Expense - Legal 500 0 500 500WCA Expense - Admin 2,000 917 2,000 2,000

Subtotal 15,000 12,806 15,000 14,500Water Monitoring

Stream Monitoring Stream Monitoring - USGS 21,700 19,750 23,500 23,500 Extensive Stream Monitoring 7,000 6,000 7,200 7,000 DO Longitudinal Survey 500 500Gauging Station - Elec Bill 190 197 195 220Rain Gauge Network 100 0 100 100Lake Monitoring Lake Monitoring - CAMP 1,650 400 1,650 1,200 Lake Monitoring - TRPD 4,240 3,000

Sentinel Lakes 3,100 2,400Additional lake 600 600Aquatic Vegetation Surveys 1,000 1,000

√ Source Assessment 2,000√ Watershed-wide TMDL - Followup - TRPD, Admin 10,000

Wetland Monitoring - WHEP 4,000 4,000 4,000 4,000Stream Health - SHEP 6,000 6,000 6,000 0

Subtotal 44,880 39,347 47,845 52,520Education

Education - City/Citizen Programs 5,500 917 6,000 4,000WMWA General Admin 4,000 4,000 4,000WMWA Implementa Activities incl Watershed PREP 6,000 6,000 6,000R Garden Workshop/Intensive BMPs 3,000 1,700 3,000 2,000Education Grants 3,000 1,000 3,000 2,000Macroinvertebrate Monitoring-River Watch 6,000 6,000 6,000 6,000Ag Specialist 2,000 2,000 2,000

Subtotal 29,500 19,367 30,000 26,000Management Plan

Plan Amendments 9,165 5,000 5,000 Local Plan Review - due two years after Commission Plan adoption 3,000 2,000Contribution to 4th Gen Plan - consider $10,000/set-aside beginning 2020

Subtotal 0 9,165 8,000 7,000

GENERAL OPERATING BUDGET

Watershed-wide TMDL Admin (Commission in-kind)

9,750

] Z:\Elm Creek\Financials\Financials 2017\Elm 2017 Proposed Budget.xls

Item 5a

Page 18: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

Elm Creek Watershed Management Commission - Proposed 2017 Operating Budget

3

A B C D AD AE AF AQ2015

Budget2015 Final

2016 Budget

2017 Proposed

646668707274757677787980818284858687888990919293949596979899100101102103104105106107108109110112113114115116117118119120121131132133

Special ProjectsProjects ineligible for ad valorem 2,608 50,000 50,000Upper and South Metro Miss TMDL 2,000 1,000 0Studies, Project Identification, Subwatershed Assessments 35,000 684 35,000 35,000

Subtotal 37,000 3,292 86,000 85,000

Contingency 3,000 0 0 0Subtotal 3,000 0 0 0

Total Operating Expense (lines 14,19,24,43,54,63,72,76) 388,380 323,363 447,651 422,820

Revenue CIPs - Ad Valorem 131,570 Project Review Fees 80,000 75,705 100,000 100,000 Water Monitoring - TRPD Co-op Agmt 5,500 6,000 6,000 6,500 WCA Fees 1,500 2,500 5,000 8,000 Forfeited/Reimbursed Sureties/Reimbursement from LGUs 3,000 1,485 1,500 0 Membership Dues 209,000 209,000 215,360 219,700 Watershed-wide TMDL 12,680 Interest Income 100 83 80 100 Miscellaneous Income 0

From (To) Cash Reserves 0 Total Operating Revenue (lines 80-91) 299,100 439,023 327,940 334,300TOTAL GENERAL OPERATING BUDGET (lines 77, 92) 89,280 115,660 119,711 88,520

Cash on hand, unencumbered 313,907 194,196 105,676

ASSIGNED FUND BALANCES Capital Projects

RevenueAd Valorem Levy Funds 131,250 131,570 250,000 492,812

ExpenseCommission Cost Share 131,250 250,000 492,812Administrative Expense 6,228 3,000 4,000

Total Capital Projects 0 125,342 3,000 4,000

Third Generation Management PlanMember Assess - Contribution to ReservesEncumbered from General FundLess Expenses

Total Third Gen Plan 0 0

WCA - Beginning AccumulatedWCA Activity - Current Year

WCA - Year-End Accumulated 0 0

Assigned for capital improvement projects 35,000Assigned for capital improvement projects, studies

Less Expenses 684Total CIPs , Projects, Studies 34,316

Total Assigned Fund Balances (lines 104, 110, 115, 120) 0 159,658

TOTAL CASH ON HAND (lines 95, 131) 0 473,565

combined

] Z:\Elm Creek\Financials\Financials 2017\Elm 2017 Proposed Budget.xls

Item 5a

Page 19: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

Elm Creek Watershed Management CommissionProposed 2017 Member Assessments

%age Dollars %age DollarsChamplin 365,574,074 4.03% 8,419.54 -11.93% -1,141Corcoran 575,802,450 6.35% 13,261.31 -2.67% -363Dayton 415,447,282 4.58% 9,568.17 2.35% 220Maple Grove 4,972,351,933 54.79% 114,518.23 3.58% 3,953Medina 711,145,751 7.84% 16,378.40 -0.10% -17Plymouth 692,491,402 7.63% 15,948.77 14.88% 2,066Rogers 1,341,913,004 14.79% 30,905.60 4.33% 1,282

Totals 9,074,725,896 100.00% 209,000.00 2.96% 6,000

%age Dollars %age DollarsChamplin 409,399,869 4.06% 8,741.51 3.82% 322Corcoran 679,629,691 6.74% 14,511.46 9.43% 1,250Dayton 467,103,289 4.63% 9,973.60 4.24% 405Maple Grove 5,431,286,657 53.85% 115,968.92 1.27% 1,451Medina 805,089,215 7.98% 17,190.28 4.96% 812Plymouth 817,567,896 8.11% 17,456.72 9.45% 1,508Rogers 1,476,090,709 14.63% 31,517.51 1.98% 612

Totals 10,086,167,326 100.00% 215,360.00 3.04% 6,360

%age Dollars %age DollarsChamplin 410,505,694 3.85% 8,458.23 -3.24% -283Corcoran 709,731,668 6.66% 14,623.61 0.77% 112Dayton 501,487,424 4.70% 10,332.86 3.60% 359Maple Grove 5,651,956,239 53.01% 116,455.30 0.42% 486Medina 891,170,325 8.36% 18,362.05 6.82% 1,172Plymouth 905,845,273 8.50% 18,664.42 6.92% 1,208Rogers 1,592,062,304 14.93% 32,803.53 4.08% 1,286

Totals 10,662,758,927 100.00% 219,700.00 2.02% 4,340

2017` 2016 Taxable Market Value

2017 Budget Share Increase over Prev Year

2016 2015 Taxable Market Value

2016 Budget Share Increase over Prev Year

2015 2014 Taxable Market Value

2015 Budget Share Increase over Prev Year

Z:\Elm Creek\Financials\Financials 2017\2017 Member Assessments_proposed.xls

Item 5a1)

Page 20: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

 Italics indicates new information                                                                                                                                                                      indicates enclosure 

CHAMPLIN • CORCORAN • DAYTON • MAPLE GROVE • MEDINA • PLYMOUTH • ROGERS

elm creek Watershed Management Commission

ADMINISTRATIVE OFFICE 3235 Fernbrook Lane Plymouth, MN 55447 PH: 763.553.1144 FAX: 763.553.9326 email: [email protected] www.elmcreekwatershed.org

TECHNICAL OFFICE Hennepin County

Environment and Energy Dept 701 Fourth Ave S Suite 700

Minneapolis, MN 55415-1600 PH: 612.596.1171 | FAX: 612.348.8532

email: [email protected]

STAFF REPORT May 4, 2016 

2012‐021 Kreps Wetland Violation, Corcoran. Kreps constructed a driveway access into his property without obtaining the necessary WCA permits. The DNR issued a Cease and Desist order to Kreps and his contractor in 2012. In November 2012 a Technical Evaluation Panel (TEP) found that three wetland  impacts occurred as a result of his work. A restoration order was issued requiring restoration of the site outside of the driveway foot‐print and a 4:1 replacement (through the BWSR wetland banking program) on the areas  impacted by the driveway. Final  impacts from the driveway footprint and side slopes are expected to be approximately 3,500 SF.  Kreps requested an extension of the restoration order to May 20, 2014, pending resolution of issues with the neighbors.  The DNR has issued a lien on the property. A court‐ordered mediation and trial of the driveway issues have been ongoing since March 2015.  Extensions to the restoration deadline have been granted pending the court’s resolution.  An email from Kreps on July 23, 2015 stated the final court order required them to follow the original driveway easement alignment.  The original driveway easement is not where the wetland impacts took place, so all wetland fill will be removed and restored to the original conditions in the spring of 2016.  Construction started on the restoration March 28.  Staff inspected the site on April 1, 2016, and again on April 6 and 22.  The site restoration is complete and  seeded.   A  certificate of  completion was  issued by  the SWCD and  the DNR  can  remove  the  lien on  the property.  Total time for bill back in April was 2.5 hours.  This item will be removed from the report. 

2013‐041 Jomico, Corcoran. This  is a wetland violation reported by the City. It  is a commercial/industrial site  located just west of CSAH 116 near downtown Corcoran. A  restoration order was  issued  to  remove  all wetland  fill before September 15, 2014. Subsequent extensions extended the deadline to September 15, 2015. Staff inspected the site with the excavator on September 15 and found minor restoration  issues remaining. These were enumerated  in the October Staff Report.  Retaining wall work, debris and material piles are scheduled to be finished by January 15.  Final grading and seeding of rutted areas will be done by May 20, 2016.  

2013‐046 Woods  of Medina. Medina.  This  is  two  parcels  totaling  9.5  acres  located  east  of  CR  116  and  south  of Hackamore Road. The site  is proposed to be developed  into 16 single‐family residential  lots. At  its January 13, 2015, meeting the Commission approved this project with two conditions: 1) a pond operations and maintenance agreement must be provided, approved by the City and the Commission, and recorded on the title to the property.  The recording must be done within 90 days of the final plat approval; and 2) a copy of the approved wetland replacement plan must also be provided.  Final platting will be done when the landowner sells the property or decides to develop it himself. 

2014‐015 Rogers Drive  Extension, Rogers.  This  project  involves  improvements  along Rogers Drive,  extending  from Vevea Lane to Brockton Lane. The project  is  located east of I‐94, south of the Cabela development. The total project area is 8.0 acres; proposed impervious surfaces total 5.6 acres.  Site plans received July 1, 2014 meet the requirements of the Commission with the exception of the nutrient control.  Due to limited options to treat the nutrient loads on the east 1.7 acre portion of Rogers Drive, the Commission approved the site plan contingent upon the City deferring 4.6 pounds of phosphorus for treatment in future ponding opportunities as the easterly corridor of Rogers Drive develops. 2.3 pounds will be accounted for in the Kinghorn Spec. Building site plan with 2.3 pounds still outstanding. This item will remain on the agenda until the total deferral is accounted for. 

2015‐001  Highway  47/Troy  Lane  School  and  Development  Site,  Plymouth.  The  Commission  received  a  plan application for review of this parcel on January 19, 2105.  The submittal was missing some of the required components of the Commission’s newly adopted Rules and Standards and considered incomplete.  Revised plans were submitted on April 23 and 30, 2015.   At  its May 13, 2015 meeting the Commission approved the project with three conditions.   The only outstanding item is the recording of the O&M plan and agreement on the school pond. Staff requested an update on the status of these documents on May 4. 

Item 5c

Page 21: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

Staff Report May 4, 2016 Page 2  

 Italics indicates new information                                                                                                                                                                      indicates enclosure 

CHAMPLIN • CORCORAN • DAYTON • MAPLE GROVE • MEDINA • PLYMOUTH • ROGERS

 

2015‐004 Kinghorn Outlot A, Rogers.  This is a 31 acre site located between the Clam and Fed Ex sites in Rogers on the west side of Brockton Road and I‐94. The proposed site will have two warehouse buildings, 275,000 and 26,000 SF in size, with associated parking and  loading  facilities. The Commission  standards  require  review of  stormwater management, grading and erosion controls and buffers. A complete plan was received May 14, 2015. At their June 2015 meeting the Commission approved this project with three conditions. These items have not been satisfied as of this update.   

2015‐006 Veit Building and Parking  Lot Addition, Rogers. This  site  is  located at  the Veit Headquarters Building at 14000 Veit Place.  It is bound by I‐94 to the north and Industrial Boulevard to the south and east. Fox Creek/DNR wetland #27‐02920  is west of this property. The owner proposes to extend the main building entrance with a 6,500 SF building expansion.  The existing surface lot adjacent to the main building entrance will be reconfigured and relocated slightly east of its current location.  Soil boring tests performed since the Commission meeting determined infiltration will not work on this pond.  Reducing the impervious area on site by 0.74 acres and installing a SAFL‐Baffle weir in the storm sewer system will combine to meet the Commission standards for this site. The project was approved by the Commission at their May meeting pending  the SAFL‐Baffle weir being covered by an easement and  the appropriate operation and maintenance agreement being obtained and recorded with the property. The applicant’s agent indicated the O&M plan has been submitted to Rogers for approval. 

2015‐013 Wayzata High  School, Plymouth.   An  application  for  the Wayzata High  School  addition and expansion was received on April 29, 2015.   The plan  includes  additions  to  the Wayzata High  School building, new and/or expanded parking areas, new driveway, new playing fields, and new and/or modified stormwater ponds.  The total disturbance area is approximately 44 acres, of which approximately 22 acres will be new  impervious area.    Staff met with  the project engineer on May 28 to discuss the project, and Staff is working with the engineer to complete the necessary revisions.  At the July 8, 2015 meeting, the Commission approved the project with the conditions of the applicant providing a detailed irrigation plan and an O&M plan for the stormwater ponds.  The applicant provided the irrigation plan. The O&M plan has been completed; however, final recording of the plan has not yet been completed. 

2015‐016 Brockton PUD, Plymouth.  This is a 16‐acre parcel located south and east of the Hamel Road and Brockton Lane intersection on the Plymouth/Medina border.  The current land use is cropland with a small farmstead (0.6 acres).  The applicant proposes to create 64 single‐family residential lots and their required infrastructure.  At their September meeting the Commission approved Staff’s findings dated August 28, 2015 pending their approval of the final erosion control plans and the recording of the ponding operation and maintenance agreement within 90 days of final plat approval. 

2015‐020 Strehler Estates, Corcoran.  This is an 80‐acre parcel currently made up of cropland, meadow and woods.  It is located north of Strehler Road, approximately 0.75 miles east of CR 19.    It  is proposed to be developed  into four rural residential lots, 9.1, 5.5, 5.8 and 59.2 acres in size.  Site work will consist of grading a shared, private driveway (1,200 feet long) and construction of two stormwater ponds and drainage swales to those ponds. At its January 10, 2015 meeting the Commission approved this project contingent upon a conservation easement being recorded on the property title. 

2015‐025 OP3 Outdoor Storage, Rogers.  The ~2.5‐acre vacant industrial site owned by OP3 Rogers, LLC, located between I‐94 and Industrial Boulevard is proposed to be developed into a paved outdoor storage facility.  About 0.9 acres of existing impervious  area  from  the  east  adjacent  lot will  be  added  to  the  proposed  new  1.9  acres  of  impervious  surface.   A stormwater pond  is proposed on  the west  side of  the parcel.   A complete application was  received August 28, 2015. Commission approved the project with the Staff recommendations.  A stormwater pond operation and maintenance plan must be submitted for review and approval and recorded. 

2015‐028 Sundance Woods Phase  II, Dayton.   The  site  is  located north of Sundance Woods  (Project 2013‐025).   The applicant requested an expedited grading and erosion control review and approval to start grading in fall 2015.  This was granted administratively.   Stormwater management plans were submitted on November 10, 2015.   Staff reviewed the revised plans submitted on February 11 and 29, 2016 and recommended approval to the Commission at their March 2016 meeting.   The Commission approved Staff’s recommendation with an amendment to the motion to highly recommend that the City of Dayton consider irrigation in the park using water from Pond 5. This item will be removed from the report. 

2015‐029 Enclave at Rush Creek, Maple Grove.  This is a 43‐acre parcel located on the north border of Maple Grove.  Rush Creek runs along the southerly border of this project.  Sixty six (66) residential lots are proposed.  One 10‐acre outlot is 

Item 5c

Page 22: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

Staff Report May 4, 2016 Page 3   

 Italics indicates new information                                                                                                                                                                      indicates enclosure 

CHAMPLIN • CORCORAN • DAYTON • MAPLE GROVE • MEDINA • PLYMOUTH • ROGERS

proposed along the creek corridor.   The developer  is selling this corridor to Three Rivers Park District.   Site plans were received October 7, with final revisions on February 12, 2016.  Staff recommended approval of the project as revised. The Commission approved Staff’s recommendation with a further recommendation to the City of Maple Grove that it consider planting the infiltration area as a rain garden. This item will be removed from the report. 

2015‐030 Kiddiegarten Child Care Center, Maple Grove.   This  is a 2.2‐acre undeveloped/vacant parcel platted with the Dalton Commons PUD.  The applicant proposes to build a kindergarten that will have about 50% impervious cover.  The PUD was approved in the early 2000s for 75% impervious cover.  The site was designed to drain to Target Pond, which is located south of CSAH 30 and west of  I‐94.   This project was approved by the Commission at their December 9, 2015 meeting with three conditions.  No new information has been received. 

2015‐032 Rogers High School Auditorium Addition, Rogers.  This site  is approximately 77 acres  in size  located north of CSAH 144, 1/4 mile east of the Highway 101 intersection.  The auditorium addition will disturb 7.0 acres of existing lawn and driveway/drop‐off areas.  The modifications will include the auditorium addition, a parking lot expansion and driveway modifications.    2.64  acres of new  impervious  areas will be  created with  this project.   A  complete plan was  received November  3,  2015.    At  their  December meeting,  the  Commission  approved  this  project  contingent  upon;  a)  Staff approval of an operation and maintenance agreement on the catch basin inlets and underground system with the City. Said agreement shall be recorded on the title to this property within 90 days after City approval of the site plans, b) Baffles provided on catch basins 2 through 5 and c) A snout, oil‐water‐debris separator provided on catch basins 1, 10, and  11.    Revisions  received  December  10,  2015  addressed  all  the  conditions with  the  exception  of  the  recorded agreement.  This project will remain open until the agreement is recorded.  

2015‐038 Wealshire of Medina, Medina.   Revised and complete plans were  received on April 21, 2016.   The 21.2‐acre project site is located on the northwest corner of Chippewa Road and Mohawk Drive. The proposed Alzheimer complex will consist of the facilities and parking lots that will add approximately 5.46 acres of new impervious surface for the first phase of the development.  Phase 1 improvements will be constructed in 2016.  Phase 2 will be constructed when Phase 1 reaches maximum capacity.  Stormwater treatment systems will be constructed during Phase 1 and is designed for 5.93 acres of total development impervious cover.  Staff review and findings report is included in the meeting packet.  Staff recommends the approval of the project with the condition of recording an O & M Plan as stated in the findings.   

2015‐039 The Enclave at Dunlavin Woods, Maple Grove.  This is an 18 acre parcel located in the southeast intersection of CSAH 101 and 101st Avenue.  The applicant is proposing to subdivide this parcel into 29 single‐family residential lots.  The initial application was determined to be  incomplete.   Revisions to the site plans were received February 25, 2016. The Commission approved this project at their April 2016 meeting.  This item will be removed from the report. 

2016‐001 CSAH 115/CR 116 Reconstruction, Medina.   The project will  include reconstruction of the roadway,  including widening the road from the existing two‐lane roadway, constructing dedicated turn  lanes, drainage  improvements, and the construction of a paved pedestrian and bicycle  trail. The purpose of  the project  is  to  increase  the capacity of  the intersection and improve mobility and safety for all transportation system users. The project will include typical roadway and trail construction activities ‐ removal of the existing roadway and storm sewer; grading; placement of aggregate base and a new bituminous base and surface; addition of curb and gutter, storm sewer, and stormwater management facilities; and new signals,  lighting, and related pedestrian facilities. A complete application was submitted on April 1, 2016. The Commission approved this project at their April 2016 meeting pending minor design modifications to reduce the 2‐year peak flow; completion of the wetland mitigation plan and approval by the LGU; and final document recordings of the O & M plans/agreements.  The design has been modified to reduce the 2‐year peak flow; however, the wetland mitigation plans and O & M recording have not been completed. 

2016‐002 The Markets at Rush Creek, Maple Grove.   This  is a proposal to develop 40 acres of a 123 acre planned unit development located on the southwest quadrant of the intersection of CSAH 101 and CSAH 10.  County Ditch 16 (Maple Creek) runs along the south property line on this project. The 40 acre project area includes a Hy‐Vee grocery store (16.8 acres), a Hy‐Vee gas station (2.5 acres) and 11 outlots (18.76 acres).  Right‐of‐way accounts for the remaining 2.3 acres. The remaining acreage (83 acres) consists of 5 outlots and right‐of‐way.  The additional outlot areas are not part of the stormwater  review  for  this project but will be  reviewed  for  compliance with  the Commission’s buffer  and  floodplain requirements.   Revisions  to  the  existing plan have been  requested.   No  recommendations are  available  at  this  time. 

Item 5c

Page 23: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

Staff Report May 4, 2016 Page 4   

 Italics indicates new information                                                                                                                                                                      indicates enclosure 

CHAMPLIN • CORCORAN • DAYTON • MAPLE GROVE • MEDINA • PLYMOUTH • ROGERS

2016‐003W Park Place Storage Wetland Replacement Plan, Corcoran. This is a wetland replacement plan submitted with the  Park  Place  Storage  site plans.    (See project  2016‐004 description below.)  The updated wetland  boundaries were approved on December 15, 2015.   Construction of  the proposed storage  facility will  require a  total of 45,793 SF  (1.05 acres) of fill in four separate wetland areas.  Wetland impacts are proposed to be replaced via wetland bank credits from the Mergen Bank  (#1183)  in Stearns County.   A Technical Evaluation Panel  (TEP) was held on March 3.   The notice of application  for  this  replacement plan was  sent February 11, 2016.   Comment period  closed on March 14, 2016.   TEP findings were  included  in  last month’s  packet.   No  new  information  or  revisions  have  been  received  to  date.    Staff extended the 15.99 deadline 60 days to June 10, 2016. 

2016‐004 Park Place Storage Site Plans, Corcoran.  The applicant is proposing to develop a 22‐acre site in the southwest portion of City of Corcoran into a multi‐unit storage facility with associated access roads, utilities, and stormwater features.  This will be an addition to the existing storage facility located west of the proposed project.  Site plans are dependent upon the WCA findings and the revisions requested by the City.  No new information or revisions have been received to date.  Staff extended the 15.99 deadline 60 days to June 10, 2016. 

2016‐005W Ravinia Wetland Bank, Corcoran.  U.S. Homes Corporation submitted a Wetland Banking Concept Plan for Phase  II of  their Ravinia Development.  They  are proposing  to  restore,  enhance  and  create wetlands  and upland buffers on the property  located  just north of Hackamore Road, 1/4 mile west of CSAH 101.   BWSR banking credits are  estimated  to  be  between  5.26  (minimum)  and  7.57  (maximum)  acres.    The  Ravinia  Wetland  Bank  Scoping Application was submitted in May of 2015. A TEP was held on‐site June 12, 2015.  The original wetland delineation was approved by the LGU September 9, 2013.  A TEP was held on March 3, 2016 to discuss the concept plan.   Additional comments from the ACOE and BWSR have been submitted to the applicant. Final banking plans are expected this spring or summer.  No action is necessary from the Commission until the final plans are submitted for approval. 

2016‐006  Mississippi  River  Shoreline  Stabilization,  Champlin.  This  project  includes  tree  clearing  and  grubbing, shoreline stabilization with rip rap, and restoration along three sections of the river upstream of  its junction with the Mill Pond Dam. Staff administratively approved the plans on April 15, 2016.  This item will be removed from the report.  

2016‐007W  Beacon Academy, Corcoran.  The applicant is proposing to develop the southeasterly 15 acres of a 43‐acre parcel  located north of CSAH  10 where  it  intersects with  Larkin Road. A wetland delineation was  conducted on November 11, 2015 for the complete 43‐acre site.  Four wetlands were delineated from the on‐site inspection and aerial photo reviews for offsite hydrology determinations.  This application is for review and approval of this wetland delineation/determination.  A  complete  review  and  decision  of  this  delineation will  not  be  completed  until  the beginning of the 2016 growing season. The 15.99 deadline was extended to May 11, 2016 in order to provide Staff and other agencies time to review and comment on the delineation during the growing season. 

2016‐008  NW Greenway Trail Phase II, Plymouth. The City of Plymouth is proposing to construct a 1.3 mile long, 12 foot wide  paved  trail  on  3.4  acres  running  from  eastward Vicksburg  lane  to westward  Plymouth Dog  Park  near County Road 47 and Elm Creek. The proposed project will place 254 CY of fill and 259 CY of excavation within the designated floodplains. The project will be reviewed for compliance with the Commission’s floodplain management, grading, and erosion and sediment control standards. Site plans meet  the Commission’s standards. This  item was approved by the Commission at their April 2016 meeting and will be removed from the report.   

2016‐009   Chris Butek Pond Excavation, Corcoran.   Butek, 21200 Oakdale Drive, has requested a permit from the Commission  to  excavate  a  pond  in  the  type  1/type  II  portion  of  a wetland  on  his  property.  Staff  reviewed  the application and visited the site and approved the permit.  This item will be removed from the report.   

2016‐011W Downtown Corcoran Utility Improvements, Corcoran.  The City of Corcoran delineated the wetlands in downtown area for future street and utility improvement projects.  Wetland boundaries for this area were approved January 6, 2016.   Most of the delineated wetlands are roadside ditches.   This current application  is a request for a no‐ loss designation for work related to the improvements. The information was noticed per WCA and Commission requirements. Staff approved the no‐loss application on April 12, 2016.  This item will be removed from the report. 

2016‐012W Corcoran Community Solar Garden, Corcoran. An application for a wetland delineation boundary and type review was received on March 17, 2016.  On October 15, 2015, the LGU staff reviewed the initial delineation in the field and concurred with the location and extent of the delineated wetland boundaries. Staff asked for a detailed

Item 5c

Page 24: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

Staff Report May 4, 2016 Page 5   

 Italics indicates new information                                                                                                                                                                      indicates enclosure 

CHAMPLIN • CORCORAN • DAYTON • MAPLE GROVE • MEDINA • PLYMOUTH • ROGERS

review of five suspect areas.   A revised delineation was noticed per WCA and Commission requirements on March 21, 2016. Staff approved the revised boundaries and sent notice for the approval decision on May 4, 2016.  This item will be removed from the report. 

2016‐013 Arrowhead Drive Trail, Medina.  The City of Medina is proposing a trail along Arrowhead Drive between Meander Road and Bridgewater Road.   The  trail will be approximately 3,000  feet  long and 8  feet wide within  the right‐of‐way on Arrowhead Drive.  New impervious area created will be 0.55 acres.  Staff reviewed the project and determined  it was  in compliance with the Commission’s requirements.    It was administratively approved on March 31, 2016.  This item will be removed from the report. 

2016‐014 Balsam Apartments, Dayton. This  is  an existing 2.5  acre  commercial  lot  located near  the  SE  corner of Balsam  Lane  and Dayton River Road  (CSAH  12).  The project will  consist of  a multi‐story  apartment  complex,  an underground parking  garage, parking  lot,  two  rain  gardens  and  related utilities.    Site plans must  conform  to  the Commission’s  Third  Generation  Stormwater  Management  Plan.  The  Commission  approved  Staff’s  findings  and recommendations at their April 2016 meeting.  Operation and maintenance agreements with an O&M plan must be recorded on the property.   

2016‐016 Wayzata High School Varsity Baseball Field Improvement, Plymouth.  This is 6.48 acre baseball field site on the Wayzata High School Campus located at Peony Lane North. The proposed site will disturb 3.18 acres and create 0.74 acres of impervious surface. Currently, the impervious surface is 0.92 acres. The project was reviewed for compliance with the Commission’s grading, erosion and sediment control standards. This project meets the Commission’s requirements. Staff administratively approved the project on April 6, 2016.  This item will be removed from the report.  

2016‐017 The Preserve at Meadow Ridge, Plymouth.  This 5.6 acre residential development located on south County Road 47 east of Troy Lane. The applicant  is proposing  to build 13 single  residential homes, and create about 1.05 acres of  impervious surface (road, homes and driveways). Currently, the site  is partially covered with two wetlands along  the south and west sides of  the area and with woods. The project will be  reviewed  for compliance with  the Commission’s requirement for stormwater management, erosion and sediment controls, buffer strips and floodplain.  No recommendation was available at the time of this update.  If available updated findings and a recommendation will be provided to the Commission at their meeting. 

2016‐018 Cambridge Park, Maple Grove. This is three large residential lots (16.4 total acres) located in the northwest corner of the  intersection of County Road 30 and Lawndale Lane. The predominant  land cover  is woods and wetland.  The site  is proposed to be developed  into 94 row townhomes. Staff’s  initial review determined the project was not  in compliance with  the  Commission’s  requirements  for  stormwater management,  erosion  and  sediment  controls  and buffer  strips.  No  recommendation  was  available  at  the  time  of  this  update.  If  available  updated  findings  and  a recommendation will be provided to the Commission at their meeting. 

2016‐019  Just  for Kix, Medina. This  is a proposal  to  redevelop 2.2 acres  from an existing  residential  lot  to a new commercial facility located on State Highway 55. The applicant proposes to construct a 18,040 SF dance studio, 74‐stall parking  lot, two filtration basins and all the related utilities. Currently, site drains directly  into Elm Creek. The project is being reviewed for compliance with the Commission’s grading and erosion control standards, stormwater management standards, buffer and floodplain requirements. No recommendation was available at the time of this update, If available updated findings and a recommendation will be provided to the Commission at their meeting. 

2016‐020 Ryan Meadows, Rogers.  This  is  an  existing  10‐acre  residential  lot  located  south of  129th Avenue.  The applicant proposes to develop 12 single‐family residential  lots with one outlot on approximately 6 of the 10 acres.  The existing home on 129th Avenue with approximately 4 acres will remain undeveloped at this time.  Site plans have not been  reviewed at  the  time  this Staff  report was updated.    If available  findings and a  recommendation will be provided to the Commission at their meeting. 

2016‐021 Diamond View Estates, Dayton.  This is four large residential lots approximately 40 acres proposed to be developed into 73 residential lots.  It is located on North Diamond Lake Road approximately 1 mile west of CSAH 12.  .  Site  plans  have  not  been  reviewed  at  the  time  this  Staff  report  was  updated.  If  available  findings  and  a recommendation will be provided to the Commission at their meeting. Z:\Elm Creek\StaffReports\Staff Reports 2016\May Staff Report.docx 

Item 5c

Page 25: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

elm creek

Watershed Management Commission ADMINISTRATIVE OFFICE TECHNICAL OFFICE 3235 Fernbrook Lane Hennepin County Public Works Plymouth, MN 55447 Department of Environment and Energy PH: 763.553.1144 701 Fourth Ave. South, Suite 700 E-mail: [email protected] Minneapolis, MN 55415 PH: 612.348.7338 E-mail: [email protected]

CHAMPLIN • CORCORAN • DAYTON • MAPLE GROVE • MEDINA • PLYMOUTH • ROGERS S:\EMD\DEMCON\CORR\DURGUNOGLU\_WATERSHEDS\ELM_CRK\PLAN_REVIEW\2015\2015-038 Wealshire of Medina, Medina\2015-038 Wealshire of Medina.docx

Wealshire of Medina Medina, Project #2015-038

Project Overview: Wealshire of Medina is proposing to build an Alzheimer complex on an approximately 23-acre site (PID = 0311823240003). The proposed development will consist of the facilities and parking lots that will add approximately 5.46 acres of new impervious surface for the first phase of the development. Phase 1 improvements will be constructed in 2016. Phase 2 will be constructed in future as Phase 1 reaches maximum capacity. Stormwater treatment systems will be constructed during Phase 1 and is designed for 5.93 acres of total development impervious cover. Our review will be for site development conformance to the Commission’s third generation watershed management plan. Applicant: Wealshire, LLC, Attn: Tom Wiskow, 10601 Lyndale Ave S., Bloomington, MN 555420. Phone: 952-345-1900; Cell: 763-464-6201. Email: [email protected] Agent/Engineer: Westwood Professional Services, Attn: Robert Olson. 3701 12th St. N., MN 56303. Phone: 320-229-2303; Cell: 763-742-8651. Email: [email protected] Exhibits:

1) ECWMC Request for Plan Review and Approval and application fee of $5,720 received December 8, 2015.

2) Incomplete application determination, dated December 9, 2105. Complete application was received on April 22, 2016.

3) Stormwater Management Hydrologic and Hydraulic Study by Westwood Professional Services, signed by Robert Olson, PE. (revision dates: 11/24/2015, 3/22/2016, 4/21/2016, 4/27/2016)

4) Wealshire of Medina Construction Plans, latest revision date is April 28, 2016, signed by Robert Olson, P.E., (21 Sheets.)

a. Sheet 1 ............... Cover b. Sheet 2 ............... Existing Conditions & Removal Plan c. Sheet 3 ............... Site Plan - Overall d. Sheet 4 ............... Site Plan – Phase 1 e. Sheet 5 ................ Grading Plan - Overall f. Sheet 6 ............... Grading Plan – North g. Sheet 7 ............... Grading Plan - South h. Sheet 8 ............... Grading Plan - Detail i. Sheet 9 ............... Grading Plan – Detail 2

Item 5c-p

Page 26: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

Wealshire of Medina (2015-038) Medina May 4,2016 Page 2 of 8

j. Sheet 10 ............. Mitigation Wetland Grading Plan k. Sheet 11 ............. Mitigation Wetland Cross Sections l. Sheet 12 ............. Mitigation Wetland Seeding Plan and Details m. Sheet 13 ............. Utility Plan – Public Extension n. Sheet 14 ............. Sanitary Sewer & Watermain Plan o. Sheet 14 ............. Sanitary Sewer & Watermain Plan p. Sheet 15 ............. Storm Sewer Plan q. Sheet 16 ............. Erosion Control Plan r. Sheets 17-19 ...... Details s. Sheet 20 ............. Landscape Plan t. Sheet 21 ............. Landscape Details

Findings;

1) A complete application was received April 21, 2016. The initial statutory project review deadline is May 20, 2016.

2) Existing land use on this property is about 19 acres of cropland and 3.7 acres of wetlands. Proposed land use is institutional with 5.93 acres of impervious cover on the north side of the property.

3) The existing wetland receives considerable runoff from the east, and discharges west via culvert under Mohawk Drive. The runoff from his site eventually reaches Medina Lake. There will be a small amount of pervious runoff directed to the north.

4) Stormwater treatment will be provided by a NURP pond, equipped with a filtration basin, located on the west side of the property. In addition to this pond, the proposed plan will have a 575-ft long, 12-ft wide and 3-ft deep bio-swale that will discharge into the NURP pond. Another 250-ft long bio-swale will be built on the west side of the site. Filtrated water from this bio-swale will be discharged into the wetland and the overflows will be directed to the NURP pond. The site will also create three bio-trenches with filtering and infiltration capabilities on the northwest side of the complex. These trenches will daylight into the bio-swale located on the west side. Due to the low permeability of the native soils, there will be modest infiltration benefits from the proposed BMPs.

Stormwater Management

Runoff Rate Controls meet the Commission’s standards. 5) Existing and post-development peak runoff rates were modeled by using the Atlas 14, 24-

hour rainfall events for the 1-year, 2-year, 10-year and 100-year storm frequencies with the HydroCad program. Post-development runoff rates will be less than the existing rates.

Total Runoff (cfs) Site 1-year 2-year 10-year 100-year

Existing 13.05 14.09 17.80 25.31 Proposed 2.05 2.63 4.56 8.49

Item 5c-p

Page 27: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

Wealshire of Medina (2015-038) Medina May 4,2016 Page 3 of 8

6) All stormwater treatment facilities must have drainage and utility easements placed on them. This includes the bio-trenches, bio-swales, NURP pond, wetlands and buffers and the west bypass storm sewer. All the storm water maintenance structures have access for maintenance purposes.

7) The developer is assuming the responsibility of the operation and maintenance of the stormwater treatment facilities and the buffer areas. A draft Development Agreement has been submitted but not reviewed yet.

Volume Controls meet the Commission’s standards. 8) 1.1” of abstraction over new imperious areas is required. The proposed project will create

about 5.934 acres of new impervious surface. This requires 23,678 cubic feet of abstraction (0.544 acre-feet).

a) About 3,945 cu-ft will be infiltrated through the bio-filtration trenches located between the buildings on the northwest side of the development. These trenches will incorporate 18-inch deep crushed rock below the filter soil mix and the drain tile to provide slow infiltration between the storm events. Infiltration volume is limited due to the slow permeability (0.10 in/hr.) of the underlying soil. These trenches will have a filtration capacity of about 5,200 cu-ft.

b) About 1.665 acres of buffers and north and west side of the site will be modified with amended soils (49,488 square feet within the buffers and 23,040 square feet on the north and west side of the site). These areas will get 0.5 inches of abstraction credit over the amended areas. This is equivalent to 3,022 cu-ft of abstraction.

c) Total abstraction credit available is 3,945 + 3,022 = 6,967 cu-ft.

d) The balance of the abstraction requirement, 16,711 cu-ft (23,678 - 6,967) will be met the filtration of stormwater through two bio-swales (west and west side), and a filtration bench constructed around the NURP pond.

e) The west bio-swale, 575 feet long, 12 feet wide and average of 3 foot deep, will be constructed along the west side of the fire lane. The swale will have four 2-ft high rock check dams to slow the runoff and to allow more time for the runoff volume to filter through the compost/sand mixture. There will be a 6-inch drain tile at the bottom of the filter medium. The drain tile will daylight at the north end of the NURP pond. This bio-swale will have a filtering capacity of about 7,000 cu-ft, including the storage capacity behind the check dams.

f) The east bio-swale will be about 275 feet long and will have a filtering capacity of about of 3,250 cu-ft. The filtered water will be discharged into the wetland, whereas the overflows will be conveyed to the NURP pond by an overflow pipe.

g) The filter bench around the NURP pond has a filtering capacity of about 20,000 cu-ft during a 1-year event.

h) A proposed irrigation system to irrigate about 3.2 acres will withdraw about 11,700 cu-ft per week of stormwater from the NURP pond. That is equivalent to about 0.5 foot of drawdown at NWL.

Item 5c-p

Page 28: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

Wealshire of Medina (2015-038) Medina May 4,2016 Page 4 of 8

i) Summary of volume control management: The project requires 23,678 cu-ft of abstraction and provides 18,667 cu-ft through soil amendment, infiltration and irrigation. For the balance of the abstract requirement 35,450 cu-ft of stormwater will be filtrated before discharging into the NURP pond.

Required abstraction = 23,678 cu-ft Credit by soil amendment = 3,022 cu-ft Infiltration credit = 3,945 cu-ft Irrigation credit = 11,700 cu-ft (per week)

Net abstraction credit = 18,667 cu-ft Filtration credit = 35,450 cu-ft

Water Quality meets the Commission’s standards.

9) The proposed NURP pond will provide about 66% nutrient treatment, without taking into account the upstream filtration trenches and bio-swales. There is an additional a quarter acre-feet per week of irrigation withdrawal from the NURP pond.

The predevelopment phosphorus load is estimated as 22.63 lbs/year. Post-development load without any BMPs would be about 37.88 lbs/year. About a quarter of the post-development load will be removed due to the irrigation

withdrawal (irrigation volume is about ¼ of the 2-year event runoff volume.) Another 25% reduction is assumed due to the upstream infiltration and filtration

BMPs. The NURP pond is designed to remove about 66% of the incoming load, assuming no

upstream load reduction. Based on these assumption, the post-development nutrient load is estimated as 9.1

lbs/year. 10) The Stormwater Quality and Volume Summary Table below shows the pre- and post-

development conditions:

Development Name: .............................. Wealshire of Medina Total Parcel Area: .................................. 22.68 acres Total Disturbed (“Buildable”) Area: ...... 19 acres Total New Impervious Area: ................ 5.93 acres Review Month/Year: .............................. May 2016 Nearest Downstream Surface Water: ..... Lake Medina/Elm Creek Headwaters

Condition TP Load (lbs./yr)1

TSS Load (lbs./yr)1

Runoff volume (AF/yr.)1, 2 ,3

Pre-development (baseline) Load 22.63 491 10.1 Post-development Without Mitigation 37.88 1827 18.9 Post-development With Mitigation 9.10 110 4.7 Net Change (“baseline” compared to “post-development with mitigation”) -13.53 -381 -5.4

1 Average annual values. 2 From Minnesota Stormwater Manual, Performance curves for MIDS calculator. 3 Annual Volume was calculated for the area north of the wetland complex (12.6 acres).

Item 5c-p

Page 29: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

Wealshire of Medina (2015-038) Medina May 4,2016 Page 5 of 8

Grading, Erosion and Sediment Controls

11) Revised plans meet the Commission’s standards.

Floodplain

12) There are no designated floodplains within this site. Buffers

13) The Commission rules require 25 feet of average, 10 feet minimum buffer width around all wetlands. Buffers graded steeper than 1V:6H slopes require extended buffers, depending on the final grade. Based on that, the project needs to have about 66,000 square feet of buffer area. The proposed replacement plan provides about 70,000 square feet of buffers. All the wetlands and buffers will be placed under protective easements and covenants. The buffers meet the Commission’s standards.

Wetlands

14) City of Medina is the LGU in charge of administering the Wetland Conservation Act within their city boundary. The proposed project is proposing about 1.39 acres of wetland impacts. The replacement will be done on site by creating new wetland on the southwest side of the property. About 4.31 acres of area will be under wetland and buffer easements for a net wetland credit of 2.78 acres. The replacement plan was approved by the city.

Recommendation:

Staff recommends the approval of the revised plans with the following condition.

A final Stormwater Maintenance Agreement, including all the reviewed and approved BMPs (buffers, pond, bio-filters, bio-swales and soil amendment), shown on a plat map, must be submitted, and recorded. Hennepin County Department of Environment and Energy

Ali Durgunoğlu, Ph.D., P.E. Technical Advisor to the Commission

Date: May 4, 2106

Item 5c-p

Page 30: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

Wealshire of Medina (2015-038) Medina May 4,2016 Page 6 of 8

Item 5c-p

Page 31: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

Wealshire of Medina (2015-038) Medina May 4,2016 Page 7 of 8

Item 5c-p

Page 32: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

Wealshire of Medina (2015-038) Medina May 4,2016 Page 8 of 8

Item 5c-p

Page 33: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

� � � � � � FY18‐19BiennialBudgetRequest

ElmCreekWMC��

Total Requested Biennial State Contribution: $1,000,563.00 BBR ID BBR16‐8937Total Leveraged Funds $3,632,000.00  Submitted Date  4/15/2016 Total Resource Project and Activities Budget $4,632,563.00  Staff Contact  Amy Juntunen Total BMPs 22  Board Conservationist  Steve Christopher Total FTEs      

WaterResourcesofConcern

Primary Water Resource of Concern Water Resource Category Watershed Impairments TrendNorthForkCrowRiver� Surface Water  Mississippi 

River ‐ Twin Cities 

Yes  Down 

FishLake� Surface Water  Mississippi River ‐ Twin Cities 

Yes  Up 

RushCreek� Surface Water  Mississippi River ‐ Twin Cities 

Yes  Down 

ElmCreek� Surface Water  Mississippi River ‐ Twin Cities 

Yes  Down 

ActivitySummary��

Water Resource Name ElmCreekActivityDescription The City of Maple Grove is proposing to restore the hydrology and plant community of a 55 acre wetland 

located between 101st and 105th Streets and west of Ranchview Lane in Maple Grove.  The project is intended to restore much of the lost function of the wetland including: flood and stormwater attenuation; vegetative diversity and integrity; wildlife, amphibian and invertebrate habitat; aesthetic, recreational and 

Report created on:4/15/16              Page 1 of 7  

Item 9a

Page 34: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

Report created on:4/15/16              Page 2 of 7  

educational values; and a groundwater recharge area. Stormwater would be significantly attenuated which will help alleviate some of the downstream flooding and stream bank erosion that is currently occurring in Rush Creek and Elm Creek.  Restoration of the previously mentioned wetland values is another significant improvement. 

ActivityCategory Wetland Restoration/Creation 

Capital Improvement Project?  Yes 

SourceofStateContribution� BWSR Clean Water Fund ‐ Projects and Practices 

Estimated # of FTEs   

TotalRequestedBiennialStateContribution�

$250,000.00  Estimated Number of Practices  4 

EstimatedLeveragedFunds� $1,750,000.00  Plan Type  Watershed Management Plan (Watershed Districts and Watershed Management Organizations only) 

Projects&ActivitiesBudget $2,000,000.00  Action or Objective (from plan)  Table 4.5 of the Third Generation Plan.  The Rush and Elm Creeks are impaired water courses.  This project will satisfy at least one of the implementation BMPs once the Elm Creek watershed TMDL is approved.  

Describehowthisactivitycouldbeaccomplishedinthebiennium

The city and watershed have committed funds to complete this project within biennium period.  The Commission is anticipating levying ad valorem funding in 2016, payable in 2017, to begin work on this project. 

��

Water Resource Name NorthForkCrowRiverActivityDescription This project will expand the current capacity for stormwater in downtown Rogers. The project will alleviate 

future redevelopment of downtown and provide an opportunity for water reuse for landscaping.  ActivityCategory Urban Stormwater 

Management Practices Capital Improvement Project?  Yes 

SourceofStateContribution� BWSR Clean Water Fund ‐ Projects and Practices 

Estimated # of FTEs   

TotalRequestedBiennialStateContribution�

$101,500.00  Estimated Number of Practices  3 

EstimatedLeveragedFunds� $304,500.00  Plan Type  Watershed Management Plan (Watershed Districts and Watershed Management 

Item 9a

Page 35: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

Report created on:4/15/16              Page 3 of 7  

Organizations only) Projects&ActivitiesBudget $406,000.00  Action or Objective (from plan)  Project CIP‐2016‐RO‐03 in 

Table 4.5 of the Third Generation Plan.  Major water quality improvements are anticipated with this project for TP and TSS reductions. This project will reduce erosion, conserve water, and improve water quality helping to reach the goals of the North Fork Crow River Turbidity and Dissolved Oxygen TMDL 

Describehowthisactivitycouldbeaccomplishedinthebiennium

Major water quality improvements are anticipated with this project for TP and TSS reductions. The pond expansion will also feature a stormwater reuse for the irrigation of nearby parks. The additional storage area will reduce flooding within the Downtown Rogers Area.  Anticipated ad valorem levy in 2018  

��

Water Resource Name RushCreekActivityDescription The City of Maple Grove is proposing a project to stabilize and restore approximately 4500 feet of Rush 

Creek north of 101st Avenue to decrease the potential for further bank instability that likely would occur subsequent to the development of the watershed and restore the channel with native vegetation for additional stability and habitat purposes.  Subsequent to development, it is likely that stormwater discharge from the adjacent and upstream watershed will increase.  This project will significantly reduce the potential for bank erosion and sediment transport downstream.  The restoration of native vegetation will provide a habitat for wildlife and a natural area for aesthetic value and study. 

ActivityCategory Streambank or Shoreline Protection 

Capital Improvement Project?  Yes 

SourceofStateContribution� BWSR Clean Water Fund ‐ Projects and Practices 

Estimated # of FTEs   

TotalRequestedBiennialStateContribution�

$168,750.00  Estimated Number of Practices  3 

EstimatedLeveragedFunds� $506,250.00  Plan Type  Watershed Management Plan (Watershed Districts and Watershed Management Organizations only) 

Projects&ActivitiesBudget $675,000.00  Action or Objective (from plan)  CIP‐2016‐MG‐03 identified in table 4.5 of the Third 

Item 9a

Page 36: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

Report created on:4/15/16              Page 4 of 7  

Generation Plan.  Projects that address stream bank stability will be critical in meeting the water quality goals for Elm Creek. 

Describehowthisactivitycouldbeaccomplishedinthebiennium

The city and watershed have committed funds to complete this project within biennium period.  The Commission is anticipating levying ad valorem funding in 2016, payable in 2017, to begin work on this project. 

��

Water Resource Name RushCreekActivityDescription The City of Maple Grove is proposing a project to stabilize and restore approximately 11,000 feet of Rush 

Creek east of I‐94 and west of Fernbrook.  Subsequent to development, it is likely that stormwater discharge from the adjacent and upstream watershed will increase.  This project will significantly reduce the potential for bank erosion and sediment transport downstream.  The restoration of native vegetation will provide a habitat for wildlife and a natural area for aesthetic value and study 

ActivityCategory Streambank or Shoreline Protection 

Capital Improvement Project?  Yes 

SourceofStateContribution� BWSR Clean Water Fund ‐ Projects and Practices 

Estimated # of FTEs   

TotalRequestedBiennialStateContribution�

$150,000.00  Estimated Number of Practices  4 

EstimatedLeveragedFunds� $300,000.00  Plan Type  Watershed Management Plan (Watershed Districts and Watershed Management Organizations only) 

Projects&ActivitiesBudget $450,000.00  Action or Objective (from plan)  CIP‐2016‐MG‐02, Identified in table 4.5 of the Third Generation Plan.  Projects that address stream bank stability will be critical in meeting the water quality goals for Elm Creek. 

Describehowthisactivitycouldbeaccomplishedinthebiennium

The city and watershed have committed funds to complete this project within biennium period.  The Commission is anticipating levying ad valorem funding in 2016, payable in 2017, to begin work on this project. 

��

Water Resource Name NorthForkCrowRiverActivityDescription This project will provide stabilization and protection along 1,285 feet of stream bank.  The segment of Fox 

Item 9a

Page 37: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

Report created on:4/15/16              Page 5 of 7  

Creek near Creekview Drive in the City of Rogers currently experiences erosion and stream bank failure from periodic high flow velocities. This project will provide stabilization for the stream banks and reduce sediment transport along Fox Creek and ultimately the Crow River. 

ActivityCategory Streambank or Shoreline Protection 

Capital Improvement Project?  Yes 

SourceofStateContribution� BWSR Clean Water Fund ‐ Projects and Practices 

Estimated # of FTEs   

TotalRequestedBiennialStateContribution�

$80,313.00  Estimated Number of Practices  3 

EstimatedLeveragedFunds� $321,250.00  Plan Type  Watershed Management Plan (Watershed Districts and Watershed Management Organizations only) 

Projects&ActivitiesBudget $401,563.00  Action or Objective (from plan)  CIP‐2016‐RO‐01 Fox Cr, Creekview, Table 4.5 of the Third Generation Plan.  Habitat enhancement, protection for wooded upland areas, water quality improvement (Sediment Load Reduction: 21‐42 tons/year, Phosphorus Load Reduction 21‐42 lbs/year) 

Describehowthisactivitycouldbeaccomplishedinthebiennium

The city and watershed have committed funds to complete this project within biennium period.  The Commission is anticipating levying ad valorem funding in 2016, payable in 2017, to begin work on this project. 

��

Water Resource Name ElmCreekActivityDescription Construct rain gardens and other BMPs for the area tributary to Mill Pond. ActivityCategory Special Projects  Capital Improvement Project?  Yes SourceofStateContribution� BWSR Clean Water Fund ‐ 

Projects and Practices Estimated # of FTEs   

TotalRequestedBiennialStateContribution�

$100,000.00  Estimated Number of Practices  4 

EstimatedLeveragedFunds� $300,000.00  Plan Type  Watershed Management Plan (Watershed Districts and Watershed Management Organizations only) 

Item 9a

Page 38: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

Report created on:4/15/16              Page 6 of 7  

Projects&ActivitiesBudget $400,000.00  Action or Objective (from plan)  Table 4.5.  Construction of Rain Gardens and other BMPs, including underground treatment will provide treatment of stormwater for approx 23 acres to reduce TP and TSS inputs to Mill Pond, Elm Creek, and, ultimately, the Mississippi River 

Describehowthisactivitycouldbeaccomplishedinthebiennium

The city and watershed have committed funds to complete this project within biennium period.  The Commission is anticipating levying ad valorem funding in 2016, payable in 2017, to begin work on this project. 

��

Water Resource Name FishLakeActivityDescription The project will involve carrying out a batch alum treatment in Fish Lake to combat internal phosphorus 

loading.  We anticipate that the application would be carried out in two phases, separated by 3‐5 years depending on the results of an interim assessment to determine the  effectiveness of the initial phase in controlling phosphorus released from the lake’s bottom sediments. It is expected that internal load control efforts will be combined with long‐term efforts to further reduce watershed loading as well through separate efforts by the City of Maple Grove and TRPD. 

ActivityCategory Special Projects  Capital Improvement Project?  Yes SourceofStateContribution� BWSR Clean Water Fund ‐ 

Projects and Practices Estimated # of FTEs   

TotalRequestedBiennialStateContribution�

$150,000.00  Estimated Number of Practices  1 

EstimatedLeveragedFunds� $150,000.00  Plan Type  Watershed Management Plan (Watershed Districts and Watershed Management Organizations only) 

Projects&ActivitiesBudget $300,000.00  Action or Objective (from plan)  Table 4.5 of Third Generation Plan.  The purpose of the project is to control internal loading in Fish Lake to a sufficient degree so that the lake consistently meets the applicable state water quality standards for eutrophication over the long term.  The TMDL 

Item 9a

Page 39: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

Report created on:4/15/16              Page 7 of 7  

work completed for Fish Lake indicates that almost 70% of the phosphorus load driving surface water quality in the lake comes from internal sources. Fish Lake will be the main water body impacted by the project, but Rice Lake which lies immediately downstream will also benefit to a minor degree.   

Describehowthisactivitycouldbeaccomplishedinthebiennium

The city and watershed have committed funds to complete this project within biennium period.  The Commission is anticipating levying ad valorem funding in 2016, payable in 2017, to begin work on this project. 

��

���

 

Item 9a

Page 40: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

elm creek

Watershed Management Commission ADMINISTRATIVE OFFICE TECHNICAL OFFICE 3235 Fernbrook Lane Hennepin County Public Works Plymouth, MN 55447 Department of Environment and Energy PH: 763.553.1144 701 Fourth Ave. South, Suite 700 E-mail: [email protected] Minneapolis, MN 55415 www.elmcreekwatershed.org PH: 612.596.1171 E-mail: [email protected]

CHAMPLIN • CORCORAN • DAYTON • MAPLE GROVE • MEDINA • PLYMOUTH • ROGERS S:\EMD\DEMCON\CORR\DURGUNOGLU\_WATERSHEDS\ELM_CRK\PLAN_REVIEW\2016\2016-006 Mississippi River Shoreline Stabilization, Champlin\2016-06 Mississippi River Shoreline Stabilization.docx

Mississippi River Shoreline Stabilization Champlin, Project #2016-006

Project Overview: City of Champlin is proposing the Mississippi River Shoreline Stabilization and Appurtenant Work between the Mississippi Point Park (confluence of Elm Creek and Mississippi River) and upstream of the TH 169 Bridge (near Colburn Street) along the south bank of the Mississippi River. Our review will be for compliance to the Commission’s 3rd generation SWMP requirements on erosion and sediment controls. Applicant: City of Champlin, Todd Tuominen, 11955 Champlin Drive, Champlin, MN 55316. Phone: 763-923-7120. Email: [email protected] Agent/Engineer: Same as Applicant. Exhibits:

1) Project 2016-006 ECWMC Request for Plan Review and Approval received March 4, 2016.

2) Project review fee of $550. 3) Pre-con meeting Minutes February 12, 2016. 4) Site plan, hard copy and electronic files (8 sheets):

Sheets include the Title Sheet, Details, East River Parkway, Mississippi Point Park, Colburn Street N. Plan sheets are dated December 14, 2015, and signed by Timothy Hanson, P.E.

Findings;

1) A complete application was received on March 10, 2016. The initial 60-day review period expires May 11, 2016.

2) Rule D. Stormwater Management does not require a review for this project. The plan proposes no new impervious area.

3) Rule F. There is FEMA floodplains within the project corridor. However, the stream restoration work will use riprap and bioengineering methods along the receded streambanks of the Mississippi and cause no net loss of floodplain conveyance or storage.

4) Rule G. Wetland Alteration. The ECWMC is the LGU in charge of administering the MN Wetland Conservation Act in the City of Champlin. The project stays below the DNR OWH and therefore the WCA is not applicable for this project.

Item 13-w

Page 41: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

Mississippi River Shoreline Stabilization Page 2 Champlin, Project 2016-006 April 15, 2016.

5) Rule I. Buffer Strip requirements. New development along the Mississippi River would require 25 feet buffer. Commission does not require buffers for appurtenant work. All the remaining streambank restoration work will be within the city-owned properties. Historically, the Commission has not required buffer within the city-owned properties..

6) Rule E. Erosion and Sediment Control will meet the Commission’s requirements. SWPPP narrative addresses NPDES permit requirements. Perimeter erosion controls are designed to isolate the restoration area and contain sediment. Permeant vegetation restoration is specified according to MPCA requirements.

Decision: Approved.

Hennepin County Department of Environment and Energy

April 15, 2016 Ali Durgunoglu Technical Advisor to the Commission

Item 13-w

Page 42: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

Mississippi River Shoreline Stabilization Page 3 Champlin, Project 2016-006 April 15, 2016.

SOUTH SIDE

Item 13-w

Page 43: 05 Notice reg meeting public meeting · h. 2015‐013 Wayzata High School, Plymouth. i. 2015‐016 Brockton PUD, Plymouth. j. 2015‐020 Strehler Estates, Corcoran. k 2015‐025 OP3

Mississippi River Shoreline Stabilization Page 4 Champlin, Project 2016-006 April 15, 2016.

NORTH SIDE

Item 13-w