04_Dynanet i PDH Update

download 04_Dynanet i PDH Update

of 6

Transcript of 04_Dynanet i PDH Update

  • 8/13/2019 04_Dynanet i PDH Update

    1/6

  • 8/13/2019 04_Dynanet i PDH Update

    2/6

    2 NOKIA NBA_VAR_Marketing_Seminar_20-21.03.2003

    Dynanet & PDH UpdateNew Ethernet Interface Unit

    In previous seminar VARs strongly suggested to develop this unit and we did it! Thank you!

    Two port EIU was launched in September 2002 and well receivedon the market

    Improvement proposal from customers: HUB functionality EIU with HUB is launched in March 2003

    Can be ordered using NC Manual is available in NOLS

    Master units: DM2, DM2+, DB2, DN2, ACM2 V2 & V5.1

    21133.0125442.01 21133.0225442.02

  • 8/13/2019 04_Dynanet i PDH Update

    3/6

    3 NOKIA NBA_VAR_Marketing_Seminar_20-21.03.2003

    EIU and multipoint connection

    DB2

    B2and

    XS

    TU21

    133.0

    1

    External HUB

    LAN DB2

    B2and

    XS

    TU2

    3.02

    DB2

    B

    2andXS

    TU21

    133.0

    1

    External HUB

    LAN

    Transmissionnetwork2 Mbit/sconnection

    2 Mbit/sconnection

    2 Mbit/sconnection

    113

  • 8/13/2019 04_Dynanet i PDH Update

    4/64 NOKIA NBA_VAR_Marketing_Seminar_20-21.03.2003

    Multipoint bridging with EIU

    Two integrated hubs: can work separately or can be connected together

    10Base-TIF 1A

    10Base-TIF 1B

    10Base-TIF 2A

    10Base-TIF 2B

    HUB 1

    Cross-Connection

    HUB 1

    Mult ipoint bridging with EIU 21133.02

    2 Mbitconnection

    DM2

  • 8/13/2019 04_Dynanet i PDH Update

    5/65 NOKIA NBA_VAR_Marketing_Seminar_20-21.03.2003

    Dynanet & PDH UpdateLife time extension

    Extensive business study done last autumn:

    Market situation:Market for traditional fixed telecommunication is not going away

    Key market requirements:High quality and high availability products continue to bewell recognized

    Product structure:True that we have terminated some products during last years but overall only 650 different items out of 1600 was sold during2002

    Implementation:Replacing End Of Life components, buying EOL components to

    stock, re-design units, modifications, removals Internal requirements:EOL component follow-up, maintenance work, customer

    support

    Risks:EOL components, forecasts give no time to react

    Conclusion was to extend the Dynanet and PDH life cycle

    No major ramp-down risks foreseen for active products, evaluation done twice peryear March and September. In case of ramp-down decision, notification will be given

    six months before last order date.

  • 8/13/2019 04_Dynanet i PDH Update

    6/66 NOKIA NBA_VAR_Marketing_Seminar_20-21.03.2003

    Dynanet & PDH UpdateExample of life time extension

    Long haul 1550 nm DFB lasers are re-designed

    DF2-8: 21519 Terminal Repeater 2-8 M, 1550 nm DFB is replaced by

    21519.01 Terminal Repeater 2-8 M,1550nm Laser DFBDF34: 21539 Terminal Repeater 34 M, 1550 nm DFB is replaced by

    21539.01 Terminal Repeater 34 M, 1550 nm DFB

    DF140: 21942 Term. Repeater 140 M, 1550 nm LASER DFB is replaced by21942.01 Term. Repeater 140M,1150nm LASER DFB

    Latest Node Manager versions are supporting Windows 2000

    Data Interface Unit 21128 system tested and added to ACM2 V2

    system release