Dynanet & PDH UpdateNew Ethernet Interface Unit
In previous seminar VARs strongly suggested to develop this unit and we did it! Thank you!
Two port EIU was launched in September 2002 and well receivedon the market
Improvement proposal from customers: HUB functionality EIU with HUB is launched in March 2003
Can be ordered using NC Manual is available in NOLS
Master units: DM2, DM2+, DB2, DN2, ACM2 V2 & V5.1
21133.0125442.01 21133.0225442.02
-
8/13/2019 04_Dynanet i PDH Update
3/6
3 NOKIA NBA_VAR_Marketing_Seminar_20-21.03.2003
EIU and multipoint connection
DB2
B2and
XS
TU21
133.0
1
External HUB
LAN DB2
B2and
XS
TU2
3.02
DB2
B
2andXS
TU21
133.0
1
External HUB
LAN
Transmissionnetwork2 Mbit/sconnection
2 Mbit/sconnection
2 Mbit/sconnection
113
-
8/13/2019 04_Dynanet i PDH Update
4/64 NOKIA NBA_VAR_Marketing_Seminar_20-21.03.2003
Multipoint bridging with EIU
Two integrated hubs: can work separately or can be connected together
10Base-TIF 1A
10Base-TIF 1B
10Base-TIF 2A
10Base-TIF 2B
HUB 1
Cross-Connection
HUB 1
Mult ipoint bridging with EIU 21133.02
2 Mbitconnection
DM2
-
8/13/2019 04_Dynanet i PDH Update
5/65 NOKIA NBA_VAR_Marketing_Seminar_20-21.03.2003
Dynanet & PDH UpdateLife time extension
Extensive business study done last autumn:
Market situation:Market for traditional fixed telecommunication is not going away
Key market requirements:High quality and high availability products continue to bewell recognized
Product structure:True that we have terminated some products during last years but overall only 650 different items out of 1600 was sold during2002
Implementation:Replacing End Of Life components, buying EOL components to
stock, re-design units, modifications, removals Internal requirements:EOL component follow-up, maintenance work, customer
support
Risks:EOL components, forecasts give no time to react
Conclusion was to extend the Dynanet and PDH life cycle
No major ramp-down risks foreseen for active products, evaluation done twice peryear March and September. In case of ramp-down decision, notification will be given
six months before last order date.
-
8/13/2019 04_Dynanet i PDH Update
6/66 NOKIA NBA_VAR_Marketing_Seminar_20-21.03.2003
Dynanet & PDH UpdateExample of life time extension
Long haul 1550 nm DFB lasers are re-designed
DF2-8: 21519 Terminal Repeater 2-8 M, 1550 nm DFB is replaced by
21519.01 Terminal Repeater 2-8 M,1550nm Laser DFBDF34: 21539 Terminal Repeater 34 M, 1550 nm DFB is replaced by
21539.01 Terminal Repeater 34 M, 1550 nm DFB
DF140: 21942 Term. Repeater 140 M, 1550 nm LASER DFB is replaced by21942.01 Term. Repeater 140M,1150nm LASER DFB
Latest Node Manager versions are supporting Windows 2000
Data Interface Unit 21128 system tested and added to ACM2 V2
system release