04.00 GENERAL 04.02 POLE ATTACHMENTS POLE · PDF file#4 duplex secondary several wraps of the...

14
04.00-00A DWG. 04.00-01 SECONDARIES & SERVICES INDIVIDUAL 1 PHASE SECONDARY OVERHEAD LINE EXTENSIONS 04.00-02 04.04-06 SECONDARY SPACER INSTALLATIONS SECONDARY AND SERVICE CABLE SPLICES 04.00-10 INSULATED SERVICE ENTRANCE COMPRESSION CONNECTORS 04.00-12 MULTIPLEX SERVICE ATTACHMENTS TO POLES 04.02-06 OVERHEAD SERVICE POLE 04.05-06 SERVICE ATTACHMENT METHODS O4.05-00 TEMPORARY SERVICE POLE 04.05-08 BILLBOARD SERVICE ENTRANCE REQUIREMENTS METHOD "A" 04.05-10 BILLBOARD SERVICE ENTRANCE REQUIREMENTS METHOD "B" 04.05-12 SECTION 4 - SECONDARY CONSTRUCTION OVERHEAD TABLE OF CONTENTS 04.02-01 POLE ATTACHMENT DEVICES 0 3 2 1 APPR. REVISED BY CK'D 04.04-08 OVERHEAD TRIPLEX SECONDARIES 7/8/10 CECCONI GUINN ELKINS 04.05 SERVICES 04.04 SECONDARIES 04.02 POLE ATTACHMENTS 04.00 GENERAL

Transcript of 04.00 GENERAL 04.02 POLE ATTACHMENTS POLE · PDF file#4 duplex secondary several wraps of the...

Page 1: 04.00 GENERAL 04.02 POLE ATTACHMENTS POLE · PDF file#4 duplex secondary several wraps of the binding wire. cover ends if not in use. continue on, ... use 840 die on 4/0 at splice.

04.00-00A

DWG.

04.00-01SECONDARIES & SERVICES

INDIVIDUAL 1 PHASE SECONDARY OVERHEAD LINE EXTENSIONS 04.00-02

04.04-06SECONDARY SPACER INSTALLATIONS

SECONDARY AND SERVICE CABLE SPLICES 04.00-10

INSULATED SERVICE ENTRANCE COMPRESSION CONNECTORS 04.00-12

MULTIPLEX SERVICE ATTACHMENTS TO POLES 04.02-06

OVERHEAD SERVICE POLE 04.05-06

SERVICE ATTACHMENT METHODS O4.05-00

TEMPORARY SERVICE POLE 04.05-08

BILLBOARD SERVICE ENTRANCE REQUIREMENTS METHOD "A" 04.05-10

BILLBOARD SERVICE ENTRANCE REQUIREMENTS METHOD "B" 04.05-12

SECTION 4 -

SECONDARY CONSTRUCTION OVERHEAD

TABLE OF CONTENTS

04.02-01POLE ATTACHMENT DEVICES

0

3

2

1

APPR.REVISED BY CK'D

04.04-08OVERHEAD TRIPLEX SECONDARIES

7/8/10

CECCONI GUINN ELKINS

04.05 SERVICES

04.04 SECONDARIES

04.02 POLE ATTACHMENTS

04.00 GENERAL

Page 2: 04.00 GENERAL 04.02 POLE ATTACHMENTS POLE · PDF file#4 duplex secondary several wraps of the binding wire. cover ends if not in use. continue on, ... use 840 die on 4/0 at splice.

1. THE NEUTRAL SHALL BE COMMON TO BOTH PRIMARY AND SECONDARY CIRCUITS ON WYE SYSTEMS. THE

NEUTRAL SHALL BE MULTI-GROUNDED.

2. THE NEUTRAL CONDUCTOR SHALL ALWAYS BE IN THE TOP POSITION ON AN OPEN-WIRE SECONDARY CIRCUIT.

SIZING OF SECONDARY CONDUCTORS WILL DEPEND ON THE AMOUNT OF LOAD, THE TYPE OF LOAD (SUCH AS

MOTORS, ETC.), AND THE VOLTAGE DROP.

3. ALL SERVICE CONDUCTORS WILL BE OF COVERED ALUMINUM. THE REQUIRED SIZE, SHALL BE SPECIFIED BY

THE ENGINEER.

4. THE SERVICE ENTRANCE LOCATION WILL BE DETERMINED BY THE COMPANY AND MUST BE AGREED TO BY

THE CUSTOMER. CUSTOMER'S REQUESTS FOR NON-STANDARD LOCATIONS FREQUENTLY REQUIRE AN

ADDITIONAL CHARGE.

DWG.

04.00-01

10/18/12

BURLISON ADCOCK

SECONDARIES & SERVICES

GENERAL

R

WIRE SIZE

LIMIT FOR ALUMINUM CABLES NOT REQUIRING GUYING

40'

60'

70'

90'

150'

110'

150'

150'

336.4/350 QUADRUPLEX SERVICE

#4/0 QUADRUPLEX SECONDARY

350/500 TRIPLEX SERVICE

#4/0 TRIPLEX SERVICE

#1/0 TRIPLEX SERVICE/SECONDARY

#4 TRIPLEX SERVICE

#4 DUPLEX SECONDARY

SEVERAL WRAPS OF THE BINDING WIRE. COVER ENDS IF NOT IN USE.

CONTINUE ON, FIRST TAPE THE ENDS OF THE PHASE CONDUCTOR THEN BEND THEM BACK AND SECURE WITH

9. TO DEADEND THE PHASE CONDUCTORS OF AERIAL SECONDARY CABLE WHILE ALLOWING NEUTRAL TO

OF SCRAP LACING WIRE.

8. BEFORE CUTTING THE LACING WIRE ON AERIAL SECONDARY CABLE, BIND THE LACING WITH SEVERAL TURNS

7. STREETLIGHT CIRCUITS ARE TO BE CONSIDERED AS SECONDARY.

6. USE INSULINKS OR INSTALL COVERS OVER SECONDARY CABLE OR SERVICE CABLE PHASE CONNECTORS.

MOST NUMBER OF RAISED RIBS WILL BE THE HIGH (208 VOLT) PHASE.

5. FOR THREE PHASE FOUR WIRE DELTA SECONDARY CABLE AND SERVICES, THE PHASE CONDUCTOR WITH THE

#1/0 QUADRUPLEX SECONDARY

50'

500 QUADRUPLEX SERVICE 40'

0

3

2

1

APPR.REVISED BY CK'D

#2 TRIPLEX SERVICE

**SPAN LENGTH

*NO CODE NAME

WALKING

LEPAS

VIATKA

SOLASTER

SANDCRAB

WHIPPET

CRAB

*NO CODE NAME

*NO CODE NAME

CODE NAME

* WIRE SIZE CUSTOM MADE IN FIELD

** BASED ON 350 LB. CUSTOMER MAST TENSION LIMIT AS INDICATED IN THE

REQUIREMENTS FOR ELECTRIC SERVICE AND METER INSTALLATIONS MANUAL.

Page 3: 04.00 GENERAL 04.02 POLE ATTACHMENTS POLE · PDF file#4 duplex secondary several wraps of the binding wire. cover ends if not in use. continue on, ... use 840 die on 4/0 at splice.

7/8/10

BURLISON GUINN ELKINS

INDIVIDUAL 1 PHASE SECONDARY

OVERHEAD LINE EXTENSIONS0

3

2

1

APPR.REVISED BY CK'D

70'

USING OH SECONDARY LIFT POLES

NO EXTRA POLE CHARGE TO NORMAL P.O.D.

150'

150'

NORMAL POINT OF DELIVERY

5

0

'

WIRING BEYOND NORMAL POINT OF DELIVERY

4

0

'

NORMAL P.O.D. IS ON THE END OF THE

BUILDING NEAREST THE OVERHEAD SOURCE.

6

0

'

NORMAL POINT OF DELIVERY

NORMAL P.O.D.

NO CHARGE

4/1/11

SIMPSON SIMPSON ELKINS

5/2/13

SIMPSON SIMPSON ADCOCK

8/18/14

SIMPSON GUINN ADCOCK

04.00-02

DEFDEP

X

DEMDEC

POLE FEE AND PER FOOT CABLE CHARGES APPLY. CONTACT COMPANY REPRESENTATIVE FOR COSTS.

NOTE: DIMENSIONS SHOWN ARE FOR

ILLUSTRATIVE PURPOSES ONLY.

Page 4: 04.00 GENERAL 04.02 POLE ATTACHMENTS POLE · PDF file#4 duplex secondary several wraps of the binding wire. cover ends if not in use. continue on, ... use 840 die on 4/0 at splice.

6"

6"6"

SEMI-TENSION SLEEVE

6"

6"

COMPRESSION CONNECTOR;

INSULATED SERVICE ENTRANCE

SEMI-TENSION SLEEVE

OCCUR.

6. PHASE CONDUCTORS SHALL BE POSITIONED SUCH THAT CONTACT WITH THE NEUTRAL SLEEVE WILL NOT

SPLICES PER SPAN.

SPAN. "REPAIR" TRIPLEX OR QUADRUPLEX SECONDARIES AND SERVICES MAY CONTAIN A MAXIMUM OF TWO

5. "NEW" TRIPLEX OR QUADRUPLEX SECONDARIES AND SERVICES MAY CONTAIN A MAXIMUM OF ONE SPLICE PER

3. CLEAN CONDUCTORS BY WIRE BRUSHING.

SLEEVE.

2. USE "BG" GROOVE OF BURNDY TOOL, OR EQUIVALENT TOOL WITH DIE FOR 5/8" SLEEVES. USE 840 DIE ON 4/0

AT SPLICE.

1. WHEN SPLICING NEUTRAL, CUT OFF ENOUGH CONDUCTOR TO ASSURE A LOOSE WRAP OF PHASE CONDUCTORS

NOTES:

DWG.

04.00-10

4. FOR DETAILS OF INSULATED COMPRESSION CONNECTOR INSTALLATION SEE DWG 04.00-12.

CATALOG NUMBER CONDUCTOR SIZE

SEMI-TENSION SLEEVES FOR SERVICE NEUTRALS

#2 ACSR OR ALLOY

#4 ACSR OR ALLOY

#6 ACSR OR ALLOY

11164100

11164001

11151610

11165602 #4/0 ACSR OR ALLOY

TRIPLEX CABLE SPLICE

QUADRUPLEX CABLE SPLICE

SECONDARY AND SERVICE CABLE SPLICES

0

3

2

1

APPR.REVISED BY CK'D

7/8/10

BURLISON GUINN ELKINS

INSTALLATION INSTRUCTIONS

AND CONNECTOR INFORMATION

SEE DWG 04.00-12 FOR

COMPRESSION CONNECTOR;

INSULATED SERVICE ENTRANCE

INSTALLATION INSTRUCTIONS

AND CONNECTOR INFORMATION

SEE DWG 04.00-12 FOR

Page 5: 04.00 GENERAL 04.02 POLE ATTACHMENTS POLE · PDF file#4 duplex secondary several wraps of the binding wire. cover ends if not in use. continue on, ... use 840 die on 4/0 at splice.

STRIP

LENGTH

NOTE 1

NOTE 2

NOTE 3

NOTES:

1. STRIP INSULATION ON EACH CONDUCTOR FOR LENGTH SHOWN BY ARROWS ON SIDE OF CONNECTOR, CLEAN

CONDUCTOR BY WIRE BRUSHING.

2. INSERT CONDUCTORS THROUGH CAPS ON EACH END UNTIL THEY HIT THE CENTER STOP.

3. MAKE THREE COMPRESSIONS ON EACH END. ROTATE TOOL SO THAT CRIMPS DO NOT LINE UP. USE "BG"

GROOVE OF BURNDY TOOL, OR EQUIVALENT TOOL WITH DIE FOR 5/8" SLEEVES. REMOVE END CAPS WHEN

INSTALLED ON BARE NEUTRAL.

4. INSULATED COMPRESSION CONNECTOR IS TO BE USED FOR NON-TENSION JOINTS ONLY. NO TAPING OR

DWG.

04.00-12

ADDITIONAL INHIBITOR IS REQUIRED. SEE DWG. 04.00-10 FOR SERVICE DROP CABLE SPLICE.

INSULATED COMPRESSION CONNECTOR SIZE TABLE

CONDUCTOR SIZECONDUCTOR SIZE

END MARKINGS

END COLOR END COLOR

4

6

4

2

2

1/0

1/0

1/0

2

ORANGE

ORANGE

YELLOW

YELLOW

YELLOW

RED

RED

RED

BLUE

BLUE

BLUE

BLUE

ORANGE

RED

RED

YELLOW

ORANGE

ORANGE4

2

4

I/0

2

6

6

4

6

INSULATED SERVICE ENTRANCE

COMPRESSION CONNECTORS

R

0

3

2

1

APPR.REVISED BY CK'D

1/0 YELLOW GRAY2/0

PGN

CN

11180809

11180908

11181104

11181203

11181302

11180205

11180403

11180502

11180700

9220121498

9/14/12

BURLISON ADCOCK

1/O

4/O

1/O

PINK

YELLOW

YELLOW

PINK

PINK

BLACK3/0

4/O

4/0

9220121506

9220121511

9220121516

Page 6: 04.00 GENERAL 04.02 POLE ATTACHMENTS POLE · PDF file#4 duplex secondary several wraps of the binding wire. cover ends if not in use. continue on, ... use 840 die on 4/0 at splice.

04.02-01

DWG.

INSULATOR, SECONDARY RACK

INSULATOR, SECONDARY SPOOL

POLE ATTACHMENT DEVICES

7/8/10

ELKINSBURLISON GUINN

RR

FOR TANGENT POLE

NEUTRAL SUPPORT

AND OPEN-WIRE

SECONDARY SUPPORT

(ANGLES 0 TO 5 DEGREES)

SECONDARY DEAD ENDS

AND OPEN-WIRE

NEUTRAL SUPPORT

FOR ANGLE POLE

10543007

011280 BOLT, SPOOL, 5/8 X 10, GALV, DUI WASHERS

WASHER, SQ, 2-1/4", 3/16, GALV.

10544005 WASHER, LOCK, 5/8, COIL, DOUBLE, GALV.

011282 BOLT, SPOOL, 5/8 X 12, GALV, DUI WASHERS

0

3

2

1

APPR.REVISED BY CK'D

1

BILL OF MATERIALS

CATALOG

DESCRIPTION

NSSB10C

NSSB12C 1

1

QTY

1

1

1

1

PER

CU

NUMBER

MACRO UNIT

-

CU

ITEM

NO.

COMPATIBLE

UNIT

QTY

REQ'D

10034908

10543007 WASHER, SQ, 2-1/4", 3/16, GALV.

BOLT, MACH, SQ, 5/8-11 X 12, GALV

1

BILL OF MATERIALS

CATALOG

DESCRIPTION

NSSCC 1

QTY

1

1

PER

CU

NUMBER

MACRO UNIT

-

CU/CN

ITEM

NO.

COMPATIBLE

UNIT

QTY

REQ'D

10510204 CLEVIS, INSULATOR SPOOL, GALV, 3-1/8"1

10543007 WASHER, SQ, 2-1/4", 3/16, GALV.1

10544005 WASHER, LOCK, 5/8, COIL, DOUBLE, GALV.1

4/11/11

ELKINSBURLISON BURLISON

2 ISPLC 1 10512002 INSULATOR, SPOOL, 3 INCH1

2 ISPLC 1 10512002 INSULATOR, SPOOL, 3 INCH1

1 2

1

2

10/18/12

ADCOCKBURLISON

NOTES:

1. FOR FACTORY FORMED TIE INFORMATION, SEE DWG. 03.04-09.

Page 7: 04.00 GENERAL 04.02 POLE ATTACHMENTS POLE · PDF file#4 duplex secondary several wraps of the binding wire. cover ends if not in use. continue on, ... use 840 die on 4/0 at splice.

4"

12"

WEDGE GRIP

EYENUT

WEDGE GRIP

ON OPPOSITE SIDE FROM EXISTING SECONDARY DEADEND

ON SAME SIDE AS EXISTING SECONDARY

NOTES:

2. APPLY INHIBITOR AND WIRE BRUSH ALL CONNECTIONS. USE ALUMINUM COMPRESSION CONNECTORS ON

COPPER TO ALUMINUM CONNECTIONS. INSTALL CONNECTORS SO THAT ALUMINUM IS ABOVE COPPER.

TO SOURCETO SERVICE

DWG.

04.02-06

CN 10321008

CU ISEYENUT58C

CN 10026201

CU ISEYEBOLT5810C

CU SERCLMPN2ALC

CN 11101805

CN 11101409

CONNECTIONS TO OPEN WIRE SECONDARIES

LIFT POLE ATTACHMENTS

LIFT POLE

GUYED LIFT POLE

MULTIPLEX SERVICE ATTACHMENTS TO POLES

1. FOR 4/0 AND LARGER TPX & QPX, SUBSTITUTE STRAIGHT DEAD END CLAMP ( CN 11104957) AND SALVAGED

AND SPOOL.

3. POLES WITH ONLY SECONDARY CONDUCTORS WILL NOT BE EQUIPPED WITH A POLE GROUND.

R

4"

7/8/10

BURLISON GUINN ELKINS

0

4

3

APPR.REVISED BY CK'D

CU SERCLMP40ALC

WEDGE GRIP

4/27/12

GUINN BURLISON ELKINS

10/18/12

BURLISON ADCOCK

4" STRAIN INSULATORS ( CN 11222908) FOR LOOP DEAD END CLAMP, AND EYEBOLT ( CN 10026201) FOR CLEVIS

12"

DETAIL SHOWN FOR

1/0 AND SMALLER

TPX AND QPX

(SEE NOTE 1)

DEAD END CLAMP

CN 11104957

USE MINIMUM 1/4" GUYSTRAND AND 6" SCREW

ANCHOR FOR ANGLE POLES AS NEEDED

5

1/18/13

SIMMONS GUINN ADCOCK

4. POLES WITH METERING EQUIPMENT TO BE EQUIPPED WITH A POLE GROUND (EITHER WRAP BUTT OR TWO

DRIVEN 5' GROUND RODS).

Page 8: 04.00 GENERAL 04.02 POLE ATTACHMENTS POLE · PDF file#4 duplex secondary several wraps of the binding wire. cover ends if not in use. continue on, ... use 840 die on 4/0 at splice.

DWG.

04.04-06

NOTES:

1. SERVICE DROP INSTALLATIONS SHALL BE APPLIED ONLY

IN THOSE CASES WHERE THE ALTERNATIVE WOULD BE

RELOCATING EXISTING POLES OR INSTALLING ADDITIONAL

ONES TO SERVE CUSTOMERS.

2. SERVICE DROPS SHALL NOT BE SPECIFIED WHEN THE

LOCATION IS INACCESSIBLE TO A LADDER.

3. INSTALLATIONS SHALL BE MADE SO THAT SAGS AND

TENSIONS OF THE SECONDARY SERVICE CABLE ARE

MAINTAINED FOR PROPER APPEARANCE.

4. MAXIMUM SIZE SERVICES PERMITTED FOR THIS

INSTALLATION ARE 80' OF #2 TRIPLEX OR 60' OF

#1/0 TRIPLEX.

5. MORE THAN ONE SERVICE PULL-OFF IN THE SAME SPAN

IS NOT PERMITTED EXCEPT FOR BACK-TO-BACK SERVICES.

6. SECONDARY SPACERS MAY BE INSTALLED AT APPROXIMATELY

50' INTERVALS TO PREVENT OUTAGES DUE TO SECONDARY

CONDUCTORS COMING TOGETHER IN LONG SPANS.

SECONDARY SPACER

DOUBLE SERVICE DROP

(TO BE USED ONLY WHERE SPECIFIED BY ENGINEER)

DOUBLE TAP

FOR 4/0 ACSR MAXIMUM

DOUBLE SERVICE BAIL

FOR SINGLE TAP

6/21/10

BURLISON GUINN ELKINS

SECONDARY SPACER INSTALLATIONS

8" SPACING (CN 11102100)

12" SPACING (CN 11102209)

USE SINGLE SERVICE BAIL (CN 11102308)

CN 11102407

0

3

2

1

APPR.REVISED BY CK'D

(TO BE USED ONLY WHERE SPECIFIED BY ENGINEER)

OR TO CLEAR POLE FOR CLIMBING

SERVICE DROP LOCATED TO AVOID OBSTACLES

(TO BE USED ONLY WHERE SPECIFIED BY ENGINEER)

SERVICE DROP FROM TRANSFORMER POLE

Page 9: 04.00 GENERAL 04.02 POLE ATTACHMENTS POLE · PDF file#4 duplex secondary several wraps of the binding wire. cover ends if not in use. continue on, ... use 840 die on 4/0 at splice.

PRIMARIES

1. THE PREFERRED METHOD IS TO INSTALL THE TRIPLEX BENEATH THE PRIMARY NEUTRAL, CLEAR-SPANNING

2. THE TRIPLEX AT ITS LOWEST POINT MUST BE AT LEAST 30" ABOVE THE TELEPHONE/CATV LINES BELOW. IF

THERE ARE NO TELEPHONE/CATV LINES, THE TRIPLEX AT ITS LOWEST POINT MUST HAVE THE APPROPRIATE

3. IF THE SAG OF THE TRIPLEX ENCROACHES THE MINIMUM CLEARANCE TO THE TELEPHONE/CATV LINES OR

GROUND BELOW, THE TRIPLEX SHOULD BE ATTACHED TO THE PRIMARY NEUTRAL, AS SHOWN IN DETAIL A

4. ONLY #2 AND #4 TRIPLEX MAY BE ATTACHED TO THE PRIMARY NEUTRAL FOR ITS SUPPORT. THE LARGER SIZE

TRIPLEXES MUST BE CLEAR-SPANNED BETWEEN POLES AND NOT SUPPORTED BY THE PRIMARY NEUTRAL.

ABOVE, AS OFTEN AS NECESSARY TO ACHIEVE THE REQUIRED MINIMUM CLEARANCES.

NOTES:

TRIPLEX

BARE NEUT.

TPX

PHASE WIRES

PRIMARY NEUTRAL

TELEPHONE/CATV

NEUTRAL

PRIMARY

CLEAR.

MIN.

AT

POLE

PRI.-NEUT.

SPACING

EXISTING

GUY CLAMP

TRIPLEX

SECONDARY

FINAL GRADE

MINIMUM CLEARANCE

TO GROUND BELOW

CLEARANCE

30" MIN.

IN SPAN

40"

MINIMUM GROUND CLEARANCE GIVEN BY DWG. 10.02-11.

PER DWG. 09.00-01

7/8/10

BURLISON GUINN ELKINS

DETAIL "A"

GUY CLAMP CN

4/0 AL 10045714

NEUT. SIZE

PRIMARY

(SEE CHART FOR SIZE & CN)

*

FROM POLE TO POLE.

OVERHEAD TRIPLEX SECONDARIES

#4 - #1/0 AL 11159001

SEE DETAIL A

0

3

2

1

APPR.REVISED BY CK'D

8/6/14

EANES EANES ADCOCK

04.04-08

DEFDEP

X

DEMDEC

Page 10: 04.00 GENERAL 04.02 POLE ATTACHMENTS POLE · PDF file#4 duplex secondary several wraps of the binding wire. cover ends if not in use. continue on, ... use 840 die on 4/0 at splice.

5. THE SERVICE POINT OF ATTACHMENT SHOULD BE LOCATED BELOW THE LEVEL OF THE WEATHERHEAD OR

4. SERVICE ENTRANCE CONNECTORS SHALL BE INSULATED PER NEC RULE 230-22.

MAST BRACKET

FASCIA

FASCIA

STEEL CONDUIT ONLY

MADE BELOW THE LEVEL OF THE SERVICE WEATHERHEAD.

2. THE CONNECTIONS OF THE SERVICE DROP CONDUCTORS TO THE SERVICE ENTRANCE CONDUCTORS SHALL BE

1. DRIP LOOPS SHALL BE FORMED ON SERVICE DROP SERVICE ENTRANCE CONDUCTORS.

LARGER MAST SIZE OR SPECIAL SAG.

TO 4'. LONGER MAST HEIGHTS REQUIRE GUYING, BRACING,

2. 2" RIGID STEEL CONDUIT IS REQUIRED FOR MASTS UP

A MAXMIUM TENSION FORCE OF 350 LBS. IMPOSED BY

BE SUPPORTED BY A GUY OR BRACE TO WITHSTAND

1. SERVICE MAST SHALL BE OF ADEQUATE STRENGTH OR

NOTES:

OR EQUIVALENT SUPPORT.

1. HOUSE BRACKETS MUST BE INSTALLED IN STUDS (2" X 4")

HOUSE BRACKET

3. SEE DWGS. 10.02-01 AND 10.02-03 FOR SERVICE GROUND CLEARANCES AND DWGS. 10.04-09A AND 10.04-09B

HOUSE BRACKETS

SERVICE MAST

NOTES:

NOTES:

SERVICE ATTACHMENT METHODS

7/8/10

ELKINSBURLISON GUINN

1 1/4" - 2 1/2"

3" - 4"

FOR SERVICE CLEARANCES AT BUILDINGS.

GOOSENECK. IF THIS IS IMPRACTICAL, THE POINT OF ATTACHMENT MUST BE LOCATED WITHIN 24" OF THE

WEATHERHEAD OR GOOSENECK (REF. NEC 230-54C).

6. CUSTOMER IS RESPONSIBLE FOR PROVIDING AN ATTACHMENT POINT FOR MASONRY AND STEEL BUILDINGS.

CN 11101003

CU SDEMASTCLMPLGC

CU SDEMASTCLMPSMC

GUY WIRE

OR BRACE

CUSTOMER'S

0

3

2

1

APPR.REVISED BY CK'D

CN 11101508

CN 11101607

10/18/12

ADCOCKBURLISON

SERVICE DROP.

7. SEE DWG. 04.02-06 FOR SERVICE CLAMP COMPATIBLE UNITS.

04.05-00

DEFDEP

X

DEMDEC

8/6/14

ADCOCKEANES EANES

Page 11: 04.00 GENERAL 04.02 POLE ATTACHMENTS POLE · PDF file#4 duplex secondary several wraps of the binding wire. cover ends if not in use. continue on, ... use 840 die on 4/0 at splice.

POINT OF DELIVERY

NOTES:

3'-0" TO

5'-6"

CUSTOMER'S POLE

(SEE NOTE 1A)

CUSTOMER'S

EQUIPMENT

(SEE NOTE 1B)

METER SOCKET

(SEE NOTE 2)

1. OWNER PROVIDE AND INSTALL

A. A 20' CLASS 9 SOUTHERN YELLOW PINE (SYP) POLE OR A 6" X 6" SYP POST THAT IS PROPERLY TREATED WITH A WOOD

PRESERVATIVE FOR EARTH CONTACT. SET POLE IN ACCORDANCE WITH OPTION A, B OR C.

2. OWNER WILL INSTALL

A. METER SOCKET IN ACCORDANCE WITH N.E.C.

5'-5"

POLE

BACKFILL WITH SOIL AND

TAMP IN 6" LAYERS. HOLE

DIAMETER SHALL BE JUST

WIDE ENOUGH TO ALLOW

TAMPING.

BACKFILL WITH CONCRETE

IN A 15" (MIN.) DIAMETER

BACKFILL WITH SOIL AND

TAMP IN 6" LAYERS. HOLE

DIAMETER SHALL BE JUST

WIDE ENOUGH TO ALLOW

TAMPING.

GUY AND ANCHOR

INSTALLATION MUST

BE APPROVED BY

LOCAL ENGINEER.

4' DEPTH

POLE

CONCRETE

3

1

4' DEPTH

4" SCREW ANCHOR

MINIMUM

7-STRAND

GUY (MIN.)

B. SERVICE ENTRANCE TO BE GROUNDED IN ACCORDANCE WITH N.E.C.

4. THIS DRAWING MAY BE USED FOR VARIOUS TYPES OF OVERHEAD SERVICES:

B. NON-RESIDENTIAL SERVICES

4" MIN.

POLE

16'

16'

14'-7"

DWG.

04.05-06

1/4",

HOLE.

OPTION A

NOT TO SCALE

NOT TO SCALE

OPTION B

NOT TO SCALE

OPTION C

OVERHEAD SERVICE POLE

A. OVERHEAD MOBILE HOME SERVICES

3. SETTING DEPTHS FOR THE THREE OPTIONS ARE FOR 350 LB. ICE TENSIONS.

SECURE TO POLE USING

HOUSE BRACKET SCREW OR

DRIVE HOOK SCREW MOUNTED

IN THE SIDE OF POLE. DO

NOT ATTACH TO TOP OF POLE.

12'-6" MIN.

ANYWHERE IN

THE SPAN

(18' MIN.

IF OVER

ROADS OR

AREAS SUBJECT

TO VEHICULAR

TRAFFIC)

7/8/10

BURLISON GUINN ELKINS

2/28/12

SIMPSON SIMPSON ELKINS

0

3

2

1

APPR.REVISED BY CK'D

PER N.E.C.

GROUNDING ELECTRODE

8/13/13

SIMPSON SIMPSON ADCOCK

Page 12: 04.00 GENERAL 04.02 POLE ATTACHMENTS POLE · PDF file#4 duplex secondary several wraps of the binding wire. cover ends if not in use. continue on, ... use 840 die on 4/0 at splice.

6/21/10

BURLISON GUINN ELKINS

TEMPORARY SERVICE POLE

0

3

2

1

APPR.REVISED BY CK'D

3' MIN.

2" X 4" STAKES

4' MIN.

6'

6'

GROUND WIRE

2" X 4" BRACE

12'-6" MINIMUM

ANYWHERE

IN SPAN

IF OVER ROADS OR

AREAS SUBJECT TO

VEHICULAR TRAFFIC)

WEATHERPROOF

SWITCH BOX

TREATED WOOD

POLE WITH MIN.

DIAMETER OF 4"

8'

3'-0"

TO

2" X 4"

NOTES:

1. ALL DIMENSIONS SHOWN ARE MINIMUM.

2. MINIMUM 20' POLE REQUIRED. TALLER

3. ONE BRACE TO BE IN DIRECTION OF

SERVICE. AT LEAST ONE ADDITIONAL

BRACE TO BE LOCATED AT 90° TO

DIRECTION OF SERVICE.

4. SOIL TO BE FIRMLY TAMPED AROUND

POLE AND STAKES DRIVEN INTO FIRM

EARTH.

5. CUSTOMER FURNISHES ALL ITEMS EXCEPT

METER. THE METER BASE, WIRING,

EQUIPMENT SERVICE EQUIPMENT

GROUND ON THE POLE ARE TO BE

INSTALLED BY THE CUSTOMER'S

ELECTRICIAN IN ACCORDANCE WITH THE

N.E.C AND LOCAL ORDINANCES.

6. SOLID, ONE PIECE, 4" X 4" WOOD

POST MAY BE SUBSTITUTED WITH

ENGINEER'S APPROVAL.

7. SERVICES SHALL NOT BE RUN TO

TEMPORARY POLES NOT MEETING THE

REQUIREMENTS SET FORTH HEREIN

WITHOUT APPROVAL OF THE LOCAL

ENGINEER ON SPECIFIC CASES.

8. HOUSE BRACKET MOUNTING

LOCATION SHALL BE IN THE

SIDE OF THE SERVICE POLE

NOT IN THE TOP.

5'-6"

BRACE

SEE NOTE 3

90°

PLAN VIEW

2' MIN.

SEE NOTE 9

90°

DIRECTION OF

SERVICE

(18'-0" MINIMUM

9. IF THE 4 FOOT MINIMUM DEPTH

CANNOT BE OBTAINED DUE TO

ROCK, TWO ADDITIONAL BRACES

90 DEGREES TO THE BRACES

SHOWN MUST BE INSTALLED

(FOUR BRACES TOTAL). IN NO

CIRCUMSTANCES SHOULD THE

EMBEDMENT DEPTH BE LESS

THAN 2 FEET.

4/1/11

SIMPSON SIMPSON ELKINS

DIRECTION OF SERVICE

LOCATION 90° FROM

ALTERNATE BRACE

8/13/13

SIMPSON SIMPSON ADCOCK

GROUNDING ELECTRODE

PER N.E.C.

MAY BE NEEDED TO MEET SERVICE SAG

REQUIREMENTS. MINIMUM 16' POLE

ALLOWED IF SET WITHIN 10' OF SOURCE

COMPANY POLE.

04.05-08

DEFDEP

X

DEMDEC

12/1/14

SIMPSON GUINN ADCOCK

Page 13: 04.00 GENERAL 04.02 POLE ATTACHMENTS POLE · PDF file#4 duplex secondary several wraps of the binding wire. cover ends if not in use. continue on, ... use 840 die on 4/0 at splice.

BILLBOARD COMPANY SERVICE WIRE

LADDER LOCATION

SERVICE RISER

METER AND BASE

FINAL GRADE

3'-0" TO 5'-6" MT.HT.

3' EXTENSION BRACKET

MUST PROVIDE REQUIRED

SERVICE DROP CLEARANCES

CATWALKS

BILLBOARDS

LADDER LOCATION

NO COMPANY SERVICE SHALL BE ATTACHED

LADDER LOCATION

SERVICE MASTHEAD

AND RISER

TO ANY PART OF THE CATWALKS

3' EXTENSION BRACKET (SUPPLIED

COMPANY SERVICE WIRE ENTRANCE TO BE

SPOTTED BY COMPANY ENGINEER

MAX.

NOTE:

BY CUSTOMER)

2'

7/8/10

BURLISONGUINN

ELKINS

SEE DWG. 10.02-01 AND 10.02-03

ELEVATION

BILLBOARD SERVICE ENTRANCE REQUIREMENTS

METHOD "A"

PLAN VIEW

MASTHEAD

0

3

2

1

APPR.REVISED BY CK'D

1. DO NOT PROVIDE SERVICE TO SIGN WHICH DOES NOT HAVE CLEARANCES FROM ADJACENT OVERHEAD

CONDUCTORS AS REQUIRED BY N.E.S.C. AND ANY ADDITIONAL COMPANY SPECIFICATIONS.

4/1/11

SIMPSON SIMPSON ELKINS

04.05-10

DEFDEP

X

DEMDEC

8/6/14

EANES EANES ADCOCK

Page 14: 04.00 GENERAL 04.02 POLE ATTACHMENTS POLE · PDF file#4 duplex secondary several wraps of the binding wire. cover ends if not in use. continue on, ... use 840 die on 4/0 at splice.

COMPANY SERVICE WIRE

SERVICE RISER AND MASTHEAD

STEEL POLE

OVERHEAD SERVICE WIRE MAY BE LOCATED

ANYWHERE IN THIS AREA. CALL LOCAL COMPANY

OFFICE FOR SERVICE ENTRANCE SPOTTING.

3

'

M

I

N

.

3

'

M

I

N

.

NO PART OF COMPANY

SERVICE WIRE WILL

BE RUN WITHIN

3' OF LADDER

3' MIN.

BILLBOARD

COMPANY SERVICE WIRE

LADDER LOCATION

SERVICE RISER

METER AND BASE

FINAL GRADE

MT. HT.

3'-0" TO 5'-6"

7/8/10

BURLISON GUINN ELKINS

SEE DWGS. 10.02-01 AND 10.02-03

ELEVATION

PLAN VIEW

BILLBOARD SERVICE ENTRANCE REQUIREMENTS

METHOD "B"O

3

2

1

APPR.REVISED BY CK'D

04.05-12

DEFDEP

X

DEMDEC

8/6/14

EANES EANES ADCOCK