03_Building - Phase G2B (7 of 7)

164
BQ.G2B/3/SUM - Add.03 84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) SUMMARY OF BUILDING W CORNER UNIT INTERMEDIATE UNIT Element Description Page Amount Amount (RM) (RM) 1 WORK BELOW LOWEST FLOOR FINISH BQ.G2B/3/1/5/5 31,553.63 28,606.23 2 FRAME BQ.G2B/3/2/4/4 42,999.10 39,120.40 3 UPPER FLOOR BQ.G2B/3/3/3/3 22,911.17 21,012.52 4 STAIRCASE BQ.G2B/3/4/4/4 - Add.03 7,845.20 7,845.20 5 ROOF AND RAINWATER GOODS BQ.G2B/3/5/5/5 51,809.74 49,169.80 6 EXTERNAL WALL BQ.G2B/3/6/1/1 9,608.00 5,354.40 7 WINDOWS AND DOORS BQ.G2B/3/7/12/12 - Add.01 117,629.68 108,156.48 8 INTERNAL WALL AND PARTITION BQ.G2B/3/8/1/1 14,925.25 19,139.75 9 INTERNAL FLOOR FINISHES BQ.G2B/3/9/4/4 19,326.86 19,191.98 10 INTERNAL CEILING FINISHES BQ.G2B/3/10/3/3 11,044.65 11,044.65 11 INTERNAL WALL FINISHES BQ.G2B/3/11/3/3 - Add.02 39,498.70 40,269.70 12 EXTERNAL FINISHES BQ.G2B/3/12/5/5 29,767.75 15,722.95 13 SANITARY FITTINGS BQ.G2B/3/13/6/6 - Add.01 12,149.50 12,149.50 14 SUNDRIES BQ.G2B/3/14/4/4 29,436.00 41,550.00 15 EXTERNAL WORKS WITHIN BOUNDARY BQ.G2B/3/15/5/5 51,230.90 20,230.20 SUB TOTAL FOR ONE (1) UNIT 491,736.13 438,563.76 X TOTAL NO 10 52 TOTAL 4,917,361.30 22,805,315.52

description

po lok mijmn kjij

Transcript of 03_Building - Phase G2B (7 of 7)

Page 1: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/SUM - Add.03

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) SUMMARY OF BUILDING WORKS : PHASE G2B (84 UNITS)

CORNER UNIT INTERMEDIATE UNITElement Description Page Amount Amount

(RM) (RM)

1 WORK BELOW LOWEST FLOOR FINISH BQ.G2B/3/1/5/5 31,553.63 28,606.23

2 FRAME BQ.G2B/3/2/4/4 42,999.10 39,120.40

3 UPPER FLOOR BQ.G2B/3/3/3/3 22,911.17 21,012.52

4 STAIRCASE BQ.G2B/3/4/4/4 - Add.03 7,845.20 7,845.20

5 ROOF AND RAINWATER GOODS BQ.G2B/3/5/5/5 51,809.74 49,169.80

6 EXTERNAL WALL BQ.G2B/3/6/1/1 9,608.00 5,354.40

7 WINDOWS AND DOORS BQ.G2B/3/7/12/12 - Add.01 117,629.68 108,156.48

8 INTERNAL WALL AND PARTITION BQ.G2B/3/8/1/1 14,925.25 19,139.75

9 INTERNAL FLOOR FINISHES BQ.G2B/3/9/4/4 19,326.86 19,191.98

10 INTERNAL CEILING FINISHES BQ.G2B/3/10/3/3 11,044.65 11,044.65

11 INTERNAL WALL FINISHES BQ.G2B/3/11/3/3 - Add.02 39,498.70 40,269.70

12 EXTERNAL FINISHES BQ.G2B/3/12/5/5 29,767.75 15,722.95

13 SANITARY FITTINGS BQ.G2B/3/13/6/6 - Add.01 12,149.50 12,149.50

14 SUNDRIES BQ.G2B/3/14/4/4 29,436.00 41,550.00

15 EXTERNAL WORKS WITHIN BOUNDARY BQ.G2B/3/15/5/5 51,230.90 20,230.20

SUB TOTAL FOR ONE (1) UNIT 491,736.13 438,563.76

X TOTAL NO 10 52

TOTAL 4,917,361.30 22,805,315.52

Page 2: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/SUM - Add.03

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) SUMMARY OF BUILDING WORKS : PHASE G2B (84 UNITS)

CORNER UNIT INTERMEDIATE UNITElement Description Page Amount Amount

(RM) (RM)

TOTAL BUILDING WORKS (PHASE G2B) CARRIED TO SUMMARY OF TENDER 38,437,803.88

Page 3: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/SUM - Add.03

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B ANGGARAN PKNS

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)SUMMARY OF BUILDING WORKS : PHASE G2B (84 UNITS)

CORNERElement Description Page

(RM)

1 WORK BELOW LOWEST FLOOR FINISH BQ.G2B/3/1/5/5

2 FRAME BQ.G2B/3/2/4/4

3 UPPER FLOOR BQ.G2B/3/3/3/3

4 STAIRCASE BQ.G2B/3/4/4/4 - Add.03

5 ROOF AND RAINWATER GOODS BQ.G2B/3/5/5/5

6 EXTERNAL WALL BQ.G2B/3/6/1/1

7 WINDOWS AND DOORS BQ.G2B/3/7/12/12 - Add.01

8 INTERNAL WALL AND PARTITION BQ.G2B/3/8/1/1

9 INTERNAL FLOOR FINISHES BQ.G2B/3/9/4/4

10 INTERNAL CEILING FINISHES BQ.G2B/3/10/3/3

11 INTERNAL WALL FINISHES BQ.G2B/3/11/3/3 - Add.02

12 EXTERNAL FINISHES BQ.G2B/3/12/5/5

13 SANITARY FITTINGS BQ.G2B/3/13/6/6 - Add.01

14 SUNDRIES BQ.G2B/3/14/4/4

15 EXTERNAL WORKS WITHIN BOUNDARY BQ.G2B/3/15/5/5

SUB TOTAL FOR ONE (1) UNIT

X TOTAL NO

TOTAL

SUMMARY OF BUILDING WORKS : PHASE G2B (84 UNITS)

END UNITAmount

(RM)

31,553.63

42,999.10

22,911.17

7,845.20

51,809.74

9,608.00

119,458.28

14,925.25

19,326.86

11,044.65

39,498.70

29,767.75

12,149.50

29,436.00

44,717.40

487,051.23

22

10,715,127.06

Page 4: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/SUM - Add.03

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B ANGGARAN PKNS

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)SUMMARY OF BUILDING WORKS : PHASE G2B (84 UNITS)

CORNERElement Description Page

(RM)

TOTAL BUILDING WORKS (PHASE G2B) CARRIED TO SUMMARY OF TENDER

SUMMARY OF BUILDING WORKS : PHASE G2B (84 UNITS)

END UNITAmount

(RM)

Page 5: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/1/5/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 1 : WORK BELOW LOWEST FLOOR FINISH

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

A Maximum depth not exceeding 1.00m, ground slab M3 16.00 35.80 572.80 33.90 542.40 35.80

B Maximum depth not exceeding 1.00m, driveway M3 16.00 12.50 200.00 12.50 200.00 12.50

C Ground beam; maximum depth not exceeding 2.00m M3 20.00 8.20 164.00 7.40 148.00 8.20

………………………………..

D Remove surplus excavated material from site M3 26.00 21.50 559.00 20.80 540.80 21.50

E 100mm Thick as specified bed, ground slab M2 13.00 159.00 2,067.00 150.40 1,955.20 159.00

F 150mm Thick as specified bed, driveway slab M2 18.50 45.30 838.05 45.30 838.05 45.30

Sand blanket as specified

G 25mm Thick under driveway slab M2 6.70 45.30 303.51 45.30 303.51 45.30

Lean concrete Grade 15 as specified

H 50mm Thick under ground beam M3 273.00 1.00 273.00 0.90 245.70 1.00

J 25mm Thick under ground slab M3 273.00 4.00 1,092.00 3.80 1,037.40 4.00

CARRIED TO COLLECTION 6,069.36 5,811.06

Excavate oversite to reduce level commencing from original finish platform level and get out, part return. fill in and ram and remainder cart away, deposit, spread and level where directed within the site

Excavate trench commencing from original finish platform level and get out, part return. fill in and ram and remainder cart away, deposit, spread and level where directed within the site

Hardcore consisting of hard dry broken bricks or stones spread and leveled, well consolidated, watered and blinded with sand

Page 6: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/1/6/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 1 : WORK BELOW LOWEST FLOOR FINISH

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

Reinforced Concrete Grade 25 as specified

A Column stump (Provisional) M3 279.00 1.80 502.20 1.60 446.40 1.80

B Ground beam M3 279.00 7.70 2,148.30 7.00 1,953.00 7.70

C Ground floor slab not exceeding 150mm thick M3 279.00 15.90 4,436.10 15.10 4,212.90 15.90

D Driveway slab not exceeding 150mm thick M3 279.00 4.60 1,283.40 4.60 1,283.40 4.60

Mild Steel Reinforcements to BS 4449 as specified

Column Stump (Provisional)

E 6mm Diameter as links Kg 3.60 91.00 327.60 65.00 234.00 91.00

Ground Beam

F 6mm Diameter as stirrups Kg 3.60 180.00 648.00 137.00 493.20 180.00

G 8mm Diameter as stirrups Kg 3.60 56.00 201.60 80.00 288.00 56.00

Ground Slab

H 6mm Diameter bar (Dowel bar) Kg 3.60 107.00 385.20 94.00 338.40 107.00

High Tensile Reinforcements to BS 4449 as specified

Column Stump (Provisional)

J 12mm Diameter bar Kg 3.60 99.00 356.40 65.00 234.00 99.00

K 16mm Diameter bar Kg 3.60 105.00 378.00 74.00 266.40 105.00

L 20mm Diameter bar Kg 3.60 67.00 241.20 67.00 241.20 67.00

Page 7: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/1/7/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 1 : WORK BELOW LOWEST FLOOR FINISH

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)CARRIED TO COLLECTION 10,908.00 9,990.90

High Tensile Reinforcements to BS 4449 as specified (Cont'd)

Ground Beam

A 10mm Diameter bar Kg 3.60 4.00 14.40 4.00 14.40 4.00

B 12mm Diameter bar Kg 3.60 415.00 1,494.00 326.00 1,173.60 415.00

C 16mm Diameter bar Kg 3.60 288.00 1,036.80 242.00 871.20 288.00

D 20mm Diameter bar Kg 3.60 188.00 676.80 182.00 655.20 188.00

E BRC A6 weighing 2.22 Kg/m2, ground slab M2 12.90 159.00 2,051.10 150.40 1,940.16 159.00

F BRC A7 weighing 3.02 Kg/m2, driveway slab M2 16.90 90.60 1,531.14 90.60 1,531.14 90.60

Formwork Class F1 as specified

Column Stump (Provisional)

G Sides of column stump M2 28.00 28.20 789.60 19.90 557.20 28.20

Ground Beam

H Not exceeding 500mm high M 14.00 298.00 4,172.00 249.00 3,486.00 298.00

Ground Floor Slab

J Not exceeding 500mm high M 14.00 143.10 2,003.40 127.60 1,786.40 143.10

Driveway Slab

K Not exceeding 500mm high M 14.00 27.00 378.00 27.00 378.00 27.00

One (1) layer of steel fabric reinforcement to B.S 4483 as described with 150mm wide lapped at joints including cutting, bending in concrete, edge bars and notching around obstructions (measured nett no allowance made for laps)

Page 8: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/1/8/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 1 : WORK BELOW LOWEST FLOOR FINISH

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

CARRIED TO COLLECTION 14,147.24 12,393.30

A Under ground floor slab M2 2.10 159.00 333.90 150.40 315.84 159.00

B Under driveway slab M2 2.10 45.30 95.13 45.30 95.13 45.30

Layer of 0.25mm Thick approved heavy duty polythene sheet moisture barrier laid on lean concrete (measured separately) with 300mm (minimum) laps at joints (measured nett no allowance made for laps)

Note: Applicator for water proofing works shall be from approved applicator with ten (10) years warranty

Page 9: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/1/9/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 1 : WORK BELOW LOWEST FLOOR FINISH

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

CARRIED TO COLLECTION 429.03 410.97

Collection :

A From Page No. BQ.G2B/3/1/1/5 - - - 6,069.36 - 5,811.06 -

B From Page No. BQ.G2B/3/1/2/5 - - - 10,908.00 - 9,990.90 -

C From Page No. BQ.G2B/3/1/3/5 - - - 14,147.24 - 12,393.30 -

D From Page No. BQ.G2B/3/1/4/5 - - - 429.03 - 410.97 -

Page 10: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/1/10/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 1 : WORK BELOW LOWEST FLOOR FINISH

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

TOTAL CARRIED TO SUMMARY 31,553.63 28,606.23

Page 11: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/1/11/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 1 : WORK BELOW LOWEST FLOOR FINISH

CORNER UNITITEM DESCRIPTION UNIT

(RM)

A Maximum depth not exceeding 1.00m, ground slab M3

B Maximum depth not exceeding 1.00m, driveway M3

C Ground beam; maximum depth not exceeding 2.00m M3

………………………………..

D Remove surplus excavated material from site M3

E 100mm Thick as specified bed, ground slab M2

F 150mm Thick as specified bed, driveway slab M2

Sand blanket as specified

G 25mm Thick under driveway slab M2

Lean concrete Grade 15 as specified

H 50mm Thick under ground beam M3

J 25mm Thick under ground slab M3

CARRIED TO COLLECTION

Excavate oversite to reduce level commencing from original finish platform level and get out, part return. fill in and ram and remainder cart away, deposit, spread and level where directed within the site

Excavate trench commencing from original finish platform level and get out, part return. fill in and ram and remainder cart away, deposit, spread and level where directed within the site

Hardcore consisting of hard dry broken bricks or stones spread and leveled, well consolidated, watered and blinded with sand

ELEMENT NO. 1 : WORK BELOW LOWEST FLOOR FINISH

END UNITAMOUNT

(RM)

572.80

200.00

164.00

559.00

2,067.00

838.05

303.51

273.00

1,092.00

6,069.36

Page 12: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/1/12/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 1 : WORK BELOW LOWEST FLOOR FINISH

CORNER UNITITEM DESCRIPTION UNIT

(RM)

Reinforced Concrete Grade 25 as specified

A Column stump (Provisional) M3

B Ground beam M3

C Ground floor slab not exceeding 150mm thick M3

D Driveway slab not exceeding 150mm thick M3

Mild Steel Reinforcements to BS 4449 as specified

Column Stump (Provisional)

E 6mm Diameter as links Kg

Ground Beam

F 6mm Diameter as stirrups Kg

G 8mm Diameter as stirrups Kg

Ground Slab

H 6mm Diameter bar (Dowel bar) Kg

High Tensile Reinforcements to BS 4449 as specified

Column Stump (Provisional)

J 12mm Diameter bar Kg

K 16mm Diameter bar Kg

L 20mm Diameter bar Kg

ELEMENT NO. 1 : WORK BELOW LOWEST FLOOR FINISH

END UNITAMOUNT

(RM)

502.20

2,148.30

4,436.10

1,283.40

327.60

648.00

201.60

385.20

356.40

378.00

241.20

Page 13: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/1/13/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 1 : WORK BELOW LOWEST FLOOR FINISH

CORNER UNITITEM DESCRIPTION UNIT

(RM)CARRIED TO COLLECTION

High Tensile Reinforcements to BS 4449 as specified (Cont'd)

Ground Beam

A 10mm Diameter bar Kg

B 12mm Diameter bar Kg

C 16mm Diameter bar Kg

D 20mm Diameter bar Kg

E BRC A6 weighing 2.22 Kg/m2, ground slab M2

F BRC A7 weighing 3.02 Kg/m2, driveway slab M2

Formwork Class F1 as specified

Column Stump (Provisional)

G Sides of column stump M2

Ground Beam

H Not exceeding 500mm high M

Ground Floor Slab

J Not exceeding 500mm high M

Driveway Slab

K Not exceeding 500mm high M

One (1) layer of steel fabric reinforcement to B.S 4483 as described with 150mm wide lapped at joints including cutting, bending in concrete, edge bars and notching around obstructions (measured nett no allowance made for laps)

ELEMENT NO. 1 : WORK BELOW LOWEST FLOOR FINISH

END UNITAMOUNT

(RM)10,908.00

14.40

1,494.00

1,036.80

676.80

2,051.10

1,531.14

789.60

4,172.00

2,003.40

378.00

Page 14: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/1/14/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 1 : WORK BELOW LOWEST FLOOR FINISH

CORNER UNITITEM DESCRIPTION UNIT

(RM)

CARRIED TO COLLECTION

A Under ground floor slab M2

B Under driveway slab M2

Layer of 0.25mm Thick approved heavy duty polythene sheet moisture barrier laid on lean concrete (measured separately) with 300mm (minimum) laps at joints (measured nett no allowance made for laps)

Note: Applicator for water proofing works shall be from approved applicator with ten (10) years warranty

ELEMENT NO. 1 : WORK BELOW LOWEST FLOOR FINISH

END UNITAMOUNT

(RM)

14,147.24

333.90

95.13

Page 15: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/1/15/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 1 : WORK BELOW LOWEST FLOOR FINISH

CORNER UNITITEM DESCRIPTION UNIT

(RM)

CARRIED TO COLLECTION

Collection :

A From Page No. BQ.G2B/3/1/1/5 -

B From Page No. BQ.G2B/3/1/2/5 -

C From Page No. BQ.G2B/3/1/3/5 -

D From Page No. BQ.G2B/3/1/4/5 -

ELEMENT NO. 1 : WORK BELOW LOWEST FLOOR FINISH

END UNITAMOUNT

(RM)

429.03

6,069.36

10,908.00

14,147.24

429.03

Page 16: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/1/16/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 1 : WORK BELOW LOWEST FLOOR FINISH

CORNER UNITITEM DESCRIPTION UNIT

(RM)

TOTAL CARRIED TO SUMMARY

ELEMENT NO. 1 : WORK BELOW LOWEST FLOOR FINISH

END UNITAMOUNT

(RM)

31,553.63

Page 17: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/2/17/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 2 : FRAME

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

Reinforced Concrete Grade 25 as specified

A Column M3 279.00 6.00 1,674.00 5.70 1,590.30 6.00

B Stiffeners (Provisional) M3 279.00 1.10 306.90 1.00 279.00 1.10

C Suspended beam M3 279.00 11.50 3,208.50 10.70 2,985.30 11.50

D Roof beam M3 279.00 8.50 2,371.50 8.60 2,399.40 8.50

E Partywall beam (T-Beam) M3 279.00 4.80 1,339.20 3.80 1,060.20 4.80

F Plinth (Provisional) M3 279.00 0.80 223.20 0.80 223.20 0.80

Mild Steel Reinforcements to BS4449 as specified

Column

G 6mm Diameter as links Kg 3.60 325.00 1,170.00 282.00 1,015.20 325.00

Stiffeners (Provisional)

H 6mm Diameter as links Kg 3.60 69.00 248.40 59.00 212.40 69.00

Suspended Beam

J 8mm Diameter as stirrups Kg 3.60 543.00 1,954.80 477.00 1,717.20 543.00

Roof Beam

K 6mm Diameter as stirrups Kg 3.60 151.00 543.60 139.00 500.40 151.00

L 8mm Diameter as stirrups Kg 3.60 371.00 1,335.60 389.00 1,400.40 371.00

Partywall Beam (T-Beam)

M 6mm Diameter as stirrups Kg 3.60 83.00 298.80 72.00 259.20 83.00

CARRIED TO COLLECTION 14,674.50 13,642.20

Page 18: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/2/18/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 2 : FRAME

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

Mild Steel Reinforcements to BS4449 as specified (Cont'd)

Plinth (Provisional)

A 6mm Diameter as stirrups Kg 3.60 19.00 68.40 19.00 68.40 19.00

High Tensile Reinforcements to BS4449 as specified

Column

B 12mm Diameter bar Kg 3.60 414.00 1,490.40 359.00 1,292.40 414.00

C 16mm Diameter bar Kg 3.60 255.00 918.00 185.00 666.00 255.00

D 20mm Diameter bar Kg 3.60 83.00 298.80 42.00 151.20 83.00

Stiffeners (Provisional)

E 12mm Diameter bar Kg 3.60 202.00 727.20 156.00 561.60 202.00

Suspended Beam

F 12mm Diameter bar Kg 3.60 300.00 1,080.00 235.00 846.00 300.00

G 16mm Diameter bar Kg 3.60 231.00 831.60 191.00 687.60 231.00

H 20mm Diameter bar Kg 3.60 743.00 2,674.80 769.00 2,768.40 743.00

J 25mm Diameter bar Kg 3.60 166.00 597.60 166.00 597.60 166.00

Roof Beam

K 12mm Diameter bar Kg 3.60 403.00 1,450.80 380.00 1,368.00 403.00

L 16mm Diameter bar Kg 3.60 220.00 792.00 208.00 748.80 220.00

M 20mm Diameter bar Kg 3.60 402.00 1,447.20 449.00 1,616.40 402.00

Page 19: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/2/19/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 2 : FRAME

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)CARRIED TO COLLECTION 12,376.80 11,372.40

High Tensile Reinforcements to BS4449 as specified (Cont'd)

Partywall Beam (T-Beam)

A 12mm Diameter bar Kg 3.60 156.00 561.60 104.00 374.40 156.00

Plinth (Provisional)

B 12mm Diameter bar Kg 3.60 35.00 126.00 35.00 126.00 35.00

Formwork Class F1 as specified

C Sides of column M2 28.00 119.80 3,354.40 104.00 2,912.00 119.80

D Sides of stiffeners (Provisional) M2 28.00 28.10 786.80 24.40 683.20 28.10

E Sides and soffits of suspended beam M2 28.00 182.00 5,096.00 161.20 4,513.60 182.00

F Sides and soffits of roof beam M2 28.00 149.50 4,186.00 145.20 4,065.60 149.50

G Sides and soffits of partywall beam (T-Beam) M2 28.00 55.00 1,540.00 40.50 1,134.00 55.00

H Sides of plinth (Provisional) M 14.00 18.00 252.00 18.00 252.00 18.00

Construction Joint

J 10mm Thick approved construction joint M 45.00 1.00 45.00 1.00 45.00 1.00

Page 20: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/2/20/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 2 : FRAME

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

CARRIED TO COLLECTION 15,947.80 14,105.80

Collection :

A From Page No. BQ.G2B/3/2/1/4 - - - 14,674.50 - 13,642.20 -

B From Page No. BQ.G2B/3/2/2/4 - - - 12,376.80 - 11,372.40 -

C From Page No. BQ.G2B/3/2/3/4 - - - 15,947.80 - 14,105.80 -

Page 21: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/2/21/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 2 : FRAME

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

TOTAL CARRIED TO SUMMARY 42,999.10 39,120.40

Page 22: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/2/22/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 2 : FRAME

CORNER UNITITEM DESCRIPTION UNIT

(RM)

Reinforced Concrete Grade 25 as specified

A Column M3

B Stiffeners (Provisional) M3

C Suspended beam M3

D Roof beam M3

E Partywall beam (T-Beam) M3

F Plinth (Provisional) M3

Mild Steel Reinforcements to BS4449 as specified

Column

G 6mm Diameter as links Kg

Stiffeners (Provisional)

H 6mm Diameter as links Kg

Suspended Beam

J 8mm Diameter as stirrups Kg

Roof Beam

K 6mm Diameter as stirrups Kg

L 8mm Diameter as stirrups Kg

Partywall Beam (T-Beam)

M 6mm Diameter as stirrups Kg

CARRIED TO COLLECTION

ELEMENT NO. 2 : FRAME

END UNITAMOUNT

(RM)

1,674.00

306.90

3,208.50

2,371.50

1,339.20

223.20

1,170.00

248.40

1,954.80

543.60

1,335.60

298.80

14,674.50

Page 23: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/2/23/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 2 : FRAME

CORNER UNITITEM DESCRIPTION UNIT

(RM)

Mild Steel Reinforcements to BS4449 as specified (Cont'd)

Plinth (Provisional)

A 6mm Diameter as stirrups Kg

High Tensile Reinforcements to BS4449 as specified

Column

B 12mm Diameter bar Kg

C 16mm Diameter bar Kg

D 20mm Diameter bar Kg

Stiffeners (Provisional)

E 12mm Diameter bar Kg

Suspended Beam

F 12mm Diameter bar Kg

G 16mm Diameter bar Kg

H 20mm Diameter bar Kg

J 25mm Diameter bar Kg

Roof Beam

K 12mm Diameter bar Kg

L 16mm Diameter bar Kg

M 20mm Diameter bar Kg

ELEMENT NO. 2 : FRAME

END UNITAMOUNT

(RM)

68.40

1,490.40

918.00

298.80

727.20

1,080.00

831.60

2,674.80

597.60

1,450.80

792.00

1,447.20

Page 24: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/2/24/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 2 : FRAME

CORNER UNITITEM DESCRIPTION UNIT

(RM)CARRIED TO COLLECTION

High Tensile Reinforcements to BS4449 as specified (Cont'd)

Partywall Beam (T-Beam)

A 12mm Diameter bar Kg

Plinth (Provisional)

B 12mm Diameter bar Kg

Formwork Class F1 as specified

C Sides of column M2

D Sides of stiffeners (Provisional) M2

E Sides and soffits of suspended beam M2

F Sides and soffits of roof beam M2

G Sides and soffits of partywall beam (T-Beam) M2

H Sides of plinth (Provisional) M

Construction Joint

J 10mm Thick approved construction joint M

ELEMENT NO. 2 : FRAME

END UNITAMOUNT

(RM)12,376.80

561.60

126.00

3,354.40

786.80

5,096.00

4,186.00

1,540.00

252.00

45.00

Page 25: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/2/25/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 2 : FRAME

CORNER UNITITEM DESCRIPTION UNIT

(RM)

CARRIED TO COLLECTION

Collection :

A From Page No. BQ.G2B/3/2/1/4 -

B From Page No. BQ.G2B/3/2/2/4 -

C From Page No. BQ.G2B/3/2/3/4 -

ELEMENT NO. 2 : FRAME

END UNITAMOUNT

(RM)

15,947.80

14,674.50

12,376.80

15,947.80

Page 26: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/2/26/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 2 : FRAME

CORNER UNITITEM DESCRIPTION UNIT

(RM)

TOTAL CARRIED TO SUMMARY

ELEMENT NO. 2 : FRAME

END UNITAMOUNT

(RM)

42,999.10

Page 27: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/3/27/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 3 : UPPER FLOOR

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

Reinforced Concrete Grade 25 as specified

AM3 279.00 10.10 2,817.90 8.10 2,259.90 10.10

BM3 279.00 13.70 3,822.30 13.70 3,822.30 13.70

CM3 279.00 0.50 139.50 0.50 139.50 0.50

Mild Steel Reinforcements to BS4449 as specified

Suspended Slab

D 6mm Diameter as links Kg 3.60 37.00 133.20 37.00 133.20 37.00

E 8mm Diameter as links Kg 3.60 296.00 1,065.60 207.00 745.20 296.00

High Tensile Reinforcements to BS4449 as specified

Suspended Slab

F 10mm Diameter bar Kg 3.60 50.00 180.00 50.00 180.00 50.00

G BRC A6 weighing 2.22 Kg/m2 M2 12.90 51.70 666.93 37.90 488.91 51.70

H BRC A7 weighing 3.02 Kg/m2 M2 16.90 109.90 1,857.31 93.20 1,575.08 109.90

J BRC A8 weighing 3.95 Kg/m2 M2 21.60 56.70 1,224.72 56.70 1,224.72 56.70

K BRC A10 weighing 6.16 Kg/m2 M2 33.00 72.10 2,379.30 72.10 2,379.30 72.10

CARRIED TO COLLECTION 14,286.76 12,948.11

Suspended floor slab exceeding 100mm Thick but not exceeding 150mm Thick (Ponding test should be verify by contractor before tiling work)

Suspended floor slab exceeding 150mm Thick but not exceeding 250mm Thick (Ponding test should be verify by contractor before tiling work)

Suspended floor slab exceeding 250mm Thick but not exceeding 350mm Thick (Ponding test should be verify by contractor before tiling work)

One (1) layer of steel fabric reinforcement to B.S 4483 as described with 150mm Wide lapped at joints including cutting, bending in concrete, edge bars and notching around obstructions (measured nett no allowance made for laps)

Page 28: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/3/28/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 3 : UPPER FLOOR

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

A BRC B9 weighing 6.97 Kg/m2 M2 37.10 28.30 1,049.93 28.30 1,049.93 28.30

B BRC B10 weighing 9.14 Kg/m2 M2 42.80 35.60 1,523.68 35.60 1,523.68 35.60

Formwork Class F1 as specified

Suspended floor slab

CSoffit of suspended floor slab exceeding 3.00m but not exceeding 5.00m high M2 28.00 216.10 6,050.80 196.10 5,490.80 216.10

One (1) layer of steel fabric reinforcement to B.S 4483 as described with 150mm Wide lapped at joints including cutting, bending in concrete, edge bars and notching around obstructions (measured nett no allowance made for laps) (Cont'd)

Page 29: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/3/29/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 3 : UPPER FLOOR

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)CARRIED TO COLLECTION 8,624.41 8,064.41

Collection :

A From Page No. BQ.G2B/3/3/1/3 - - - 14,286.76 - 12,948.11 -

B From Page No. BQ.G2B/3/3/2/3 - - - 8,624.41 - 8,064.41 -

Page 30: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/3/30/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 3 : UPPER FLOOR

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

TOTAL CARRIED TO SUMMARY 22,911.17 21,012.52

Page 31: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/3/31/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 3 : UPPER FLOOR

CORNER UNITITEM DESCRIPTION UNIT

(RM)

Reinforced Concrete Grade 25 as specified

AM3

BM3

CM3

Mild Steel Reinforcements to BS4449 as specified

Suspended Slab

D 6mm Diameter as links Kg

E 8mm Diameter as links Kg

High Tensile Reinforcements to BS4449 as specified

Suspended Slab

F 10mm Diameter bar Kg

G BRC A6 weighing 2.22 Kg/m2 M2

H BRC A7 weighing 3.02 Kg/m2 M2

J BRC A8 weighing 3.95 Kg/m2 M2

K BRC A10 weighing 6.16 Kg/m2 M2

CARRIED TO COLLECTION

Suspended floor slab exceeding 100mm Thick but not exceeding 150mm Thick (Ponding test should be verify by contractor before tiling work)

Suspended floor slab exceeding 150mm Thick but not exceeding 250mm Thick (Ponding test should be verify by contractor before tiling work)

Suspended floor slab exceeding 250mm Thick but not exceeding 350mm Thick (Ponding test should be verify by contractor before tiling work)

One (1) layer of steel fabric reinforcement to B.S 4483 as described with 150mm Wide lapped at joints including cutting, bending in concrete, edge bars and notching around obstructions (measured nett no allowance made for laps)

ELEMENT NO. 3 : UPPER FLOOR

END UNITAMOUNT

(RM)

2,817.90

3,822.30

139.50

133.20

1,065.60

180.00

666.93

1,857.31

1,224.72

2,379.30

14,286.76

Page 32: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/3/32/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 3 : UPPER FLOOR

CORNER UNITITEM DESCRIPTION UNIT

(RM)

A BRC B9 weighing 6.97 Kg/m2 M2

B BRC B10 weighing 9.14 Kg/m2 M2

Formwork Class F1 as specified

Suspended floor slab

CSoffit of suspended floor slab exceeding 3.00m but not exceeding 5.00m high M2

One (1) layer of steel fabric reinforcement to B.S 4483 as described with 150mm Wide lapped at joints including cutting, bending in concrete, edge bars and notching around obstructions (measured nett no allowance made for laps) (Cont'd)

ELEMENT NO. 3 : UPPER FLOOR

END UNITAMOUNT

(RM)

1,049.93

1,523.68

6,050.80

Page 33: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/3/33/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 3 : UPPER FLOOR

CORNER UNITITEM DESCRIPTION UNIT

(RM)CARRIED TO COLLECTION

Collection :

A From Page No. BQ.G2B/3/3/1/3 -

B From Page No. BQ.G2B/3/3/2/3 -

ELEMENT NO. 3 : UPPER FLOOR

END UNITAMOUNT

(RM)8,624.41

14,286.76

8,624.41

Page 34: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/3/34/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 3 : UPPER FLOOR

CORNER UNITITEM DESCRIPTION UNIT

(RM)

TOTAL CARRIED TO SUMMARY

ELEMENT NO. 3 : UPPER FLOOR

END UNITAMOUNT

(RM)

22,911.17

Page 35: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/4/35/164 - Add.03

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 4 : STAIRCASE

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

STAIRCASE STRUCTURE

Reinforced Concrete Grade 25 as specified

A Staircase beam M3 279.00 0.30 83.70 0.30 83.70 0.30

B Landing beam M3 279.00 0.10 27.90 0.10 27.90 0.10

Mild Steel Reinforcements to BS4449 as specified

Staircase Beam

C 8mm Diameter Bar Kg 3.60 18.00 64.80 18.00 64.80 18.00

Landing Beam

D 8mm Diameter Bar Kg 3.60 8.00 28.80 8.00 28.80 8.00

High Tensile Reinforcements to BS 4449 as specified

Staircase Beam

E 20mm Diameter bar Kg 3.60 89.00 320.40 89.00 320.40 89.00

Landing Beam

F 20mm Diameter bar Kg 3.60 30.00 108.00 30.00 108.00 30.00

Formwork Class F1 as specified

G To side and soffit of staircase beam M2 28.00 5.80 162.40 5.80 162.40 5.80

H Ditto landing beam M2 28.00 2.00 56.00 2.00 56.00 2.00

CARRIED TO COLLECTION 852.00 852.00

Page 36: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/4/36/164 - Add.03

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 4 : STAIRCASE

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

STAIRCASE FINISHES

A

M2 259.00 6.60 1,709.40 6.60 1,709.40 6.60

B Ditto staircase landing (measured separately) ditto M2 259.00 1.20 310.80 1.20 310.80 1.20

C 19mm thick to side and soffit staircase beam M2 23.00 5.80 133.40 5.80 133.40 5.80

D 19mm thick to side and soffit landing beam M2 23.00 2.00 46.00 2.00 46.00 2.00

E Plastered sides and soffit of staircase beam M2 6.00 5.80 34.80 5.80 34.80 5.80

F Ditto landing beam M2 6.00 2.00 12.00 2.00 12.00 2.00

200mm Wide x 4mm thick mild steel plate connected to staircase steps (measured separately) and embedded into staircase stringer and brickwall including necessary jointing, adhesive, expansion bolt to be embedded in concrete with approved finish complete with all necessary works all as per detail drawings and Architect's approval

Cement and sand (1:6) plainface plaster with an approved plasticiser as described

Prepare and apply one coat approved alkali resisting primer sealer and two coats 'ICI' or other equal and approved emulsion paint as described :

Page 37: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/4/37/164 - Add.03

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 4 : STAIRCASE

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)CARRIED TO COLLECTION 2,246.40 2,246.40

Timber Handrail

A

M 328.00 8.10 2,656.80 8.10 2,656.80 8.10

B

M 190.00 11.00 2,090.00 11.00 2,090.00 11.00

15mm thick solid timber (Merbau) handrail overall girth 320mm to be embedded into brickwall and including all necessary jointing, adhesive and apply with approved timber varnish to all exposed surfaces of timber and all as per detail drawings No. WD-10-IH57G2B-00-554.00 to Architect's approval.

150mm x 10mm thick solid timber (Teak) cut piece top to be placed on top of 120mm x 10mm thick timber piece backing and embedded into brickwall including all necessary jointing, adhesive and apply with approved timber varnish to all exposed surfaces of timber and all as per detail drawings No. WD-10-IH57G2B-00-554.00 to Architect's approval.

Page 38: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/4/38/164 - Add.03

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 4 : STAIRCASE

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

CARRIED TO COLLECTION 4,746.80 4,746.80

Collection :

A From Page No. BQ.G2B/3/4/1/4 - - - 852.00 - 852.00 -

B - - - 2,246.40 - 2,246.40 -

C - - - 4,746.80 - 4,746.80 -

From Page No. BQ.G2B/3/4/2/4 - Add.01

From Page No. BQ.G2B/3/4/3/4 - Add.03

Page 39: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/4/39/164 - Add.03

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 4 : STAIRCASE

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

TOTAL CARRIED TO SUMMARY 7,845.20 7,845.20

Page 40: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/4/40/164 - Add.03

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 4 : STAIRCASE

CORNER UNITITEM DESCRIPTION UNIT

(RM)

STAIRCASE STRUCTURE

Reinforced Concrete Grade 25 as specified

A Staircase beam M3

B Landing beam M3

Mild Steel Reinforcements to BS4449 as specified

Staircase Beam

C 8mm Diameter Bar Kg

Landing Beam

D 8mm Diameter Bar Kg

High Tensile Reinforcements to BS 4449 as specified

Staircase Beam

E 20mm Diameter bar Kg

Landing Beam

F 20mm Diameter bar Kg

Formwork Class F1 as specified

G To side and soffit of staircase beam M2

H Ditto landing beam M2

CARRIED TO COLLECTION

ELEMENT NO. 4 : STAIRCASE

END UNITAMOUNT

(RM)

83.70

27.90

64.80

28.80

320.40

108.00

162.40

56.00

852.00

Page 41: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/4/41/164 - Add.03

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 4 : STAIRCASE

CORNER UNITITEM DESCRIPTION UNIT

(RM)

STAIRCASE FINISHES

A

M2

B Ditto staircase landing (measured separately) ditto M2

C 19mm thick to side and soffit staircase beam M2

D 19mm thick to side and soffit landing beam M2

E Plastered sides and soffit of staircase beam M2

F Ditto landing beam M2

200mm Wide x 4mm thick mild steel plate connected to staircase steps (measured separately) and embedded into staircase stringer and brickwall including necessary jointing, adhesive, expansion bolt to be embedded in concrete with approved finish complete with all necessary works all as per detail drawings and Architect's approval

Cement and sand (1:6) plainface plaster with an approved plasticiser as described

Prepare and apply one coat approved alkali resisting primer sealer and two coats 'ICI' or other equal and approved emulsion paint as described :

ELEMENT NO. 4 : STAIRCASE

END UNITAMOUNT

(RM)

1,709.40

310.80

133.40

46.00

34.80

12.00

Page 42: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/4/42/164 - Add.03

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 4 : STAIRCASE

CORNER UNITITEM DESCRIPTION UNIT

(RM)CARRIED TO COLLECTION

Timber Handrail

A

M

B

M

15mm thick solid timber (Merbau) handrail overall girth 320mm to be embedded into brickwall and including all necessary jointing, adhesive and apply with approved timber varnish to all exposed surfaces of timber and all as per detail drawings No. WD-10-IH57G2B-00-554.00 to Architect's approval.

150mm x 10mm thick solid timber (Teak) cut piece top to be placed on top of 120mm x 10mm thick timber piece backing and embedded into brickwall including all necessary jointing, adhesive and apply with approved timber varnish to all exposed surfaces of timber and all as per detail drawings No. WD-10-IH57G2B-00-554.00 to Architect's approval.

ELEMENT NO. 4 : STAIRCASE

END UNITAMOUNT

(RM)2,246.40

2,656.80

2,090.00

Page 43: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/4/43/164 - Add.03

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 4 : STAIRCASE

CORNER UNITITEM DESCRIPTION UNIT

(RM)

CARRIED TO COLLECTION

Collection :

A From Page No. BQ.G2B/3/4/1/4 -

B -

C -

From Page No. BQ.G2B/3/4/2/4 - Add.01

From Page No. BQ.G2B/3/4/3/4 - Add.03

ELEMENT NO. 4 : STAIRCASE

END UNITAMOUNT

(RM)

4,746.80

852.00

2,246.40

4,746.80

Page 44: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/4/44/164 - Add.03

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 4 : STAIRCASE

CORNER UNITITEM DESCRIPTION UNIT

(RM)

TOTAL CARRIED TO SUMMARY

ELEMENT NO. 4 : STAIRCASE

END UNITAMOUNT

(RM)

7,845.20

Page 45: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/5/45/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 5 : ROOF AND RAINWATER GOODS

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

Notes:-

A Roof area ; approximately 9.25m High above ground floor level M2 50.00 169.00 8,450.00 154.00 7,700.00 169.00

B

M2 108.00 187.00 20,196.00 170.00 18,360.00 187.00

C

M 27.50 0.00 21.80 0.00 27.50

CARRIED TO COLLECTION 28,646.00 26,060.00

1. Notwithstanding to the Standard Method of Measurement, this item is measured flat on plan of roof area in Square Metre (M2). The Tenderer shall allow for all cost in connection therewith.

2. Prices for the lightweight steel roof trusses shall include for all steel members, fasteners, tie rods, wall plates, connection plates, stiffener plate, bolts and nuts, fillet weld, shop priming, painting and treatment of members and plates including all necessary touch-up, design fees, fabrication, installation and including providing ten (10) years written manufacturer's warranty.

3. The Tenderer is requested to submit shop drawings, specification and calculation sheet document to Architect for approval prior to fabrication and installation. Only designs from specialist Proprietary Roof Trusses Manufacturer's together with their Professional Engineer endorsement will be accepted.

Design, fabricate, supply, deliver, unload, hoisting and fixing all fabricated lightweight steel roof trusses as described in accordance to manufacturer's specifications including fasteners, plate, rafters, tie plate, connectors and all other accessories etc. and to be certified by a professional engineer all as per Architect's satisfaction (measured flat on plan):

'MONIER' Legacy or approved equivalent interlocking colour and quartz coated concrete roof tiles laid at 25 degree pitch on 50mm x 50mm C-channel batten all in strictly accordance with the Manufacturer's instruction (measured nett - no allowance made for laps)

Extra Over 'MONIER' Legacy or approved equivalent angular ridge tiles to match roof system complete with 'MONIER' Compactroll 280 laid below the ridge tile and including requisite connectors and screws, all as per the Manufacturer's instruction.

Page 46: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/5/46/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 5 : ROOF AND RAINWATER GOODS

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

A

M 42.00 0.00 21.00 0.00 42.00

B

M2 7.30 187.00 1,365.10 170.00 1,241.00 187.00

C

M 23.00 0.00 19.00 0.00 23.00

D

M 16.00 86.20 1,379.20 58.90 942.40 86.20

EM2 8.50 51.80 440.30 35.40 300.90 51.80

……………………………………………………..

Reinforced Concrete Grade 25 as specified

F Flat roof slab exceeding 100mm thick but not exceeding 150mm thick M3 279.00 9.20 2,566.80 8.00 2,232.00 9.20

Mild Steel Reinforcements to BS4449 as specified

Flat Roof

G 6mm Diameter Bar Kg 3.60 15.00 54.00 15.00 54.00 15.00

High Tensile Reinforcements to BS 4449 as specified

Flat Roof

H 10mm Diameter bar Kg 3.60 39.00 140.40 39.00 140.40 39.00

Extra Over 'MONIER' Legacy or approved equivalent angular verge tiles to match roof system complete with verge seal and including requisite connectors and screws, all as per the Manufacturer's instruction.

Approved one layer of 'MONIER' Radenshield wovel AL+ or approved equivalent double sided woven aluminium foil insulation laid over trusses, well lapped at joints all as per the Manufacturer's instruction (measured nett - no allowance made for laps)

Approved 'MONIER' Easyflash or approved equivalent as described flashing under roof coverings brickwall including pre-finished zincalume flashing with 1 layer of 'MONIER' Wakastrip all as per the Manufacturer's instruction.

230mm x 3600mm x 12mm Thick 'HUME' Primaplank Klassik or approved equivalent smooth (painted) cellulose fibre reinforced cement as described fascia board fixed to metal end of rafter / truss complete with one layer of sisalation all as per the Manufacturer's instruction.

Knot, prime, stop and paint one (1) undercoat and two (2) finishing coats of gloss enamel paint as described on fascia board

Page 47: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/5/47/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 5 : ROOF AND RAINWATER GOODS

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)CARRIED TO COLLECTION 5,945.80 4,910.70

A BRC A6 weighing 2.22 Kg/m2, Flat Roof M2 12.90 52.60 678.54 39.50 509.55 52.60

B BRC A7 weighing 3.02 Kg/m2, Flat Roof M2 16.90 33.70 569.53 33.70 569.53 33.70

C BRC A8 weighing 3.95 Kg/m2, Flat Roof M2 21.60 13.50 291.60 3.00 64.80 13.50

D BRC A10 weighing 6.16 Kg/m2, Flat Roof M2 33.00 41.80 1,379.40 41.80 1,379.40 41.80

Formwork Class F1 as specified

E Soffit of Roof Slab exceeding 3.00m but not exceeding 5.00m High M2 28.00 71.10 1,990.80 60.80 1,702.40 71.10

…………………...………………………………

F To Flat Roof M2 38.50 71.10 2,737.35 60.80 2,340.80 71.10

G 20mm Thick to surfaces of Flat Roof M2 27.00 71.10 1,919.70 60.80 1,641.60 71.10

HM 13.90 5.80 80.62 5.80 80.62 5.80

One (1) layer of steel fabric reinforcement to B.S 4483 as described with 150mm Wide lapped at joints including cutting, bending in concrete, edge bars and notching around obstructions (measured nett no allowance made for laps)

Prepare and apply two coats of 'SIKALASTIK 150' bituminous PU waterproofing system to floor/wall joint at 150mm wide away from the wall and 300mm high upturn and fillet 45 skirting incorporating fibreglass matt reinforcement in between coat all as per Manufacturer's instructions to exposed surfaces of concrete slab.

Note: Applicator for water proofing works shall be from approved applicator with ten (10) years warranty

Chipping mix sand and fine stone (1:3) rendering power float finish with 'ANTISOL A' curing compound as described

Extra Over 150mm x 25mm deep concrete scupper drain including 20mm thick cement render, approved water proofing with all necessary formwork etc.

Page 48: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/5/48/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 5 : ROOF AND RAINWATER GOODS

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

CARRIED TO COLLECTION 9,647.54 8,288.70

Unplasticised Polyvinyl Chloride (uPVC) to BS4514 as described:

A

M 50.00 42.80 2,140.00 36.80 1,840.00 42.80

B

M 32.00 94.70 3,030.40 124.70 3,990.40 94.70

C 120mm x 80mm Overall size rainwater down pipe embedded in hardcore M 40.00 20.00 800.00 54.00 2,160.00 20.00

D No 16.00 60.00 960.00 72.00 1,152.00 60.00

ENo 32.00 20.00 640.00 24.00 768.00 20.00

'ARENSI MARLEY' or approved equivalent uPVC gutter, overall girth 410mm to be fixed to fascia board complete with approved holder bolts, fixing brackets, etc. including all necessary fitting and painting to all exposed surface with approved paint finish all as per Architect's approval

'ARENSI MARLEY' or approved equivalent uPVC rectangular rainwater down pipe, overall size 100mm x 80mm fixed to / chased in concrete column or brickwall including with UPVC debris trap / dome wire mesh on top and painting to all exposed surface with approved paint finish all as per Architect's approval

Extra Over for 100mm x 80mm overall size uPVC socket bend 95°

100mm x 80mm Overall size uPVC dome rain water outlet fixed to position with approved jointing materials

Page 49: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/5/49/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 5 : ROOF AND RAINWATER GOODS

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

CARRIED TO COLLECTION 7,570.40 9,910.40

Collection :

A From Page No. BQ.G2B/3/5/1/5 - - - 28,646.00 - 26,060.00 -

B From Page No. BQ.G2B/3/5/2/5 - - - 5,945.80 - 4,910.70 -

C From Page No. BQ.G2B/3/5/3/5 - - - 9,647.54 - 8,288.70 -

D From Page No. BQ.G2B/3/5/4/5 - - - 7,570.40 - 9,910.40 -

Page 50: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/5/50/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 5 : ROOF AND RAINWATER GOODS

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

TOTAL CARRIED TO SUMMARY 51,809.74 49,169.80

Page 51: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/5/51/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 5 : ROOF AND RAINWATER GOODS

CORNER UNITITEM DESCRIPTION UNIT

(RM)

Notes:-

A Roof area ; approximately 9.25m High above ground floor level M2

B

M2

C

M

CARRIED TO COLLECTION

1. Notwithstanding to the Standard Method of Measurement, this item is measured flat on plan of roof area in Square Metre (M2). The Tenderer shall allow for all cost in connection therewith.

2. Prices for the lightweight steel roof trusses shall include for all steel members, fasteners, tie rods, wall plates, connection plates, stiffener plate, bolts and nuts, fillet weld, shop priming, painting and treatment of members and plates including all necessary touch-up, design fees, fabrication, installation and including providing ten (10) years written manufacturer's warranty.

3. The Tenderer is requested to submit shop drawings, specification and calculation sheet document to Architect for approval prior to fabrication and installation. Only designs from specialist Proprietary Roof Trusses Manufacturer's together with their Professional Engineer endorsement will be accepted.

Design, fabricate, supply, deliver, unload, hoisting and fixing all fabricated lightweight steel roof trusses as described in accordance to manufacturer's specifications including fasteners, plate, rafters, tie plate, connectors and all other accessories etc. and to be certified by a professional engineer all as per Architect's satisfaction (measured flat on plan):

'MONIER' Legacy or approved equivalent interlocking colour and quartz coated concrete roof tiles laid at 25 degree pitch on 50mm x 50mm C-channel batten all in strictly accordance with the Manufacturer's instruction (measured nett - no allowance made for laps)

Extra Over 'MONIER' Legacy or approved equivalent angular ridge tiles to match roof system complete with 'MONIER' Compactroll 280 laid below the ridge tile and including requisite connectors and screws, all as per the Manufacturer's instruction.

ELEMENT NO. 5 : ROOF AND RAINWATER GOODS

END UNITAMOUNT

(RM)

8,450.00

20,196.00

0.00

28,646.00

Page 52: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/5/52/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 5 : ROOF AND RAINWATER GOODS

CORNER UNITITEM DESCRIPTION UNIT

(RM)

A

M

B

M2

C

M

D

M

EM2

……………………………………………………..

Reinforced Concrete Grade 25 as specified

F Flat roof slab exceeding 100mm thick but not exceeding 150mm thick M3

Mild Steel Reinforcements to BS4449 as specified

Flat Roof

G 6mm Diameter Bar Kg

High Tensile Reinforcements to BS 4449 as specified

Flat Roof

H 10mm Diameter bar Kg

Extra Over 'MONIER' Legacy or approved equivalent angular verge tiles to match roof system complete with verge seal and including requisite connectors and screws, all as per the Manufacturer's instruction.

Approved one layer of 'MONIER' Radenshield wovel AL+ or approved equivalent double sided woven aluminium foil insulation laid over trusses, well lapped at joints all as per the Manufacturer's instruction (measured nett - no allowance made for laps)

Approved 'MONIER' Easyflash or approved equivalent as described flashing under roof coverings brickwall including pre-finished zincalume flashing with 1 layer of 'MONIER' Wakastrip all as per the Manufacturer's instruction.

230mm x 3600mm x 12mm Thick 'HUME' Primaplank Klassik or approved equivalent smooth (painted) cellulose fibre reinforced cement as described fascia board fixed to metal end of rafter / truss complete with one layer of sisalation all as per the Manufacturer's instruction.

Knot, prime, stop and paint one (1) undercoat and two (2) finishing coats of gloss enamel paint as described on fascia board

ELEMENT NO. 5 : ROOF AND RAINWATER GOODS

END UNITAMOUNT

(RM)

0.00

1,365.10

0.00

1,379.20

440.30

2,566.80

54.00

140.40

Page 53: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/5/53/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 5 : ROOF AND RAINWATER GOODS

CORNER UNITITEM DESCRIPTION UNIT

(RM)CARRIED TO COLLECTION

A BRC A6 weighing 2.22 Kg/m2, Flat Roof M2

B BRC A7 weighing 3.02 Kg/m2, Flat Roof M2

C BRC A8 weighing 3.95 Kg/m2, Flat Roof M2

D BRC A10 weighing 6.16 Kg/m2, Flat Roof M2

Formwork Class F1 as specified

E Soffit of Roof Slab exceeding 3.00m but not exceeding 5.00m High M2

…………………...………………………………

F To Flat Roof M2

G 20mm Thick to surfaces of Flat Roof M2

HM

One (1) layer of steel fabric reinforcement to B.S 4483 as described with 150mm Wide lapped at joints including cutting, bending in concrete, edge bars and notching around obstructions (measured nett no allowance made for laps)

Prepare and apply two coats of 'SIKALASTIK 150' bituminous PU waterproofing system to floor/wall joint at 150mm wide away from the wall and 300mm high upturn and fillet 45 skirting incorporating fibreglass matt reinforcement in between coat all as per Manufacturer's instructions to exposed surfaces of concrete slab.

Note: Applicator for water proofing works shall be from approved applicator with ten (10) years warranty

Chipping mix sand and fine stone (1:3) rendering power float finish with 'ANTISOL A' curing compound as described

Extra Over 150mm x 25mm deep concrete scupper drain including 20mm thick cement render, approved water proofing with all necessary formwork etc.

ELEMENT NO. 5 : ROOF AND RAINWATER GOODS

END UNITAMOUNT

(RM)5,945.80

678.54

569.53

291.60

1,379.40

1,990.80

2,737.35

1,919.70

80.62

Page 54: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/5/54/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 5 : ROOF AND RAINWATER GOODS

CORNER UNITITEM DESCRIPTION UNIT

(RM)

CARRIED TO COLLECTION

Unplasticised Polyvinyl Chloride (uPVC) to BS4514 as described:

A

M

B

M

C 120mm x 80mm Overall size rainwater down pipe embedded in hardcore M

D No

ENo

'ARENSI MARLEY' or approved equivalent uPVC gutter, overall girth 410mm to be fixed to fascia board complete with approved holder bolts, fixing brackets, etc. including all necessary fitting and painting to all exposed surface with approved paint finish all as per Architect's approval

'ARENSI MARLEY' or approved equivalent uPVC rectangular rainwater down pipe, overall size 100mm x 80mm fixed to / chased in concrete column or brickwall including with UPVC debris trap / dome wire mesh on top and painting to all exposed surface with approved paint finish all as per Architect's approval

Extra Over for 100mm x 80mm overall size uPVC socket bend 95°

100mm x 80mm Overall size uPVC dome rain water outlet fixed to position with approved jointing materials

ELEMENT NO. 5 : ROOF AND RAINWATER GOODS

END UNITAMOUNT

(RM)

9,647.54

2,140.00

3,030.40

800.00

960.00

640.00

Page 55: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/5/55/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 5 : ROOF AND RAINWATER GOODS

CORNER UNITITEM DESCRIPTION UNIT

(RM)

CARRIED TO COLLECTION

Collection :

A From Page No. BQ.G2B/3/5/1/5 -

B From Page No. BQ.G2B/3/5/2/5 -

C From Page No. BQ.G2B/3/5/3/5 -

D From Page No. BQ.G2B/3/5/4/5 -

ELEMENT NO. 5 : ROOF AND RAINWATER GOODS

END UNITAMOUNT

(RM)

7,570.40

28,646.00

5,945.80

9,647.54

7,570.40

Page 56: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/5/56/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 5 : ROOF AND RAINWATER GOODS

CORNER UNITITEM DESCRIPTION UNIT

(RM)

TOTAL CARRIED TO SUMMARY

ELEMENT NO. 5 : ROOF AND RAINWATER GOODS

END UNITAMOUNT

(RM)

51,809.74

Page 57: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/6/57/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 6 : EXTERNAL WALL

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY AMOUNT

(RM) (RM) (RM) (RM)

Brickworks

A

M2 39.50 232.00 9,164.00 129.20 5,103.40 232.00 9,164.00

BM 1.00 26.00 26.00 18.00 18.00 26.00 26.00

C

No 1.00 418.00 418.00 233.00 233.00 418.00 418.00

TOTAL CARRIED TO SUMMARY 9,608.00 5,354.40 9,608.00

150mm Thick clay brickwall laid on cement and sand mortar (1:3) mortar with an approved plasticiser as described including layer of exmet at every fourth courses as described

110mm Wide approved hessian based bituminous felt damp proof course to B.S 743 as described

6mm Diameter x 450mm Diameter long mild steel bar to B.S 15 as described bonding tie with one end built into brickwork and the other end cast into concrete including forming perforation into formwork

Page 58: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/6/58/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 6 : EXTERNAL WALL

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY AMOUNT

(RM) (RM) (RM) (RM)

Page 59: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/7/59/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 7 : WINDOW AND DOOR

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

Window

Note:

General

Aluminum Works

A

B

C

D

E

CARRIED TO COLLECTION - -

The tenderer shall check the windows schedule provided by Consultant Architect for clear view of the items described. The tenderer shall also include in the items rate for any items not described in the description but shown in the drawings.

The quantity given herein are not to be used as the basis for ordering the window and fixed panel units, the contractor shall, prior to placement of his orders, verify from the drawings and physical work on the site and subsequently confirm with the S.O, the numbers and exact size of window and fixed panel unit show in this Bills and shall allow herein the extra costs incurred or savings accrued for any minor difference in size and all adjustment necessary for the window and fixed panel units.

Rates for aluminum works are to include everything necessary whether described herein or otherwise, for the complete installation of each unit in accordance with the specification, contract drawings and the approved shop drawings.

The word 'frames' in the description hereinafter shall be deemed to include heads, jambs, cills, mullions, etc. to window and fixed panel unit.

The tenderer must ascertain the actual panel sizes of glass required and allow in the rates of each aluminum units the extra costs or saving of glass over the quantities given resulting from usage of smaller or larger frame extrusions, or different method of glazing.

The Tenderer shall provide and supply shop drawings in accordance to site measurements and no claimed will be entertained for any discrepencies between the Drawings, Bill Of Quantities and Site Measurement.

Page 60: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/7/60/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 7 : WINDOW AND DOOR

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

Window (Cont'd)

A

M 46.00 39.00 1,794.00 33.00 1,518.00 39.00

B

(Type W1) No 284.00 1.00 284.00 1.00 284.00 1.00

C

(Type W2) No 231.00 1.00 231.00 1.00 231.00 1.00

D

(Type W3) No 981.00 1.00 981.00 1.00 981.00 1.00

E

(Type W4) No 4,722.00 1.00 4,722.00 1.00 4,722.00 1.00

Precast concrete Grade 25 as described including moulds, finished fair on exposed faces and hoisting, fixing, bedding, jointing and pointing in cement and sand mortar as described

150mm x 225mm lintol reinforced with and including 4 nos of 10mm diameter high tensile rod reinforcement bars and 230mm centres of 6mm diamater mild steel stirrups and sawn formwork as described

Supply and fix the following 1.2mm thick powder coated aluminium frame window fabricated from extruded section and including glass (measured separately) with glazing gasket complete with all necessary ironmongeries and other accessories including building in or cutting and priming, bedding frames in cement mortar (1:3) and pointed internally with an approved tropical mastic and externally with and approved silicon sealant caulking accordance with Manufacturer's instruction etc. all as per relevant Architect's drawings

1200mm x 600mm High (overall size) top hung window complete with 6mm thick obscure glass (glass measured separately)

750mm x 600mm High (overall size) top hung window complete with 6mm thick obscure glass (glass measured separately)

1650mm x 2100mm High (overall size) sliding window with top hung window above and fixed window below complete with 6mm thick obscure glass (glass measured separately)

4600mm x 2250mm High (overall size) sliding window with 6mm thick tinted glass and 2 panel of adjustable louvres glass window on both sides with 6mm thick clear louvres glass (glass measured separately)

Page 61: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/7/61/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 7 : WINDOW AND DOOR

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)CARRIED TO COLLECTION 8,012.00 7,736.00

Window (Cont'd)

A

(Type W5) No 852.00 3.00 2,556.00 3.00 2,556.00 3.00

B

(Type W6) No 1,605.00 1.00 1,605.00 - - 1.00

C

(Type W7) No 2,286.00 2.00 4,572.00 3.00 6,858.00 2.00

D

(Type W8) No 1,139.00 2.00 2,278.00 - - 2.00

E

(Type W9) No 353.00 2.00 706.00 2.00 706.00 2.00

F

(Type W10) No 546.00 1.00 546.00 1.00 546.00 1.00

Supply and fix the following 1.2mm thick powder coated aluminium frame window fabricated from extruded section and including glass (measured separately) with glazing gasket complete with all necessary ironmongeries and other accessories including building in or cutting and priming, bedding frames in cement mortar (1:3) and pointed internally with an approved tropical mastic and externally with and approved silicon sealant caulking accordance with Manufacturer's instruction etc. all as per relevant Architect's drawings (Cont'd)

1200mm x 2250mm High (overall size) casement window complete with 6mm thick tinted glass (glass measured separately)

2300mm x 2250mm High (overall size) casement window with fixed glass panel window above complete with 6mm tinted glass (glass measured separately)

3200mm x 2250mm High (overall size) casement and fixed glass panel window above with 6mm tinted glass (glass measured separately)

600mm x 1400mm High (overall size) adjustable louvres window with 6mm thick clear louvres glass (glass measured separately)

1200mm x 600mm High (overall size) high casement window and ventilation window at side complete with 6mm thick obscure glass (glass measured separately)

2200mm x 750mm High (overall size) high top hung window complete with 6mm thick obscure glass (glass measured separately)

Page 62: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/7/62/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 7 : WINDOW AND DOOR

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

CARRIED TO COLLECTION 12,263.00 10,666.00

Window (Cont'd)

A

(Type W11) No 460.00 2.00 920.00 1.00 460.00 2.00

B

(Type W12) No 439.00 1.00 439.00 1.00 439.00 1.00

C

(Type W13) No 653.00 1.00 653.00 - - 1.00

D

(Type W14) No 407.00 1.00 407.00 - - 1.00

E

(Type W15a & W15b) No 1,483.00 - - - - 1.00

Supply and fix the following 1.2mm thick powder coated aluminium frame window fabricated from extruded section and including glass (measured separately) with glazing gasket complete with all necessary ironmongeries and other accessories including building in or cutting and priming, bedding frames in cement mortar (1:3) and pointed internally with an approved tropical mastic and externally with and approved silicon sealant caulking accordance with Manufacturer's instruction etc. all as per relevant Architect's drawings (Cont'd)

3400mm x 500mm High (overall size) fixed glass window complete with 6mm tinted glass (glass measured separately)

450mm x 2250mm High (overall size) casement window and fixed glass window below with 6mm thick tinted glass (glass measured separately)

1800mm x 1400mm High (overall size) top hung window complete with 6mm thick tinted glass (glass measured separately)

600mm x 1800mm High (overall size) casement window complete with 6mm thick tinted glass (glass measured separately)

(2050mm + 800mm) x 2250mm High (overall size) fixed and casement corner window with top hung window above complete with 6mm thick tinted glass (glass measured separately)

Page 63: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/7/63/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 7 : WINDOW AND DOOR

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

CARRIED TO COLLECTION 2,419.00 899.00

Window (Cont'd)

AM2 54.00 46.70 2,521.80 44.50 2,403.00 53.10

BM2 51.00 7.80 397.80 7.80 397.80 7.80

C

M 5.40 11.00 59.40 - - 11.00

Approved sheet glass as described including cutting glass to the required size, waste and cleaning on both surfaces upon completion as described

6mm Thick 30% green tinted glass fixed to aluminium framings (measured separately) with and including glazing compound all round

6mm Thick obscure glass fixed to aluminium framings (measured separately) with and including glazing compound all round

600mmx 100mm x 6mm Thick clear louvres glass fixed to aluminium framings (measured separately) with and including glazing compound all round

Page 64: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/7/64/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 7 : WINDOW AND DOOR

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

CARRIED TO COLLECTION 2,979.00 2,800.80

Door

A

M 46.00 57.00 2,622.00 52.00 2,392.00 57.00

B 1200mm x 2400mm High overall door size(Type D1) No 185.00 1.00 185.00 1.00 185.00 1.00

C 900mm x 2400mm High overall door size(Type D3) No 201.00 1.00 201.00 1.00 201.00 1.00

D 900mm x 2400mm High overall door size(Type D4) No 164.00 4.00 656.00 4.00 656.00 4.00

E 900mm x 2400mm High overall door size(Type D5) No 201.00 1.00 201.00 1.00 201.00 1.00

F 900mm x 2400mm High overall door size(Type D7) No 164.00 1.00 164.00 1.00 164.00 1.00

G 750mm x 2400mm High overall door size(Type D8) No 199.00 4.00 796.00 4.00 796.00 4.00

H 900mm x 2400mm High overall door size

Precast concrete Grade 25 as described including moulds, finished fair on exposed faces and hoisting, fixing, bedding, jointing and pointing in cement and sand mortar as described

150mm x 225mm lintol reinforced with and including 4 Nos of 10mm Diameter high tensile rod reinforcement bars and 230mm centres of 6mm Diamater mild steel stirrups and sawn formwork as described

Supply and install 162mm x 50mm x 1.2mm thick 'HFI 8' or approved equivalent hot dipped galvanised metal door frame of single rebetted complete with etching primer metal frame finish including assembling secured wire ties, built into concrete or brickwork and bedded in cement and sand (1:3) mortar, painted both sides with silicone sealant complete with complete with hinges and all necessary adaptors, including paintings etc. all in accordance to Manufacturer's instruction and drawings as described

Page 65: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/7/65/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 7 : WINDOW AND DOOR

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)(Type DW1) No 376.00 1.00 376.00 1.00 376.00 1.00

CARRIED TO COLLECTION 5,201.00 4,971.00

Door (Cont'd)

Supply and install the following door panel as described :

A

(Type D1) No 1,100.00 1.00 1,100.00 1.00 1,100.00 1.00

B

(Type D3) No 701.00 1.00 701.00 1.00 701.00 1.00

C

(Type D4) No 417.00 4.00 1,668.00 4.00 1,668.00 4.00

D

(Type D5) No 395.00 1.00 395.00 1.00 395.00 1.00

1200mm x 2400mm x 43mm Thick single leaf "Deco Pro" DPW Pine Dark or other equivalent solid core engineered and laminated timber door complete with 6mm x 6mm stainless steel inlay set in 250mm from the lock side on both panels c/w matching edge bands on all four sides c/w water, fade, crack and peel resistant qualities (no further varnishing required) and all to Manufacturer's details and Architect's approval

900mm x 2100mm x 37mm Thick single leaf "Deco Pro" DPW Pine Dark or other equivalent honeycomb core engineered and laminated timber door complete with 900mm x 300mm high ventilation glass window on top and matching varnished louvers of size 520mm x 1700mm c/w matching edge bands on all four sides c/w water, fade, crack and peel resistant qualities (no further varnishing required) and all to Manufacturer's details and Architect's approval

900mm x 2400mm x 37mm Thick single leaf "Deco Pro" DPW Pine Dark or other equivalent honeycomb core engineered and laminated timber door complete with matching edge bands on all four sides c/w water, fade, crack and peel resistant qualities (no further varnishing required) and all to Manufacturer's details and Architect's approval

900mm x 2100mm x 37mm Thick single leaf "Deco Pro" DPW Pine Dark or other equivalent honeycomb core engineered and laminated timber door complete with 900mm x 300mm high ventilation obscure glass window on top and matching edge bands on all four sides c/w water, fade, crack and peel resistant qualities (no further varnishing required) and all to Manufacturer's details and Architect's approval

Page 66: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/7/66/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 7 : WINDOW AND DOOR

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

CARRIED TO COLLECTION 3,864.00 3,864.00

Door (Cont'd)

Supply and install the following door panel as described : (Cont'd)

A

(Type D7) No 417.00 1.00 417.00 1.00 417.00 1.00

B

(Type D8) No 389.00 4.00 1,556.00 4.00 1,556.00 4.00

C

(Type DW1) No 2,093.00 1.00 2,093.00 1.00 2,093.00 1.00

900mm x 2400mm x 37mm Thick single leaf "Deco Pro" DPW Pine Dark or other equivalent honeycomb core engineered and laminated timber door complete with matching edge bands on all four sides c/w water, fade, crack and peel resistant qualities. No further varnishing required and all to Manufacturer's details and Architect's approval

750mm x 2100mm x 37mm Thick single leaf "Deco Pro" DPW Pine Dark or other equivalent honeycomb core engineered and laminated timber door complete with 750mm x 300mm high ventilation obscure glass window on top and matching edge bands on all four sides c/w water, fade, crack and peel resistant qualities. No further varnishing required and all to Manufacturer's details and Architect's approval

900mm x 2400mm x 37mm Thick (overall size) single leaf "Deco Pro" combination DPW0303 Pine Dark or other equivalent semi-solid core engineered and laminated timber door on the interior panel comprised of two (2) panel 600mm x 1400mm high adjustable louvres glass window on both sides complete with matching edge bands on all four sides c/w marine plywood (painting measured separately) on the exterior panel c/w water, crack and peel resistant qualities. No further varnishing required on the interior panel and all to Manufacturer's details and Architect's approval

Page 67: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/7/67/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 7 : WINDOW AND DOOR

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

CARRIED TO COLLECTION 4,066.00 4,066.00

Door (Cont'd)

A

(Type D2) No 3,664.00 1.00 3,664.00 1.00 3,664.00 1.00

B

(Type FD1) No 17,462.00 3.00 52,386.00 3.00 52,386.00 3.00

C

(Type FD2) No 7,982.00 1.00 7,982.00 1.00 7,982.00 1.00

Supply and fix the following powder coated aluminium doors of approved colours complete with frames, locks, hinges, sliding gears, sensors, wiring, glazing beads, sealant and all other accessories including bedding building in or cutting and pinning lugs bolting frames in waterproof cement mortar (1:3) and pointing both sides with mastic complete with wire netting to the inner side and fixing to aluminium frame as described

800mm x 2100mm x 50mm Thick double sliding aluminium louvres door with approved finish to all exposed surfaces all as per detail Architect's drawings to approval

5250mm x 2400mm High (overall size) 'KESTO 59s' or other approved aluminium folding door complete with 8mm thick clear tempered float glass fixed panel with 30% green tinted , premium concealed hinges, lockset, ironmongeries and other necessary accessories with 6mm x 102mm (wide) 'BREEZWAY' or other approved powder coated adjustable louvres all as per Manufacturer's detail and Architect's approval

2400mm x 2400mm High (overall size) 'KESTO 59s' or other approved aluminium folding door complete with 8mm thick clear tempered float glass fixed panel with 30% green tinted , premium concealed hinges, lockset, ironmongeries and other necessary accessories with 6mm x 102mm (wide) 'BREEZWAY' or other approved powder coated adjustable louvres all as per Manufacturer's detail and Architect's approval

Page 68: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/7/68/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 7 : WINDOW AND DOOR

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

CARRIED TO COLLECTION 64,032.00 64,032.00

Door (Cont'd)

A

(Type SD1) No 4,078.00 1.00 4,078.00 1.00 4,078.00 1.00

B

(Type SD2) No 2,105.00 1.00 2,105.00 - - 1.00

C

(Type SD3) No 3,567.00 1.00 3,567.00 - - 1.00

………………………………..

D

M 13.20 137.40 1,813.68 137.40 1,813.68 137.40

Supply and fix the following powder coated aluminium doors of approved colours complete with frames, locks, hinges, sliding gears, sensors, wiring, glazing beads, sealant and all other accessories including bedding building in or cutting and pinning lugs bolting frames in waterproof cement mortar (1:3) and pointing both sides with mastic complete with wire netting to the inner side and fixing to aluminium frame as described (Cont'd)

4000mm x 2400mm High (overall size) aluminium sliding door with 4000mm x 300mm high top hung window above complete with 'wool pile' with 8mm thick clear glass with 30% green tinted, lockset, ironmongeries and other necessary accessories all as per Manufacturer's detail

1800mm x 2400mm High (overall size) aluminium sliding door with 1800mm x 300mm high top hung window above complete with 'wool pile' with 8mm thick clear glass with 30% green tinted, lockset, ironmongeries and other necessary accessories all as per Manufacturer's detail

3000mm x 2400mm High (overall size) aluminium sliding door with 3000mm x 300mm high top hung window above complete with 'wool pile' with 8mm thick clear glass with 30% green tinted, lockset, ironmongeries and other necessary accessories all as per Manufacturer's detail

75mm x 8mm Thick 'SHERA' strip smooth texture architrave complete with pre spray-painted white finishes fixed to brickwall with v-cut edge and approved all jointing materials and approved finish to exposed surfaces

Page 69: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/7/69/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 7 : WINDOW AND DOOR

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

CARRIED TO COLLECTION 11,563.68 5,891.68

Ironmongeries

Hinges

A HAFELE 489.05.007, 127mm x 89mm butt hinges (H001) No 39.00 8.00 312.00 8.00 312.00 8.00

B HAFELE 921.17.170, 102 x 76 x 2mm thick butt hinge 2bb matt (H002) No 11.00 44.00 484.00 44.00 484.00 44.00

Lock Set

C HAFELE 499.10.084, Mortise Sashlock / T-Turn Cylinder (L002) No 430.00 1.00 430.00 1.00 430.00 1.00

D HAFELE 489.10.057, Mortise Sashlock / T-Turn Cylinder (L003) No 212.00 1.00 212.00 1.00 212.00 1.00

E HAFELE 489.10.281, Entrance Lever Handle Set (L004) No 100.00 5.00 500.00 5.00 500.00 5.00

F HAFELE 489.10.282, Privacy Lever Handle Set (L005) No 118.00 6.00 708.00 6.00 708.00 6.00

Accessories

G HAFELE 489.70.230 Dome Shape Floor Mounted Stopper (A001) No 18.00 6.00 108.00 6.00 108.00 6.00

H HAFELE 489.70.220 Door stopper with hook (A002) No 18.00 6.00 108.00 6.00 108.00 6.00

J HAFELE 151.35.208, Rectangular Flush Pull No 28.50 2.00 57.00 2.00 57.00 2.00

Sliding Fitting

K HAFELE SLD02, Sliding Door Fitting Silent 100/A No 311.00 1.00 311.00 1.00 311.00 1.00

Supply and fix the following approved medium range ironmongeries including providing requisite matching screw as described.

Page 70: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/7/70/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 7 : WINDOW AND DOOR

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

CARRIED TO COLLECTION 3,230.00 3,230.00

Collection :

A From Page No. BQ.G2B/3/7/1/12 - - - - - - -

B From Page No. BQ.G2B/3/7/2/12 - - - 8,012.00 - 7,736.00 -

C From Page No. BQ.G2B/3/7/3/12 - - - 12,263.00 - 10,666.00 -

D From Page No. BQ.G2B/3/7/4/12 - - - 2,419.00 - 899.00 -

E From Page No. BQ.G2B/3/7/5/12 - - - 2,979.00 - 2,800.80 -

F From Page No. BQ.G2B/3/7/6/12 - - - 5,201.00 - 4,971.00 -

G - - - 3,864.00 - 3,864.00 -

H - - - 4,066.00 - 4,066.00 -

J From Page No. BQ.G2B/3/7/9/12 - - - 64,032.00 - 64,032.00 -

From Page No. BQ.G2B/3/7/7/12 - Add.01

From Page No. BQ.G2B/3/7/8/12 - Add.01

Page 71: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/7/71/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 7 : WINDOW AND DOOR

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)K From Page No. BQ.G2B/3/7/10/12 - - - 11,563.68 - 5,891.68 -

L - - - 3,230.00 - 3,230.00 -

TOTAL CARRIED TO SUMMARY 117,629.68 108,156.48

From Page No. BQ.G2B/3/7/11/12 - Add.01

Page 72: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/7/72/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 7 : WINDOW AND DOOR

CORNER UNITITEM DESCRIPTION UNIT

(RM)

Window

Note:

General

Aluminum Works

A

B

C

D

E

CARRIED TO COLLECTION

The tenderer shall check the windows schedule provided by Consultant Architect for clear view of the items described. The tenderer shall also include in the items rate for any items not described in the description but shown in the drawings.

The quantity given herein are not to be used as the basis for ordering the window and fixed panel units, the contractor shall, prior to placement of his orders, verify from the drawings and physical work on the site and subsequently confirm with the S.O, the numbers and exact size of window and fixed panel unit show in this Bills and shall allow herein the extra costs incurred or savings accrued for any minor difference in size and all adjustment necessary for the window and fixed panel units.

Rates for aluminum works are to include everything necessary whether described herein or otherwise, for the complete installation of each unit in accordance with the specification, contract drawings and the approved shop drawings.

The word 'frames' in the description hereinafter shall be deemed to include heads, jambs, cills, mullions, etc. to window and fixed panel unit.

The tenderer must ascertain the actual panel sizes of glass required and allow in the rates of each aluminum units the extra costs or saving of glass over the quantities given resulting from usage of smaller or larger frame extrusions, or different method of glazing.

The Tenderer shall provide and supply shop drawings in accordance to site measurements and no claimed will be entertained for any discrepencies between the Drawings, Bill Of Quantities and Site Measurement.

ELEMENT NO. 7 : WINDOW AND DOOR

END UNITAMOUNT

(RM)

-

Page 73: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/7/73/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 7 : WINDOW AND DOOR

CORNER UNITITEM DESCRIPTION UNIT

(RM)

Window (Cont'd)

A

M

B

(Type W1) No

C

(Type W2) No

D

(Type W3) No

E

(Type W4) No

Precast concrete Grade 25 as described including moulds, finished fair on exposed faces and hoisting, fixing, bedding, jointing and pointing in cement and sand mortar as described

150mm x 225mm lintol reinforced with and including 4 nos of 10mm diameter high tensile rod reinforcement bars and 230mm centres of 6mm diamater mild steel stirrups and sawn formwork as described

Supply and fix the following 1.2mm thick powder coated aluminium frame window fabricated from extruded section and including glass (measured separately) with glazing gasket complete with all necessary ironmongeries and other accessories including building in or cutting and priming, bedding frames in cement mortar (1:3) and pointed internally with an approved tropical mastic and externally with and approved silicon sealant caulking accordance with Manufacturer's instruction etc. all as per relevant Architect's drawings

1200mm x 600mm High (overall size) top hung window complete with 6mm thick obscure glass (glass measured separately)

750mm x 600mm High (overall size) top hung window complete with 6mm thick obscure glass (glass measured separately)

1650mm x 2100mm High (overall size) sliding window with top hung window above and fixed window below complete with 6mm thick obscure glass (glass measured separately)

4600mm x 2250mm High (overall size) sliding window with 6mm thick tinted glass and 2 panel of adjustable louvres glass window on both sides with 6mm thick clear louvres glass (glass measured separately)

ELEMENT NO. 7 : WINDOW AND DOOR

END UNITAMOUNT

(RM)

1,794.00

284.00

231.00

981.00

4,722.00

Page 74: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/7/74/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 7 : WINDOW AND DOOR

CORNER UNITITEM DESCRIPTION UNIT

(RM)CARRIED TO COLLECTION

Window (Cont'd)

A

(Type W5) No

B

(Type W6) No

C

(Type W7) No

D

(Type W8) No

E

(Type W9) No

F

(Type W10) No

Supply and fix the following 1.2mm thick powder coated aluminium frame window fabricated from extruded section and including glass (measured separately) with glazing gasket complete with all necessary ironmongeries and other accessories including building in or cutting and priming, bedding frames in cement mortar (1:3) and pointed internally with an approved tropical mastic and externally with and approved silicon sealant caulking accordance with Manufacturer's instruction etc. all as per relevant Architect's drawings (Cont'd)

1200mm x 2250mm High (overall size) casement window complete with 6mm thick tinted glass (glass measured separately)

2300mm x 2250mm High (overall size) casement window with fixed glass panel window above complete with 6mm tinted glass (glass measured separately)

3200mm x 2250mm High (overall size) casement and fixed glass panel window above with 6mm tinted glass (glass measured separately)

600mm x 1400mm High (overall size) adjustable louvres window with 6mm thick clear louvres glass (glass measured separately)

1200mm x 600mm High (overall size) high casement window and ventilation window at side complete with 6mm thick obscure glass (glass measured separately)

2200mm x 750mm High (overall size) high top hung window complete with 6mm thick obscure glass (glass measured separately)

ELEMENT NO. 7 : WINDOW AND DOOR

END UNITAMOUNT

(RM)8,012.00

2,556.00

1,605.00

4,572.00

2,278.00

706.00

546.00

Page 75: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/7/75/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 7 : WINDOW AND DOOR

CORNER UNITITEM DESCRIPTION UNIT

(RM)

CARRIED TO COLLECTION

Window (Cont'd)

A

(Type W11) No

B

(Type W12) No

C

(Type W13) No

D

(Type W14) No

E

(Type W15a & W15b) No

Supply and fix the following 1.2mm thick powder coated aluminium frame window fabricated from extruded section and including glass (measured separately) with glazing gasket complete with all necessary ironmongeries and other accessories including building in or cutting and priming, bedding frames in cement mortar (1:3) and pointed internally with an approved tropical mastic and externally with and approved silicon sealant caulking accordance with Manufacturer's instruction etc. all as per relevant Architect's drawings (Cont'd)

3400mm x 500mm High (overall size) fixed glass window complete with 6mm tinted glass (glass measured separately)

450mm x 2250mm High (overall size) casement window and fixed glass window below with 6mm thick tinted glass (glass measured separately)

1800mm x 1400mm High (overall size) top hung window complete with 6mm thick tinted glass (glass measured separately)

600mm x 1800mm High (overall size) casement window complete with 6mm thick tinted glass (glass measured separately)

(2050mm + 800mm) x 2250mm High (overall size) fixed and casement corner window with top hung window above complete with 6mm thick tinted glass (glass measured separately)

ELEMENT NO. 7 : WINDOW AND DOOR

END UNITAMOUNT

(RM)

12,263.00

920.00

439.00

653.00

407.00

1,483.00

Page 76: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/7/76/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 7 : WINDOW AND DOOR

CORNER UNITITEM DESCRIPTION UNIT

(RM)

CARRIED TO COLLECTION

Window (Cont'd)

AM2

BM2

C

M

Approved sheet glass as described including cutting glass to the required size, waste and cleaning on both surfaces upon completion as described

6mm Thick 30% green tinted glass fixed to aluminium framings (measured separately) with and including glazing compound all round

6mm Thick obscure glass fixed to aluminium framings (measured separately) with and including glazing compound all round

600mmx 100mm x 6mm Thick clear louvres glass fixed to aluminium framings (measured separately) with and including glazing compound all round

ELEMENT NO. 7 : WINDOW AND DOOR

END UNITAMOUNT

(RM)

3,902.00

2,867.40

397.80

59.40

Page 77: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/7/77/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 7 : WINDOW AND DOOR

CORNER UNITITEM DESCRIPTION UNIT

(RM)

CARRIED TO COLLECTION

Door

A

M

B 1200mm x 2400mm High overall door size(Type D1) No

C 900mm x 2400mm High overall door size(Type D3) No

D 900mm x 2400mm High overall door size(Type D4) No

E 900mm x 2400mm High overall door size(Type D5) No

F 900mm x 2400mm High overall door size(Type D7) No

G 750mm x 2400mm High overall door size(Type D8) No

H 900mm x 2400mm High overall door size

Precast concrete Grade 25 as described including moulds, finished fair on exposed faces and hoisting, fixing, bedding, jointing and pointing in cement and sand mortar as described

150mm x 225mm lintol reinforced with and including 4 Nos of 10mm Diameter high tensile rod reinforcement bars and 230mm centres of 6mm Diamater mild steel stirrups and sawn formwork as described

Supply and install 162mm x 50mm x 1.2mm thick 'HFI 8' or approved equivalent hot dipped galvanised metal door frame of single rebetted complete with etching primer metal frame finish including assembling secured wire ties, built into concrete or brickwork and bedded in cement and sand (1:3) mortar, painted both sides with silicone sealant complete with complete with hinges and all necessary adaptors, including paintings etc. all in accordance to Manufacturer's instruction and drawings as described

ELEMENT NO. 7 : WINDOW AND DOOR

END UNITAMOUNT

(RM)

3,324.60

2,622.00

185.00

201.00

656.00

201.00

164.00

796.00

Page 78: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/7/78/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 7 : WINDOW AND DOOR

CORNER UNITITEM DESCRIPTION UNIT

(RM)(Type DW1) No

CARRIED TO COLLECTION

Door (Cont'd)

Supply and install the following door panel as described :

A

(Type D1) No

B

(Type D3) No

C

(Type D4) No

D

(Type D5) No

1200mm x 2400mm x 43mm Thick single leaf "Deco Pro" DPW Pine Dark or other equivalent solid core engineered and laminated timber door complete with 6mm x 6mm stainless steel inlay set in 250mm from the lock side on both panels c/w matching edge bands on all four sides c/w water, fade, crack and peel resistant qualities (no further varnishing required) and all to Manufacturer's details and Architect's approval

900mm x 2100mm x 37mm Thick single leaf "Deco Pro" DPW Pine Dark or other equivalent honeycomb core engineered and laminated timber door complete with 900mm x 300mm high ventilation glass window on top and matching varnished louvers of size 520mm x 1700mm c/w matching edge bands on all four sides c/w water, fade, crack and peel resistant qualities (no further varnishing required) and all to Manufacturer's details and Architect's approval

900mm x 2400mm x 37mm Thick single leaf "Deco Pro" DPW Pine Dark or other equivalent honeycomb core engineered and laminated timber door complete with matching edge bands on all four sides c/w water, fade, crack and peel resistant qualities (no further varnishing required) and all to Manufacturer's details and Architect's approval

900mm x 2100mm x 37mm Thick single leaf "Deco Pro" DPW Pine Dark or other equivalent honeycomb core engineered and laminated timber door complete with 900mm x 300mm high ventilation obscure glass window on top and matching edge bands on all four sides c/w water, fade, crack and peel resistant qualities (no further varnishing required) and all to Manufacturer's details and Architect's approval

ELEMENT NO. 7 : WINDOW AND DOOR

END UNITAMOUNT

(RM)376.00

5,201.00

1,100.00

701.00

1,668.00

395.00

Page 79: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/7/79/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 7 : WINDOW AND DOOR

CORNER UNITITEM DESCRIPTION UNIT

(RM)

CARRIED TO COLLECTION

Door (Cont'd)

Supply and install the following door panel as described : (Cont'd)

A

(Type D7) No

B

(Type D8) No

C

(Type DW1) No

900mm x 2400mm x 37mm Thick single leaf "Deco Pro" DPW Pine Dark or other equivalent honeycomb core engineered and laminated timber door complete with matching edge bands on all four sides c/w water, fade, crack and peel resistant qualities. No further varnishing required and all to Manufacturer's details and Architect's approval

750mm x 2100mm x 37mm Thick single leaf "Deco Pro" DPW Pine Dark or other equivalent honeycomb core engineered and laminated timber door complete with 750mm x 300mm high ventilation obscure glass window on top and matching edge bands on all four sides c/w water, fade, crack and peel resistant qualities. No further varnishing required and all to Manufacturer's details and Architect's approval

900mm x 2400mm x 37mm Thick (overall size) single leaf "Deco Pro" combination DPW0303 Pine Dark or other equivalent semi-solid core engineered and laminated timber door on the interior panel comprised of two (2) panel 600mm x 1400mm high adjustable louvres glass window on both sides complete with matching edge bands on all four sides c/w marine plywood (painting measured separately) on the exterior panel c/w water, crack and peel resistant qualities. No further varnishing required on the interior panel and all to Manufacturer's details and Architect's approval

ELEMENT NO. 7 : WINDOW AND DOOR

END UNITAMOUNT

(RM)

3,864.00

417.00

1,556.00

2,093.00

Page 80: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/7/80/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 7 : WINDOW AND DOOR

CORNER UNITITEM DESCRIPTION UNIT

(RM)

CARRIED TO COLLECTION

Door (Cont'd)

A

(Type D2) No

B

(Type FD1) No

C

(Type FD2) No

Supply and fix the following powder coated aluminium doors of approved colours complete with frames, locks, hinges, sliding gears, sensors, wiring, glazing beads, sealant and all other accessories including bedding building in or cutting and pinning lugs bolting frames in waterproof cement mortar (1:3) and pointing both sides with mastic complete with wire netting to the inner side and fixing to aluminium frame as described

800mm x 2100mm x 50mm Thick double sliding aluminium louvres door with approved finish to all exposed surfaces all as per detail Architect's drawings to approval

5250mm x 2400mm High (overall size) 'KESTO 59s' or other approved aluminium folding door complete with 8mm thick clear tempered float glass fixed panel with 30% green tinted , premium concealed hinges, lockset, ironmongeries and other necessary accessories with 6mm x 102mm (wide) 'BREEZWAY' or other approved powder coated adjustable louvres all as per Manufacturer's detail and Architect's approval

2400mm x 2400mm High (overall size) 'KESTO 59s' or other approved aluminium folding door complete with 8mm thick clear tempered float glass fixed panel with 30% green tinted , premium concealed hinges, lockset, ironmongeries and other necessary accessories with 6mm x 102mm (wide) 'BREEZWAY' or other approved powder coated adjustable louvres all as per Manufacturer's detail and Architect's approval

ELEMENT NO. 7 : WINDOW AND DOOR

END UNITAMOUNT

(RM)

4,066.00

3,664.00

52,386.00

7,982.00

Page 81: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/7/81/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 7 : WINDOW AND DOOR

CORNER UNITITEM DESCRIPTION UNIT

(RM)

CARRIED TO COLLECTION

Door (Cont'd)

A

(Type SD1) No

B

(Type SD2) No

C

(Type SD3) No

………………………………..

D

M

Supply and fix the following powder coated aluminium doors of approved colours complete with frames, locks, hinges, sliding gears, sensors, wiring, glazing beads, sealant and all other accessories including bedding building in or cutting and pinning lugs bolting frames in waterproof cement mortar (1:3) and pointing both sides with mastic complete with wire netting to the inner side and fixing to aluminium frame as described (Cont'd)

4000mm x 2400mm High (overall size) aluminium sliding door with 4000mm x 300mm high top hung window above complete with 'wool pile' with 8mm thick clear glass with 30% green tinted, lockset, ironmongeries and other necessary accessories all as per Manufacturer's detail

1800mm x 2400mm High (overall size) aluminium sliding door with 1800mm x 300mm high top hung window above complete with 'wool pile' with 8mm thick clear glass with 30% green tinted, lockset, ironmongeries and other necessary accessories all as per Manufacturer's detail

3000mm x 2400mm High (overall size) aluminium sliding door with 3000mm x 300mm high top hung window above complete with 'wool pile' with 8mm thick clear glass with 30% green tinted, lockset, ironmongeries and other necessary accessories all as per Manufacturer's detail

75mm x 8mm Thick 'SHERA' strip smooth texture architrave complete with pre spray-painted white finishes fixed to brickwall with v-cut edge and approved all jointing materials and approved finish to exposed surfaces

ELEMENT NO. 7 : WINDOW AND DOOR

END UNITAMOUNT

(RM)

64,032.00

4,078.00

2,105.00

3,567.00

1,813.68

Page 82: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/7/82/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 7 : WINDOW AND DOOR

CORNER UNITITEM DESCRIPTION UNIT

(RM)

CARRIED TO COLLECTION

Ironmongeries

Hinges

A HAFELE 489.05.007, 127mm x 89mm butt hinges (H001) No

B HAFELE 921.17.170, 102 x 76 x 2mm thick butt hinge 2bb matt (H002) No

Lock Set

C HAFELE 499.10.084, Mortise Sashlock / T-Turn Cylinder (L002) No

D HAFELE 489.10.057, Mortise Sashlock / T-Turn Cylinder (L003) No

E HAFELE 489.10.281, Entrance Lever Handle Set (L004) No

F HAFELE 489.10.282, Privacy Lever Handle Set (L005) No

Accessories

G HAFELE 489.70.230 Dome Shape Floor Mounted Stopper (A001) No

H HAFELE 489.70.220 Door stopper with hook (A002) No

J HAFELE 151.35.208, Rectangular Flush Pull No

Sliding Fitting

K HAFELE SLD02, Sliding Door Fitting Silent 100/A No

Supply and fix the following approved medium range ironmongeries including providing requisite matching screw as described.

ELEMENT NO. 7 : WINDOW AND DOOR

END UNITAMOUNT

(RM)

11,563.68

312.00

484.00

430.00

212.00

500.00

708.00

108.00

108.00

57.00

311.00

Page 83: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/7/83/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 7 : WINDOW AND DOOR

CORNER UNITITEM DESCRIPTION UNIT

(RM)

CARRIED TO COLLECTION

Collection :

A From Page No. BQ.G2B/3/7/1/12 -

B From Page No. BQ.G2B/3/7/2/12 -

C From Page No. BQ.G2B/3/7/3/12 -

D From Page No. BQ.G2B/3/7/4/12 -

E From Page No. BQ.G2B/3/7/5/12 -

F From Page No. BQ.G2B/3/7/6/12 -

G -

H -

J From Page No. BQ.G2B/3/7/9/12 -

From Page No. BQ.G2B/3/7/7/12 - Add.01

From Page No. BQ.G2B/3/7/8/12 - Add.01

ELEMENT NO. 7 : WINDOW AND DOOR

END UNITAMOUNT

(RM)

3,230.00

-

8,012.00

12,263.00

3,902.00

3,324.60

5,201.00

3,864.00

4,066.00

64,032.00

Page 84: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/7/84/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 7 : WINDOW AND DOOR

CORNER UNITITEM DESCRIPTION UNIT

(RM)K From Page No. BQ.G2B/3/7/10/12 -

L -

TOTAL CARRIED TO SUMMARY

From Page No. BQ.G2B/3/7/11/12 - Add.01

ELEMENT NO. 7 : WINDOW AND DOOR

END UNITAMOUNT

(RM)11,563.68

3,230.00

119,458.28

Page 85: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/8/85/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 8 : INTERNAL WALL & PARTITION

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

Brickwork

A

M2 79.00 66.00 5,214.00 120.00 9,480.00 66.00

B

M2 31.50 231.00 7,276.50 226.00 7,119.00 231.00

CM 2.00 11.00 22.00 22.00 44.00 11.00

DM 1.00 31.00 31.00 27.00 27.00 31.00

E

No 1.00 535.00 535.00 623.00 623.00 535.00

Brickwall Projection

F

M2 77.50 9.70 751.75 9.70 751.75 9.70

Box-up To Cover Pipe at Toilet

G

No 210.00 1.00 210.00 1.00 210.00 1.00

H 1200mm x 3300mm high ditto No 350.00 1.00 350.00 1.00 350.00 1.00

J 2000mm x 3300mm high ditto No 535.00 1.00 535.00 1.00 535.00 1.00

TOTAL CARRIED TO SUMMARY 14,925.25 19,139.75

230mm Thick clay brick wall laid on cement and sand mortar (1:3) mortar with an approved plasticiser including layer of exmet at every fourth courses as described party wall (Bomba's Approved)

150mm Thick cement and sand brickwall laid on cement and sand mortar (1:3) mortar with an approved plasticiser as described including layer of exmet at every fourth courses as described

230mm Wide approved hessian based bituminous felt damp proof course to B.S 743 as described

110mm Wide approved hessian based bituminous felt damp proof course to B.S 743 as described

6mm Diameter x 450mm Diameter long mild steel bar to B.S 15 as described bonding tie with one end built into brickwork and the other end cast into concrete including forming perforation into formwork

Construct and complete 100mm thick brickwall laid on cement and sand mortar (1:3) mortar with an approved plasticiser as described projection complete with approved finishes and other necessary works all as per Architect's approval

600mm x 3300mm high box-up to pipe constructed from 110mm thick common cement and sand brickwall laid on cement and sand mortar (1:3) mortar with an approved plasticiser including layer of exmet at every fourth courses including layer of exmet at every fourth courses including 20mm thick plastering, painting etc all to Architect's approval

Page 86: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/8/86/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 8 : INTERNAL WALL & PARTITION

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

Page 87: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/8/87/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 8 : INTERNAL WALL & PARTITION

CORNER UNITITEM DESCRIPTION UNIT

(RM)

Brickwork

A

M2

B

M2

CM

DM

E

No

Brickwall Projection

F

M2

Box-up To Cover Pipe at Toilet

G

No

H 1200mm x 3300mm high ditto No

J 2000mm x 3300mm high ditto No

TOTAL CARRIED TO SUMMARY

230mm Thick clay brick wall laid on cement and sand mortar (1:3) mortar with an approved plasticiser including layer of exmet at every fourth courses as described party wall (Bomba's Approved)

150mm Thick cement and sand brickwall laid on cement and sand mortar (1:3) mortar with an approved plasticiser as described including layer of exmet at every fourth courses as described

230mm Wide approved hessian based bituminous felt damp proof course to B.S 743 as described

110mm Wide approved hessian based bituminous felt damp proof course to B.S 743 as described

6mm Diameter x 450mm Diameter long mild steel bar to B.S 15 as described bonding tie with one end built into brickwork and the other end cast into concrete including forming perforation into formwork

Construct and complete 100mm thick brickwall laid on cement and sand mortar (1:3) mortar with an approved plasticiser as described projection complete with approved finishes and other necessary works all as per Architect's approval

600mm x 3300mm high box-up to pipe constructed from 110mm thick common cement and sand brickwall laid on cement and sand mortar (1:3) mortar with an approved plasticiser including layer of exmet at every fourth courses including layer of exmet at every fourth courses including 20mm thick plastering, painting etc all to Architect's approval

ELEMENT NO. 8 : INTERNAL WALL & PARTITION

END UNIT AMOUNT

(RM)

5,214.00

7,276.50

22.00

31.00

535.00

751.75

210.00

350.00

535.00

14,925.25

Page 88: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/8/88/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 8 : INTERNAL WALL & PARTITION

CORNER UNITITEM DESCRIPTION UNIT

(RM)

ELEMENT NO. 8 : INTERNAL WALL & PARTITION

END UNIT AMOUNT

(RM)

Page 89: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/9/89/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 9 : INTERNAL FLOOR FINISHES

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

A 20mm thick to receive floor tiles M2 14.00 145.40 2,035.60 141.80 1,985.20 145.40

B 20mm thick to drop 25mm high M 1.00 9.00 9.00 9.00 9.00 9.00

C 20mm thick to drop 50mm high M 1.00 19.00 19.00 20.00 20.00 19.00

D 20mm thick to drop 100mm high M 2.00 24.00 48.00 31.00 62.00 24.00

Cement and sand (1:3) rendering as smooth surface level as described

E 25mm thick to receive engineered timber floor M2 20.00 102.00 2,040.00 102.00 2,040.00 102.00

F 600mm x 600mm x 9.5mm thick to floor (Lucido GMA 02 Carolina) M2 74.00 115.80 8,569.20 112.20 8,302.80 115.80

G 50mm High to drop M 13.20 1.00 13.20 4.00 52.80 1.00

H 100mm High to drop M 17.10 22.00 376.20 22.00 376.20 22.00

CARRIED TO COLLECTION 13,110.20 12,848.00

Cement and sand (1:3) bonded screed as backing screed, tamped finish to received bedding as described

Selected 'NIRO' or approved equivalent polished porcelain tiles including tile trim as described, cut to varies approved size and shape to form motif and pattern, bedded, jointed, cement adhesive and pointed in match coloured cement mortar (1:3) and laid in approved pattern as described all as per Architect's satisfaction

Page 90: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/9/90/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 9 : INTERNAL FLOOR FINISHES

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

A 300mm x 600mm x 7.5mm Thick to floor (Rastik GRK 01 - Avorio) M2 78.00 8.40 655.20 8.40 655.20 8.40

B 25mm High to drop M 10.50 3.00 31.50 3.00 31.50 3.00

C 50mm High to drop M 11.70 9.00 105.30 8.00 93.60 9.00

D 100mm High to drop M 14.10 2.00 28.20 9.00 126.90 2.00

E 300mm x 600mm x 7.5mm Thick to floor (Marmo GMA 24 - White) M2 88.00 6.40 563.20 6.40 563.20 6.40

F 50mm High to drop M 12.20 4.00 48.80 2.00 24.40 4.00

G 300mm x 300mm x 7.5mm Thick to floor (Granite Series GG 200 - Bianca) M2 62.00 8.10 502.20 8.10 502.20 8.10

H 25mm High to drop M 10.90 2.00 21.80 2.00 21.80 2.00

J 50mm High to drop M 12.50 1.00 12.50 2.00 25.00 1.00

K 300mm x 600mm x 7.5mm Thick to floor (Granite Stone GGS 15) M2 111.00 4.80 532.80 4.80 532.80 4.80

L 25mm High to drop M 11.30 2.00 22.60 2.00 22.60 2.00

M 50mm High to drop M 13.40 2.00 26.80 1.00 13.40 2.00

N 150mm x 600mm x 10mm Thick to floor (Eco Foresta GDW 12) M2 148.00 1.90 281.20 1.90 281.20 1.90

P 25mm High to drop M 15.20 2.00 30.40 2.00 30.40 2.00

Q 50mm High to drop M 18.10 2.00 36.20 3.00 54.30 2.00

Selected 'NIRO' or approved equivalent non-slip polished porcelain tiles including tile trim as described, cut to varies approved size and shape to form motif and pattern, bedded, jointed, cement adhesive and pointed in match coloured cement mortar (1:3) and laid in approved pattern as described all as per Architect's satisfaction

Page 91: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/9/91/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 9 : INTERNAL FLOOR FINISHES

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)CARRIED TO COLLECTION 2,898.70 2,978.50

A

M 13.20 116.30 1,535.16 119.90 1,582.68 116.30

BM 89.00 5.70 507.30 5.70 507.30 5.70

Dividing Strip

CM 48.00 5.70 273.60 5.70 273.60 5.70

…………………………………………………….

D

M2 19.00 32.90 625.10 32.90 625.10 32.90

E Ditto, to vertical surface 300mm high M 8.00 47.10 376.80 47.10 376.80 47.10

75mm x 8mm Thick 'SHERA' strip smooth V-cut skirting fixed to brickwall with and approved all jointing materials and two layer finish to exposed surfaces

300mm x 300mm x 12mm thick terracota nosing tiles with and approved all jointing materials cut to size all as per Architect's approval

5mm Thick stainless steel dividing strip inserted in hairline finish to divide floor material all as per Architect's approval

Prepare and apply two coats of 'SIKA' Top Seal 107 cementitious waterproofing system to floor/wall joint at 150mm wide away from the wall and 300mm high upturn skirting for all except 1500mm high upturn at shower area incorporating fibreglass matt reinforcement in between coat all as per Manufacturer's instructions to exposed surfaces of concrete slab

Note: Applicator for waterproofing works shall be from approved applicator with ten (10) years warranty

Page 92: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/9/92/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 9 : INTERNAL FLOOR FINISHES

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

CARRIED TO COLLECTION 3,317.96 3,365.48

Collection :

A From Page No. BQ.G2B/3/9/1/4 - - - 13,110.20 - 12,848.00 -

B From Page No. BQ.G2B/3/9/2/4 - - - 2,898.70 - 2,978.50 -

C From Page No. BQ.G2B/3/9/3/4 - - - 3,317.96 - 3,365.48 -

Page 93: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/9/93/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 9 : INTERNAL FLOOR FINISHES

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

TOTAL CARRIED TO SUMMARY 19,326.86 19,191.98

Page 94: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/9/94/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 9 : INTERNAL FLOOR FINISHES

CORNER UNITITEM DESCRIPTION UNIT

(RM)

A 20mm thick to receive floor tiles M2

B 20mm thick to drop 25mm high M

C 20mm thick to drop 50mm high M

D 20mm thick to drop 100mm high M

Cement and sand (1:3) rendering as smooth surface level as described

E 25mm thick to receive engineered timber floor M2

F 600mm x 600mm x 9.5mm thick to floor (Lucido GMA 02 Carolina) M2

G 50mm High to drop M

H 100mm High to drop M

CARRIED TO COLLECTION

Cement and sand (1:3) bonded screed as backing screed, tamped finish to received bedding as described

Selected 'NIRO' or approved equivalent polished porcelain tiles including tile trim as described, cut to varies approved size and shape to form motif and pattern, bedded, jointed, cement adhesive and pointed in match coloured cement mortar (1:3) and laid in approved pattern as described all as per Architect's satisfaction

ELEMENT NO. 9 : INTERNAL FLOOR FINISHES

END UNITAMOUNT

(RM)

2,035.60

9.00

19.00

48.00

2,040.00

8,569.20

13.20

376.20

13,110.20

Page 95: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/9/95/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 9 : INTERNAL FLOOR FINISHES

CORNER UNITITEM DESCRIPTION UNIT

(RM)

A 300mm x 600mm x 7.5mm Thick to floor (Rastik GRK 01 - Avorio) M2

B 25mm High to drop M

C 50mm High to drop M

D 100mm High to drop M

E 300mm x 600mm x 7.5mm Thick to floor (Marmo GMA 24 - White) M2

F 50mm High to drop M

G 300mm x 300mm x 7.5mm Thick to floor (Granite Series GG 200 - Bianca) M2

H 25mm High to drop M

J 50mm High to drop M

K 300mm x 600mm x 7.5mm Thick to floor (Granite Stone GGS 15) M2

L 25mm High to drop M

M 50mm High to drop M

N 150mm x 600mm x 10mm Thick to floor (Eco Foresta GDW 12) M2

P 25mm High to drop M

Q 50mm High to drop M

Selected 'NIRO' or approved equivalent non-slip polished porcelain tiles including tile trim as described, cut to varies approved size and shape to form motif and pattern, bedded, jointed, cement adhesive and pointed in match coloured cement mortar (1:3) and laid in approved pattern as described all as per Architect's satisfaction

ELEMENT NO. 9 : INTERNAL FLOOR FINISHES

END UNITAMOUNT

(RM)

655.20

31.50

105.30

28.20

563.20

48.80

502.20

21.80

12.50

532.80

22.60

26.80

281.20

30.40

36.20

Page 96: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/9/96/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 9 : INTERNAL FLOOR FINISHES

CORNER UNITITEM DESCRIPTION UNIT

(RM)CARRIED TO COLLECTION

A

M

BM

Dividing Strip

CM

…………………………………………………….

D

M2

E Ditto, to vertical surface 300mm high M

75mm x 8mm Thick 'SHERA' strip smooth V-cut skirting fixed to brickwall with and approved all jointing materials and two layer finish to exposed surfaces

300mm x 300mm x 12mm thick terracota nosing tiles with and approved all jointing materials cut to size all as per Architect's approval

5mm Thick stainless steel dividing strip inserted in hairline finish to divide floor material all as per Architect's approval

Prepare and apply two coats of 'SIKA' Top Seal 107 cementitious waterproofing system to floor/wall joint at 150mm wide away from the wall and 300mm high upturn skirting for all except 1500mm high upturn at shower area incorporating fibreglass matt reinforcement in between coat all as per Manufacturer's instructions to exposed surfaces of concrete slab

Note: Applicator for waterproofing works shall be from approved applicator with ten (10) years warranty

ELEMENT NO. 9 : INTERNAL FLOOR FINISHES

END UNITAMOUNT

(RM)2,898.70

1,535.16

507.30

273.60

625.10

376.80

Page 97: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/9/97/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 9 : INTERNAL FLOOR FINISHES

CORNER UNITITEM DESCRIPTION UNIT

(RM)

CARRIED TO COLLECTION

Collection :

A From Page No. BQ.G2B/3/9/1/4 -

B From Page No. BQ.G2B/3/9/2/4 -

C From Page No. BQ.G2B/3/9/3/4 -

ELEMENT NO. 9 : INTERNAL FLOOR FINISHES

END UNITAMOUNT

(RM)

3,317.96

13,110.20

2,898.70

3,317.96

Page 98: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/9/98/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 9 : INTERNAL FLOOR FINISHES

CORNER UNITITEM DESCRIPTION UNIT

(RM)

TOTAL CARRIED TO SUMMARY

ELEMENT NO. 9 : INTERNAL FLOOR FINISHES

END UNITAMOUNT

(RM)

19,326.86

Page 99: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/10/99/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 10 : INTERNAL CEILING FINISHES

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

A 4.5mm Thick to soffit of concrete slab and the likes M2 7.50 105.30 789.75 105.30 789.75 105.30

B Flat ceiling surfaces M2 37.00 116.70 4,317.90 116.70 4,317.90 116.70

C No 75.00 3.00 225.00 3.00 225.00 3.00

D Item - - 2,400.00 - 2,400.00 -

E Flat ceiling surfaces M2 49.00 36.00 1,764.00 36.00 1,764.00 36.00

CARRIED TO COLLECTION 9,496.65 9,496.65

Approved skim coat coating as described exceeding 3.50m but not exceeding 5.00m High finish with wooden float :-

9mm thick 'GYPROC' Topline or approved equivalent as described plasterboard ceiling to be screw fixed complete with 'GYPROC' Casoline SL35 Concealed Celing System comprise of Gypframe SL35 secondary channels spaced at 400mm centres secured onto Gypframe SL35 primary channels spaced at 1000mm centres and fix to and including Gypframe SL35 ceiling hanger to soffit of slab or fixed to roof truss, ceiling perimeter to be secured with Gypframe SL35 wall angle, board joints to be secured with Gyproc Paper Tape and finished with Protop Joint Compound, providing openings for light fittings and the like :-

Extra Over; 610mm x 610mm x 9mm thick access panel

Extra Over; 20mm x 38mm deep aluminium channel perimeter shadowline

9mm thick 'GYPROC' Aqualine or approved equivalent as described moisture resistant plasterboard ceiling to be screw fixed complete with 'GYPROC' Casoline SL35 Concealed Celing System comprise of Gypframe SL35 secondary channels spaced at 400mm centres secured onto Gypframe SL35 primary channels spaced at 1000mm centres and fix to and including Gypframe SL35 ceiling hanger to soffit of slab or fixed to roof truss, ceiling perimeter to be secured with Gypframe SL35 wall angle, board joints to be secured with Gyproc Paper Tape and finished with Protop Joint Compound, providing openings for light fittings and the like :-

Page 100: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/10/100/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 10 : INTERNAL CEILING FINISHES

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

A Surface of skim coated ceiling M2 6.00 105.30 631.80 105.30 631.80 105.30

B Surface of plasterboard ceiling M2 6.00 116.70 700.20 116.70 700.20 116.70

C Surface of moisture resistant plasterboard ceiling M2 6.00 36.00 216.00 36.00 216.00 36.00

(Warranty deem to be include commencing from completion of the work)

Prepare and apply one coat approved alkali resisting primer sealer and two coats 'ICI' or other equal and approved emulsion paint as described :

Note: applicator for painting works shall be from approved applicator paint supplier with five (5) years warranty

Page 101: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/10/101/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 10 : INTERNAL CEILING FINISHES

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)CARRIED TO COLLECTION 1,548.00 1,548.00

Collection :

A From Page No. BQ.G2B/3/10/1/3 - - - 9,496.65 - 9,496.65 -

B From Page No. BQ.G2B/3/10/2/3 - - - 1,548.00 - 1,548.00 -

Page 102: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/10/102/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 10 : INTERNAL CEILING FINISHES

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

TOTAL CARRIED TO SUMMARY 11,044.65 11,044.65

Page 103: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/10/103/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 10 : INTERNAL CEILING FINISHES

CORNER UNITITEM DESCRIPTION UNIT

(RM)

A 4.5mm Thick to soffit of concrete slab and the likes M2

B Flat ceiling surfaces M2

C No

D Item

E Flat ceiling surfaces M2

CARRIED TO COLLECTION

Approved skim coat coating as described exceeding 3.50m but not exceeding 5.00m High finish with wooden float :-

9mm thick 'GYPROC' Topline or approved equivalent as described plasterboard ceiling to be screw fixed complete with 'GYPROC' Casoline SL35 Concealed Celing System comprise of Gypframe SL35 secondary channels spaced at 400mm centres secured onto Gypframe SL35 primary channels spaced at 1000mm centres and fix to and including Gypframe SL35 ceiling hanger to soffit of slab or fixed to roof truss, ceiling perimeter to be secured with Gypframe SL35 wall angle, board joints to be secured with Gyproc Paper Tape and finished with Protop Joint Compound, providing openings for light fittings and the like :-

Extra Over; 610mm x 610mm x 9mm thick access panel

Extra Over; 20mm x 38mm deep aluminium channel perimeter shadowline

9mm thick 'GYPROC' Aqualine or approved equivalent as described moisture resistant plasterboard ceiling to be screw fixed complete with 'GYPROC' Casoline SL35 Concealed Celing System comprise of Gypframe SL35 secondary channels spaced at 400mm centres secured onto Gypframe SL35 primary channels spaced at 1000mm centres and fix to and including Gypframe SL35 ceiling hanger to soffit of slab or fixed to roof truss, ceiling perimeter to be secured with Gypframe SL35 wall angle, board joints to be secured with Gyproc Paper Tape and finished with Protop Joint Compound, providing openings for light fittings and the like :-

ELEMENT NO. 10 : INTERNAL CEILING FINISHES

END UNITAMOUNT

(RM)

789.75

4,317.90

225.00

2,400.00

1,764.00

9,496.65

Page 104: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/10/104/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 10 : INTERNAL CEILING FINISHES

CORNER UNITITEM DESCRIPTION UNIT

(RM)

A Surface of skim coated ceiling M2

B Surface of plasterboard ceiling M2

C Surface of moisture resistant plasterboard ceiling M2

(Warranty deem to be include commencing from completion of the work)

Prepare and apply one coat approved alkali resisting primer sealer and two coats 'ICI' or other equal and approved emulsion paint as described :

Note: applicator for painting works shall be from approved applicator paint supplier with five (5) years warranty

ELEMENT NO. 10 : INTERNAL CEILING FINISHES

END UNITAMOUNT

(RM)

631.80

700.20

216.00

Page 105: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/10/105/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 10 : INTERNAL CEILING FINISHES

CORNER UNITITEM DESCRIPTION UNIT

(RM)CARRIED TO COLLECTION

Collection :

A From Page No. BQ.G2B/3/10/1/3 -

B From Page No. BQ.G2B/3/10/2/3 -

ELEMENT NO. 10 : INTERNAL CEILING FINISHES

END UNITAMOUNT

(RM)1,548.00

9,496.65

1,548.00

Page 106: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/10/106/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 10 : INTERNAL CEILING FINISHES

CORNER UNITITEM DESCRIPTION UNIT

(RM)

TOTAL CARRIED TO SUMMARY

ELEMENT NO. 10 : INTERNAL CEILING FINISHES

END UNITAMOUNT

(RM)

11,044.65

Page 107: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/11/107/164 - Add.02

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 11 : INTERNAL WALL FINISHES

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

A 25mm Thick plainface walls, beams, columns and the likes M2 23.00 707.20 16,265.60 723.70 16,645.10 707.20

B Item - - 1,800.00 - 1,800.00 -

CM2 117.00 27.90 3,264.30 30.40 3,556.80 27.90

DM2 128.00 37.10 4,748.80 37.10 4,748.80 37.10

EM2 306.00 5.00 1,530.00 5.00 1,530.00 5.00

FM2 79.00 23.20 1,832.80 23.20 1,832.80 23.20

GM2 95.00 57.40 5,453.00 57.40 5,453.00 57.40

CARRIED TO COLLECTION 34,894.50 35,566.50

Cement and sand (1:6) mixed with and approved plasticiser with wooden float as described

Extra Over PVC edge beading fixed to position

Selected 'NIRO' or approved equivalent polished porcelain wall tiles including tile trim as described, cut to varies approved size and shape to form motif and pattern or feature, bedded, jointed, cement adhesive and pointed in match coloured cement lining on 20mm thick cement and sand (1:3) backing screed and laid in approved pattern as described all as per Architect's satisfaction

300mm x 600mm x 7.5mm thick to wall, column and the like (Marmo GMA 24 - White)

300mm x 600mm x 7.5mm thick to wall, column and the like (Granite Stone GGS 15 - Brick Lay)

300mm x 300mm x 7.5mm thick to wall, column and the like (Granite Stone GGS 15 - Mosaic Cut)

300mm x 300mm x 7.5mm thick to wall, column and the like (Granite Series GG 200)

300mm x 600mm x 7.5mm thick to wall, column and the like (Rastik GRK 01 - Avorio [Brick Lay])

Page 108: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/11/108/164 - Add.02

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 11 : INTERNAL WALL FINISHES

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

A Plastered surfaces of walls, beams, columns and the likes M2 6.00 707.20 4,243.20 723.70 4,342.20 707.20

(Warranty deem to be include commencing from completion of the work)

…………………………………………………….

B

M2 19.00 19.00 361.00 19.00 361.00 19.00

Prepare and apply one coat approved alkali resisting primer sealer and two coats 'ICI' or other equal and approved emulsion paint as described :

Note: applicator for painting works shall be from approved applicator paint supplier with five (5) years warranty

Prepare and apply two coats of 'SIKA' Top Seal 107 cementitious waterproofing system to surface fo wall all as per Manufacturer's instructions and Architect's approval

Note: Applicator for waterproofing works shall be from approved applicator with ten (10) years warranty

Page 109: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/11/109/164 - Add.02

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 11 : INTERNAL WALL FINISHES

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)CARRIED TO COLLECTION 4,604.20 4,703.20

Collection :

A - - - 34,894.50 - 35,566.50 -

B - - - 4,604.20 - 4,703.20 -

From Page No. BQ.G2B/3/11/1/3 - Add.02

From Page No. BQ.G2B/3/11/2/3 - Add.02

Page 110: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/11/110/164 - Add.02

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 11 : INTERNAL WALL FINISHES

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

TOTAL CARRIED TO SUMMARY 39,498.70 40,269.70

Page 111: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/11/111/164 - Add.02

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 11 : INTERNAL WALL FINISHES

CORNER UNITITEM DESCRIPTION UNIT

(RM)

A 25mm Thick plainface walls, beams, columns and the likes M2

B Item

CM2

DM2

EM2

FM2

GM2

CARRIED TO COLLECTION

Cement and sand (1:6) mixed with and approved plasticiser with wooden float as described

Extra Over PVC edge beading fixed to position

Selected 'NIRO' or approved equivalent polished porcelain wall tiles including tile trim as described, cut to varies approved size and shape to form motif and pattern or feature, bedded, jointed, cement adhesive and pointed in match coloured cement lining on 20mm thick cement and sand (1:3) backing screed and laid in approved pattern as described all as per Architect's satisfaction

300mm x 600mm x 7.5mm thick to wall, column and the like (Marmo GMA 24 - White)

300mm x 600mm x 7.5mm thick to wall, column and the like (Granite Stone GGS 15 - Brick Lay)

300mm x 300mm x 7.5mm thick to wall, column and the like (Granite Stone GGS 15 - Mosaic Cut)

300mm x 300mm x 7.5mm thick to wall, column and the like (Granite Series GG 200)

300mm x 600mm x 7.5mm thick to wall, column and the like (Rastik GRK 01 - Avorio [Brick Lay])

ELEMENT NO. 11 : INTERNAL WALL FINISHES

END UNITAMOUNT

(RM)

16,265.60

1,800.00

3,264.30

4,748.80

1,530.00

1,832.80

5,453.00

34,894.50

Page 112: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/11/112/164 - Add.02

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 11 : INTERNAL WALL FINISHES

CORNER UNITITEM DESCRIPTION UNIT

(RM)

A Plastered surfaces of walls, beams, columns and the likes M2

(Warranty deem to be include commencing from completion of the work)

…………………………………………………….

B

M2

Prepare and apply one coat approved alkali resisting primer sealer and two coats 'ICI' or other equal and approved emulsion paint as described :

Note: applicator for painting works shall be from approved applicator paint supplier with five (5) years warranty

Prepare and apply two coats of 'SIKA' Top Seal 107 cementitious waterproofing system to surface fo wall all as per Manufacturer's instructions and Architect's approval

Note: Applicator for waterproofing works shall be from approved applicator with ten (10) years warranty

ELEMENT NO. 11 : INTERNAL WALL FINISHES

END UNITAMOUNT

(RM)

4,243.20

361.00

Page 113: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/11/113/164 - Add.02

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 11 : INTERNAL WALL FINISHES

CORNER UNITITEM DESCRIPTION UNIT

(RM)CARRIED TO COLLECTION

Collection :

A -

B -

From Page No. BQ.G2B/3/11/1/3 - Add.02

From Page No. BQ.G2B/3/11/2/3 - Add.02

ELEMENT NO. 11 : INTERNAL WALL FINISHES

END UNITAMOUNT

(RM)4,604.20

34,894.50

4,604.20

Page 114: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/11/114/164 - Add.02

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 11 : INTERNAL WALL FINISHES

CORNER UNITITEM DESCRIPTION UNIT

(RM)

TOTAL CARRIED TO SUMMARY

ELEMENT NO. 11 : INTERNAL WALL FINISHES

END UNITAMOUNT

(RM)

39,498.70

Page 115: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/12/115/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 12 : EXTERNAL FINISHES

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

Floor

A 20mm thick to receive floor tiles M2 14.00 24.20 338.80 13.50 189.00 24.20

B 20mm thick to drop 50mm high M 1.00 25.00 25.00 15.00 15.00 25.00

C 25mm Thick to floor M2 20.00 50.80 1,016.00 36.60 732.00 50.80

D 300mm x 600mm x 7.5mm Thick to floor (Rastik GRK 03) M2 78.00 24.20 1,887.60 13.50 1,053.00 24.20

E 50mm High to drop M 11.70 25.00 292.50 15.00 175.50 25.00

…………………………………………………….

F

M 13.20 7.00 92.40 4.00 52.80 7.00

G

M2 30.00 50.90 1,527.00 49.20 1,476.00 50.90

CARRIED TO COLLECTION 5,179.30 3,693.30

Cement and sand (1:3) bonded screed as backing screed, tamped finish to received bedding as described

Cement and sand (1:6) rendering trowelled finish as smooth surfaces as described

Selected 'NIRO' or approved equivalent polished porcelain tiles including tile trim as described, cut to varies approved size and shape to form motif and pattern, bedded, jointed, cement adhesive and pointed in match coloured cement mortar (1:3) and laid in approved pattern as described all as per Architect's satisfaction

75mm x 8mm Thick 'SHERA' strip smooth V-cut skirting fixed to brickwall with and approved all jointing materials and two layer finish to exposed surfaces

Approved 100mm thick stamp concrete finished as described to concrete slab including dry shake colour hardener and colour release and embross to a required pattern all as per Manufacturer's instruction and Architect's satisfaction

Page 116: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/12/116/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 12 : EXTERNAL FINISHES

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

Floor (Cont"d)

A

M2 19.00 50.80 965.20 36.60 695.40 50.80

Prepare and apply two coats of 'SIKA' Top Seal 107 cementitious waterproofing system to floor/wall joint at 150mm wide away from the wall and 300mm high upturn skirting incorporating fibreglass matt reinforcement in between coat all as per manufacturer's instructions to exposed surfaces of concrete slab

Note: Applicator for waterproofing works shall be from approved applicator with ten (10) years warranty

Page 117: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/12/117/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 12 : EXTERNAL FINISHES

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)CARRIED TO COLLECTION 965.20 695.40

Ceiling

A 4.5mm Thick to soffit of concrete slab and the likes M2 7.50 114.60 859.50 92.50 693.75 114.60

B Flat ceiling surfaces M2 58.00 62.50 3,625.00 62.50 3,625.00 62.50

C Surface of skim coat M2 8.50 114.60 974.10 92.50 786.25 114.60

D Surface of plasterboard ceiling M2 8.50 62.50 531.25 62.50 531.25 62.50

(Warranty deem to be include commencing from completion of the work)

Approved skim coat coating as described exceeding 3.50m but not exceeding 5.00m High finish with wooden float :-

'HUME' Primaflex or approved equivalent 4.5mm thick suspended water resistant plasterboard ceiling complete with decorative cornice set out symmetrically from centre of room and fix to and including 12mm x 32mm x 0.4mm ceiling batten ramset to soffit of slab or fixed to roof truss, hanging rod 12mm diameter 1200mm c/c, T bar, aluminium step slip mould fastened to wall and the other end fixed to concrete soffits or to roof trusses including 12mm x 32mm x 0.4mm ceiling batten, providing openings for light fittings and the like :-

Prepare and apply one coat approved alkali resisting sealer and two coats 'ICI' or other equal and approved Weathershield and Pentalite / Acrylic) as described :

Note: applicator for painting works shall be from approved applicator paint supplier with five (5) years warranty

Page 118: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/12/118/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 12 : EXTERNAL FINISHES

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

CARRIED TO COLLECTION 5,989.85 5,636.25

Wall

A 25mm Thick plainface to walls, beams, columns and the likes M2 22.50 265.00 5,962.50 158.00 3,555.00 265.00

B Item - - 800.00 - 800.00 -

Wall Cladding

C

M2 168.00 51.30 8,618.40 - - 51.30

D Plastered surfaces of walls, beams, columns and the likes M2 8.50 265.00 2,252.50 158.00 1,343.00 265.00

(Warranty deem to be include commencing from completion of the work)

D M2

Cement and sand (1:6) mixed with and approved plasticiser with wooden float as described

Extra Over PVC edge beading fixed to position

150mm x 9mm Thick 'HUME' Primaplank Shiplap Cladding as described wall cladding to be fixed to brickwall complete with all necessary jointing, connection and approved weathercoat painted finish all as per Architect's detail drawing and approval

Prepare and apply one coat approved alkali resisting sealer and two coats 'ICI' or other equal and approved Weathershield and Pentalite / Acrylic) as described :

Note: applicator for painting works shall be from approved applicator paint supplier with five (5) years warranty

Page 119: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/12/119/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 12 : EXTERNAL FINISHES

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

CARRIED TO COLLECTION 17,633.40 5,698.00

Collection :

A From Page No. BQ.G2B/3/12/1/5 - - - 5,179.30 - 3,693.30 -

B From Page No. BQ.G2B/3/12/2/5 - - - 965.20 - 695.40 -

C From Page No. BQ.G2B/3/12/3/5 - - - 5,989.85 - 5,636.25 -

D From Page No. BQ.G2B/3/12/4/5 - - - 17,633.40 - 5,698.00 -

Page 120: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/12/120/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 12 : EXTERNAL FINISHES

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

TOTAL CARRIED TO SUMMARY 29,767.75 15,722.95

Page 121: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/12/121/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 12 : EXTERNAL FINISHES

CORNER UNITITEM DESCRIPTION UNIT

(RM)

Floor

A 20mm thick to receive floor tiles M2

B 20mm thick to drop 50mm high M

C 25mm Thick to floor M2

D 300mm x 600mm x 7.5mm Thick to floor (Rastik GRK 03) M2

E 50mm High to drop M

…………………………………………………….

F

M

G

M2

CARRIED TO COLLECTION

Cement and sand (1:3) bonded screed as backing screed, tamped finish to received bedding as described

Cement and sand (1:6) rendering trowelled finish as smooth surfaces as described

Selected 'NIRO' or approved equivalent polished porcelain tiles including tile trim as described, cut to varies approved size and shape to form motif and pattern, bedded, jointed, cement adhesive and pointed in match coloured cement mortar (1:3) and laid in approved pattern as described all as per Architect's satisfaction

75mm x 8mm Thick 'SHERA' strip smooth V-cut skirting fixed to brickwall with and approved all jointing materials and two layer finish to exposed surfaces

Approved 100mm thick stamp concrete finished as described to concrete slab including dry shake colour hardener and colour release and embross to a required pattern all as per Manufacturer's instruction and Architect's satisfaction

ELEMENT NO. 12 : EXTERNAL FINISHES

END UNITAMOUNT

(RM)

338.80

25.00

1,016.00

1,887.60

292.50

92.40

1,527.00

5,179.30

Page 122: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/12/122/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 12 : EXTERNAL FINISHES

CORNER UNITITEM DESCRIPTION UNIT

(RM)

Floor (Cont"d)

A

M2

Prepare and apply two coats of 'SIKA' Top Seal 107 cementitious waterproofing system to floor/wall joint at 150mm wide away from the wall and 300mm high upturn skirting incorporating fibreglass matt reinforcement in between coat all as per manufacturer's instructions to exposed surfaces of concrete slab

Note: Applicator for waterproofing works shall be from approved applicator with ten (10) years warranty

ELEMENT NO. 12 : EXTERNAL FINISHES

END UNITAMOUNT

(RM)

965.20

Page 123: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/12/123/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 12 : EXTERNAL FINISHES

CORNER UNITITEM DESCRIPTION UNIT

(RM)CARRIED TO COLLECTION

Ceiling

A 4.5mm Thick to soffit of concrete slab and the likes M2

B Flat ceiling surfaces M2

C Surface of skim coat M2

D Surface of plasterboard ceiling M2

(Warranty deem to be include commencing from completion of the work)

Approved skim coat coating as described exceeding 3.50m but not exceeding 5.00m High finish with wooden float :-

'HUME' Primaflex or approved equivalent 4.5mm thick suspended water resistant plasterboard ceiling complete with decorative cornice set out symmetrically from centre of room and fix to and including 12mm x 32mm x 0.4mm ceiling batten ramset to soffit of slab or fixed to roof truss, hanging rod 12mm diameter 1200mm c/c, T bar, aluminium step slip mould fastened to wall and the other end fixed to concrete soffits or to roof trusses including 12mm x 32mm x 0.4mm ceiling batten, providing openings for light fittings and the like :-

Prepare and apply one coat approved alkali resisting sealer and two coats 'ICI' or other equal and approved Weathershield and Pentalite / Acrylic) as described :

Note: applicator for painting works shall be from approved applicator paint supplier with five (5) years warranty

ELEMENT NO. 12 : EXTERNAL FINISHES

END UNITAMOUNT

(RM)965.20

859.50

3,625.00

974.10

531.25

Page 124: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/12/124/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 12 : EXTERNAL FINISHES

CORNER UNITITEM DESCRIPTION UNIT

(RM)

CARRIED TO COLLECTION

Wall

A 25mm Thick plainface to walls, beams, columns and the likes M2

B Item

Wall Cladding

C

M2

D Plastered surfaces of walls, beams, columns and the likes M2

(Warranty deem to be include commencing from completion of the work)

D M2

Cement and sand (1:6) mixed with and approved plasticiser with wooden float as described

Extra Over PVC edge beading fixed to position

150mm x 9mm Thick 'HUME' Primaplank Shiplap Cladding as described wall cladding to be fixed to brickwall complete with all necessary jointing, connection and approved weathercoat painted finish all as per Architect's detail drawing and approval

Prepare and apply one coat approved alkali resisting sealer and two coats 'ICI' or other equal and approved Weathershield and Pentalite / Acrylic) as described :

Note: applicator for painting works shall be from approved applicator paint supplier with five (5) years warranty

ELEMENT NO. 12 : EXTERNAL FINISHES

END UNITAMOUNT

(RM)

5,989.85

5,962.50

800.00

8,618.40

2,252.50

Page 125: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/12/125/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 12 : EXTERNAL FINISHES

CORNER UNITITEM DESCRIPTION UNIT

(RM)

CARRIED TO COLLECTION

Collection :

A From Page No. BQ.G2B/3/12/1/5 -

B From Page No. BQ.G2B/3/12/2/5 -

C From Page No. BQ.G2B/3/12/3/5 -

D From Page No. BQ.G2B/3/12/4/5 -

ELEMENT NO. 12 : EXTERNAL FINISHES

END UNITAMOUNT

(RM)

17,633.40

5,179.30

965.20

5,989.85

17,633.40

Page 126: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/12/126/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 12 : EXTERNAL FINISHES

CORNER UNITITEM DESCRIPTION UNIT

(RM)

TOTAL CARRIED TO SUMMARY

ELEMENT NO. 12 : EXTERNAL FINISHES

END UNITAMOUNT

(RM)

29,767.75

Page 127: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/13/127/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 13 : SANITARY FITTINGS

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

A

No 917.00 1.00 917.00 1.00 917.00 1.00

B

No 758.00 3.00 2,274.00 3.00 2,274.00 3.00

C

No 416.00 1.00 416.00 1.00 416.00 1.00

D

No 433.00 2.00 866.00 2.00 866.00 2.00

CARRIED TO COLLECTION 4,473.00 4,473.00

Supply and fix the following or other equal and approved sanitary fittings and accessories including storing, assembling, bedding, plugging and screwing with matching screws, cutting and pinning or building in pinning or building in brackets, jointing and connecting to services and to soil and waste pipes and making and making good all works disturbed all as per Manufacturer's specifications and Architect's approval :-

'Johnson Suisse' VENEZIA close coupled washdown pedestal dual outlet btw WC with bottom outlet in vitreous china with 2 pairs fixing bolts, L stand and straight oulet connector complete with 'Venezia' 6.0 litres (single flush) push button activated cistern and lid in vitreous china with plastic internal fittings, 'Venezia' soft close seat and cover, WBFA300704CP 'Galio' chrome plated 0.5" angle valve with wall flange, WBFA300713CP 300mm long 0.5" stainless steel reinforced flexible hose and all other necessary accessories to Architect's approval

'Johnson Suisse' TRIESTE dual outlet btw WC complete with 'Trieste' 6.0 litres cistern with lid and fittings, WBSC950076WW 2 nos. fixing bolts with L stand, WBTS800095WW white ware 'Trieste' soft close seat and cover, WBFA300704CP 'Galio' chrome plated 0.5" angle valve with wall flange, WBFA300713CP 300mm long 0.5" stainless steel reinforced flexible hose and all other necessary accessories to Architect's approval

'Johnson Suisse' LUTON close coupled washdown pedestal WC with horizontal or bottom outlet in vitreous china with 1 pair fixing bolts and straight oulet connector complete with 'Luton' 6.0 litres (single flush) push button activated cistern and lid in vitreous china with plastic internal fittings, 'Luton' white ware soft close seat and cover in matching colour, WBFA300704CP 'Galio' chrome plated 0.5" angle valve with wall flange, WBFA300713CP 300mm long 0.5" stainless steel reinforced flexible hose and all other necessary accessories to Architect's approval

'Johnson Suisse' WBVC950089WW LUCCA 910 white ware counter top basin or other equal complete with WBFT400576CP chrome plated brass bottle trap with 1.25" pop-up waste and jointing to waste pipe including all other necessary accessories to Architect's approval

Page 128: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/13/128/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 13 : SANITARY FITTINGS

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

A

No 269.00 3.00 807.00 3.00 807.00 3.00

B

No 164.00 1.00 164.00 1.00 164.00 1.00

C

No 705.00 1.00 705.00 1.00 705.00 1.00

D

No 285.00 3.00 855.00 3.00 855.00 3.00

E

No 80.00 1.00 80.00 1.00 80.00 1.00

Supply and fix the following or other equal and approved sanitary fittings and accessories including storing, assembling, bedding, plugging and screwing with matching screws, cutting and pinning or building in pinning or building in brackets, jointing and connecting to services and to soil and waste pipes and making and making good all works disturbed all as per Manufacturer's specifications and Architect's approval :- (Cont'd)

'Johnson Suisse' WBFT400099XX AROSA white ware semi recessed vanity basin in vitreous china or other equal complete with 'WST 10 x 120' 1 pair fixing bolts, WBFT400576CP chrome plated brass bottle trap, WBFA300753CP 1.25" brass pop-out waste (push type with overflow) and jointing to waste pipe including all other necessary accessories to Architect's approval

'Johnson Suisse' BOSTON wall-hung wash hand basin in vitreous china or other equal and approved basin size 500mm x 420mm with 'WST 10 x 140' 1 pair fixing bolts and 3 semi-punched tapholes complete with chrome plated bottle trap, 32mm waste, plug and chain and jointing to waste pipe including all other necessary accessories to Architect's approval

'Johnson Suisse' WBFA300706CP NAUTICAL II 220mm dia. size chrome plated fixed rain shower head with single function spray complete with WBFA300664CP 400mm long chrome plated brass shower arm and flange, WBFA300762CP 'Ferla' chrome plated single lever concealed bath shower mixer with diverter, WBFA300557CP 150mm long chrome plated bath spout including all necessary fittings and accessories to Architect's approval

'Johnson Suisse' WBFA300573CP WAVE 140mm dia. size chrome plated fixed shower head with spray, massage and spray-massage functions complete with WBFA300474CP 150mm long chrome plated brass shower arm and flange, WBFA300736CP 'Trevi' chrome plated 0.5' concealed stop valve with 100mm flange, WBFA300660CP 'Trevi' 0.5' long bib tap with flange including all necessary fittings and accessories to Architect's approval

'Johnson Suisse' WBFA300518CP RAVENNA chrome plated concealed shower tap with fixed shower head including all necessary fitting and accessories to Architect's approval

Page 129: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/13/129/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 13 : SANITARY FITTINGS

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)CARRIED TO COLLECTION 2,611.00 2,611.00

ANo 226.00 2.00 452.00 2.00 452.00 2.00

B

No 130.00 3.00 390.00 3.00 390.00 3.00

CNo 66.00 1.00 66.00 1.00 66.00 1.00

D

No 127.00 4.00 508.00 4.00 508.00 4.00

E

No 85.00 1.00 85.00 1.00 85.00 1.00

FNo 80.00 4.00 320.00 4.00 320.00 4.00

G

No 26.50 1.00 26.50 1.00 26.50 1.00

H

No 24.00 1.00 24.00 1.00 24.00 1.00

Supply and fix the following or other equal and approved sanitary fittings and accessories including storing, assembling, bedding, plugging and screwing with matching screws, cutting and pinning or building in pinning or building in brackets, jointing and connecting to services and to soil and waste pipes and making and making good all works disturbed all as per Manufacturer's specifications and Architect's approval :- (Cont'd)

'Johnson Suisse' WBFA300816CP MESSINA chrome plated single lever basin mixer including all other necessary accessories to Architect's approval

'Johnson Suisse' WWBFA300669CP TREVI chrome plated single lever pillar tap with extended spout including all other necessary accessories to Architect's approval

'Johnson Suisse' WBFA300511CP RAVENNA 0.5' chrome plated basin pillar tap including all other necessary accessories to Architect's approval

'Johnson Suisse' WBFA300643CP TREVI chrome plated hand bidet set complete with hand spray, 1200mm long double interlock brass shower hose, WBFA300593CP TREVI 0.5' angle valve with flange, and wall bracket including all necessary fittings and accessories to Architect's approval

'Johnson Suisse' WBFA300660CP TREVI 0.5' chrome plated long bib tap with flange including all necessary fittings and accessories to Architect's approval

'Johnson Suisse' WBBA100163CP RIVOLI brass chrome plated spare paper holder set into tiled wall to Architect's approval

'Johnson Suisse' WBSRTE000WW semi recessed toilet roll holder overall size 165mm x 165mm x 95mm in vitreous china with plastic roller set into tiled wall to Architect's approval

'Johnson Suisse' WBBRSP000WW semi recessed soap dish overall size 165mm x 165mm x 95mm in vitreous china set into tiled wall to Architect's approval

Page 130: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/13/130/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 13 : SANITARY FITTINGS

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

CARRIED TO COLLECTION 1,871.50 1,871.50

ANo 48.00 8.00 384.00 8.00 384.00 8.00

B 150mm x 150mm overall size stainless steel floor trap to Architect's approval No 20.00 3.00 60.00 3.00 60.00 3.00

C

No 147.00 2.00 294.00 2.00 294.00 2.00

D

No 114.00 2.00 228.00 2.00 228.00 2.00

E

No 89.00 3.00 267.00 3.00 267.00 3.00

F

No 67.50 4.00 270.00 4.00 270.00 4.00

G

No 75.50 2.00 151.00 2.00 151.00 2.00

Supply and fix the following or other equal and approved sanitary fittings and accessories including storing, assembling, bedding, plugging and screwing with matching screws, cutting and pinning or building in pinning or building in brackets, jointing and connecting to services and to soil and waste pipes and making and making good all works disturbed all as per Manufacturer's specifications and Architect's approval :- (Cont'd)

'Johnson Suisse' WBFT400654XX chrome plated floor trap marble/ granite/ ceramic tile drainage overall size 130mm x 130mm to Architect's approval

'CAM' Stainless steel kitchen sink single bowl single drainer overall size 42" x 18" complete with 40mm PVC bottle trap including all necessary fittings and accessories to Architect's approval

'Johnson Suisse' WBFA300596CP TREVI chrome plated deck mounted kitchen tap with swivel spout including all necessary fittings and accessories to Architect's approval

'Johnson Suisse' WBFA300661CP TREVI chrome plated washing machine / garden tap including all necessary fittings and accessories to Architect's approval

'Johnson Suisse' WBFA300605CP ASTI 0.5" chrome plated concealed stop valve with flange including all necessary fitting and accessories to Architect's approval

'Johnson Suisse' WBFA300672CP ASTI 0.75" chrome plated concealed stop valve with flange including all necessary fitting and accessories to Architect's approval

Page 131: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/13/131/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 13 : SANITARY FITTINGS

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

CARRIED TO COLLECTION 1,654.00 1,654.00

A 440mm x 590mm (overall size) to be flushed with wall tiles surface No 120.00 1.00 120.00 1.00 120.00 1.00

B 600mm x 800mm (overall size) to be flushed with wall tiles surface No 222.00 3.00 666.00 3.00 666.00 3.00

C 1200mm x 1000mm (overall size) to be flushed with wall tiles surface No 554.00 1.00 554.00 1.00 554.00 1.00

………………………………………………..

D

Item - - 200.00 - 200.00 -

Supply and fix approved equivalent Grade A float glass recessed mirror with sand blast lining and triple bevelled edge, four times drilled for screws, complete with chromium plated sunken counter needle screws and rubber washer and including 6 mm thick water proof plywood backing with painted edges and screwed

On completion of the installation test all apparatus, piping and fittings, make good any defects and leave the whole in perfect working order to the entire satisfaction of the S.O

Page 132: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/13/132/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 13 : SANITARY FITTINGS

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

CARRIED TO COLLECTION 1,540.00 1,540.00

Collection :

A - - - 4,473.00 - 4,473.00 -

B - - - 2,611.00 - 2,611.00 -

C - - - 1,871.50 - 1,871.50 -

D From Page No. BQ.G2B/3/13/4/6 - - - 1,654.00 - 1,654.00 -

E From Page No. BQ.G2B/3/13/5/6 - - - 1,540.00 - 1,540.00 -

From Page No. BQ.G2B/3/13/1/6 - Add.01

From Page No. BQ.G2B/3/13/2/6 - Add.01

From Page No. BQ.G2B/3/13/3/6 - Add.01

Page 133: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/13/133/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 13 : SANITARY FITTINGS

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

TOTAL CARRIED TO SUMMARY 12,149.50 12,149.50

Page 134: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/13/134/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 13 : SANITARY FITTINGS

CORNER UNITITEM DESCRIPTION UNIT

(RM)

A

No

B

No

C

No

D

No

CARRIED TO COLLECTION

Supply and fix the following or other equal and approved sanitary fittings and accessories including storing, assembling, bedding, plugging and screwing with matching screws, cutting and pinning or building in pinning or building in brackets, jointing and connecting to services and to soil and waste pipes and making and making good all works disturbed all as per Manufacturer's specifications and Architect's approval :-

'Johnson Suisse' VENEZIA close coupled washdown pedestal dual outlet btw WC with bottom outlet in vitreous china with 2 pairs fixing bolts, L stand and straight oulet connector complete with 'Venezia' 6.0 litres (single flush) push button activated cistern and lid in vitreous china with plastic internal fittings, 'Venezia' soft close seat and cover, WBFA300704CP 'Galio' chrome plated 0.5" angle valve with wall flange, WBFA300713CP 300mm long 0.5" stainless steel reinforced flexible hose and all other necessary accessories to Architect's approval

'Johnson Suisse' TRIESTE dual outlet btw WC complete with 'Trieste' 6.0 litres cistern with lid and fittings, WBSC950076WW 2 nos. fixing bolts with L stand, WBTS800095WW white ware 'Trieste' soft close seat and cover, WBFA300704CP 'Galio' chrome plated 0.5" angle valve with wall flange, WBFA300713CP 300mm long 0.5" stainless steel reinforced flexible hose and all other necessary accessories to Architect's approval

'Johnson Suisse' LUTON close coupled washdown pedestal WC with horizontal or bottom outlet in vitreous china with 1 pair fixing bolts and straight oulet connector complete with 'Luton' 6.0 litres (single flush) push button activated cistern and lid in vitreous china with plastic internal fittings, 'Luton' white ware soft close seat and cover in matching colour, WBFA300704CP 'Galio' chrome plated 0.5" angle valve with wall flange, WBFA300713CP 300mm long 0.5" stainless steel reinforced flexible hose and all other necessary accessories to Architect's approval

'Johnson Suisse' WBVC950089WW LUCCA 910 white ware counter top basin or other equal complete with WBFT400576CP chrome plated brass bottle trap with 1.25" pop-up waste and jointing to waste pipe including all other necessary accessories to Architect's approval

ELEMENT NO. 13 : SANITARY FITTINGS

END UNITAMOUNT

(RM)

917.00

2,274.00

416.00

866.00

4,473.00

Page 135: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/13/135/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 13 : SANITARY FITTINGS

CORNER UNITITEM DESCRIPTION UNIT

(RM)

A

No

B

No

C

No

D

No

E

No

Supply and fix the following or other equal and approved sanitary fittings and accessories including storing, assembling, bedding, plugging and screwing with matching screws, cutting and pinning or building in pinning or building in brackets, jointing and connecting to services and to soil and waste pipes and making and making good all works disturbed all as per Manufacturer's specifications and Architect's approval :- (Cont'd)

'Johnson Suisse' WBFT400099XX AROSA white ware semi recessed vanity basin in vitreous china or other equal complete with 'WST 10 x 120' 1 pair fixing bolts, WBFT400576CP chrome plated brass bottle trap, WBFA300753CP 1.25" brass pop-out waste (push type with overflow) and jointing to waste pipe including all other necessary accessories to Architect's approval

'Johnson Suisse' BOSTON wall-hung wash hand basin in vitreous china or other equal and approved basin size 500mm x 420mm with 'WST 10 x 140' 1 pair fixing bolts and 3 semi-punched tapholes complete with chrome plated bottle trap, 32mm waste, plug and chain and jointing to waste pipe including all other necessary accessories to Architect's approval

'Johnson Suisse' WBFA300706CP NAUTICAL II 220mm dia. size chrome plated fixed rain shower head with single function spray complete with WBFA300664CP 400mm long chrome plated brass shower arm and flange, WBFA300762CP 'Ferla' chrome plated single lever concealed bath shower mixer with diverter, WBFA300557CP 150mm long chrome plated bath spout including all necessary fittings and accessories to Architect's approval

'Johnson Suisse' WBFA300573CP WAVE 140mm dia. size chrome plated fixed shower head with spray, massage and spray-massage functions complete with WBFA300474CP 150mm long chrome plated brass shower arm and flange, WBFA300736CP 'Trevi' chrome plated 0.5' concealed stop valve with 100mm flange, WBFA300660CP 'Trevi' 0.5' long bib tap with flange including all necessary fittings and accessories to Architect's approval

'Johnson Suisse' WBFA300518CP RAVENNA chrome plated concealed shower tap with fixed shower head including all necessary fitting and accessories to Architect's approval

ELEMENT NO. 13 : SANITARY FITTINGS

END UNITAMOUNT

(RM)

807.00

164.00

705.00

855.00

80.00

Page 136: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/13/136/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 13 : SANITARY FITTINGS

CORNER UNITITEM DESCRIPTION UNIT

(RM)CARRIED TO COLLECTION

ANo

B

No

CNo

D

No

E

No

FNo

G

No

H

No

Supply and fix the following or other equal and approved sanitary fittings and accessories including storing, assembling, bedding, plugging and screwing with matching screws, cutting and pinning or building in pinning or building in brackets, jointing and connecting to services and to soil and waste pipes and making and making good all works disturbed all as per Manufacturer's specifications and Architect's approval :- (Cont'd)

'Johnson Suisse' WBFA300816CP MESSINA chrome plated single lever basin mixer including all other necessary accessories to Architect's approval

'Johnson Suisse' WWBFA300669CP TREVI chrome plated single lever pillar tap with extended spout including all other necessary accessories to Architect's approval

'Johnson Suisse' WBFA300511CP RAVENNA 0.5' chrome plated basin pillar tap including all other necessary accessories to Architect's approval

'Johnson Suisse' WBFA300643CP TREVI chrome plated hand bidet set complete with hand spray, 1200mm long double interlock brass shower hose, WBFA300593CP TREVI 0.5' angle valve with flange, and wall bracket including all necessary fittings and accessories to Architect's approval

'Johnson Suisse' WBFA300660CP TREVI 0.5' chrome plated long bib tap with flange including all necessary fittings and accessories to Architect's approval

'Johnson Suisse' WBBA100163CP RIVOLI brass chrome plated spare paper holder set into tiled wall to Architect's approval

'Johnson Suisse' WBSRTE000WW semi recessed toilet roll holder overall size 165mm x 165mm x 95mm in vitreous china with plastic roller set into tiled wall to Architect's approval

'Johnson Suisse' WBBRSP000WW semi recessed soap dish overall size 165mm x 165mm x 95mm in vitreous china set into tiled wall to Architect's approval

ELEMENT NO. 13 : SANITARY FITTINGS

END UNITAMOUNT

(RM)2,611.00

452.00

390.00

66.00

508.00

85.00

320.00

26.50

24.00

Page 137: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/13/137/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 13 : SANITARY FITTINGS

CORNER UNITITEM DESCRIPTION UNIT

(RM)

CARRIED TO COLLECTION

ANo

B 150mm x 150mm overall size stainless steel floor trap to Architect's approval No

C

No

D

No

E

No

F

No

G

No

Supply and fix the following or other equal and approved sanitary fittings and accessories including storing, assembling, bedding, plugging and screwing with matching screws, cutting and pinning or building in pinning or building in brackets, jointing and connecting to services and to soil and waste pipes and making and making good all works disturbed all as per Manufacturer's specifications and Architect's approval :- (Cont'd)

'Johnson Suisse' WBFT400654XX chrome plated floor trap marble/ granite/ ceramic tile drainage overall size 130mm x 130mm to Architect's approval

'CAM' Stainless steel kitchen sink single bowl single drainer overall size 42" x 18" complete with 40mm PVC bottle trap including all necessary fittings and accessories to Architect's approval

'Johnson Suisse' WBFA300596CP TREVI chrome plated deck mounted kitchen tap with swivel spout including all necessary fittings and accessories to Architect's approval

'Johnson Suisse' WBFA300661CP TREVI chrome plated washing machine / garden tap including all necessary fittings and accessories to Architect's approval

'Johnson Suisse' WBFA300605CP ASTI 0.5" chrome plated concealed stop valve with flange including all necessary fitting and accessories to Architect's approval

'Johnson Suisse' WBFA300672CP ASTI 0.75" chrome plated concealed stop valve with flange including all necessary fitting and accessories to Architect's approval

ELEMENT NO. 13 : SANITARY FITTINGS

END UNITAMOUNT

(RM)

1,871.50

384.00

60.00

294.00

228.00

267.00

270.00

151.00

Page 138: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/13/138/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 13 : SANITARY FITTINGS

CORNER UNITITEM DESCRIPTION UNIT

(RM)

CARRIED TO COLLECTION

A 440mm x 590mm (overall size) to be flushed with wall tiles surface No

B 600mm x 800mm (overall size) to be flushed with wall tiles surface No

C 1200mm x 1000mm (overall size) to be flushed with wall tiles surface No

………………………………………………..

D

Item

Supply and fix approved equivalent Grade A float glass recessed mirror with sand blast lining and triple bevelled edge, four times drilled for screws, complete with chromium plated sunken counter needle screws and rubber washer and including 6 mm thick water proof plywood backing with painted edges and screwed

On completion of the installation test all apparatus, piping and fittings, make good any defects and leave the whole in perfect working order to the entire satisfaction of the S.O

ELEMENT NO. 13 : SANITARY FITTINGS

END UNITAMOUNT

(RM)

1,654.00

120.00

666.00

554.00

200.00

Page 139: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/13/139/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 13 : SANITARY FITTINGS

CORNER UNITITEM DESCRIPTION UNIT

(RM)

CARRIED TO COLLECTION

Collection :

A -

B -

C -

D From Page No. BQ.G2B/3/13/4/6 -

E From Page No. BQ.G2B/3/13/5/6 -

From Page No. BQ.G2B/3/13/1/6 - Add.01

From Page No. BQ.G2B/3/13/2/6 - Add.01

From Page No. BQ.G2B/3/13/3/6 - Add.01

ELEMENT NO. 13 : SANITARY FITTINGS

END UNITAMOUNT

(RM)

1,540.00

4,473.00

2,611.00

1,871.50

1,654.00

1,540.00

Page 140: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/13/140/164 - Add.01

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 13 : SANITARY FITTINGS

CORNER UNITITEM DESCRIPTION UNIT

(RM)

TOTAL CARRIED TO SUMMARY

ELEMENT NO. 13 : SANITARY FITTINGS

END UNITAMOUNT

(RM)

12,149.50

Page 141: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/14/141/164

69 UNITS (PHASE G2A) & 84 UNITS (PHASE G2B) TERRACE HOUSE ELMINA EAST

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 14 : SUNDRIES

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

Aluminium Steel Trellis / Pergola

A

No 15,640.00 - - 1.00 15,640.00 -

Aluminium Pivot Sunshading Louvres

B

(Type LV1) No 12,211.00 1.00 12,211.00 1.00 12,211.00 1.00

Aluminium Fixed Louvres

C

(Type LV2) No 2,818.00 1.00 2,818.00 1.00 2,818.00 1.00

D 1015mm x 2917mm high (overall size) ditto(Type LV3) No 1,563.00 1.00 1,563.00 1.00 1,563.00 1.00

E 1200mm x 900mm high (overall size) ditto(Type LV4) No 600.00 1.00 600.00 - - 1.00

CARRIED TO COLLECTION 17,192.00 32,232.00

6045mm x 4900mm (overall size) aluminium steel trellis / pergola complete with 50mm x 150mm aluminium hollow section trellis at 150mm center to center, 50mm x 50mm powder coated aluminium hollow section rebated above aluminium trellis with aluminium plate fixed to reinforced concrete beam as support including anchor bolts, nuts and all other necessary jointings all in accordance to Manufacturer's detail and all as per Architect's approval and detail drawing No. WD-15-IH57G2B-00-697

5200mm x 2965mm high (overall size) powder coated aluminium sunshading louvres consists of 35mm x 100mm thick aluminium louvres complete with interconnected arms and locksets, pivots for adjustable louvres panel, 100mm x 60mm high reinforced concrete kerb, 25mm diameter spout pipe all to Manufacturer's detail and Architect's approval and detail drawings

1800mm x 2965mm high (overall size) powder coated aluminium louvres complete with reinforced concrete stump, 75mm x 25mm thick aluminium hollow section flat louvres at 100mm center to center, 38mm x 100mm powder coated aluminium spacer, 38mm x 100mm powder coated aluminium RHS metal with 7900mm overall height to be welded with 'I' channel and all necessary fixing accessories and fixed in accordance to Manufacturer's detail and all as per Architect's approval and detail drawings

Page 142: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/14/142/164

69 UNITS (PHASE G2A) & 84 UNITS (PHASE G2B) TERRACE HOUSE ELMINA EAST

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 14 : SUNDRIES

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

Mild Steel Railing

A

M 110.00 7.00 770.00 - - 7.00

B

M 368.00 15.00 5,520.00 16.00 5,888.00 15.00

RHS Metal Strut

C

No 400.00 2.00 800.00 2.00 800.00 2.00

Counter Top

D Overall size 1800mm x 600mm x 200mm high No 1,458.00 1.00 1,458.00 1.00 1,458.00 1.00

900mm High mild steel railing complete with 100mm high kerb as described

balcony railing comprise of 200mm x 50mm x 2mm thick rail weld together

fixed onto R.C kerb jointed in approved fillet weld with bottom end fishtailed

cast into concrete with and including all necessary bend, quadrant,

accessories etc. and apply with anti rust paint and finishing coat to Architect

approval and all as per Architect's detail drawings

700mm High powder coated RHS railing as described internal window railing comprise of 35mm x 75mm powder coated RHS railing and 25mm x 50mm powder coated RHS balustrade railing weld together fixed onto powder coated aluminium window frame jointed in approved 10mm aluminium angle groove including all necessary bend, quadrant, accessories etc. and apply with anti rust paint and finishing coat all as per Architect's approval and detail drawings WD-12-IH57G2B-00-599

Supply and install 100mm x 150mm x 2100mm RHS metal strut including 350mm x 200mm metal plate, nuts and washer complete with approve paint all as per Architect's approval

25mm x 25mm x 3mm thick galvanised iron (GI) vanity counter top framing fixed at 770mm high, complete with 25mm thick black granite solid surface finish to top with rounded edge sides and soffit of counter top, glue fixed trimming all round, silicone sealant along edges of basin including necessary works all as shown in the drawings and making good all works disturbed

Page 143: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/14/143/164

69 UNITS (PHASE G2A) & 84 UNITS (PHASE G2B) TERRACE HOUSE ELMINA EAST

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 14 : SUNDRIES

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM) CARRIED TO COLLECTION 8,548.00 8,146.00

R.C Hood / Sill

A

M 128.00 21.00 2,688.00 7.00 896.00 21.00

Scupper Drain

B

M 45.00 4.00 180.00 - - 4.00

Filling Mortar

C

M 23.00 36.00 828.00 12.00 276.00 36.00

Precast concrete Grade 25 as described including moulds, finished fair on exposed faces and hoisting, fixing, bedding, jointing and pointing in cement and sand mortar as described

700mm x 125mm thick reinforced concrete hood/sill including all necessary reinforcements, formworks, form 13mm throating, plasticier, waterproof, paint etc. all as per details

200mm x 25mm deep concrete scupper drain complete with non-slip porcelain tiles finish, approved water proofing with all necessary formwork etc. all as per Architect's approval and detail drawings

Fill in cement and sand mortar (1:3) mortar between gap party beam and party wall and make good all works complete with all necessary formworks to Architect's approval.

Page 144: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/14/144/164

69 UNITS (PHASE G2A) & 84 UNITS (PHASE G2B) TERRACE HOUSE ELMINA EAST

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 14 : SUNDRIES

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

3,696.00 1,172.00

Collection :

A From Page No. BQ.G2B/3/14/1/4 - - - 17,192.00 - 32,232.00 -

B From Page No. BQ.G2B/3/14/2/4 - - - 8,548.00 - 8,146.00 -

C From Page No. BQ.G2B/3/14/3/4 - - - 3,696.00 - 1,172.00 -

Page 145: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/14/145/164

69 UNITS (PHASE G2A) & 84 UNITS (PHASE G2B) TERRACE HOUSE ELMINA EAST

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 14 : SUNDRIES

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

TOTAL CARRIED TO SUMMARY 29,436.00 41,550.00

Page 146: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/14/146/164

69 UNITS (PHASE G2A) & 84 UNITS (PHASE G2B) TERRACE HOUSE ELMINA EAST

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 14 : SUNDRIES

CORNER UNITITEM DESCRIPTION UNIT

(RM)

Aluminium Steel Trellis / Pergola

A

No

Aluminium Pivot Sunshading Louvres

B

(Type LV1) No

Aluminium Fixed Louvres

C

(Type LV2) No

D 1015mm x 2917mm high (overall size) ditto(Type LV3) No

E 1200mm x 900mm high (overall size) ditto(Type LV4) No

CARRIED TO COLLECTION

6045mm x 4900mm (overall size) aluminium steel trellis / pergola complete with 50mm x 150mm aluminium hollow section trellis at 150mm center to center, 50mm x 50mm powder coated aluminium hollow section rebated above aluminium trellis with aluminium plate fixed to reinforced concrete beam as support including anchor bolts, nuts and all other necessary jointings all in accordance to Manufacturer's detail and all as per Architect's approval and detail drawing No. WD-15-IH57G2B-00-697

5200mm x 2965mm high (overall size) powder coated aluminium sunshading louvres consists of 35mm x 100mm thick aluminium louvres complete with interconnected arms and locksets, pivots for adjustable louvres panel, 100mm x 60mm high reinforced concrete kerb, 25mm diameter spout pipe all to Manufacturer's detail and Architect's approval and detail drawings

1800mm x 2965mm high (overall size) powder coated aluminium louvres complete with reinforced concrete stump, 75mm x 25mm thick aluminium hollow section flat louvres at 100mm center to center, 38mm x 100mm powder coated aluminium spacer, 38mm x 100mm powder coated aluminium RHS metal with 7900mm overall height to be welded with 'I' channel and all necessary fixing accessories and fixed in accordance to Manufacturer's detail and all as per Architect's approval and detail drawings

ELEMENT NO. 14 : SUNDRIES

END UNIT AMOUNT

(RM)

-

12,211.00

2,818.00

1,563.00

600.00

17,192.00

Page 147: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/14/147/164

69 UNITS (PHASE G2A) & 84 UNITS (PHASE G2B) TERRACE HOUSE ELMINA EAST

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 14 : SUNDRIES

CORNER UNITITEM DESCRIPTION UNIT

(RM)

Mild Steel Railing

A

M

B

M

RHS Metal Strut

C

No

Counter Top

D Overall size 1800mm x 600mm x 200mm high No

900mm High mild steel railing complete with 100mm high kerb as described

balcony railing comprise of 200mm x 50mm x 2mm thick rail weld together

fixed onto R.C kerb jointed in approved fillet weld with bottom end fishtailed

cast into concrete with and including all necessary bend, quadrant,

accessories etc. and apply with anti rust paint and finishing coat to Architect

approval and all as per Architect's detail drawings

700mm High powder coated RHS railing as described internal window railing comprise of 35mm x 75mm powder coated RHS railing and 25mm x 50mm powder coated RHS balustrade railing weld together fixed onto powder coated aluminium window frame jointed in approved 10mm aluminium angle groove including all necessary bend, quadrant, accessories etc. and apply with anti rust paint and finishing coat all as per Architect's approval and detail drawings WD-12-IH57G2B-00-599

Supply and install 100mm x 150mm x 2100mm RHS metal strut including 350mm x 200mm metal plate, nuts and washer complete with approve paint all as per Architect's approval

25mm x 25mm x 3mm thick galvanised iron (GI) vanity counter top framing fixed at 770mm high, complete with 25mm thick black granite solid surface finish to top with rounded edge sides and soffit of counter top, glue fixed trimming all round, silicone sealant along edges of basin including necessary works all as shown in the drawings and making good all works disturbed

ELEMENT NO. 14 : SUNDRIES

END UNIT AMOUNT

(RM)

770.00

5,520.00

800.00

1,458.00

Page 148: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/14/148/164

69 UNITS (PHASE G2A) & 84 UNITS (PHASE G2B) TERRACE HOUSE ELMINA EAST

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 14 : SUNDRIES

CORNER UNITITEM DESCRIPTION UNIT

(RM)CARRIED TO COLLECTION

R.C Hood / Sill

A

M

Scupper Drain

B

M

Filling Mortar

C

M

Precast concrete Grade 25 as described including moulds, finished fair on exposed faces and hoisting, fixing, bedding, jointing and pointing in cement and sand mortar as described

700mm x 125mm thick reinforced concrete hood/sill including all necessary reinforcements, formworks, form 13mm throating, plasticier, waterproof, paint etc. all as per details

200mm x 25mm deep concrete scupper drain complete with non-slip porcelain tiles finish, approved water proofing with all necessary formwork etc. all as per Architect's approval and detail drawings

Fill in cement and sand mortar (1:3) mortar between gap party beam and party wall and make good all works complete with all necessary formworks to Architect's approval.

ELEMENT NO. 14 : SUNDRIES

END UNIT AMOUNT

(RM) 8,548.00

2,688.00

180.00

828.00

Page 149: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/14/149/164

69 UNITS (PHASE G2A) & 84 UNITS (PHASE G2B) TERRACE HOUSE ELMINA EAST

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 14 : SUNDRIES

CORNER UNITITEM DESCRIPTION UNIT

(RM)

Collection :

A From Page No. BQ.G2B/3/14/1/4 -

B From Page No. BQ.G2B/3/14/2/4 -

C From Page No. BQ.G2B/3/14/3/4 -

ELEMENT NO. 14 : SUNDRIES

END UNIT AMOUNT

(RM)

3,696.00

17,192.00

8,548.00

3,696.00

Page 150: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/14/150/164

69 UNITS (PHASE G2A) & 84 UNITS (PHASE G2B) TERRACE HOUSE ELMINA EAST

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 14 : SUNDRIES

CORNER UNITITEM DESCRIPTION UNIT

(RM)

TOTAL CARRIED TO SUMMARY

ELEMENT NO. 14 : SUNDRIES

END UNIT AMOUNT

(RM)

29,436.00

Page 151: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/15/151/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 15 : EXTERNAL WORKS WITHIN BOUNDRIES

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

Reinforced Concrete Steps

A

No 200.00 1.00 200.00 1.00 200.00 1.00

Perimeter Fencing

B

(Fencing Type A) M 350.00 13.60 4,760.00 2.40 840.00 10.20

C

(Fencing Type B) M 290.00 17.80 5,162.00 5.50 1,595.00 12.70

D

(Fencing Type C) M 289.00 37.60 10,866.40 8.80 2,543.20 31.10

CARRIED TO COLLECTION 20,988.40 5,178.20

Construct and complete 700mm x 700mm overall size reinforced concrete steps or staircase at backyard including all necessary excavation, reinforcement, formwork, concrete works etc all as per Engineer's detail drawing

1500mm High 'Southern Steel Mesh (SSM)' hot dipped galvanised 'FB' series mesh pattern steel fencing complete with 'Ultragal' steel post (square/round shape), 100mm thick reinforced concrete kerb and footing with all necessary reinforcement, formwork, including all excavation and painting with approved paint, stainless steel U-clip, bolt, nut and all necessary jointing all as per Architect's approval and detail drawing No. WD-17-IH57G2B-00-823

1500mm High ventilation wall block fencing comprise of 150mm x 150mm

ventilation wall block complete with 100mm thick reinforced concrete kerb

and footing with all necessary reinforcement, formwork, including all

excavation and painting with approved paint, and all necessary jointing all as

per Architect's approval and detail drawing No. WD-17-IH57G2B-00-823

1500mm High brick fencing comprise of 110mm thick brickwall fencing with 20mm thick plastering on both sides complete with 50mm width groove line with 1mm thick cement plaster on both side of brickwall, 100mm thick reinforced concrete kerb and footing with all necessary reinforcement, formwork, including all excavation and painting with approved paint, and all necessary jointing all as per Architect's approval and detail drawing No. WD-17-IH57G2B-00-823

Page 152: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/15/152/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 15 : EXTERNAL WORKS WITHIN BOUNDRIES

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

Main Gate

A

(Type G2) No 1,300.00 1.00 1,300.00 1.00 1,300.00 1.00

Front Gate

B

No 850.00 1.00 850.00 1.00 850.00 1.00

Rear Gate

C

(Type G1) No 430.00 1.00 430.00 1.00 430.00 1.00

Main gate overall size 4400mm wide x 1500mm high double leaf RHS hot

dipped galvanised as describe main gate all welded or screw together

complete with latch, catch, dowel bolt, hook, hinges and all other neceessary

accessories and painting all metalwork surfaces with two coats etchimg

primer and approved anti-rust paint finish and provide connection with auto

gate system (auto gate system provided by others) as described all as per

detailed and specified on Architect's drawing no. WD-12-IH57G2B-00-592.00

Front gate overall size 1950mm x 2250mm high (extreme) construct with 110mm thick brickwall with 20mm thick plastering on both sides, paint with approved weather resistant emulsion paint externally, 150mm thick reinforced concrete coping with approved cement and plaster, 75mm diameter hot dipped galvanised metal to support coping, complete with 1 nos. 900mm wide x 1500mm high RHS hot dipped galvanised gate including all necessary excavation, reinforcement, formwork, concrete works etc., all welded together complete with latch, catch, dowel bolt, hook, hinges, and all other neceessary accessories and painting all metalwork surfaces with two coats etching primer and approved anti-rust paint finish as described all as per detailed and specified on Architect's approval and detail drawing WD-09-IH57-09-500.00

Rear gate overall size 750mm wide x 1500mm high RHS hot dipped galvanised as described rear gate complete with R.C. column as gate post both sides including all necessary excavation, reinforcement, formwork, concrete works etc., all welded together complete with latch, catch, dowel bolt, hook, hinges, and all other neceessary accessories and painting all metalwork surfaces with two coats etching primer and approved anti-rust paint finish as described all as per detailed and specified on Architect's approval and detail drawing WD-12-IH57G2B-00-592.00

Page 153: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/15/153/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 15 : EXTERNAL WORKS WITHIN BOUNDRIES

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)CARRIED TO COLLECTION 2,580.00 2,580.00

Refuse Compartment and Letter Box

A

No 2,300.00 1.00 2,300.00 1.00 2,300.00 1.00

TNB Meter Compartment

B

No 1,500.00 1.00 1,500.00 1.00 1,500.00 1.00

Construct and complete overall size 900mm x 950mm x 1650mm high

(extreme size) as described refuse compartment and letter box comprise of reinforced concrete slab footing, compacted hardcore, 110mm thick brickwall with 20mm thick plastering on both sides, paint with approved weather resistant emulsion paint externally and finished with 200mm x 200mm ceramic floor and wall tiles internally, letter compartment complete with 1 nos. of 950mm x 600mm x 300mm high natural anodised aluminium letter box

with handle, 2 nos. 600mm x 1100mm high (Type D9) aluminium louvres door including aluminium frame and ironmongeries, all including with necessary fittings and accessories, stainless steel floor trap with pipe to drain, door bell, etc. including all necessary excavation, reinforcement, formwork, etc all as per drawing No. WD-09-IH57-00-500.00

Construct and complete overall size 800mm x 550mm x 1500mm high

(extreme size) as described TNB meter compartment comprise of reinforced

concrete slab footing, compacted hardcore, 110mm thick brickwall with 20mm

thick plastering on both sides, paint with approved weather resistant emulsion

paint externally, approved TNB meter compartment with 1 nos. 500mm x

700mm high (Type D10) aluminium louvres door to match size with opening

complete with 4mm thick glass panel including ironmongeries and approved

paint on both sides, all including with necessary fittings and accessories

including all necessary excavation, reinforcement, formwork, etc all as per

drawing No. WD-09-IH57-00-500.00

Page 154: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/15/154/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 15 : EXTERNAL WORKS WITHIN BOUNDRIES

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

CARRIED TO COLLECTION 3,800.00 3,800.00

House Plate Numbering

ANo 80.00 1.00 80.00 1.00 80.00 1.00

Turfing

B

M3 16.00 80.00 1,280.00 15.00 240.00 53.00

C Supply, lay and grade to requirement 50mm thick top soil of good quality M2 2.50 399.00 997.50 74.00 185.00 265.00

D

M2 6.00 399.00 2,394.00 74.00 444.00 265.00

Precast Concrete Step

E

No 65.00 111.00 7,215.00 45.00 2,925.00 111.00

Subsoil Drain

F

M 68.00 - - 34.00 2,312.00 -

200mm x 250mm Metal house plate numbering all as per Specialist's detail and Architect's approval

Excavate to reduce level average 200mm deep commencing from formation level and get out, part return, fill in and ram, reminder load, deposit, spread and well compacted within the site as directed, level inclination of sub-base, all to the requirement of the S.O

Supply and lay 300mm x 300mm close turfing including provision of peat top soil layer, application of fertilizer at the required rate, weed killer as required and regular maintenance of turf including rolling and cutting to required level including maintenance

450mm x 450mm x 100mm Thick precast concrete slab as stepping stone with cement render finish at 100mm centres and placing in position all as Architect's approval

Supply and lay complete 150mm diameter uPVC perforated rib loc sub-soil drainage system wrapped with geotextile filters membrane including sand filling, excavation and accessories and jointing to collector drain (measured separately) all to the Manufacturer's recommendation and detail drawing

Page 155: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/15/155/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 15 : EXTERNAL WORKS WITHIN BOUNDRIES

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

CARRIED TO COLLECTION 11,966.50 6,186.00

Precast Drain

A

M 120.00 45.00 5,400.00 - - 45.00

Brick Sump

B

No 285.00 10.00 2,850.00 6.00 1,710.00 9.00

Mild Steel Grating

C

No 110.00 8.00 880.00 4.00 440.00 7.00

Precast Concrete Sump Cover

D

No 168.00 2.00 336.00 2.00 336.00 2.00

Aggregate Stone Finish

EM2 90.00 27.00 2,430.00 - - 27.00

Construct and complete 600mm wide precast drain construct from 110mm thick cement and sand brick with plaster wall, concrete Grade 25 with BRC A8 as base including all necessary works and painting to all surfaces with approved paint and placing in position

Construct and complete 300mm length x 300mm wide brick sump not exceeding 2000mm deep construct from 110mm thick cement and sand brick with plaster wall, concrete Grade 25 with BRC A8 as base including all necessary works and painting to all surfaces with approved paint and placing in position

450mm x 450mm Mild steel grating complete with 50mm thick aggregate stone finish laid in position including all necessary angle frame, fish tale, bar support, 2 coats of bitumenious paint etc. forming rebates joints and placing in position

450mm x 450mm x 75mm Thick precast compressed concrete sump cover with and including all necessary reinforcements, formworks, fishtailed and forming rebates joints all as per detail drawing

50mm Thick aggregate stone finishes laid in position all as per Architect's approval

Page 156: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/15/156/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 15 : EXTERNAL WORKS WITHIN BOUNDRIES

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

CARRIED TO COLLECTION 11,896.00 2,486.00

Collection :

A From Page No. BQ.G2B/3/15/1/6 - - - 20,988.40 - 5,178.20 -

B From Page No. BQ.G2B/3/15/2/6 - - - 2,580.00 - 2,580.00 -

C From Page No. BQ.G2B/3/15/3/6 - - - 3,800.00 - 3,800.00 -

D From Page No. BQ.G2B/3/15/4/6 - - - 11,966.50 - 6,186.00 -

E From Page No. BQ.G2B/3/15/5/6 - - - 11,896.00 - 2,486.00 -

Page 157: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/15/157/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS) ELEMENT NO. 15 : EXTERNAL WORKS WITHIN BOUNDRIES

CORNER UNIT INTERMEDIATE UNIT END UNITITEM DESCRIPTION UNIT RATE QTY AMOUNT QTY AMOUNT QTY

(RM) (RM) (RM)

TOTAL CARRIED TO SUMMARY 51,230.90 20,230.20

Page 158: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/15/158/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 15 : EXTERNAL WORKS WITHIN BOUNDRIES

CORNER UNITITEM DESCRIPTION UNIT

(RM)

Reinforced Concrete Steps

A

No

Perimeter Fencing

B

(Fencing Type A) M

C

(Fencing Type B) M

D

(Fencing Type C) M

CARRIED TO COLLECTION

Construct and complete 700mm x 700mm overall size reinforced concrete steps or staircase at backyard including all necessary excavation, reinforcement, formwork, concrete works etc all as per Engineer's detail drawing

1500mm High 'Southern Steel Mesh (SSM)' hot dipped galvanised 'FB' series mesh pattern steel fencing complete with 'Ultragal' steel post (square/round shape), 100mm thick reinforced concrete kerb and footing with all necessary reinforcement, formwork, including all excavation and painting with approved paint, stainless steel U-clip, bolt, nut and all necessary jointing all as per Architect's approval and detail drawing No. WD-17-IH57G2B-00-823

1500mm High ventilation wall block fencing comprise of 150mm x 150mm

ventilation wall block complete with 100mm thick reinforced concrete kerb

and footing with all necessary reinforcement, formwork, including all

excavation and painting with approved paint, and all necessary jointing all as

per Architect's approval and detail drawing No. WD-17-IH57G2B-00-823

1500mm High brick fencing comprise of 110mm thick brickwall fencing with 20mm thick plastering on both sides complete with 50mm width groove line with 1mm thick cement plaster on both side of brickwall, 100mm thick reinforced concrete kerb and footing with all necessary reinforcement, formwork, including all excavation and painting with approved paint, and all necessary jointing all as per Architect's approval and detail drawing No. WD-17-IH57G2B-00-823

ELEMENT NO. 15 : EXTERNAL WORKS WITHIN BOUNDRIES

END UNITAMOUNT

(RM)

200.00

3,570.00

3,683.00

8,987.90

16,440.90

Page 159: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/15/159/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 15 : EXTERNAL WORKS WITHIN BOUNDRIES

CORNER UNITITEM DESCRIPTION UNIT

(RM)

Main Gate

A

(Type G2) No

Front Gate

B

No

Rear Gate

C

(Type G1) No

Main gate overall size 4400mm wide x 1500mm high double leaf RHS hot

dipped galvanised as describe main gate all welded or screw together

complete with latch, catch, dowel bolt, hook, hinges and all other neceessary

accessories and painting all metalwork surfaces with two coats etchimg

primer and approved anti-rust paint finish and provide connection with auto

gate system (auto gate system provided by others) as described all as per

detailed and specified on Architect's drawing no. WD-12-IH57G2B-00-592.00

Front gate overall size 1950mm x 2250mm high (extreme) construct with 110mm thick brickwall with 20mm thick plastering on both sides, paint with approved weather resistant emulsion paint externally, 150mm thick reinforced concrete coping with approved cement and plaster, 75mm diameter hot dipped galvanised metal to support coping, complete with 1 nos. 900mm wide x 1500mm high RHS hot dipped galvanised gate including all necessary excavation, reinforcement, formwork, concrete works etc., all welded together complete with latch, catch, dowel bolt, hook, hinges, and all other neceessary accessories and painting all metalwork surfaces with two coats etching primer and approved anti-rust paint finish as described all as per detailed and specified on Architect's approval and detail drawing WD-09-IH57-09-500.00

Rear gate overall size 750mm wide x 1500mm high RHS hot dipped galvanised as described rear gate complete with R.C. column as gate post both sides including all necessary excavation, reinforcement, formwork, concrete works etc., all welded together complete with latch, catch, dowel bolt, hook, hinges, and all other neceessary accessories and painting all metalwork surfaces with two coats etching primer and approved anti-rust paint finish as described all as per detailed and specified on Architect's approval and detail drawing WD-12-IH57G2B-00-592.00

ELEMENT NO. 15 : EXTERNAL WORKS WITHIN BOUNDRIES

END UNITAMOUNT

(RM)

1,300.00

850.00

430.00

Page 160: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/15/160/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 15 : EXTERNAL WORKS WITHIN BOUNDRIES

CORNER UNITITEM DESCRIPTION UNIT

(RM)CARRIED TO COLLECTION

Refuse Compartment and Letter Box

A

No

TNB Meter Compartment

B

No

Construct and complete overall size 900mm x 950mm x 1650mm high

(extreme size) as described refuse compartment and letter box comprise of reinforced concrete slab footing, compacted hardcore, 110mm thick brickwall with 20mm thick plastering on both sides, paint with approved weather resistant emulsion paint externally and finished with 200mm x 200mm ceramic floor and wall tiles internally, letter compartment complete with 1 nos. of 950mm x 600mm x 300mm high natural anodised aluminium letter box

with handle, 2 nos. 600mm x 1100mm high (Type D9) aluminium louvres door including aluminium frame and ironmongeries, all including with necessary fittings and accessories, stainless steel floor trap with pipe to drain, door bell, etc. including all necessary excavation, reinforcement, formwork, etc all as per drawing No. WD-09-IH57-00-500.00

Construct and complete overall size 800mm x 550mm x 1500mm high

(extreme size) as described TNB meter compartment comprise of reinforced

concrete slab footing, compacted hardcore, 110mm thick brickwall with 20mm

thick plastering on both sides, paint with approved weather resistant emulsion

paint externally, approved TNB meter compartment with 1 nos. 500mm x

700mm high (Type D10) aluminium louvres door to match size with opening

complete with 4mm thick glass panel including ironmongeries and approved

paint on both sides, all including with necessary fittings and accessories

including all necessary excavation, reinforcement, formwork, etc all as per

drawing No. WD-09-IH57-00-500.00

ELEMENT NO. 15 : EXTERNAL WORKS WITHIN BOUNDRIES

END UNITAMOUNT

(RM)2,580.00

2,300.00

1,500.00

Page 161: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/15/161/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 15 : EXTERNAL WORKS WITHIN BOUNDRIES

CORNER UNITITEM DESCRIPTION UNIT

(RM)

CARRIED TO COLLECTION

House Plate Numbering

ANo

Turfing

B

M3

C Supply, lay and grade to requirement 50mm thick top soil of good quality M2

D

M2

Precast Concrete Step

E

No

Subsoil Drain

F

M

200mm x 250mm Metal house plate numbering all as per Specialist's detail and Architect's approval

Excavate to reduce level average 200mm deep commencing from formation level and get out, part return, fill in and ram, reminder load, deposit, spread and well compacted within the site as directed, level inclination of sub-base, all to the requirement of the S.O

Supply and lay 300mm x 300mm close turfing including provision of peat top soil layer, application of fertilizer at the required rate, weed killer as required and regular maintenance of turf including rolling and cutting to required level including maintenance

450mm x 450mm x 100mm Thick precast concrete slab as stepping stone with cement render finish at 100mm centres and placing in position all as Architect's approval

Supply and lay complete 150mm diameter uPVC perforated rib loc sub-soil drainage system wrapped with geotextile filters membrane including sand filling, excavation and accessories and jointing to collector drain (measured separately) all to the Manufacturer's recommendation and detail drawing

ELEMENT NO. 15 : EXTERNAL WORKS WITHIN BOUNDRIES

END UNITAMOUNT

(RM)

3,800.00

80.00

848.00

662.50

1,590.00

7,215.00

-

Page 162: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/15/162/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 15 : EXTERNAL WORKS WITHIN BOUNDRIES

CORNER UNITITEM DESCRIPTION UNIT

(RM)

CARRIED TO COLLECTION

Precast Drain

A

M

Brick Sump

B

No

Mild Steel Grating

C

No

Precast Concrete Sump Cover

D

No

Aggregate Stone Finish

EM2

Construct and complete 600mm wide precast drain construct from 110mm thick cement and sand brick with plaster wall, concrete Grade 25 with BRC A8 as base including all necessary works and painting to all surfaces with approved paint and placing in position

Construct and complete 300mm length x 300mm wide brick sump not exceeding 2000mm deep construct from 110mm thick cement and sand brick with plaster wall, concrete Grade 25 with BRC A8 as base including all necessary works and painting to all surfaces with approved paint and placing in position

450mm x 450mm Mild steel grating complete with 50mm thick aggregate stone finish laid in position including all necessary angle frame, fish tale, bar support, 2 coats of bitumenious paint etc. forming rebates joints and placing in position

450mm x 450mm x 75mm Thick precast compressed concrete sump cover with and including all necessary reinforcements, formworks, fishtailed and forming rebates joints all as per detail drawing

50mm Thick aggregate stone finishes laid in position all as per Architect's approval

ELEMENT NO. 15 : EXTERNAL WORKS WITHIN BOUNDRIES

END UNITAMOUNT

(RM)

10,395.50

5,400.00

2,565.00

770.00

336.00

2,430.00

Page 163: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/15/163/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 15 : EXTERNAL WORKS WITHIN BOUNDRIES

CORNER UNITITEM DESCRIPTION UNIT

(RM)

CARRIED TO COLLECTION

Collection :

A From Page No. BQ.G2B/3/15/1/6 -

B From Page No. BQ.G2B/3/15/2/6 -

C From Page No. BQ.G2B/3/15/3/6 -

D From Page No. BQ.G2B/3/15/4/6 -

E From Page No. BQ.G2B/3/15/5/6 -

ELEMENT NO. 15 : EXTERNAL WORKS WITHIN BOUNDRIES

END UNITAMOUNT

(RM)

11,501.00

16,440.90

2,580.00

3,800.00

10,395.50

11,501.00

Page 164: 03_Building - Phase G2B (7 of 7)

BQ.G2B/3/15/164/164

84 UNITS TERRACE HOUSE ELMINA EAST, PHASE G2B

BILL NO. 3 - BUILDING WORKS : PHASE G2B (84 UNITS)ELEMENT NO. 15 : EXTERNAL WORKS WITHIN BOUNDRIES

CORNER UNITITEM DESCRIPTION UNIT

(RM)

TOTAL CARRIED TO SUMMARY ###

ELEMENT NO. 15 : EXTERNAL WORKS WITHIN BOUNDRIES

END UNITAMOUNT

(RM)

44,717.40