0.3-PENGESAHAN

1
ii REPORT ENDORSEMENT The report entitled semi automatic mortar and pestle is being submitted. reviewed, and endorsed to fulfill the conditions and requirements of report writing as specified. Checked by: Supervisor’s Signature : Supervisor’s name: : CIK LIANA FAIRUZ BINTI ZAKARIA Date : Endorsed by: Project Coordinator’s Signature : Project Coordinator’s Name : Date :

description

0.3-PENGESAHAN

Transcript of 0.3-PENGESAHAN

Page 1: 0.3-PENGESAHAN

ii

REPORT ENDORSEMENT

The report entitled semi automatic mortar and pestle is being submitted.

reviewed, and endorsed to fulfill the conditions and requirements of report

writing as specified.

Checked by:

Supervisor’s Signature :

Supervisor’s name: : CIK LIANA FAIRUZ BINTI ZAKARIA

Date :

Endorsed by:

Project Coordinator’s Signature :

Project Coordinator’s Name :

Date :