Transcript of 03 christian reise - fraunhofer
![Page 1: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/1.jpg)
© Fraunhofer ISE
LONGTERM EXPERIENCE
WITH PV POWER PLANTS IN GERMANY
Dr. Christian Reise
Fraunhofer Institute for
Solar Energy Systems ISE
Freiburg, Germany
Solar Operations & Maintenance
Milan, October 9th, 2013
![Page 2: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/2.jpg)
© Fraunhofer ISE
2
The Fraunhofer ISE Quality Circle
Yield Assessments Module
Measurements
System tests
Quality
Monitoring
![Page 3: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/3.jpg)
© Fraunhofer ISE
3
What are the questions?
![Page 4: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/4.jpg)
© Fraunhofer ISE
4
What are the questions?
What is the state-of-the-art performance of a PV power plant?
What about degradation?
What affects system reliability?
![Page 5: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/5.jpg)
© Fraunhofer ISE
5
What are the questions?
What is the state-of-the-art performance of a PV power plant?
A review of 20+ years of commercial PV systems in Germany
What about degradation?
A study on 100+ power plants in Germany
What affects system reliability?
Modules / inverters / operation management…
![Page 6: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/6.jpg)
© Fraunhofer ISE
6
PV support schemes in Germany
![Page 7: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/7.jpg)
© Fraunhofer ISE
7
Development of system Performance Ratio in Germany
A typical
5 kWp
system
installed
in 1993
within the
German
1000 Roofs
Programme
![Page 8: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/8.jpg)
© Fraunhofer ISE
8
Performance Ratio (PR): A simple Definition
PR =
![Page 9: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/9.jpg)
© Fraunhofer ISE
9
Development of system Performance Ratio in Germany
![Page 10: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/10.jpg)
© Fraunhofer ISE
10
Development of system Performance Ratio in Germany
![Page 11: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/11.jpg)
© Fraunhofer ISE
11
In Germany, state-of-the-art PV systems reach PR(si) values around 90%
Note the difference of some 3…4% between PR(si) and PR(pyr)
In southern Europe, PR will be reduced by 3…5%
Development of system Performance Ratio in Germany
Where is the limit?
![Page 12: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/12.jpg)
© Fraunhofer ISE
12
In Germany, state-of-the-art PV systems reach PR(si) values around 90%
Note the difference of some 3…4% between PR(si) and PR(pyr)
In southern Europe, PR will be reduced by 3…5%
Development of system Performance Ratio in Germany
Where is the limit?
PR =
![Page 13: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/13.jpg)
© Fraunhofer ISE
13
Modules show rated power
Maintenance of area
Theft protection
Minimized row to row shading
Important factors for successful projects
Lessons learnt
![Page 14: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/14.jpg)
© Fraunhofer ISE
14
Important factors for successful projects
Lessons learnt
Modules show rated power
Maintenance of area
Theft protection
Minimized row to row shading
Minimized local shading
Durable installation
QC with commissioning
Regular cleaning intervals
Monitoring of operation
![Page 15: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/15.jpg)
© Fraunhofer ISE
15
What are the questions?
What is the state-of-the-art performance of a PV power plant?
A review of 20+ years of commercial PV systems in Germany
What about degradation?
A study on 100+ power plants in Germany
What affects system reliability?
Modules / inverters / operation management…
![Page 16: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/16.jpg)
© Fraunhofer ISE
16
A study on 100+ power plants in Germany
Data Handling
Filtering of 5-min average values:
![Page 17: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/17.jpg)
© Fraunhofer ISE
17
A study on 100+ power plants in Germany
Data Handling
Filtering of 5-min average values:
Irradiance between
800…1000 W/m²
![Page 18: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/18.jpg)
© Fraunhofer ISE
18
A study on 100+ power plants in Germany
Data Handling
Filtering of 5-min average values:
Irradiance between
800…1000 W/m²
Module temperature between
40…45 °C
![Page 19: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/19.jpg)
© Fraunhofer ISE
19
A study on 100+ power plants in Germany
Data Handling
Filtering of 5-min average values:
Irradiance between
800…1000 W/m²
Module temperature between
40…45 °C
Values inside median ± 5%
![Page 20: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/20.jpg)
© Fraunhofer ISE
20
A study on 100+ power plants in Germany
Data Handling
Filtering of 5-min average values:
Irradiance between
800…1000 W/m²
Module temperature between
40…45 °C
Values inside median ± 5%
Calculation of rate of change
rate in %/year
![Page 21: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/21.jpg)
© Fraunhofer ISE
21
A study on 100+ power plants in Germany
Example: a German „1000-Roofs-Programme“ system
5 kWp PV system built in 1993
New monitoring equipment in 2001
outliers excluded
fitted linear slope
Rate of Change: ca. –0.3%/a
![Page 22: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/22.jpg)
© Fraunhofer ISE
22
-4.0%
-3.0%
-2.0%
-1.0%
0.0%
1.0%
2.0%
3.0%
4.0%mono/poly
1 2 3 4 5 6 7 8 9 10 11_
rate of change in % per year
years of operation
A study on 100+ power plants in Germany
Results statistics for c-Si
Calculation of a rate of
change per year for each
PV system shows large
scatter
Average c-Si degradation
rates are around –0.25%
per year
![Page 23: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/23.jpg)
© Fraunhofer ISE
23
-4.0%
-3.0%
-2.0%
-1.0%
0.0%
1.0%
2.0%
3.0%
4.0% mono/poly
EFG/String Ribbon
A study on 100+ power plants in Germany
Results for alternative silicon wafer technologies
1 2 3 4 5 6 7 8 9 10 11_
rate of change in % per year
years of operation
Average c-Si degradation
rates are around –0.25%
per year
Systems with EFG or
string-ribbon modules
reveal a tendency towards
larger negative rates of
change
![Page 24: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/24.jpg)
© Fraunhofer ISE
24
What are the questions?
What is the state-of-the-art performance of a PV power plant?
A review of 20+ years of commercial PV systems in Germany
What about degradation?
A study on 100+ power plants in Germany
What affects system reliability?
Modules / inverters / operation management…
![Page 25: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/25.jpg)
© Fraunhofer ISE
25
What affects system reliability?
On average, there
are 5 incidents per
PV power plant and
year
Source:
meteocontrol,
Augsburg,
Germany
![Page 26: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/26.jpg)
© Fraunhofer ISE
26
What affects system reliability?
Module reliability
BOS component & installation reliability
Operation management
![Page 27: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/27.jpg)
© Fraunhofer ISE
27
What affects system reliability?
Module reliability
“no problem”
BOS component & installation reliability
Commissioning tests
Operation management
Monitoring & intervention concepts
![Page 28: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/28.jpg)
© Fraunhofer ISE
28
Commissioning tests
Detailed on-site analysis of the
entire power plant:
Comprehensive visual
inspection
Thermographic imaging
Measurement of actual PV
power and conversion to
Standard Test Conditions
Assessment of Performance
Ratio (PR)
![Page 29: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/29.jpg)
© Fraunhofer ISE
29
System Inspection and Testing
Verification of design data (module types, tilt angles, distances)
Screening for large and small anomalies (insufficient foundation,
cell grid faults)
![Page 30: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/30.jpg)
© Fraunhofer ISE
30
System Inspection and Testing
Mechanical problems
Faulty mounting of modules
Missing protection leading to cable damage
![Page 31: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/31.jpg)
© Fraunhofer ISE
31
Loose connectors
System Inspection and Testing
Mechanical problems
![Page 32: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/32.jpg)
© Fraunhofer ISE
32
System Inspection and Testing
Mechanical problems
Combination of connectors from
different manufacturers
Loose cables
![Page 33: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/33.jpg)
© Fraunhofer ISE
33
System Inspection and Testing
Mechanical problems
Cable glands on top, moisture in the sub-distribution box
Spare cable glands not sealed, moisture and animals in the box
![Page 34: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/34.jpg)
© Fraunhofer ISE
34
Mobile lifting platform used
for infrared camera imaging
Temperature analysis of a
solar module with defective
cells
Temperature analysis of a
large module field
System Inspection and Testing
Infrared imaging
![Page 35: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/35.jpg)
© Fraunhofer ISE
35
Detection of defective bypass diodes
System Inspection and Testing
Infrared imaging
![Page 36: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/36.jpg)
© Fraunhofer ISE
36
System Inspection and Testing
Infrared imaging
Detection of defective terminals with high transition resistance
![Page 37: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/37.jpg)
© Fraunhofer ISE
37
System Inspection and Testing
Infrared imaging
Detection of weak connections on power rails
![Page 38: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/38.jpg)
© Fraunhofer ISE
38
Commissioning tests
Detailed on-site analysis of the
entire power plant:
Comprehensive visual
inspection
Thermographic imaging
Measurement of actual PV
power and conversion to
Standard Test Conditions
Assessment of Performance
Ratio (PR)
![Page 39: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/39.jpg)
© Fraunhofer ISE
39
What affects system reliability?
Module reliability
“no problem”
BOS component & installation reliability
Commissioning tests
Operation management
Monitoring & intervention concepts
![Page 40: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/40.jpg)
© Fraunhofer ISE
40
Operation management
Monitoring & intervention
Operation of a state-of-the-art supervisory control and data acquisition
(SCADA) system in each PV power plant
Operation of a dedicated control centre, offering all features needed to
evaluate system operation and to optimize maintenance work flow
Rapid reaction to error messages
Management, performing and documentation of maintenance and repair
On-site visits in regular intervals
Landscape maintenance
Learn more about operation management at this event…
![Page 41: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/41.jpg)
© Fraunhofer ISE
41
Conclusions…
PV power plant operation is well understood and reproducible
Today’s systems may reach PR(si) values around 90% in Central Europe
Mono- and polycrystalline silicon systems show small degradation rates, by
default, Fraunhofer ISE assumes –0.25% per year
Long term success starts with a comprehensive system testing
Only professional O&M concepts ensure high performance and yields
![Page 42: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/42.jpg)
© Fraunhofer ISE
42
Thank you for your attention!
Fraunhofer Institute for Solar Energy Systems ISE
Dr. Christian Reise
www.ise.fraunhofer.de
![Page 43: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/43.jpg)
© Fraunhofer ISE
43
Development of system Performance Ratio in Germany
Comparison prediction vs. real world system operation
![Page 44: 03 christian reise - fraunhofer](https://reader034.fdocuments.us/reader034/viewer/2022052411/5579f2bcd8b42abc2e8b49c0/html5/thumbnails/44.jpg)
© Fraunhofer ISE
44
Development of system Performance Ratio in Germany
Comparison prediction vs. real world system operation