NRCIPG&E MEETING FEBRUARY 21, 2007 HUMBOLDT BAY POWER PLANT IMPACT OF NEW GENERATION PLANT ON LICENSE TERMINATION Pacific Gas and U Elecftic Company

Transcript of 02/21/2007 Slides from NRC/PG&E meeting regarding the ... · E]HBRP Area Released From License...

Page 1: 02/21/2007 Slides from NRC/PG&E meeting regarding the ... · E]HBRP Area Released From License Remains Within "Site Boundary" EiHBRIP Area Considered Within the "Controlled Area"

NRCIPG&E MEETINGFEBRUARY 21, 2007

HUMBOLDT BAY POWER PLANT

IMPACT OF NEW GENERATION PLANT

ON LICENSE TERMINATION

Pacific Gas andU Wý Elecftic Company

Page 2: 02/21/2007 Slides from NRC/PG&E meeting regarding the ... · E]HBRP Area Released From License Remains Within "Site Boundary" EiHBRIP Area Considered Within the "Controlled Area"

PURPOSE OF MEETING

wDescribe Unique Situation at HBPPwConstruct New Fossil Unit on Licensed Site

wExplore Options to Mitigate Impact onLicense Termination

wDiscuss Possible Regulatory Approaches

2

Page 3: 02/21/2007 Slides from NRC/PG&E meeting regarding the ... · E]HBRP Area Released From License Remains Within "Site Boundary" EiHBRIP Area Considered Within the "Controlled Area"

AGENDA

wi Current HBPP Statusw~ Major Projectsw~ Site ComplexitywMARSSIM Survey ClassificationswUnit 3 License Termination Is-sueswPotential Regulatory Approaches

w~ Next Steps

3

Page 4: 02/21/2007 Slides from NRC/PG&E meeting regarding the ... · E]HBRP Area Released From License Remains Within "Site Boundary" EiHBRIP Area Considered Within the "Controlled Area"

CURRENT HBPP STATUS

w~ Fossil Units Currently OperatinigwNuclear Unit 3 in SAFSTOR

DWork in Progress to Prepare for ISFSIwi ISFSI Licensed

u NRC Issued License November 17, 2005wi Humboldt Bay Repowering Project (HBRP)

wApproved by California Public Utilities CommissionSApplication for Certification Submitted to CaliforniaEnergy Commission in September 2006

4

Page 5: 02/21/2007 Slides from NRC/PG&E meeting regarding the ... · E]HBRP Area Released From License Remains Within "Site Boundary" EiHBRIP Area Considered Within the "Controlled Area"

HBPP SITE

7.

WA

7e

5

Page 6: 02/21/2007 Slides from NRC/PG&E meeting regarding the ... · E]HBRP Area Released From License Remains Within "Site Boundary" EiHBRIP Area Considered Within the "Controlled Area"

AERIAL VIEW OF HBPP SITE

6

Page 7: 02/21/2007 Slides from NRC/PG&E meeting regarding the ... · E]HBRP Area Released From License Remains Within "Site Boundary" EiHBRIP Area Considered Within the "Controlled Area"

MAJOR PROJECTS

wHBRPw: Construction Permit Expected Late 2007DConstruction Begin's Early 2008wOperational Mid 2009

*ISFSI- Construction During 2007- Cask Loading 2008

*Nuclear Decommissioning, and LicenseTermination

wAfter ISFSI LoadingwFinal Status Survey (FSS) Projected 2015

7

Page 8: 02/21/2007 Slides from NRC/PG&E meeting regarding the ... · E]HBRP Area Released From License Remains Within "Site Boundary" EiHBRIP Area Considered Within the "Controlled Area"

HUMBOLDT BAY POWER PLANTMAJOR PROJECT SCHEDULE

2007

UNEW PLANT SITE PREPARATION

NEW PLANT CONSTRUCTION

NEW PLANT OPERATION

ISFSI CONSTRUCTION

ISFSI LOADING

ISFSI OPERATION

SITE SURVEYS

UNIT 3 TRANSITION TO DECOM

DECOMMISSIONING ACTIVITIES

UNIT 3 PART 50 LICENSE TERMINATION

2008 2009 2010 1 2011 2012 1 2013 2014 2015

mi-i-i-i-i-i-

I -- S0 0moo

mi-i-i-i-i-i-

8

Page 9: 02/21/2007 Slides from NRC/PG&E meeting regarding the ... · E]HBRP Area Released From License Remains Within "Site Boundary" EiHBRIP Area Considered Within the "Controlled Area"

9

Page 10: 02/21/2007 Slides from NRC/PG&E meeting regarding the ... · E]HBRP Area Released From License Remains Within "Site Boundary" EiHBRIP Area Considered Within the "Controlled Area"

SITE COMPLEXITYwPhysical Site Limitations

" Proximity of Site Boundary" Limited Space for Decommissioning Activities

wRadiological IssueswControlling Dose to Members of Public in UnrestrictedArea

wi Radiological Environmental Monitoring ProgramwFlexibility During Decommissioning Activities

wHBRP (MARSS IM) Surveyo Completed Historic Site Assessment (HSA)wHBRP Site (~-5 Acres) is a Class 3 Impacted Area

10

Page 11: 02/21/2007 Slides from NRC/PG&E meeting regarding the ... · E]HBRP Area Released From License Remains Within "Site Boundary" EiHBRIP Area Considered Within the "Controlled Area"

CLASS 1 STRUCTURES

11

Page 12: 02/21/2007 Slides from NRC/PG&E meeting regarding the ... · E]HBRP Area Released From License Remains Within "Site Boundary" EiHBRIP Area Considered Within the "Controlled Area"

CLASS 1 LAND AREA

2U- i4

A, I

j .. ~ ~

-t

MULTI-AGENCY RADIATION SURVEYAND SITE INVESTIGATION MANUAL

(MASSI~ CASSFICTIOS

77ý-C CLASS I LAND AREA

HMBOLDT BAY POWER PLANTINITIAL MARSSIM

SURVEY CLASSIFICATIONS

Parifi GMKas oadNOT TO SCALE ~Aor If.~I X 12

Page 13: 02/21/2007 Slides from NRC/PG&E meeting regarding the ... · E]HBRP Area Released From License Remains Within "Site Boundary" EiHBRIP Area Considered Within the "Controlled Area"

CLASS 2 STRUCTURES~.fl

- :., ' . .

IT~ ~ T ,'

-Iv '-r,

MULni-AGENCY RADIATION SURVEY-~ -- AND SITE INVESTIGATION MANUAL

(MARSSIM) CLASSIFICATIONS

CLASS 2 STRUCTURES

tHUMBOLIDT BAY POWER PLANTIMMTAL MARSSIM

ISURVEY CLASSIFICATIONS

NOT TO SCALE E~puCIIJ~I

rArW, BY TI'M 91'BCT SET~. B

13

Page 14: 02/21/2007 Slides from NRC/PG&E meeting regarding the ... · E]HBRP Area Released From License Remains Within "Site Boundary" EiHBRIP Area Considered Within the "Controlled Area"

CLASS 2 LAND AREA- ---v..,~

r, APA

[7~~

________________________ 1I!~Z FI ~

ViA 1 4-,

I 1'- V. I

-I

-' A

Vt-I. -

T ---

MULTI-AGENCY RADIATION SURVEYAND SITE INVESTIGATION MANUAL

V (MARS~IRCLASIFICATIONS

El CLASS 2 LAND AREA

HUMBOLDT BAY POWER PLANITINITIAL MARSSIM

SURVEY CLASSIFICATIONS

NOT TO SCALETPAIATMMWC ýIO 3,. 5L 5 14

Page 15: 02/21/2007 Slides from NRC/PG&E meeting regarding the ... · E]HBRP Area Released From License Remains Within "Site Boundary" EiHBRIP Area Considered Within the "Controlled Area"

CLASS 3 STRUCTURES AND LAND AREA

ýq.

MULTI-AGENCY RADIATION SURVEYAND SITE INVESTIGATION MANUAL

(MARSSIM) CLASSIFICATION

M CLASS 3 STRUCTURESE3 CLASS 3LAND AREA

NOT TO SCALE15

Page 16: 02/21/2007 Slides from NRC/PG&E meeting regarding the ... · E]HBRP Area Released From License Remains Within "Site Boundary" EiHBRIP Area Considered Within the "Controlled Area"

UNIT 3 LICENSE TERMINATIONISSUES.

w- Regulatory ProcesswNRC License Termination Rule

DLicense Termination PlanwFinal Status Survey (FSS)

i~i HBPP Decommissioning ChallengewTerminate Part 50 License With NewOperating Plant Onsite

wFinalityiiAvoid Need to Re-Survey Inaccessible Areas

16

Page 17: 02/21/2007 Slides from NRC/PG&E meeting regarding the ... · E]HBRP Area Released From License Remains Within "Site Boundary" EiHBRIP Area Considered Within the "Controlled Area"

POTENTIAL REGULATORYAPPROACHES

wOptions

w~Partial Site Release (PSR) for HBRPArea

w~License Amendment Without PSR

wOther Options?

17

Page 18: 02/21/2007 Slides from NRC/PG&E meeting regarding the ... · E]HBRP Area Released From License Remains Within "Site Boundary" EiHBRIP Area Considered Within the "Controlled Area"

PSR OPTIONED Requirements of 10 CFR 50.83 (NUREG 1836)

SSatisfy Requirements of 1 0 CFR 20.1402

ii Satisfy Requirements of 10 CFR Part 20, Subpart D

SPerform Survey Prior to Construction of HBRP

SSubmit Environmental Report Supplement

SRevise Offsite Dose Calculation Manual (ODCM)

" Submit License Amendment Request to ReleaseProperty From License

Dl Opportunity for Hearing

" Public Meeting Required18

Page 19: 02/21/2007 Slides from NRC/PG&E meeting regarding the ... · E]HBRP Area Released From License Remains Within "Site Boundary" EiHBRIP Area Considered Within the "Controlled Area"

PSR OPTION (cont.)D Provides Finalityw1 "Licensed Site" vs "Site Boundary"

E]HBRP Area Released From License Remains Within "Site Boundary"

EiHBRIP Area Considered Within the "Controlled Area"EAllowing Time to be Used to Meet the Dose Limits of 10 CFR

20.1301 (a)(1) and increase flexibilityEiAlternatively, HBRP Outside "Controlled Area".

o Reassess Impacts Under 10 CFR Part 20Ei Potential Need for Part 20 Exemptions in an Unrestricted Area

DEffects on Environmental Monitoring Program,E Timing (Surveys and Reviews, Public Meeting,

Hearing., etc).19

Page 20: 02/21/2007 Slides from NRC/PG&E meeting regarding the ... · E]HBRP Area Released From License Remains Within "Site Boundary" EiHBRIP Area Considered Within the "Controlled Area"

LICENSE AMENDMENT OPTION

wPerform Survey Prior to Construction of HBRP

wi Implement Cross Contamination Prevention andMonitoring Plan

wLicense Amendment to Incl-ude (for example)

Ei "To demonstrate compliance-with the NRC License TerminationRule, the Final Status Survey for the HBPP Unit 3 licensetermination can rely on the results of the licensee's survey, andconfirmed by the NRC, of the area underlying the Humboldt BayRepowering Project (HBRP), provided the Cross ContaminationPrevention and Monitoring Plan is maintained."

20

Page 21: 02/21/2007 Slides from NRC/PG&E meeting regarding the ... · E]HBRP Area Released From License Remains Within "Site Boundary" EiHBRIP Area Considered Within the "Controlled Area"

LICENSE AMENDMENTOPTION (cont.)

wi No Impact. on 10 CFR Part 20 Implementation

~'HBRP Area a Controlled Area for Purposes of 10 CFR 20 (ascurrently exists)

SAvoids Potential Need for Part 20 ExemptionSNo Changes Required for Environmental Monitoring

Di Likely to Take Less Time Than Partial Site Release Optiono Precedent Exists

u Approach Used for Some Fuel Cycle Facilitieswi Provides for FinalityDi Meets Decommissioning Objectives of Partial Site Release

21

Page 22: 02/21/2007 Slides from NRC/PG&E meeting regarding the ... · E]HBRP Area Released From License Remains Within "Site Boundary" EiHBRIP Area Considered Within the "Controlled Area"

OTHER OPTIONS?.

wOther Options That Provides Finality ToFuture License Termination

22

Page 23: 02/21/2007 Slides from NRC/PG&E meeting regarding the ... · E]HBRP Area Released From License Remains Within "Site Boundary" EiHBRIP Area Considered Within the "Controlled Area"

NEXT STEPS

w~ Developing Proposed DCGL's andMARSSIM Sampling Plan

wSurvey Scheduled for Fall 2007w~ Determine Most Viable Option for HBRP

SiteN NRC Feedback

iiTiming

wPossible Future Meetings