Public Meeting to Discuss Implementation of Risk Metrics for New Light-Water Reactor 1 Risk-Informed Applications February 18, 2009 Document Date: February 18, 2009 ML090490778

Transcript of 02/18/09 Risk Metrics handouts - Public Meeting to Discuss ... · • Two most common risk metrics...

Page 1: 02/18/09 Risk Metrics handouts - Public Meeting to Discuss ... · • Two most common risk metrics for operating reactors: – Core Damage Frequency (CDF) of 10-4 /yr – Large Early

Public Meeting to Discuss Implementation of Risk Metrics for New Light-Water Reactor

1

gRisk-Informed Applications

February 18, 2009

Document Date: February 18, 2009

ML090490778

Page 2: 02/18/09 Risk Metrics handouts - Public Meeting to Discuss ... · • Two most common risk metrics for operating reactors: – Core Damage Frequency (CDF) of 10-4 /yr – Large Early

Meeting Purpose

The purpose of the meeting is to discuss the issues, and obtain stakeholder feedback, regarding the implementation of risk metrics for new light-water reactor

2

risk metrics for new light-water reactor risk-informed applications, and to identify potential paths forward.

Page 3: 02/18/09 Risk Metrics handouts - Public Meeting to Discuss ... · • Two most common risk metrics for operating reactors: – Core Damage Frequency (CDF) of 10-4 /yr – Large Early

Immediate Needs

• US-APWR Design Certification Document (DCD) and Comanche Peak combined license (COL) application Technical Specifications (TS) propose adoption of Risk-Informed TS: – Risk-Informed Completion Times (RICT)– Surveillance Frequency Control Program (SFCP)

3

Surveillance Frequency Control Program (SFCP)

• RICT in NEI 06-09 and SFCP in NEI 04-10 (used by operating reactors) are specified in TS and require a quality PRA and quantified risk assessments

• NEI 06-09 and NEI 04-10 invoke quantified risk metrics consistent with Regulatory Guide (RG) 1.174 and RG 1.177

Page 4: 02/18/09 Risk Metrics handouts - Public Meeting to Discuss ... · • Two most common risk metrics for operating reactors: – Core Damage Frequency (CDF) of 10-4 /yr – Large Early

Immediate Needs(cont.)

• Comanche Peak review schedule requires early resolution of evaluation of risk metrics: Proposed schedule for COL issuance is October 2012

4

• Resolution of issues regarding risk metrics and possible revision of associated documents are potentially critical path tasks

• Based on schedule for resolution, Comanche Peak may need to decide whether to remove RICT and SFCP initiatives from proposed TS or accept a schedule delay

Page 5: 02/18/09 Risk Metrics handouts - Public Meeting to Discuss ... · • Two most common risk metrics for operating reactors: – Core Damage Frequency (CDF) of 10-4 /yr – Large Early

Longer Term Needs

• Additional risk-informed applications for new reactors are being proposed and may be considered for post-COL:

– EPRI research program on risk-informed

5

EPRI research program on risk-informed inservice inspection of piping

– Risk-managed TS

– Special treatment requirements (10CFR50.69)

Page 6: 02/18/09 Risk Metrics handouts - Public Meeting to Discuss ... · • Two most common risk metrics for operating reactors: – Core Damage Frequency (CDF) of 10-4 /yr – Large Early

Implementation Issues

• Review of the US-APWR DC and Comanche Peak COL applications has raised fundamental questions about risk metric acceptance criteria for implementation of risk-informed initiatives

6

• Use of current numerical risk metric goals would result in risk-informed applications/amendments being evaluated against less restrictive criteria than those used for the licensing basis

Page 7: 02/18/09 Risk Metrics handouts - Public Meeting to Discuss ... · • Two most common risk metrics for operating reactors: – Core Damage Frequency (CDF) of 10-4 /yr – Large Early

Background

• Two most common risk metrics for operating reactors:– Core Damage Frequency (CDF) of 10-4 /yr– Large Early Release Frequency (LERF) of 10-5 /yr

7

• These two metrics are typically used as surrogates for latent and early fatality risk, respectively, from the Commission quantitative health objectives (QHO) in the Safety Goal Policy Statement

Page 8: 02/18/09 Risk Metrics handouts - Public Meeting to Discuss ... · • Two most common risk metrics for operating reactors: – Core Damage Frequency (CDF) of 10-4 /yr – Large Early

Background (cont.)

The Commission “fully expects that vendors engaged in designing new standard (or custom) plants will achieve a higher standard of severe accident safety performance than their prior designs.”

- August 1985

8

g

“The Commission expects that advanced reactors will provide enhanced margins of safety and/or utilize simplified, inherent, passive, or other innovative means to accomplish their safety functions.”

- July 1994

Page 9: 02/18/09 Risk Metrics handouts - Public Meeting to Discuss ... · • Two most common risk metrics for operating reactors: – Core Damage Frequency (CDF) of 10-4 /yr – Large Early

Background (cont.)

• Commission approved new reactor safety goals/objectives:– CDF < 10-4 /yr– LRF < 10-6 /yr– Conditional containment failure probability (CCFP) < 0.1

• LRF and CCFP net effect on CDF:

9

LRF and CCFP net effect on CDF:

assuming LRF = CDF x CCFP

implies that CDF would be < 10-5 /yr to meet LRF < 10-6 /yr

Page 10: 02/18/09 Risk Metrics handouts - Public Meeting to Discuss ... · • Two most common risk metrics for operating reactors: – Core Damage Frequency (CDF) of 10-4 /yr – Large Early

Background (cont.)

• New reactor applicants’ PRAs are expected to demonstrate how the design compares against the Commission Goals of less than 10-4 /yr CDF and 10-6 /yr LRF– RG 1.206, “Combined License Applications for

N l P Pl t (LWR Editi )”

10

Nuclear Power Plants (LWR Edition)”– Standard Review Plan (SRP) Chapter 19.0,

“Probabilistic Risk Assessment and Severe Accident Evaluation for New Reactors”

• Regulatory guidance associated with risk-informed initiatives are based on LERF (e.g., RG 1.174, 1.175, 1.177, 1.178, 1.200, 1.201)

Page 11: 02/18/09 Risk Metrics handouts - Public Meeting to Discuss ... · • Two most common risk metrics for operating reactors: – Core Damage Frequency (CDF) of 10-4 /yr – Large Early

CDF and LRF by Plant Type

(internal events at-power for U.S. plants only)

1.E-06

1.E-05

1.E-04

1.E-03

CD

F (

per

yr)

NRC Goal (new reactors)

11

1.E-08

1.E-07

0 1 2 3 4 5operating PWRs

operating BWRs

newLWRs

(active)

newLWRs

(passive)

(internal events at-power only)

1.E-10

1.E-09

1.E-08

1.E-07

1.E-06

1.E-05

1.E-04

0 1 2 3 4 5

LR

F (

per

yr)

operating PWRs(IPE)

operating BWRs(IPE)

newLWRs

(active)

newLWRs

(passive)

NRC Goal (new reactors)

"significant" earlyrelease (10 - 90th %iles)

Source: NUREG-1560

mean

Page 12: 02/18/09 Risk Metrics handouts - Public Meeting to Discuss ... · • Two most common risk metrics for operating reactors: – Core Damage Frequency (CDF) of 10-4 /yr – Large Early

New Reactor Risk Metrics

• Licensing: – How should acceptance guidelines for new reactor license

applications or amendments proposing to implement risk-informed initiatives consider Commission’s expectations:

• CDF?• LRF?

12

• Operations:– Reactor Oversight Process thresholds rely on CDF, ΔCDF,

conditional core damage probability (CCDP), incremental CCDP, LERF, ΔLERF, etc.

– How should risk metrics for new reactor operations consider Commission’s expectations?

• Focus on needs for licensing first

Page 13: 02/18/09 Risk Metrics handouts - Public Meeting to Discuss ... · • Two most common risk metrics for operating reactors: – Core Damage Frequency (CDF) of 10-4 /yr – Large Early

Regulatory Guidance

•• Regulatory Guide 1.174Regulatory Guide 1.174, “An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis”

• Risk-Acceptance Guidelines:– Baseline risk metrics of CDF and LERF

AND

13

ANDΔCDF and ΔLERF due to change

• Basis:– Increases should be limited to small increments– CDF threshold related to backfit regulatory analysis guidelines

ΔCDF limit based on absolute change and set close to limit of resolution of PRA models

Page 14: 02/18/09 Risk Metrics handouts - Public Meeting to Discuss ... · • Two most common risk metrics for operating reactors: – Core Damage Frequency (CDF) of 10-4 /yr – Large Early

From RG 1.174

10-6

Region I• No Changes AllowedRegion II• Small Changes• Track Cumulative ImpactsRegion III• Very Small Changes• More Flexibility with

∆L

ER

F

10-6

Region I• No Changes AllowedRegion II• Small Changes• Track Cumulative ImpactsRegion III• Very Small Changes• More Flexibility with

∆L

ER

F

14

Figure 4. Acceptance Guidelines for Large Early Release Frequency (LERF)10-5

10-7

10-6

yRespect to Baseline LERF

• Track Cumulative Impacts

Region III

Region II

LERF10-5

10-7

10-6

yRespect to Baseline LERF

• Track Cumulative Impacts

Region III

Region II

LERF

Page 15: 02/18/09 Risk Metrics handouts - Public Meeting to Discuss ... · • Two most common risk metrics for operating reactors: – Core Damage Frequency (CDF) of 10-4 /yr – Large Early

Regulatory Guidance (cont.)

• For new reactors, should the principle of “small increase” be based on relative or absoluteΔCDF and ΔLERF?

15

ΔCDF and ΔLERF?

• Should RG 1.174 include an additional ΔLRF acceptance guideline for new reactors?

Page 16: 02/18/09 Risk Metrics handouts - Public Meeting to Discuss ... · • Two most common risk metrics for operating reactors: – Core Damage Frequency (CDF) of 10-4 /yr – Large Early

Regulatory Guidance (Cont.)

•• Regulatory Guide 1.177Regulatory Guide 1.177, “An Approach for Plant-Specific, Risk-Informed Decisionmaking: Technical Specifications”

• Risk-Acceptance Guidelines:

16

– Baseline risk metrics of CDF and LERF, ΔCDF and ΔLERF due to change,

AND– Incremental conditional core damage probability

(ICCDP) < 5 x 10-7 and incremental conditional large early release probability (ICLERP) < 5 x 10-8

for a single TS allowed outage time change (AOT)

Page 17: 02/18/09 Risk Metrics handouts - Public Meeting to Discuss ... · • Two most common risk metrics for operating reactors: – Core Damage Frequency (CDF) of 10-4 /yr – Large Early

Regulatory Guidance (cont.)

• For new reactors, is it acceptable that the ICCDP and ICLERP for a large AOT change do not even approach the current guidelines due to lower

17

gbaseline CDF and LRF estimates?

• Should RG 1.177 include an additional ICLRP acceptance guideline?

Page 18: 02/18/09 Risk Metrics handouts - Public Meeting to Discuss ... · • Two most common risk metrics for operating reactors: – Core Damage Frequency (CDF) of 10-4 /yr – Large Early

Regulatory Guidance (Cont.)

•• Regulatory Guide 1.201Regulatory Guide 1.201, “Guidelines for Categorizing Structures, Systems, and Components in Nuclear Power Plants According to Their Safety Significance,” 10CFR50.69

• Importance measures such as FV and RAW are measures of relative risk. Example criteria in risk-informed applications:– Sum of Fussell-Vesely (FV) > 0.005– Maximum component basic event Risk Achievement Worth

(RAW) l > 2

18

(RAW) value > 2– Maximum applicable common cause basic events RAW value > 20

• Risk sensitivity studies using CDF and LERF are measures of absolute risk:– Any potential increases in CDF and LERF are small

Page 19: 02/18/09 Risk Metrics handouts - Public Meeting to Discuss ... · • Two most common risk metrics for operating reactors: – Core Damage Frequency (CDF) of 10-4 /yr – Large Early

Regulatory Guidance (cont.)

• Should the principle of “small increase” be based on relative or absolute ΔCDF and ΔLERF?

19

• Should RG 1.201 include an additional ΔLRF acceptance guideline strictly for new reactors?

Page 20: 02/18/09 Risk Metrics handouts - Public Meeting to Discuss ... · • Two most common risk metrics for operating reactors: – Core Damage Frequency (CDF) of 10-4 /yr – Large Early

Regulatory Guidance (Cont.)

• Other programs, processes, and regulations:–– Regulatory Guide 1.163Regulatory Guide 1.163, “Performance-Based

Containment Leak-Test Program” (specifically, ILRT test interval extension)

–– Regulatory Guide 1.175Regulatory Guide 1.175, “An Approach for Plant-Specific, Risk-Informed Decisionmaking: Inservice Testing”

–– Regulatory Guide 1.178Regulatory Guide 1.178, “An Approach for Plant-Specific Ri k I f d D i i ki f I i I ti f

20

Risk-Informed Decisionmaking for Inservice Inspection of Piping”

–– Regulatory Guide 1.200Regulatory Guide 1.200, “An Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities”

–– 10CFR50.6510CFR50.65, “Maintenance Rule”

– Other programs, processes, regulations to be considered?

Page 21: 02/18/09 Risk Metrics handouts - Public Meeting to Discuss ... · • Two most common risk metrics for operating reactors: – Core Damage Frequency (CDF) of 10-4 /yr – Large Early

Some Possible Options

• Option 1 Status Quo: Current acceptance guidelines in RG 1.174 (and associated regulatory guides) would also be applied to new reactors

Advantages• Option provides a consistent set of acceptance guidelines

for both existing and new reactors• Acknowledges and gives credit to new reactors for lower

risk estimates

21

• Others?Disadvantages• May not be consistent with Commission policy statements

on expectations that new reactor designs “will achieve a higher standard of severe accident safety performance….”

• Less restrictive change process than the Commission established for the review of new reactors

• Options could allow large relative increases in CDF and LERF compared to the baseline CDF and LERF estimates for new reactor designs

• Others?

Page 22: 02/18/09 Risk Metrics handouts - Public Meeting to Discuss ... · • Two most common risk metrics for operating reactors: – Core Damage Frequency (CDF) of 10-4 /yr – Large Early

Options (cont.)

• Option 2 Convert to Relative Risk Changes: New and current reactors

Advantages• Option recognizes that “small increase” is a relative measure and

precludes large % change in CDF and/or LERF for new reactors• Others?Disadvantages• Inconsistent with the underlying technical basis for the current absolute

thresholds in RG 1.174P t ti l di t b t i d t d t ff di h t

22

• Potential disagreement between industry and staff regarding what constitutes the “baseline” for CDF and LERF changes

• Major changes to current regulatory guides and other processes would be required

• Impacts currently operating reactors• Results in inconsistency between existing and new reactors• Transition from existing absolute acceptance guidelines to relative (%

changes) could be difficult• Depending on the chosen limits for acceptance guidelines, past

conditions that were deemed acceptable might not be found acceptable under the new formulation

• Others?

Page 23: 02/18/09 Risk Metrics handouts - Public Meeting to Discuss ... · • Two most common risk metrics for operating reactors: – Core Damage Frequency (CDF) of 10-4 /yr – Large Early

Options (cont.)

• Option 3 Reduce Acceptance Guidelines for New Reactors: Acceptance guidelines in RG 1.174 (and associated regulatory guides) would be lowered by 1 or more orders of magnitude solely for new reactors

Advantages• Acknowledges that new reactor CDF/LERF estimates are significantly

lower than existing reactors and adjusts acceptance guidelines accordingly

• Consistent with Commission policy statements on expectations that new

23

Consistent with Commission policy statements on expectations that new reactor designs “will achieve a higher standard of severe accident safety performance….”

• Others?Disadvantages• Inconsistent with the underlying technical basis for the current absolute

thresholds in RG 1.174• Penalizes new reactors for having lower risk estimates• Results in different treatment for new and current reactors of a proposed

licensing basis change resulting in a ΔLERF of 4x10-8/yr, for example• May be inconsistent with the Commission’s Safety Goal Policy

Statement on acceptable level of risk• Others?

Page 24: 02/18/09 Risk Metrics handouts - Public Meeting to Discuss ... · • Two most common risk metrics for operating reactors: – Core Damage Frequency (CDF) of 10-4 /yr – Large Early

Options (cont.)

• Option 4 Use a Combination of Existing and New Acceptance Guidelines

Advantages• Option addresses some of the concerns regarding large relative

changes to risk with new reactors• Consistent with Commission policy statements on expectations

that new reactor designs “will achieve a higher standard of severe accident safety performance….”

24

y p• Others?Disadvantages• Inconsistent with the underlying technical basis for the current

absolute thresholds in RG 1.174• Penalizes new reactors for having lower risk estimates• Results in different treatment at new and current reactors of a

proposed licensing basis change resulting in a ΔLERF of 4x10-8/yr• May be inconsistent with the Commission’s Safety Goal Policy

Statement on acceptable level of risk• Others?

Page 25: 02/18/09 Risk Metrics handouts - Public Meeting to Discuss ... · • Two most common risk metrics for operating reactors: – Core Damage Frequency (CDF) of 10-4 /yr – Large Early

Options (cont.)• Option 5 Use Existing Acceptance Guidelines

for Current and New Reactors (Status Quo), but Establish an LRF-Based Acceptance Guideline for New Reactors

Advantages• Option consistent with the goals that the Commission established

for the review of new reactors• Provides a consistent set of acceptance guidelines for both existing

and new reactors with regard to ΔCDF

25

g• Consistent with the underlying technical basis for the current

absolute thresholds for ΔCDF and ΔLERF in RG 1.174, as modified to reflect Commission policy regarding ΔLRF for new reactors

• Consistent with Commission policy statements on expectations that new reactor designs “will achieve a higher standard of severe accident safety performance….”

• Allows anticipated risk-informed initiatives to move forward• Others?

Disadvantages• Options could allow large relative increases in CDF and LERF

compared to baseline CDF and LERF estimates for new reactors• Requires significant changes to regulatory guides• Others?

Page 26: 02/18/09 Risk Metrics handouts - Public Meeting to Discuss ... · • Two most common risk metrics for operating reactors: – Core Damage Frequency (CDF) of 10-4 /yr – Large Early

Options (cont.)

• Option 6 Assess New Reactors on a Case-by-Case Basis

Advantages• No changes needed to regulatory guides and related documents for

current reactors• Staff could await the accumulation of sufficient new reactor operating

experience before making a decision on the treatment of new reactors

26

• Others?

Disadvantages• Current and new reactors would be treated inconsistently• New reactor applicants/licensees would not know the acceptance

guidelines for risk-informed initiatives• Defers any decision on the treatment of new reactors• Others?

Page 27: 02/18/09 Risk Metrics handouts - Public Meeting to Discuss ... · • Two most common risk metrics for operating reactors: – Core Damage Frequency (CDF) of 10-4 /yr – Large Early

Options (cont.)

• Are there other options and implementation issues to consider? What are the advantages/disadvantages of

27

advantages/disadvantages of those options?

Page 28: 02/18/09 Risk Metrics handouts - Public Meeting to Discuss ... · • Two most common risk metrics for operating reactors: – Core Damage Frequency (CDF) of 10-4 /yr – Large Early

Path ForwardPath Forward

• What has been done…– White paper

– Public meeting

• What is in progress…D fi iti f LRF i RG 1 200 2

28

– Definition of LRF in RG 1.200 rev. 2

– Tentative ACRS meeting scheduled

• What are the next steps…– Consider input from stakeholders

– Initiate Commission paper (for policy decision)??

– Schedule follow-up public meetings??

– Initiate regulatory guidelines??