    DIVISION 2 - SITE WORK

    SECTION 02050 - DEMOLITION

    PART 1 - GENERAL

    1.01 DESCRIPTION

    This Section covers providing the demolition WORK and removal and/or replanting of allitems as shown on the Drawings and as required for execution of the new WORK.

    PART 2 - PRODUCTS

    (Not used)

    PART 3 - EXECUTION

    3.01 Materials to be Salvaged: Prior to demolition, the CONTRACTOR shall reconfirm fromthe Company Representative what materials are to be salvaged. Materials identified for

    salvage shall be carefully disassembled and delivered to reclamation or to SAUDIARAMCO for storage as and where directed by Company Representative. Items to bereused on this project shall be stored by the CONTRACTOR.

    3.02 Structures: Remove structures and foundations to one and one half (1) meters belowexisting finish grade or deeper if required to eliminate conflicts with new construction.

    Abandoned underground tanks and manholes shall be removed in their entirety,regardless of depth.

    3.03 Utilities: Remove utilities and appurtenance to one and one half (1) meters belowexisting finish grade. Removal may be required to be deeper than one and one half (1) meters at selected locations, if required to eliminate conflicts with new construction.

    All utilities deeper than one and one half (1) meters shall be abandoned in place. Allabandoned sewer lines shall be flushed and capped. All electrical systems shall bedisconnected per Company Representative and where required, SCECO or STCdirection.

    3.04 Pavement: Saw-cut pavement to be removed. Pavement shall be carefully removed soas to avoid damage to areas not intended to be demolished.

    3.05 Existing Parking Space and Sidewalk: Remove existing parking space andconcrete/asphalt sidewalk as shown on the Construction Drawings.

    3.06 Existing Concrete Curb and Gutter: Remove existing concrete curb and gutter to provideaccess to the new parking space. Cut existing concrete curb up to 25mm above the

    gutter flow link to provide an easy approach for new pedestrian/vehicular ramp as shownon the Construction Drawing.

    SECTION 02050

    CONSTRUCTION SPECIFICATIONS

    SABG GIRLS ELEMENTARY SCHOOL AND

    BOYS INTERMEDIATE SCHOOL

    DOC 089/

    090 A BE-3157561

    of0

    MUBARRAZ AND HOFUF 2050 2

  • 7/28/2019 02050

    2/2

    3.07 Existing Chain Link Fence: Carefully dismantle and remove existing boundary chain linkfence which are to be replaced by a SABG School Standard boundary fence/wall andstore as per Company Representative's instructions.

    3.08 Existing Planting: Remove and dispose of existing trees, shrubs and planting as shownon the Construction Drawings. Mark and protect with tags and or barricades, as

    required, trees, shrubs and planting areas indicated on the Construction Drawings toremain. Confirm plants and procedure with Company Representative for planting shownon the Construction Drawings to be removed and replanted in a new locations.

    3.09 Use of Explosives: Use of explosives for demolition WORK is prohibited.

    3.10 Disposal: Disposal of demolished items shall be in accordance with Section-02110Clearing and Grubbing.

    3.11 Fill: Fill and compact all excavated holes, hazardous openings or base course resultingfrom demolition WORK in accordance with Section-02210, Earthwork.

    3.12 Asbestos: Should there be any asbestos materials found while demolition WORK is inprocess, it shall be handled/disposed of per SAUDI ARAMCO GI.150.001.

    END OF SECTION

    SECTION 02050

    CONSTRUCTION SPECIFICATIONS

    SABG GIRLS ELEMENTARY SCHOOL AND

    BOYS INTERMEDIATE SCHOOL

    DOC 089/

    090 A BE-3157562

    of0

    MUBARRAZ AND HOFUF 2050 2