8/4/2019 02 Geyser Blanket Guideline 1
1/30
M&V Guideline forM&V Guideline forGeyser InsulationGeyser Insulation
DistributionDistribution
Jacques WheelerJacques Wheeler
Anton HarrisAnton Harris
ErnstErnst UkenUken
M&V WorkshopM&V WorkshopFeb 2009Feb 2009
-
8/4/2019 02 Geyser Blanket Guideline 1
2/30
OVERVIEW
Historical Motivation - DSM
Geyser Blanket issues, Results
& Procedures CPUT & DSM
M&V Standardised Tool for
Geyser & Pipe Insulation - NWU
-
8/4/2019 02 Geyser Blanket Guideline 1
3/30
-
8/4/2019 02 Geyser Blanket Guideline 1
4/30
WHY GEYSER BLANKETS ?
ESKOM has to save 10% - 20% electricityimmediately for the next 5 -10 years
Govt aims to convert 1m geysers to solarthermal to save 600 MW, but industry onlymanufactures 30 000 geysers pa
Hence, Eskom sponsored 200 000 GeyserBlankets to the Western Cape during 2006
power outages to reduce standing losses. During M&V audits, CPUT M&V team also
advised householders to have temps
set at 550C
-
8/4/2019 02 Geyser Blanket Guideline 1
5/30
Geyser insulation test at CPUTGeyser insulation test at CPUT
-
8/4/2019 02 Geyser Blanket Guideline 1
6/30
-
8/4/2019 02 Geyser Blanket Guideline 1
7/30
CommentsComments
Smaller impact on standing losses inSmaller impact on standing losses in
warmer climates & lower set pointswarmer climates & lower set points
Geysers scattered over a large area,Geysers scattered over a large area,
making the metering expensivemaking the metering expensive
Therefore NWU M&V TeamTherefore NWU M&V Teamstandardised methodology to measurestandardised methodology to measure
impact of installing geyser and pipeimpact of installing geyser and pipeinsulationinsulation
-
8/4/2019 02 Geyser Blanket Guideline 1
8/30
Installed Geyser Blanket
-
8/4/2019 02 Geyser Blanket Guideline 1
9/30
-
8/4/2019 02 Geyser Blanket Guideline 1
10/30
-
8/4/2019 02 Geyser Blanket Guideline 1
11/30
DSM AUDIT PROCEDURE
If insulation not fastened with Al Tape - Reject
If geyser not in a working condition - Reject
If insulation not loosely fitted and material iscompressed to less than 60% of contractedthickness - Reject
If gaps in insulation are found on top of theGeyser - Reject
If >15% of geyser is not covered - Reject
If sides of geyser are not completely covered
- Reject
-
8/4/2019 02 Geyser Blanket Guideline 1
12/30
DSM AUDIT PROCEDURE (cont.)
If geyser is not properly covered
at inlet and outlet ends - Reject
If pipes are not insulated for at least3 meters or up to a wall entrance - Reject
If dampness due to geyser leakageis found - Reject
If materials used differ (provide lessinsulation) from contracted material - Reject
-
8/4/2019 02 Geyser Blanket Guideline 1
13/30
CPUT GEYSER BLANKET AUDIT
PROCEDURE FOR GEYSERS & PIPES Measure water temp from tap nearest
geyser, after running water for 1 min Is blanket material SABS approved ?
Inspect blanket installation for :
Coverage (
-
8/4/2019 02 Geyser Blanket Guideline 1
14/30
M&V RESULSTS OF FIRST 200 000
GEYSER BLANKET INSTALLATIONS 51.9% Outlet pipes had
-
8/4/2019 02 Geyser Blanket Guideline 1
15/30
NWU STANDARDISEDNWU STANDARDISED
METHODOLOGY FOR GUIDELINEMETHODOLOGY FOR GUIDELINE
BeforeBefore andand afterafter
testing on a sampletesting on a sampleof 9 identical andof 9 identical andadjustable geysersadjustable geysers
(100 litre/2 kW) in(100 litre/2 kW) inapartment complexapartment complex
inin
PotchefstroomPotchefstroom
-
8/4/2019 02 Geyser Blanket Guideline 1
16/30
Methodology (cont.)Methodology (cont.)Baseline criteria :Baseline criteria :
Geyser temp set pointGeyser temp set point Ambient tempAmbient temp
Water usageWater usage Size of geyserSize of geyser
Geyser Blanket characteristicsGeyser Blanket characteristics
-
8/4/2019 02 Geyser Blanket Guideline 1
17/30
Methodology (cont.)Methodology (cont.)Metering:Metering:
Electricity consumptionElectricity consumption
Hot water temperatureHot water temperature
Electrical
energy
measurement
Temperature
measurement
-
8/4/2019 02 Geyser Blanket Guideline 1
18/30
ENERGY USE (Uninsulated and Insulated)vs OUTSIDE TEMP
-
8/4/2019 02 Geyser Blanket Guideline 1
19/30
Methodology : Geyser and pipeMethodology : Geyser and pipe
insulation distribution projectsinsulation distribution projects Geyser (size and type)Geyser (size and type)
Temperature (geyser setTemperature (geyser set--point andpoint andambient)ambient)
Number of geysersNumber of geysers
Location of geysers (inside, outside or inLocation of geysers (inside, outside or in
ceiling void)ceiling void)
Insulation (type and percentage coverage)Insulation (type and percentage coverage) Decay rateDecay rate
-
8/4/2019 02 Geyser Blanket Guideline 1
20/30
Methodology (cont) : Geyser and pipeMethodology (cont) : Geyser and pipe
insulation distribution projectsinsulation distribution projects Characterisation and metering procedureCharacterisation and metering procedure
Geyser set point (Ts)Geyser set point (Ts)Ambient temperature (Ta)Ambient temperature (Ta)
Power consumption (kWh)Power consumption (kWh)
Measurements on geyser:Measurements on geyser:
Without geyser blanketWithout geyser blanket
With geyser blanketWith geyser blanketWith GB and 3m pipe insulationWith GB and 3m pipe insulation
FORM
-
8/4/2019 02 Geyser Blanket Guideline 1
21/30
FORMMetering procedure With blanket : (repeat for
& characterisation each type of insulator)
-
8/4/2019 02 Geyser Blanket Guideline 1
22/30
-
8/4/2019 02 Geyser Blanket Guideline 1
23/30
-
8/4/2019 02 Geyser Blanket Guideline 1
24/30
Geyser Insulation M&V ToolGeyser Insulation M&V Tool
Inputs into the statistical model :Inputs into the statistical model :
Number of geysersNumber of geysers Set pointSet point
Size of geyserSize of geyser
Type/make of geyserType/make of geyser
Location of geyserLocation of geyser
Ambient temperatureAmbient temperature
-
8/4/2019 02 Geyser Blanket Guideline 1
25/30
Geyser Insulation M&V ToolGeyser Insulation M&V Tool
Inputs into the statistical model (cont.):Inputs into the statistical model (cont.):
Type of insulationType of insulation % coverage of geyser with blanket% coverage of geyser with blanket
% coverage of pipe with insulation% coverage of pipe with insulation
Decay rateDecay rate
-
8/4/2019 02 Geyser Blanket Guideline 1
26/30
Geyser Insulation M&V ToolGeyser Insulation M&V ToolMM--values, characteristic tovalues, characteristic to geysergeyser size ;size ;
geyser typegeyser type ; and; and insulationinsulation typetype :: M1M1without GBwithout GB
M2M2with GBwith GB
M3M3with GB and pipewith GB and pipe insulationinsulation
Output :Output :
BaselineBaseline
hourly Watt valueshourly Watt values
ActualActualhourly Watt valueshourly Watt values
S G
-
8/4/2019 02 Geyser Blanket Guideline 1
27/30
Using Standardised Tool for GeyserUsing Standardised Tool for Geyser
insulation distribution projectsinsulation distribution projectsSTEPS :STEPS :
1: Complete fieldworker forms1: Complete fieldworker forms2: Enter fieldworker forms into application2: Enter fieldworker forms into application
3: Generate results using the tool3: Generate results using the tool
4: Conduct follow4: Conduct follow--up visit (decay rate)up visit (decay rate)
5: Enter follow5: Enter follow--up results into applicationup results into application
6: Generate results using the tool6: Generate results using the tool
-
8/4/2019 02 Geyser Blanket Guideline 1
28/30
Fieldworker form :GEYSER INSULATION
Fi ld k f
-
8/4/2019 02 Geyser Blanket Guideline 1
29/30
Fieldworker form :
DECAY RATE of geyser insulation
-
8/4/2019 02 Geyser Blanket Guideline 1
30/30
TABLE :