Transcript of 02. garrido 30

1. ASSYCE GROUP

2. INTRODUCTION TO THE WORLD ENERGY PROBLEM

3. CONTRIBUTION OF FOTOVOLTAIC ENERGY

4. APPLICATION TO CARIBBEAN PROBLEM

LAYOUT OF THE PRESENTATION

ASSYCE GROUP is a Spanish group of companies formed by a multidisciplinary team of specialists in engineering construction and consulting leading Green infrastructures and R&D Sustainable technologies on an international basis

1. ASSYCE GROUP

1. ASSYCE GROUP The company provides integrated turnkey energy solutions in:

Solar Photovoltaic Thermal manufacturing and systems (Solar and Biomass) Engineering for energy savings and energy efficiency Passive architecture and High Efficiency architecture Control and monitoring for energy savings ESCO`s (Energy Services Companies)

1. ASSYCE GROUP

Installation of the first big size solar thermal collector in Spain (2005) Greatest surface for solar thermal projects presented in Spain (IDAE 2005) Biggest installed solar cooling plant in Spain (Marbella 2006) Development of the first thin film MW-scale solar power plant in Spain (Marchal 2.2 MW 2006) Installation of the biggest photovoltaic power plant in Spain using thin film technology (26 MW Castuera 2010)

MILESTONES REACHED

1. ASSYCE GROUP

PHILOSOPHY:

High quality technical criteria Conscience of the necessity of innovation due to inmaturity of the technical solutions

Conservative investment criteria

Highest warranty standards

Agile response

Flexibility and customer focused

Long term focused

1. ASSYCE GROUP Main Companies of the group:

BLUE SOLAR

Solar Photovoltaic Big photovoltaic Power Plants One of the biggest companies

specialized in thin film projects High quality and high profit

projects by own innovative technology

Solar Thermal Energy and Efficiency Big thermal power plants Energy efficiency projects Biomass Thermal energy production

installations trough high efficiency

Solar Manufacturer Own technology for

manufacturing of thermal panels

High quality, high efficiency, low cost through innovation

Monitoring for Energy Energy Savings Own monitoring system for

Solar Photovoltaic Own technology applied to the

energy savings

Passive House Architecture 90 % energy savings for

buildings with standard cost of the building

Development of own technology for price reduction

ESCO (Energy Services Company) Company specialized in energy

management and high efficiency energy contracts and services

Development of an investor basis for energy funds

BLUE SOLAR

1. ASSYCE GROUP: International ASSYCE GROUP has headquarters and investments in different

points of the planet

2. ASSYCE GROUP

3. EXPERIENCE IN PHOTOVOLTAIC

SPAIN •CASTUERA: 26 MW •DARRO: 5,8 MW • ÁCULA: 2,25 MW • CUEVA DEL NEGRO: 2,1 MW • ESCÚZAR: 2,1 MW • MARCHAL SOLAR: 2,0 MW • ALBURQUERQUE: 1,90MW • LORA DE ESTEPA: 1,89MW •TÍJOLA: 1,4 MW •………

GERMANY •ECHOLSTÄDT: 8,5 MW •JESSEN: 3,84 MW FRANCE • NARBONNE: 7,5 MW • Burdeos 1,5 MW ITALY • Lazio: 6 MW • Sicily: 3 MW THAILAND • Nakhon Ratschasima: 7,5 MW • Chiang Rai: 10 MW

1. ASSYCE GROUP

2. INTRODUCTION TO THE WORLD ENERGY PROBLEM

3. CONTRIBUTION OF FOTOVOLTAIC ENERGY

4. APPLICATION TO CARIBBEAN PROBLEM

LAYOUT OF THE PRESENTATION

Depending of the energy politics of the different countries, there are variations in the relationship between the GDP and the Power Consumtion per capita. Wordlwide there is a fix relationship between the economical growth ant the increase in energy consumption. Given that the capiltalist economy must grow at least 2% yearly: The world must to consume always more energy.

• EFFICIENT COUNTRIES vs NON EFFICIENT COUNTRIES

ECONOMY NEED TO

INCREASE GDP, ENERGY CONSUMPTION IS DEPENDENT OF GDP

Today, the largest amount of energy consumption based on petrol. It is not planed any worldwide big change in this trend for the next years

- 5% yearly in the last 30 years - 15% yearly in the last 10 years

Petrol prices has changed from a base of 25 $ during the years between 1980 and 2000 to a base of 80-100 $ for the next years.

• HOW CAN STABILISE THE PRICE OF OIL?

BRENT 2012.03.29: 122 $ PER BARREL …. BUT THE WORLD IS NOT YET OUT OF THE ECONOMICAL CRISIS !!!

In 1971 Dr. Huber has predicted the world oil peak for year 2000. SOME CHANGES ON THE CONSUMPTION IN 1979 HAS DELAYED TO … ?

October 5th, 1903 -- October 11th, 1989

"Our ignorance is not so vast as our failure to use what we know."

In 1956 Dr. Hubert has predicted the 1970 peak oil of US

1. ASSYCE GROUP

2. INTRODUCTION TO THE WORLD ENERGY PROBLEM

3. CONTRIBUTION OF FOTOVOLTAIC ENERGY

4. APPLICATION TO CARIBBEAN PROBLEM

LAYOUT OF THE PRESENTATION

World has a

total necessity of 15 TW of power

The marked areas can produce about 18 TW of solar power

FROM A TECHNOLOGICAL POINT OF VIEW?

¿?

BUT PRICE IS THE KEY

DURING THE LAST 2

YEARS, IN SOME PLACES PV PRESENTS A NEAR COMPETITIVITY POSITION AGAINS WIND

HERE IS OUR MODEL T?!!

3. PHOTOVOLTAIC: EXAMPLE OF QUALITY

Solar power plant: Castuera, Spain

3. PHOTOVOLTAIC: EXAMPLE OF SIZE

Solar power plant : Escúzar, Spain

3. PHOTOVOLTAIC: TECHNICAL DIFFICULTY

Output capacity: 2.1 MWp

Module type: FS CTS® thin film

Reduction of CO2: 1.575 tonnes/year

Sunday 07.09.08 Monday 08.09.08 Martes 09.09.08

Miercoles 10.09.08 Jueves 11.09.08 Viernes 12.09.08 Con

stru

ctio

n pe

riod

: 4 w

eeks

3. PHOTOVOLTAIC: EXAMPLE OF VELOCITY

Solar power plant: Darro, Spain

3. PHOTOVOLTAIC: EXAMPLE OF BEAUTY

Output capacity: 5,8 MWp

Module type: FS 272 CTSA ® thin film

Reduction of CO2: 4.350 tonnes/year

3. COMBINED WITH BIOMASS

VIDEO!!

1. ASSYCE GROUP

2. INTRODUCTION TO THE WORLD ENERGY PROBLEM

3. CONTRIBUTION OF FOTOVOLTAIC ENERGY

4. APPLICATION TO CARIBBEAN PROBLEM

LAYOUT OF THE PRESENTATION

DEPENDING OF PETROL GENERATORS

4 TIMES HIGHER

ELECTRICAL COST AS IN USA OR EU

+ 40 $C for kWh

EXTREMELY DEPENDENT AND SENSIBLE TO CHANGES OIL PRICES

SHORT PAY-BACK OF ANY ENERGY SOLUTION

NUCLEAR ENERGY??

PLANTS OF COAL? Do you have own coal? Is it good for the tourism sector? Do you have infrastructures to support

DECENTRALISED DEVELOPMENT?

GAS Very good for power, dangerous for energy

RENEWABLE ENERGY: Local labor for local energy

IMPLEMENTING NEW CONCEPTS DEVELOPING OWN CONCEPTS

HIGH IRRADIATION PLACES

HIGH AIR CONDITIONING CONSUPMTION

QUIK INSTALLATION (50 MW IN 6 MONTHS)

FIX COST OF ENERGY FOR THE NEXT 20 YEARS

INDEPENDENCE OF OIL AND ENERGY PRICES

HELP TO STABILISE GRIDS AND DESENTRALICED GENERATION IF NEEDED

VERY LOW ENVIRONMENTAL IMPACT

HIGH WIND LOADS

HIGH SEA CORROSION

NECESSITY TO STABILITY FOR THE GRIDS

AFTER 40 % OF ENERGY SUPPLY, ACCUMULATION WILL BE NEEDED

MONITORING AND CONTROL OF THE POWER PLANTS AND GRIDS

IF YOU WANT TO INCREASE YOUR GDP YOU WILL NEED INCREASE

YOUR ECONOMICAL CONSUMPTION

THE ONLY WAY TO DO IT IS SAFELY IS TO REDUCE YOUR DEPENDENCIY ON FOSIL FUELS

TO REDUCE YOUR DEPENDENCY ON FOSIL FUELS, THE BEST WAY IS TO USE RENEWABLE ENERGY