    Handbook Tankhouse Bridge Cranes Project : GABY Document 2.2 espPage printed 1/06/07 9:59:35 Page 1/2Copyright FEMONT Edition 1 Revision 0

    Handbook TANKHOUSEBRIDGECRANES520-CN

    2.2 Caractersticas generales tankhouse bridge crane

    2.2.1 Main design criteria ...................................................................................................... 12.2.2 Main technical data....................................................................................................... 12.2.3 Crane operation............................................................................................................ 2

    2.2.1 Main design criteria

    Equipment number 520-CN-001 and 520-CN-002Crane design Top-running, double girderOperating hours / day 24Number of anodes / cell 61Number of anodes / cell 61Spacing of anodes - cathodes [mm] 100Pb-anode weight [kg] 99

    Loaded cathode max. weight [kg] 120Blank weight [kg] 50Number of cells per aisle 276Number of aisles 2Number of cranes per aisle 1Required crane availability [%] 98Plant capacity (tons per year) 150000Plant elevation [m] 2700Service indoorMax. temperature [C] 40Environment highly corrosive due to sulfuric acid mistNumber of cranes 2Auxiliary hoists 1

    2.2.2 Main technical data

    Load lifting capacity main hoist under crane bale [t] 10Load lifting capacity auxiliary hoist [t] 5Capacity of cathodes under the bale 40Capacity of anodes under the bale 40Span [m] 17,200Range of lift main hoist [mm] 3180Range of lift monorail auxiliary hoist [mm] 9000Running sheaves number 6Running sheaves size [mm] 500

    Running sheaves material 42 CrMo 4VLifting speed main hoist [m/min] 0 15Lifting speed auxiliary hoist [m/min] 1,3 and 8Travelling speed main hoist [m/min] 0 120Travelling speed (auxiliary hoist) [m/min] 5 and 20Wheel quantity 4Wheel diameter [mm] 500Wheel material 42 CrMo 4VCrane runway length [m] approx. 272Main voltage/3 pH current 400 V / 50 HzMain drive voltage/direct/3 pH. current 400 V / 50 HzMain starter switch drive voltage 120 V AC

    Control power voltage 120 V AC

  • 8/7/2019 02-02 SP Caracteristicas generales rev0_2

    2/2

    Handbook Tankhouse Bridge Cranes Project : GABY Document 2.2 espPage printed 1/06/07 9:59:35 Page 2/2Copyright FEMONT Edition 1 Revision 0

    Handbook TANKHOUSEBRIDGECRANES520-CN

    Control power voltage profibus / Modbus+ 24 V DCMaximum static wheel pressure 16 tTotal crane weight (Bridge + Bale + hoists) approx. 52 tCrane runway rail A 75Classification according FEM Overhead travelling crane FEM A8 (Q4-U8)

    Steel structure E8Main mechanisms M8Auxiliary hoist M5Auxiliary hoist mechanisms A5 (Q2-U5)

    2.2.3 Crane operation

    The automated electrode handling crane equipped with one positioning lifting bale willbe used to perform the following main duties:Lift batches of deposited cathodes from two adjacent electrowinning cells and transferthem to the stripping area. Consecutively returning with stripped cathodeblanks to

    deposit them in the spaces of the cells that were vacated by harvesting cathodes.This operation will be cyclical and fully automaticLift anodes from two adjacent cells for draining and cleaning. Periodic, semi-automatic operation with lifting bales.Pick up, install and remove jumper frame for cell maintenance in semi-automaticoperation mode.General maintenance duties including the removal and replacement of damagedcells. Occasional, manual operation with hooks of the auxiliary hoists and otherequipment as required.

    Cathodes will be pulled from the two adjacent cells in groups of 40 for washing andstripping. Replacement stripped blanks, also in pre-spaced groups of 40, will be returnedby the tankhouse cranes for reinsertion into the electrowinning cells, before any additional

    cathodes are pulled.

    The automated electrode handling crane will perform the following operational sequenceswith no interruptions between any set of consecutive tasks:

    Crane transfer from previous harvested cells to new cells to be harvestedCrane bale movement to pick up a specific third of cathodes in two adjacent cells

    Hood lifting movement above two adjacent cellsOpen drip traysPicking up cathodes

    Closing drip traysRelocate hoods

    Crane drive to inlet CSM

    Open drip traysDeposit of 40 cathodes to the inlet rack of the CSM.

    Empty drip trayCrane transfer to the outlet rack (blanks) of the CSM.Picking up 40 blanks

    Closing drip trayCrane travels to cellsCrane bale fine positionning movement in order to prepare the deposit of a specificthird of blanks in two adjacent cells

    Hood lifting movement above two adjacent cellsOpen drip traysDeposit of 40 blanks

    Relocate hoods and close drip trays