    1/1

    Pont de Normandie Bridge, France

    Year of Completion: 1995

    Construction Cost: $400M

    Client: Chambre de Commerce et

    dIndustrie du Havre

    Services Performed:

    Review of Preliminary Design

    Detailed Design of Main Bridge

    Steel Structures

    Construction of the Normandy Bridge.

    BenC.

    Gerwick,

    Inc.

    01-063e-02a

    The Normandy Bridge is situated about

    15 km east of Le Havre, and crossesthe river Seine. With an effective width

    of 19.7 m the bridge will carry a two-

    lane dual motorway. The superstruc-

    ture of the viaducts and a 116 m por-

    tion of the stiffening girder from each

    pylon into the main span is designed

    as a concrete box girder, whereas the

    central 624 m part of the stiffening

    girder is designed as an aerodynami-

    cally shaped closed steel box to re-

    duce the dead weight.

    Prefabricated steel panels with trough

    stiffeners were assembled to full width

    sections in the assembly yard. The

    yard contained two production lines for

    welding and trial assembly and one

    painting station for the exterior surface

    treatment. The interior of the steel box

    girder will be protected against corro-sion by means of dehumidication fol-

    lowing principles used in large Danish

    steel bridges over the last 22 years.

    In order to strengthen the box girder

    plate diaphragms are placed per every

    four meters through the full length of

    the steel bridge. At the bridge edge all

    the cable stays are attached to transfer

    load from the bridge deck to the ca-

    bles. These complicated edge sections

    arrived to the yard as prefabricated

    items including the eye plates for the

    cable anchors. Accurate planning was

    required to make the various panels t

    together.

    The bridge erection proceeded from

    the concrete girder ends close to the

    pylons and continued until nal gap

    closure at midspan. Each section was

    initially loaded onto a barge and trans-

    ported to bridge site, and it was then

    hoisted, welded and attached to the

    cable stays. The cable was thenstressed and adjusted for geometric

    control.

    The stay cables are of the Freyssinet

    type where parallel-galvanized seven-

    wire strands are arranged inside a PE-

    duct. The cables are arranged in two

    semifan shaped slightly inclined cable

    planes and suspend the girder each

    19.65 m.

    The concrete pylons are shaped as aninverted Y, and will rise 215 m above

    the river.

    Aerial view of the nished bridge.