01/04/2010
description
Transcript of 01/04/2010
01/04/2010
01/04/2010• Start of the studies delayed due
to trip of RQD.A12 at 08:43 at the end of pre-cycling nQPS triggered but no signal observed above threshold.
• Injection started at ~12:00 for RF capture optimization. Due to the low longitudinal emittance delivered by the SPS the capture voltage could be decreased from 8 to 5 MV at injection
• Trim to new values implemented in the sequencer
01/04/2010• Preliminary tests of the chromaticity measurement by RF
frequency modulation
01/04/2010• Smooth ramp in preparation of
squeeze test• 15:00 Beam lost at flat-top due
to bad manipulation with the sequencer
• Finally ready to start the squeeze at 18:30
• No losses during the squeeze (except to over enthusiastic use of AC dipole)
01/04/2010• b* = 9 m• Tune and chromaticity OK
01/04/2010• b* = 9 m • Beta beating measurement
• Beam 2
• Beam 1 (lost 80 % of the beam during AC dipole excitation)
01/04/2010• b* = 7 m• Tune and chromaticity OK
01/04/2010• b* = 7 m• Beam 2
01/04/2010• b* = 5 m - Tune and chromaticity OK. Coupling increases to
~0.01
01/04/2010• b* = 5 m• Beam 2
01/04/2010• Coupling Beam 2• b*=9 m b*=5 m
01/04/2010• Important loss during the ramp beam unstable. Likely
chromaticity too low
01/04/2010• Today:
– 05:00 Ramp (without feedback) - OK– 06:37 – lost cryo (oil pump?) – beams dumped – access in PZ45 for CRYO intervention
– around 14:00 – recover from cryo– 09:00 Tune feedback / chromaticity measurement during the ramp– 14:00 Non linear chromaticity measurement and off-momentum beta
beating– 17:00-18:00 LHCb polarity change– Prepare fill for the night
01/04/2010• Saturday to Monday:
– 2 fills/day with an end of fill or beginning of fill study (2-3 hours)
• Beginning/End of fill study list in work– Working point in collision– Machine protection tests– Non-linear chromaticity measurement at flat-top– b3 correction checks