01 Renc. Plumbing-Isometri

1
MH-1 Manhole tipe 1 MH-2 Manhole tipe 2 ST Septick Tank PR Peresapan FD Floor Drain SH Shower CL Closet RD Roof Drain KS Kitchen Sink / /ERZ MRLQW 39& < < MRLQW 39& WH Washtafel Saluran Air Hujan Saluran Air Kotor Saluran Closet SH Shower CL Closet KS Kitchen Sink WH Washtafel Pipa inlet PVC AW 3 4 " Pipa Distribusi Air Bersih WT Water Tank TANPA SKALA TANPA SKALA 0 0 0 CATATAN : PEMBERI TUGAS : OBJEK GAMBAR : DISETUJUI : PENANGGUNG JAWAB : KONSULTAN PERENCANA : GAMBAR : SKALA : KODE GAMBAR : JUMLAH LEMBAR : NO. LEMBAR : DIGAMBAR / DIPERIKSA TANGGAL PARAF BAMBANG KARSONO DRAFTER JOB CAPT. / ASISTEN NO TANGGAL REVISI PARAF PT. SERDANG BEDAGAI DEVELOPMENTS VILLA RAJA MUDA SUDUT RAMADHONI DWIPAYANA, ST PT. CITRA DIECONA CONSULTING ENGINEERS PROYEK : THE SOELTAN PALACE NOVI SEPRIMA IR. T. ADY GRAHA

description

zz

Transcript of 01 Renc. Plumbing-Isometri

Page 1: 01 Renc. Plumbing-Isometri

MH-1 Manhole tipe 1

MH-2 Manhole tipe 2

ST Septick Tank

PR Peresapan

FD Floor Drain

SH Shower

CL Closet

RD Roof Drain

KS Kitchen Sink

L-45° L-bow joint 45° (PVC)

Y-45° Y- joint 45° (PVC)

WH Washtafel

Saluran Air HujanSaluran Air KotorSaluran Closet

SH Shower

CL Closet

KS Kitchen Sink

WH Washtafel

Pipa inlet PVC AW 34"Pipa Distribusi Air Bersih

WT Water Tank

TANPA SKALATANPA SKALA

0 0 0

CATATAN :

PEMBERI TUGAS :

OBJEK GAMBAR :

DISETUJUI :

PENANGGUNG JAWAB :

KONSULTAN PERENCANA :

GAMBAR : SKALA :

KODE GAMBAR : JUMLAH LEMBAR :NO. LEMBAR :

DIGAMBAR / DIPERIKSA TANGGAL PARAF

BAMBANG KARSONO

DRAFTER

JOB CAPT. / ASISTEN

NO TANGGAL REVISI PARAF

PT. SERDANG BEDAGAI DEVELOPMENTS

VILLA RAJA MUDA SUDUT

RAMADHONI DWIPAYANA, ST

PT. CITRA DIECONACONSULTING ENGINEERS

PROYEK :

THE SOELTAN PALACE

NOVI SEPRIMA

IR. T. ADY GRAHA