01 - Galileo IOV config & test objectives v6.ppt -...

33
Navigation solutions powered by Europe Galileo IOV Results

Transcript of 01 - Galileo IOV config & test objectives v6.ppt -...

Page 1: 01 - Galileo IOV config & test objectives v6.ppt - CNIGcnig.gouv.fr/wp-content/uploads/2014/09/ESA_ENC-GNSS2014-Galile… · Positive Feedbacks Around the World Galileo fixes Europe's

Navigation solutions powered by Europe

GalileoIOV Results

Page 2: 01 - Galileo IOV config & test objectives v6.ppt - CNIGcnig.gouv.fr/wp-content/uploads/2014/09/ESA_ENC-GNSS2014-Galile… · Positive Feedbacks Around the World Galileo fixes Europe's

Galileo IOV results

1. Galileo IOV System Configuration and IOV Test Campaign Objectives - E. Breeuwer (ESA)

2. Quality of the broadcast Galileo navigation messagea) Orbit and clock prediction, ionospheric and group

delay parameters - A. Ballereau (ESA)b) UTC-Galileo System Time offset and GPS-Galileo

Time Offset - F. Gonzalez (ESA)

3. Galileo UERE and Position accuracy results - G. Lopez-Risueno (ESA)

4. Performance extrapolation to FOC & Outlook towards Galileo Early Services - D. Blonski (ESA)

Page 3: 01 - Galileo IOV config & test objectives v6.ppt - CNIGcnig.gouv.fr/wp-content/uploads/2014/09/ESA_ENC-GNSS2014-Galile… · Positive Feedbacks Around the World Galileo fixes Europe's

Navigation solutions powered by Europe

GalileoIOV System Configuration And Test Campaign

Edward Breeuwer ESA – Galileo Project

Page 4: 01 - Galileo IOV config & test objectives v6.ppt - CNIGcnig.gouv.fr/wp-content/uploads/2014/09/ESA_ENC-GNSS2014-Galile… · Positive Feedbacks Around the World Galileo fixes Europe's

DevelopmentSystem Testbed

GIOVE A/B

In-Orbit Validation4 satellites

initial ground infrastructure

Full Operational Capability30 operational satellites

and complete ground infrastructure

Early Galileo ServicesOS, SAR, PRS

and CS demonstrator

2005

… 2013

2014/15

2020

Deployment / Exploitation Plan

Hand-over Exploitation Phase

FOC1 System

End 2016

Page 5: 01 - Galileo IOV config & test objectives v6.ppt - CNIGcnig.gouv.fr/wp-content/uploads/2014/09/ESA_ENC-GNSS2014-Galile… · Positive Feedbacks Around the World Galileo fixes Europe's

Galileo System

5

Page 6: 01 - Galileo IOV config & test objectives v6.ppt - CNIGcnig.gouv.fr/wp-content/uploads/2014/09/ESA_ENC-GNSS2014-Galile… · Positive Feedbacks Around the World Galileo fixes Europe's

Galileo IOV Configuration

GSS

Galileo Rx

11 Monitoring Stations + GSS PTF

4 Galileo IOV Satellites

GCC-I (GMS)

External Entities(TVF, OVF, RLSP,

GALSEE)

2 (+1)TTC

GCC-D (GCS)

L-band

C-band

S-band

3ULS

Test User Receivers

GPS COTS Rx

Page 7: 01 - Galileo IOV config & test objectives v6.ppt - CNIGcnig.gouv.fr/wp-content/uploads/2014/09/ESA_ENC-GNSS2014-Galile… · Positive Feedbacks Around the World Galileo fixes Europe's

7

IOVGSAT0102

GSAT0101

GSAT0104

GSAT0103

Page 8: 01 - Galileo IOV config & test objectives v6.ppt - CNIGcnig.gouv.fr/wp-content/uploads/2014/09/ESA_ENC-GNSS2014-Galile… · Positive Feedbacks Around the World Galileo fixes Europe's

7 May, 2014

Document Title 8

IOV FM3/FM4 Satellites

SPACECRAFT PropertiesMass at Launch (incl. Propellant)Power ConsumptionDimensions:LifetimeOrbit InjectionAttitude Profile

~700 kg1420 W

2.74 x 14.5 x 1.59 m12 yearsDirect into MEO orbit Yaw Steered

FM1/2 + FM3/4 differences• SAR Transponder (not

on FM 1/2)• NSGU

EADS Astrium GmbHEADS Astrium Ltd

Thales Alenia Space – Italy

SAR Rx antenna(406 MHz, array)

SAR Tx antenna(L band)

Navigation antenna(L band, array)

Uplink antenna(C band)

Page 9: 01 - Galileo IOV config & test objectives v6.ppt - CNIGcnig.gouv.fr/wp-content/uploads/2014/09/ESA_ENC-GNSS2014-Galile… · Positive Feedbacks Around the World Galileo fixes Europe's
Page 10: 01 - Galileo IOV config & test objectives v6.ppt - CNIGcnig.gouv.fr/wp-content/uploads/2014/09/ESA_ENC-GNSS2014-Galile… · Positive Feedbacks Around the World Galileo fixes Europe's
Page 11: 01 - Galileo IOV config & test objectives v6.ppt - CNIGcnig.gouv.fr/wp-content/uploads/2014/09/ESA_ENC-GNSS2014-Galile… · Positive Feedbacks Around the World Galileo fixes Europe's

First two IOV Satellites (PFM/FM2)launched from Guiana Space Center on 21October 2011

IOV-1 Launch: Soyuz from CSG «Maiden Flight»

21 October 2011

Page 12: 01 - Galileo IOV config & test objectives v6.ppt - CNIGcnig.gouv.fr/wp-content/uploads/2014/09/ESA_ENC-GNSS2014-Galile… · Positive Feedbacks Around the World Galileo fixes Europe's

IOV-2 Launch 12th of October 2012

Page 13: 01 - Galileo IOV config & test objectives v6.ppt - CNIGcnig.gouv.fr/wp-content/uploads/2014/09/ESA_ENC-GNSS2014-Galile… · Positive Feedbacks Around the World Galileo fixes Europe's

Ground Stations Network (2013)

Troll GSSTroll GSS

Svalbard GSSSvalbard GSS

Kiruna TTCKiruna TTC

Redu GSS/IOT/TTCRedu GSS/IOT/TTC

Fucino GSSFucino GSS

Reunion ULS/GSSReunion ULS/GSS

Kourou TTC/ULS/GSS

Kourou TTC/ULS/GSS

Noumea ULS/GSSNoumea ULS/GSS

11 GSS3 ULS3 TT&C1 IOT

1 MEOLUT

Jan Mayen GSSJan Mayen GSS

Kerguelen GSSKerguelen GSSFalkland GSS Falkland GSS

St Pierre et Miquelon GSS

St Pierre et Miquelon GSS

MaspalomasMEOLUT

MaspalomasMEOLUT

Page 14: 01 - Galileo IOV config & test objectives v6.ppt - CNIGcnig.gouv.fr/wp-content/uploads/2014/09/ESA_ENC-GNSS2014-Galile… · Positive Feedbacks Around the World Galileo fixes Europe's

Fucino- Control Centre

Oberpfaffenhoffen- Control Centre

St Germain en LayeSecurity Monitoring Centre

SwanwickSecurity Monitoring Centre

MadridGalileo Service Centre (OS, CS)

Toulouse- LEOP Centre- SAR Data Service Manager

Galileo Sites in Europe

DarmstadtLEOP Centre

ReduIn Orbit Testing

ESTEC- Time and Geodesy (IOV)- Performance Monitoring

Navigation solutions powered by Europe

- OS, CS Service Centre (1x )- SaR Data Service Manager (1x) - Galileo Security Monitoring Centre (2x)

- Performance Monitoring (1x)

SERVICE INFRASTRUCTURE

- In Orbit Testing (1x)

- Time and Geodesy (1x IOV)- Control Centre (2x)

- Launch and Early Orbit Phase (2x)CORE INFRASTRUCTURE

NLGalileo Reference Centre

Page 15: 01 - Galileo IOV config & test objectives v6.ppt - CNIGcnig.gouv.fr/wp-content/uploads/2014/09/ESA_ENC-GNSS2014-Galile… · Positive Feedbacks Around the World Galileo fixes Europe's

Galileo Control Centre (D)

Page 16: 01 - Galileo IOV config & test objectives v6.ppt - CNIGcnig.gouv.fr/wp-content/uploads/2014/09/ESA_ENC-GNSS2014-Galile… · Positive Feedbacks Around the World Galileo fixes Europe's

Galileo Control Centre (I)

Page 17: 01 - Galileo IOV config & test objectives v6.ppt - CNIGcnig.gouv.fr/wp-content/uploads/2014/09/ESA_ENC-GNSS2014-Galile… · Positive Feedbacks Around the World Galileo fixes Europe's

IOV Main Objectives

1. Validation in fight of all space, ground and user components, including their interfaces, prior to full system deployment

2. Analysis of system performance with the view to refine the FOC system prior to full system deployment

3. Verification of the adequacy of the site requirements4. Verification of Navigation Processing5. User Equivalent Range Error budget characterization6. Characterization of feared events7. Verification of operational procedures8. Deployment risk reduction

Page 18: 01 - Galileo IOV config & test objectives v6.ppt - CNIGcnig.gouv.fr/wp-content/uploads/2014/09/ESA_ENC-GNSS2014-Galile… · Positive Feedbacks Around the World Galileo fixes Europe's

12 March 2013 – Galileo 1st Position Fix

-8 -6 -4 -2 0 2 4 6 8-8

-6

-4

-2

0

2

4

6

895th Percentile:5.9[m]50th Percentile:3.1[m]

12 03 2013 10:00 11:00 UTC

Dual Frequency E1-E5a F/NAV

12/03/2013 10:00 -11:00 UTC

Page 19: 01 - Galileo IOV config & test objectives v6.ppt - CNIGcnig.gouv.fr/wp-content/uploads/2014/09/ESA_ENC-GNSS2014-Galile… · Positive Feedbacks Around the World Galileo fixes Europe's

Positive Feedbacks Around the World

Galileo fixes Europe's position in history

12 Mar 2013 - Galileo. This first position fix of longitude, latitude and altitude took place at the Navigation Laboratory at ESA's technical heart ESTEC, ...

NavSAS, Septentrio Report Galileo IOV Positioning Results,Turin

13 Mar 2013 - Two European organizations announced successful positioning results yesterday (March 12, 2013) using signals from the four Galileo in-orbit ...

PLAN Group Tracks Galileo Satellites for Positioning in Canada

15 Mar 2013 - Within a day of their initial activation over central Europe on March 12, Galileo satellites were visible over North America. The PLAN Group of ...

Four Galileo Birds Sighted over Asia

27 Mar 2013 - Scientists in Hanoi, Vietnam, send word that on March 27 the four Galileo in-orbit validation satellites were visible at the same time in the sky over that Southeast Asian country ….

Real-time PPP with Galileo is now a reality!

25 Mar 2013 – Press Release indicates that the noise level of the position is better with Galileo alone than when GPS and GLONASS satellites are also used. This suggests a strong future for Fugro’sGalileo PPP solution.

GALILEO-only Position Fix from India

9 Sep 2013 - First successful Galileo-only 3-dimensional position solution obtained from Burdwan, India on 03 July, 2013.

Page 20: 01 - Galileo IOV config & test objectives v6.ppt - CNIGcnig.gouv.fr/wp-content/uploads/2014/09/ESA_ENC-GNSS2014-Galile… · Positive Feedbacks Around the World Galileo fixes Europe's

IOV Test Campaign started on 14th May up to 31st Oct 2013More than 5 months of continuous navigation validation campaign conducted in Rome, Fucino and at ESTEC2 months of Search and Rescue validation campaign conducted in Toulouse, Maspalomas and ESTEC2 months of PRS access control campaign in Fucino, Rome and ESTECTest Activity conducted in Galileo GCCs, ESA, CNES and TASI Laboratories and facilities ( both fixed and mobile )Teams of up to 35 people for Industry and 25 for ESA continuously deployedTens of Terabites of data accumulated and processed during the campaign Mobile Vans

Open Service 8500Km and 250 hrsPRS 2000Km and 100 hrs

IOV test campaign Facts and Figures

Page 21: 01 - Galileo IOV config & test objectives v6.ppt - CNIGcnig.gouv.fr/wp-content/uploads/2014/09/ESA_ENC-GNSS2014-Galile… · Positive Feedbacks Around the World Galileo fixes Europe's

IOV Test campaign achievements

Date Event12 March First Position Fix16 April First GST-UTC offset dissemination22 April First GGTO dissemination27 May First implementation of GTRF aligned to ITRF200825 June First dissemination of Commercial Service data9 July First SAR localisations using Maspalomas MEOLUTJuly First PRS position fix by Member States (PPTI)October First dissemination of SAR Return Link12 November First aeronautical test (incl. PRS)22 November First Mobile PRS Access Control

Page 22: 01 - Galileo IOV config & test objectives v6.ppt - CNIGcnig.gouv.fr/wp-content/uploads/2014/09/ESA_ENC-GNSS2014-Galile… · Positive Feedbacks Around the World Galileo fixes Europe's

Time and Geodetic Validation Facility (TGVF)

GPC ESTEC

Network of 16 Galileo Experimental Sensor

Stations (GESS)

• Independent reference for GMS orbit and clocks

• Off-line PVT computation at each GESS location

Page 23: 01 - Galileo IOV config & test objectives v6.ppt - CNIGcnig.gouv.fr/wp-content/uploads/2014/09/ESA_ENC-GNSS2014-Galile… · Positive Feedbacks Around the World Galileo fixes Europe's

GALSEE

Generates orbit&clock reference based on IOCE tool processing GSS dataCollects and compares orbit and clock data directly retrieved from GMS through dedicated interface

Page 24: 01 - Galileo IOV config & test objectives v6.ppt - CNIGcnig.gouv.fr/wp-content/uploads/2014/09/ESA_ENC-GNSS2014-Galile… · Positive Feedbacks Around the World Galileo fixes Europe's

OS and PRS versionsCollect data for UERE analysis and run PRS access control testsFixed and Mobile set-ups (ESTEC and TAS-I/Rome).

Test User Receivers

ESTEC

Page 25: 01 - Galileo IOV config & test objectives v6.ppt - CNIGcnig.gouv.fr/wp-content/uploads/2014/09/ESA_ENC-GNSS2014-Galile… · Positive Feedbacks Around the World Galileo fixes Europe's

First Road and Maritime and Trials

25

Page 26: 01 - Galileo IOV config & test objectives v6.ppt - CNIGcnig.gouv.fr/wp-content/uploads/2014/09/ESA_ENC-GNSS2014-Galile… · Positive Feedbacks Around the World Galileo fixes Europe's

First Galileo Aeronautical Trials

26

• 3 flights in November 2013 co-organized by ESA and NLR • Done in Gilze-Rijen Air Force Base using the NLR Metro-2 aircraft.

Page 27: 01 - Galileo IOV config & test objectives v6.ppt - CNIGcnig.gouv.fr/wp-content/uploads/2014/09/ESA_ENC-GNSS2014-Galile… · Positive Feedbacks Around the World Galileo fixes Europe's

Galileo Positioning works well

-20 -15 -10 -5 0 5 10 15 20

-15

-10

-5

0

5

10

15

20

<- West - East (m) ->

<- S

outh

-

Nor

th (m

) ->

95th Percentile:7.8[m]drms:4[m]

GUSN 23rd August - 3rd September 2013, GDOP<10 [mean GDOP = 4.5]

Dual Frequency Positioning Accuracy (PDOP <=5):

• Horizontal (95%)8 m in average

• Vertical (95%)9 m in average

Page 28: 01 - Galileo IOV config & test objectives v6.ppt - CNIGcnig.gouv.fr/wp-content/uploads/2014/09/ESA_ENC-GNSS2014-Galile… · Positive Feedbacks Around the World Galileo fixes Europe's

Galileo Timing works well

Timing Accuracy: 10 nsec in avg

• 67% availability with 4 IOV S/C• 96% availability after 1st FOC launch (6 S/C)

1 Dec 15 Dec 31 Dec-10

-8

-6

-4

-2

0

2

4

6

8

10

UT

C(S

IS) -

UT

Cra

pid

[ns

]

Page 29: 01 - Galileo IOV config & test objectives v6.ppt - CNIGcnig.gouv.fr/wp-content/uploads/2014/09/ESA_ENC-GNSS2014-Galile… · Positive Feedbacks Around the World Galileo fixes Europe's

Search And Rescue/Galileo

Search and RescueMission Control Center

GALILEOControl Center

Rescue CoordinationCenter

SARMEOLUT

GALILEOUp-Link

Alarm

Acknowledgment

Page 30: 01 - Galileo IOV config & test objectives v6.ppt - CNIGcnig.gouv.fr/wp-content/uploads/2014/09/ESA_ENC-GNSS2014-Galile… · Positive Feedbacks Around the World Galileo fixes Europe's

Galileo Search and Rescue works well

Grey = 3 s/cBlack = 4 s/c

SAR Beacons Localisation Accuracy:

• Within 2 km (77% localisations)

• Within 5 km (95% localisations)

Page 31: 01 - Galileo IOV config & test objectives v6.ppt - CNIGcnig.gouv.fr/wp-content/uploads/2014/09/ESA_ENC-GNSS2014-Galile… · Positive Feedbacks Around the World Galileo fixes Europe's

IOV Industry Team

WP1 SETA Industrial Team:TASI as Prime ContractorAstrium-D (now Airbus!) for Signal, Performance and External InterfacesTCS for Security

WP6 Operations Industrial Team:SpaceOpal as Prime ContractorDLR Lead for Spacecraft Operations and GCS Ground OperationsTelespazio Lead for GMS Ground Operations and PLSU M&C

Page 32: 01 - Galileo IOV config & test objectives v6.ppt - CNIGcnig.gouv.fr/wp-content/uploads/2014/09/ESA_ENC-GNSS2014-Galile… · Positive Feedbacks Around the World Galileo fixes Europe's

Positioning Search And Rescue

Grey = 3 s/cBlack = 4 s/c

-20 -15 -10 -5 0 5 10 15 20

-15

-10

-5

0

5

10

15

20

<- West - East (m) ->

<- S

outh

-

Nor

th (m

) ->

95th Percentile:7.8[m]drms:4[m]

GUSN 23rd August - 3rd September 2013, GDOP<10 [mean GDOP = 4.5]

Dual Frequency Positioning Accuracy (PDOP <=5):

• Horizontal (95%)8 m in average

• Vertical (95%)9 m in average

Timing Accuracy:< 10 nsec in avg

• 67% availability with 4 IOV S/C

• 96% availability after 1st FOC launch (6 S/C)

Timing

SAR Beacons Localisation Accuracy:

• Within 2 km (77% localisations)

• Within 5 km (95% localisations)

Galileo works very well!!

1 Dec 15 Dec 31 Dec-10

-8

-6

-4

-2

0

2

4

6

8

10

UT

C(S

IS) -

UT

Cra

pid

[ns

]

Page 33: 01 - Galileo IOV config & test objectives v6.ppt - CNIGcnig.gouv.fr/wp-content/uploads/2014/09/ESA_ENC-GNSS2014-Galile… · Positive Feedbacks Around the World Galileo fixes Europe's

http://www.esa.int/Our_Activities/Galileohttp://www.gsc-europa.eu

Thank You