FIRE & tIFE SAFETY CONSTRUCTION INSPECTION REPORT
I Preliminary/Pre-Con
I Rough Building/Frame
I Rough Fire Alarm
I Rough Fire Sprinkler
I Rough Underground
I Underground Hydro Test
I Rough Mechanical
I Rough Smoke/Fire Barrier
I Rough MedicalGas
I Rough Kitchen Hood
I Rough Fire Dampers
I Building Safety
n FGlCompliance
f] Progress
I Other lnspection (explain)
I FinalFire
I FinalBuilding
fl Final Fire Alarm
fl Final Fire Sprinkler
I Aboveground Hydro Test
I Underground Final/Flush
I FinalMechanical
I Final Smoke/Fire Barrier
I Final MedicalGas
fl FinalKitchen Hood
I Final Fire Dampers
Building Permit Card @yesFinal Fire lnspection @yes
Final Electrical lnspection @yes
Final Plumbing lnspection C yes
Third Party lnspections f, yes
Special lnspection Docs C yes
Conveyance lnspection (; yes
NFPA 72-Record of Completion Form
NFPA 24 or 25 - Material & Test Certifìcate
81 635
Approved Plans on Sitermit Card on Site flYes f]NoflYes flNo
QYes CNo frN/A
Terra Energy Trail Ridge Employee Housing Facility
21054
March 21,2017
cN/AcN/AoN/A
elN/A
øN/A
e)N/A
ØN/A
nNoØNo
CNo
CNo
CNo
CNo
CNo
CNo
c,No
flYes
IYes
Section 3, Township 5
Parachute
Fire Pump Commission I Special System I rype
[Yes nNo OtherSystem n rype
z-6z-5z-2 z-3 z-4
Pressures (psi) Supply Static
Tri-County Fire Protection
Jim Fiscus
Drain Test (psi) Static Pressu
Drain Test (psi) Static Pressu
Air Static (if applicable)
Required System
Required System
Valves Supervised f]Yes trNo
Switch (in seconds) Z-1
System Static
Residual
Residual
Type n 13 fl 13D X 13R n 13 Mult¡-Purpose
Rev:7/13/16
(¡lol,v,1,,,Ir1ill tlr
1) Fire pump flow test (annunciates to FA panel) - Ok* Fire pump flow test results per Tri-County report dated 3'9-17:
- Water flow @ 30 psi- 10 gpm in 18-sec. calcs. to 33-gpm @ 30 psi
2) Hydrostatic test result per Tri-County report dated 3-9-17 - Passed3) Fire Alarm function test - Ok4) Kitchen Hood has current service & activates FA system - Ok5) Fire extinguishers .- Ok6) EM Lighting - Ok
All listed code discrepencies must be corrected, re-inspected, and approved by a certified fire suppress¡on system inspector before the work is concealed. Approval as
a result ofthis inspection shall not be construed to be an approval of a violation ofthe applicable codes and/or ordinances of the jurisdiction.
Ø TNSTALLATION APPROVED ÜRE-tNSPECTION REQUTRED
Jim Fiscus
@tcfire.net
Chadwell SGH:07-17-0191 SUP:05-506
[email protected] C:303-91 3-2256 March 21,2017
Jim Wilson
From:Sent:To:Subject:Attachments:
Logan, David < [email protected] >
Monday, March 27,20L7 L2:59 PM
Jim WilsonFW:TEP Mancamp (ChieÐ
Fuel Line Protection - Coverage (L0).JPG; Cable Clean Up (1-).JPG; Cable Clean Up (2).JPG;
Fuel Line Protection - Coverage (L).JPG; Fuel Line Protection - Coverage (6).JPG; Reefer
Signage (2).JPG; Lift Pump Venting (L).JPG; Lift Pump Venting (2).JPG; Lift Pump
Venting (3).JPG; No Smoking Signage (1).JPG; No Smoking Signage (2).JPG; No
Smoking Signage (a).JPG; Outdoor Fire Extingusher Locate (2).JPG; Reefer Signage(1).JPG; TEP Sewer Log - Mancamp.pdf
D
Mr. Jim -
I have removed some of the photos and will send just a few, if I missed something you would like to see, please just let
me know, as I received a message saying I sent you tooooo muchhhhh stufflll!
Thank you -
From: Logan, DavidSent: Monday, March 27, 2017 12:48 PM
To: Jim Wilson [email protected]); Chadwell - CDPS, David
Cc: PhilVaughan ([email protected]); [email protected]; [email protected]: TEP Mancamp (Chief)
Good Afternoon Mr. Jim and Mr. David -
Thank you for your time last week in regards the final camp inspections. As I promised, please see attached photos
addressing the concerns we discussed. We have addressed each concern as listed below and have included photos as
well. I appreciate everyone's efforts to help navigate this in a timely manner.
a
a
GarCo Building:o Fuel Line Protectiono Signage for each Reefer to ensure doors remain closed and secure.
o Lift Pump Ventingo Sewage Pumpout/Removal Log
State Fire:
o No Smoking on all Barriers on East Side of Camp
o 20# ABC Fire Extinguisher located just outside of Barriers and Fuel Tanks. (Practical Access)
lf I have missed anything, please don't hesitate to reach out and give me a shout!
Thank you -
D
1
C O L O R A Þ O 4300CherryCreekDriveS.,Denver,co80246Department of Public 303-692-3645 | Fax 303-753-6809
llealth & Environment w.ww.colorado.gov/cdphe/dehs
RETAIL FOOD ESTÀBLISHMENT INSPECTION REPORT
Risk Factors (FBI) which ale violations directll' rel¿ted to causins {bodborue ill¡ess-
Page I of 2
License #
ESTABLISHMENT Trail Ridge Employee Housing FacilityowNERNAME Phil Vaughn/David Logan
ADDRESS 1058 county Road 215 Parachute, COzrP coDE 81635
COUNTY FIRMID INSPECTOR ID DATEDAY YEARMONTH
TRAVELTIMEIMINUTESI
INSP TIME(MINUTES)
TYPE
Garfield BH 0 3 L 0 1 7 120 60 Pre-Operational
RR Out NON CRITICAL ITEMSITEMSIn Out NÀ NO09 FOOD LABELING, FOOD PROTECTION_
a. Orisinal container. oroperlv l¿belecla,b. Food orotected f¡om contaminationfree ofb.
IO trOUTIMENT DESIGN. CONSTRUCTIONC¡oss-contamination oo'
c.a. Food-contactsurfacesd. I{ACCP olan
Date b. Non-f'ood contact surtàces
c. Dishwashingfacilitiesf. Consumer AdvisorYT1 TESTING DEVICES
wla, a. Refrigeration units provided with accurate,
consnicuous thermometerb. Wounds properly coveredH¿nds
&.
b. Dishrnachine provided with accurate thermometer
d.accessiblec. Chemical test kitse. Smokirs, eating, drinking
12 CLEANING OF EQUTPMENT & UTENSILSf. Demonstrationa. Food-contactsurfacesb. Non-food contact suriaces
food contamination fromÞ'FBT
c. Dishwashinsoperationsd. Winhe clothsotcoola.
13 UTENSILS. SINGLE-SERVICE ARTICLESto Ló5"F orgreater n"'b. Rapidlyreheatofatc. Hot a. Utensils
service articles usedb.fÞld. Requiredcookingtemperah¡reat41oF o¡e. c. No re-use ofsingle-service articlesx
FACILITIESl4Food thermometer (probe-tYPe)f.xa. Plumbine:installed,maintainedb. Garbase and refuse
c. Adeouate equipmenttemperatues Èt
to maintain foodxc. Floors. walls, ceilings
d. Liehtinsa. Manuale.b. Mechanical
foomsf.c. ln-Places. Premises maintainedh. Seoaration oflivins. laundrva. Safe water sourcex i. Restroom facilitiesb. Hot & cold water underx
15 OTHER OPERATIONSc. Backflow,backsiphonagexd. Sewage disposalx n¡rmerlv stored
a.xb. Accæssible ¡Btx
Ix available&U.
ora.
Animals orohibitedc-
KEY:lnOutNA
NO
Item in compliance dregulations at the time of inspection
Item out ofcotnpliance w/regulations at the time ofinspection(Not Applicable) - T1ris section(s) ofthe regulation
is not perlbrmed by the establishment(Not Observed) - This section(s) of the regulation was not being
performed by the establishment at the time of tlre inspection
Repeat violationR
storeda.
b. P¡operly labeledDEHS Fo¡m RF00 l -1
-revk. l-HC
@:crvcs: flYe¡EtloOn-Site Follow Up:EYq€lNo
c PrnnerlvusedRE(:EIVED BYr /n-
W-- )uo,,tENVIRONMENTAL HEATTH SPECIALIST:
03 FOOD T-I]MPT)RATLIRE CONÎ-ROI,
O6 H.{¡{D\\'ASHING F'ACILITIIS
08 POIS()NOUS 0R -I'OXIC I'I'ILMS
PI,UMBING S}'STNMS05 wA
O7 PEST CONTROL
sEll
{ì4 SANITIZATION Conc
OI FOOD SOURCE
{ì2 PERSONNIIT,
COLORADO DEPARTMENT OF PUBLIC HEALTH AND EÌ\TYTRONMENT
RETAIL FOOD INSPECTION REPORT Page
Items described below identi$ violations to be corrected as indicated by the regulatory authority. Failure to
comply may result in further action by the regulatory authority.
Method of/for CorrectionCorrected On site (COS) I CMS t] Folow-up (F/U) nThis is a Follow-up to the Inspection conducted on
-
2 of 7
DATE3/toh7
FIRM IDESTABLISHMENTTrail Ridge Employee Housing Facility
Method oflforCorrection
CORRECTBY
(MI\{/DD/TY)
ITEM#
REMARKS
Approved for operation
RECEIVED BYENVTRONMENTAL lrEALrH SnectN,fu-
ComplÍance Agreement (CA) tr
COLORADO STATE ELECTRICAL BOARI)1560 Broadway, Suite 1350Denver, CO 80202
Inspection Report
Permit #: 816233
Permit Hotder: DUCEY'S ELECTRIC INC ALAN DUCEY
PO BOX 606 RANGELY 81648
Phone: (970) 675-8368 Fax: Email: [email protected]
Date lnspected: 0310112017
lSmiles south from county rd 5 on county rd 1009A Rifle, Garfield County,
Terra Energy
Acceptedlnspection Type: Final
NEW OTHER
Inspector: Norman Feck 303-869-3442
Corrections
Comments:
Site:Owner:
Status
2. RIO BLANCO CR 539%4'16.607"N
10756'45.265"W
1. RIFLE, COLORADO
¡l;ir f.l;,?.ìri
!.4
v-3
çt
ð¡g
tìACir:tS FA
{ìn r,;i*iMr st
1.
'-¡
rl.,t,ìì !i¡¡lri,L'q¡i ,4
Rrtle ü"tpSt¿tÈ Pilrk
,5 f{ ,4 ,li ii t-,
DIRECTIONS FROM RIFLE CO. via BLM 10094 RD1. Follow CO-13 N/CO-789 N to Co Rd 5 - 18.4 miles2. Turn left onto Co Rd 5 (Piceance Creek Rd) - 20.1 miles3. Turn left onto MTW Ranch Rd - 14.9 miles4. Turn left onto site access road - 0.5 miles5. WPX Energy Rocky Mt. Trail Ridge Employee Housing Facility
5
3. MTW RANCH RD3950'37.024"N108'14'3.052"w
5. HOUSING FACILITY39 138'57.931 'N
108.15'43.878'W
1 009
ACCESS GATE &GUARD STATION
g/J
=c,iÉr!:¿ulr.lJz
DRIVING DIRECTIONS FROM RIFLE CO. TO SITE
WPX ENERGY ROCKY MOUNTAIN TRAIL RIDGE EMPLOYEE HOUSING FACILITYSOPRIS ENGINEERING - LLC CIVIL CONSULTANTS 502 MAIN STREET, SUITE A3 CARBONDALE, COLORADO 8.|623 970.704.0311 1 41 80 EmergResponsel 411 1 I
EMERGENCY RESPONSE MAP
4. ACCESS ROAD39 138',56.133"N
109'1 6'14.601.W
HELICOPTER PAD39 39'00.198'N
109'15'46.779',w
00.5 1 2 3 4EMiIeS l!
bt
}(ï
il(Ë:¡isst ,r ,qi¡ilå
4K4aE
l_{,rÂ,$ ,{lrLìf
^
,¿
ii';:,¡Ë"3, r; r
¡:,
-\
\åi. {-
!
{
åç
T
February 14,2077
Mr. Phil VaughanPhil Vaughan Construction Management
1038 County Road 323
Rifle, CO 81650
oddo
engineering
RE: Trail Ridge Employee Housing I Yz" pipe locations
Dear Phil:
We understand that the location of the I Yz" pipe sleeve for the Yz" diameter minimum wire rope
tie clown anchors have been installed at vadous locations along the skids, which are differentthan the Oddo Engineering construction documents.
The following locations are acceptable as desøibed below:
t. Mancamp building- East Elevation- 7-112" pipe installed 4- 718" from modular box tocenterline of pipe.
Mancamp building- West Elevation- l- Yz" pipe installed 3- 718" from modular box tocenterline of pipe.
RefrigeratorlEreezer skid- both ends. l-1/2" pipe installed against the box as per
drawings.
4 Potable water skid/Sewer skid- both ends. I -712" pipe installed 5" from sea can box tocenterline of pipe.
Let me know if you have questions
2
J
Jllttl1
ENGINEER
LA. Oddo, P.E.
Bab2}l 4 / I 420-A6lTrail Ridge Employee Pipe
713 Cooper Ave ô Suite 200 t Glenwood Springs, CO 81601
(970) 945-1006 t Fax (970)945-2966 ç E-Mail [email protected]
wt{) ;'j
4. ACCESS ROAD3938'56.133'N
108"16'14.601"W
\i,
Åt
\;a-
L
è
tT
¡ù
fî (}
,J
Çå
b
ACCESS GATE &GUARD STATION
5. HOUSING FACILITY3938'57.931"N
108"15'43.878'W
3. MTW RANCH RD3950',37.024'N108.14'3.052'W
EMERGENCY RESPONSE MAPDRIVING DIRECTIONS FROM RIFLE CO. TO SITE Ër
Éu¡:¿r.¡ltJJ
Ø,Ltl ¡
¿(f,
^t
1. RIFLE, COLORADO
2. RIO BLANCO CR 539%4'16.607'N
10756',45.265'W
HELICOPTER PAD39ts9'00.198'N
108"15'46.779"W
000.5 1 2 3 4E-rMiles
, ñl;ge
?t is q:
{(t¡-
¡v
sY
4K4
Pl/4¡SÁV
rrr f¡iif
r-()Åi6 ñ,Ð$fi
q
LuC)o
o0c A
û¿y,s'." Ë,,r¡r /
.:
üKñ,4SË1 r,{,,åçb ^ {ê
¡.t4q
f¡"d'r'r,tr
SOPRIS ENGINEERING - LLC CIVIL CONSULTANTS 502 MAIN STREET, SUITE A3 CARBONDALE, COLORADO 81623 970.704.0311 14180 EmergResponsel4l .l19
WPX ENERGY ROCKY MOUNTAIN TRAIL RIDGE EMPLOYEE HOUSING FACILITY
DIRECTIONS FROM RIFLE CO. via BLM 100e4 RD1. Follow CO-13 N/CO-789 N to Co Rd 5 - 18.4 miles2. Turn left onto Co Rd 5 (Piceance Creek Rd) - 20.1 miles3. Turn left onto MTW Ranch Rd - 14.9 miles4. Turn left onto site access road - 0.5 miles5. WPX Energy Rocky Mt. Trail Ridge Employee Housing Facility
\-'i;:.
6;: r Hl Pa¡å
:\" ç-'
å9
!r,",-ti-
(,.
{:.4Õ¡us v-A
::r{
i*¡f 'ì.!rli] rS€
ùSJilnta?rì
ûo ui te¡ile sa
ðñAfuO H
Rrfle GapSate Filk
David Argo
Sent:To:Cc:
From:
Subject:
Attachments:
Phil Vaughan <[email protected]>Friday, February L7,20L7 5:24 AMDavid ArgoJeff Johnson ([email protected]); Mike Harvey ([email protected]);
Joel Martinez fi [email protected])RE:Terra Energy Partners- Trail Ridge Employee Housing Facility- Building Permit
ClarificationsTrail Ridge Stamped-O2 -I6-L7.pdf
Dave,
I hope that you are doing well today.
As noted below ín my 2/L4/L7 email, please find attached the updated, sealed, electrical drawings prepared by Joel
Martinez, P.E. for your files and information. The updated electrical drawings reflect the added sewer skid.
I have plotted the drawings and will incorporate them into the field set.
Thank you and please contact me with questions.
Sincerely,
PhilVaughanPresidentPhil Vaughan Construction Management, lnc.
1038 County Road 323Rifle, CO 81650o. 970-62s-53s0c.970-379-0428Email: [email protected]
Website: www.pvcmi.com
David Arqo
From:Sent:To:Cc:
Subject:
Attachments:
Follow Up Flag:Flag Status:
372.
Phil Vaughan < [email protected]>
Monday, February L3,2017 3:01 PM
David ArgoJeff Johnson [email protected]); Mike Harvey ([email protected])
RE: Terra Energy Partners- Trail Ridge Employee Housing Facility- Building Permit
Clarifications1-61-14-02-13-L6 CVR.PDF; SZ-S815-OPO.J PG
Follow upFlagged
Dave,
I hope that you are doing wellthis afternoon.
I left a voice mailon your phone a few minutes ago.
HB Rentals, the supplier of the housing facility building, will be utilizing a sewage vault located within a sea container
please find a photo attached. This vault is permitted under Garfield County Permit # SEPT-12-I-6-4535.
I have had project architect Jeff Johnson prepare an evaluation of the sewage vault skid for compliance with IBC
2015. Jeff is cc'd on this communicat¡on: Phone: 970-625-0580'
Jeff noted the following:
,,The sewer skid use ond occupancy classification wilt be a Group U- Utitity & Miscetlaneous os defined in IBC 2075 section
t would suggest the sewer skid be cotegorized os Type V-B os per 2075 tBC, (reference Toble 607).
ln addition, Tqbte 602 shows that o V-B type of construction does not require rated exter¡or walls for either the Group R-
Housing or the Group tJ-Sewer skid os long os the distonce between the two buildings is between 70 feet ond 30 feet.
The distance between the sewer skid and the housing focility should therefore be 77'-0" "
I have attached a revised site plan prepared by Jeff Johnson adding the sewer skid.
please let me know if you agree with my assertion that, like the potable water skid, the sewer skid does not urre a
Garfield County Building Permit.
I have also cc'd Chief Mike Harvey- De Beque Fire Protection District on this email as well.
Thank you for your assistance and please contact me with questions
Sincerely, ?uv zlvlnr.o.wf%l
PhilVaughanPresident
1
þ4d/¿)frlt0w-w7
General Notes:Tho puçoseof thesedraüngslslographlællyd€plctlh6 general
nalureof lhewtrlobê psdomsd. Thecontsctorshallænlmdlmenslons ånd s€lect labdæton prccesses ând t€chnlques pdorlo
appll€ble d€s, odlnånæs, laws, psmlß, ånd ønùactdocuñânls.
The Conrâcto.shall h responslble forarsnglng all nêcessery
lnspecdons required by Gaileld Countypdorto@vedng ånysuch
CODE REPORISCode Repons were p€ómed by JêlJohnson khtrectural, PC
and d6led November30,2016. All lnformatlon lndudd ln üese repods
shall be a pan oflhis Pemfr sô|. The tollo#ng wo repds were subñhed.
Houslno FadlltvRefi ge-Gtor/ Fô6zer Sk¡d
Plansshall be used ln æniuncilontr Wo*lng Dmw¡ng DæumenlsofOuloosl Oñæ Þrcüdsd byAtco Studur€s lnc..Dråwlng No. 93642-01: Specficallon No.60m25;CDoH Sââl 0&17.2007
All dråwlngs, plsns, and speclflcalions sre inshmsnb ofserviceprovided by JeffJohnson Archllectu€ì, PC and r€maln lhe prcpeny
--- ---¿!-- - - - -- -: --
FutureStorage
\
Con3truct¡on
cover, S¡te,Houslng gldg.,Hôtei & lndêr
Revisêd:0213f7
GVR
JohnsonArch¡tec,tural PC
13ô EâstThhd Sfs€tRlf¡e, CO Elô50
970€2il)580llarú@rcf.n6t
copydght 201 7
Site PlanTrail Ë
TIt¡IElrÐE
II
oI)o
I¡0o ^gEËË-g äfE o.ãÈEeàr¡ *PoËqrÐitr1¡ rir¡¡E;!E_ õLtr rr
bEEl-F (ll
UNIT 1
UNIT 2
UNIT 3
UNIT 1
UNIT 5
UNIT6
Gombined
Facil
CODE INFORMÀÍION: 201 s lntsmallonâl Bulldlng CodeCharacterând Uss: L¡üng quâdâßbr NatuBl Gas Wo*€¡s
8,,J1å8fl'lgJi8&oo" "s¡snias, cDoH pran appbvâr m47r4
OccupsncyClasslfl€llon: R-2 & B
TWe ofConstrucllon: V-BNumberofStod6s: One
Buildlng Slze = il'{ x 73'{'Bulldln! Area =3,980 SF
Bulldlns Helshtr 10.67 n.
RoolLive Loed: 75 PSF
WlndLoad: Exp.C/QS=110mph/31.0PS'
H
I
I
f
Jcot-oo
=
ooNo
o
=
-+Const. VB Const VB
HF
w¡lhoul wlt€n mnsenl by JetrJohnson hhlt€cluraì, PC.
N
David Argo
From:Sent:To:Subject:
Dave,
Thank you for taking time to speak this afternoon.
t. Permit t2-t6-4534
A. ATCO Structures Cover Sheet- I have removed the 2 yellow sticky notes from this page as these are not
formal plan review comments.
B. Sheet CVR- "Verify adequate structural support @ floor/foundation for water tank at Mech. Room". As per
our conversation, this fire suppression system water tank is shown on the ATCO Structures Sheet AA01 as
equipment item number 642. This tank, and associated water weight, was calculated into the steel skid
design and was approved via the Colorado Division of Housing Plan Approval and affixing the CDOH insignias
on each factory manufactured unit. We agreed that additional verification of this issue is not required.
C. I will have Don Berger, P.E. provide a letter certifying the installation of the ground a nchors and will submit
this to you via email for your information and for the use of the Garfield County Building Department Field
lnspectors.
Thank you for your assistance and please contact me with questions.
Sincerely,
PhilVaughanPresidentPhil Vaughan Construction Management, lnc.
1038 County Road 323Rifle, CO 81650o.970-62s-s350c.970-379-0428Email: [email protected]
Website: www.pvcmi.com
Phil Vaughan < [email protected]>
Tuesday, February 07,20t7 7:09 PM
David ArgoTerra Energy Partners- Trail Ridge Employee Housing Facility- Building Permit
Clarifications
1