    CONFIDENTIALTechnical Assistance and Supervision for the ISPA Contracts in

    Pitesti

    Works Contract

    E!A"ILITATION AND E#TENSION OF T!E WATE S$PPL% AND SEWEA&ENETWO'S IN PITESTI

    Proposed Ne(otiation Schedules

    Introduction

    The assessment of the Tenders for the Works Contract was undertaken by the evaluationCommittee from 16th March 2007 up to 27th pril 2007 and the Tender !valuation "eport wassubmitted to C#C$% Takin& into account that all offers received e'ceeded the available bud&et of the pro(ect)accordin& with the !valuation "eport conclusions and in line with the *"+ provisions) the

    C#C$ decided to cancel the tender procedure and to enter into ne&otiations%

    The followin& tenders were considered compliant and to start ne&otiation with,

    -. /oares da Costa amount of, 21%17%66)00 !uro3

    -. 4idroconstructia amount of, 25%20%57)00 !uro3

    /oco&etra amount of, 26%16%07)00 !uro3

    ne comment needed to be done) as there was a fourth compliant Tenderer) 8 -. va' with atotal amount of, %59%511)90 !uro% :ecause of the &reat difference in the price more than0; compared with the more e'pensive) /oco&etra3 and the fact that there are still threeother Tenderers to ne&otiate with) it was a&reed to do not continue to ne&otiate with them at

    this sta&e%

    The $=s approach andaims to support C#C$ in the ne&otiations e'ercise) in particular to,

    •  &ree in advance the aims of the ne&otiations in order to achieve a

    successful contract

    • !nable those attendin& the ne&otiations to properly consider and

    prepare for the activity

    • !nable any documentation re?uired from the Tenderers to be

    re?uested and completed by them in advance of the meetin&s of ne&otiations) and if 

    necessary for the information to be received and reviewed in advance of meetin&s withthe Tenderers%

    Financin(

    The bud&et for the *ro(ect is 15%10%770 !uro% The available bud&et of the pro(ect remainsunchan&ed%

    Staffin( and Ti)in( of the Ne(otiations

    The

  • 8/17/2019 00 Negotiation Strategy Networks 13 Jun 2007

    2/3

     nswer reception by #a' from Tenderers 8 sta&e 1,

    "eview /ubmissions from Tenderers,

    "eview list of ob(ectives to be subtracted,

    "e?uest of new prices after subtraction of items to theTenderers

    n order to be able to assess the reduction of scope of work and value) a clear breakdown of prices proposed by the Tenderers must be asked for some specificitems e&% asphalt strippin&) debri evacuation) concrete slab) asphalt layer) etc3

    3 :ased on the new bud&et the old allocation from *rocurement *lan I the new funds&athered from Aocal Council3 and the reduced /cope of Works based on streetsalready done by #inal beneficiary3) an analyse will be done on the remainin&

    difference

    2

  • 8/17/2019 00 Negotiation Strategy Networks 13 Jun 2007

    3/3

    63 n ade?uate reduction of the scope of work will be done based on the priority criteriawhich needed to be done%

    The strate&y was developed in accordance with *"+ provisions article 2%5%153 takin& intoconsideration that the ori&inal terms of the Tenderer Bocuments shall not be substantiallyaltered in order to respect the #inancin& Memorandum and the principles of e?ual treatmentshould be observed%

    #ollowin& the receipt of the acceptable answer from the Tenderers) they will be invited tomeetin&s to finalise ne&otiations%

    Schedule of Activities in the Ne(otiations

    We su&&est the followin& schedule of activities in se?uence,

    i3 >ssue to the tenderers a re?uest for lowest price

    ii3 !valuate the answer from the Tenderersiii3 "eview list of ob(ectives to be subtracted

    iv3 "e?uest ?uotations from Tenderers on the reduced scope of works

    v3 #inalise scope and price with the Tenderers

    vi3 /election of a winner and award of Contract%

    Chairperson, dela .asile

    /ecretary, "a@van Aiutiev

    .otin& members, +elu Mu(a

    -ean8Auc +rard

    .ladimir Mateica