EDCON/EHV/L-37-38 Erection Schedule Price breakup towards erection of materials/ equipment etc. Sl. no. Description of Items Unit Unit Rate (Rs.) Total Amount (Rs.) Service Tax Rate (Rs.) Service Tax Amount (Rs.) Mejia-Kly LILO at Burnpur IISCO Feeder Total 1 2 3 a b 4=a+b 5 6 7 8 1 Survey a) Detail survey including preliminary survey, Km 4 0.5 4.5 plotting of towers in the route profile drawing, line chart, towerschedule etc. for approval. b) Check survey including preparation & sub- Km 18.5 1.2 19.7 mission of profile drawing, tower spotting, line chart etc. for approval. c) Forest survey as mentioned in specification Km 1 0.5 1.5 2 Eart h wor k in excavati on i n fo undati on Trenches, drains etc. including dressing of sides & ramming of bottoms, lift upto 3.0 m, including getting out the excavated soil & disposal of surplus excavated soils as directed within a lead of 50m complete as per specifications, drawing & instruction of Engineer-in-charge: a) Ordinary soil Cum 6000 1250 7250 b) Slushy soil Cum 5000 250 5250 c) Hard soil mixed with gravel & moorum Cum 500 50 550 d) Ordinary rock Cum 500 50 550 e) Hard rock (requiring blasting) Cum 100 10 110 f) Hard rock (blasting prohibited) Cum 50 10 60 3 Ext ra over ite m ( 2) abo ve for excava tion i n foundation for every additional lift of 1.5m or part thereof over the initial lift of 3.0m: a) Ordinary soil Cum 900 250 1150 b) Slushy soil Cum 750 50 800 c) Hard soil mixed with gravel & moorum Cum 75 10 85 Provisional Quantity Page 1 Signature with stamp of Bidder  

Transcript of 0-Line_35-Erection SCH

8/7/2019 0-Line_35-Erection SCH

http://slidepdf.com/reader/full/0-line35-erection-sch 1/9

EDCON/EHV/L-37-38 Erection Schedule

Price breakup towards erection of materials/ equipment etc.

Sl. no. Description of Items Unit

Unit Rate

(Rs.)

Total Amount

(Rs.)

Service Tax

Rate

(Rs.)

Service Tax

Amount (Rs.)

Mejia-Kly

LILO at

Burnpur 

IISCO

Feeder  Total1 2 3 a b 4=a+b 5 6 7 8

1 Survey

a) Detail survey including preliminary survey, Km 4 0.5 4.5

plotting of towers in the route profile drawing,

line chart, towerschedule etc. for approval.

b) Check survey including preparation & sub- Km 18.5 1.2 19.7

mission of profile drawing, tower spotting, line

chart etc. for approval.

c) Forest survey as mentioned in specification Km 1 0.5 1.5

2 Earth work in excavation in foundation

Trenches, drains etc. including dressing of 

sides & ramming of bottoms, lift upto 3.0 m,

including getting out the excavated soil &

disposal of surplus excavated soils as

directed within a lead of 50m complete as per 

specifications, drawing & instruction of 

Engineer-in-charge:

a) Ordinary soil Cum 6000 1250 7250

b) Slushy soil Cum 5000 250 5250

c) Hard soil mixed with gravel & moorum Cum 500 50 550

d) Ordinary rock Cum 500 50 550

e) Hard rock (requiring blasting) Cum 100 10 110

f) Hard rock (blasting prohibited) Cum 50 10 60

3 Extra over item (2) above for excavation in

foundation for every additional lift of 1.5m or 

part thereof over the initial lift of 3.0m:

a) Ordinary soil Cum 900 250 1150

b) Slushy soil Cum 750 50 800

c) Hard soil mixed with gravel & moorum Cum 75 10 85

Provisional Quantity

Page 1 Signature with stamp of Bidder  

8/7/2019 0-Line_35-Erection SCH

http://slidepdf.com/reader/full/0-line35-erection-sch 2/9

EDCON/EHV/L-37-38 Erection Schedule

Sl. no. Description of Items Unit

Unit Rate

(Rs.)

Total Amount

(Rs.)

Service Tax

Rate

(Rs.)

Service Tax

Amount (Rs.)

Mejia-Kly

LILO at

Burnpur 

IISCO

Feeder  Total

1 2 3 a b 4=a+b 5 6 7 8

Provisional Quantity

d) Ordinary rock Cum 75 10 85

e) Hard rock (requiring blasting) Cum 0 0 0

f) Hard rock (blasting prohibited) Cum 0 0 0

4 Earthwork in filling in excavated pits, trenches,

plinth&sides of foundation etc. in layers not

exceeding 200mm in depth, consolidating &

dressing each deposited layer by ramming and

watering, including cost of supply &

carriage of materials etc. complete as per 

drgs., specifications & directions.

a) with earth obtained from excavation of Cum 9000 1250 10250foundation (excluding rock)

b) with sand Cum 500 100 600

c) with earth obtained from borrow pits inclusive Cum 1000 50 1050

of excavation & carriage/haulage/

transportation.

5 Fitting of template and setting of stub (4 stubs

per tower)--stub to be upplied by DVC free of 

cost:

A For 220 kV Tower 

a) A type tower (maximum deviation 2 degree) Per Tower  37 1 38

b) S type tower (maximum deviation 15 degree) Per Tower  4 1 5

c) B type tower (maximum deviation 30 degree) Per Tower  5 0 5

d) C type tower (maximum deviation 60 degree) Per Tower  12 0 12

e) D type tower (maximum deviation 90 degree) Per Tower  6 5 11

f) Special Line Crossing Tower  Per Tower  0 0 0

(maximum deviation 5 degree)

Page 2 Signature with stamp of Bidder  

8/7/2019 0-Line_35-Erection SCH

http://slidepdf.com/reader/full/0-line35-erection-sch 3/9

EDCON/EHV/L-37-38 Erection Schedule

Sl. no. Description of Items Unit

Unit Rate

(Rs.)

Total Amount

(Rs.)

Service Tax

Rate

(Rs.)

Service Tax

Amount (Rs.)

Mejia-Kly

LILO at

Burnpur 

IISCO

Feeder  Total

1 2 3 a b 4=a+b 5 6 7 8

Provisional Quantity

6 Supplying, straightening, cutting, bending, MT 42 5 47

cranking, hooking, fixing,binding & placing at

any position in superstructure, foundation, &

plnth with M/S/ Torsteel reinforcements in all

works of concrete, masonry etc.including

supply of binding wire with 18SWG (1.05mm)

galvanised wire twisted tight and/or welding

the splices where necessary as per IS codes

or direction and holding in position with steel

rod spacer/chairs/horses etc. complete.

7 Hiring, erecting, centering, supporting, stiking, Sqm 500 100 600cleaning etc.of formwork of approved design

with staging, props and supports for plain &

RCC works with all accessories and at all

heights including removal of forms as per 

drawings, specificvations & directions.

8 Charges for shoring & strutting of pits includ- Sqm 50 10 60

ing cost of materials required for this purpose

& fixing in position during excavation and/or 

concreting works as per specifications and

directions.

9 Providing and laying in position plain cement

concrete in foundation &plinth with coarse sand

& 20mm & down stone aggregates of approved

quality, well graded, washed and screened

including cost of supply & transport of all

materials to site, mixing, laying, vibrating, curing

etc. complete but excluding centering &

shuttering as per drawings, specification &

direction with:

a) Mix 1:4:8 Cum 2 1 3

b) Mix 1:3:6 Cum 5 3 8

c) Mix 1:2:4 Cum 3 2 5

Page 3 Signature with stamp of Bidder  

8/7/2019 0-Line_35-Erection SCH

http://slidepdf.com/reader/full/0-line35-erection-sch 4/9

EDCON/EHV/L-37-38 Erection Schedule

Sl. no. Description of Items Unit

Unit Rate

(Rs.)

Total Amount

(Rs.)

Service Tax

Rate

(Rs.)

Service Tax

Amount (Rs.)

Mejia-Kly

LILO at

Burnpur 

IISCO

Feeder  Total

1 2 3 a b 4=a+b 5 6 7 8

Provisional Quantity

10 Providing & laying in position Reinforced Cement

concrete work in pyramid & chimney of tower 

foundation & plinth, with coarse sand & 20mm.

& down stone aggregates of approved quality,

well graded, washed and screened including

cost of supply & transport of all materials to si te,

mixing, laying, vibrating, curing etc.complete

including hiring, erection, supporting, striking out,

cleaning etc.of steel muff boxes, but excluding

the cost of reinforcement as per drawings,

specifications &directions with :a) Concrete mix 1:2:4 Cum 5 3 8

b) Concrete mix 1:1.5:3 Cum 660 110 770

c) Concrete mix 1:1:2 Cum 560 5 565

11 Providing & laying in position Reinforced Cement

concrete work in stepped foundation & plinth,

with coarse sand & 20mm, & down stone

aggregates of approved quality, well graded,

washed and screened including cost of supply &

transport of all materials to site, mixing, laying,

vibrating, curing etc. complete but excluding the

cost of reinforcement and formwork as per 

drawings., specifications & directions with:

a) Concrete mix 1:2:4 Cum 5 2 7

b) Concrete mix 1:1.5:3 Cum 150 8 158

c) Concrete mix 1:1:2 Cum 75 60 135

Page 4 Signature with stamp of Bidder  

8/7/2019 0-Line_35-Erection SCH

http://slidepdf.com/reader/full/0-line35-erection-sch 5/9

EDCON/EHV/L-37-38 Erection Schedule

Sl. no. Description of Items Unit

Unit Rate

(Rs.)

Total Amount

(Rs.)

Service Tax

Rate

(Rs.)

Service Tax

Amount (Rs.)

Mejia-Kly

LILO at

Burnpur 

IISCO

Feeder  Total

1 2 3 a b 4=a+b 5 6 7 8

Provisional Quantity

12 Providing & laying in position Reinforced Cement

concrete work with coarse sand & 20 mm. &

down stone aggregates of approved quality,

well graded, washed and screened including

cost of supply & transport of all materials to

site, mixing, laying, vibrating, curing etc. complete

but excluding the cost of reinforcement and

formwork as per drawings, specifications &

directions in superstructure with

a) Concrete mix 1:2:4 Cum 2 1 3

b) Concrete mix 1:1.5:3 Cum 8 4 12

c) Concrete mix 1:2:4 Cum 0 0 0

13 Supplying, Fabricating,Transporting, assembl- MT 3.2 0 3.2

ing, placing & fixing in position,Holding down /

foundation steel bolts including threading as

required etc.complete with 2 (two) nos. of nuts.

The 200 mm top portions of bolt are to be

be galvanised.

14 Transporting, Assembling & Erecting of 220 kV MT 610.5 104 714.5

tower members / structures at site with

contractor's own tools & tackles, crane & la-

bour, including fitting, checking, punching & tack

welding of all bolts, nuts and/ or connections

upto bottom cross-arm including aluminium

painting of tack welded bolts & nuts etc., fitting &

fixing of Number plate,Danger plate, Phase plate,

Circuit plate,Bird guard, Anti-climbing devices etc.

complete as per drgs, specifications &

directions.

Page 5 Signature with stamp of Bidder  

8/7/2019 0-Line_35-Erection SCH

http://slidepdf.com/reader/full/0-line35-erection-sch 6/9

EDCON/EHV/L-37-38 Erection Schedule

Sl. no. Description of Items Unit

Unit Rate

(Rs.)

Total Amount

(Rs.)

Service Tax

Rate

(Rs.)

Service Tax

Amount (Rs.)

Mejia-Kly

LILO at

Burnpur 

IISCO

Feeder  Total

1 2 3 a b 4=a+b 5 6 7 8

Provisional Quantity

15 Providing, supplying and laying of 20cm thick Sq.m. 100 10 110

second class brick pitching (brick on edge over 

one brick flat pitching) on slopes of embankment

canal etc. in 1:4 cement mortar curing preparing

base to proper level of slope, with weep holes

at a spacing of 1.8 metre horizontally and 0.9

metre vertically or as shown in the drawing

complete (with pointing 1:3)

16 Providing, supplying and laying of rouble pitch- Cum 75 5 80

ing (thickness varying from150m to 300m) with

stone boulder including hand packing and

caulking with cement concrete (1:3:6), 0.15

cu.m. per cu.m. of boulder pitching with 20mm

and down stone chips including making weep

holes at a spacing of 180 cm. horizontally and

90 cm. vertically including rough dressing of 

the slope for pitching, packing of the back of 

weep holes etc. complete

17 Providing, supplying and laying of random rubble Cum 25 5 30

pitching with stone boulder of approved quality

and size and packed as per direction etc.

complete.

18 Dismantling, taking out, removing, stacking, dispo-

sal of unserviceable materials and transportation

of salvaged items to specified DVC Stores,

including loading/ unloading etc.all complete of 

following substructures and superstructures at

all elevations as per direction of Engineer-in-charge:

a) R.C.C. work including stacking of reinforcement Cum 1 0.5 1.5

b) 1:3:6 or richer mix Cement concrete work Cum 0.5 0.3 0.8

c) 1:4:8 or leaner mix Cement concrete work Cum 0.5 0.3 0.8

d) Masonary work in cement mortar Cum 0 0 0

e) Steel work in built-up sections including dismembering MT 1 0.5 1.5

Page 6 Signature with stamp of Bidder  

8/7/2019 0-Line_35-Erection SCH

http://slidepdf.com/reader/full/0-line35-erection-sch 7/9

EDCON/EHV/L-37-38 Erection Schedule

Sl. no. Description of Items Unit

Unit Rate

(Rs.)

Total Amount

(Rs.)

Service Tax

Rate

(Rs.)

Service Tax

Amount (Rs.)

Mejia-Kly

LILO at

Burnpur 

IISCO

Feeder  Total

1 2 3 a b 4=a+b 5 6 7 8

Provisional Quantity

19 Carrying out necessary field test for soil

samples, preparation and submission of soil

testing report in triplicate giving results of 

investigation and related reasons qualitatively,

expected settlement and recommendation

for bearing capacity at different level by

conducting laboratory test on soil samples

as per relevant practice:

a) Determination of crushing strength of soil Nos. 1 1 2

samples

b) Determination of modulus of sub-grade reaction Nos. 0 0 0

(k), modulus of elasticity (E), Poisson's Ratio( m )

c) Moisture absorption test and porosity Nos. 0 0 0

d) Bulk density, natural moisture content,dry Nos. 3 1 4

density, relative density and specific gravity.

e) Standard Penetration Test(SPT) Nos. 5 2 7

20 Grounding of 220 kV Tower with

a) GI pipe, GI flats etc. as per drawing, exclusive per set 61 6 67

cost of all materials to be supplied by DVC free

of cost but including cost of storing, handling &

transporting to site complete as per drawing,

specifications and directions.

b) Counter poise earthing exclusive cost of all per set 4 1 5

material to be supplied by DVC free of cost but

including excavation and backfill & levelling &

cost of materials to site complete as per 

drawing, specifications and directions.

Page 7 Signature with stamp of Bidder  

8/7/2019 0-Line_35-Erection SCH

http://slidepdf.com/reader/full/0-line35-erection-sch 8/9

EDCON/EHV/L-37-38 Erection Schedule

Sl. no. Description of Items Unit

Unit Rate

(Rs.)

Total Amount

(Rs.)

Service Tax

Rate

(Rs.)

Service Tax

Amount (Rs.)

Mejia-Kly

LILO at

Burnpur 

IISCO

Feeder  Total

1 2 3 a b 4=a+b 5 6 7 8

Provisional Quantity

21 Stringing and sagging of 6 nos. power Km 18.5 1.2 19.7

conductors(AAAC Zebra)(61/3.31mm)

including hoisting of insulators and fixing on the

towers, erection of hardware sets, jointing of 

conductors, running out and pulling out of 

conductors and tensioning and clipping in with

clamps, fixing of vibration dampers and or 

preformed armour rods, number plates, danger 

plates, step bolts and anticlimbing devices with

barbed wire etc.,erection of jumpers at the

section/angle towers and hoisting & fixing of 

the suspension insulator, stringing for jumper 

connection etc.complete in all materials to the

site per route Kilometer of the 220 kV line.(AAAC

zebra conductor,insulators,hardwares &clamps,

repair sleeves, vibration dampers, pre-formed

armour rods, compression joints, non-tension

 joints, danger plate, number plate & step bolts

to be supplied by DVC free of cost)

22 Stringing and sagging of one no.earth wire Km 18.5 0 18.5

(7/3.15mm) quality galvanized steel wire

including laying string, tensioning, clamping,

 jointing etc.complete including storing, handling,

transporting of all materials of site per route

Kilometer of the 220 kV line (including fixing of 

hardwares, vibration damper and/or armour 

rods)(Steel ground wire, hardware and clamps,

vibration dampers, armour rods, compression

 joints to be supplied by DVC free of cost)

Page 8 Signature with stamp of Bidder  

8/7/2019 0-Line_35-Erection SCH

http://slidepdf.com/reader/full/0-line35-erection-sch 9/9

EDCON/EHV/L-37-38 Erection Schedule

Sl. no. Description of Items Unit

Unit Rate

(Rs.)

Total Amount

(Rs.)

Service Tax

Rate

(Rs.)

Service Tax

Amount (Rs.)

Mejia-Kly

LILO at

Burnpur 

IISCO

Feeder  Total

1 2 3 a b 4=a+b 5 6 7 8

Provisional Quantity

24 Service charges to get the following proposal

cleared as mentioned inspec.

a) Railway Clearance per Xing 1 1 2

b) PTCC Clearance

i) for Mejia-Kly LILO at Burnpur S/Stn LS

ii) for IISCO feeder LS

c) Forest Clearance(optional)

i) for Mejia-Kly LILO at Burnpur S/Stn LS

ii) for IISCO feeder LS

TOTAL

Note: LS indicates Lump Sum. Bidder is requested to quote separately for Mejia-Kly LILO and IISCO feeder against sl. No. 25 (a) and (c).

Page 9 Signature with stamp of Bidder