Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup 01 Del Norte 101 36.1/0.0 43640 0100V 0100000193 201.110 2016/17 $1,500 $ 50,448 $ - HBRR-S $7,000 $3,700 $ 520 $8,400 $ 19,620 01 Del Norte 101 8.2/8.7 0B090 1072 0100020444 201.113 2017/18 $5,589 $ 13,290 $ - HBRR-S $2,159 $3,720 $ 373 $3,282 $ 9,534 01 Del Norte 101 15.1/15.3 0B270 1077 0112000111 201.131 2015/16 $ 20 $ 4,390 $ - NH $ 437 $1,331 $ 90 $ 878 $ 2,736 01 Del Norte 101 17.5/0.0 0B280 1078 0112000112 201.131 2015/16 $ 10 $ 8,000 $ - NH $ 400 $1,500 $ 90 $2,000 $ 3,990 01 Del Norte 101 21.7/22.9 0B290 1079 0112000113 201.131 2015/16 $ 10 $ 1,000 $ - NH $ 350 $1,050 $ 80 $ 700 $ 2,180 01 Del Norte 101 22.0/0.0 0B300 1080 0112000114 201.131 2014/15 $ 10 $ 3,500 $ - NH $ 85 $1,250 $ 40 $ 700 $ 2,075 01 Del Norte 101 15.0/0.0 0C241 1098 0113000082 201.131 2015/16 $ 120 $ 2,500 $ - NH $ 400 $ 600 $ 80 $ 500 $ 1,580 01 Del Norte 101 20.6/23.6 0E260 1099 0114000003 201.010 2015/16 $ 6 $ 7,415 $ - STP $ 319 $ 374 $ 6 $ 986 $ 1,685 01 Del Norte 101 0C590 7011 0113000013 201.015 2016/17 $ 145 $ 2,880 $ - STP $ 504 $ 415 $ 39 $ 295 $ 1,253 01 Del Norte 199 22.7/26.5 4500U 1073 0100020447 201.310 2014/15 $ 200 $ 4,500 $ - NH $ 300 $ 700 $ 150 $ 900 $ 2,050 01 Del Norte 199 8.0/8.5 0B260 1076 0112000150 201.015 2015/16 $ 72 $ 4,255 $ - STP $1,035 $ 685 $ 33 $1,683 $ 3,436 01 Del Norte 199 8.7/21.7 0B310 1081 0112000115 201.131 2014/15 $ 20 $ 1,250 $ - NH $ 200 $ 400 $ 10 $ 320 $ 930 01 Del Norte 199 24.6/0.0 0B320 1082 0112000116 201.131 2014/15 $ 20 $ 3,000 $ - NH $ 300 $ 900 $ 10 $ 650 $ 1,860 01 Del Norte 199 26.3/0.0 0B330 1083 0112000117 201.131 2014/15 $ 20 $ 850 $ - NH $ 120 $ 300 $ 10 $ 200 $ 630 01 Del Norte 199 33.4/0.0 0C470 1094 0112000287 201.235 2017/18 $ 7 $ 1,751 $ - NH $ 158 $ 638 $ 9 $ 479 $ 1,284 01 Del Norte VAR 0A100 1065 0112000023 201.113 2015/16 $4,091 $ 12,225 $ - HBRR-S $1,219 $1,706 $ 84 $2,147 $ 5,156 01 Humboldt 101 89.1/R90.4 29611 0073X 0100020395 201.111 2015/16 $ - $ 500 $ - HBRR-S $ 50 $ 60 $ 11 $ 90 $ 211 01 Humboldt 101 27.7/M53.9 0A110 2301 0112000211 201.113 2017/18 $ 44 $ 5,565 $ - HBRR-S $1,198 $1,145 $ 204 $1,171 $ 3,718 2014 SHOPP As of June 2014 Close-Out ($1,000) Near Crescent City from 0.2 mle north of the Smith River Overflow Bridge. Replace bridge. Near Klamath, at Panther Creek Bridge No. 01-0025 and at Hunter Creek Bridge No. 01-0003. Seismic retrofit. Near Crescent City, from 1.3 to 1.5 miles north of Rudisill Road. Repair roadway. Near Crescent City, at 2.8 miles north of Mill Creek Park. Reconstruct roadway. Near Crescent City, from 1 to 1.5 miles south to 0.2 mile north of Hamilton Road; also at PM 22.9. Repair slipouts. Near Crescent City, at 0.6 mile south of Hamilton Road. Stabilize Near Crescent City, at 1.2 miles north of Rudisill Road. Construct soldier-tie-back wall Near Crescent City, from north of Mill Creek Park entrance to south of Humboldt Road. Place dense graded asphalt concrete and high friction surface treatment. In Del Norte and Humboldt counties, on Routes 101, 169, 197 and 199 at various locations. Upgrade metal beam guard rail. Near Patricks Creek, from 0.6 mile north of Patrick Creek Road to 1.1 miles north of Siskiyou Fork Road. Widen shoulder Near Crescent City, from 0.8 mile north of South Fork Road to 0.2 mile south of Signal Peak Sidehill Viaduct. Widen Near Patrick Creek, at 2.3 miles south of Hardscrabble Creek Bridge; also at 0.3 mile south of Patrick Creek Campground. Near Patrick Creek, at 0.6 mile north of Middle Fork Smith River Bridge. Construct soldier pile Near Patrick Creek, at 0.9 mile north of Siskiyou Fork Road. Reconstruct roadway and drainage. Near Idlewild, south of Collier Tunnel Bridge. Install required public water system in compliance with Federal and State statutes and regulatory requirements. In Del Norte County, on Route 101 at Railroad Avenue Overcrossing No. 01-0063, Smith River Overflow Bridge No. 01-0046, Rowdy Creek Bridge No. 01-0023; also on Route 199, at Route 199/101 Connector Overcrossing No. 01-0058F and Middle Fork Smith River Near McKinleyville, from 0.2 mile south to 0.6 mile north of Mad River Bridge; also on Route 200 from St. Maru Lane to Reserve Road (PM R0.3/0.5). Required environmental mitigation for EA Near Fortuna, at South Fork Eel River Bridge No. 04-0123 and Eel River Bridge No. 04-0016R.

Transcript of €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0...

Page 1: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup 01 Del Norte 101 36.1/0.0 43640 0100V 0100000193 201.110 2016/17 $ 1,500 $ 50,448 $ - HBRR-S $ 7,000 $ 3,700 $ 520 $ 8,400 $ 19,620

01 Del Norte 101 8.2/8.7 0B090 1072 0100020444 201.113 2017/18 $ 5,589 $ 13,290 $ - HBRR-S $ 2,159 $ 3,720 $ 373 $ 3,282 $ 9,534

01 Del Norte 101 15.1/15.3 0B270 1077 0112000111 201.131 2015/16 $ 20 $ 4,390 $ - NH $ 437 $ 1,331 $ 90 $ 878 $ 2,736

01 Del Norte 101 17.5/0.0 0B280 1078 0112000112 201.131 2015/16 $ 10 $ 8,000 $ - NH $ 400 $ 1,500 $ 90 $ 2,000 $ 3,990

01 Del Norte 101 21.7/22.9 0B290 1079 0112000113 201.131 2015/16 $ 10 $ 1,000 $ - NH $ 350 $ 1,050 $ 80 $ 700 $ 2,180

01 Del Norte 101 22.0/0.0 0B300 1080 0112000114 201.131 2014/15 $ 10 $ 3,500 $ - NH $ 85 $ 1,250 $ 40 $ 700 $ 2,075

01 Del Norte 101 15.0/0.0 0C241 1098 0113000082 201.131 2015/16 $ 120 $ 2,500 $ - NH $ 400 $ 600 $ 80 $ 500 $ 1,580

01 Del Norte 101 20.6/23.6 0E260 1099 0114000003 201.010 2015/16 $ 6 $ 7,415 $ - STP $ 319 $ 374 $ 6 $ 986 $ 1,685

01 Del Norte 101 0C590 7011 0113000013 201.015 2016/17 $ 145 $ 2,880 $ - STP $ 504 $ 415 $ 39 $ 295 $ 1,253

01 Del Norte 199 22.7/26.5 4500U 1073 0100020447 201.310 2014/15 $ 200 $ 4,500 $ - NH $ 300 $ 700 $ 150 $ 900 $ 2,050

01 Del Norte 199 8.0/8.5 0B260 1076 0112000150 201.015 2015/16 $ 72 $ 4,255 $ - STP $ 1,035 $ 685 $ 33 $ 1,683 $ 3,436

01 Del Norte 199 8.7/21.7 0B310 1081 0112000115 201.131 2014/15 $ 20 $ 1,250 $ - NH $ 200 $ 400 $ 10 $ 320 $ 930

01 Del Norte 199 24.6/0.0 0B320 1082 0112000116 201.131 2014/15 $ 20 $ 3,000 $ - NH $ 300 $ 900 $ 10 $ 650 $ 1,860

01 Del Norte 199 26.3/0.0 0B330 1083 0112000117 201.131 2014/15 $ 20 $ 850 $ - NH $ 120 $ 300 $ 10 $ 200 $ 630

01 Del Norte 199 33.4/0.0 0C470 1094 0112000287 201.235 2017/18 $ 7 $ 1,751 $ - NH $ 158 $ 638 $ 9 $ 479 $ 1,284

01 Del Norte VAR 0A100 1065 0112000023 201.113 2015/16 $ 4,091 $ 12,225 $ - HBRR-S $ 1,219 $ 1,706 $ 84 $ 2,147 $ 5,156

2014 SHOPP As of June 2014 Close-Out($1,000)

Near Crescent City from 0.2 mle north of the Smith River Overflow Bridge. Replace bridge.Near Klamath, at Panther Creek Bridge No. 01-0025 and at Hunter Creek Bridge No. 01-0003. Seismic retrofit.

Near Crescent City, from 1.3 to 1.5 miles north of Rudisill Road. Repair roadway.

Near Crescent City, at 2.8 miles north of Mill Creek Park. Reconstruct roadway.

Near Crescent City, from 1 to 1.5 miles south to 0.2 mile north of Hamilton Road; also at PM 22.9. Repair slipouts.

Near Crescent City, at 0.6 mile south of Hamilton Road. Stabilize roadway.Near Crescent City, at 1.2 miles north of Rudisill Road. Construct soldier-tie-back wall and reconstruct roadway.Near Crescent City, from north of Mill Creek Park entrance to south of Humboldt Road. Place dense graded asphalt concrete and high friction surface treatment.

In Del Norte and Humboldt counties, on Routes 101, 169, 197 and 199 at various locations. Upgrade metal beam guard rail.

Near Patricks Creek, from 0.6 mile north of Patrick Creek Road to 1.1 miles north of Siskiyou Fork Road. Widen shoulder

Near Crescent City, from 0.8 mile north of South Fork Road to 0.2 mile south of Signal Peak Sidehill Viaduct. Widen shoulders.

Near Patrick Creek, at 2.3 miles south of Hardscrabble Creek Bridge; also at 0.3 mile south of Patrick Creek Campground. Construct buttresses.

Near Patrick Creek, at 0.6 mile north of Middle Fork Smith River Bridge. Construct soldier pile wall.Near Patrick Creek, at 0.9 mile north of Siskiyou Fork Road. Reconstruct roadway and drainage.Near Idlewild, south of Collier Tunnel Bridge. Install required public water system in compliance with Federal and State statutes and regulatory requirements.

In Del Norte County, on Route 101 at Railroad Avenue Overcrossing No. 01-0063, Smith River Overflow Bridge No. 01-0046, Rowdy Creek Bridge No. 01-0023; also on Route 199, at Route 199/101 Connector Overcrossing No. 01-0058F and Middle Fork Smith River

Page 2: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

01 Humboldt 101 89.1/R90.4 29611 0073X 0100020395 201.111 2015/16 $ - $ 500 $ - HBRR-S $ 50 $ 60 $ 11 $ 90 $ 211

01 Humboldt 101 27.7/M53.9 0A110 2301 0112000211 201.113 2017/18 $ 44 $ 5,565 $ - HBRR-S $ 1,198 $ 1,145 $ 204 $ 1,171 $ 3,718

01 Humboldt 101 R15.0/0.0 0B400 2338 0112000124 201.131 2014/15 $ 10 $ 2,180 $ - NH $ 217 $ 651 $ 50 $ 436 $ 1,354

01 Humboldt 101 R40.9/0.0 0B410 2339 0112000125 201.131 2014/15 $ 5 $ 1,450 $ - NH $ 145 $ 747 $ 57 $ 290 $ 1,239

01 Humboldt 101 110.6/0.0 0B420 2340 0112000126 201.131 2015/16 $ 20 $ 1,950 $ - NH $ 193 $ 579 $ 28 $ 390 $ 1,190

01 Humboldt 101 111.4/111.6 0B430 2341 0112000127 201.131 2015/16 $ 5 $ 4,500 $ - NH $ 630 $ 1,889 $ 80 $ 1,260 $ 3,859

01 Humboldt 101 102.9/105.2 0C440 2365 0112000284 201.235 2017/18 $ 20 $ 2,423 $ - NH $ 412 $ 1,204 $ 39 $ 793 $ 2,448

01 Humboldt 101 77.0/77.5 0C710 2368 0113000031 201.010 2017/18 $ 110 $ 2,474 $ - STP $ 395 $ 704 $ 164 $ 544 $ 1,807

01 Humboldt 101 80.8/87.8 0C970 2375 0113000094 201.015 2016/17 $ 118 $ 1,763 $ - STP $ 310 $ 415 $ 48 $ 287 $ 1,060

01 Humboldt 101 79.9/84.7 0E000 2376 0113000091 201.112 2016/17 $ 196 $ 4,249 $ - HBRR-S $ 368 $ 1,514 $ 63 $ 1,342 $ 3,287

01 Humboldt 101 R48.6/R49.0 0E230 2394 0114000026 201.119 2014/15 $ 18 $ 2,310 $ - HBRR-S $ 163 $ 116 $ 70 $ 419 $ 768

01 Humboldt 101 0B820 7009 0112000189 201.015 2016/17 $ 71 $ 3,500 $ - STP $ 173 $ 345 $ 104 $ 529 $ 1,151

01 Humboldt 101 0C840 7012 0113000066 201.015 2016/17 $ 11 $ 2,054 $ - STP $ 144 $ 268 $ 62 $ 353 $ 827

01 Humboldt 169 26.4/29.9 0B440 2342 0112000128 201.131 2015/16 $ 30 $ 2,770 $ - NH $ 371 $ 1,113 $ 120 $ 750 $ 2,354

01 Humboldt 254 0.8/43.1 43060 0046D 0100000186 201.112 2015/16 $ 112 $ 5,500 $ - HBRR-S $ 1,600 $ 1,400 $ 197 $ 1,700 $ 4,897

01 Humboldt 254 6.8/42.1 40950 2270 0100000158 201.151 2017/18 $ 305 $ 1,160 $ - NH $ 266 $ 140 $ 151 $ 190 $ 747

Near McKinleyville, from 0.2 mile south to 0.6 mile north of Mad River Bridge; also on Route 200 from St. Maru Lane to Reserve Road (PM R0.3/0.5). Required environmental mitigation for EA 29610.

Near Fortuna, at South Fork Eel River Bridge No. 04-0123 and Eel River Bridge No. 04-0016R. Seismic retrofit.Near Redway, at 1.5 miles south of Hurlbutt Undercrossing; also at 1.1 miles south of Williford Road Undercrossing (PM 29.4). Reconstruct roadway and drainage.

Near Redcrest, at 1.1 miles north of Redcrest northbound onramp. Reconstruct roadway and de-water.Near Trinidad at 1.9 miles south of Kane Road; also at 1.3 miles north of Kane Road (PM T113.8). Reconstruct roadway and de-water.

Near Big Lagoon, from 1.9 to 2.1 miles north of Georgia Pacific Road. Repair slipout.Near Trinidad¸ between PMs 102.9 and 105.2. Install public water system in compliance with Federal and State statutes and regulatory requirements.

In Eureka, 0.3 mile south to 0.2 mile north of Wabash Avenue. Improve intersections.Near Eureka, from PMs 80.0 to 87.8.   Upgrade metal beam guardrail.Near Eureka, from postmile 79.9 to 84.7.   Replace bridge rails on Gannon Slough Bridge No. 04-0024R, replace guard rail on Eureka Slough Bridge No. 04-0022L and replace Jacoby Creek Bridge No. 04-0023L.  Upgrade bridge rails and replace bridge.

Near Scotia, at Eel River Overhead No. 04-0014. Rehabilitate bridge deck.In Humboldt and Mendocino counties, on Routes 20 and 101 at various locations. Upgrade metal beam guard rail.

In Lake, Mendocino, Humboldt and Del Norte counties, on Routes 20,36, 101, 175 and 299 at various locations. Upgrade crash cushions.

Near Weitchpec, from 0.6 mile west of Miners Creek Bridge to Martins Ferry Bridge.

Repair slipouts.

Near Phillipsville, from Ohman Creek Bridge to Bear Creek Bridge at various locations. Replace bridge rails and widen shoulder.

Near Miranda, from 2.3 miles south of Miranda Post Office to 0.9 mile south of Bear Creek Bridge. Upgrade drainage systems.

Page 3: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

01 Humboldt 254 4.4/11.2 47531 2381 0113000112 201.131 2015/16 $ 50 $ 966 $ - NH $ 208 $ 238 $ 89 $ 150 $ 685

01 Humboldt 299 R29.2/38.6 48740 2268 0113000128 201.121 2014/15 $ - $ 8,415 $ - NH $ 225 $ 337 $ 41 $ 1,181 $ 1,784

01 Humboldt 299 R5.7/38.6 49830 2292 0100000693 201.015 2015/16 $ 25 $ 21,050 $ - STP $ 2,107 $ 1,536 $ 54 $ 3,582 $ 7,279

01 Humboldt 299 30.2/30.6 0A320 2305 0100020307 201.010 2014/15 $ 8 $ 1,419 $ - STP $ 300 $ 423 $ 54 $ 314 $ 1,091

01 Humboldt 299 23.6/23.9 0A370 2307 0100020290 201.015 2015/16 $ 7 $ 1,921 $ - STP $ 339 $ 475 $ 54 $ 416 $ 1,284

01 Humboldt 299 25.0/25.7 0A490 2308 0100020308 201.010 2015/16 $ 63 $ 4,071 $ - STP $ 428 $ 622 $ 52 $ 368 $ 1,470

01 Humboldt 299 R21.1/R21.5 0A520 2311 0100020425 201.010 2014/15 $ 29 $ 2,300 $ - STP $ 526 $ 525 $ 66 $ 280 $ 1,397

01 Humboldt 299 R10.7/R26.1 0B450 2343 0112000130 201.131 2015/16 $ 30 $ 2,560 $ - NH $ 352 $ 1,055 $ 40 $ 725 $ 2,172

01 Humboldt 299 32.0/0.0 0B460 2344 0112000129 201.131 2014/15 $ - $ 850 $ - NH $ 134 $ 575 $ 15 $ 270 $ 994

01 Humboldt 36 36.1/40.5 43730 2272 0112000180 201.310 2015/16 $ 20 $ 7,180 $ - NH $ 200 $ 100 $ 400 $ 100 $ 800

01 Humboldt 36 22.8/27.7 0B340 2332 0112000118 201.131 2014/15 $ 5 $ 1,410 $ - NH $ 141 $ 680 $ 20 $ 282 $ 1,123

01 Humboldt 36 30.2/0.0 0B350 2333 0112000119 201.131 2014/15 $ 5 $ 1,100 $ - NH $ 135 $ 499 $ 46 $ 270 $ 950

01 Humboldt 36 35.5/36.0 0B360 2334 0112000120 201.131 2014/15 $ 53 $ 2,200 $ - NH $ 250 $ 1,100 $ 60 $ 336 $ 1,746

01 Humboldt 36 44.4/0.0 0B370 2335 0112000121 201.131 2014/15 $ 10 $ 1,600 $ - NH $ 159 $ 477 $ 80 $ 320 $ 1,036

01 Humboldt 96 11.0/13.2 49370 2278 0100000478 201.010 2014/15 $ 151 $ 2,700 $ - STP $ 360 $ 698 $ 53 $ 555 $ 1,666

01 Humboldt 96 8.3/8.9 0B030 2328 0112000002 201.010 2014/15 $ 111 $ 2,500 $ - STP $ 413 $ 467 $ 67 $ 375 $ 1,322

01 Humboldt 96 6.2/6.9 0A990 2329 0112000001 201.015 2015/16 $ 303 $ 3,433 $ - STP $ 491 $ 975 $ 67 $ 780 $ 2,313

01 Humboldt 96 4.1/0.0 0B380 2336 0112000122 201.131 2014/15 $ 10 $ 1,600 $ - NH $ 159 $ 477 $ 70 $ 320 $ 1,026

Near Garberville, from 1.2 miles north of State Park Road to 0.4 mile north of Bridge Creek. Required mitigation for EA 01-47502 to reconstruct and restore culverts.

Near Blue Lake, from Titlow Hill Road to Willow Creek. Rehabilitate pavement.

Near Blue Lake, from 0.2 mile east of Blue Lake to 0.2 mile west of Route 96 Junction. Grind-in shoulder rumble strips.

Near Willow Creek, from 0.3 mile west to 0.1 mile east of Cedar Creek Road. Curve improvement.Near Willow Creek, from 1.2 to 1.5 miles east of Redwood Creek Bridge. Curve shoulder widening.Near Willow Creek, from 0.4 mile to 1.1 miles east of Chezem Road. Curve improvement.Near Blue Lake, from 0.5 mile to 0.9 mile east of Chezem Road. Improve super-elevation, widen shoulders and install centerline ground- in rumble strips.

Near Blue Lake, from 0.3 mile west of North Fork Mad River Bridge to 1.3 miles west of Old Three Creek Road. Repair slides and slipouts.

Near Willow Creek, at 1.2 miles west of East Fork Willow Creek Bridge. Stabilize roadway.In and near Dinsmore, on Route 36 (Forest Highway 4). Roadway improvements.Near Swains Flat, from 1.3 to 3.9 miles west of Van Duzen River. Reconstruct roadway and drainage.Near Bridgeville, at 0.1 mile west of McClellan Mountain Road River Bridge. Stabilize roadway.Near Dinsmore, from 0.1 mile east of SFK Van Duzen River Bridge to 0.1 mile east of Van Duzen River Bridge. Reconstruct roadway and drainage.

Near Dinsmore, at 1.2 miles west of Humboldt-Trinity County line. Repair slide.In Hoopa, from Loop Road to 0.1 mile west of Hostler Creek Bridge. Shoulder widening.Near Willow Creek, from 8.3 miles east of Willow Creek to 0.3 mile west of Shoemaker Road. Widen shoulders, install centerline and shoulder rumble strips, and improve curves.

Near Willow Creek, from 6.2 miles east of Willow Creek to 2.6 miles west of Tish-Tang Campground. Widen shoulders install rumble strips and realign roadway.

Near Willow Creek, 1 mile east of Pipeline Overcrossing. Repair slide.

Page 4: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

01 Humboldt 96 8.5/8.7 0B390 2337 0112000123 201.131 2015/16 $ 10 $ 8,000 $ - NH $ 799 $ 2,397 $ 120 $ 1,600 $ 4,916

01 Humboldt VAR 46392 2210B 0112000274 201.015 2014/15 $ 10 $ 5,000 $ - STP $ 510 $ 350 $ 20 $ 500 $ 1,380

01 Lake 175 R24.0/27.5 0A040 3080 0100020013 201.010 2015/16 $ 1,875 $ 12,029 $ - STP $ 1,324 $ 2,161 $ 582 $ 2,159 $ 6,226

01 Lake 20 1.1/3.9 0A690 3082 0100020432 201.015 2014/15 $ 12 $ 1,242 $ - STP $ 151 $ 222 $ 11 $ 622 $ 1,006

01 Lake 20 13.5/30.5 0B120 3086 0112000010 201.361 2015/16 $ 182 $ 1,140 $ - NH $ 109 $ 252 $ 445 $ 231 $ 1,037

01 Lake 29 0.2/0.0 38560 3087 0112000022 201.119 2014/15 $ 176 $ 300 $ - HBRR-S $ 71 $ 75 $ 16 $ 219 $ 381

01 Lake 29 R41.4/0.0 0B690 3097 0112000184 201.378 2016/17 $ 7 $ 478 $ - NH $ 206 $ 228 $ 63 $ 265 $ 762

01 Lake 29 28.5/31.6 29811 3099 0114000043 201.010 2017/18 $ 3,000 $ 34,000 $ - STP $ 500 $ 2,500 $ 700 $ 2,000 $ 5,700

01 Lake VAR 42780 3047B 0110000180 201.151 2017/18 $ 438 $ 3,773 $ - NH $ 880 $ 1,346 $ 746 $ 1,135 $ 4,107

01 Mendocino 1 43.3/44.2 40110 4490 0100000154 201.110 2015/16 $ 4,794 $ 47,690 $ - HBRR-S $ 3,104 $ 5,164 $ 794 $ 4,416 $ 13,478

01 Mendocino 1 42.4/43.3 40140 4491 0100000155 201.110 2015/16 $ 4,638 $ 52,545 $ - HBRR-S $ 4,392 $ 5,593 $ 748 $ 3,905 $ 14,638

01 Mendocino 1 48.0/62.1 43480 4507 0100000672 201.112 2015/16 $ 3,259 $ 9,587 $ - HBRR-S $ 1,790 $ 2,825 $ 341 $ 1,214 $ 6,170

01 Mendocino 1 2.3/2.5 49771 4513 0100020262 201.131 2014/15 $ 15 $ 1,830 $ - NH $ 250 $ 425 $ 25 $ 460 $ 1,160

01 Mendocino 1 35.7/0.0 0B470 4547 0112000131 201.131 2014/15 $ 60 $ 320 $ - NH $ 110 $ 200 $ 60 $ 120 $ 490

01 Mendocino 1 75.7/76.2 0B480 4548 0114000034 201.131 2017/18 $ 767 $ 14,706 $ - NH $ 923 $ 1,319 $ 69 $ 1,620 $ 3,931

01 Mendocino 1 91.8/0.0 0B490 4549 0112000132 201.131 2015/16 $ 160 $ 1,300 $ - NH $ 200 $ 342 $ 64 $ 260 $ 866

01 Mendocino 1 R81.1/0.0 0C120 4565 0112000221 201.131 2015/16 $ 5 $ 460 $ - NH $ 180 $ 175 $ 6 $ 125 $ 486

01 Mendocino 101 20.4/R21.4 29302 4453 0100020336 201.112 2015/16 $ 124 $ 3,810 $ - HBRR-S $ 407 $ 896 $ 209 $ 1,131 $ 2,643

01 Mendocino 101 3.7/5.3 0B500 4550 0112000133 201.131 2015/16 $ 300 $ 13,762 $ - NH $ 620 $ 2,285 $ 128 $ 1,210 $ 4,243

01 Mendocino 101 R87.4/R100.4 0B510 4551 0112000134 201.131 2015/16 $ 120 $ 2,550 $ - NH $ 243 $ 729 $ 48 $ 510 $ 1,530

Near Willow Creek, from 0.2 to 0.4 mile east of End Sidehill Viaduct. Stabilize roadway.In Humboldt County, on Routes 36, 96, 169, 211, 254 and 255 at various locations. Replace metal beam guardrails.

Near Middletown, from Putah Creek Bridge to Dry Creek Bridge. Widen shoulders.Near Blue Lakes, from 1.1 to 3.9 miles east of Mendocino/Lake County line. Install metal beam guard rail.Near Lucerne, from 0.1 mi west of Sayre Avenue to 0.2 mi west of Junction Route 53 South. Upgrade curb ramps and sidewalk.

Near Middletown, at St. Helena Creek Bridge No.14-0052. Scour prevention.Near Lakeport, at Lakeport overcrossing. Upgrade pedestrian facilities.

Near Kelseyville, from north of Route 29/281 Junction to north of Route 29/175 Junction. Improve road condition.

In Lake County, on Routes 20. 29 and 53 at various locations. Upgrade drainage systems.Near Albion, from 3.0 miles north of route 128 junction to 0.2 mile north of Albion river Bridge No. 10-0136. Bridge Replacement.

Near Albion, from 2.2 miles north of Route 128 junction to 0.2 mile north of Salmon Creek Bridge No. 10-0134. Bridge replacement.

In and near Fort Bragg at Little River Bridge No. 10-0178, at Jack Peters Bridge No. 10-0150, at Russian Gulch Bridge No. 10-0151, and at Pudding Creek Bridge No. 10-0158. Upgrade and replace barrier rails.

Near Gualala, from 0.1 to 0.3 mile north of Big Gulch Road. Repair slide.Near Elk, at 1.8 miles north of Philo Greenwood Road. Repair slipout.Near Westport, from 0.5 to 1.0 mile north of Blue Slide Gulch Bridge. Reconstruct roadway.Near Rockport, at 0.9 mile north of Usal Road; also at Post Mile 99.0. Repair slipouts.Near Hardy, at 0.5 mile north of Howard Creek Bridge. Repair slipoutNear El Roble, at Robinson Creek Bridge No. 10-0005L and Willits Overhead Bridge No. 10-0001. Upgrade barrier rail and widen bridge.

Near Hopland, at 0.6 mile north of Geysers Road; also at 0.6 mile north of Pieta Creek Bridge (Post Mile 5.3). Repair slides.

Near Laytonville, from 0.3 mile south of Route 101/271 Junction to Red Mountain Creek Bridge. Repair slides and slipout.

Page 5: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

01 Mendocino 101 47.2/47.4 0B830 4564 0112000188 201.378 2016/17 $ 183 $ 1,841 $ - NH $ 351 $ 695 $ 112 $ 514 $ 1,672

01 Mendocino 101 89.2/0.0 0C370 4573 0112000283 201.119 2015/16 $ 37 $ 2,872 $ - HBRR-S $ 492 $ 544 $ 86 $ 1,126 $ 2,248

01 Mendocino 101 50.7/51.2 0C900 4583 0113000077 201.010 2014/15 $ - $ 920 $ 763 5/8/14 STP $ 179 $ 331 $ 23 $ 168 $ 701

01 Mendocino 101 34.0/99.2 0E280 7013 0114000006 201.010 2015/16 $ 6 $ 1,263 $ - STP $ 193 $ 262 $ 5 $ 197 $ 657

01 Mendocino 128 0.2/11.1 37817 4506 0100000137 201.151 2014/15 $ 50 $ 3,388 $ - NH $ 742 $ 2,000 $ 475 $ 937 $ 4,154

01 Mendocino 128 39.5/39.8 0B520 4552 0112000135 201.131 2015/16 $ 100 $ 3,800 $ - NH $ 370 $ 1,110 $ 40 $ 760 $ 2,280

01 Mendocino 162 11.5/11.8 0B530 4553 0114000035 201.131 2015/16 $ 10 $ 9,515 $ - NH $ 1,300 $ 1,300 $ 10 $ 1,430 $ 4,040

01 Mendocino 162 13.9/22.7 0B540 4554 0112000136 201.131 2015/16 $ 140 $ 1,750 $ - NH $ 161 $ 483 $ 56 $ 350 $ 1,050

01 Mendocino 162 16.1/0.0 0B550 4555 0112000137 201.131 2015/16 $ 100 $ 2,800 $ - NH $ 270 $ 810 $ 40 $ 560 $ 1,680

01 Mendocino 253 1.5/1.8 0B560 4556 0112000138 201.131 2015/16 $ 60 $ 650 $ - NH $ 59 $ 177 $ 24 $ 130 $ 390

01 Mendocino 253 6.8/0.0 0B570 4557 0112000139 201.131 2015/16 $ 10 $ 2,500 $ - NH $ 249 $ 747 $ 4 $ 500 $ 1,500

01 Mendocino 271 17.7/18.0 0A840 4545 0113000058 201.110 2017/18 $ 464 $ 4,934 $ - HBRR-S $ 644 $ 973 $ 162 $ 1,696 $ 3,475

01 Mendocino VAR 0C430 4572 0112000293 201.111 2016/17 $ 207 $ 613 $ - HBRR-S $ 236 $ 462 $ 74 $ 446 $ 1,218

01 Mendocino VAR 0E240 4589 0114000002 201.110 2017/18 $ - $ 5,500 $ - HBRR-S $ 74 $ 63 $ 66 $ 73 $ 276

02 Lassen 36 6.1/14.3 4E460 3468 0200020287 201.120 2017/18 $ 210 $ 15,900 $ - NH $ 1,100 $ 1,800 $ 100 $ 2,100 $ 5,100

02 Lassen 36 7.2/7.4 4F560 3512 0213000006 201.110 2017/18 $ 45 $ 2,700 $ - HBRR-S $ 600 $ 500 $ 50 $ 750 $ 1,900

02 Lassen 36 22.4/R29.4 4F990 3529 0213000057 201.121 2016/17 $ 165 $ 9,000 $ - NH $ 450 $ 550 $ 190 $ 750 $ 1,940

02 Lassen 395 R0.0/5.6 4E420 3464 0200020283 201.121 2015/16 $ 21 $ 14,574 $ - NH $ 550 $ 1,200 $ 100 $ 800 $ 2,650

02 Lassen 395 R49.6/0.0 4E690 3478 0212000033 201.250 2015/16 $ - $ 2,300 $ - NH $ 305 $ 534 $ 42 $ 319 $ 1,200

02 Modoc 139 10.7/28.0 4E440 3466 0200020285 201.120 2014/15 $ 35 $ 18,293 $ - NH $ 610 $ 990 $ 190 $ 1,880 $ 3,670

In Willits, at Sherwood Road. Upgrade pedestrian facilities.Near Leggett, at Cedar Creek Arch Culvert. Repair arched culvert bridge.Near Willits, from 0.1 mile south of Reynolds Highway to 0.5 mile south of Ryan Creek Road. Improve road super-elevation.

Near Willits, from 0.8 mile north of Willits to Rattlesnake Creek Bridge; also in Humboldt County, from Humboldt County line to 0.4 mile south of Newton B Drury (PM 0.0/125.8). Install ground-in edge line and centerline rumble strips.

Near Navarro, from east of Route 1 to west of Flynn Creek Bridge # 10-0079. Rehabilitate culverts.Near Yorkville, from 0.7 to 1.0 miles east of Beebe Creek Bridge. Stabilize roadway.Near Dos Rios, from 1.4 to 1.7 miles east of Rodeo Creek Bridge. Construct soldier pile walls and drainage galleries.

Near Dos Rios, from 1.2 miles west of Middle Fork Eel River Bridge to 2.8 miles east of Sand Bank Creek. Repair slipouts.

Near Dos Rios, at 0.9 mile east of Dos Rios Road. Stabilize roadway.Near Boonville, from 0.2 mile west to 0.1 mile east of Singly Cattle Pass. Repair slide.Near Boonville, at 3.4 miles east of Soda Creek Bridge. Stabilize roadway.

Near Piercy, from 0.7 mile north of Routes 271/101 separation Bridge No. 10-0217 to 0.4 mile south of Sidehill Viaduct No. 10-0100. Replace bridge.

On Route 101, in Willits; On Route 128, 34.1 miles west of Ukiah; also on Route 20, 8.5 miles east of Route 101/20 Junction. Scour mitigation.

In Mendocino County, at various routes and at various locations. Mitigate environmental impacts.Near Westwood, from east of Goodrich Creek Bridge to 1.3 miles west of Willard Creek Road. Rehabilitate roadway.

Near Westwood, at Goodrich Creek Bridge No. 07-0048. Replace bridge.In and near Susanville, from east of Eagle Lake Road to Route 395. Rehabilitate pavement.In Sierra and Lassen Counties, from Nevada State line to 1 mile north of Route 70. Rehabilitate pavement.Near Janesville, at the Honey Lake Safety Roadside Rest Area. Rehabilitate the potable water supply and waste water system.

Near Newell, from 0.1 mile north of Boles Road to 0.1 mile south of Perez Road. Rehabilitate roadway.

Page 6: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

02 Modoc 299 4F210 3484 0212000072 201.110 2017/18 $ 47 $ 5,600 $ - HBRR-S $ 610 $ 680 $ 270 $ 1,150 $ 2,710

02 Modoc 299 23.3/0.0 4F570 3513 0213000008 201.111 2017/18 $ 50 $ 1,770 $ - HBRR-S $ 290 $ 390 $ 70 $ 750 $ 1,500

02 Modoc 299 24.5/33.5 4F770 3522 0213000031 201.120 2017/18 $ 28 $ 11,087 $ - NH $ 750 $ 760 $ 50 $ 1,660 $ 3,220

02 Plumas 147 8.9/9.3 4E640 3472 0212000011 201.110 2014/15 $ 160 $ 8,100 $ - HBRR-S $ 1,400 $ 1,200 $ 163 $ 2,000 $ 4,763

02 Plumas 70 14.9/0.0 1C750 3208 0200000080 201.113 2016/17 $ 400 $ 7,800 $ - HBRR-S $ 1,620 $ 1,460 $ 140 $ 2,000 $ 5,220

02 Plumas 70 50.6/51.7 2C090 3212 0200000161 201.110 2015/16 $ 240 $ 15,400 $ - HBRR-S $ 1,100 $ 1,700 $ 300 $ 2,100 $ 5,200

02 Plumas 89 29.5/30.5 0E180 3349 0200000022 201.113 2015/16 $ 60 $ 9,000 $ - HBRR-S $ 1,100 $ 1,300 $ 300 $ 1,600 $ 4,300

02 Shasta 151 5.5/R5.8 4F790 3524 0213000033 201.378 2017/18 $ 317 $ 1,683 $ - NH $ 205 $ 295 $ 250 $ 250 $ 1,000

02 Shasta 273 14.9/16.2 3E800 3469 0200020165 201.378 2014/15 $ 420 $ 3,300 $ - NH $ 700 $ 800 $ 600 $ 500 $ 2,600

02 Shasta 299 77.8/79.7 4E020 3449 0200020196 201.120 2017/18 $ 51 $ 7,500 $ - NH $ 500 $ 580 $ 100 $ 1,000 $ 2,180

02 Shasta 299 7.6/18.3 3E740 3456 0200020160 201.120 2017/18 $ 57 $ 35,600 $ - NH $ 3,480 $ 2,590 $ 370 $ 3,760 $ 10,200

02 Shasta 299 47.5/48.1 4E890 3480 0212000062 201.010 2014/15 $ 173 $ 2,300 $ - STP $ 150 $ 247 $ 154 $ 321 $ 872

02 Shasta 44 59.6/0.0 4F200 3483 0212000071 201.110 2017/18 $ 327 $ 4,160 $ - HBRR-S $ 620 $ 780 $ 170 $ 1,140 $ 2,710

02 Shasta 44 59.0/59.6 4F290 3489 0212000087 201.010 2014/15 $ 135 $ 3,000 $ - STP $ 308 $ 150 $ 85 $ 300 $ 843

02 Shasta 44 45.1/45.4 4G490 3538 0214000004 201.010 2015/16 $ 50 $ 1,550 $ - STP $ 374 $ 226 $ 94 $ 286 $ 980

02 Shasta 5 29.5/30.0 0E090 3346 0200000016 201.113 2014/15 $ 82 $ 10,961 $ - HBRR-S $ 671 $ 1,278 $ 52 $ 1,770 $ 3,771

02 Shasta 5 0.0/67.0 4F510 3506 0213000001 201.015 2017/18 $ 780 $ 5,600 $ - STP $ 500 $ 725 $ 75 $ 700 $ 2,000

02 Shasta 5 4F610 3517 0213000013 201.119 2014/15 $ 6 $ 4,400 $ - HBRR-S $ 300 $ 430 $ 30 $ 890 $ 1,650

02 Shasta 5 R10.7/R15.5 4E790 3575 0212000034 201.170 2014/15 $ - $ 1,200 $ - NH $ 98 $ 267 $ 10 $ 175 $ 550

02 Shasta VAR 4E812 3479A 0214000051 201.235 2014/15 $ 60 $ 3,300 $ - NH $ 400 $ 600 $ 100 $ 600 $ 1,700

Near Adin, at Butte Creek Bridge No. 03-001 and at Ash Creek Bridge No. 03-002. Replace bridges.Near Canby, at Caldwell Creek Bridge No. 03-0028. Replace bridge.Near Alturas, from 1.1 miles east of Caldwell Creek Bridge to 1.7 miles west of County Road 75. Rehabilitate roadway.

Near Canyon Dam, from 0.1 mle south to 0.4 mile north of Hamilton Branch Bridge. Replace bridge.Near Belden, at Yellow Creek Bridge #09-0008. Replace bridge.Near Quincy, from 0.6 mile west to 0.5 mile east of Spring Garden Bridge Overhead. Replace bridge.Near Canyon Dam, at Lake Almanor Spillway. Replace bridge.In Shasta Lake City, from west of Coram Underpass to Locust Avenue. Upgrade curbs, sidewalks and crosswalks.

In Redding, from 0.1 mile south of Wyndham Lane to Lincoln Street. Construct and Modify ADA curb ramps.

Near Burney, from west of Sonoma Street to west of Route 89. Rehabilitate roadway.In and near the town of Shasta, from west of Crystal Creek Road to Trinity Alley. Rehabilitate roadway.Near Ingot, from 5.0 miles to 4.3 miles west of Buzzard Roost Road. Curve improvement.Near Old Station, at Hat Creek Bridge No.06-0084. Replace Bridge.Near Old Station, from 0.6 mile west of Sugar Loaf Drive to Sugar Loaf Drive. Curve improvement. Curve improvement.

Near Viola, from 1.5 miles to 1.1 miles west of North Battle Creek Reservoir Road. Improve roadway geometrics.Near Shasta Lake, at Sidehill Viaduct No. 06-0042L; also at Dog Creek Bridge No. 06-0027 (PM 45.5). Seismic retrofit bridges.

In and near Redding, from the Tehama County Line to the Siskiyou County Line. Improve roadside clear recovery zone.

In Shasta and Siskiyou counties at various locations. Place polyester concrete overlay and repair joint seal.In and near Redding, from 0.1 mile south of Smith Road overcrossing to 0.1 mile north of East Redding Separation. Replace overhead signs.

In Shasta, Butte, Lassen and Plumas Counties at various locations. Pave shoulder and install lighting and signage at chain control locations.

Page 7: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

02 Shasta VAR 4F780 3523 0213000032 201.235 2017/18 $ 296 $ 7,400 $ - NH $ 1,200 $ 1,070 $ 330 $ 1,410 $ 4,010

02 Siskiyou 263 57.1/0.0 2E480 3424 0200000586 201.110 2017/18 $ 330 $ 8,500 $ - HBRR-S $ 1,800 $ 1,600 $ 180 $ 1,900 $ 5,480

02 Siskiyou 5 R7.2/0.0 2E800 3426 0200000603 201.321 2014/15 $ 9 $ 4,700 $ - ST-CASH $ 385 $ 950 $ 56 $ 1,000 $ 2,391

02 Siskiyou 5 68.3/0.0 3E730 3455 0200020157 201.110 2014/15 $ 16 $ 5,800 $ - HBRR-S $ 900 $ 1,000 $ 90 $ 1,200 $ 3,190

02 Siskiyou 5 R58.0/0.0 4E670 3476 0212000031 201.250 2015/16 $ 250 $ 3,300 $ - NH $ 495 $ 685 $ 265 $ 555 $ 2,000

02 Siskiyou 5 R15.5/R16.3 4F540 3509 0213000004 201.110 2017/18 $ 68 $ 8,600 $ - HBRR-S $ 870 $ 1,520 $ 230 $ 1,310 $ 3,930

02 Siskiyou 5 58.1/58.4 4F580 3514 0213000009 201.112 2016/17 $ 5 $ 4,400 $ - HBRR-S $ 310 $ 450 $ 100 $ 630 $ 1,490

02 Siskiyou 5 R58.1/0.0 4G230 3534 0213000093 201.322 2016/17 $ 2 $ 2,000 $ - NH $ 300 $ 450 $ 100 $ 580 $ 1,430

02 Siskiyou 5 R25.2/0.0 4G240 3535 0213000095 201.322 2016/17 $ 39 $ 4,000 $ - NH $ 680 $ 750 $ 210 $ 870 $ 2,510

02 Siskiyou 5 2.7/R11.4 4G550 3560 0214000036 201.122 2016/17 $ 464 $ 53,600 $ - NH $ 4,590 $ 4,300 $ 270 $ 4,870 $ 14,030

02 Siskiyou 5 11.4/R19.1 4G820 3567 0214000063 201.122 2014/15 $ 5 $ 34,833 $ - NH $ 1,400 $ 1,810 $ 90 $ 3,470 $ 6,770

02 Siskiyou 89 20.9/21.2 4F550 3519 0213000005 201.110 2017/18 $ 81 $ 2,600 $ - HBRR-S $ 550 $ 510 $ 150 $ 630 $ 1,840

02 Siskiyou 96 23.2/56.0 4C150 3314 0213000132 201.151 2017/18 $ 200 $ 1,608 $ - NH $ 500 $ 532 $ 92 $ 469 $ 1,593

02 Siskiyou 96 52.5/88.3 4E650 3473 0212000012 201.112 2015/16 $ 328 $ 8,100 $ - HBRR-S $ 2,300 $ 1,200 $ 120 $ 2,000 $ 5,620

02 Siskiyou 97 21.8/0.0 4E680 3477 0212000032 201.235 2017/18 $ 12 $ 2,100 $ - NH $ 490 $ 420 $ 60 $ 630 $ 1,600

02 Siskiyou VAR 0H210 3574 0214000145 201.170 2014/15 $ - $ 2,000 $ - NH $ 51 $ 248 $ 11 $ 318 $ 628

02 Tehama 32 5.1/5.8 4E900 3481 0212000063 201.010 2014/15 $ 80 $ 2,648 $ - STP $ 146 $ 88 $ 14 $ 310 $ 558

02 Tehama 36 42.1/46.0 3E720 3453 0200020154 201.121 2016/17 $ 97 $ 5,300 $ - NH $ 260 $ 380 $ 240 $ 540 $ 1,420

02 Tehama 36 76.0/77.0 4F530 3508 0213000003 201.015 2016/17 $ 276 $ 2,600 $ - STP $ 410 $ 300 $ 100 $ 630 $ 1,440

02 Tehama 36 75.4/76.0 4G030 3533 0213000071 201.010 2015/16 $ 250 $ 4,810 $ - STP $ 374 $ 149 $ 92 $ 261 $ 876

In Shasta, Butte, Lassen, Siskiyou and Trinity counties, on various routes at various locations. Upgrade chain control facilities.

Near Yreka, at Klamath River Bridge. Replace bridge.Near Dunsmuir at Dunsmuir, Grade Commercial Vehicle Enforcement Facility. Upgrade facility.Near Yreka, at Hilt Road Overcrossing No. 02-0130. Replace bridge.Near Hornbrook, at the Collier Safety Roadside Rest Area. Rehabilitate the potable water supply and waste water system.

Near Weed, from north of Deetz Road Undercrossing No. 02-0161 to north of Black Butte Overhead No. 02-0004. Bridge replacement.

Near Hornbrook, from Klamath River Bridge No. 02-0134 to north of Route 96. Rail upgrade and bridge deck rehabilitation.

Near Hornbrook, at Klamath River Road Undercrossing #02-0133L&R. Strengthen and upgrade bridges.Near Edgewood, from 0.4 mile south to 0.4 mile north of North Edgewood Overhead #02-0032L&R. Strengthen and upgrade bridges.

In and near Dunsmuir, from Sacramento River bridge to 0.6 mile south of North Mount Shasta underpass. Rehabilitate roadway.

In and near Weed, from 0.7 mile south of Mount Shasta underpass to Route 97. Roadway rehabilitation.Near McCloud, at Mud Creek Bridge No. 02-0046. Replace bridge.In and near Happy Camp, from west of Swillup Creek Bridge to 3.6 miles east of Thompson Creek Bridge. Drainage system restoration.

Near Seiad Valley, at various locations from Slater Butte Road to 0.1 mile west of Beaver Creek Bridge. Upgrade bridge rail.

Near Macdoel, at Grass Lake Safety Roadside Rest Area. Upgrade water and wastewater systems.In Siskiyou, Lassen, Shasta, Sierra, and Tehama counties, on various routes at various locations. Upgrade signs to retro-reflective.

Near Forest Ranch, from 1.6 miles to 2.2 miles east of Soda Springs Road. Curve improvement.In and near Red Bluff, from East Sand Slough Bridge to east of Stice Road. Rehabilitate pavement.Near Mineral, at Tramway Road. Improve clear recovery zone.Near Mineral, from 1.3 miles west to 0.7 mile west of Tramway Road; also at PM 77.0/78.4. Realign curve and widen shoulders.

Page 8: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

02 Tehama 5 10.5/0.0 0E360 3359 0200000030 201.250 2015/16 $ - $ 6,000 $ 6,000 6/26/14 NH $ 25 $ 1,200 $ 15 $ 1,800 $ 3,040

02 Tehama 5 R25.4/0.0 4F590 3515 0213000010 201.113 2017/18 $ 56 $ 22,100 $ - HBRR-S $ 900 $ 1,200 $ 280 $ 3,700 $ 6,080

02 Trinity 299 4G250 3536 0213000094 201.335 2017/18 $ 126 $ 1,800 $ - NH $ 580 $ 420 $ 110 $ 650 $ 1,760

02 Trinity 36 26.8/27.1 4F860 3526 0213000043 201.010 2015/16 $ 120 $ 1,580 $ - STP $ 374 $ 149 $ 92 $ 261 $ 876

03 Butte 191 6.8/8.6 3F760 2705 0313000165 201.010 2015/16 $ 311 $ 13,690 $ - STP $ 1,150 $ 1,100 $ 596 $ 2,000 $ 4,846

03 Butte 32 9.5/10.2 1F990 2108 0300020426 201.378 2015/16 $ 78 $ 1,544 $ - NH $ 500 $ 650 $ 530 $ 650 $ 2,330

03 Butte 32 9.1/R9.2 4F260 2110 0314000091 201.010 2016/17 $ 36 $ 1,559 $ - STP $ 200 $ 360 $ 200 $ 500 $ 1,260

03 Butte 70 24.3/0.0 0F690 2282 0300000100 201.111 2014/15 $ 80 $ 3,425 $ - HBRR-S $ 650 $ 790 $ 50 $ 600 $ 2,090

03 Butte 99 40.6/40.8 1F420 2427 0300001119 201.010 2014/15 $ 99 $ 3,400 $ - STP $ 350 $ 1,050 $ 195 $ 850 $ 2,445

03 Butte 99 30.1/37.5 2F330 2428 0300020612 201.121 2014/15 $ 19 $ 8,206 $ - NH $ 380 $ 750 $ 85 $ 1,000 $ 2,215

03 El Dorado 49 24.0/0.0 0F310 3122 0300000078 201.113 2015/16 $ 499 $ 13,908 $ - HBRR-S $ 710 $ 1,731 $ 230 $ 2,076 $ 4,747

03 El Dorado 49 14.9/15.1 2F600 3126 0300020632 201.361 2014/15 $ 6 $ 1,000 $ - NH $ - $ 470 $ 112 $ 350 $ 932

03 El Dorado 49 36.4/36.7 4F390 3306 0314000157 201.010 2014/15 $ 5 $ 610 $ - STP $ 140 $ 140 $ 20 $ 140 $ 440

03 El Dorado 50 75.4/77.3 3C380 3258 0300000458 201.335 2015/16 $ 3,000 $ 24,000 $ - NH $ 1,300 $ 3,741 $ 2,650 $ 3,778 $ 11,469

03 El Dorado 50 38.0/58.0 2F130 3300 0300020539 201.335 2017/18 $ 350 $ 4,000 $ - NH $ 450 $ 475 $ 215 $ 715 $ 1,855

03 El Dorado 50 67.3/0.0 3F530 3304 0313000135 201.110 2017/18 $ 27 $ 6,000 $ - HBRR-S $ 540 $ 1,153 $ 16 $ 1,324 $ 3,033

03 El Dorado 50 0G030 3307 0314000027 201.119 2014/15 $ 10 $ 2,828 $ - HBRR-S $ 142 $ 281 $ 88 $ 423 $ 934

03 Glenn 5 24.8/28.6 0F370 3707 0312000075 201.322 2014/15 $ 719 $ 6,715 $ - NH $ 580 $ 1,275 $ 620 $ 1,075 $ 3,550

03 Nevada 80 3F050 4626 0312000064 201.113 2015/16 $ 360 $ 2,000 $ - HBRR-S $ 2,000 $ 900 $ 100 $ 1,000 $ 4,000

Near Corning, at Corning Safety Roadside Rest Area. Rehabilitate and reconstruct Safety Roadside Rest Area.

In Red Bluff, at Sacramento River Bridge No. 08-0095R/L. Retrofit Bridges.

In Trinity County, on Route 299 at postmile 37.0/43.0 and postmile 69.0/72.2; also on Route 3 at postmile 30.9/40.2. Repair/replace culverts.

Near Forest Glen, from 0.5 to 0.1 mile west of Route 3. Curve improvement.Near Paradise, from 2.0 miles south of Clear Creek Cemetery Road to south of Airport Road. Roadway improvements.

Near Chico, from Poplar Street to 99/32 Separation. Construct curb ramps and sidewalks.In Chico, at Ivy Street. Install traffic signals.In Oroville, at Flag Canyon Creek Bridge # 12-0140. Replace bridge.Near Chico, at the Rock Creek Bridge #12-27. Widen shoulder on structure.In Chico, from south of Skyway Overcrossing to south of Garner Lane. Rehabilitate pavement.Near Placerville, at South Fork American River Bridge No. 25-0021. Cross bracing seismic retrofit.In Placerville, at the intersection of Spring Street and Route 50; also at the intersection of Spring Street and Coloma Street. Upgrade curb ramps, sidewalk and adjust turn lane to install crosswalk.

In El Dorado County, on routes 49 and 50, at various locations; also in Sacramento and Yolo counties on Route 80 at various locations. Apply high friction surface treatment.

In South Lake Tahoe, north of Route 89 to Trout Creek Bridge. Water quality improvements.Near Placerville, from 0.8 mile east of Bridal Veil Falls Road to Strawberry Lodge Drive. Construct traction sand traps.

Near South Lake Tahoe, west of South Lake Tahoe at Echo Summit Sidehill Viaduct Bridge No. 25-0044. Rehabilitate or Replace bridge.

In and near Placerville, on Routes 50 and 193 at various locations; also in Placer County on Route 80 at Post Mile 3.5. Place polyester overlay.

Near Willows, from County Road 16 overcrossing to County Road 3 overcrossing. Raise structures for vertical clearance.

In Nevada and Placer Counties, on routes 80 and 89 at South Yuba River Bridge near Emigrant Gap and Prosser Creek Bridge near Truckee. Seismic retrofit bridges.

Page 9: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

03 Nevada 89 0.1/0.4 1C080 4378 0300000231 201.378 2014/15 $ - $ 4,400 $ 4,400 6/26/14 NH $ - $ - $ - $ - $ -

03 Placer 193 4.4/5.4 4E860 5580 0300000725 201.010 2014/15 $ 3,963 $ 8,500 $ - STP $ 1,400 $ 1,641 $ 743 $ 1,146 $ 4,930

03 Placer 65 4.8/12.5 4F020 4897 0314000010 201.121 2014/15 $ - $ 7,800 $ - NH $ 554 $ 793 $ 81 $ 1,217 $ 2,645

03 Placer 80 35.1/38.3 1F400 5067 0300020420 201.310 2014/15 $ 40 $ 37,160 $ - NH $ - $ 570 $ - $ 6,680 $ 7,250

03 Placer 80 28.5/31.5 3E050 5096 0300020597 201.151 2017/18 $ 82 $ 1,143 $ - NH $ 162 $ 224 $ 51 $ 256 $ 693

03 Placer 80 41.4/42.2 3F480 5103 0313000017 201.235 2016/17 $ - $ 1,836 $ - NH $ 120 $ 400 $ 44 $ 300 $ 864

03 Sacramento 12 0.0/0.4 3F570 5959 0313000139 201.110 2016/17 $ 6 $ 19,220 $ - HBRR-S $ 461 $ 635 $ 55 $ 2,328 $ 3,479

03 Sacramento 160 20.9/0.0 3F090 5832 0312000056 201.113 2015/16 $ 271 $ 7,348 $ - HBRR-S $ 405 $ 801 $ 149 $ 1,489 $ 2,844

03 Sacramento 160 L7.0/0.0 3F340 7284 0312000219 201.119 2014/15 $ 10 $ 10,245 $ - HBRR-S $ 200 $ 510 $ 10 $ 1,200 $ 1,920

03 Sacramento 5 3F170 5834 0312000097 201.235 2014/15 $ 1 $ 2,775 $ - NH $ 70 $ 225 $ 18 $ 325 $ 638

03 Sacramento 5 12.9/13.1 4F120 5843 0314000038 201.010 2014/15 $ 8 $ 700 $ - STP $ 123 $ 123 $ 14 $ 149 $ 409

03 Sacramento 5 0.1/18.4 4F330 5845 0314000145 201.310 2014/15 $ 5 $ 1,000 $ - NH $ 265 $ 291 $ 25 $ 314 $ 895

03 Sacramento 5 31.8/32.8 2F630 5851 0313000316 201.310 2014/15 $ 35 $ 1,300 $ - NH $ 500 $ 250 $ 50 $ 300 $ 1,100

03 Sacramento 5 3F180 6705 0312000098 201.235 2014/15 $ 1 $ 2,440 $ - NH $ 125 $ 160 $ 4 $ 215 $ 504

03 Sacramento 50 R5.3/23.1 3F930 6235 0313000240 201.235 2016/17 $ - $ 1,250 $ - NH $ 118 $ 135 $ 30 $ 118 $ 401

03 Sacramento 50 4F130 6237 0314000040 201.010 2014/15 $ - $ 1,660 $ - STP $ 110 $ 120 $ 7 $ 290 $ 527

03 Sacramento 50 L0.0/21.5 4F710 6406 0314000244 201.170 2014/15 $ - $ 2,075 $ - NH $ 146 $ 208 $ 42 $ 311 $ 707

In Truckee, at the Donner Creek Underpass. Construct pedestrian/bike tunnel.Near Lincoln, from 0.1 mile west to 0.9 mile east of Clark Tunnel Road. Curve improvements and widening.In and near Roseville, from Route 80 to Twelve Bridges Drive. Pavement rehabilitation.Near Colfax, from east of Long Ravine Bridge to the Alpine Overcrossing exit ramp. Construct truck climbing lane and shoulders.

In and near Colfax, from 0.3 mile south of Weimar overhead to .3 mile south of Illinoistown overcrossing. Rehabilitate culvert.

Near Gold Run, at the Gold Run Safety Roadside Rest Area. Replace water distribution system.In Sacramento and Solano counties, near Rio Vista at the Sacramento River Bridge No. 23-0024. Clean and repaint steel surfaces.

In the city of Sacramento, at Sacramento River Bridge No. 24-0053 and North Sacramento Undercrossing No. 24-0111L; also in San Joaquin County, at Mokelumne River Bridge No. 29-0197R/L. Seismic retrofit.

Near Isleton, at Three Mile Slough Bridge #24-121. Paint bridge.In and near Sacramento, on Routes 5, 50, 51 and 99 at various locations. Roadside pavement and safe access for employees.

Near Elk Grove, at Beach Lake Bridge No. 24-262R/L. Apply high friction treatment on bridge deck.In Sacramento and San Joaquin counties, at various locations. Construct paved crossovers and California Highway Patrol/Maintenance pullouts.

Near Sacramento, at Route 5/Airport Boulevard northbound off-ramp. Lengthen deceleration lane.In and near Sacramento, on Routes 5 and 99, from 0.6 mile south of Lambert Road Undercrossing to Elverta Road at various locations. Provide vegetation control measures under guardrails and interchange areas.

Near Sacramento, from Watt Avenue overcrossing to Sacramento/El Dorado County line. Pave narrow areas, install vegetation control and construct roadside signs.

In Sacramento County, on Routes 5, 50 and 80 at various locations; also in Butte County, on Route 191 (PM 7.1/7.3). Place high friction surface treatment.

In Sacramento, El Dorado and Yolo counties, on Routes 50, 5, 51, 80 and 99 at various locations. Replace sign panels and upgrade sign structures.

Page 10: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

03 Sacramento 51 0.2/1.1 3F080 6403 0312000055 201.119 2014/15 $ - $ 8,078 $ - HBRR-S $ 163 $ 373 $ 5 $ 728 $ 1,269

03 Sacramento 51 L4.3/0.0 4F360 8568 0314000151 201.010 2014/15 $ 5 $ 515 $ - STP $ 125 $ 90 $ 10 $ 135 $ 360

03 Sacramento 80 4F270 6709 0314000092 201.010 2014/15 $ 5 $ 630 $ - STP $ 195 $ 90 $ 18 $ 180 $ 483

03 Sacramento 99 6.8/6.9 3F640 6903 0313000143 201.321 2014/15 $ - $ 1,360 $ - ST-CASH $ 62 $ 139 $ 37 $ 184 $ 422

03 Sacramento 99 7.4/8.4 0F280 6912 0312000069 201.112 2016/17 $ 1,126 $ 10,016 $ - HBRR-S $ 1,699 $ 2,714 $ 617 $ 2,863 $ 7,893

03 Sacramento 99 4.9/0.0 3F540 6916 0313000136 201.111 2017/18 $ 450 $ 4,747 $ - HBRR-S $ 259 $ 521 $ 19 $ 919 $ 1,718

03 Sacramento 99 8.5/22.4 3F940 6919 0313000241 201.235 2016/17 $ - $ 1,750 $ - NH $ 165 $ 188 $ 42 $ 165 $ 560

03 Sacramento VAR 3F830 5839 0313000197 201.315 2015/16 $ - $ 1,751 $ - NH $ 113 $ 540 $ 9 $ 285 $ 947

03 Sacramento VAR 3F840 5840 0313000198 201.315 2016/17 $ - $ 3,547 $ - NH $ 185 $ 1,002 $ 9 $ 483 $ 1,679

03 Sutter 20 5.0/11.3 1A920 8132 0300020608 201.120 2017/18 $ 650 $ 19,710 $ - NH $ 850 $ 1,809 $ 251 $ 2,771 $ 5,681

03 Sutter 20 17.0/0.0 3F560 8140 0313000033 201.111 2017/18 $ 1,200 $ 7,500 $ - HBRR-S $ 510 $ 800 $ 100 $ 1,100 $ 2,510

03 Sutter 20 16.5/0.0 3F790 8141 0313000189 201.010 2014/15 $ 45 $ 575 $ - STP $ 170 $ 250 $ 130 $ 210 $ 760

03 Yolo 16 23.2/23.5 0C471 8655 0314000271 201.010 2016/17 $ 1,916 $ 1,491 $ - STP $ 8,857 $ 5,606 $ 3,114 $ 1,063 $ 18,640

03 Yolo 16 20.5/31.6 0C472 8655A 0314000272 201.010 2017/18 $ 7,989 $ 19,390 $ - STP $ - $ 2,327 $ 2,200 $ 4,254 $ 8,781

03 Yolo 275 13.1/0.0 3F550 9427 0313000137 201.110 2017/18 $ 10 $ 7,360 $ - HBRR-S $ 270 $ 493 $ 54 $ 422 $ 1,239

03 Yolo 5 5.5/R9.6 0G050 8569 0314000029 201.119 2014/15 $ - $ 2,603 $ - HBRR-S $ 92 $ 203 $ 6 $ 675 $ 976

In the city of Sacramento, at Fort Sutter Viaduct #24-188R. Grind asphalt concrete and place methacrylate overlay.

In Sacramento County, on Route 51 at PM L4.3; also in Yolo and El Dorado counties on Route 5 (PM 9.3) and Route 50 (PM 61.1/61.3). Install high friction surface treatment.

In Sacramento and Glenn counties, on Routes 16, 32, 50, 80 and 160 at various locations. Install and /or modify signals and signs.

Near Elk Grove, from 0.1 to 0.2 mile south of Badger Creek Bridge. Replace Weight in Motion (WIM) station sensors and associated electronics.

Near Elk Grove, at Dillard Road Overcrossing Bridge No. 24-0163, Consumnes River Overflow Bridge No. 24-0021R/L, and Consumnes River Overflow Bridge No. 24-0020R/L. Bridge seismic retofit.

On Route 99, at Lagoon Creek Bridge No. 24-0045L; also on Route 160 (PM 44.5) at American River Bridge No. 24-0001L. Scour mitigation.

In Sacramento, from Cosumnes River Bridge to Fruitridge Road overcrossing. Pave narrow areas, install vegetation control, construct pullouts and construct roadside signs.

In El Dorado, Nevada, Placer, Sacramento and Yolo counties on Routes 5, 50, 51, 80, 89, 99 and 267 at various locations. Upgrade closed caption televisions (CCTV).

In Sacramento, Placer, Yolo and Yuba counties, on Routes 5, 50, 51, 65, 70, 80, 99 and 113 at various locations. Upgrade Traffic Monitoring Stations (TMS).

Near Yuba City, from Sutter Bypass to Lytle Road. Rehabilitate roadway.Near Yuba City, at the Feather River Bridge No. 18-009. Scour mitigation.In Yuba City, at Plumas Street. Replace signal poles.Near Capay, from 0.3 mile west of County Road 82B to County Road 82B. Shoulder widening, curve correction.

Near Cadenasso, from 0.4 mile west of County Road 79 to 0.4 mile east of County Road 79; also from Esparto to 0.2 mile west of Route 505. Shoulder widening, curve correction, left-turn channelization, signalization and two-way left-turn lanes.

In West Sacramento, at the Tower Bridge (Sacramento River Bridge No. 22-0021). Replace fender system.In and near Woodland, on Routes 5 and 113 at various locations. Place polyester overlay or methacrylate seal.

Page 11: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

03 Yolo 50 0.4/0.6 3F690 8742 0313000151 201.321 2014/15 $ - $ 1,836 $ - ST-CASH $ 74 $ 220 $ 42 $ 236 $ 572

03 Yuba 20 2F080 9580 0300020462 201.361 2017/18 $ 159 $ 3,353 $ - NH $ 356 $ 944 $ 1,377 $ 858 $ 3,535

03 Yuba 20 0.6/0.8 1E760 9582 0300000273 201.310 2015/16 $ 150 $ 3,518 $ - NH $ 100 $ 1,700 $ 476 $ 723 $ 2,999

03 Yuba 20 8.0/10.2 2F320 9587 0300020594 201.120 2017/18 $ 1,282 $ 6,488 $ - NH $ 700 $ 900 $ 409 $ 1,200 $ 3,209

03 Yuba 20 20.1/21.6 2F590 9588 0300020624 201.015 2017/18 $ 2,190 $ 15,300 $ - STP $ 1,387 $ 1,137 $ 1,571 $ 2,904 $ 6,999

03 Yuba 20 18.2/20.2 3F510 9590 0313000020 201.015 2017/18 $ 7,490 $ 28,932 $ - STP $ 1,500 $ 2,900 $ 850 $ 4,000 $ 9,250

03 Yuba 65 2.2/0.0 0F270 9730 0300000076 201.111 2014/15 $ 15 $ 430 $ - HBRR-S $ 261 $ 504 $ 95 $ 283 $ 1,143

03 Yuba 65 0.0/4.8 4F040 9731 0314000016 201.121 2014/15 $ - $ 5,081 $ - NH $ 298 $ 566 $ 64 $ 759 $ 1,687

03 Yuba 70 15.5/16.4 1E060 9812 0312000068 201.111 2015/16 $ 209 $ 18,039 $ - HBRR-S $ 854 $ 1,284 $ 155 $ 3,473 $ 5,766

03 Yuba 70 3F130 9817 0312000071 201.361 2017/18 $ 12 $ 1,850 $ - NH $ 360 $ 440 $ 20 $ 800 $ 1,620

04 Alameda 2G502 0107J 0414000057 201.015 2015/16 $ 7 $ 2,042 $ - STP $ 320 $ 320 $ 24 $ 480 $ 1,144

04 Alameda 13 12.1/13.4 2G480 0124J 0400020860 201.378 2015/16 $ 22 $ 1,484 $ - NH $ 221 $ 310 $ 11 $ 288 $ 830

04 Alameda 13 4.8/5.0 1SS41 0140Q 0413000228 201.131 2014/15 $ 150 $ 5,100 $ - NH $ 1,000 $ 1,160 $ 100 $ 1,525 $ 3,785

04 Alameda 13 9.1/0.0 2G830 0144R 0412000007 201.131 2014/15 $ 80 $ 1,240 $ - NH $ 650 $ 480 $ 100 $ 570 $ 1,800

04 Alameda 13 4.3/R9.6 1J190 1480W 0414000153 201.121 2014/15 $ 5 $ 4,000 $ - NH $ 250 $ 175 $ 25 $ 630 $ 1,080

04 Alameda 238 R14.6/0.0 4H080 0448E 0413000097 201.119 2017/18 $ 20 $ 5,849 $ - HBRR-S $ 864 $ 720 $ 72 $ 896 $ 2,552

04 Alameda 580 R4.0/0.0 2G850 0102R 0412000008 201.131 2014/15 $ 120 $ 6,100 $ - NH $ 750 $ 1,000 $ 80 $ 850 $ 2,680

04 Alameda 580 R4.9/R5.6 1SS03 0105A 0400020869 201.131 2014/15 $ 150 $ 10,500 $ - NH $ 765 $ 1,300 $ 50 $ 950 $ 3,065

Near West Sacramento, 0.4 mile west of the westbound Route 80 on-ramp onto eastbound Route 50. Relocate weight in motion (WIM) station.

In and near Marysville, on Route 20 from Sutter County Line to Levee Road; also on Route 70 from E Street bridge to 24 Street. Upgrade pedestrian infrastructure.

In Marysville, from I Street to F Street; also on Route 70 from 4th Street to 5th Street. Install left turn pockets and modify signals.

Near Marysville, from 0.1 mile east of Loma Rica Road to 0.2 mile west of Spring Valley Road. Rehabilitate roadway.

Near Lake Wildwood, from 0.4 mile east of McGanney Lane to Yuba/Nevada County line; also in Nevada County, from Yuba/Nevada County line to Mooney Flat Road. Shoulder widening and curve improvements.

Near Smartsville, from east of the Yuba River Bridge to 0.1 mile east of Smartsville Road. Realign and widen roadway.

Near Wheatland, at Dry Creek Bridge #16-2. Bridge scour mitigation.Near Wheatland, from Placer County line at Bear River Bridge to 0.3 mile north of South Beale Road. Pavement rehabilitation.

Near Marysville, at Simmerly Slough Bridge No. 16-0019. Replace bridge.In Yuba, Sacramento, Placer, El Dorado and Butte counties, on various Routes at various locations. Upgrade pedestrian facilities.

In Alameda County, on various routes at various locations. Upgrade transition railing (Site Group #2).In Berkeley, from Shattuck Avenue to 7th Street. Upgrade curb ramps and sidewalks.In Oakland, from Shepherd Street to Carson Street. Install soldier beam tie-back retaining wall.In Oakland, near Broadway Terrace. Construct retaining wall.In Oakland, from Route 13/580 Separation to Route 13/24 Separation. Rehabilitate pavement.Between Livermore and Hayward, at East Connector Separation Bridge No. 33-0524F, N238/S880 Connector Bridge No. 33-0540G and I-580 Arroyo Seco Bridge No. 33-0066. Bridge maintenance.

Near Livermore, at Stonecut Underpass. Repair embankment slipout and install retaining wall.Near Livermore, east of North Flynn Road. Repair median slope slipout and install retaining wall.

Page 12: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

04 Alameda 580 2G520 0107H 0400020999 201.015 2014/15 $ 20 $ 6,971 $ - STP $ 1,286 $ 1,309 $ 24 $ 1,964 $ 4,583

04 Alameda 580 R26.8/R27.2 4G800 0130B 0413000050 201.110 2017/18 $ 5 $ 4,991 $ - HBRR-S $ 576 $ 540 $ 36 $ 749 $ 1,901

04 Alameda 580 R41.4/R41.5 4H260 0133H 0413000123 201.378 2016/17 $ 10 $ 1,956 $ - NH $ 177 $ 462 $ 53 $ 423 $ 1,115

04 Alameda 580 R41.2/47.0 4H222 0133T 0414000054 201.121 2014/15 $ 20 $ 2,726 $ - NH $ 38 $ 500 $ 38 $ 550 $ 1,126

04 Alameda 580 R30.8/R41.5 27010 0135A 0412000131 201.121 2016/17 $ 57 $ 28,842 $ - NH $ 356 $ 2,385 $ 35 $ 2,385 $ 5,161

04 Alameda 580 44.3/0.0 4G790 0135Q 0413000064 201.110 2016/17 $ 5 $ 4,557 $ - HBRR-S $ - $ 810 $ 36 $ 846 $ 1,692

04 Alameda 580 46.1/0.0 1A672 0159Q 0412000347 201.110 2014/15 $ 800 $ 15,520 $ - HBRR-S $ 5 $ 2,800 $ 250 $ 3,000 $ 6,055

04 Alameda 580 0.0/7.8 3G590 8315V 0412000115 201.122 2015/16 $ 5 $ 58,526 $ - NH $ 1,800 $ 6,435 $ 179 $ 7,518 $ 15,932

04 Alameda 61 18.6 0J290 1480V 0413000492 201.119 2014/15 $ 5 $ 1,980 $ - HBRR-S $ 80 $ 670 $ 12 $ 600 $ 1,362

04 Alameda 680 R19.9/R20.2 2G410 0272K 0400020752 201.015 2014/15 $ 10 $ 1,065 $ - STP $ 75 $ 117 $ 32 $ 149 $ 373

04 Alameda 680 20.2/0.0 1SS42 0272Q 0412000601 201.131 2014/15 $ 10 $ 565 $ - NH $ 260 $ 175 $ 25 $ 175 $ 635

04 Alameda 680 M0.0/R12.4 3G600 0587E 0412000139 201.120 2016/17 $ 13 $ 24,332 $ - NH $ 883 $ 3,650 $ 243 $ 3,650 $ 8,426

04 Alameda 80 15500 0064A 0414000166 201.315 2016/17 $ 63 $ 31,762 $ - NH $ 2,220 $ 2,970 $ 270 $ 4,140 $ 9,600

04 Alameda 80 01411 0064Q 0414000436 201.352 2014/15 $ 370 $ 12,100 $ - ST-CASH $ 926 $ 3,000 $ 15 $ 3,000 $ 6,941

04 Alameda 80 4.6/5.7 4G230 1003J 0412000357 201.015 2016/17 $ 6 $ 1,300 $ - STP $ 122 $ 174 $ 52 $ 261 $ 609

04 Alameda 84 10.8/18.0 2A331 0076A 0414000038 201.010 2014/15 $ 100 $ 4,000 $ - STP $ 2,910 $ 1,100 $ 70 $ 990 $ 5,070

04 Alameda 84 10.8/18.0 2A332 0076B 0414000039 201.010 2016/17 $ 1,760 $ 14,000 $ - STP $ 9,580 $ 1,890 $ 230 $ 3,170 $ 14,870

04 Alameda 84 13.0/13.6 16030 0084B 0400000429 201.110 2016/17 $ 275 $ 24,000 $ - HBRR-S $ 4,000 $ 5,000 $ 299 $ 5,000 $ 14,299

In Alameda and Contra Costa Counties, on Routes 580 and 680 at various locations. Upgrade transition railing.

In Castro Valley, on eastbound East Castro Valley Boulevard Undercrossing No. 33-0235L. Replace bridge deck.

In Oakland, between Fruitvale Avenue/Champion Street and Harold Street /Montana Street. Upgrade sidewalk and curb ramps.

In Oakland, from 0.1 mile east of Boston Avenue overcrossing to 0.2 mile east of Route 80/580 Junction: also on Route 80 at PM 2.1/3.0. Rehabilitate pavement\curb ramps.

In San Leandro and Oakland, from Routes 580/238 Separation to Fruitvale Avenue undercrossing. Rehabilitate pavement.

In Oakland, at Oakland Avenue Undercrossing No. 33-0288. Rehabilitate bridge deck.In Oakland, at MacArthur Boulevard Bridge No. 33-0061L/R. Rehabilitate bridge.Near Livermore, from San Joaquin county line to east of Greenville overcrossing; also on Route 205 (PM 0.0/1.0) from San Joaquin county line to Midway Road undercrossing. Rehabilitate roadway.

Near Alameda, at San Leandro Bay Bridge No.33-0086 and San Leandro Bike Bridge. Rehabilitate bridge.In Dublin, at the 580/680 Interchange. Replace metal beam guardrail with concrete guardrail.In Pleasanton, at Route 580/680 interchange. Repair slope and install rock slope protection.In and near Fremont, from south of Scott Creek Road to Koopman Road. Rehabilitate roadway.In Alameda, Contra Costa, and Solano counties, on Routes 80, 580 and 980 at various locations. Install traffic operations systems (TOS).

Near Oakland, at the San Francisco Oakland Bay Bridge Toll Plaza Building. Reconstruct maintenance facilities.

In Berkeley, from Potter Street/Ashby Avenue on-ramp to University Avenue off-ramp. Replace metal beam guard rail with concrete barrier.

In Fremont, from Rosewarnes Underpass to Route 680. Construct minor safety improvements.In Fremont, from Route 238 (Mission Boulevard) to Route 680. Widen shoulders, install traffic signals and upgrade barriers.

In Fremont, at Alameda Creek Bridge #33-36. Replace bridge.

Page 13: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

04 Alameda 84 16.5/0.0 17244 0085Q 0400020175 201.010 2014/15 $ 1,585 $ 1,825 $ - STP $ 460 $ 749 $ 180 $ 617 $ 2,006

04 Alameda 880 4.6/7.4 15148 0012B 0400000421 201.315 2014/15 $ - $ 10,926 $ - NH $ - $ - $ - $ 2,030 $ 2,030

04 Alameda 880 19.3/0.0 1SS44 0039A 0412000603 201.131 2015/16 $ 30 $ 955 $ - NH $ 234 $ 500 $ 20 $ 515 $ 1,269

04 Alameda 880 28.5/29.0 1A683 0044Q 0412000335 201.120 2015/16 $ 100 $ 9,900 $ - NH $ 10 $ 2,200 $ 100 $ 2,640 $ 4,950

04 Alameda 880 30.5/0.0 4A800 0050N 0400001164 201.110 2015/16 $ 1,000 $ 6,754 $ - HBRR-S $ 620 $ 910 $ 300 $ 800 $ 2,630

04 Alameda 880 2.4/0.0 1SS43 0070A 0412000602 201.131 2015/16 $ 80 $ 2,995 $ - NH $ 762 $ 762 $ 64 $ 895 $ 2,483

04 Alameda 880 20.4/22.9 4H010 0085X 0413000132 201.235 2016/17 $ 5 $ 2,864 $ - NH $ 288 $ 426 $ 47 $ 429 $ 1,190

04 Alameda 880 10.7/0.0 4G880 0086Q 0413000058 201.113 2017/18 $ 20 $ 3,881 $ - HBRR-S $ 846 $ 540 $ 90 $ 540 $ 2,016

04 Alameda 880 8.5/8.6 0J350 0482Q 0413000459 201.131 2015/16 $ 50 $ 365 $ - NH $ 213 $ 120 $ 30 $ 162 $ 525

04 Alameda 880 11.9/27.5 4H580 0483W 0413000162 201.121 2016/17 $ - $ 21,230 $ - NH $ 497 $ 1,489 $ 166 $ 1,489 $ 3,641

04 Alameda 880 R2.9/R27.5 2J070 1480S 0414000421 201.015 2014/15 $ 100 $ 35,636 $ - STP $ 3,900 $ 4,900 $ 100 $ 3,570 $ 12,470

04 Alameda VAR 2G501 0107G 0414000005 201.015 2014/15 $ 18 $ 4,619 $ - STP $ 380 $ 760 $ 75 $ 1,140 $ 2,355

04 Alameda VAR 4G970 0481F 0413000125 201.235 2016/17 $ 5 $ 1,519 $ - NH $ 280 $ 390 $ 80 $ 600 $ 1,350

04 Alameda VAR 0J000 0820P 0413000370 201.015 2016/17 $ 10 $ 2,466 $ - STP $ 270 $ 310 $ 100 $ 390 $ 1,070

04 Alameda VAR 2J140 1480K 0414000431 201.170 2014/15 $ 5 $ 8,003 $ - NH $ 1,300 $ 1,950 $ 5 $ 1,500 $ 4,755

04 Alameda VAR 4H830 1480T 0413000284 201.119 2014/15 $ 5 $ 2,826 $ - HBRR-S $ 30 $ 255 $ 30 $ 475 $ 790

04 Alameda VAR 3G710 8315W 0412000156 201.235 2014/15 $ 44 $ 2,450 $ - NH $ 200 $ 493 $ 30 $ 513 $ 1,236

04 Contra Costa 24 1.3/0.0 1SS45 0228Q 0412000604 201.131 2014/15 $ 20 $ 495 $ - NH $ 273 $ 273 $ 25 $ 220 $ 791

In Sunol, at Tyler Ranch north of 2nd Street and Railroad Avenue. Required environmental mitigation for EFIS 04 0000 0455, PPNO 0086Z.

Near Fremont, from Auto Mall Parkway to Mowry Avenue; also on Route 84, from Thornton Avenue to Newark Boulevard. Install ramp metering and traffic operation system elements.(Partnership funding with locals.)

Near Hayward, at Hacienda Avenue. Re-grade ground and install rock slope protection.In Oakland, from 23rd to 29th Street. Rehabilitate roadway.In Oakland, at Lake Merrit Channel Bridge No. 33-0027 and 5th Avenue overhead. Bridge replacement.In Fremont, at Warren Avenue. Install pressure grouting.In San Leandro, between Washington Avenue and Marina Boulevard. Pave side slope areas.In Fremont, at Crandall Creek Bridge No. 33-0273. Seismic retrofit.Between Newark and Fremont, on northbound 880 below Southern Pacific Railroad overcrossing. Install rock slope protection (RSP).

Near Union City, from 0.4 mile north of Fremont Boulevard overcrossing to A Street undercrossing; also from 0.1 mile south of Washington Avenue overcrossing to south of High Street undercrossing. Rehabilitate pavement.

In Fremont, Newark, Union City, Hayward, San Leandro and Oakland, from 0.6 mile north of Mission Boulevard in Fremont to High Street in Oakland. Install median concrete barriers.

In Alameda County, on various routes at various locations. Upgrade transition railing (Site Group #1).On Route 13, between 4.3 and 10.1 miles; also on Route 24 between 1.8 and 6.0 miles. Pave beyond gore areas.

In Alameda and Contra Costa counties, on various routes at various intersection locations. Enhance pedestrian crossings.

In Alameda County, on Routes 13, 24, 77, 80, 84, 92, 205, 238, 262, 580, 680, 880 and 980 at various locations. Replace overhead sign panels.

On Routes 24, 580, 680, 880 and 980 at various locations. Rehabilitate bridge decks.In Fremont, Union City, San Leandro and Oakland, on Routes 580, 680 and 880 at various locations. Construct roadside paving.

In Orinda, at 0.2 mile east of Wider Road. Install drainage and place rock riprap slope protection.

Page 14: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

04 Contra Costa 242 R1.6/0.0 4G810 0250B 0413000055 201.110 2016/17 $ 5 $ 1,216 $ - HBRR-S $ 360 $ 594 $ 36 $ 288 $ 1,278

04 Contra Costa 4 10.7/0.0 28680 0182K 0413000088 201.321 2014/15 $ 14 $ 1,630 $ - ST-CASH $ - $ 456 $ 33 $ 408 $ 897

04 Contra Costa 4 0.0/T31.5 4G980 0481D 0413000122 201.235 2016/17 $ 5 $ 2,925 $ - NH $ 330 $ 450 $ 90 $ 700 $ 1,570

04 Contra Costa 580 5.8/0.0 4G890 0086R 0413000059 201.113 2016/17 $ 280 $ 4,280 $ - HBRR-S $ 750 $ 935 $ 180 $ 850 $ 2,715

04 Contra Costa 680 10.3/0.0 1SS47 0277Q 0412000606 201.131 2014/15 $ 45 $ 4,714 $ - NH $ 480 $ 720 $ 50 $ 720 $ 1,970

04 Contra Costa 680 17.7/17.9 1SS46 0294D 0412000605 201.131 2014/15 $ 50 $ 715 $ 714 6/26/14 NH $ 333 $ 333 $ 27 $ 220 $ 913

04 Contra Costa 680 24.3/0.0 3A87A 0333M 0414000120 201.113 2015/16 $ 5 $ 420 $ - HBRR-S $ - $ 300 $ 10 $ 210 $ 520

04 Contra Costa 680 11.5/11.8 0J380 0482S 0413000462 201.131 2017/18 $ 100 $ 4,559 $ - NH $ 563 $ 1,027 $ 150 $ 1,125 $ 2,865

04 Contra Costa 80 2G440 0026D 0400020807 201.015 2014/15 $ 50 $ 2,902 $ - STP $ 450 $ 700 $ 142 $ 900 $ 2,192

04 Contra Costa 80 8.7/0.0 0J370 0482R 0413000461 201.131 2017/18 $ 30 $ 375 $ - NH $ 186 $ 106 $ 150 $ 142 $ 584

04 Contra Costa 80 0.0/10.1 3G610 0587F 0412000140 201.121 2014/15 $ 5 $ 36,603 $ - NH $ 981 $ 3,447 $ 300 $ 5,491 $ 10,219

04 Contra Costa 80 2J150 1480M 0414000432 201.170 2014/15 $ 10 $ 4,332 $ - NH $ 370 $ 980 $ 80 $ 820 $ 2,250

04 Contra Costa VAR 2G450 0277E 0400020840 201.015 2014/15 $ 50 $ 2,843 $ - STP $ 450 $ 700 $ 20 $ 900 $ 2,070

04 Marin 1 0.0/50.5 4G940 0086W 0413000218 201.235 2017/18 $ 5 $ 2,005 $ - NH $ 216 $ 270 $ 54 $ 450 $ 990

04 Marin 1 8.1/0.0 2G890 0209R 0400021259 201.131 2015/16 $ 394 $ 7,693 $ - NH $ 550 $ 1,800 $ 400 $ 1,950 $ 4,700

04 Marin 1 8.1/0.0 4S660 0308J 0400001256 201.131 2015/16 $ 100 $ 2,200 $ - NH $ 850 $ 600 $ 100 $ 515 $ 2,065

04 Marin 1 2.2/0.0 1SS58 0312T 0412000635 201.131 2016/17 $ 55 $ 1,639 $ - NH $ 400 $ 400 $ 50 $ 350 $ 1,200

04 Marin 1 10.9/0.0 4S220 0313E 0400001217 201.131 2014/15 $ 50 $ 2,200 $ - NH $ 440 $ 2,300 $ 100 $ 650 $ 3,490

04 Marin 1 24.7/0.0 4S780 0315D 0400020145 201.131 2015/16 $ 90 $ 2,275 $ - NH $ 400 $ 1,200 $ 100 $ 500 $ 2,200

04 Marin 1 50.3/50.5 20950 0326A 0412000116 201.110 2015/16 $ 1,530 $ 5,722 $ - HBRR-S $ 1,080 $ 630 $ 270 $ 810 $ 2,790

In Concord, at Buchanan Field Viaduct No. 28-0186. Rehabilitate bridge.In Contra Costa County at Ppostmile 10.7; also in Napa County at postmile 9.1. Install Weight-In-Motion (WIM) system.

Near Concord, on Route 4 from Route 80 to Route 160; also on Route 24 east of Caldecott Tunnel to Route 680. Place vegetation control, Maintenance Vehicle Pullout (MVP) and pave beyond gore.

In Richmond, at Scofield Avenue Undercrossing No. 28-140L/R. Seismic retrofit.Near Danville, at 0.1 mile south of Stone Valley Road. Reconstruct roadway and install rock slope protection.

In Pleasant Hill, at 0.2 mile north of Monument Boulevard. Install compaction grouting.In and near Marina Vista, at Mococo Overhead Bridge. Environmental mitigation.Near Alamo, on southbound of Route 680, between Rudgear Road and Livorna Road. Repair slide.Near Albany, from Central Avenue undercrossing to Pomona Street undercrossing; also on Route 580, from Central Avenue overcrossing to Western Drive at various locations. Upgrade transition railing.

In Pinole, east of Pinole Valley Road. Place drainage system and rock slope protection (RSP).In Richmond, El Cerrito, San Pablo, Pinole and Hercules, from Alameda county line to 4/80 Route 4 separation. Rehabilitate pavement.

In Contra Costa County, on Routes 80, 4, 24, 160, 242, 580 and 680 at various locations. Replace overhead and roadside signs.

In Contra Costa County on routes 160, 242 and 680 at various locations. Install transition railing.Near Marin City, from Route 101 to Marin/Sonoma County line. Place concrete under metal beam guard rail.Near Slide Ranch, 2.1 miles north of Muir Woods Road. Construct soldier pile wall with tieback.Near Muir Beach, at Cold Stream Road. Construct retaining wall.Near Mill Valley, at 0.2 mile north of Loring Avenue. Provide drainage system and install rock slope protection.

Near Stinson Beach, 0.2 mile north of Dipsea Trail. Construct tie-back wall.Near Olema, 1.8 miles south of Olema. Replace culvert with a bridge.Near Bloomfield, at Estero Americano Bridge No. 27-0028. Replace bridge.

Page 15: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

04 Marin 1 0.0/0.8 2G690 0434H 0400021211 201.378 2016/17 $ 700 $ 1,976 $ - NH $ 300 $ 400 $ 300 $ 340 $ 1,340

04 Marin 1 3.1/50.5 4H870 0487P 0413000295 201.010 2015/16 $ 5 $ 2,061 $ - STP $ 130 $ 270 $ 50 $ 270 $ 720

04 Marin 1 6.6/0.0 3S900 0713F 0400001043 201.131 2015/16 $ 225 $ 5,860 $ - NH $ - $ 2,700 $ 150 $ 1,000 $ 3,850

04 Marin 1 7.7/7.8 3S910 0713G 0400001044 201.131 2015/16 $ 157 $ 6,174 $ - NH $ 168 $ 1,918 $ 150 $ 1,000 $ 3,236

04 Marin 101 10.6/10.9 4G820 0350H 0413000049 201.110 2017/18 $ 570 $ 7,264 $ - HBRR-S $ 630 $ 600 $ 300 $ 900 $ 2,430

04 Marin 101 4A000 0355A 0412000117 201.112 2014/15 $ 5 $ 1,785 $ - HBRR-S $ 360 $ 750 $ 90 $ 600 $ 1,800

04 Marin 101 1.5/14.0 4G460 0832E 0412000480 201.112 2014/15 $ 300 $ 6,480 $ - HBRR-S $ 1,210 $ 1,100 $ 200 $ 1,000 $ 3,510

04 Marin 101 0.0/4.0 3G210 2119Q 0412000027 201.361 2016/17 $ 351 $ 1,682 $ - NH $ 450 $ 360 $ 126 $ 270 $ 1,206

04 Marin 580 2.7/0.0 1SS59 0327Q 0412000636 201.131 2016/17 $ 90 $ 896 $ - NH $ 250 $ 427 $ 126 $ 243 $ 1,046

04 Marin 580 3.3/0.0 4G470 0832F 0412000481 201.112 2014/15 $ 5 $ 2,040 $ - HBRR-S $ 357 $ 692 $ 59 $ 600 $ 1,708

04 Marin VAR 4A670 0273P 0400001155 201.361 2015/16 $ 50 $ 890 $ - NH $ - $ 400 $ 12 $ 450 $ 862

04 Marin VAR 2J180 1480Q 0414000435 201.170 2014/15 $ 20 $ 3,427 $ - NH $ 400 $ 1,000 $ 15 $ 1,030 $ 2,445

04 Napa 121 20.2/20.4 2A11A 0348J 0412000644 201.111 2014/15 $ 10 $ 440 $ - HBRR-S $ - $ 150 $ 20 $ 150 $ 320

04 Napa 121 8.9/9.4 2A320 0380L 0400000817 201.111 2015/16 $ 2,100 $ 9,650 $ - HBRR-S $ 1,800 $ 2,100 $ 275 $ 2,100 $ 6,275

04 Napa 128 17.9/0.0 2G940 0522R 0400021254 201.131 2015/16 $ 122 $ 1,540 $ - NH $ 540 $ 480 $ 80 $ 450 $ 1,550

04 Napa 128 R7.4/0.0 1G430 0587H 0412000126 201.111 2016/17 $ 20 $ 7,165 $ - HBRR-S $ 960 $ 1,050 $ 150 $ 1,000 $ 3,160

04 Napa 128 29.7/0.0 2G950 0640B 0400021255 201.131 2014/15 $ 122 $ 2,100 $ - NH $ 190 $ 480 $ 80 $ 330 $ 1,080

04 Napa 128 19.7/20.7 4G840 0830B 0413000051 201.110 2017/18 $ 239 $ 12,710 $ - HBRR-S $ 1,560 $ 1,560 $ 216 $ 1,940 $ 5,276

04 Napa 29 11.9/0.0 4G490 0116Q 0412000491 201.015 2016/17 $ 10 $ 1,242 $ - STP $ 306 $ 486 $ 18 $ 90 $ 900

In Almonte, near Route 101 off-ramp to Route 1; also from Coyote Creek to Flamingo Road. Upgrade pedestrian facilities.

In Marin County, near Tamalpais-Homestead Valley, from 0.2 mile west of Erica Road to Valley Ford Road; also in Napa County, on Route 29, from PM 48.0 to PM 48.6. Install centerline rumble strips.

Near Muir Beach, 0.3 mile north of Seacape Drive. Construct tie-back wall.

Near Muir Beach, 0.2 mile north of Cold Stream Fire Road. Construct tie-back wall.In San Rafael, from Route 101 northbound off-ramp to 2nd Street at San Rafael Harbor Bridge No. 27-0033. Replace bridge.

In San Rafael, at Freitas Parkway Overcrossing No. 27-0080, Lucas Valley Road Undercrossing No. 27-0059 and North San Pedro Road Undercrossing No. 27-0014S. Replace bridge railings and rehabilitate deck.

In Marin County on Route 101, at various locations. Upgrade bridge rail.In Sausalito, Corte Madera, Larkspur, and Tiburon, on Routes 101 and 131 at various locations. Upgrade curb ramps, driveways and sidewalks.

Near Mill Valley, at 0.6 mile south of Panoramic Highway. Re-grade slope and repair down drain.Near Greenbrae, at Sir Francis Drake Boulevard Overcrossing No. 27-0074; also at Bellam Boulevard Undercrossing No. 27-0073L (PM 4.5). Upgrade bridge rail.

In Marin, Napa and Sonoma counties, on various routes, at various locations. Install curb ramps.In Marin, Napa, and Sonoma counties, on Routes 12, 29, 37, 101 and 580 at various locations. Replace overhead and roadside sign panels.

Near Napa, at Capell Creek Bridge #21-0009. Highway planting re-vegetation.Near Napa, at Sarco Creek Bridge #21-0008. Replace bridge.Near Rutherford, at 1.1 miles west of Knoxville Road. Construct roadway retaining system.Near Rutherford, at Conn Creek Bridge No. 21-0021. Replace bridge.Near Winters, at 1.5 miles east of Wragg Canyon Road. Construct roadway retaining system.Near Napa, at Capell Creek Bridge No. 21-0078. Rehabilitate bridge.In Napa, on southbound on-ramp from Solano Avenue to Route 29. Construct concrete barrier.

Page 16: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

04 Napa 29 11.4/0.0 4G540 0340Q 0412000491 201.010 2015/16 $ 10 $ 712 $ - STP $ 216 $ 251 $ 6 $ 171 $ 644

04 Napa 29 36.9/4.0 3G140 0371Q 0412021276 201.361 2016/17 $ 561 $ 1,422 $ - NH $ 700 $ 500 $ 175 $ 300 $ 1,675

04 Napa 29 13.5/25.5 4H200 0378E 0413000258 201.121 2017/18 $ 35 $ 14,715 $ - NH $ 510 $ 851 $ 35 $ 1,140 $ 2,536

04 Napa 29 37.0/0.0 3G640 0587G 0412000134 201.111 2015/16 $ 674 $ 9,204 $ - HBRR-S $ 1,090 $ 980 $ 400 $ 1,100 $ 3,570

04 Santa Clara 101 28.5/40.7 4H000 0085Y 0413000236 201.235 2016/17 $ 10 $ 2,181 $ - NH $ 144 $ 288 $ 36 $ 288 $ 756

04 Santa Clara 101 17.8/41.1 4G950 0086X 0413000235 201.235 2016/17 $ 5 $ 1,980 $ - NH $ 210 $ 310 $ 50 $ 450 $ 1,020

04 Santa Clara 101 16.0/27.6 1J630 0488P 0414000303 201.121 2014/15 $ 10 $ 26,224 $ - NH $ 792 $ 1,242 $ 54 $ 2,528 $ 4,616

04 Santa Clara 130 5.6/6.0 2G990 0500C 0412002012 201.131 2015/16 $ 100 $ 1,627 $ - NH $ 400 $ 550 $ 150 $ 486 $ 1,586

04 Santa Clara 152 0.0/5.2 2A251 0483Q 0413000402 201.010 2015/16 $ 1,000 $ 1,100 $ - STP $ - $ 440 $ 300 $ 195 $ 935

04 Santa Clara 152 0.0/5.2 2A252 0483R 0413000403 201.010 2015/16 $ 2,000 $ 1 $ - STP $ - $ 350 $ 150 $ - $ 500

04 Santa Clara 152 16.2/19.5 2A442 0485Q 0412000582 201.010 2015/16 $ 913 $ 1 $ - STP $ - $ 350 $ 250 $ - $ 600

04 Santa Clara 152 16.2/19.5 2A441 0485U 0412000581 201.010 2015/16 $ 1,000 $ 1,486 $ - STP $ - $ 600 $ 350 $ 395 $ 1,345

04 Santa Clara 152 6.1/6.5 44884 0487M 0400021236 201.111 2015/16 $ - $ 600 $ - HBRR-S $ - $ 108 $ 5 $ 60 $ 173

04 Santa Clara 152 6.1/R35.2 4H860 0487N 0413000292 201.015 2016/17 $ 6 $ 1,632 $ - STP $ 108 $ 234 $ 72 $ 306 $ 720

04 Santa Clara 152 11.9/0.0 0G720 0552 0400001989 201.010 2015/16 $ 119 $ 3,340 $ - STP $ 468 $ 432 $ 144 $ 270 $ 1,314

04 Santa Clara 152 R26.9/0.0 1A200 0587Q 0413000124 201.321 2015/16 $ 13 $ 1,304 $ - ST-CASH $ - $ 450 $ 10 $ 340 $ 800

04 Santa Clara 152 13.8/14.7 1G870 0730F 0400020620 201.010 2015/16 $ 336 $ 4,038 $ - STP $ 721 $ 730 $ 370 $ 795 $ 2,616

04 Santa Clara 280 R2.6/0.0 1SS52 0155Q 0412000543 201.131 2014/15 $ 55 $ 1,804 $ - NH $ 307 $ 384 $ 23 $ 489 $ 1,203

04 Santa Clara 280 7.5/11.5 27205 0503P 0414000056 201.121 2014/15 $ 20 $ 3,742 $ - NH $ 67 $ 311 $ 12 $ 312 $ 702

In Napa, at northbound Route 29 at First Street off-ramp intersection. Install traffic signals.In Calistoga, on Route 29 from postmile 36.9 to 38.0 at various locations; also on Route 128 from postmile 4.0 to 4.5 at various locations. Construct ADA ramps.

In and near Napa and Yountville, from north of Trancas Street/Redwood Road to Mee Lane. Rehabilitate pavement.In Calistoga, at Napa River Bridge No. 21-0018. Replace bridge.Near San Jose, from Blossom Hill Road to Timble Road at various locations. Pave beyond gore areas.In Santa Clara, San Mateo and San Francisco Counties, on various routes, various locations. Upgrade pump houses.

In Morgan Hill and San Jose, from East Dunne Avenue to 0.6 mile north of Silicon Valley Boulevard. Pavement rehabilitation.

In Saratoga, north of Booker Creek Road. Construct segmented pile wall.In Santa Clara, from Hecker pass to Uvas Creek. Planting and environmental mitigation.In Santa Clara, from Hecker pass to Uvas Creek. Environmental species mitigation.

Near Gilroy, from Old Lake Road to San Felipe Road. Environmental species mitigation.Near Gilroy, from Old Lake Road to San Felipe Road. Planting and environmental mitigation.Near Gilroy, at Uvas Creek. Required environmental species mitigation for bridge replacement project EA 04-44880.

In and near Gilroy, from 1.1 miles east of Watsonville Road to Merced County line. Install rumble strips.Near Gilroy at Route 152/Frazier Lake Road intersection. Construct right turn lane and install traffic signals.Near Gilroy, 1.9 miles east of Casa de Fruta Drive undercrossing. Replace Weigh-In-Motion (WIM) system.Near Gilroy, from 0.6 mile west to 0.2 mile east of the Prunedale Avenue intersection. Construct shoulders, install rumble strips and soft median barrier.

In San Jose, at Minor Avenue. Construct geo-synthetic reinforced embankment.

In Cupertino, from Tantau Avenue overcrossing to Foothill Expressway. Rehabilitate pavement\curb ramps.

Page 17: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

04 Santa Clara 82 14.8/18.1 2G540 0525A 0400021004 201.010 2014/15 $ 291 $ 6,133 $ - STP $ - $ 900 $ 54 $ 756 $ 1,710

04 Santa Clara 85 2.0/4.5 4G990 0085V 0413000234 201.235 2017/18 $ 5 $ 2,075 $ - NH $ 144 $ 270 $ 36 $ 270 $ 720

04 Santa Clara 85 R20.0/0.0 4G830 0440Q 0413000054 201.110 2016/17 $ 10 $ 1,858 $ - HBRR-S $ 270 $ 360 $ 72 $ 144 $ 846

04 Santa Clara 87 4.9/0.0 1SS48 0428Q 0412000539 201.131 2014/15 $ 10 $ 363 $ - NH $ 198 $ 133 $ 18 $ 161 $ 510

04 Santa Clara 87 9.0/9.2 4G610 2205A 0412000549 201.010 2014/15 $ 10 $ 515 $ - STP $ - $ 135 $ 18 $ 90 $ 243

04 Santa Clara 880 1.3/1.4 1G860 0730C 0400020618 201.015 2016/17 $ 266 $ 1,129 $ - STP $ 119 $ 143 $ 72 $ 215 $ 549

04 Santa Clara 9 3.6/0.0 1A340 0385C 0412000162 201.112 2014/15 $ 30 $ 1,660 $ - HBRR-S $ 450 $ 540 $ 100 $ 500 $ 1,590

04 Santa Clara 9 4.9/0.0 3G630 0386F 0412000409 201.110 2017/18 $ 6,779 $ 11,668 $ - HBRR-S $ 1,200 $ 1,400 $ 396 $ 1,526 $ 4,522

04 Santa Clara 9 4.6/0.0 2G960 0387R 0412000010 201.131 2015/16 $ 250 $ 2,000 $ - NH $ 400 $ 672 $ 150 $ 600 $ 1,822

04 Santa Clara VAR 2J170 1480P 0414000434 201.170 2014/15 $ 10 $ 8,723 $ - NH $ 1,340 $ 1,890 $ 50 $ 2,000 $ 5,280

04 San Francisco 1 R0.0/R6.9 4C130 0585E 0400001180 201.121 2017/18 $ 180 $ 17,143 $ - NH $ 294 $ 1,319 $ 35 $ 1,319 $ 2,967

04 San Francisco 1 6.0/0.0 1A903 1067B 0412000591 201.335 2014/15 $ 30 $ 2,400 $ - NH $ 36 $ 480 $ 15 $ 540 $ 1,071

04 San Francisco 101 2.0/0.0 3G620 0587D 0412000141 201.110 2015/16 $ 20 $ 19,557 $ - HBRR-S $ 830 $ 2,350 $ 20 $ 2,620 $ 5,820

04 San Francisco 101 3.4/0.0 3G170 0600H 0412000014 201.131 2014/15 $ 15 $ 700 $ - NH $ 80 $ 500 $ 55 $ 400 $ 1,035

04 San Francisco 101 8.0/9.8 1637N 0619K 0400020923 201.110 2014/15 $ 100 $ 5,470 $ - HBRR-S $ - $ 3,500 $ 30 $ 2,500 $ 6,030

04 San Francisco 101 T4.7/8.1 3E600 0832J 0412000482 201.121 2016/17 $ 600 $ 9,995 $ - NH $ 170 $ 816 $ 34 $ 816 $ 1,836

04 San Francisco 101 1.6/4.1 3G700 8315U 0412000155 201.235 2014/15 $ 25 $ 2,000 $ - NH $ 140 $ 600 $ 40 $ 600 $ 1,380

04 San Francisco 280 R4.2/R6.6 2A490 0608K 0400000827 201.110 2015/16 $ 432 $ 10,730 $ - HBRR-S $ 605 $ 2,247 $ 755 $ 1,732 $ 5,339

In Sunnyvale, at Route 82 intersections with Henderson Avenue, South Wolfe Road, Maria Lane, Sunnyvale Saratoga Road/South Sunnyvale Avenue, South Mathilda Avenue, and South Bernardo Avenue. Upgrade drainage system, curb ramps and pedestrian passageways

In San Jose, from Cottle Road to south of Route 85/87 Separation at various locations. Pave between edge of shoulder and sound wall.

Near Sunnyvale, at Stevens Creek Bridge No. 37-0185 on Routes 101 and 131 at various locations. Overlay deck with polyester concrete.

In San Jose, at West Virginia Street. Repair pavement.In San Jose, south of Route 101 and north of Airport Parkway undercrossing. Replace K-Rail barrier with metal beam guard rail and concrete barrier.

In San Jose, on northbound Route 880 off-ramp to westbound Bascom Avenue; also on southbound Route 880 off-ramp to Bascom Avenue. Construct concrete median barriers.

Near Saratoga, at West Branch Saratoga Creek Bridge No. 37-0073 and at Saratoga Avenue Bridge No. 37-0144 (PM 11.4). Upgrade bridge rail.

Near Saratoga, at Saratoga Creek Bridge No. 37-0074. Replace bridge.Near Saratoga, 0.3 mile north of Sanborn Road. Construct soldier pile wall.

In Santa Clara County, on Routes 17, 85, 87, 101, 237, 280, 680 and 880 at various locations. Replace overhead and ground-mounted sign panels.

In San Francisco, from Route 280 to Ruckman Avenue undercrossing. Rehabilitate roadway.In the city of San Francisco, at Presidio National Park. Water quality improvements.Near San Francisco, at Alemany Circle Undercrossing No. 34-0033. Rehabilitate bridge.In the city of San Francisco, at 23rd Street. Reconstruct slope and place rock slope protection.In San Francisco, from Richardson Avenue to the Golden Gate Bridge Plaza. Rehabilitate bridge.In San Francisco, from Mission Street to Lyon Street. Rehabilitate pavement.

In San Francisco County, on Routes 101 and 280; also on Route 101 in Marin County at various locations. Construct roadside paving and relocate facilities.

In San Francisco, at Southern Viaduct Bridge #34-0046. Rehabilitate bridge deck.

Page 18: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

04 San Francisco 280 R0.1/R1.5 4H900 0820J 0413000300 201.010 2014/15 $ 10 $ 1,511 $ - STP $ - $ 750 $ 30 $ 320 $ 1,100

04 San Francisco VAR 4H750 0158G 0413000259 201.015 2016/17 $ 40 $ 5,773 $ - STP $ 572 $ 811 $ 48 $ 716 $ 2,147

04 San Mateo 1 4G550 0045G 0412000501 201.015 2015/16 $ 10 $ 4,443 $ - STP $ 402 $ 468 $ 45 $ 423 $ 1,338

04 San Mateo 1 4.2/4.4 4G650 0045Q 0412000624 201.131 2016/17 $ 100 $ 2,800 $ - NH $ 700 $ 560 $ 100 $ 450 $ 1,810

04 San Mateo 1 0.3/0.0 0J210 0482K 0413000444 201.131 2017/18 $ 40 $ 740 $ - NH $ 235 $ 165 $ 165 $ 205 $ 770

04 San Mateo 1 37.9/R48.0 4H210 0636S 0413000140 201.121 2016/17 $ 50 $ 15,163 $ - NH $ 500 $ 1,120 $ 60 $ 1,120 $ 2,800

04 San Mateo 1 44.0/0.0 4G850 0681Q 0413000052 201.110 2016/17 $ 5 $ 3,662 $ - HBRR-S $ 500 $ 400 $ 100 $ 450 $ 1,450

04 San Mateo 1 32.0/32.3 1J590 1480Y 0414000286 201.131 2014/15 $ - $ 1,250 $ - NH $ - $ - $ - $ 500 $ 500

04 San Mateo 101 23.7 3E790 1480X 0413000299 201.119 2014/15 $ 30 $ 6,400 $ - HBRR-S $ 50 $ 700 $ 40 $ 700 $ 1,490

04 San Mateo 101 20.0/26.1 3G680 8315Q 0412000152 201.235 2014/15 $ 5 $ 1,100 $ - NH $ 135 $ 250 $ 10 $ 205 $ 600

04 San Mateo 101 0.0/20.0 3G670 8315R 0412000151 201.235 2015/16 $ 5 $ 1,550 $ - NH $ 110 $ 150 $ 40 $ 210 $ 510

04 San Mateo 280 9.4/0.0 4G590 0729Q 0412000619 201.131 2014/15 $ 397 $ 860 $ - NH $ 430 $ 133 $ 173 $ 260 $ 996

04 San Mateo 280 R0.3/R27.1 1G830 0730B 0400020615 201.015 2014/15 $ 10 $ 3,300 $ - STP $ 297 $ 745 $ 90 $ 620 $ 1,752

04 San Mateo 280 25.2/0.0 4G630 0733H 0412000621 201.131 2014/15 $ 10 $ 760 $ - NH $ 352 $ 235 $ 35 $ 231 $ 853

04 San Mateo 280 R2.1/10.8 2J080 1480H 0414000422 201.121 2014/15 $ 10 $ 24,711 $ - NH $ 495 $ 1,035 $ 35 $ 3,415 $ 4,980

04 San Mateo 82 13.7/0.0 1G020 0686 0400002011 201.010 2015/16 $ 1,352 $ 2,253 $ - STP $ 846 $ 810 $ 360 $ 216 $ 2,232

Near Daly City, on southbound Route 280 at John Daly Boulevard off-ramp; also on northbound Route 280 at San Jose Avenue overcrossing. Install outer separation concrete barrier.

In San Francisco County, on Routes 35 and 82 at various locations; also in Santa Clara County, on Routes 82, 130, and 152 at various locations. Install pedestrian crosswalk regulatory signs and warning signs.

In San Mateo County, on Routes 1, 82 and 84 at various locations; also in Solano County, on Route 29 at various locations. Install crosswalk safety enhancements.

Near Ano Nuevo Park, at Rossi Road. Repair slipout.Near Pigeon Point, at 0.3 mile north of the Santa Cruz County line. Construct rock slope protection (RSP) and install drainage system.

In and near Montara, Pacifica and Daly cities, from 1.3 miles north of 2nd Street to Sullivan Avenue overcrossing. Rehabilitate pavement.

In Pacifica, at San Jose avenue Pedestrian Overcrossing No. 35-0240. Replace bridge.Near Half Moon Bay, from 0.3 mile north of Santa Ana Street to Santa Ana Street. Construct retaining wall and install rock slope protection.

Near South San Francisco, at Sierra Point Overhead No. 35-0130. Blast clean, paint steel girders, and bent caps.

In and near South San Francisco, from Route 380 to South Airport Boulevard; also on Routes 35, 280, and 380 at various locations. Construct roadside paving, access gates and relocate facilities.

Near Palo Alto, from Santa Clara County line to 0.4 mile south of San Bruno Avenue at various locations. Construct roadside paving and relocate facilities.

Near Belmont, at 1.4 miles south of Route 92. Repair pipe system and backfill sinkhole.Near Stanford, from Route 1/280 Junction to San Francisquito Creek at various locations; also near Lincoln, on Route 92 at PM 14.4. Upgrade metal beam guardrail transition railing.

In Daly City, at Sullivan Avenue onramp. Repair washout and install rock slope protection.In Woodside and near Belmont, from 0.5 mile north of Sand Hill Road overcrossing to Route 280/92 Separation. Pavement rehabilitation.

Near Burlingame and Hillsborough city limits, at the intersection of Route 82 and Floribunda Avenue. Install left turn signal.

Page 19: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

04 San Mateo 82 17.1/0.0 1G540 0686A 0400020033 201.010 2014/15 $ 50 $ 307 $ - STP $ - $ 180 $ 35 $ 60 $ 275

04 San Mateo 84 21.6/0.0 4G640 0653R 0412000622 201.131 2014/15 $ 250 $ 4,900 $ - NH $ 450 $ 1,030 $ 180 $ 1,100 $ 2,760

04 San Mateo 92 6.0/0.0 0J140 0482D 0413000437 201.131 2017/18 $ 65 $ 615 $ - NH $ 435 $ 250 $ 40 $ 300 $ 1,025

04 San Mateo 92 5.4/6.2 1G850 0730G 0400020617 201.015 2014/15 $ 8 $ 1,262 $ - STP $ 121 $ 242 $ 121 $ 363 $ 847

04 San Mateo VAR 4A360 1066A 0400001128 201.015 2014/15 $ 10 $ 8,073 $ - STP $ 640 $ 893 $ 20 $ 1,053 $ 2,606

04 Solano 12 19.2/0.0 4G560 8060A 0412000504 201.010 2017/18 $ 71 $ 4,671 $ - STP $ 594 $ 684 $ 54 $ 468 $ 1,800

04 Solano 680 R7.7/8.1 3G060 0384R 0400021256 201.131 2015/16 $ 500 $ 1,747 $ - NH $ 500 $ 550 $ 150 $ 600 $ 1,800

04 Solano 780 6.8/7.2 4G450 0832D 0412000477 201.322 2015/16 $ 350 $ 5,900 $ - NH $ 504 $ 1,008 $ 504 $ 1,584 $ 3,600

04 Solano 80 1.1/38.1 4G960 0481C 0413000147 201.235 2017/18 $ 5 $ 1,965 $ - NH $ 216 $ 305 $ 54 $ 450 $ 1,025

04 Solano 80 14.6/0.0 4G870 0487Q 0413000057 201.111 2016/17 $ 10 $ 1,446 $ - HBRR-S $ 350 $ 350 $ 16 $ 300 $ 1,016

04 Solano 80 31.4/32.6 4G510 0832G 0412000483 201.113 2015/16 $ 10 $ 11,500 $ - HBRR-S $ 1,040 $ 1,460 $ 240 $ 1,820 $ 4,560

04 Solano 80 2J160 1480N 0414000433 201.170 2014/15 $ 10 $ 3,332 $ - NH $ 378 $ 990 $ 15 $ 995 $ 2,378

04 Solano 80 19.5/19.6 1SS57 5303Q 0412000616 201.131 2014/15 $ 5 $ 417 $ - NH $ 197 $ 132 $ 20 $ 160 $ 509

04 Solano 80 13.9/0.0 3G690 8315N 0412000153 201.110 2017/18 $ 145 $ 2,306 $ - HBRR-S $ 446 $ 592 $ 50 $ 448 $ 1,536

04 Solano 84 12.1/12.2 0G660 0886 0400000343 201.110 2016/17 $ 1,050 $ 21,900 $ - HBRR-S $ 1,836 $ 2,754 $ 1,098 $ 2,754 $ 8,442

04 Sonoma 1 7.2/0.0 3G070 0330H 0400021271 201.131 2015/16 $ 150 $ 600 $ - NH $ 220 $ 280 $ 60 $ 180 $ 740

04 Sonoma 1 15.1/15.8 0A020 0748E 0400000129 201.131 2015/16 $ 3,000 $ 20,500 $ - NH $ 4,500 $ 1,800 $ 500 $ 2,200 $ 9,000

04 Sonoma 1 30.5/0.0 3G080 0753R 0400021272 201.131 2015/16 $ 240 $ 7,100 $ - NH $ 1,000 $ 1,000 $ 100 $ 1,500 $ 3,600

04 Sonoma 1 0.0/7.1 1J170 1480E 0414000151 201.121 2014/15 $ 5 $ 2,500 $ - NH $ 150 $ 350 $ 50 $ 500 $ 1,050

In Millbrae, at the intersection of Route 82 and Millwood Drive. Install traffic signals.In Woodside, at Route 84/280 separation. Repair washout and construct secant wall.Near San Mateo, east of Route 35. Construct rock slope protection (RSP).Near Skylawn Memorial Park, from Skyline Boulevard to Skyline Quarry Road; also in Solano County, on Route 780, from 0.2 mile south of East 5th Street undercrossing to 0.4 mile north of East 2nd Street undercrossing. Install metal beam guardrail.

In San Mateo, Napa and Solano Counties on various routes at various locations. Replace metal beam guardrail with concrete guardrail.

Near Rio Vista, at the intersection of Route 12 and Route 113. Install roundabout.Near Cordelia, 0.2 mile north of Marshview Road overcrossing to 1.9 miles south of Gold Hill Road overcrossing. Construct rammed aggregate piers.

Near Vallejo, at Laurel Street Bridge No. 23-0119. Replace bridge.Near Vallejo, on Route 80 between postmile 1.1 and 38.1; on Route 37 at postmile 6.9; also on Route 12 between postmile 7.4 and 19.5. Install roadside safety improvements.

Near Fairfield, on Route 80, near Fairfield at Suisun Creek Bridge No. 23-0007; also in Marin County, near San Rafael on Route 101 at Miller Creek Bridge No. 27-0004. Scour mitigation.

Near Vacaville, at Meridian Road Overcrossing No. 23-0147 and Midway Road Overcrossing No. 23-0148. Rehabilitate and replace bridges.

In Solano County, on Routes 80, 12, 37, 113, 505, 680 and 780 at various locations. Replace overhead and roadside signs.

Near Fairfield, at Waterman Boulevard. Repair drainage system.Near Fairfield, at Dan Wilson Creek Bridge No. 23-0006. Rehabilitate bridge.

Near Rio Vista, at Miner Slough Bridge #23-0035. Replace bridge.Near Bodega Bay, at 0.8 mile north of Bay Hill Road. Place rock slope protection.Near Camet, 0.1 mile north of Del Sol Road. Realign roadway.Near Fort Ross, at 2.6 miles south of Fort Ross Road. Construct soil nail walls.

Near Bodega Bay, from Marin/Sonoma county line to 0.8 mile north of Bay Hill Road. Rehabilitate pavement.

Page 20: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

04 Sonoma 101 11.6/0.0 1SS35 0116R 0412000617 201.131 2014/15 $ 50 $ 874 $ - NH $ 405 $ 270 $ 40 $ 266 $ 981

04 Sonoma 101 9.0/0.0 0J100 0481B 0413000408 201.131 2017/18 $ 100 $ 694 $ - NH $ 423 $ 102 $ 150 $ 207 $ 882

04 Sonoma 101 R33.5/R43.4 4G480 0780G 0412000490 201.010 2016/17 $ 10 $ 1,090 $ - STP $ 200 $ 450 $ 50 $ 200 $ 900

04 Sonoma 101 33.5/0.0 1SS36 0797K 0412000519 201.131 2014/15 $ 25 $ 758 $ - NH $ 350 $ 235 $ 25 $ 230 $ 840

04 Sonoma 116 13.6/13.9 1J320 0488H 0414000190 201.131 2017/18 $ 40 $ 1,714 $ - NH $ - $ 150 $ 20 $ 300 $ 470

04 Sonoma 116 26.6/26.9 1G840 0730E 0400020616 201.378 2017/18 $ 140 $ 2,790 $ - NH $ 240 $ 660 $ 140 $ 300 $ 1,340

04 Sonoma 116 10.4/10.5 0G640 0756 0400001986 201.113 2016/17 $ 2,941 $ 12,052 $ - HBRR-S $ 2,000 $ 2,000 $ 735 $ 2,206 $ 6,941

04 Sonoma 116 15.0/0.0 4S190 0816G 0400001215 201.131 2014/15 $ 650 $ 3,216 $ - NH $ 1,000 $ 1,200 $ 200 $ 350 $ 2,750

04 Sonoma 116 39.8/0.0 3G110 0819Q 0400021275 201.131 2014/15 $ 200 $ 1,400 $ - NH $ 220 $ 300 $ 100 $ 400 $ 1,020

04 Sonoma 12 25.8/33.3 4H050 0269M 0413000080 201.111 2017/18 $ 150 $ 6,800 $ - HBRR-S $ 1,000 $ 650 $ 500 $ 600 $ 2,750

04 Sonoma 12 17.7/18.2 4G220 0775F 0412000314 201.010 2016/17 $ 55 $ 5,415 $ - STP $ 600 $ 800 $ 50 $ 1,330 $ 2,780

04 Sonoma 12 R15.8/R16.5 3G720 8315S 0412000157 201.235 2015/16 $ 5 $ 1,480 $ - NH $ 100 $ 150 $ 44 $ 223 $ 517

04 Sonoma 121 10.2/0.0 1SS37 0815C 0412000618 201.131 2014/15 $ 25 $ 1,100 $ - NH $ 200 $ 300 $ 25 $ 400 $ 925

04 Sonoma 128 4A883 0829N 0400021168 201.111 2015/16 $ - $ 150 $ - HBRR-S $ 25 $ 200 $ - $ - $ 225

05 Monterey 1 0R510 2235 0500000363 201.361 2014/15 $ 300 $ 1,852 $ - NH $ 485 $ 983 $ 450 $ 675 $ 2,593

05 Monterey 1 58.3/59.8 1A000 2313 0500020284 201.015 2017/18 $ 14 $ 5,349 $ - STP $ 575 $ 983 $ 11 $ 1,154 $ 2,723

05 Monterey 1 21.6/22.1 0T850 2314 0500020308 201.131 2015/16 $ 500 $ 12,650 $ - NH $ 2,500 $ 1,500 $ 793 $ 2,500 $ 7,293

05 Monterey 1 R77.6/R85.1 1A760 2355 0512000019 201.121 2014/15 $ 44 $ 9,219 $ - NH $ 300 $ 1,028 $ 19 $ 1,005 $ 2,352

In Cotati, at 1.0 mile south of West Sierra Avenue off-ramp. Re-grade slope.

Near Petaluma, north of Pepper Road. Repair slide.In and near Healdsburg, from Grant Avenue undercrossing to Canyon Road undercrossing at various locations. Upgrade electroliers.

In Healdsburg, at 0.1 mile south of Grant Avenue undercrossing. Repair slipout.

Near Guernville, 1.1 miles east of Mays Canyon Road. Repair embankment.

In Sebastopol, from Keating Avenue to Willow Street; also from McKinley Street to Joe Rodora Trail. Upgrade curb ramps, driveways and sidewalks.

Near Guernewood, at Russian River Viaducts #20-0071 and #20-0072. Retrofit bridges.Near Guerneville, east of Mays Canyon Road. Construct soldier pile wall.

Near Petaluma, at 0.5 mile east of Lakeville Highway. Place rock slope protection.In and near Sonoma, at Sonoma Creek Bridge No. 20-0027, Stuart Creek Bridge No. 20-0025 and Hooker Creek Bridge No. 20-0030. Scour mitigation.

In Santa Rosa, from Farmers Lane to Brush Creek Road. Install concrete median barrier and Midwest Guardrail System.

In and near Santa Rosa, on Routes 12 and 101; also in Solano County on Route 37 at various locations. Construct roadside paving and relocate facilities.

Near Schellville, 0.6 mile north of Ramal Road. Install cast in drill hole pile wall.

Near Bidwell Creek in the Maacama Creek Watershed. Environmental mitigation Financial Contribution Only (FCO).

In Monterey and Santa Cruz counties at various locations on Routes 1, 9, 68, and 218. Upgrade pedestrian curb ramps.

North of Big Sur, from south of Bixby Creek Bridge to south of Rocky Creek Bridge. Widen shoulders and upgrade guardrails.

Near Lucia, from north of Limekiln Creek Bridge to south of Lucia. Slide repair.

In the city of Monterey, from Sloat Avenue Undercrossing to South Marina Overhead. Rehabilitate pavement.

Page 21: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

05 Monterey 1 2.5/67.3 1F080 2478 0513000052 201.151 2017/18 $ 84 $ 3,279 $ - NH $ 672 $ 1,154 $ 288 $ 783 $ 2,897

05 Monterey 1 28.0/28.6 1F890 2574 0514000072 201.131 2014/15 $ 318 $ 3,114 $ - NH $ 500 $ 500 $ 100 $ 500 $ 1,600

05 Monterey 101 67.0/73.8 0S780 2261 0512000016 201.121 2014/15 $ - $ 9,476 $ - NH $ 277 $ 1,409 $ 7 $ 741 $ 2,434

05 Monterey 101 R40.5/55.0 0T990 2312 0500020243 201.015 2015/16 $ 1,477 $ 4,548 $ - STP $ 553 $ 671 $ 69 $ 627 $ 1,920

05 Monterey 101 R39.5/R73.0 1C090 2357 0512000073 201.235 2014/15 $ 5 $ 2,209 $ - NH $ 245 $ 450 $ 5 $ 705 $ 1,405

05 Monterey 101 R41.4/R41.8 1C960 2454 0513000019 201.113 2017/18 $ 2,552 $ 27,935 $ - HBRR-S $ 1,118 $ 4,795 $ 67 $ 5,275 $ 11,255

05 Monterey 101 51.2/61.1 1E050 2470 0513000029 201.015 2015/16 $ 28 $ 5,156 $ - STP $ - $ 1,198 $ 14 $ 1,117 $ 2,329

05 Monterey 101 47.7/53.9 1E060 2472 0513000030 201.010 2014/15 $ 6 $ 4,830 $ - STP $ - $ 1,396 $ 20 $ 1,181 $ 2,597

05 Monterey 101 87.3/R91.5 1C890 2474 0513000009 201.122 2017/18 $ 90 $ 34,000 $ - NH $ 700 $ 1,600 $ 120 $ 2,800 $ 5,220

05 Monterey 101 55.2/67.0 1F690 2536 0514000047 201.121 2014/15 $ 2 $ 22,078 $ - NH $ 232 $ 989 $ 34 $ 1,181 $ 2,436

05 Monterey 101 62.1/63.2 0F970 9700 0513000017 201.110 2017/18 $ 1,578 $ 6,674 $ - HBRR-S $ 34 $ 1,416 $ 58 $ 1,392 $ 2,900

05 Monterey 156 R1.1/R2.1 0A090 0900A 0513000028 201.112 2017/18 $ 467 $ 4,500 $ - HBRR-S $ 70 $ 1,800 $ 130 $ 1,100 $ 3,100

05 Monterey 198 22.4/22.8 1C660 2420 0512000186 201.010 2016/17 $ - $ 1,274 $ - STP $ 567 $ 629 $ 37 $ 523 $ 1,756

05 Monterey 68 19.0/19.3 0T270 2303 0500000833 201.010 2014/15 $ 265 $ 904 $ - STP $ - $ 387 $ 115 $ 304 $ 806

05 Monterey 68 1.6/L4.0 1C250 2378 0512000107 201.015 2017/18 $ - $ 3,138 $ - STP $ 715 $ 1,093 $ 17 $ 786 $ 2,611

05 Monterey 68 L4.0/R18.1 0N190 4019 0513000142 201.315 2016/17 $ 200 $ 3,220 $ - NH $ 260 $ 480 $ 100 $ 290 $ 1,130

05 Monterey 68 R17.7/R17.9 0F700 7000 0500000049 201.114 2014/15 $ 467 $ 19,100 $ - HBRR-S $ 1,229 $ 2,751 $ 243 $ 2,733 $ 6,956

05 Monterey VAR 1C990 2458 0513000022 201.235 2017/18 $ 12 $ 2,396 $ - NH $ 309 $ 708 $ 13 $ 376 $ 1,406

05 Santa Barbara 1 15.6/0.0 0A050 1501 0500000007 201.111 2015/16 $ 100 $ 5,560 $ - HBRR-S $ 2,065 $ 1,398 $ 122 $ 1,500 $ 5,085

South of Carmel, at seven (7) locations from north of the San Luis Obispo County line to south of Malpaso Creek Bridge. Rehabilitate and/or replace culverts.

Near Lucia, from south of Big Creek Bridge to south of Dolan Creek Bridge. Construct viaduct.Near Soledad, from 1.5 miles north of Soledad Overcrossing to 0.5 mile north of North Gonzales Overcrossing. Rehabilitate pavement.

In Monterey County on Route 101 from Central Avenue to 0.1 mile S of Lagomarsino Avenue. Tree removal.Near Salinas, on Route 101; also on Route 68 (PM 15.0/R18.5) at various locations. Construct roadside paving, access gates, weed barriers and relocate facilities.

In and near King City, at the Salinas River Bridge No 44- 32. Bridge seismic retrofit and bridge rail replacement.

Near Soledad, from north of Underwood Road to the Salinas River Bridge. Improve roadside clear recovery zone.

In Greenfield, from Teague Avenue to Walnut Avenue. Construct concrete median barrier.In Salinas, from East Market Street to south of Russell/Espinosa Road.  Rehabilitate pavement.In and near Soledad, from north of North Greenfield Overcrossing to north of Soledad Prison Overcrossing. Rehabilitate pavement.

Near Soledad, from Route 146 to Front Street at the North Soledad Overhead No. 44-91R. Rehabilitate bridge.Near Castroville, from Route 183 to Castroville Boulevard. Upgrade bridge railing and widen overhead.Near San Lucas, at North Fork Road. Widen and repave roadway to correct cross-slope.Near Salinas, from east of Foster Road to west of Hunter Lane. Install traffic signals.Near Pacific Grove, from south of Piedmont Avenue to Scenic Drive. Widen shoulders.Near the cities of Monterey and Salinas, from Route 1 to Spreckels Boulevard. Install Traffic Management System (TMS) elements.

Near Salinas, at the Salinas River Bridge #44-40. Widen bridge.In and near Carmel, Monterey, and Seaside, on Routes 1 and 68 at various locations. Roadside maintenance safety improvements.

Near Lompoc, at the Salsipuedes Creek Bridge No. 51-0095. Replace Bridge (Scour Mitigation)

Page 22: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

05 Santa Barbara 101 13.2/27.1 0S250 2256 0500020289 201.235 2014/15 $ 10 $ 2,429 $ - NH $ 250 $ 500 $ 6 $ 800 $ 1,556

05 Santa Barbara 101 45.6/46.4 0T630 2292 0500020029 201.010 2015/16 $ 356 $ 6,578 $ - STP $ 2,200 $ 1,800 $ 110 $ 1,600 $ 5,710

05 Santa Barbara 101 21.0/27.1 1A720 2333 0512000012 201.121 2014/15 $ - $ 12,208 $ - NH $ 193 $ 990 $ 11 $ 1,447 $ 2,641

05 Santa Barbara 101 0.0/12.7 1C120 2360 0512000072 201.235 2015/16 $ 5 $ 2,424 $ - NH $ 247 $ 507 $ 5 $ 506 $ 1,265

05 Santa Barbara 101 2.6/4.6 1C820 2426 0512000236 201.120 2017/18 $ 4,232 $ 19,511 $ - NH $ 1,429 $ 2,840 $ 146 $ 5,601 $ 10,016

05 Santa Barbara 101 21.0/46.5 1C970 2456 0513000020 201.235 2016/17 $ 10 $ 1,550 $ - NH $ 225 $ 395 $ 12 $ 448 $ 1,080

05 Santa Barbara 101 46.9/0.0 1E010 2462 0513000024 201.235 2016/17 $ 5 $ 2,800 $ - NH $ 200 $ 940 $ 10 $ 1,000 $ 2,150

05 Santa Barbara 154 R7.8/R8.3 0T001 2267Y 0513000169 201.010 2014/15 $ - $ 135 $ - STP $ - $ 222 $ - $ 402 $ 624

05 Santa Barbara 154 R5.9/22.9 1C830 2428 0512000238 201.121 2015/16 $ 18 $ 14,880 $ - NH $ 454 $ 963 $ 25 $ 1,240 $ 2,682

05 Santa Barbara 192 15.4/15.6 39610 0335 0500000514 201.111 2015/16 $ 905 $ 5,475 $ - HBRR-S $ 960 $ 3,314 $ 601 $ 734 $ 5,609

05 Santa Barbara 217 1.0/0.0 1C360 2386 0512000134 201.110 2017/18 $ 61 $ 15,317 $ - HBRR-S $ 1,635 $ 3,378 $ 59 $ 2,703 $ 7,775

05 Santa Barbara 246 R20.9/26.3 1A750 2336 0512000013 201.121 2015/16 $ 23 $ 9,845 $ - NH $ 285 $ 581 $ 54 $ 736 $ 1,656

05 Santa Barbara VAR 1G190 2589 0514000123 201.170 2014/15 $ 5 $ 3,793 $ - NH $ 77 $ 338 $ 14 $ 927 $ 1,356

05 Santa Barbara VAR 0J490 4900 0514000120 201.170 2014/15 $ - $ 3,000 $ - NH $ - $ 650 $ 40 $ 400 $ 1,090

05 San Benito 156 R10.0/R18.4 1C840 2430 0512000239 201.121 2017/18 $ 26 $ 6,400 $ - NH $ 119 $ 937 $ 4 $ 752 $ 1,812

05 San Benito 156 0.0/3.0 1C870 2434 0513000005 201.121 2017/18 $ 9 $ 4,941 $ - NH $ 118 $ 833 $ 4 $ 620 $ 1,575

05 San Benito 25 25.9/26.2 1C260 2379 0512000108 201.015 2017/18 $ 180 $ 1,580 $ - STP $ 864 $ 1,004 $ 155 $ 431 $ 2,454

05 San Benito 25 R49.9/R52.2 1F430 2514 0513000151 201.015 2017/18 $ 177 $ 6,720 $ - STP $ 456 $ 985 $ 156 $ 741 $ 2,338

In and near the cities of Santa Barbara and Goleta, from Salsipuedes Street to north of Cathedral Oaks Road. Construct roadside paving, contrasting surface treatment, access gates, and weed barriers and relocate facilities.

In Gaviota, from 0.7 mile north of Beckstead Overcrossing to 0.8 mile south of Gaviota Tunnel. Improve roadway alignment.

In and near Goleta, from Maria Ygnacio Creek Bridge to north of Cathedral Oaks Overcrossing. Rehabilitate pavement.

In and near the city of Santa Barbara, on Route 101 at various locations. Construct roadside paving, access gates, weed barriers and relocate facilities.

In Carpinteria, between Casitas Pass and west of Sandpiper Drive. Rehabilitate roadway.In and near Goleta, from Patterson Avenue to Gaviota State Park Entrance. Roadside safety improvements.

Near Gaviota, at the Gaviota Safety Roadside Rest Area. Upgrade wastewater system.Near Santa Ynez, at and near Route 246 intersection. Landscape mitigation.

Near Santa Ynez, from Baseline Avenue to Cold Spring Canyon Bridge. Rehabilitate pavement.Near Carpinteria, at Arroyo Parida Creek Bridge #51-113. Replace bridge (scour).

Near Goleta, at the San Jose Creek Bridge # 51-0217. Replace bridge.Near Buellton, from 0.4 mile east of Santa Rosa Creek Bridge to Route 101/246 Separation. Rehabilitate pavement.

In Santa Barbara, Monterey, San Benito, San Luis Obispo and Santa Cruz counties at various locations. Upgrade highway signs and lighting.

In Santa Barbara, Monterey, San Benito, Santa Cruz and San Luis Obispo counties at various locations. Upgrade highway signs and lighting.

Near Hollister, from west of Hudner Overhead to the Santa Clara County line. Rehabilitate pavement.In and near San Juan Bautista, from Route 101 to Alameda Street. Rehabilitate pavement.Near Hollister, from north of Route 146 to north of La Gloria Road. Realign roadway.In and near Hollister, from Sunnyslope/Tres Pinos Road to San Felipe Road. Roadway safety improvements.

Page 23: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

05 Santa Cruz 1 16.9/17.1 1A870 2341 0512000034 201.010 2014/15 $ - $ 955 $ - STP $ 387 $ 715 $ 5 $ 392 $ 1,499

05 Santa Cruz 1 R7.5/17.4 1C100 2358 0512000074 201.235 2015/16 $ - $ 1,222 $ - NH $ 290 $ 421 $ 5 $ 482 $ 1,198

05 Santa Cruz 1 20.4/30.6 1C310 2381 0512000117 201.010 2014/15 $ - $ 607 $ - STP $ 180 $ 155 $ 3 $ 145 $ 483

05 Santa Cruz 1 10.2/17.5 1C850 2432 0512000240 201.121 2017/18 $ - $ 14,971 $ - NH $ 147 $ 988 $ 100 $ 901 $ 2,136

05 Santa Cruz 129 9.5/10.0 0T540 2285 0500000857 201.010 2014/15 $ 101 $ 11,790 $ - STP $ 924 $ 1,808 $ 175 $ 1,840 $ 4,747

05 Santa Cruz 129 1.8/9.9 1F030 2476 0513000037 201.010 2016/17 $ 14 $ 6,946 $ - STP $ - $ 1,658 $ 69 $ 1,092 $ 2,819

05 Santa Cruz 152 1.3/R2.0 1E020 2464 0513000025 201.378 2017/18 $ 195 $ 1,565 $ - NH $ 494 $ 563 $ 331 $ 345 $ 1,733

05 Santa Cruz 17 0.7/2.2 0Q600 1989 0500020290 201.335 2015/16 $ 1,107 $ 9,905 $ - NH $ 1,273 $ 991 $ 196 $ 1,113 $ 3,573

05 Santa Cruz 17 8.2/10.1 0T980 2311 0500020244 201.015 2015/16 $ 1,654 $ 5,590 $ - STP $ - $ 1,899 $ 236 $ 1,729 $ 3,864

05 Santa Cruz 17 0.1/0.4 1C670 2422 0512000194 201.010 2017/18 $ 93 $ 5,713 $ - STP $ 335 $ 867 $ 189 $ 336 $ 1,727

05 Santa Cruz 9 22.1/23.8 1C650 2418 0512000185 201.015 2017/18 $ - $ 7,658 $ - STP $ 1,050 $ 1,842 $ 40 $ 1,350 $ 4,282

05 1 32.6/34.5 0L720 0072 0512000102 201.112 2015/16 $ 129 $ 7,952 $ - HBRR-S $ 448 $ 1,769 $ 68 $ 1,463 $ 3,748

05 1 17.7/59.0 1C240 2377 0512000106 201.015 2014/15 $ - $ 2,655 $ - STP $ 281 $ 540 $ 5 $ 438 $ 1,264

05 1 R12.6/0.0 1C130 2382 0512000078 201.361 2014/15 $ - $ 920 $ - NH $ 270 $ 480 $ 95 $ 430 $ 1,275

05 101 63.2/R69.3 0G040 0040B 0500020020 201.120 2015/16 $ 1,062 $ 46,276 $ - NH $ 3,029 $ 5,214 $ 430 $ 4,598 $ 13,271

05 101 44.8/59.7 1C080 2356 0512000071 201.235 2015/16 $ 5 $ 2,529 $ - NH $ 551 $ 451 $ 5 $ 440 $ 1,447

In the city of Santa Cruz, from the northbound on-ramp from southbound Route 17 to the northbound off-ramp to Ocean Street. Restripe and widen shoulders.

In and near the city of Santa Cruz, on Route 1, also on Route 17 (PM 0.0/6.3) at various locations. Construct roadside paving, access gates, and relocate facilities.

Near the city of Santa Cruz, from Shaffer Road to Swanton Road. Install rumble strips.Near the city of Santa Cruz, from North Aptos Underpass to Route 9. Rehabilitate pavement.In Santa Cruz County, west of Chittenden Road. Improve roadway alignment.

Near Watsonville in Santa Cruz County. Also in San Benito County at School Road. Place open graded friction pavement and upgrade guardrail.

In Watsonville, from Wagner Avenue to Holohan Road. Construct pedestrian infrastructure.In Santa Cruz, from 0.7 mile north of Route 1/17 Separation to north of Simms Road. Storm water mitigation.Near Glenwood, from 0.9 mile north of Vinehill Road and 0.5 mile south of Glenwood Drive. Shoulder widening and concrete guardrail.

Near the city of Santa Cruz, from southbound exit ramp to Route 1 to entrance ramp from Pasatiempo Drive. Widen shoulder and construct retaining wall.

In Castle Rock State Park, from 5 miles south to 3.3 miles south of Route 35. Widen shoulders, replace guardrail and construct centerline rumble strips.

San Luis Obispo

Near the city of San Luis Obispo, on Routes 1, 41, and 58 at four bridges. Upgrade bridge rails.

San Luis Obispo

Near the city of San Luis Obispo, from Highland Drive to north of Hearst Castle Road. Install rumble strips.

San Luis Obispo

In Oceano, at Oceano Overhead. Construct pedestrian ramps and sidewalks.

San Luis Obispo

In and near San Miguel, from San Marcos Creek Bridge to the Monterey County line; Also in Monterey County (PM R0.0 to R1.9). Pavement rehabilitation.

San Luis Obispo

In and near Atascadero, from Curbaril Avenue to north of North Paso Robles Overhead. Pave roadside, improve drainage, relocate utility boxes and construct concrete barriers.

Page 24: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

05 101 0.5/35.0 1C110 2359 0512000075 201.235 2015/16 $ 5 $ 2,547 $ - NH $ 281 $ 520 $ 5 $ 512 $ 1,318

05 101 16.4/0.0 1C370 2387 0512000135 201.111 2017/18 $ 275 $ 2,442 $ - HBRR-S $ 732 $ 1,035 $ 150 $ 764 $ 2,681

06 Fresno 168 R0.0/R11.7 0E350 1772 0612000136 201.235 2016/17 $ 1 $ 2,700 $ - NH $ 107 $ 411 $ 1 $ 413 $ 932

06 Fresno 168 T29.0/T29.4 0M050 6502 0600000353 201.010 2014/15 $ 556 $ 2,510 $ - STP $ 456 $ 888 $ 182 $ 594 $ 2,120

06 Fresno 168 T30.2/0.0 0L340 6623 0600000301 201.010 2015/16 $ 72 $ 2,208 $ - STP $ 542 $ 558 $ 181 $ 338 $ 1,619

06 Fresno 168 R6.9/R7.1 0P980 6657 0612000328 201.010 2014/15 $ - $ 403 $ - STP $ 103 $ 370 $ 5 $ 189 $ 667

06 Fresno 198 35.3/35.6 0M250 6574 0612000096 201.110 2015/16 $ 33 $ 2,082 $ - HBRR-S $ 245 $ 617 $ 17 $ 766 $ 1,645

06 Fresno 269 10.7/12.3 39460 2184 0600020595 201.150 2017/18 $ - $ 1 $ - NH $ 1,700 $ 3,000 $ 300 $ 4,000 $ 9,000

06 Fresno 41 33.3/33.4 0N990 6598 0612000114 201.113 2015/16 $ 65 $ 2,779 $ - HBRR-S $ 164 $ 1,742 $ 30 $ 1,249 $ 3,185

06 Fresno 41 0Q630 6697 0613000151 201.235 2015/16 $ 12 $ 2,688 $ - NH $ 247 $ 700 $ 26 $ 576 $ 1,549

06 Fresno 41 0R230 6702 0614000060 201.010 2015/16 $ - $ 1,781 $ - STP $ 218 $ 578 $ 5 $ 273 $ 1,074

06 Fresno VAR 0K800 6596 0612000110 201.113 2015/16 $ - $ 4,825 $ - HBRR-S $ 456 $ 1,589 $ 18 $ 2,132 $ 4,195

06 Fresno VAR 0S740 6717 0614000237 201.170 2014/15 $ 1 $ 4,215 $ - NH $ 137 $ 364 $ 11 $ 594 $ 1,106

06 Kern 119 R10.0/R13.3 42471 3645C 0613000157 201.310 2014/15 $ - $ 5,800 $ - NH $ - $ - $ - $ 763 $ 763

06 Kern 155 1.5/0.0 0P290 6636 0612000106 201.010 2016/17 $ 1,010 $ 2,540 $ - STP $ 391 $ 722 $ 432 $ 422 $ 1,967

06 Kern 204 5.5/6.7 0N960 6587 0612000026 201.119 2014/15 $ 2 $ 8,654 $ - HBRR-S $ 145 $ 628 $ 5 $ 776 $ 1,554

06 Kern 395 0.0/23.4 0S270 6719 0614000164 201.121 2014/15 $ 1 $ 7,500 $ - NH $ 159 $ 360 $ 12 $ 900 $ 1,431

06 Kern 43 16.1/25.2 0P270 6645 0612000090 201.361 2015/16 $ 255 $ 1,206 $ - NH $ - $ 571 $ 80 $ 271 $ 922

San Luis Obispo

In and near the city of San Luis Obispo, from Santa Maria River Bridge to Cuesta Overhead at various locations. Construct roadside paving, access gates, weed barriers and relocate facilities.

San Luis Obispo

In Pismo Beach, at Pismo Creek Bridge No. 49-0015K. Scour prevention.

In Fresno and Clovis, at various location from Route 180 to Shepherd Avenue. Roadside maintenance safety improvements.

Near Prather, from 1.2 miles west of Auberry Road to 0.8 mile west of Auberry Road. Realign roadway curve.Near Prather, at Auberry Road. Improve intersection.In Clovis, from Herndon Avenue to Clovis Avenue. Install concrete median barrier.

Near Huron, at the California Aqueduct Bridge Bridge No. 42-0270. Replace Bridge deck.Near Huron, from 1.1 miles north of Palmer Avenue to 0.4 miles south of Route 198. Construct new bridge and raise profile grade. (Additional funding from Fresno sales tax Measure C – not shown)

In and near the city of Fresno, at the San Joaquin River Bridge No. 42-0112; also on Route 41 in Madera County at the San Joaquin River Bridge No. 41-0040 (Mad 41 PM 0.0/0.2). Retrofit bridges.

In Fresno and Madera counties at various locations in and near the city of Fresno. Roadside safety improvements

In Fresno County, on Routes 41, 99, 168 and 180. Apply high friction surface treatment.In Fresno, Kings and Madera Counties at structures Nos. 42-0134, 42-0216F, 45-0007, 45-0064, and 41-0059E. Bridge seismic restoration.

In Fresno, Kings, and Tulare counties on Routes 5, 41, 168, 180 and 198 at various locations. Upgrade highway signs and lighting.

Near Dustin Acres, from Elk Hills Road to Tupman Road. Construct truck climbing lanes and widen shoulders.

Near Delano, at Browning Road. Construct a roundabout.In Bakersfield, on Route 204 at various bridges from north of Route 178 to south of Route 99. Overlay deck, replace joint seals, and paint.

Near Johannesburg, from the San Bernardino County line to Route 178. Rehabilitate pavement.In the cities of Shafter and Wasco, at various intersections. Construct pedestrian curb ramps.

Page 25: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

06 Kern 43 0.1/0.4 0P900 6698 0612000293 201.010 2017/18 $ 1,160 $ 4,200 $ - STP $ 1,323 $ 1,348 $ 880 $ 850 $ 4,401

06 Kern 46 57.3/57.8 0K460 6601 0612000105 201.110 2015/16 $ 1,265 $ 19,375 $ - HBRR-S $ 701 $ 2,920 $ 900 $ 2,600 $ 7,121

06 Kern 5 54.1/0.0 0Q620 6662 0613000150 201.235 2016/17 $ 10 $ 2,000 $ - NH $ 320 $ 980 $ 10 $ 850 $ 2,160

06 Kern 58 R99.3/R99.7 0M260 6588 0612000095 201.110 2014/15 $ 2 $ 3,000 $ - HBRR-S $ - $ 752 $ 6 $ 517 $ 1,275

06 Kern 58 R94.5/0.0 0N560 6648 0600020488 201.010 2014/15 $ 66 $ 714 $ - STP $ - $ 487 $ 26 $ 256 $ 769

06 Kern 58 R94.2/0.0 0Q180 6673 0613000145 201.112 2017/18 $ 2 $ 1,425 $ - HBRR-S $ - $ 711 $ 25 $ 680 $ 1,416

06 Kern 58 R99.0/R100.3 0Q190 6674 0613000152 201.110 2017/18 $ 10 $ 11,000 $ - HBRR-S $ 328 $ 2,327 $ 13 $ 2,768 $ 5,436

06 Kern 58 R52.4/R55.5 0G851 6678 0614000009 201.120 2016/17 $ 30 $ 21,370 $ - NH $ - $ 1,771 $ 35 $ 3,410 $ 5,216

06 Kern 58 T52.1/52.3 0R020 6690 0613000297 201.010 2014/15 $ - $ 275 $ - STP $ 67 $ 140 $ 4 $ 56 $ 267

06 Kern 58 136.0/143.8 0S280 6720 0614000186 201.121 2014/15 $ 1 $ 4,500 $ - NH $ 160 $ 360 $ 10 $ 675 $ 1,205

06 Kern 58 R88.5/R99.8 0R150 6721 0614000041 201.121 2014/15 $ 10 $ 18,503 $ - NH $ - $ 1,058 $ 1 $ 1,092 $ 2,151

06 Kern 99 21.6/24.7 0E340 3541 0612000122 201.235 2014/15 $ - $ 2,170 $ - NH $ 167 $ 420 $ 6 $ 300 $ 893

06 Kern 99 49.6 0H642 6485A 0614000266 201.378 2015/16 $ 150 $ 4,000 $ - NH $ 278 $ 1,376 $ 272 $ 800 $ 2,726

06 Kern 99 26.8/0.0 0K810 6605 0612000108 201.113 2015/16 $ 45 $ 6,980 $ - HBRR-S $ 280 $ 1,314 $ 20 $ 1,500 $ 3,114

06 Kern 99 24.1/28.4 0Q280 6661 0613000051 201.120 2016/17 $ 70 $ 45,000 $ - NH $ 930 $ 1,800 $ 20 $ 5,900 $ 8,650

06 Kern VAR 0S750 6718 0614000238 201.170 2014/15 $ 1 $ 3,265 $ - NH $ 150 $ 344 $ 12 $ 428 $ 934

06 Kings 198 R8.9/R10.6 0N180 6622 0600020552 201.010 2015/16 $ 9 $ 3,391 $ - STP $ 224 $ 433 $ 13 $ 305 $ 975

06 Kings 198 R15.5 0Q320 6651 0613000034 201.010 2017/18 $ 240 $ 2,263 $ - STP $ 925 $ 1,475 $ 725 $ 806 $ 3,931

06 Kings 43 1.3/1.7 0M370 6619 0600000959 201.010 2015/16 $ 452 $ 1,919 $ - STP $ 609 $ 527 $ 166 $ 541 $ 1,843

06 Madera 152 R0.1/1.1 0P970 6676 0612000319 201.010 2014/15 $ - $ 2,270 $ - STP $ - $ 675 $ 10 $ 500 $ 1,185

Near Bakersfield, at the intersection of Routes 43 and 119. Intersection improvement.Near Wasco, at Route 99 Separation Bridge No. 50-0184E (Also Route 99 PM 43.9/44.6). Replace bridge and realign southbound ramps.

Near Buttonwillow, at the northbound and southbound Buttonwillow safety roadside rest areas. Upgrade water and waste water systems.

Near Tehachapi, at Sand Canyon Road Bridge No. 50-0345R. Replace bridge.

In Tehachapi, at Tehachapi Summit Interchange. Widen intersection.In Tehachapi, at the Summit Overhead Bridge No. 50-343L/R. Upgrade bridge railNear Tehachapi, at Cache Creek Bridge No.50-346L/R. Replace Bridge.In Bakersfield from 58/99 Separation to Cottonwood Road. Rehabilitate roadway.

In Bakersfield, west of the southern junction of Routes 58/99. Add high friction surface treatment and install guardrail.

Near Boron, from west of West Boron Overcrossing to the San Bernardino County line. Rehabilitate pavement.Near Bakersfield, between Tehachapi Creek Bridge and Cache Creek Bridge. Rehabilitate pavement.In Bakersfield at various locations, from Planz Road to north of California Avenue. Improve freeway maintenance worker access.

In Kern County, at Kern Avenue Pedestrian Overcrossing. Upgrade pedestrian Overcrossing to provide Americans with Disabilities Act compliance.

In Bakersfield, at Airport Drive Bridge No. 50-0266; also on Route 178 at Golden State Avenue Bridge No. 50-0326. Bridge seismic restoration.

In and near Bakersfield, from Palm Street to Beardsley Canal. Rehabilitate roadway.In Kern County on Routes 5, 58, 99 and 178 at various locations. Upgrade highway signs and lighting.In and near Lemoore, from 0.5 mile west to 1.2 miles east of 19th Avenue. Construct median barrier.Near Hanford, at the Hanford-Armona Road Undercrossing. Improve intersection.Near Corcoran, at Route 137. Improve intersection.Near Chowchilla, from east of the Merced County line to Route 4. Construct high tension cable median barrier.

Page 26: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

06 Madera 99 10.0/26.8 0Q610 6675 0613000149 201.235 2016/17 $ 1 $ 2,000 $ - NH $ 153 $ 266 $ 13 $ 274 $ 706

06 Tulare 190 20.9/21.3 0J530 6428 0600000188 201.010 2014/15 $ 370 $ 1,700 $ - STP $ 565 $ 585 $ 340 $ 290 $ 1,780

06 Tulare 190 0.0/8.0 46150 6508 0600020148 201.120 2015/16 $ 6,000 $ 17,000 $ - NH $ 1,500 $ 2,400 $ 1,760 $ 1,860 $ 7,520

06 Tulare 190 4.0/5.0 0P590 6624 0612000182 201.010 2015/16 $ 1,387 $ 2,481 $ - STP $ 992 $ 799 $ 357 $ 317 $ 2,465

06 Tulare 198 R4.2/R8.3 0R050 6713 0614000001 201.010 2016/17 $ 41 $ 2,630 $ - STP $ 240 $ 680 $ 14 $ 662 $ 1,596

06 Tulare 198 R14.6 0S590 6722 0614000264 201.131 2014/15 $ - $ 988 $ - NH $ 50 $ 280 $ 2 $ 235 $ 567

06 Tulare 201 0H200 6521 0612000157 201.112 2015/16 $ 600 $ 8,500 $ - HBRR-S $ 1,268 $ 2,498 $ 516 $ 1,916 $ 6,198

06 Tulare 65 31.6/39.6 0G980 6349 0613000022 201.121 2015/16 $ 1 $ 5,245 $ - NH $ - $ 736 $ 21 $ 537 $ 1,294

06 Tulare 65 18.8/31.5 0Q260 6654 0613000049 201.121 2016/17 $ 1 $ 13,500 $ - NH $ - $ 1,300 $ 30 $ 1,200 $ 2,530

07 Los Angeles 1 38.3/38.7 27510 4159 0700000519 201.015 2015/16 $ 1,400 $ 6,100 $ - STP $ 744 $ 1,089 $ 280 $ 1,095 $ 3,208

07 Los Angeles 1 1.0/0.0 27540 4165 0700000520 201.113 2015/16 $ 2,938 $ 14,590 $ - HBRR-S $ 1,075 $ 1,551 $ - $ 2,772 $ 5,398

07 Los Angeles 1 7.7/9.2 28670 4387 0700020923 201.335 2016/17 $ 35 $ 43,200 $ - NH $ - $ 5,000 $ 700 $ 5,000 $ 10,700

07 Los Angeles 1 0.1/4.0 28660 4390 0700020900 201.335 2016/17 $ 10 $ 17,500 $ - NH $ - $ 2,450 $ 300 $ 2,600 $ 5,350

07 Los Angeles 1 41.8/42.1 3X450 4446 0712000164 201.131 2014/15 $ 175 $ 3,500 $ - NH $ 10 $ 465 $ 50 $ 840 $ 1,365

07 Los Angeles 1 2.7/12.2 29080 4491 0712000075 201.361 2015/16 $ - $ 5,300 $ - NH $ 1,000 $ 1,500 $ - $ 1,000 $ 3,500

07 Los Angeles 1 56.5/56.9 29140 4498 0712000094 201.110 2017/18 $ 2,021 $ 5,488 $ - HBRR-S $ 738 $ 1,428 $ 174 $ 1,251 $ 3,591

07 Los Angeles 1 3.5/0.0 29910 4632 0713000302 201.015 2016/17 $ 11 $ 2,326 $ - STP $ 89 $ 356 $ 5 $ 445 $ 895

In the cities of Madera and Chowchilla, from Route 145 to East Robertson Boulevard at various locations. Roadside maintenance safety improvements.

Near Porterville, at Road 284. Intersection improvement. (Additional $400,000 from local contribution)Tulare County, from west of Route 99/190 Separation to west of Road 184. Rehabilitate roadway.Near Tipton, from east of Road 148 to west of Road 160. Improve intersection.

In Visalia, from 0.6 mile west of Road 80 to Road 80, and from Akers Street to 0.2 mile east of County Center Drive. Construct median barrier.

In Farmersville, at County Road 164 Overcrossing (Bridge # 46-0217). Repair bridge.Near Kingsburg, on Route 201 at Sand Creek and Friant-Kern Canal Bridge; also on Route 216 at Kaweah River Bridge. Bridge rail replacement.

In Exeter, from Route 137 to Route 198. Rehabilitate pavement.Near Porterville, from south of Olive Avenue to Route 137. Rehabilitate pavement.In the city of Los Angeles (Pacific Palisades), from north of Temescal Canyon Road to Bay Club Drive. Construct shoulders and upgrade guardrail.

In Long Beach, at Alamitos Bay Bridge No. 53-0064. Seismic retrofit.In the cities of Los Angeles, Long Beach, Signal Hill, Lakewood, Carson, and Hawthorn on various routes at various loaction. Mitigate for stormwater quality by using Best Management Practices (BMP's).

In Long Beach, Signal Hill and Lakewood on various routes at various locations. Mitigate for stormwater quality by installing bio-filtration swales, basins, media filters and gross solid removal devices, and other best management practices (BMP's).

In Malibu, 1 mile north of Topanga Canyon Road. Reconstruct roadway embankment, shoulder and repair failed drainage system.

In Los Angeles and Long Beach, from E. Anaheim Street to Vermont Avenue. Upgrade pedestrian facilities.In Malabu, from Guernsey Avenue to Trancas Canyon Road/Broad Beach Road. Replace bridge.In Long Beach, at Lakewood Boulevard (Route 19) and Los Alamitos Traffic Circle. Install pavement delineation, overhead guide signs and associated roadway improvements.

Page 27: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

07 Los Angeles 1 49.3/50.2 29930 4650 0713000310 201.010 2017/18 $ 23 $ 4,405 $ - STP $ 400 $ 700 $ 80 $ 800 $ 1,980

07 Los Angeles 1 2.6/30.7 29950 4651 0713000313 201.010 2015/16 $ 5 $ 1,160 $ - STP $ 88 $ 180 $ 24 $ 195 $ 487

07 Los Angeles 1 29.1/0.0 30050 4677 0713000472 201.010 2014/15 $ - $ 384 $ - STP $ 20 $ 50 $ 2 $ 60 $ 132

07 Los Angeles 1 28.5/34.5 2W700 4793 0713000438 201.119 2014/15 $ - $ 1,203 $ - HBRR-S $ - $ 260 $ 5 $ 260 $ 525

07 Los Angeles 10 R11.0/R14.0 29600 4597 0713000034 201.235 2016/17 $ - $ 1,698 $ - NH $ 54 $ 324 $ - $ 385 $ 763

07 Los Angeles 10 R14.0/19.0 29660 4599 0713000057 201.110 2016/17 $ 134 $ 65,640 $ - HBRR-S $ - $ 3,024 $ 30 $ 5,904 $ 8,958

07 Los Angeles 10 2.1/18.4 30150 4700 0714000020 201.121 2017/18 $ - $ 25,120 $ - NH $ 74 $ 2,387 $ 126 $ 2,512 $ 5,099

07 Los Angeles 10 R2.2/48.0 30860 4780 0714000246 201.315 2014/15 $ 10 $ 3,590 $ - NH $ - $ 721 $ 2 $ 717 $ 1,440

07 Los Angeles 10 26.8/30.8 2W660 4791 0713000449 201.119 2015/16 $ 10 $ 2,757 $ - HBRR-S $ - $ 400 $ - $ 500 $ 900

07 Los Angeles 101 29.3/38.2 28150 4279 0700000552 201.335 2015/16 $ 52 $ 42,900 $ - NH $ 350 $ 5,000 $ 500 $ 5,000 $ 10,850

07 Los Angeles 101 0.0/25.9 28270 4293 0700021842 201.015 2014/15 $ 30 $ 11,800 $ - STP $ 10 $ 1,640 $ 50 $ 1,700 $ 3,400

07 Los Angeles 101 0.0/0.1 28710 4391 0700020899 201.015 2014/15 $ - $ 4,400 $ - STP $ 100 $ 850 $ 10 $ 850 $ 1,810

07 Los Angeles 101 8.5/9.2 28760 4409 0700020928 201.010 2014/15 $ 203 $ 2,500 $ - STP $ - $ 500 $ 80 $ 500 $ 1,080

In Malibu, from Puerco Canyon Road to Corral Canyon Road. Reconstruct raised median island.In the cities of Long Beach, Los Angeles, Lomita, Torrance, Redondo Beach and Manhattan Beach, from south of Anaheim Street to Fiji Way. Install channelization or rumble strips along center line median at various locations.

In the city of Los Angeles, near Los Angeles International Airport (LAX) at Manchester Avenue. Modify signals.In the cities of Playa Vista, Marina Del Rey, Venice, and Santa Monica, from Westchester Parkway to Route 10; also on Route 405 and Route 10 at various bridges. Repair bridges.

In the city of Los Angeles, from West Boulevard to Hoover Street. Enhance highway worker safety by installing Maintenance Vehicle Pullouts, access gates and other measures.

In the city of Los Angeles, at Santa Monica Viaduct (Br. No. 53-1301). Paint and rehabilitate bridge.In the cities of Santa Monica and Los Angeles, from Route 1 to Route 5/101 interchange; also on Route 1 from McClure Tunnel to Lincoln Boulevard. Rehabilitate pavement.

In the cities of Santa Monica, Los Angeles, El Monte, Pomona and Claremont at various locations; also on Route 710 in various cities (PM 9.4 to PM 23.2) at various locations. Upgrade ramp metering and Transportation Management System (TMS) elements.

In Rosemead and El Monte, from Rosemead Boulevard (Route 164) to Garvey Avenue. Apply methacrylate bridge deck treatment, replace joint seals and repair loose concrete.

Near Hidden Hills, from Calabasas Parkway in Los Angeles County to Hampshire Road in Ventura County. Storm water mitigation through erosion control.

In the cities of Los Angeles and Hollywood, between downtown and Ventura County line. Install metal beam guardrail.

In the city of Los Angeles, at Route 101/10 connector. Install concrete barrier.In the city of Los Angeles, from south of Mulholland Drive to Barham Boulevard. Install safety lighting, concrete barrier/retaining wall, and flashing speed limit sign.

Page 28: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

07 Los Angeles 101 30.9/38.1 29110 4493 0712000068 201.378 2016/17 $ - $ 1,969 $ - NH $ 200 $ 400 $ - $ 400 $ 1,000

07 Los Angeles 101 11.5/11.8 29210 4503 0712000107 201.235 2014/15 $ - $ 2,215 $ - NH $ 73 $ 371 $ 1 $ 367 $ 812

07 Los Angeles 101 S0.0/1.4 29460 4584 0713000012 201.235 2014/15 $ - $ 1,760 $ - NH $ 122 $ 330 $ 1 $ 474 $ 927

07 Los Angeles 101 1.3/6.3 29860 4630 0713000276 201.235 2016/17 $ - $ 1,300 $ - NH $ 47 $ 246 $ - $ 293 $ 586

07 Los Angeles 101 0.5/29.3 30040 4676 0713000435 201.335 2016/17 $ - $ 27,350 $ - NH $ 270 $ 2,655 $ 20 $ 2,655 $ 5,600

07 Los Angeles 101 S0.0/1.9 30080 4680 0713000489 201.121 2016/17 $ - $ 12,840 $ - NH $ 88 $ 1,346 $ 71 $ 1,503 $ 3,008

07 Los Angeles 101 S0.0/17.2 20760 4803 0714000279 201.170 2014/15 $ 25 $ 10,150 $ - NH $ 100 $ 1,421 $ 101 $ 1,725 $ 3,347

07 Los Angeles 103 0.9/1.2 4Y850 4383 0700020042 201.119 2014/15 $ 1,749 $ 3,123 $ - HBRR-S $ - $ 800 $ 800 $ 842 $ 2,442

07 Los Angeles 105 R6.6/R8.1 29740 4614 0713000149 201.010 2015/16 $ 50 $ 4,920 $ - STP $ - $ 1,100 $ 50 $ 850 $ 2,000

07 Los Angeles 105 R12.7/R14.2 29720 4616 0713000154 201.010 2014/15 $ 50 $ 5,050 $ - STP $ - $ 1,100 $ 50 $ 850 $ 2,000

07 Los Angeles 105 R0.3/R2.5 30500 4723 0714000087 201.119 2015/16 $ - $ 4,940 $ - HBRR-S $ 30 $ 970 $ - $ 790 $ 1,790

07 Los Angeles 110 24.1/31.9 29530 4588 0713000017 201.235 2017/18 $ - $ 2,028 $ - NH $ 113 $ 333 $ - $ 466 $ 912

In and near Calabasas, Agoura Hills and West Lake Village, from Las Virgenes Road to Lindero Canyon Road; also in and near the cities of Camarillo, Oxnard, and Ventura from Pleasant Valley Road to Padre Juan Canyon Road. Upgrade to ADA standards.

In North Hollywood, at Route 101/134/170 Interchange. Construct roadside paving, access gates, weed barriers and relocate facilities.

In the city of Los Angeles, from East 7th Street to North Figueroa Street. Improve safety for highway workers.In the city of Los Angeles, from Grand Avenue to Sunset Boulevard. Enhance highway worker safety by modifying irrigation, miscellanous paving, and other measures.

In the cities of Los Angeles and Calabasas, at various locations from Alameda Street to Mureau Road. Mitgate for stormwater quality by installing best management practices (BMP's) and stabilizing soil erosion.

In the city of Los Angeles, from Route 5 to Route 110. Rehabilitate pavement.

In the city of Los Angeles, from Route 5 to Route 405. Upgrade existing guide signs to current standards and convert overhead sign lighting to induction type.

In the City of Los Angeles, at Anaheim Street. Paint bridge.In the city of Los Angeles, from Vermont Avenue to San Pedro Street; also on Route 110 from Athens Boulevard to 104th street. Install safety lighting, refresh striping and markings, and upgrade guide sign panels.

In Paramount and Lynwood, from Atlantic Avenue to Garfield Avenue; also on Route 710 from Rosecrans Avenue to south of Route 90. Install safety lighting, refresh striping and markings, and upgrade guide sign panels.

In and near the cities of Los Angeles and Hawthorne, at Airport Viaduct between Route 1 and Route 405. Apply deck methacrylate treatment, replace joint seal, repair minor deck spalls, and remove and replace striping.

In cities of Los Angeles, South Pasadena, and Pasadena, from West Sunset Boulevard to East Glenarm Street. Enhance highway worker safety by installing Maintenance Vehicle Pullouts, access gates and other measures.

Page 29: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

07 Los Angeles 110 17.9/20.0 29590 4596 0713000033 201.235 2016/17 $ - $ 1,354 $ - NH $ 49 $ 256 $ - $ 305 $ 610

07 Los Angeles 110 24.6/30.0 29750 4617 0713000194 201.015 2016/17 $ 23 $ 6,031 $ - STP $ 363 $ 1,116 $ 33 $ 710 $ 2,222

07 Los Angeles 110 23.7/25.5 29770 4620 0713000224 201.010 2015/16 $ 10 $ 1,420 $ - STP $ 150 $ 314 $ 8 $ 405 $ 877

07 Los Angeles 110 R0.8/24.1 3009U 4681 0714000238 201.121 2016/17 $ 20 $ 33,823 $ - NH $ 550 $ 2,050 $ 150 $ 3,000 $ 5,750

07 Los Angeles 110 24.5/29.3 2W680 4792 0713000445 201.119 2014/15 $ 25 $ 1,293 $ - HBRR-S $ - $ 300 $ 15 $ 300 $ 615

07 Los Angeles 110 7.0/16.7 2W730 4794 0713000442 201.119 2014/15 $ - $ 1,360 $ - HBRR-S $ - $ 260 $ 5 $ 260 $ 525

07 Los Angeles 110 16.9/23.7 2W740 4795 0713000437 201.119 2014/15 $ - $ 1,250 $ - HBRR-S $ - $ 260 $ 5 $ 260 $ 525

07 Los Angeles 118 0.0/R14.4 30210 4684 0713000486 201.121 2016/17 $ - $ 17,600 $ - NH $ 70 $ 1,872 $ 12 $ 2,071 $ 4,025

07 Los Angeles 138 2.1/36.7 29780 4621 0713000232 201.010 2014/15 $ - $ 1,859 $ - STP $ 68 $ 300 $ - $ 300 $ 668

07 Los Angeles 14 R32.1/R59.2 29100 4492 0712000077 201.378 2016/17 $ - $ 2,258 $ - NH $ 200 $ 400 $ - $ 400 $ 1,000

07 Los Angeles 187 3.5/8.9 30300 4691 0713000493 201.121 2017/18 $ 10 $ 10,500 $ - NH $ 100 $ 700 $ 30 $ 1,200 $ 2,030

07 Los Angeles 19 4.0/8.4 28990 4485 0712000015 201.378 2016/17 $ 507 $ 2,910 $ - NH $ 300 $ 705 $ 45 $ 600 $ 1,650

07 Los Angeles 2 18.6/19.6 29220 4504 0712000108 201.235 2014/15 $ - $ 2,220 $ - NH $ 100 $ 500 $ 5 $ 595 $ 1,200

07 Los Angeles 210 R9.7/R16.1 28802 4413A 0713000361 201.120 2014/15 $ - $ 2,500 $ - NH $ - $ 700 $ - $ 1,000 $ 1,700

In the city of Los Angeles, in Southeast Los Angeles, from Slauson Avenue to 37th Street. Enhance highway worker safety by installing Maintenance Vehicle Pullouts, access gates and other measures.

In the city of Los Angeles, from Stadium Way to Arroyo Drive and on northbound off-ramp to Route 5. Upgrade metal beam guardrail, install concrete barrier, removed raised island, and install safety lighting.

In the city of Los Angeles, on northbound lanes from Route 101 to Route 5. Install safety lighting.In and near the cities of Los Angeles and Carson, from Gaffey Street to College Street. Extend service life of existing pavement and install concrete barrier and metal beam guardrail.

In the cities of Los Angeles, Montecito Heights, Eagle Rock and Highland Park, from Stadium Way to Marion Way; also on Routes 5 and 134 at various bridges. Repair bridges.

In the cities of Carson, Gardena and South Los Angeles, from Carson Street to 76th Street at various bridges. Repair bridges.

In the city of Los Angeles, from Florence Avenue to Route 101 at various bridges. Repair bridges.In and near the city of Los Angeles, from Ventura County line to Route 210; also on Route 27 (Topanga Canyon Boulevard) from Devonshire Street to Route 118. Rehabilitate pavement.

Near Lancaster, from east of Route 5 to west of Route 14. Install ground-in median edge lines, shoulder rumble strips and re-stripe with high reflective striping and recessed markers.

In and near Santa Clarita and Palmdale, from Santa Clarita River Bridge to Rayburn Road. Upgrade curb ramps and sidewalks to Americans with Disabilities Act (ADA) standards.

In the cities of Los Angeles and Culver City, on Venice Boulevard from Lincoln Boulevard (Route 1) to Cadillac Avenue. Rehabilitate pavement.

In Lakewood, Bellflower, Paramount and Downey, from Del Amo Boulevard to Gardendale Street. Upgrade curb ramps and sidewalks to Americans with Disabilities Act (ADA) standards.

In Glendale, at Route 2/134 Interchange. Construct roadside paving, access gates, weed barriers and relocate facilities .

In Sunland and Tujunga, from west of Big Tujunga to east of Boston Avenue undercrossing. Construct permanent storm water BMP's.

Page 30: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

07 Los Angeles 210 R15.6/R18.5 29520 4587 0713000019 201.235 2016/17 $ - $ 1,800 $ - NH $ 73 $ 332 $ - $ 405 $ 810

07 Los Angeles 210 R18.5/R24.9 29690 4604 0713000112 201.235 2017/18 $ - $ 2,504 $ - NH $ 101 $ 462 $ - $ 563 $ 1,126

07 Los Angeles 210 R24.7/R44.9 30640 4747 0714000165 201.315 2014/15 $ 10 $ 18,390 $ - NH $ - $ 2,940 $ 2 $ 3,498 $ 6,440

07 Los Angeles 210 R18.8/R24.9 12997 4765 0714000080 201.315 2014/15 $ 57 $ 8,800 $ - NH $ 7 $ 1,319 $ 15 $ 1,319 $ 2,660

07 Los Angeles 27 0.0/11.1 29960 4652 0713000314 201.235 2016/17 $ - $ 1,490 $ - NH $ 54 $ 284 $ - $ 338 $ 676

07 Los Angeles 39 31.0/33.0 26040 3917 0700000488 201.111 2014/15 $ 5 $ 6,310 $ - HBRR-S $ 300 $ 1,850 $ 10 $ 1,200 $ 3,360

07 Los Angeles 405 0.0/28.0 25710 3821 0713000161 201.315 2016/17 $ - $ 6,654 $ - NH $ 333 $ 832 $ 4 $ 1,160 $ 2,329

07 Los Angeles 405 8.7/0.0 4Y700 4386 0700001891 201.119 2014/15 $ 1,052 $ 7,077 $ - HBRR-S $ - $ 1,500 $ 350 $ 1,200 $ 3,050

07 Los Angeles 405 8.7/11.2 28740 4414 0700020935 201.015 2015/16 $ 225 $ 6,495 $ - STP $ - $ 900 $ 100 $ 1,134 $ 2,134

07 Los Angeles 405 11.7/12.2 28910 4457 0700021123 201.321 2016/17 $ 10 $ 4,872 $ - ST-CASH $ 210 $ 1,100 $ 5 $ 600 $ 1,915

07 Los Angeles 405 12.6/R21.2 29000 4486 0712000016 201.015 2014/15 $ 10 $ 11,200 $ - STP $ - $ 1,700 $ 80 $ 1,700 $ 3,480

07 Los Angeles 405 20.2/R20.7 3X870 4567 0713000241 201.131 2015/16 $ 10 $ 2,500 $ - NH $ 10 $ 970 $ 20 $ 875 $ 1,875

07 Los Angeles 405 R21.5/26.3 29630 4593 0713000030 201.235 2017/18 $ - $ 2,130 $ - NH $ 79 $ 405 $ - $ 475 $ 959

07 Los Angeles 405 0.7/6.7 29610 4598 0713000035 201.235 2017/18 $ - $ 2,165 $ - NH $ 81 $ 360 $ - $ 378 $ 819

In and near Glendale and La Canada Flintridge, from Lowell Avenue to Waltonia Drive. Enhance highway worker safety by installing access gates and maintenance vehicle pullouts, and pave misc. areas.

In and near La Canada Flintridge and Pasadena from Waltonia Drive to Route 134/210 interchange. Enhance highway worker safety by installing Maintenance Vehicle Pullouts, access gates and other measures.

In and near Pasadena, Arcadia, Monrovia, Duarte, Irwindale, Azusa, and Glendora, from Route 134 to Route 57. Upgrade Transportation Management System (TMS) elements and install fiber optic cable.

In La Canada Flintridge and Pasadena, from Route 2 to Route 134. Upgrade transportation management system field elements.

Near Topanga, from Route 1 to Mulholland Drive. Enhance highway worker safety by installing weed barrier, paving maintenance vehicle pull-outs, and other measures.

In Angeles National Forest, on San Gabriel Canyon Road at Bridge # 53-2245. Rplace bridge.In and near the city of Los Angeles, at various locations on various routes. Upgrade communications sustem to fiber optic cable and connect to the Trans. Management System (TMC) field elements.

In Carson, at Dolores Yard Overhead Bridge. Paint structure.In Carson, from Alameda Street to Avalon Boulevard. Construct new concrete barrier and metal beam guardrail on outside shoulders.

In Carson, from Avalon Boulevard to Main Street. Reconstruct commerical vehicle enforcement facility.In various cities, from Main Street to Route 105 at various locations. Install concrete barrier and metal beam guardrail.

Near Hawthorne and Los Angeles Airport, at the northbound connector with Route 105. Reconstruct distressed pavement and embankment.

In and near the cities of Inglewood, Los Angeles, and Culver City, from 105 to Port Road. Enhance highway worker safety by replacing crash cushions, miscellanous paving, and other measures.

In Long Beach and Signal Hill, from Los Cerritos Channel to Pacific Avenue. Enhance highway worker safety by miscellanous paving, relocating irrigation, and other measures.

Page 31: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

07 Los Angeles 405 33.0/35.5 29850 4629 0713000270 201.310 2015/16 $ 750 $ 10,830 $ - NH $ 480 $ 1,080 $ 60 $ 2,400 $ 4,020

07 Los Angeles 405 20.5/28.0 30060 4678 0713000485 201.121 2014/15 $ 30 $ 18,143 $ - NH $ 332 $ 895 $ 226 $ 1,867 $ 3,320

07 Los Angeles 405 1.6/15.8 2W750 4796 0713000448 201.119 2014/15 $ - $ 1,414 $ - HBRR-S $ - $ 280 $ 5 $ 315 $ 600

07 Los Angeles 47 0.9/2.0 29070 4497 0712000076 201.113 2014/15 $ - $ 28,750 $ - HBRR-S $ - $ 4,000 $ 10 $ 5,000 $ 9,010

07 Los Angeles 5 39.4/R88.6 24320 3373 0714000274 201.170 2014/15 $ - $ 6,200 $ - NH $ - $ 930 $ 50 $ 930 $ 1,910

07 Los Angeles 5 R45.4/R59.0 25262 3725B 0700021272 201.120 2016/17 $ - $ 78,200 $ - NH $ - $ 6,410 $ 20 $ 9,138 $ 15,568

07 Los Angeles 5 18.4/36.3 25840 3858 0712000102 201.335 2014/15 $ - $ 12,125 $ - NH $ 897 $ 1,310 $ 121 $ 1,310 $ 3,638

07 Los Angeles 5 25.7/0.0 29230 4505 0712000109 201.015 2016/17 $ 25 $ 3,300 $ - STP $ 140 $ 410 $ 15 $ 435 $ 1,000

07 Los Angeles 5 25.2/25.9 29340 4550 0712000216 201.010 2014/15 $ - $ 2,900 $ - STP $ - $ 500 $ 50 $ 650 $ 1,200

07 Los Angeles 5 20.3/0.0 1W240 4580 0700021166 201.110 2014/15 $ 290 $ 20,755 $ - HBRR-S $ 50 $ 1,000 $ 200 $ 1,000 $ 2,250

07 Los Angeles 5 38.8/40.5 29510 4586 0713000016 201.235 2017/18 $ - $ 2,053 $ - NH $ 113 $ 333 $ - $ 466 $ 912

07 Los Angeles 5 16.1/17.0 29640 4594 0713000031 201.235 2016/17 $ 10 $ 5,117 $ - NH $ 135 $ 699 $ 27 $ 843 $ 1,704

07 Los Angeles 5 13.8/19.2 30070 4679 0713000492 201.121 2014/15 $ 10 $ 13,900 $ - NH $ 130 $ 1,000 $ 17 $ 2,000 $ 3,147

07 Los Angeles 5 C43.9/C46.4 30290 4693 0713000478 201.122 2014/15 $ - $ 18,700 $ - NH $ - $ 1,500 $ 100 $ 2,500 $ 4,100

In the city of Los Angeles, near Bel Air, from Sunset Boulevard to south of Bel Air Crest Road. Upgrade existing temporary ramps.

In and near the cities of Inglewood, Culver City, and Los Angeles, from north of El Segundo Boulevard to Venice Boulevard (Route 187). Rehabilitate pavement.

In the cities of Long Beach and Signal Hill, from Woodruff Avenue to 182nd Street; also on Route 710 at various bridges. Repair bridges.

In the city of Los Angeles, at Vincent Thomas Bridge No. 53-1471. Repair failing seismic and structural elements.

In and near the cities of Los Angeles and Santa Clarita, from Route 118 to the Kern County Line. Upgrade existing guide signs to current standards and convert overhead sign lighting to induction type.

In and near Santa Clarita, from Route 14 to Parker Road. Rehabilitate pavement.

In city of Los Angeles, from Route 10 to Route 170. Storm water mitigation through erosion control.In the city of Los Angeles, near Glendale, at northbound off-ramp to Colorado Freeway Extension. Widen off-ramp, replace MBGR with concrete barrier, and widen LA River Bridge to reduce truck off-tracking.

In the cities of Los Angeles and Glendale, on the Colorado Freeway Extension, from southbound Route 5 on-ramp to West Colorado Street. Construct median barrier.

In the city of Los Angeles, at Elysian Viaduct Bridge No. 53-1424. Clean and paint steel surfaces.In the city of Los Angeles from Filmore Street to Rinaldi Street, also on Route 118 from Route 405 to west of San Fernando Road. Enhance highway worker safety by paving misc. areas, install access gates and maint. vehicle pullout areas.

In the city of Los Angeles, at Route 5/10/60 Interchange. Enhance highway worker safety by modifying irrigation, miscellanous paving, and other measures.

In and near the city of Los Angeles, from Route 710 to Main Street. Rehabilitate pavement.In and near the city of Los Angeles, near Sylmar and Granada Hills communities, on the Route 5 truck spur from San Fernando Road Overhead to south of Weldon Canyon Road. Rehabilitate pavement.

Page 32: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

07 Los Angeles 5 R59.7/R73.2 30730 4768 0714000218 201.010 2015/16 $ - $ 1,050 $ - STP $ 80 $ 250 $ 30 $ 300 $ 660

07 Los Angeles 5 R47.7/R48.0 30940 4789 0714000282 201.010 2015/16 $ - $ 1,260 $ - STP $ 100 $ 150 $ 20 $ 180 $ 450

07 Los Angeles 5 34.3/56.1 2W760 4797 0713000441 201.119 2014/15 $ - $ 1,931 $ - HBRR-S $ - $ 370 $ 5 $ 375 $ 750

07 Los Angeles 57 R7.7/R12.2 29120 4494 0712000008 201.361 2016/17 $ - $ 2,257 $ - NH $ 200 $ 400 $ - $ 400 $ 1,000

07 Los Angeles 57 R2.0/5.6 30030 4675 0713000436 201.335 2016/17 $ 8 $ 1,709 $ - NH $ - $ 250 $ 5 $ 250 $ 505

07 Los Angeles 57 R4.5/R12.1 30260 4689 0713000483 201.121 2014/15 $ 616 $ 14,464 $ - NH $ - $ 1,015 $ 185 $ 1,918 $ 3,118

07 Los Angeles 60 0.3/3.1 28820 4419 0700021023 201.335 2015/16 $ - $ 2,200 $ - NH $ 77 $ 360 $ 5 $ 385 $ 827

07 Los Angeles 60 R3.7/R6.3 29580 4595 0713000037 201.235 2016/17 $ - $ 2,028 $ - NH $ 113 $ 334 $ - $ 466 $ 913

07 Los Angeles 60 R3.2/11.8 30110 4699 0714000009 201.122 2017/18 $ 165 $ 75,000 $ - NH $ 75 $ 5,105 $ 20 $ 8,880 $ 14,080

07 Los Angeles 710 21.9/23.1 20212 4137A 0700020870 201.120 2014/15 $55,000 $ 94,691 $ - NH $ 500 $11,700 $ 2,600 $14,000 $ 28,800

07 Los Angeles 710 R15.8/R24.4 28920 4458 0700021113 201.335 2015/16 $ - $ 4,200 $ - NH $ 70 $ 540 $ 5 $ 570 $ 1,185

07 Los Angeles 91 R6.5/R11.0 29010 4489 0712000030 201.015 2014/15 $ 50 $ 11,275 $ - STP $ - $ 1,600 $ 50 $ 1,600 $ 3,250

07 Los Angeles 91 R11.4/0.0 29170 4500 0712000095 201.112 2016/17 $ - $ 1,446 $ - HBRR-S $ 73 $ 252 $ 12 $ 295 $ 632

07 Los Angeles 91 R11.8/R14.1 29620 4592 0713000029 201.235 2017/18 $ - $ 2,031 $ - NH $ 73 $ 384 $ - $ 457 $ 914

Near Castaic, from Lake Hughes Road to south of Vista Del Lago Road; also on Route 14 near Palmdale, from Soledad Canyon Road to Kern County line (PM 35.5 to R77.1). Install shoulder rumble strips.

Near Santa Clarita, in the northbound lanes from 500 feet south of the Gavin Canyon Undercrossing to the end of the undercrossing. Install high friction pavement.

In the cities of Sun Valley, San Fernando, Santa Clarita, and Valencia, from Penrose Street to Biscailuz Drive; also on routes 118 and 210 at various bridges. Repair bridges.

In San Dimas and Glendora from Route 10 to Route 210, also on Route 60 in and near the cities of Los Angeles, Monterey Park, and Montebello. Construct Americans with Disabilities Act (ADA) curb ramp improvements.

In Diamond Bar, from Diamond Bar Boulevard to State Street; also, on Route 210 in Irwindale, Azusa, and Glendora, from Irwindale Avenue to Route 57. Soil stabilization at bridge abututment slopes.

In Diamond Bar, Pomona, San Dimas and Glendora, from Route 60 to Route 210. Roadway rehabilitation.In Los Angeles on Route 60 from Boyle Ave OC to Eastern Ave OC - Source ControlIn and near Monterey Park and Montebello, from Mednick Avenue to Markland drive. Enhance highway worker safety by installing Maintenance Vehicle Pullouts, access gates and other measures.

In and near Monterey Park, Montebello, Rosemead, and South El Monte, from Route 710 to Route 605. Rehabilitate pavement.

In Commerce and Bell from South Atlantic Blvd to Triggs Street. Rehabilitate roadway.In various cities, from north of Rosecrans Avenue to Ford Boulevard ramps. Storm water mitigation through erosion control.

In various cities, on Routes 91 and 105 at various locations. Install concrete barrier and reconstruct metal beam guardrail.

In Long Beach, at Butler-Artesia Undercrossing (Br. No. 53-2169). Upgrade bridge rails and lower on-ramp to increase vertical clearance.

In Long Beach, from the Los Angeles River Bridge to Downey Avenue. Enhance highway worker safety by miscellanous paving, relocating irrigation, and other measures.

Page 33: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

07 Los Angeles 91 R11.3/R20.7 30620 4736 0714000151 201.121 2014/15 $ 1,909 $ 16,284 $ - NH $ - $ 1,117 $ 300 $ 2,048 $ 3,465

07 Los Angeles VAR 24070 3323 0713000162 201.315 2017/18 $ - $ 6,680 $ - NH $ 334 $ 835 $ 5 $ 1,164 $ 2,338

07 Ventura 1 0.0/4.4 30330 4696 0714000008 201.121 2017/18 $ 50 $ 4,675 $ - NH $ 44 $ 310 $ 30 $ 530 $ 914

07 Ventura 101 R40.4/R43.6 25190 3711 0700021082 201.121 2015/16 $ - $ 10,720 $ - NH $ 240 $ 1,123 $ 10 $ 1,123 $ 2,496

07 Ventura 101 14.1/21.1 27600 4173 0712000100 201.335 2014/15 $ - $ 15,512 $ - NH $ 475 $ 2,000 $ 179 $ 2,000 $ 4,654

07 Ventura 101 29.8/0.0 29040 4490 0712000034 201.378 2016/17 $ 11 $ 408 $ - NH $ 102 $ 195 $ 15 $ 170 $ 482

07 Ventura 101 30.2/31.4 29540 4710 0713000018 201.235 2017/18 $ - $ 1,931 $ - NH $ 115 $ 309 $ - $ 445 $ 869

07 Ventura 126 R13.1/20.1 27360 4107 0700000512 201.010 2015/16 $ 4,200 $ 58,100 $ - STP $ 1,600 $ 5,950 $ 650 $ 6,000 $ 14,200

07 Ventura 126 0.0/R13.6 30220 4685 0713000481 201.121 2016/17 $ 10 $ 12,800 $ - NH $ 120 $ 940 $ 40 $ 1,400 $ 2,500

07 Ventura 150 27.4/29.4 3X021 4656 0713000398 201.131 2016/17 $ 150 $ 4,015 $ - NH $ 110 $ 1,640 $ 50 $ 1,500 $ 3,300

07 Ventura 23 0.0/R3.3 30350 4698 0714000007 201.121 2017/18 $ 20 $ 3,646 $ - NH $ 32 $ 230 $ 20 $ 390 $ 672

07 Ventura 23 R4.9/R11.4 30850 4779 0714000245 201.315 2014/15 $ 10 $ 2,290 $ - NH $ - $ 688 $ 2 $ 575 $ 1,265

07 Ventura 33 0.0/6.0 27500 4157 0700000518 201.335 2014/15 $ 400 $ 25,900 $ - NH $ 345 $ 3,500 $ 425 $ 3,500 $ 7,770

07 Ventura 33 7.6/0.0 29130 4496 0712000083 201.111 2016/17 $ 1,300 $ 1,800 $ - HBRR-S $ 250 $ 1,310 $ 240 $ 900 $ 2,700

07 Ventura 33 0.0/6.3 30340 4697 0714000006 201.121 2017/18 $ 20 $ 4,809 $ - NH $ 80 $ 585 $ 5 $ 1,785 $ 2,455

08 Riverside 1C400 0111C 0812000326 201.119 2014/15 $ 5 $ 1,300 $ - HBRR-S $ - $ 254 $ - $ 260 $ 514

08 Riverside 10 6.8/9.6 1C210 0005U 0812000305 201.235 2017/18 $ 7 $ 1,229 $ - NH $ 184 $ 226 $ 21 $ 198 $ 629

In Long Beach, Bellflower, Artesia and Cerritos, from Route 710 to the Orange County Line. Roadway rehabilitation.In Los Angeles and Ventura Counties in various cities and spot locations on various routes. Install and upgrade Highway Advisory Radio (HAR) systems and signs.

Near Oxnard, from Los Angeles County line to south of Sycamore Canyon Road. Rehabilitate pavement.In La Conchita, from 0.6 mile north of Mobil Peir undercrossing to Santa Barbra County line. Rehabilitate pavement.

In Camarillo, from Lewis Road to north of Rose Avenue. Storm water mitigation through erosion control.In the city of Ventura, at Ash Street Pedestrian Overcrossing. Upgrade pedestrian overcrossing to Americans with Disabilities Act (ADA) standards.

In the city of Ventura, at the Route 33 interchange. Enhance highway worker safety by miscellanous paving, replacing crash cushions, and other measures.

In and near Santa Paula and Fillmore, from Hallock Drive to E Street. Construct median barrier and roundabouts.

In and near the cities of Ventura and Santa Paula, from Route 101 to Haun Creek Bridge. Rehabilitate pavement.Near Ojai, from Polly Road to Salt Marsh Road. Install reataining wall to prvent additional storm realated slope failure.

In Thousand Oaks, from Carlisle Road to Route 101. Rehabilitate pavement.In and near Thousand Oaks and Moorpark, from Janss Road to Route 118; also on Route 118 in Simi Valley, from Princeton Avenue to Los Angeles County Line (PM 19.6 to PM R32.6). Upgrade ramp metering and Transportation Management System (TMS) elements.

Near San Buena Ventura, from Route 101 to Casitas Vista Road. Storm water mitigation through erosion control.

Near Oak View, at San Antonio Creek Bridge (Br. No. 52-0065). Scour mitigation and bridge rail upgrade.In and near the city of Ventura, from Route 101 to south of Park View Drive. Rehabilitate pavement.In and near the cities of Moreno Valley, Perris and Riverside, at various bridge locations. Repair bridge decks.In Beaumont, from Route 60 westbound off-ramp to Highland Springs Avenue. Roadside safety improvements.

Page 34: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

08 Riverside 10 8.2/R25.1 1C380 0007N 0812000303 201.122 2017/18 $ 25 $ 156,618 $ - NH $ 5,191 $10,591 $ 291 $11,215 $ 27,288

08 Riverside 10 0Q890 0010C 0800020582 201.119 2016/17 $ 20 $ 1,802 $ - HBRR-S $ 210 $ 652 $ 11 $ 452 $ 1,325

08 Riverside 10 R155.1/R156.1 0R250 0012J 0812000054 201.310 2014/15 $ - $ 3,000 $ - NH $ - $ - $ - $ - $ -

08 Riverside 10 R74.0/R105.0 1E860 0014M 0814000115 201.122 2014/15 $ 50 $ 88,440 $ - NH $ 1,360 $ 2,340 $ 50 $ 3,500 $ 7,250

08 Riverside 10 44.4/R52.3 1C060 0015N 0812000256 201.121 2017/18 $ 5 $ 15,210 $ - NH $ 396 $ 924 $ 30 $ 1,350 $ 2,700

08 Riverside 10 6.3/6.9 0R470 0244G 0812000087 201.235 2014/15 $ - $ 1,450 $ - NH $ 200 $ 400 $ 34 $ 378 $ 1,012

08 Riverside 111 0.0/13.0 1C620 0098F 0812000337 201.335 2016/17 $ 7 $ 1,182 $ - NH $ 160 $ 200 $ 20 $ 285 $ 665

08 Riverside 111 47.3/55.3 0R300 0105C 0812000056 201.378 2017/18 $ 128 $ 1,453 $ - NH $ 250 $ 571 $ 267 $ 374 $ 1,462

08 Riverside 15 0.0/4.8 1C220 0014J 0812000277 201.235 2016/17 $ 7 $ 1,130 $ - NH $ 183 $ 221 $ 23 $ 198 $ 625

08 Riverside 15 4.8/6.5 1C140 0016M 0812000264 201.235 2016/17 $ 7 $ 1,623 $ - NH $ 224 $ 271 $ 28 $ 232 $ 755

08 Riverside 15 44.1/48.5 1C150 0016N 0812000263 201.235 2017/18 $ 7 $ 1,394 $ - NH $ 279 $ 328 $ 34 $ 285 $ 926

08 Riverside 15 6.5/8.2 1C200 0019P 0812000279 201.235 2017/18 $ 7 $ 2,435 $ - NH $ 347 $ 433 $ 41 $ 358 $ 1,179

08 Riverside 15 1C420 0019R 0812000311 201.119 2014/15 $ 5 $ 1,900 $ - HBRR-S $ - $ 260 $ - $ 385 $ 645

08 Riverside 15 1C900 0022J 0813000074 201.119 2014/15 $ 5 $ 1,300 $ - HBRR-S $ - $ 235 $ - $ 423 $ 658

08 Riverside 15 45.6/47.3 1C610 0028C 0812000336 201.335 2016/17 $ 7 $ 1,667 $ - NH $ 213 $ 267 $ 27 $ 382 $ 889

08 Riverside 215 R8.4/R38.5 0G780 0252Q 0814000173 201.315 2014/15 $ 10 $ 6,620 $ - NH $ 451 $ 813 $ 10 $ 1,810 $ 3,084

08 Riverside 371 56.4/60.2 0R740 0259R 0812000166 201.010 2014/15 $ - $ 325 $ - STP $ 174 $ 207 $ 3 $ 97 $ 481

08 Riverside 371 70.6/71.0 0R950 0259S 0812000218 201.010 2014/15 $ 11 $ 625 $ - STP $ 330 $ 484 $ 26 $ 285 $ 1,125

In and near Beaumont and Banning, from Pennsylvania Avenue to Route 111. Rehabilitate pavement.In Riverside and San Bernardino counties, on Routes 10, 111, and 215 at various locations. Rehabilitate 9 structures.

In Blythe, at the Blythe Border Station, from east of Intake Boulevard to west of Arizona state line. Relocate ramps.Near Desert Center, from east of Cactus City Roadside Safety Rest Area to east of Route 177. Rehabilitate pavement.

In and near Indio, from Monterey Avenue to Jefferson Overcrossing. Rehbilitate pavement.In Beaumont at Route 10/60 interchange. Improve worker safety.At Salton Sea, from Imperial Creek to west of Cleveland Street. Sediment stabilization and erosion control.In Palm Springs, from Gateway Drive to Golf Club Drive. Reconstruct sidewalks and curb ramps.In and near Temecula, from the San Diego County line to the southbound on-ramp at Rancho California Overcrossing. Roadside safety improvements.

In Temecula, from Rancho California southbound on-ramp to Route 79/Winchester Road Interchange southbound on-ramp. Roadside safety improvements.

In and near Norco, from 3rd Street to northbound on-ramp at Limonite Avenue Interchange. Roadside safety improvements.

In Temecula, from Route 79/Winchester Road to southbound on-ramp from Route 215. Roadside safety improvements.

On Routes 15, 71 and 91 in various cities at various locations. Repair bridge decks at 10 locations.On Routes 15 and 215 in various cities at various locations; also in San Bernardino County on Routes 60 and 138 in various cities at various locations. Repair bridge decks at 8 locations.

In and near Norco, from 6th Street to south of 68th Street. Sediment stabilization and erosion control.In and near the cities of Murrieta, Menifee, Perris, Riverside, and Moreno Valley, from south of Route 15 to north of Route 60. Install traffic management system (TMS) elements.

Near Aguanga, from Route 79 to Wilson Valley Road. Construct centerline ground-in rumble strips and outside shoulder object markers.

Near Anza, from west of Bahrman Road to Bailiff Road. Construct left-turn lane in each direction.

Page 35: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

08 Riverside 60 R12.2/30.4 1C090 0033N 0812000287 201.121 2016/17 $ 7 $ 27,155 $ - NH $ 734 $ 1,787 $ 22 $ 2,285 $ 4,828

08 Riverside 60 13.3/21.5 1C160 0033P 0812000262 201.235 2017/18 $ 7 $ 2,007 $ - NH $ 303 $ 361 $ 34 $ 313 $ 1,011

08 Riverside 60 R6.9/R12.2 0Q753 0038K 0812000108 201.122 2017/18 $ 50 $ 24,874 $ - NH $ 215 $ 1,221 $ 144 $ 2,047 $ 3,627

08 Riverside 60 10.7/13.3 1C230 0041L 0812000276 201.235 2017/18 $ 7 $ 1,160 $ - NH $ 179 $ 226 $ 22 $ 196 $ 623

08 Riverside 60 22.2/26.5 0Q180 0045G 0800020220 201.010 2015/16 $ 250 $ 25,000 $ - STP $ 2,000 $ 1,500 $ 200 $ 3,700 $ 7,400

08 Riverside 62 R6.9/9.2 0R750 0023A 0812000168 201.010 2014/15 $ - $ 457 $ - STP $ 207 $ 249 $ 3 $ 121 $ 580

08 Riverside 74 52.1/92.0 0R780 0050L 0812000165 201.015 2016/17 $ 10 $ 4,976 $ - STP $ 800 $ 600 $ 80 $ 700 $ 2,180

08 Riverside 74 11.8/14.4 0R310 0050M 0812000057 201.378 2017/18 $ 158 $ 1,280 $ - NH $ 356 $ 624 $ 463 $ 481 $ 1,924

08 Riverside 74 R14.8/15.2 1E050 0050N 0813000139 201.010 2016/17 $ 30 $ 1,782 $ - STP $ 911 $ 700 $ 40 $ 672 $ 2,323

08 Riverside 74 0.0/5.8 1C850 0050P 0813000047 201.010 2017/18 $ 20 $ 53,600 $ - STP $ 2,060 $ 2,590 $ 20 $ 4,985 $ 9,655

08 Riverside 74 43.3/0.0 1C740 0059C 0813000008 201.010 2015/16 $ 121 $ 566 $ - STP $ 235 $ 448 $ 136 $ 297 $ 1,116

08 Riverside 79 R33.8/0.0 1E100 0065K 0813000152 201.010 2015/16 $ 10 $ 740 $ - STP $ 319 $ 593 $ 12 $ 403 $ 1,327

08 Riverside 79 R33.9/40.0 1E660 0068K 0814000060 201.010 2015/16 $ 10 $ 1,660 $ - STP $ 315 $ 414 $ 76 $ 524 $ 1,329

08 Riverside 91 7.0/7.8 0R490 0076G 0812000089 201.235 2017/18 $ - $ 1,486 $ - NH $ 165 $ 425 $ 26 $ 415 $ 1,031

08 Riverside 91 10.8/12.9 0R460 0080J 0812000086 201.235 2014/15 $ - $ 1,325 $ - NH $ 160 $ 400 $ 25 $ 360 $ 945

08 Riverside 91 17.4/20.5 1C840 0080M 0813000046 201.119 2014/15 $ 5 $ 2,500 $ - HBRR-S $ - $ 265 $ - $ 524 $ 789

08 Riverside VAR 1C640 0033R 0812000339 201.315 2016/17 $ 7 $ 1,928 $ - NH $ 150 $ 300 $ 75 $ 300 $ 825

In and near the city of Riverside, from Route 215 to Route 10. Rehabilitate pavement.In Moreno Valley, from Day Street to westbound off-ramp at Theodore Street. Roadside safety improvements.

In and near the city of Riverside, from west of Valley Way to Routes 60/91/215 Junction. Rehabilitate Roadway.

In the city of Riverside, from west of Market Street to Day Street in the City of Moreno Valley. Roadside safety improvements.

Near Moreno Valley, from Gilman Springs Road to Jack Rabbit Trail. Construct left and right shoulders for westbound direction.

Near Desert Hot Springs, from east of Indian Avenue to Hess Boulevard. Install median barrier markers and rumble strips.

In and near Palm Desert, from west of Strawberry Creek bridge to west of Cahuilla Hills Road. Install metal beam guardrail.

In Lake Elsinore, from west of Grand avenue to north of Lakeshore Drive. Reconstruct sidewalks and curb ramps.

In Lake Elsinore, at Gunnerson Street and Strickland Avenue. Widen for left-turn channelization and shoulder.Near Lake Elsinore, from Orange County Line to Monte Vista Street. Widen for standard lane widths and shoulders and construct ground-in rumble strips.

In and near Hemet, at Hemet Street. Install traffic signals.Near Beaumont, at Gilman Springs Road southbound off ramp. Install traffic signal and widen intersection.Near Beaumont, from Gilman Springs Road to First Street. Install drainage inlets.In Corona, at Route 15/91 Interchange. Construct roadside paving, weed barriers and relocate facilities.In the city of Riverside, from east of Pierce Avenue to west of Tyler Avenue. Construct roadside paving, weed barriers, relocate facilities and upgrade guardrail.

In the city of Riverside, at various locations; also in San Bernardino County in Fontana at Valley Boulevard ramps. Clean and paint 4 bridges.

In and near the city of Riverside, on Route 60 from Milliken Avenue to Routes 60/91/215 Junction; also on Route 91 from Spruce Street to Routes 60/91/215 Junction. Replace transportation wireless communication system with fiber optic infrastructure.

Page 36: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

08 Riverside VAR 0R350 0107F 0812000071 201.113 2016/17 $ 20 $ 4,433 $ - HBRR-S $ 456 $ 1,008 $ 21 $ 943 $ 2,428

08 San Bernardino 10 R23.8/R23.8 0Q910 0133N 0800020580 201.110 2016/17 $ 13 $ 23,171 $ - HBRR-S $ 1,025 $ 3,300 $ 240 $ 3,660 $ 8,225

08 San Bernardino 10 12.0/12.8 1C710 0134M 0813000002 201.010 2015/16 $ - $ 1,295 $ - STP $ 328 $ 505 $ 17 $ 341 $ 1,191

08 San Bernardino 10 33.3/R36.9 0K292 0151J 0812000099 201.122 2014/15 $ - $ 36,000 $ - NH $ - $ 1,920 $ 268 $ 3,185 $ 5,373

08 San Bernardino 10 30.9/33.3 0K291 0159J 0812000098 201.122 2016/17 $ 7 $ 25,055 $ - NH $ - $ 1,593 $ 220 $ 2,623 $ 4,436

08 San Bernardino 10 R36.9/R39.1 0K293 0163C 0812000100 201.122 2017/18 $ 7 $ 17,144 $ - NH $ - $ 1,072 $ 145 $ 1,725 $ 2,942

08 San Bernardino 138 R17.1/R19.2 0Q300 0237P 0800020191 201.015 2014/15 $ 425 $ 31,968 $ - STP $ 1,657 $ 1,340 $ 570 $ 4,800 $ 8,367

08 San Bernardino 142 3.9/5.7 0L710 0242K 0800000431 201.378 2016/17 $ 153 $ 1,443 $ - NH $ - $ 459 $ 135 $ 219 $ 813

08 San Bernardino 15 32.5/42.2 0R540 0160G 0812000097 201.235 2015/16 $ - $ 1,000 $ - NH $ 150 $ 250 $ 30 $ 290 $ 720

08 San Bernardino 15 7.0/R20.0 0R510 0168S 0812000092 201.235 2015/16 $ - $ 1,200 $ - NH $ 140 $ 275 $ 25 $ 240 $ 680

08 San Bernardino 15 R20.0/R23.0 0R450 0170S 0812000094 201.235 2015/16 $ - $ 1,300 $ - NH $ 150 $ 250 $ 30 $ 290 $ 720

08 San Bernardino 15 R23.0/R26.2 0R440 0171G 0812000093 201.235 2015/16 $ - $ 1,300 $ - NH $ 120 $ 240 $ 20 $ 220 $ 600

08 San Bernardino 15 172.1/173.8 0M280 0172X 0800000472 201.110 2014/15 $ 50 $ 10,688 $ - HBRR-S $ 634 $ 3,121 $ 100 $ 2,271 $ 6,126

08 San Bernardino 15 R87.3/R91.8 0R710 0177G 0812000153 201.010 2015/16 $ 7 $ 1,764 $ - STP $ 231 $ 525 $ 18 $ 461 $ 1,235

08 San Bernardino 15 37.8/40.2 1E010 0178R 0813000117 201.010 2016/17 $ 10 $ 1,032 $ - STP $ 373 $ 1,015 $ 17 $ 976 $ 2,381

08 San Bernardino 18 R11.0/R17.0 0R260 0179F 0812000055 201.119 2016/17 $ 20 $ 2,990 $ - HBRR-S $ 215 $ 418 $ 20 $ 464 $ 1,117

08 San Bernardino 18 9.1/17.8 1C100 0179G 0812000288 201.121 2017/18 $ 5 $ 12,837 $ - NH $ 396 $ 915 $ 37 $ 1,200 $ 2,548

08 San Bernardino 18 T8.3/R17.7 0R220 0179H 0812000032 201.010 2015/16 $ 20 $ 7,242 $ - STP $ 1,311 $ 1,012 $ 13 $ 1,241 $ 3,577

08 San Bernardino 18 24.9/29.9 1C010 0182G 0812000236 201.015 2016/17 $ 30 $ 2,037 $ - STP $ 300 $ 562 $ 45 $ 375 $ 1,282

Between Banning and Blythe on Routes 10 and 111, at Bridges No.56-0003, 56-0241R, and 56-0596. Seismic retrofit.

In Colton, between Mt. Vernon Avenue and Routes 10/215 Junction at Santa Ana River (Bridge No. 54-0292L/R and 54-0292G). Seismic retrofit.

In and near Fontana, from east of Etiwanda Avenue to west of Cherry Avenue. Modify drainage.In and near Redlands, from Ford Street to Live Oak Canyon Road. Lane replacement.In Redlands, from Route 38/Orange Street to Ford Street. Rehabilitate roadway.Near Redlands, from Live Oak Canyon Road to County Line Road. Rehabilitate roadway.Near Hesperia, from 1.8 miles east of Route 15 to west of Summit Post Office Road. Realign roadway.In Chino Hills, from Rustic Drive to Route 71. Construct sidewalks and upgrade curb ramps and other pedestrian facilities.

In Hesperia and Victorville, from north of Joshua Street to north of Mojave Drive. Install weed barriers and upgrade guardrail.

In and near Fontana, from north of Baseline Road to Cleghorn Road. Install weed barriers and upgrade guardrail.

Near Hesperia, from Cleghorn Road Undercrossing to 0.3 mile north of North Alray Overhead. Construct weed barriers and upgrade guardrail.

Near Hesperia, from north of North Alray Overhead to south of Oak Hill Road. Install weed barriers and upgrade guardrail.

Near Mountain Pass, at Cenda Ditch Bridge (No. 54-0620L) and Wheaton Wash Bridge (No. 54-0621L). Replace bridges.

Near Barstow, from Agricultural Inspection Station to Coyote Lake Road. Install median barrier.In Victorville, from Bear Valley Road to Palmdale Road (Route 18). Install northbound outer separation barrier.Near Waterman Canyon, from north of Route 210 to south of Route 138 on Bridges No. 54-0790, 54-0847, and 54-0876. Construct catwalks to provide access for bridge inspection.

Near Crestline, from Arrowhead Springs Road to Route 138. Rehabilitate pavement.In and near the city of San Bernardino, from 2.1 miles north of 30th Street to Route 138. Install median barrier.Near Lake Arrowhead, from east of Route 173 to Nob Hill Drive. Install guardrail.

Page 37: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

08 San Bernardino 18 44.5/52.8 1C560 0186F 0812000331 201.335 2016/17 $ 202 $ 3,686 $ - NH $ 472 $ 590 $ 59 $ 845 $ 1,966

08 San Bernardino 18 49.1/51.6 0J990 0187G 0800000327 201.378 2014/15 $ 671 $ 3,060 $ - NH $ 650 $ 831 $ 1,188 $ 453 $ 3,122

08 San Bernardino 18 75.5/87.6 1E020 0190H 0813000118 201.010 2016/17 $ - $ 482 $ - STP $ 216 $ 309 $ 3 $ 123 $ 651

08 San Bernardino 18 88.9/89.6 1E080 0190N 0813000142 201.010 2016/17 $ 8 $ 1,290 $ - STP $ 267 $ 464 $ 38 $ 933 $ 1,702

08 San Bernardino 18 101.5/115.9 0P390 0191G 0800001025 201.010 2015/16 $ 179 $ 25,475 $ - STP $ 2,168 $ 1,788 $ 394 $ 3,422 $ 7,772

08 San Bernardino 18 101.9/0.0 0P980 0191H 0800020091 201.010 2014/15 $ 60 $ 644 $ - STP $ 253 $ 412 $ 110 $ 356 $ 1,131

08 San Bernardino 18 99.4/100.9 0Q120 0191J 0800020125 201.010 2017/18 $ 30 $ 9,101 $ - STP $ 1,123 $ 1,297 $ 164 $ 1,212 $ 3,796

08 San Bernardino 18 110.8/0.0 0Q230 0191K 0800020308 201.010 2014/15 $ 323 $ 897 $ - STP $ 299 $ 766 $ 323 $ 340 $ 1,728

08 San Bernardino 2 2.2/2.7 0H470 0127J 0812000074 201.112 2017/18 $ 5 $ 2,731 $ - HBRR-S $ 324 $ 520 $ 36 $ 518 $ 1,398

08 San Bernardino 210 1.3/1.5 0Q830 0195L 0800020516 201.010 2014/15 $ - $ 145 $ 145 6/26/14 STP $ 221 $ 269 $ 8 $ 87 $ 585

08 San Bernardino 210 R21.8/R27.3 0E551 0195M 0814000085 201.315 2016/17 $ 10 $ 2,622 $ - NH $ 220 $ 337 $ 22 $ 405 $ 984

08 San Bernardino 247 9.6/20.3 0G900 0253F 0800020175 201.015 2014/15 $ 4,847 $ 14,743 $ - STP $ 1,337 $ 2,400 $ 3,300 $ 2,654 $ 9,691

08 San Bernardino 330 32.5/33.7 38852 0256C 0812000124 201.112 2017/18 $ 10 $ 2,048 $ - HBRR-S $ 250 $ 725 $ 19 $ 315 $ 1,309

08 San Bernardino 38 30.9/0.0 0R340 0200J 0812000072 201.110 2017/18 $ 24 $ 1,321 $ - HBRR-S $ 139 $ 369 $ 45 $ 463 $ 1,016

08 San Bernardino 38 50.4/59.4 0R430 0206U 0812000075 201.335 2016/17 $ 39 $ 2,195 $ - NH $ 325 $ 220 $ 5 $ 480 $ 1,030

08 San Bernardino 395 35.5/45.9 0N970 0258P 0800000550 201.010 2016/17 $ 3,857 $ 35,983 $ - STP $ 2,830 $ 1,955 $ 997 $ 6,155 $ 11,937

08 San Bernardino 395 19.0/35.6 0C122 0259Q 0812000155 201.010 2014/15 $ - $ 400 $ - STP $ - $ 50 $ - $ 100 $ 150

08 San Bernardino 395 46.0/73.5 1E870 0261G 0814000116 201.121 2014/15 $ 20 $ 16,550 $ - NH $ 800 $ 1,070 $ 72 $ 1,300 $ 3,242

08 San Bernardino 40 R105.2/R106.5 0N550 0206T 0800020102 201.110 2014/15 $ 10 $ 9,532 $ - HBRR-S $ 755 $ 1,701 $ 70 $ 1,410 $ 3,936

In and near Big Bear Lake, from Route 38 to Gildart Drive. Sediment stabilization and erosion control.In the city of Big Bear Lake, from Pine Knot Avenue to Stanfield cutoff. Replace and repair damaged sidewalks, curbs and gutters.

Near Apple Valley and Lucerne Valley, from Custer Avenue to Pauhaska Road. Install ground-in rumble strips.In Apple Valley, from Navajo Road to Kiowa Road. Construct raised median curb.In and near Adelanto, from Route 395 to west of Oasis Road. Widen shoulders and add centerline and shoulder rumble strips.

In Adelanto, at Bellflower Street. Install traffic signal, concrete curb, gutter, crosswalk, and ADA curb ramps.

In Victorville, from Cobalt Road to Route 395. Construct raised curb median.

Near Victorville, at Sheep Creek Road. Install traffic signals and make Americans with Disabilities Act improvements.

Near Wrightwood, at Sheep Creek Bridge No. 54-0360. Upgrade bridge railing.

In Upland, from 0.2 miles west of Mountain Avenue to Mountain Avenue. Construct drainage improvements.In and near the cities of San Bernardino and Highland, from Route 215 to Victoria Avenue. Transportation management systems.

In Landers, from Hadley Road to north of Boone Avenue. Construct paved shoulders.Near Highland, at City Creek Bridge No. 54-365, and at East Fork City Creek Bridge No. 54-345. Replace bridge rail and approach rail.

Near Redlands, at Santa Ana River Bridge No. 54-0407. Rehabilitate bridge and upgrade bridge railing.At Big Bear Dam, from Eagle Mountain Drive to Route 18. Sediment control and stabilization.Near Adelanto, from 0.9 mile south of Kramer Hills to Route 58. Widen median and shoulders; install rumble strips.

Near Adelanto, 7.9 miles north of Route 18 to 10.4 miles south of Route 58. Plant establishment and environmental monitoring of the desert tortoise and fencing.

Near Kramer Junction and Johannesburg, from north of Route 58 to Kern County Line. Roadway rehabilitation.

Near Essex, at Watson Wash Bridge No. 54-0805L. Replace bridge.

Page 38: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

08 San Bernardino 40 R93.6/R94.2 0Q790 0206X 0800020481 201.110 2015/16 $ 10 $ 8,844 $ - HBRR-S $ 860 $ 1,650 $ 92 $ 1,934 $ 4,536

08 San Bernardino 40 R50.0/R75.0 0R160 0206Y 0812000029 201.015 2015/16 $ 2,065 $ 17,600 $ - STP $ 1,537 $ 2,157 $ 190 $ 2,418 $ 6,302

08 San Bernardino 40 0.0/R25.0 0R120 0207J 0812000026 201.015 2015/16 $ 2,100 $ 17,400 $ - STP $ 1,537 $ 2,157 $ 183 $ 2,345 $ 6,222

08 San Bernardino 60 0.9/2.9 0F030 0033E 0800020358 201.110 2017/18 $ 3,912 $ 19,560 $ - HBRR-S $ 1,013 $ 2,246 $ 1,030 $ 3,740 $ 8,029

08 San Bernardino 60 R1.9/R2.9 1C170 0033Q 0812000266 201.235 2016/17 $ 7 $ 1,558 $ - NH $ 223 $ 274 $ 43 $ 196 $ 736

08 San Bernardino 60 R0.0/R1.9 1C180 0218H 0812000267 201.235 2016/17 $ 7 $ 1,321 $ - NH $ 216 $ 258 $ 27 $ 231 $ 732

08 San Bernardino 60 R2.9/R4.1 1C190 0219F 0812000268 201.235 2016/17 $ 7 $ 1,321 $ - NH $ 216 $ 258 $ 27 $ 231 $ 732

08 San Bernardino 60 R3.4/R4.6 0R480 0220F 0812000088 201.235 2015/16 $ - $ 1,780 $ - NH $ 180 $ 360 $ 40 $ 330 $ 910

08 San Bernardino 60 R4.6/R10.0 0Q752 0224N 0812000106 201.122 2017/18 $ 90 $ 86,505 $ - NH $ 876 $ 4,816 $ 584 $ 8,325 $ 14,601

08 San Bernardino 62 1.8/7.7 0Q130 0046G 0800020212 201.010 2015/16 $ 5 $ 5,185 $ - STP $ 630 $ 1,150 $ 20 $ 820 $ 2,620

08 San Bernardino 62 16.8/25.2 0R130 0226G 0812000027 201.010 2015/16 $ 30 $ 4,300 $ - STP $ 822 $ 698 $ 25 $ 748 $ 2,293

08 San Bernardino 71 R4.8/R8.5 1C600 0234V 0812000335 201.335 2016/17 $ 7 $ 1,244 $ - NH $ 164 $ 205 $ 20 $ 294 $ 683

08 San Bernardino 95 R57.2/80.5 1C910 0238R 0813000082 201.010 2015/16 $ - $ 765 $ - STP $ 288 $ 397 $ 3 $ 174 $ 862

09 Inyo 127 0.0/21.0 35530 0613 0912000039 201.121 2014/15 $ 40 $ 12,199 $ - NH $ - $ 190 $ 35 $ 620 $ 845

09 Inyo 127 35750 0614 0913000002 201.151 2016/17 $ 81 $ 2,349 $ - NH $ 240 $ 490 $ 40 $ 480 $ 1,250

09 Inyo 168 35210 0611 0900020090 201.378 2017/18 $ 1,448 $ 2,860 $ - NH $ 287 $ 733 $ 1,306 $ 556 $ 2,882

09 Inyo 190 69.2/69.8 35320 0610 0912000007 201.015 2017/18 $ 322 $ 4,323 $ - STP $ 535 $ 850 $ 130 $ 520 $ 2,035

Near Essex, at Hoff Wash Bridge (No. 54-0889L/R) 39 miles west of Junction Route 95. Replace bridges.Near Ludlow, from Crucero Road to Banger Wash. Regrade median cross-slope.In and near Barstow and Newberry Springs, from Route 15 to east of Fort Cady Road. Regrade median cross-slope.

In Chino, at Pipeline Avenue Overcrossing (OC) No. 54-0744, Monte Vista Avenue OC No. 54-0746, and Benson Avenue OC No. 54-0748. Replace bridges.

In Chino, from Monte Vista Avenue to Benson Avenue. Roadside safety improvements.In Chino, from the Los Angeles County line to Monte Vista Avenue. Roadside safety improvements.In Chino, from Benson Avenue to San Antonio Avenue. Roadside safety improvements.In Chino and Ontario, from west of Mountain Avenue to Euclid Avenue; also on Route 10 from east of North Vinyard Avenue to east of Miliken Avenue. Construct roadside paving, weed barriers and relocate facilities.

In Ontario, from Euclid Avenue to the Riverside County line; also in Riverside County, from the San Bernardino county line to Mission Boulevard (PM R0.0/R3.0). Rehabilitate roadway.

Near Morongo Valley, from East Drive to Yucca Park Road. Construct raised median curb.Near Joshua Tree, from west of Torres Avenue to east of Lee Drive. Provide continuous two-way left turn lane throughout corridor and widen shoulders.

In Chino and Chino Hills, from north of Soquel Canyon Road to the Riverside County line. Sediment stabilization and erosion control.

Near Needles, from Route 40 to the Nevada state line. Install ground-in rumble strips.Near Shoshone, from the San Bernardino County line to 4.6 miles north of Route 178 West. Rehabilitate pavement.

Near Shoshone, at various locations. Replace deteriorating culverts.In Bishop, from Pioneer Lane to Route 395; also on Route 395 from Jay Street to Wye Road. Upgrade pedestrian facilities.

In Death Valley National Park near Panamint Springs, east of Panamint Valley Road.  Widen shoulders and realign roadway curves.

Page 39: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

09 Inyo 395 R20.3/R22.2 35120 0605 0900020058 201.015 2014/15 $ 149 $ 1,940 $ - STP $ 585 $ 745 $ 195 $ 635 $ 2,160

09 Inyo 395 0.0/8.4 36140 2610 0914000053 201.121 2014/15 $ - $ 3,600 $ - NH $ 45 $ 220 $ 10 $ 470 $ 745

09 Inyo VAR 35690 0612 0912000064 201.015 2015/16 $ - $ 3,650 $ - STP $ 180 $ 450 $ 9 $ 675 $ 1,314

09 Inyo VAR 36450 2609 0914000051 201.315 2014/15 $ - $ 1,400 $ - NH $ 115 $ 305 $ 15 $ 243 $ 678

09 Mono 395 52.3/53.7 33500 0566 0900020002 201.015 2014/15 $ 3 $ 7,273 $ - NH $ 1,120 $ 840 $ 90 $ 770 $ 2,820

09 Mono 395 72.5/86.0 34090 0587 0900020091 201.151 2015/16 $ 445 $ 1,400 $ - NH $ 615 $ 565 $ 219 $ 395 $ 1,794

09 Mono 395 80.6/84.1 35080 0604 0900020055 201.015 2016/17 $ - $ 5,250 $ - STP $ 1,200 $ 1,055 $ 170 $ 850 $ 3,275

09 Mono 395 93.4/95.7 35780 0615 0913000007 201.015 2017/18 $ 43 $ 5,053 $ - STP $ 370 $ 640 $ 160 $ 710 $ 1,880

09 Mono 395 88.4/91.6 34940 2600 0912000033 201.015 2017/18 $ 190 $ 5,860 $ - STP $ 1,700 $ 821 $ 350 $ 1,140 $ 4,011

09 Mono 395 69.8/76.0 36060 2608 0914000008 201.121 2014/15 $ - $ 5,410 $ - NH $ 10 $ 360 $ 2 $ 350 $ 722

10 Alpine 88 0.0/7.5 0W610 0308 1012000019 201.121 2014/15 $ - $ 7,123 $ - NH $ - $ 590 $ 2 $ 663 $ 1,255

10 Amador 49 3.6/0.0 0W360 0331 1000020631 201.010 2014/15 $ 58 $ 707 $ - STP $ 252 $ 524 $ 156 $ 272 $ 1,204

10 Amador 49 4.0/7.0 0S720 0339 1000020670 201.121 2014/15 $ 8 $ 4,086 $ - NH $ 40 $ 381 $ 7 $ 367 $ 795

10 Amador 49 17.0/17.5 0Q880 3075 1000000221 201.310 2014/15 $ - $ 1,100 $ - NH $ - $ - $ - $ - $ -

10 Amador 88 46.9/R54.7 0Q220 0168 1000020647 201.121 2014/15 $ - $ 8,432 $ - NH $ 133 $ 499 $ 13 $ 516 $ 1,161

10 Amador 88 R54.7/R60.8 0W590 0303 1012000017 201.121 2014/15 $ - $ 6,810 $ - NH $ 70 $ 560 $ 2 $ 424 $ 1,056

10 Amador 88 66.6/71.7 0W600 0326 1012000018 201.121 2014/15 $ - $ 3,625 $ - NH $ - $ 404 $ - $ 356 $ 760

10 Amador VAR 0X350 3017 1012000217 201.010 2014/15 $ - $ 603 $ - STP $ 82 $ 253 $ 11 $ 98 $ 444

10 Calaveras 26 8.8/9.2 0V290 3000 1000020457 201.010 2014/15 $ 481 $ 1,165 $ - STP $ 442 $ 554 $ 531 $ 423 $ 1,950

10 Calaveras 26 8.4/0.0 0V620 3004 1000020114 201.010 2015/16 $ 283 $ 1,350 $ - STP $ 577 $ 709 $ 314 $ 351 $ 1,951

Near Lone Pine, from Rose Valley Ranch Road to north of the Los Angeles Aqueduct Bridge. Widen shoulders, correct roadside slope, and install rumble strip.

Near Owens Lake, from the Kern County line to 1.2 miles south of South Little Lake Road. Rehabilitate pavement.

In Inyo and Mono counties on various routes at various locations. Upgrade bridge approach metal beam guardrail.In Inyo and Kern counties, at various locations. Install changeable message signs (CMS).Near Lee Vining, from 0.2 mile north of Mono Lake Visitor Center driveway to 0.6 mile north of Picnic Grounds Road. Flatten cut slopes to minimize rockfall potential.

Near Bridgeport, from north of Green Creek Road to south of Dressler Creek Bridge. Replace Culverts.Near Bridgeport, from Buckeye Road to south of Swauger Road. Widen shoulders and stabilize slopes.Near Bridgeport, at and near Route 108.  Widen shoulders and install rumble strips.

Near Bridgeport, from north of Devil’s Gate Summit to Burcham Flat Road. Widen shoulders and add rumble strip.Near Bridgeport, from Route 270 to north of Jack Sawyer Road. Rehabilitate pavement.Between the Amador County line and Red Lake. Rehabilitate pavement.In Jackson, at French Bar Road. Construct traffic signal and intersection improvements.In Jackson, South Junction Route 88 to Ridge Road. Rehabilitate pavement.

In Plymouth, at Main Street/Shenandoah Road. Intersection improvement.

Project includes additional $1,000,000 of Local funds)

Near Peddler Hill, from east of Cat Creek to west of Foster Meadow Road. Rehabilitate pavement.Near Silver Lake, from east of Peddler Hill Road to west of Tragedy Springs Road. Rehabilitate pavement.Near Silver Lake, from east of Kays Road to the Alpine County line. Rehabilitate pavement.In Amador and Tuolumne counties, at various locations. Construct shoulder and centerline rumble strips.Near Valley Springs, at and near St. Andrews Road. Install two-way left turn lane.In Valley Springs, at Vista Del Lago Drive. Signalize intersection.

Page 40: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

10 Calaveras 4 29.6/0.0 0V300 0332 1000020458 201.378 2015/16 $ 38 $ 1,742 $ - NH $ 240 $ 540 $ 126 $ 351 $ 1,257

10 Calaveras 4 R0.0/R21.1 0X390 3063 1012000291 201.121 2014/15 $ - $ 5,510 $ - NH $ 30 $ 110 $ 6 $ 300 $ 446

10 Calaveras 4 43.8/44.2 0F280 3248 1000000033 201.335 2015/16 $ 595 $ 10,424 $ - NH $ 2,133 $ 1,252 $ 157 $ 1,330 $ 4,872

10 Merced 140 11.3/0.0 0P800 0330 1012000052 201.111 2014/15 $ 122 $ 1,078 $ - HBRR-S $ 430 $ 380 $ 6 $ 440 $ 1,256

10 Merced 140 0.0/42.1 0Y110 3018 1013000108 201.015 2017/18 $ 23 $ 2,940 $ - STP $ 819 $ 873 $ 280 $ 704 $ 2,676

10 Merced 140 6.1/35.8 0Y740 3023 1014000032 201.121 2016/17 $ 485 $ 22,800 $ - NH $ 1,380 $ 1,450 $ 215 $ 1,380 $ 4,425

10 Merced 140 40.7/0.0 0X300 3029 1012000209 201.010 2015/16 $ 58 $ 483 $ - STP $ 65 $ 201 $ 2 $ 52 $ 320

10 Merced 152 R0.0/R2.4 0W140 3012 1012000042 201.010 2015/16 $ 3 $ 5,434 $ - STP $ 553 $ 804 $ 4 $ 684 $ 2,045

10 Merced 165 29.8/30.3 0Q290 0262 1000000201 201.010 2015/16 $ 369 $ 3,212 $ - STP $ 689 $ 1,119 $ 420 $ 784 $ 3,012

10 Merced 165 35.6/36.1 0U290 3006 1000020436 201.015 2015/16 $ 674 $ 1,554 $ - STP $ 308 $ 780 $ 490 $ 400 $ 1,978

10 Merced 5 0.4/0.9 0W620 3008 1012000020 201.235 2017/18 $ - $ 2,271 $ - NH $ 121 $ 589 $ - $ 827 $ 1,537

10 Merced 5 21.4 0X610 3064 1013000003 201.119 2014/15 $ - $ 2,201 $ - HBRR-S $ 20 $ 70 $ 10 $ 450 $ 550

10 Merced 59 12.8/13.5 0U520 3005 1000020459 201.010 2015/16 $ 818 $ 1,500 $ - STP $ 699 $ 727 $ 598 $ 369 $ 2,393

10 Merced 59 23.3/33.7 0Y910 3061 1014000063 201.121 2014/15 $ - $ 2,600 $ - NH $ 30 $ 110 $ 6 $ 300 $ 446

10 Merced 99 15.1/16.0 0X630 3021 1013000093 201.235 2015/16 $ - $ 2,120 $ - NH $ 202 $ 460 $ 20 $ 407 $ 1,089

10 Merced 99 23.7/R30.4 0Y630 3069 1013000269 201.010 2015/16 $ 7 $ 4,168 $ - STP $ 286 $ 686 $ 29 $ 633 $ 1,634

10 Merced VAR 0T810 0265 1000000297 201.361 2015/16 $ 15 $ 280 $ - NH $ - $ 508 $ 377 $ 252 $ 1,137

10 Mariposa 140 42.0/42.7 0P921 0280 1014000148 201.131 2015/16 $ 1,500 $ 96,100 $ - NH $ 5,900 $ 7,000 $ 350 $ 7,000 $ 20,250

10 Mariposa 140 22.1/25.3 0G340 4736 1013000078 201.121 2017/18 $ 13 $ 3,126 $ - NH $ 208 $ 410 $ 2 $ 314 $ 934

Near Angels Camp. Also in Mariposa county on Routes 49, and 140 at various locations. Upgrade pedestrian facilities.

In and near Copperopolis, from Stanislaus County line to Route 49. Rehabilitate pavement.From White Pines to Big Trees State Park. Construct retaining walls and shoulders for sediment control.Near Gustine, at North Branch Mud Slough Bridge # 39-009. Scour mitigation.Near the city of Merced at various locations, from Route 5 to 6 miles east of the city of Merced. Upgrade metal beam guardrails

In and near the city of Merced, from east Junction 33 to Route 99. Rehabilitate pavement.Near Merced, at Arboleda Drive; also in Atwater on Route 99 at Applegate Road off-ramp; and in Stanislaus County in Riverbank on Route 108 at Eighth Street. Add flashing beacons and advance warning signs.

Near Pacheco State Park, from east of Fifield Road in Santa Clara County to west of Vista Point in Merced County. Construct median barrier.

Near Hilmar, from south of Westside Boulevard to River Road. Correct roadway curve and widen shoulders.Near Hilmar, from north of Johnson Avenue to south of Bradburry Road. Install left turn channelization.Near Firebaugh, at the John “Chuck” Erreca Safety Roadside Rest Area (SRRA). Upgrade water and wastewater system.

In Santa Nella, at the San Luis Wasteway Bridge No. 39-0167L/R. Repair Bridge deck, approach, and departure slabs.

In the city of Merced, at Mission Avenue/Dickenson Ferry Road. Left turn channelization.In and near Snelling, from north of Oakdale Road to La Grange Road. Rehabilitate pavement.In the city of Merced, from O Street to north of Junction Route 140/59. Roadside safety improvement.In and near Livingston, from north of West Atwater Overhead to Winton Parkway Overcrossing. Install median barrier.

In Merced County, on Routes 59, 99, 140, and 152 at various locations. Construct pedestrian ramps and sidewalks.

Near El Portal and Yosemite National Park, 0.5 miles west of South Fork Merced River. Construct rockshed.Near Mariposa, from the north Junction of Route 140 and 49 to Whitlock Road. Rehabilitate pavement.

Page 41: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

10 San Joaquin 12 5.0/11.0 0W560 0323 1012000010 201.121 2014/15 $ 2 $ 7,777 $ - NH $ 36 $ 670 $ 9 $ 739 $ 1,454

10 San Joaquin 120 6.5/16.7 0Y950 3062 1014000070 201.121 2014/15 $ 20 $ 3,700 $ - NH $ 30 $ 110 $ 10 $ 300 $ 450

10 San Joaquin 132 0.4/7.1 0G820 7835 1013000073 201.120 2015/16 $ 2 $ 30,801 $ - NH $ 1,035 $ 2,024 $ 315 $ 3,334 $ 6,708

10 San Joaquin 205 L0.0/R13.4 1C210 3073 1014000104 201.315 2014/15 $ 10 $ 6,769 $ - NH $ 609 $ 812 $ 338 $ 1,015 $ 2,774

10 San Joaquin 4 R16.2/0.0 0W110 3014 1000020426 201.010 2014/15 $ 28 $ 2,160 $ - STP $ 250 $ 400 $ 25 $ 260 $ 935

10 San Joaquin 4 16.0/19.4 0X970 3058 1013000114 201.315 2014/15 $ 15 $ 3,227 $ - NH $ 105 $ 271 $ 10 $ 215 $ 601

10 San Joaquin 4 R16.6 1C090 3065 1014000133 201.119 2014/15 $ - $ 6,248 $ - HBRR-S $ 30 $ 150 $ 20 $ 1,362 $ 1,562

10 San Joaquin 4 0.0/R8.3 3A750 7012 1013000253 201.121 2014/15 $ - $ 6,300 $ - NH $ 150 $ 400 $ 50 $ 800 $ 1,400

10 San Joaquin 5 0G720 0337 1012000039 201.113 2016/17 $ - $ 2,195 $ - HBRR-S $ - $ 1,490 $ 10 $ 1,174 $ 2,674

10 San Joaquin 5 41.7/45.9 0X540 3015 1012000303 201.010 2015/16 $ - $ 2,992 $ - STP $ 308 $ 654 $ 4 $ 520 $ 1,486

10 San Joaquin 580 5.0/15.3 0Q170 0164 1000020646 201.121 2014/15 $ - $ 14,007 $ - NH $ 41 $ 501 $ 13 $ 1,151 $ 1,706

10 San Joaquin 580 4.8/15.4 0W750 3068 1012000047 201.315 2014/15 $ - $ 8,330 $ - NH $ 111 $ 422 $ 2 $ 1,269 $ 1,804

10 San Joaquin 580 0.0/5.0 0G810 7901 1012000004 201.120 2014/15 $ 12 $ 15,439 $ - NH $ 17 $ 1,271 $ 9 $ 2,069 $ 3,366

10 San Joaquin 88 16.4/25.4 0Q180 0165 1013000025 201.121 2017/18 $ - $ 6,100 $ - NH $ 100 $ 400 $ 50 $ 750 $ 1,300

10 San Joaquin 88 15.4/19.4 0Y680 3057 1014000016 201.010 2014/15 $ - $ 591 $ - STP $ 69 $ 84 $ 25 $ 173 $ 351

Near Terminous, from Potato Slough Bridge to east of Flag City Boulevard. Rehabilitate pavement.In and near Manteca, from west of Vasconcellos Avenue to west of Escalon Bellota/McHenry Avenue. Rehabilitate pavement.

Near Vernalis, from east of Route 580 to Stanislaus County line. Rehabilitate roadway.Near Tracy, from Route 5 in San Joaquin County to Route 580 in Alameda County. Install Intelligent Transportation System (ITS).

In Stockton, at the connector ramp from eastbound Route 4 to southbound Route 5. Place high friction surface material and upgrade guardrail and signs.

In Stockton, between Interstate 5 and Route 99; also on local roads from Route 99 to the District Transportation Management Center (TMC). Install fiber optic lines, Changeable message signs, CCTVs -Traffic Monitoring stations.

In Stockton, at the Crosstown Freeway Viaduct Bridge No 29-0269. Reconstruct hinges, replace joint seals and bearing pads.

Near Holt, from the Contra Costa County line to east of Bacon Island Road/Trapper Road. Rehabilitate pavement.

In Stockton, at Route 5/4 Separation Bridge No. 29-0232R/L, Route 4/5 Connector Undercrossing Bridge No. 29-0235R/L and Route 5/4 Connector viaduct Bridge No. 29-0233H. Seismic retrofit.

Near Thornton, from Turner Road to Beaver Slough Bridge. Construct double thrie beam median barrier.Near Tracy, from Route 132 Westbound on-ramp to west of Corral Hollow Road. Rehabilitate pavement.In and near Tracy, from Route 5 to Route 205. Install fiber optic lines, changeable message signs, closed circuit televisions and Traffic Monitoring stations.

Near Tracy, from Junction Interstate 5 to Junction 132. Pavement repair and widen shoulders.Near Lockeford, from east of Disch Road to the Amador County line. Rehabilitate pavement.In San Joaquin County, on Route 88 from east of View Lane to west of Mokelumne River Bridge; also in Calaveras County on Route 4 from east of Hodson Road to west of Hunt Road. Install centerline and shoulder rumble strips.

Page 42: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

10 San Joaquin 99 0.0/5.7 0Q160 0163 1013000255 201.121 2017/18 $ - $ 13,800 $ - NH $ 150 $ 700 $ 50 $ 1,700 $ 2,600

10 San Joaquin 99 0.0/0.3 0L020 0321 1013000053 201.110 2017/18 $ 133 $ 17,355 $ - HBRR-S $ 868 $ 1,736 $ 868 $ 2,603 $ 6,075

10 San Joaquin 99 23.8/38.8 0X450 3016 1013000061 201.015 2015/16 $ 12 $ 2,746 $ - STP $ 272 $ 621 $ 3 $ 443 $ 1,339

10 San Joaquin 99 18.5/22.9 0Y900 3060 1014000044 201.121 2014/15 $ - $ 5,000 $ - NH $ 30 $ 110 $ 6 $ 300 $ 446

10 San Joaquin VAR 0P550 0338 1012000055 201.113 2017/18 $ 34 $ 23,373 $ - HBRR-S $ 900 $ 2,000 $ 50 $ 2,650 $ 5,600

10 San Joaquin VAR 1C000 3071 1014000105 201.170 2014/15 $ - $ 1,200 $ - NH $ 63 $ 359 $ 5 $ 368 $ 795

10 San Joaquin VAR 1C220 3072 1014000103 201.315 2014/15 $ 50 $ 5,320 $ - NH $ 480 $ 967 $ 286 $ 776 $ 2,509

10 Stanislaus 108 0W900 3010 1012000082 201.378 2017/18 $ 32 $ 1,126 $ - NH $ 609 $ 931 $ 310 $ 610 $ 2,460

10 Stanislaus 108 33.1/36.1 0X320 3019 1012000212 201.010 2014/15 $ - $ 1,035 $ - STP $ 164 $ 322 $ 2 $ 184 $ 672

10 Stanislaus 120 0.0/4.1 0K140 9649 1013000051 201.121 2014/15 $ 2 $ 3,948 $ - NH $ 116 $ 384 $ 2 $ 374 $ 876

10 Stanislaus 132 1.1/1.8 0T780 0348 1000000746 201.010 2015/16 $ 1,072 $ 3,264 $ - STP $ 464 $ 1,190 $ 341 $ 617 $ 2,612

10 Stanislaus 5 27.0/27.5 0W630 3009 1012000021 201.235 2016/17 $ - $ 2,387 $ - NH $ 124 $ 592 $ - $ 728 $ 1,444

10 Stanislaus 5 17.3/25.5 0Y640 3076 1013000270 201.010 2015/16 $ 6 $ 4,887 $ - STP $ 391 $ 538 $ 49 $ 489 $ 1,467

10 Stanislaus 5 0K340 9050C 1014000166 201.315 2014/15 $ 41 $ 3,461 $ - NH $ 225 $ 474 $ 50 $ 485 $ 1,234

10 Stanislaus 99 M18.7/0.0 0X560 3011 1012000313 201.010 2015/16 $ 3 $ 2,184 $ - STP $ 155 $ 669 $ 1 $ 615 $ 1,440

10 Stanislaus 99 R11.7/R15.0 0Y100 3070 1013000268 201.010 2015/16 $ 3 $ 2,639 $ - STP $ 142 $ 630 $ 3 $ 318 $ 1,093

10 Tuolumne 108 R16.1/R18.1 40160 0126 1013000049 201.121 2017/18 $ - $ 2,046 $ - NH $ - $ 434 $ 11 $ 61 $ 506

10 Tuolumne 108 L5724/0.0 0P670 0155 1000000191 201.330 2014/15 $ - $ 367 $ - NH $ 87 $ 199 $ 1 $ 72 $ 359

In and near Ripon, from the Stanislaus County line to south of South Junction Route 120 Separation. Rehabilitate pavement.

In Ripon, at the San Joaquin/ Stanislaus County line. At the Stanislaus River Bridge No. 29-0013L/R. Rehabilitate Bridge.

In San Joaquin County from south of Morada Lane to the Sacramento County line at various locations. Upgrade guardrail and guardrail end treatment.

In and near Stockton, from north of Marsh Street Pedestrian Overcrossing to Hammer Lane Overcrossing. Rehabilitate pavement.

In San Joaquin, Merced, and Stanislaus counties at various bridge locations. Bridge seismic retrofit.In San Joaquin, Amador, Calaveras, Mariposa, Merced, Stanislaus, and Tuolumne counties on various highways at various locations. Upgrade highway signs and lighting.

In San Joaquin, Mariposa, Merced, Stanislaus, and Tuolumne counties on various highways at various locations. Upgrade and/or replace aging Intelligent Transportation Systems (ITS) components.

Near Modesto and Riverbank, on Routes 108 and 132 at various locations. Upgrade curb ramps, sidewalk and crosswalks.

Also in Merced County on Route 165 (PM 28.1/32.4). Construct shoulder and centerline rumble strips.Near Oakdale, from the Stanislaus County line to west of the Stanislaus River Bridge. Rehabilitate pavement.Near Modesto, at Kasson Road/River Road. Install traffic signal and widen intersection.Near Westley, at the Westley Safety Roadside Rest Area (SRRA). Upgrade water and wastewater systems.Near Patterson, from Hansen Road to Hamilton Road. Install cable median barrier.In Stanislaus County, on Routes 5 and 99 at various locations. Install fiber optic lines, changeable message signs, and CCTVs -Traffic Monitoring stations.

In Modesto, at the southbound off-ramp at Carpenter/Briggsmore Avenue. Reconstruct off-ramp.In and near Modesto, from north of North Street to Tuolumne Bridge. Install highway lighting.Near Long Barn, from Lyons Dam Road to west of Long Barn Connection. Rehabilitate pavement.In Sonora, at the Old Sonora Maintenance Station. Clean up soil and groundwater.

Page 43: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

10 Tuolumne 120 R19.5/R20.0 0L970 0031 1012000053 201.110 2014/15 $ - $ 13,700 $ - HBRR-S $ - $ 1,629 $ 4 $ 4,151 $ 5,784

10 Tuolumne 120 11.2/18.2 3A730 0282 1013000050 201.121 2016/17 $ 58 $ 29,200 $ - NH $ 1,680 $ 2,520 $ 280 $ 1,680 $ 6,160

10 Tuolumne 49 1C030 3053 1013000066 201.010 2014/15 $ 2 $ 426 $ - STP $ 25 $ 169 $ 14 $ 125 $ 333

10 Tuolumne 49 R8.8/12.8 0X420 3059 1013000134 201.121 2014/15 $ - $ 1,200 $ - NH $ 28 $ 105 $ 4 $ 95 $ 232

11 Imperial 111 23.9/40.5 2M740 0544 1114000075 201.121 2014/15 $ - $ 4,600 $ - NH $ 5 $ 490 $ 5 $ 495 $ 995

11 Imperial 8 R45.5/R55.0 41360 0534 1113000036 201.122 2014/15 $ 5 $ 66,980 $ - NH $ 711 $ 2,125 $ 2 $ 8,633 $ 11,471

11 Imperial 8 R65.0/R74.5 41370 0546 1114000112 201.122 2014/15 $ 5 $ 65,564 $ - NH $ 833 $ 2,725 $ 5 $10,520 $ 14,083

11 Imperial 8 R28.0/R40.9 2M780 0597 1114000092 201.121 2014/15 $ - $ 5,460 $ - NH $ - $ 540 $ 3 $ 730 $ 1,273

11 Imperial 8 R90.0/R96.8 41690 1121 1114000006 201.122 2014/15 $ 5 $ 48,959 $ - NH $ 741 $ 2,387 $ 7 $ 6,567 $ 9,702

11 San Diego 125 9.8/12.4 29200 1087 1113000045 201.335 2016/17 $ - $ 2,780 $ - NH $ 257 $ 819 $ 10 $ 812 $ 1,898

11 San Diego 15 R6.5/R10.9 41330 1122 1114000037 201.121 2014/15 $ - $ 16,697 $ - NH $ - $ 1,485 $ 2 $ 2,136 $ 3,623

11 San Diego 163 3.6 41680 1098 1113000121 201.010 2015/16 $ 4 $ 1,719 $ - STP $ - $ 780 $ 3 $ 514 $ 1,297

11 San Diego 163 2.5/4.0 41530 1103 1113000018 201.015 2016/17 $ - $ 6,193 $ - STP $ 404 $ 665 $ 2 $ 1,086 $ 2,157

11 San Diego 5 R20.3/R21.2 00271 0778A 1113000115 201.310 2014/15 $ - $ 1,000 $ - NH $ - $ 376 $ 14 $ 517 $ 907

11 San Diego 5 R31.7 28230 0909 1100000313 201.335 2014/15 $ - $ 1,303 $ - NH $ 241 $ 337 $ 31 $ 339 $ 948

11 San Diego 5 R48.7/R59.6 29930 1048 1112000052 201.119 2015/16 $ 23 $ 1,490 $ - HBRR-S $ - $ 630 $ 4 $ 602 $ 1,236

Near Moccasin, east of Yosemite Junction at James E. Roberts Memorial Bridge No. 32-0018. Replace deck and retrofit bridge.

In Tuolumne County and Stanislaus County, near Oakdale and Sonora, from west of Lancaster Road to Moccasin Creek Bridge. Rehabilitate pavement.

Near Sonora, at Jamestown Road/Main Street; and on Route 108 at Mono Way and at Soulsbyville Road. Upgrade traffic signals, improve sight distance and install vehicle detector loops.

In and near Chinese Camp, from Route 120 to Chicken Ranch Road. Rehabilitate pavement.In and near Brawley and Calipatria, from New River Bridge to Main Street. Place asphalt rubber seal coat.Near El Centro, from west of Anderholt Road to east of E. Highline Canal Bridge. Roadway rehabilititation.Near Calexico, from west of Route 98 to east of the All American Canal Bridges. Pavement rehabilitation.In and near El Centro, east of Westside Road to Route 111. Place asphalt rubber overlay.Near Yuma, Arizona, from Pilot Wash Bridge to east of Fourth Avenue Overcrossing. Pavement rehabilitation.

In and near Lemon Grove, from Paradise Valley Road to north of Troy Street. Repair median erosion and implement storm water quality measures.

In the city of San Diego, from south of San Diego Mission Road to north of Route 52. Roadway rehabilitation.In the city of San Diego, at Route 8. Apply high friction surface treatment, improve drainage, and enhance striping.

In the city of San Diego, from Robinson Avenue to San Diego River. Safety enhancements that include lighting, rumble strips, striping, lighting, bridge rail end treatments and high friction surface treatment.

In the city of San Diego, from south of Fiesta Island Road to north of Tecolote Creek Bridge. Landscape mitigation.In the city of San Diego, at 0.1 miles south of Carmel Mountain Road. Retrofit permanent treatment BMP's, slope stabilization.

In and near Carlsbad and Oceanside, at various locations. Apply methacrylate bridge deck treatment, and repair joint seals and loose concrete.

Page 44: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

11 San Diego 5 41060 1060 1112000106 201.378 2014/15 $ 323 $ 1,979 $ - NH $ 252 $ 1,212 $ 94 $ 618 $ 2,176

11 San Diego 5 R0.3/5.4 41090 1104 1112000138 201.235 2016/17 $ 60 $ 3,101 $ - NH $ 353 $ 639 $ 68 $ 1,048 $ 2,108

11 San Diego 5 3.9/9.2 24400 1107 1114000045 201.315 2016/17 $ 43 $ 8,706 $ - NH $ 800 $ 1,200 $ 23 $ 1,600 $ 3,623

11 San Diego 52 3.8/6.6 29280 1088 1113000044 201.335 2017/18 $ - $ 2,751 $ - NH $ 214 $ 566 $ 10 $ 719 $ 1,509

11 San Diego 54 0.0/T13.0 40960 1099 1112000048 201.235 2015/16 $ 30 $ 1,957 $ - NH $ 244 $ 629 $ 17 $ 703 $ 1,593

11 San Diego 67 6.7/19.0 40320 0670 1100000545 201.010 2015/16 $ 33 $ 43,000 $ - STP $ 1,800 $ 1,500 $ 50 $ 2,800 $ 6,150

11 San Diego 67 21.0/21.9 41490 1070 1112000206 201.310 2014/15 $ 3,811 $ 5,078 $ - NH $ 518 $ 1,298 $ 1,985 $ 1,346 $ 5,147

11 San Diego 67 9.3/11.2 41470 1094 1112000191 201.010 2015/16 $ 70 $ 3,355 $ - STP $ 476 $ 746 $ 9 $ 514 $ 1,745

11 San Diego 75 R21.0/R21.6 40930 1059 1112000070 201.110 2014/15 $ 2 $ 20,031 $ - HBRR-S $ 368 $ 691 $ 2 $ 3,354 $ 4,415

11 San Diego 75 R20.3/R22.0 26220 1063 1100000215 201.110 2016/17 $ 32 $ 12,261 $ - HBRR-S $ 426 $ 1,243 $ 103 $ 2,192 $ 3,964

11 San Diego 76 32.6/33.2 40570 1020 1100020265 201.010 2015/16 $ 1,924 $ 5,160 $ - STP $ 1,205 $ 1,163 $ 815 $ 1,030 $ 4,213

11 San Diego 76 22.2/47.1 29910 1067 1100000421 201.112 2016/17 $ - $ 2,086 $ - HBRR-S $ 202 $ 1,342 $ 1 $ 1,015 $ 2,560

11 San Diego 78 0.0/R16.5 41570 1095 1113000008 201.010 2015/16 $ - $ 8,749 $ - STP $ 456 $ 1,041 $ 11 $ 1,869 $ 3,377

11 San Diego 78 0.6/10.9 40980 1096 1112000050 201.235 2015/16 $ 60 $ 2,083 $ - NH $ 243 $ 597 $ 47 $ 566 $ 1,453

In San Diego County, on Routes 5, 54, 75, and 78 and in Imperial County on Route 115, at various locations. Install and upgrade curb ramps.

In the city of San Diego, at various locations from Camino De La Plaza to Main Street. Improve maint. worker safety by constructing Maintenance Vehicle Pullouts (MVP), paving misc. areas,and repairing damaged systems that require frequent maint.

In the cities of San Diego, Chula Vista, and National City, at various locations from Coronado Avenue to north of E Street. Install ramp meters.

In the city of San Diego from Route 805 to Route 163. Repair median erosion and implement storm water quality measures.

In and near National City and Chula Vista, at various locations from Route 5 to Route 125. Install access gates, pullouts, pave gore areas, and shield or relocate cabinets and poles to improve safety for maintenance personnel.

In and near Poway, from Willow Road to Shady Oaks Drive. Construct median barrier.Near Ramona, at Highland Valley Road/Dye Road. Widen intersection; add lanes, shoulders, and new traffic signals. (Local Contribution: $3,050,000).

Near Poway, from Slaughter House Canyon Road to 1.9 miles north of Slaughter House Canyon Road. Drainage and paving improvements to reduce wet pavement incidents.

In the city of San Diego, north of Glorietta Boulevard. Paint steet surfaces and build traveler systems.In the cities of San Diego and Coronado, at the San Diego-Coronado Bay Bridge No. 57-0857 and related facilities. Rehabilitate and upgrade bridge electrical components.

Near Rincon, from west of Rincon Springs Road to west of Water Mountain Road. Construct roundabout and realign curve.

Near Palomar Mountain State Park, from Gomez Creek Bridge No. 57-0158 to San Luis Rey River Bridge No. 57-0713L at various locations. Bridge rail upgrade.

In Oceanside, Vista, San Marcos and Escondido, from Route 5 to Route 15. Install enhanced lighting and concrete barrier, improve striping, and place markers.

In Oceanside, Vista, and San Marcos, from west of Jefferson Street to east of Rancho Santa Fe Road at various locations. Install access gates, pullouts, pave gore areas, and construct concrete barrier.

Page 45: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

11 San Diego 79 0.1/29.5 40800 1066 1100020480 201.112 2014/15 $ 20 $ 1,610 $ - HBRR-S $ - $ 840 $ 2 $ 583 $ 1,425

11 San Diego 8 R37.8/R39.4 26041 0651 1100000203 201.335 2014/15 $ - $ 4,746 $ - NH $ 360 $ 953 $ 2 $ 1,100 $ 2,415

11 San Diego 8 6.9/8.2 40550 1044 1100020122 201.015 2014/15 $ 3 $ 12,640 $ - STP $ - $ 1,529 $ 25 $ 2,043 $ 3,597

11 San Diego 8 T0.5/R0.7 40860 1061 1112000016 201.121 2016/17 $ 1 $ 6,223 $ - NH $ - $ 980 $ 3 $ 1,858 $ 2,841

11 San Diego 8 9.0/15.3 40870 1062 1112000017 201.121 2016/17 $ 1 $ 17,423 $ - NH $ 302 $ 989 $ 7 $ 2,681 $ 3,979

11 San Diego 8 R0.1/R2.0 41480 1068 1112000193 201.010 2016/17 $ 73 $ 8,142 $ - STP $ 824 $ 1,240 $ 181 $ 1,872 $ 4,117

11 San Diego 8 49.0/0.0 40910 1085 1112000043 201.235 2016/17 $ - $ 3,275 $ - NH $ 409 $ 879 $ 20 $ 799 $ 2,107

11 San Diego 8 16.0/R30.5 41540 1093 1113000013 201.015 2014/15 $ - $ 3,180 $ - STP $ 408 $ 663 $ 11 $ 537 $ 1,619

11 San Diego 8 R0.2/R23.6 40970 1100 1112000049 201.235 2015/16 $ 30 $ 2,118 $ - NH $ 349 $ 702 $ 17 $ 578 $ 1,646

11 San Diego 8 15.3/R21.6 41350 1102 1113000038 201.121 2017/18 $ - $ 13,255 $ - NH $ - $ 1,377 $ 2 $ 2,697 $ 4,076

11 San Diego 8 5.4/10.6 23796 1108 1114000046 201.315 2016/17 $ 23 $ 11,579 $ - NH $ 750 $ 1,220 $ 10 $ 2,100 $ 4,080

11 San Diego 805 0.3/4.0 41120 1084 1112000141 201.235 2017/18 $ 60 $ 3,825 $ - NH $ 373 $ 768 $ 25 $ 939 $ 2,105

11 San Diego 805 15.7/17.5 41080 1086 1112000137 201.235 2016/17 $ - $ 2,174 $ - NH $ 260 $ 609 $ 14 $ 796 $ 1,679

11 San Diego 94 59.7/60.2 29520 0919 1100000392 201.010 2015/16 $ 304 $ 5,125 $ - STP $ 790 $ 884 $ 185 $ 1,120 $ 2,979

At various locations, from Samagatuma Creek to Matagual Creek Bridge. Replace bridge railing at 4 bridges.

Near Pine Valley, from Route 79 to 1.6 miles east of Route 79. Construct drainage improvements.In the city of San Diego, from west of Waring Road to west of College Avenue. Upgrade median metal beam guardrail to concrete barrier.

In the city of San Diego, from Nimitz Boulevard to west of Presidio Park Overcrossing. Pavement rehabilitation.

In the cities of San Diego, La Mesa, and El Cajon, from west of Lake Murray Boulevard to Johnson Avenue. Pavement rehabilitation.

In the city of San Diego, from west of Morena Boulevard to east of Hotel Circle North interchange ramps. Enhance striping and signage in westbound direction.

Near Pine Valley, at Buckman Springs Safety Roadside Rest Area (SRRA). Rehabilitate SRRA sewer and water systems.

In and near El Cajon, from Ballantyne Street to 0.4 mile east of East Victoria Drive. Enhance existing striping and rumble strips, and upgrade guard railing.

In and near the cities of San Diego, La Mesa, and El Cajon, at various locations from Route 5 to east of Lake Jennings Park Road. Install access gates, pullouts, pave gore areas, and shield or relocate cabinets and poles to improve safety for maintenanc

In and near El Cajon, from Johnson Avenue to west of Lake Jennings Park Road. Pavement rehabilitation.In the cities of San Diego and La Mesa, from west of Route 15 to Flecher Parkway. Transportation management systems.

In the cities of San Diego and Chula Vista, from south of San Ysidro Boulevard to north of Main Street at various locations. Construct Maintenance Vehicle Pullouts (MVP), paving, construct concrete barrier and other measures.

In the city of San Diego, from Landis Street to Route 8. Improve maint. worker safety by relocating equip. away from traffic, installing access gates, constructing Maintenance Vehicle Pullouts (MVP), replace MBGR with conc. barrier, and other measures.

Near Manzanita, from 0.8 to 1.3 miles east of Campo Creek Bridge. Realign curve, widen shoulders, and remove fixed objects from clear recovery zone.

Page 46: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

11 San Diego 94 29920 1053 1100000422 201.113 2014/15 $ 79 $ 8,944 $ - HBRR-S $ - $ 1,707 $ 14 $ 1,479 $ 3,200

11 San Diego 94 46.9/R58.9 40900 1064 1112000042 201.112 2016/17 $ 40 $ 2,220 $ - HBRR-S $ 371 $ 840 $ 2 $ 1,036 $ 2,249

11 San Diego 94 7.2/10.5 41110 1083 1112000140 201.235 2017/18 $ - $ 3,808 $ - NH $ 456 $ 1,071 $ 35 $ 1,224 $ 2,786

11 San Diego VAR 40580 1022 1100020271 201.361 2017/18 $ 90 $ 4,394 $ - NH $ 436 $ 1,999 $ 118 $ 976 $ 3,529

11 San Diego VAR 40640 1029 1100020325 201.015 2015/16 $ - $ 5,559 $ - STP $ 465 $ 998 $ 5 $ 976 $ 2,444

11 San Diego VAR 40760 1045 1100020422 201.015 2014/15 $ 200 $ 5,065 $ - STP $ 465 $ 987 $ 45 $ 819 $ 2,316

11 San Diego VAR 41550 1089 1113000002 201.315 2016/17 $ - $ 4,362 $ - NH $ 160 $ 573 $ 2 $ 703 $ 1,438

11 San Diego VAR 41600 1090 1113000046 201.315 2017/18 $ - $ 4,266 $ - NH $ 169 $ 570 $ 2 $ 792 $ 1,533

11 San Diego VAR 41780 1120 1114000039 201.119 2015/16 $ - $ 1,656 $ - HBRR-S $ - $ 520 $ 4 $ 730 $ 1,254

12 Orange 1 0N820 2200B 1214000112 201.315 2014/15 $ - $ 2,100 $ - NH $ 150 $ 500 $ 15 $ 400 $ 1,065

12 Orange 1 9.3/0.0 0M990 2293 1213000086 201.110 2016/17 $ 230 $ 1,164 $ - HBRR-S $ 53 $ 88 $ 18 $ 88 $ 247

12 Orange 1 11.6/11.9 0N260 2314 1213000186 201.335 2017/18 $ - $ 935 $ - NH $ 200 $ 470 $ 10 $ 335 $ 1,015

12 Orange 1 22.1/29.9 0M470 2420 1212000065 201.010 2015/16 $ 20 $ 2,800 $ - STP $ - $ 1,100 $ 60 $ 900 $ 2,060

In San Diego County, on Routes 94, 125, and 805 at various locations. Seismic retofit 7 bridges and bridge rail upgrade.

Near Campo at Campo Creek Bridge No. 57-0118, and 7 miles west of Manzanita at Campo Creek Bridge No. 57-0686,. Upgrade bridge rails and bridge approach rails.

In and near Lemon Grove at various locations, from west of College Avenue to Campo Road. Improve maint. worker safety by installing access gates and Maintenance Vehicle Pullouts (MVP), paving, construct concrete barrier and other measures.

In and near the cities of San Diego and National City, upgrade curb ramps to comply with Americans with Disabilities Act (ADA) standards.

In San Diego County, on various Routes at various locations. Upgrade bridge rail end treatments.In San Diego County, at various locations. Upgrade nonstandard bridge rail end treatments to current standards.

In San Diego and Imperial counties, on various routes at various locations. Replace and upgrade Traffic Management System (TMS) field elements including traffic controllers, detection stations, CCTV systems, and other aging data collection equipment.

In San Diego and Imperial counties, on various routes at various locations. Replace and upgrade Traffic Management System (TMS) field elements including communication HUBs, Highway Advisory Radio (HAR) systems, and other aging data collection equipment.

At various locations in San Diego County on various routes. Apply methacrylate bridge deck treatment and repair or replace joint seals.

In and near various cities on Routes 1, 74, 133, and 142 at various locations and at the District Traffic Management Center. Install Traffic Management System equipment and detection devices.

In Laguna Beach, at Route 133 (Broadway Street). Replace bridge. Financial Contribution Only (FCO)Near Laguna Beach, from north of Irvine Cove Drive to Moro Ridge Road. Storm water mitigation.In and near Huntington Beach, at the intersections of Brookhurst Street, Magnolia Street, Newland Street, Lake/1st Street, Goldenwest Street and Warner Avenue. Modify traffic signals and add lighting.

Page 47: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

12 Orange 133 R7.8/13.7 0N100 4839A 1213000102 201.235 2017/18 $ - $ 1,900 $ - NH $ 200 $ 340 $ 60 $ 400 $ 1,000

12 Orange 133 8.8/10.9 0N110 4849C 1213000116 201.131 2014/15 $ 2 $ 20,200 $ - NH $ 1,040 $ 2,157 $ 51 $ 2,652 $ 5,900

12 Orange 22 0N800 2864B 1214000110 201.315 2014/15 $ - $ 3,700 $ - NH $ 370 $ 888 $ 75 $ 1,110 $ 2,443

12 Orange 241 14.5/32.5 0J660 5490A 1212000105 201.335 2015/16 $ - $ 2,200 $ - NH $ 250 $ 500 $ 50 $ 600 $ 1,400

12 Orange 261 0.0/0.1 0H450 4926B 1200000218 201.335 2014/15 $ - $ 2,400 $ - NH $ 1,058 $ 750 $ 221 $ 922 $ 2,951

12 Orange 261 0.0/6.2 0J650 4926D 1212000104 201.335 2015/16 $ - $ 2,200 $ - NH $ 250 $ 550 $ 50 $ 650 $ 1,500

12 Orange 39 9.8/10.5 0H270 3184 1200000211 201.151 2016/17 $ 24 $ 2,838 $ - NH $ 233 $ 410 $ 8 $ 387 $ 1,038

12 Orange 405 0.2/8.7 0H226 4928B 1212000058 201.315 2014/15 $ - $ 4,330 $ - NH $ 487 $ 1,282 $ 7 $ 1,028 $ 2,804

12 Orange 405 2.6/6.5 0M350 4952B 1212000018 201.010 2015/16 $ - $ 16,280 $ - STP $ - $ 2,884 $ 13 $ 2,880 $ 5,777

12 Orange 405 8.4/0.0 0N540 5011A 1214000057 201.131 2014/15 $ 5,200 $ 16,800 $ - NH $ 400 $ 3,000 $ 650 $ 2,350 $ 6,400

12 Orange 405 0N250 5151A 1213000185 201.010 2015/16 $ 5 $ 1,606 $ - STP $ 252 $ 756 $ 13 $ 541 $ 1,562

12 Orange 5 23.2/30.3 0H234 1984 1214000037 201.315 2014/15 $ - $ 1,981 $ - NH $ 70 $ 480 $ 5 $ 300 $ 855

12 Orange 5 0N780 2530G 1214000108 201.315 2014/15 $ - $ 4,700 $ - NH $ 550 $ 800 $ - $ 800 $ 2,150

12 Orange 5 0N790 2530H 1214000109 201.315 2014/15 $ - $ 3,000 $ - NH $ 380 $ 650 $ - $ 650 $ 1,680

In and near Irvine, from south of Route 405 to north of Route 241. Enhance highway worker safety with access gates, miscellaneous paving, and other measures.

In Irvine, at the Route 5 interchange. Deep injection grouting at three locations.

In Orange County on Routes 22, 57, and 405 at various locations. Install computer hardware at various hubs and controller cabinets to provide for Internet Protocol (IP) based ethernet communications with field elements.

Near Rancho Santa Magarita, from Oso Parkway Overcrossing to Santiago Canyon Road overcrossing. Storm water mitigation.

In Irvine, at Walnut Avenue pumping plant. Construct groundwater transmission line. Financial Contribution Only (FCO)

In Irvine, from Walnut Avenue Overcrossing to Route 241 Interchange. Storm water mitigation.In Stanton, from south of Bever Place to south of Katella Avenue. Rehabilitate drainage system to alleviate flooding.

In and near Irvine and Costa Mesa, from Route 5 to Route 55. Upgrade existing communication cables with fiber optic cables, install new electronic equipment and upgrade CCTV system.

In Irvine, from south of Sand Canyon Avenue to north of Culver Drive. Extend auxiliary lane and replace temporary railing (type K) with permanent concrete median barrier.

In Costa Mesa, at Red Hill Avenue Overcrossing southern approach. Reconstruct failed slope embankment, retaining walls, and approach slab to re-open all lanes of local roadway.

In Irvine, Fountain Valley and Seal Beach at various locations, at Route 133, Brookhurst Street, Warner Avenue, and Seal Beach Boulevard. Increase ramp wet pavement friction by overlaying ramps and modifying drainage.

In Irvine and Tustin, from Route 133 to Route 55. Update software for Advanced Transportation Management System (ATMS).

In various cities on Routes 5, 73, 241 and 261 at various locations. Upgrade the existing analog closed circuit televisions to high-definition along freeway segments.

In various cities on Routes 5, 91 and 405 at various locations and at the District Traffic Management Center. Strengthen District traffic management system network security.

Page 48: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

12 Orange 5 1.2/2.2 0M490 2545 1212000090 201.010 2015/16 $ 14 $ 9,400 $ - STP $ - $ 1,940 $ 142 $ 1,633 $ 3,715

12 Orange 5 12.8/21.6 0N330 2659A 1213000197 201.121 2014/15 $ 5 $ 10,600 $ - NH $ - $ 1,420 $ 80 $ 1,790 $ 3,290

12 Orange 5 R23.8/0.0 0N220 2769D 1213000182 201.315 2014/15 $ - $ 3,500 $ - NH $ 105 $ 480 $ - $ 405 $ 990

12 Orange 5 33.3/34.5 0N080 2859A 1213000100 201.235 2016/17 $ - $ 4,600 $ - NH $ 270 $ 490 $ 90 $ 550 $ 1,400

12 Orange 55 0.0/17.9 0M500 3401A 1212000092 201.015 2016/17 $ - $ 14,110 $ - STP $ - $ 3,500 $ 20 $ 3,480 $ 7,000

12 Orange 55 9.6/12.0 0H890 3449 1212000063 201.235 2014/15 $ - $ 1,200 $ - NH $ 80 $ 150 $ - $ 130 $ 360

12 Orange 57 10.8/21.8 0N340 2119 1214000002 201.119 2014/15 $ - $ 2,737 $ - HBRR-S $ 25 $ 370 $ 16 $ 411 $ 822

12 Orange 57 11.0/R22.5 0L090 3743A 1200020235 201.121 2014/15 $ - $ 4,500 $ - NH $ 40 $ 608 $ 27 $ 675 $ 1,350

12 Orange 57 20.7/21.2 0N140 3848A 1213000125 201.010 2014/15 $ 5 $ 1,010 $ - STP $ 185 $ 550 $ 15 $ 350 $ 1,100

12 Orange 57 21.6/22.1 0N130 3851 1213000124 201.010 2014/15 $ 5 $ 375 $ - STP $ 75 $ 185 $ 15 $ 135 $ 410

12 Orange 73 16.4/16.6 0M340 4095H 1212000017 201.010 2014/15 $ - $ 1,670 $ - STP $ - $ 750 $ - $ 750 $ 1,500

12 Orange 73 23.6/25.2 0M110 4096D 1200020297 201.010 2014/15 $ - $ 2,200 $ - STP $ - $ 598 $ 27 $ 572 $ 1,197

12 Orange 73 22.5/R25.7 0M960 4096M 1213000068 201.121 2016/17 $ - $ 5,400 $ - NH $ - $ 514 $ 49 $ 690 $ 1,253

12 Orange 73 R26.1/R28.0 0H225 4096N 1212000057 201.315 2014/15 $ - $ 1,100 $ - NH $ 60 $ 250 $ 6 $ 250 $ 566

In San Clemente, at El Camino Real. Realign mainline horizontal curve, construct new approach slabs, and install warning sign structure and beacons.

In and near Mission Viejo, Laguna Hills, Lake Forest and Irvine, from south of Avery Parkway to Route 405. Pavement rehabilitation.

In Irvine at the Traffic Management Center (TMC) at Sand Canyon Avenue. Upgrade the existing audio-visual (AV) system.

In the cities of Santa Ana and Orange, from Broadway to the Santa Ana River; also on Route 22 from Santa Ana River to Main Street, and on Route 57 from Route 5 to Chapman Avenue. Enhance highway worker safety with access gates and other measures.

In Newport Beach, Costa Mesa, Santa Ana, Tustin, Orange and Anaheim, from Finley Avenue to Route 91. Upgrade metal beam guardrail (MBGR) and clean-up clear recovery zone.

In Tustin and Santa Ana, from McFaddden to 17th Street; also on Route 5 from Newport Avenue to 4th Street. Construct roadside paving, weed barriers and relocate facilities.

In various cities on Routes 57, 22 and 55, at various bridge locations. Repair bridge decks.In and near the cities of Orange, Anaheim, Placentia, Fullerton, and Brea, from north of Route 5 to Los Angeles County Line. Pavement rehabilitation.

In Brea, at Lambert Road. Widen on-ramp and increase skid resistance at off-ramp.In and near Brea, at northbound on-ramp from Lambert Road to the Tonner Canyon Road off-ramp. Add safety lighting.

In Laguna Beach, at northbound collector/distributor from El Toro Road on-ramp to Laguna Canyon Road (Route 133) off-ramp. Widen ramp terminal and modify signals.

In Newport Beach, from the MacArthur Boulevard northbound on-ramp to Birch Street northbound off-ramp. Widen on-ramp to extend lanes, and improve drainage on northbound lanes.

In and near Irvine and Newport Beach, from Bonita Canyon Road/New Ford Road to north of Campus Drive. Rehabilitate Pavement.

In Costa Mesa, from Route 405 to Route 55. Install fiber optic communication system, closed circuit television (CCTV), and electronic equipment.

Page 49: €¦ · XLS file · Web view2014-08-18 · 1500 50448 0 7000 3700 520 8400 19620. 5589 13290 0 2159 3720 373 3282 9534. 20 4390 0 437 1331 90 878 2736. 10 8000 0 400 1500 90 2000

Dist County Route Post Miles Location/Description EA PPNO EFIS Prog Code FY RW Con Vote Vote Date Fund Type PA & ED PS & E RW Sup Con Sup Total Sup

2014 SHOPP As of June 2014 Close-Out($1,000)

12 Orange 74 2.9/5.1 0L720 4124 1200020180 201.010 2015/16 $ 3,085 $ 8,615 $ - STP $ 1,300 $ 3,327 $ 1,250 $ 4,225 $ 10,102

12 Orange 90 0.6/8.0 0M910 4317 1213000036 201.378 2016/17 $ 760 $ 4,472 $ - NH $ 493 $ 1,200 $ 947 $ 1,150 $ 3,790

12 Orange 91 R0.0/R2.8 0H243 4506E 1214000038 201.315 2015/16 $ - $ 2,150 $ - NH $ 322 $ 538 $ 20 $ 430 $ 1,310

12 Orange 91 0.0/2.8 0M400 4507A 1212000064 201.235 2015/16 $ - $ 1,200 $ - NH $ 80 $ 150 $ - $ 130 $ 360

12 Orange 91 5.2/6.4 0N090 4558A 1213000101 201.235 2017/18 $ - $ 3,400 $ - NH $ 200 $ 340 $ 60 $ 400 $ 1,000

12 Orange 91 R13.8/0.0 0N270 4644A 1213000187 201.321 2017/18 $ - $ 3,373 $ - ST-CASH $ 422 $ 774 $ 18 $ 809 $ 2,023

Near San Juan Capistrano, from east of Antonio Parkway/La Pata Avenue to west of Conrock Entrance. Widen shoulders and construct centerline rumble strip, pullouts, metal beam guardrail, and drainage improvements.

In La Habra, Fullerton, Brea, and Placentia, from Route 39 (Beach Blvd.) to west of Rose Drive. Americans with Disabilities Act (ADA) improvements.

In La Palma and Buena Park, from Los Angeles County line to Stanton Avenue. Upgrade the communication systems.

In La Palma and Buena Park, from Los Angeles County line to Stanton Avenue. Construct roadside paving, access gates, weed barriers and relocate facilities.

In Anaheim and Placentia from State College boulevard to La Palma Avenue; also on Route 57 from south of La Palma Avenue to south of Orangethorpe Avenue. Enhance highway worker safety with access gates, miscellaneous paving and other measures.

Near Anaheim, at the westbound Peralta Weigh Station. Rehabilitate Commercial Vehicle Enforcement Facility (CVEF).