( x is tngA9 Cr oP · A9P12-AMJ-ENM-Z_ZZZZZ_XX-DR-GI-0015 ± Doc um ent N b r Revision Proje ct...

6
NCN7 HI110 IN27.01 Allt Cosach A 9 Slochd Summit Slochd Mór Cairn na Doire Leathain nan Gordonach Torr Mòr U2856 Creag an Tuim Bhig Continued on Sheet 2 NCN7 HI110 IN27.01 Allt Cosach A 9 Slochd Summit Slochd Mór Cairn na Doire Leathain nan Gordonach Torr Mòr U2856 Tomatin South Left-in/Left-out Creag an Tuim Bhig Continued on Sheet 2 Figure 9.2a Proposed Impacts on Paths and Proposed Mitigation Sheet 1 of 6 A9P12-AMJ-ENM-Z_ZZZZZ_XX-DR-GI-0020 ± Revision Document Number Project Originator Volume Location Type Role Number Title Client P04 0 0.25 0.5 Kilometres Proposed Scheme ( New Crossing Point to Replace Existing At-Grade Crossing ( Existing A9 Crossing Point ( Existing Crossing Point Maintained NMU Routes National Cycle Network Route Right of Way Core Path Other Route Planned Path NMU Mitigation Routes Diverted NCN Route Diverted NMU Route 1:10,000 Scale Drawn Checked Approved Authorised Status Suitability MM GK FINAL RM SB B Reproduced by permission of Ordnance Survey on behalf of HMSO. © Crown copyright and database right 2017. All rights reserved. Ordnance Survey Licence number 100046668 Baseline Scheme Design and Mitigation

Transcript of ( x is tngA9 Cr oP · A9P12-AMJ-ENM-Z_ZZZZZ_XX-DR-GI-0015 ± Doc um ent N b r Revision Proje ct...

Page 1: ( x is tngA9 Cr oP · A9P12-AMJ-ENM-Z_ZZZZZ_XX-DR-GI-0015 ± Doc um ent N b r Revision Proje ct Origin ato r Volume L ocati n Typ eR l Numb r Tit le Client P04 0 0.25 0.5 Kilometres

NCN7

HI110

NCN7

IN27.01

AlltCosach

Allt Braenrerich

A 9

SlochdSummit

SlochdMór

Carn a'Gharbh-choire

CarnBraenrerich

Cairn naDoire Leathain

nanGordonach

Carn Baile

TorrMòr

Braenrerich

U2856

Creag anTuim Bhig

Conti

nued

on Sh

eet 2

NCN7

HI110

NCN7

IN27.01

AlltCosach

Allt Braenrerich

A 9

SlochdSummit

SlochdMór

Carn a'Gharbh-choire

CarnBraenrerich

Cairn naDoire Leathain

nanGordonach

Carn Baile

TorrMòr

Braenrerich

U2856Tomatin SouthLeft-in/Left-out

Creag anTuim Bhig

Conti

nued

on Sh

eet 2

Figure 9.2aProposed Impacts on Paths

and Proposed MitigationSheet 1 of 6

A9P12-AMJ-ENM-Z_ZZZZZ_XX-DR-GI-0020±

RevisionDocument NumberProject Originator Volume

Location Type Role Number

Title

Client

P04

0 0.25 0.5

Kilometres

Proposed Scheme

( New Crossing Point to Replace ExistingAt-Grade Crossing

( Existing A9 Crossing Point

( Existing Crossing Point Maintained

NMU RoutesNational Cycle Network RouteRight of WayCore PathOther RoutePlanned Path

NMU Mitigation RoutesDiverted NCN RouteDiverted NMU Route

1:10,000Scale Drawn Checked Approved Authorised

Status Suitability

MM GK

FINAL

RM SB

B

Reproduced by permission of Ordnance Survey on behalf of HMSO.© Crown copyright and database right 2017. All rights reserved.Ordnance Survey Licence number 100046668

Baseline

Scheme Design and Mitigation

Page 2: ( x is tngA9 Cr oP · A9P12-AMJ-ENM-Z_ZZZZZ_XX-DR-GI-0015 ± Doc um ent N b r Revision Proje ct Origin ato r Volume L ocati n Typ eR l Numb r Tit le Client P04 0 0.25 0.5 Kilometres

(

(

Section 4

Section 8

Section 6

Section 7

Section 3

Section 5

P1

NCN7

IN27.02

HI110

P1

IN27

.03

IN27.0

2

Raigbeg

Tomatin

Strathdearn

R i v e r F i ndhorn

FindhornBridge

FindhornViaduct

Juniper Drive

Station Road

Tomatin House

Morilemore

Corrybrough

HighlandMain Line

A9

Porter'sLodge

Allt a' Choire Mhoir

Allt Neacrath

C1121

C1121Tomatin Road

C1121

U2856

Conti

nued

on Sh

eet 3Continued on Sheet 1

(

(

Section 4

Section 8

Section 6

Section 7

Section 3

Section 5

P1

NCN7

IN27.02

HI110

P1

IN27

.03

IN27.0

2

Raigbeg

Tomatin

Strathdearn

R i v e r F i ndhorn

FindhornBridge

FindhornViaduct

Juniper Drive

Station Road

Tomatin House

Morilemore

Corrybrough

HighlandMain Line

A9

Porter'sLodge

Allt a' Choire Mhoir

Allt NeacrathTomatin BusTurningCircle

C1121

C1121Tomatin Road

C1121

U2856

Conti

nued

on Sh

eet 3Continued on Sheet 1

Figure 9.2bProposed Impacts on Paths

and Proposed MitigationSheet 2 of 6

A9P12-AMJ-ENM-Z_ZZZZZ_XX-DR-GI-0019

±

RevisionDocument NumberProject Originator Volume

Location Type Role Number

Title

Client

P04

0 0.25 0.5

Kilometres

Proposed Scheme

( New Crossing Point to Replace ExistingAt-Grade Crossing

( Existing A9 Crossing Point

( Existing Crossing Point Maintained

NMU RoutesNational Cycle Network RouteRight of WayCore PathOther RoutePlanned Path

NMU Mitigation RoutesDiverted NCN RouteDiverted NMU Route

1:10,000Scale Drawn Checked Approved Authorised

Status Suitability

MM GK

FINAL

RM SB

B

Reproduced by permission of Ordnance Survey on behalf of HMSO.© Crown copyright and database right 2017. All rights reserved.Ordnance Survey Licence number 100046668

Baseline

Scheme Design and Mitigation

Page 3: ( x is tngA9 Cr oP · A9P12-AMJ-ENM-Z_ZZZZZ_XX-DR-GI-0015 ± Doc um ent N b r Revision Proje ct Origin ato r Volume L ocati n Typ eR l Numb r Tit le Client P04 0 0.25 0.5 Kilometres

(

(

(

(

NCN7

P2

P8

P5

P4

P3

P6

P8

P7

Secti

on 1

Section 4

Section 2

Secti

on 10

A

Section 3

Section 10

Section 5

HI95

P1

IN27

.02

The Bellhouse

TomatinDistillery

TomatinDistillery

HighlandMain Line

Station Road

Tigh n Ulidh

LowerInverbrough

Tom na hUlaidh

Invereen

Dalmagarry

Highland MainLine

Tigh An AlltR i v e r F i ndhorn

Porter'sLodge

Allt Dubhag

Dalmaga

rry Burn

Funtack Burn

Allt na h-Airigh Samhraic

C1121Tomatin Road

Ruthven

Allt n

a Frith

e

Continued on Sheet 4

Conti

nued

on Sh

eet 2

(

(

(

Path to/from Tomatin Distillery Entrance

Minor realignment andimprovement of NCN7

Ruthen Moy Link Road

Tomatin BusTurning Circle

Ruthen Tomatin Link Road

NCN7

P2

P8

P5

P4

P3

P6

P8

P7

Secti

on 1

Section 4

Section 2

Secti

on 10

A

Section 3

Section 10

Section 5

HI95

P1

IN27

.02

Tomatin GradeSeparatedJunction

The Bellhouse

TomatinDistillery

TomatinDistillery

HighlandMain Line

Station Road

Tigh n Ulidh

LowerInverbrough

Tom na hUlaidh

Invereen

Dalmagarry

Highland MainLine

Tigh An AlltR i v e r F i ndhorn

Porter'sLodge

Allt Dubhag

Dalmaga

rry Burn

Funtack Burn

Allt na h-Airigh Samhraic

Moy Left-in/Left/out

C1121Tomatin Road

Ruthven

Allt n

a Frith

e

Continued on Sheet 4

Conti

nued

on Sh

eet 2

Figure 9.2cProposed Impacts on Paths

and Proposed MitigationSheet 3 of 6

A9P12-AMJ-ENM-Z_ZZZZZ_XX-DR-GI-0015

±

RevisionDocument NumberProject Originator Volume

Location Type Role Number

Title

Client

P04

0 0.25 0.5

Kilometres

Proposed Scheme

( New Crossing Point to Replace ExistingAt-Grade Crossing

( Existing A9 Crossing Point

( Existing Crossing Point Maintained

NMU RoutesNational Cycle Network RouteRight of WayCore PathOther RoutePlanned Path

NMU Mitigation RoutesDiverted NCN RouteDiverted NMU Route

1:10,000Scale Drawn Checked Approved Authorised

Status Suitability

MM GK

FINAL

RM SB

B

Reproduced by permission of Ordnance Survey on behalf of HMSO.© Crown copyright and database right 2017. All rights reserved.Ordnance Survey Licence number 100046668

Baseline

Scheme Design and Mitigation

Page 4: ( x is tngA9 Cr oP · A9P12-AMJ-ENM-Z_ZZZZZ_XX-DR-GI-0015 ± Doc um ent N b r Revision Proje ct Origin ato r Volume L ocati n Typ eR l Numb r Tit le Client P04 0 0.25 0.5 Kilometres

((

NCN7

P8

P5

P6

P8

P7

P11

HI95

P11

General

Wade's

Military

Road/HI43

Dalmagarry Moy

L o c h Moy

Tom na hUlaidh

Beinn nah-lolaire

Isle of Moy

Moy House

Funtack Burn

Moy Burn

Allt na h-Airigh Samhraic

Allt a'Chui

l

Allt na Loinne Moire

B9154

Highland MainLine

HighlandMain Line

Conti

nued

on Sh

eet 3 Continued on Sheet 5

((

Ruthen Moy Link Road

Parking Area

Realignment of NMU route via gradeseparated crossing

NCN7

P8

P5

P6

P8

P7

P11

HI95

P11

General

Wade's

Military

Road/HI43

GradeSeparatedCrossing

GradeSeparatedCrossing

Dalmagarry

LynebegLeft-in/Left-out

Moy

L o c h Moy

Tom na hUlaidh

Beinn nah-lolaire

Isle of Moy

Moy House

Funtack Burn

Moy Burn

Allt na h-Airigh Samhraic

Allt a'Chui

l

Allt na Loinne Moire

Moy Left-in/Left-out

Highland MainLine

HighlandMain Line

Conti

nued

on Sh

eet 3 Continued on Sheet 5

Figure 9.2dProposed Impacts on Paths

and Proposed MitigationSheet 4 of 6

A9P12-AMJ-ENM-Z_ZZZZZ_XX-DR-GI-0016

±

RevisionDocument NumberProject Originator Volume

Location Type Role Number

Title

Client

P04

0 0.25 0.5

Kilometres

Proposed Scheme

( New Crossing Point to Replace ExistingAt-Grade Crossing

( Existing A9 Crossing Point

( Existing Crossing Point Maintained

NMU RoutesNational Cycle Network RouteRight of WayCore PathOther RoutePlanned Path

NMU Mitigation RoutesDiverted NCN RouteDiverted NMU Route

1:10,000Scale Drawn Checked Approved Authorised

Status Suitability

MM GK

FINAL

RM SB

B

Reproduced by permission of Ordnance Survey on behalf of HMSO.© Crown copyright and database right 2017. All rights reserved.Ordnance Survey Licence number 100046668

Baseline

Scheme Design and Mitigation

Page 5: ( x is tngA9 Cr oP · A9P12-AMJ-ENM-Z_ZZZZZ_XX-DR-GI-0015 ± Doc um ent N b r Revision Proje ct Origin ato r Volume L ocati n Typ eR l Numb r Tit le Client P04 0 0.25 0.5 Kilometres

(

NCN7

P10

P11 General Wade's

MilitaryRoad/HI43

P11General Wade's

Military

Road/HI43

Moy

L o c h Moy

Lynebeg

Lynemore

Moy Hall

Meall Mor

DisusedQuarry

Stairsneachnan Gaidheal

HighlandMain Line

Moy House

Allt n

a Loin

ne M

oir

Moy Burn

Allt na S

lanaic

h

Caochan na h-Earbaige

Allt Creag Bheichin

B9154

Allt na Loinne Moire

Conti

nued

on Sh

eet 4

Continued on Sheet 6

(

Southbound Layby

Northbound Layby

Realignment of NMU route via gradeseparated crossing

NCN7

P10

P11 General Wade's

MilitaryRoad/HI43

P11General Wade's

Military

Road/HI43

GradeSeparatedCrossing

Moy

L o c h Moy

Lynebeg

Lynemore

Moy Hall

Meall Mor

DisusedQuarry

Stairsneachnan Gaidheal

HighlandMain Line

Moy House

Allt n

a Loin

ne M

oir

Moy Burn

Allt na S

lanaic

h

Caochan na h-Earbaige

Allt Creag Bheichin

B9154

LynebegLeft-in/Left-out

Allt na Loinne Moire

Conti

nued

on Sh

eet 4

Continued on Sheet 6Figure 9.2e

Proposed Impacts on Paths and Proposed Mitigation

Sheet 5 of 6

A9P12-AMJ-ENM-Z_ZZZZZ_XX-DR-GI-0017±

RevisionDocument NumberProject Originator Volume

Location Type Role Number

Title

Client

P04

0 0.25 0.5

Kilometres

Proposed Scheme

( New Crossing Point to Replace ExistingAt-Grade Crossing

( Existing A9 Crossing Point

( Existing Crossing Point Maintained

NMU RoutesNational Cycle Network RouteRight of WayCore PathOther RoutePlanned Path

NMU Mitigation RoutesDiverted NCN RouteDiverted NMU Route

1:10,000Scale Drawn Checked Approved Authorised

Status Suitability

MM GK

FINAL

RM SB

B

Reproduced by permission of Ordnance Survey on behalf of HMSO.© Crown copyright and database right 2017. All rights reserved.Ordnance Survey Licence number 100046668

Baseline

Scheme Design and Mitigation

Page 6: ( x is tngA9 Cr oP · A9P12-AMJ-ENM-Z_ZZZZZ_XX-DR-GI-0015 ± Doc um ent N b r Revision Proje ct Origin ato r Volume L ocati n Typ eR l Numb r Tit le Client P04 0 0.25 0.5 Kilometres

P10

General Wade'sMilitaryRoad/HI43

Meall Mor

Beinn a'Bheurlaich

Creag an Eoin

Stairsneachnan Gaidheal

CreaganBad Each

Mid Lairgs

Allt n

a Slan

aich

Caochan na h-Earbaige

Allt Creag Bheichin

Continued on Sheet 5

P10

General Wade'sMilitaryRoad/HI43

Meall Mor

Beinn a'Bheurlaich

Creag an Eoin

Stairsneachnan Gaidheal

CreaganBad Each

Mid Lairgs

Allt n

a Slan

aich

Caochan na h-Earbaige

Allt Creag Bheichin

Forestry/Wind Farm Left-in/Left-out

Continued on Sheet 5

Figure 9.2fProposed Impacts on Paths

and Proposed MitigationSheet 6 of 6

A9P12-AMJ-ENM-Z_ZZZZZ_XX-DR-GI-0018±

RevisionDocument NumberProject Originator Volume

Location Type Role Number

Title

Client

P04

0 0.25 0.5

Kilometres

Proposed Scheme

( New Crossing Point to Replace ExistingAt-Grade Crossing

( Existing A9 Crossing Point

( Existing Crossing Point Maintained

NMU RoutesNational Cycle Network RouteRight of WayCore PathOther RoutePlanned Path

NMU Mitigation RoutesDiverted NCN RouteDiverted NMU Route

1:10,000Scale Drawn Checked Approved Authorised

Status Suitability

MM GK

FINAL

RM SB

B

Reproduced by permission of Ordnance Survey on behalf of HMSO.© Crown copyright and database right 2017. All rights reserved.Ordnance Survey Licence number 100046668

Baseline

Scheme Design and Mitigation