1. Executive Summary
La Vega Intermediate School in La Vega ISD is Center Number 2 in La Vega ISD’s (LVISD) 21st CCLC
Cycle 7 Grant. La Vega ISD is part of the Waco Metropolitan area in McLennan County outside
Waco. The La Vega Intermediate ACE Program serves 4th, 5th,and 6th grades and is a Title 1 school.
La Vega ISD has an enrollment district-wide of 2,875 and 90.2% of the students in LVISD have been
identified as Economically Disadvantaged, 23.4% African American, 52.8% Hispanic, and 21.9%
White. 2.6% of the students are English Language Learners (ELL) and 56.9% of the students are at
risk for not graduating high school. La Vega Intermediate campus has an enrollment of
approximately 611 students. The ACE Center was required to serve 120 regular students and 25
adults in grades 4-6. The required goal was far exceeded by serving 191 Regular students and 59
Non-Regular students during the 2013-14 school year. Almost one-third (27%) of the students at
the campus attended the ACE Program as either a regular student or non-regular student.
Overview of the Evaluation - Key Findings:
La Vega Intermediate ACE ProgramAcademic Support:
1. An average of 239 students in the fall and 203 students in the spring enrolled in the ACE
program. On Friday an average of 61 students attend the morning program. 63 students
attended Saturday activities in the spring semester for STAAR skill instruction.
2. The average daily attendance for all ACE students in the regular day is 44%.
3. 41 ACE students (16%) increased their attendance from fall to spring.
4. 57% of the Regular ACE students passed the reading STAAR test; 66% of the Regular ACE
students passed the mathematics STAAR test. In comparison to “All Students Tested” ACE
students were 5 percentage points below in reading and 1 percentage point in mathematics.
5. 70% of the Regular ACE students showed an increase or maintenance in grades (GPA) from
1
fall to spring by at least one grade point or letter grade. In 2013, 60.75% of ACE students
improved or maintained their GPA in all core courses;
6. 100% of the ACE students were promoted to the next grade level.
7. The Academic Program makes up 78% of the total ACE Program.
8. The ACE Academic Program is aligned to the Regular School Day Program at 100%.
Enrichment:
1. The ACE Enrichment Program is 75% aligned to the Regular School Day Program
2. The ACE Enrichment Program makes up 10% of the ACE Program
3. The Enrichment Component of the ACE Program includes activities that are provided by the
Waco YMCA -ports Academy; CIS bullying, job prep and college readiness. Other
Enrichment Activities:
o Crop, Paper, Scissors ACE Staffo Imagination Station ACE Staffo Adv Athletics Teacher and ACE Staffo Sewing- Teachero Tech Girls- Volunteer and Staffo Yearbook Teachero Creative Writing ACE Staff
College and Career Readiness:
1. The ACE College and Career Readiness is 10% aligned with the Regular School Day
2. The ACE College and Career Readiness Program is 11% of the total ACE Program
3. College and career awareness are embedded into the activities in the ACE Program and are
also provided by Communities in Schools (CIS) staff.
Parent and Family Support:
1. The ACE Parent and Family Support Program is 10% aligned with the Regular School Day
2. The ACE Parent and Family Support Program make up about 10% of the ACE Program – this
portion of the program is done after the academic and enrichment program is finished and is in
addition to the regular ACE Program.
3. Parent and Family Support Activities are GED & ESL Program; Jay’s Boot Camp for parents;
and Parent Events and Parent Connection.
4. 18 more parents than required by the grant were served in the ACE Program.
2
Intermediate Outcomes
Increased Attendance
1. Attendance in the regular school day slightly increased from (96.2% in 2013 to 96.3% in
2014)
2. 41 ACE students (21%) increased their attendance from fall to spring.
3. The average daily attendance in the ACE Program in 2014 was 44%.
Increased Academic Performance
See Academic Support page 1 of this report
Decreased Behavior Problems
There was no criminal behaviors reported the last two years and discretionary removals decreased
from 72 in 2013 to 63 in 2014.
Increased Graduation Rates
The Graduate rate for LVISD for 2014 is 83%
Increased Family Participation
18 more adults than required were served in the ACE Program.
Level of Funding: The level of funding for the ACE Program was $1,481 per student.
Assessment of implementation fidelity:
Fidelity of implementation occurs when the components of the program are implemented at high
levels. The La Vega Intermediate ACE Program has implemented the following program
components at the levels noted:
Increased Academic Performance (GPA)
70% of the ACE students improved or maintained their GPA from fall to spring in all core courses. In 2013, 60% of ACE students improved or maintained their GPA in all core courses
STAAR (academic achievement)
57% of ACE students passed the reading STAAR test; 66% of ACE students passed the mathematics STAAR test. These scores are below the state average for these grade levels by 18 percentage points in reading and 9 percentage points in mathematics. For all students on the campus who took the STAAR test: 68% passed reading and 70% passed mathematics.
Increased Attendance 41 ACE students (16%) increased their attendance from fall to spring. Attendance rate on the campus increased by 1 percentage point from 2013
3
to 2014.Decreased Behavior Decreased by 9 incidents from 2013 to 2014Increased Promotion Rates
All ACE students were promoted to the next grade level
Increased Family Engagement Activities
More adults were served in the ACE program than in previous years
Increased graduation rates
Not known at this time
For the third year of implementation the La Vega Intermediate ACE Program was implemented with a
high level of fidelity.
Summary of any survey findings from stakeholders:
Surveys from stakeholders in the ACE Program (0 regular teachers replied to the survey; 1 ACE teacher;
37 students) were done in the spring. With just one ACE Teacher responding, the survey will be not be
valid. The majority of the students who responded were from 4th and 5th grades. However, 96% of the
students said that they “feel they are a better student since attending the ACE Program. (See survey
results at VI Stakeholder Perceptions).
Commentary about next steps:
The Site Coordinator recognizes that there are some changes that can be made for the upcoming 2014-
15 school year.
Increase activities for College and Career Readiness by including more awareness activities in all
of the activities that lend itself to that topic
Increase Parent Engagement activities and offer more activities that meet the needs of parents
and work with the FES to develop more activities.
Increase the amount of time that students who are enrolled in the program attend daily
activities.
II. Introduction and Purpose of Program
Describe the ACE Program – Four Areas of Focus
The purpose of La Vega ‘s 21st Century Community Learning Center (21st CCLC) Program (known as ACE)
is to provide high-quality extended learning opportunities before and after school to students in need of
4
academic assistance. La Vega’s ACE program is designed based on a community, district, and campus
needs assessment in conjunction with each campus’s improvement plans in a collaborative,
comprehensive and coordinated approach. La Vega’s ACE Program has used grant funds to build and
expand a systemic infrastructure of extended learning opportunities. The approach is centered on a
specific framework and foundation and included assurances for effective implementation and high
quality programs for the attainment of TEA’s objectives. The strategies implemented also complement
TEA’s overarching goals and critical success factors. The ACE Program is intended to improve the
following outcomes for students in 1) Academic Performance; 2) Attendance; 3) Behavior; 4) Promotion
Rates; and 5) Graduation Rates. La Vega Intermediate School is one of 4 campuses located in La Vega
ISD.
The following chart outlines the demographics of La Vega Intermediate School:
Total Campus Enrollment: 611
Category Number Percentage Category Percentage
African American
133 21.8% Attendance rate 96.3%
Hispanic 328 53.7% Annual dropout rate (Gr 9-12) 0%
White 136 22.3% STAAR (students passing all tests) 67%
2 or more races 13 2.1TAKS commended 2013 performance, all tests (sum of all grades tested)
NA33333
Economically disadvantaged
562 92% Students taking the ACT and/or SAT N/A
Limited English proficient (LEP)
134 21.9%Average SAT score (number value, not a percentage)
N/A
Disciplinary placements
20 2.9%Average ACT score (number value, not a percentage)
N/A
According to the census there were 9,901 people, 3,513 households residing in the city of Bellmead.
The racial makeup of the city is 42.5% White, 17.2% African American, 0.4% Native American, 0.6%
Asian, 0.1% from other races, and 1.5% from two or more races. Hispanic or Latino of any race is
37.8% of the population. The average income for a household in the city was $43,523, and the
median income for a family was $34,511. The per capita income for the city was $16,910. Within the
population 65.7% have graduated from high school and nearly 11% of these people have completed
a higher degree.
Academic Support (Interim Report 2 Workbook & Activity Average Daily Attendance Report)
Activity (Fall Only) Students Days Attended Student
5
Enrolled ADAMorning All Stars 186 61 21ACE All Stars 239 49 10Math Intervention 125 13Reading Intervention 72 13
Description: The Morning All Stars begins each day at 7:00-8:00 and is in session Monday through
Friday. Afternoon Homework Assistance is Monday through Thursday for students who need
additional assistance (from teacher referral). The Academic Support Program is 100% aligned with
the regular school day. This is evidenced by the fact that regular classroom teacher lesson plans
and the ACE teacher lesson plans are coordinated at a high level. Skills that are being taught in the
classroom are transferred to the ACE Program in a diligent manner. Rosters of students, the skills
they are lacking, and the skills that they have mastered are available in the SC’s office. The first
hour of the program is devoted to Homework and Study Skills Monday through Thursday. The
second hour of the program is reading and mathematics interventions. Small group interventions
are held for students who are in need of additional and intense one-on-one instruction (identified
through teacher referrals and STAAR benchmark assessments). Students are referred to the
program by a teachers or campus administrators. Teacher-assigned homework as well as project-
work makes up most of the instruction in the program. Success Maker Software Program is used
for problem solving. During the fall semester students attended a total of 2232.5 total hours of
Academic Assistance (Interim Report # 2). Academic Support is 78.5% of the total ACE Program.
Enrichment Activities (Interim Report 2 Workbook)
Activity (Fall) Students Enrolled
Days Attended
Student ADA
Communities in Schools (CIS) Enrichment Program
13 13 7
YMCA Sports Academy 16 13 12Creation Time (Arts & Crafts) 19 13 5Angry Birds 46 23 17Crop, Paper, Scissors 12 13 4Imagination Station 23 13 9Mindworks 32 13 13Pinterest 101 7 13 4
Description: Parts of the ACE Enrichment Program are provided through the YMCA and
Communities in Schools (CIS) Programs in Waco, Texas. ACE Staff, teachers, and volunteers
supervise other enrichment activities that students have said they want. These programs are held
6
Monday through Thursday for one hour each day. Student Voice and Choice is an important part of
the enrichment activities that are offered to students and although the overall theme of the activity
does not change, the activities within are scheduled based on student interest. Alignment with the
regular school day is approximately 50%. Every attempt is made strategically to tie an academic
skill that is being taught in the regular school day to the Enrichment Program. Lesson plans from
classroom teachers and the ACE staff are coordinated so that the skills being taught during the
regular school day are transferred to the after noon program at a high rate. The Enrichment
portion of the ACE Programs makes up 10% of the total program.
College and Career (Interim Report 2 Workbook)
Activity (Fall) Students Enrolled
Days Attended Student ADA
ESL/GEDJay’s Boot Camps
Description: Although some College and Career activities were listed on the Interim Report # 2, the
evaluator concluded that these are actually enrichment or parent involvement activities. Although
lesson plans for the ACE activities do occasionally embed college and career awareness activities
into the activities as they are presented to the students, this does not meet the intent of the ACE
programming for College and Career Readiness. CIS does do some college and career readiness but
there is no documentation as to how much is done. The Interim Report # 2 states that College and
Career composes 11% of the ACE Program and is aligned to the regular school day at 10%.
Family and Parental Support –
Parent Involvement Activities # Of Parents AttendingGED Classes 1 adults were enrolled; offered 36 times; 1 adult
attendedESL Classes 5 adults were enrolled; offered 36 times; 1 adults
attendedJay’s Boot Camp 5 adult was enrolled; offered 95 times; 1 adults
attendedParent Events/Activities 11 adults enrolled; held 1 times; 1 parents
attendedDescription: 43 adults (parents and community members) have been served through the ACE
program. The Family Engagement Specialist (FES) schedules and supervises the adult ESL and GED
Programs and Jay’s Boot Camp. Site Coordinators are responsible for offering parent workshops
and sessions that relate to the specific Center. It is estimated that Family Support composes
approximately 5% of the ACE program and is 10% aligned with the school day. This is
7
documented through Leadership Meeting Minutes and Logs that show the ACE SC meetings
frequently with grade level teams and the campus team to discuss family involvement programs
that are going to be held and what teachers are working on in their classrooms to encourage parent
involvement.
Summary of Academic, Enrichment, College and Career Readiness and Family Engagement Activities:
The Academic and Enrichment activities are targeted to the students’ needs and are well implemented.
The alignment to the school day and the amount of time spent on the Academic and Enrichment
activities are appropriate and meet the needs of students (STAAR scores; GPA; attendance). Although a
large number of students attend these activities, the quartile dosage of student attendance needs to be
increased. Although the Academic Support component of the program is broken into 10-15 different
sessions, the attendance in many of these sessions is low. The charts below Illustrates that the quartile
dosage of attendance is low.
Academic Assistance (Fall) 0-25% 25-50% 50-75% 75-100%
All Stars 4th grade -11 students enrolled 5 3 1 1
All Stars 5th grade -16 students enrolled 8 4 2 2All Stars 6th grade – 20 students enrolled 8 4 1 1YMCA Sports Academy - 28 enrolled 4 8 6 8
*Activity Attendance Percentage Chart
Although the Activity Attendance Percentage Chart details the low numbers of students attending
for extended periods of time, there have been few modifications made to better align activities.
College and Career Readiness Activities are virtually non-existent in the program and will be a
recommendation for improvement. The Family Engagement component of the program needs to be
more clearly aligned between the Family Engagement Specialist and the Site Coordinator. Although
the Site Coordinator did host some parent and family activities, the Family Engagement Specialist
will need to assist in individualizing the activities for the LV Intermediate Center. This will also be a
recommendation.
Three of the highest attending activities were (Interim Report # 2):
Tech Girls Angry Birds 101 AE Reading
8
The three lowest attending activities were: ( Interim Report # 2)
AE Mathematics UIL Pharris Jay’s Boot Camp
Activities Offered Fall Only; Spring Only; Both Fall & Spring
Academic Activity Fall Only Spring Only Both Fall & SpringMorning All Stars XACE All Stars XMath Intervention XReading Intervention X
Enrichment Activity Fall Only Spring Only Both Fall & SpringCommunities in Schools (CIS) Enrichment Program
X
YMCA Sports Academy XCreation Time (Arts & Crafts) XAngry Birds XCrop, Paper, Scissors XImagination Station XMindworks XPinterest 101 X
College and Career Activity Fall Only Spring Only Both Fall & Spring
Family Engagement Activity Fall Only Spring Only Both Fall & Spring
GED Classes XESL Classes XJay’s Boot Camp XParent Events/Activities X
Overall Goals (Intermediate Outcomes)
9
The La Vega Intermediate School ACE Community Task Force understands that the critical success
factors reflect behavioral changes that must be demonstrated by students and families enrolled in
the program or by the adults working on their behalf. These critical success factors are essential for
the ACE Program to succeed in meeting the objectives for student success. The Community Task
Force agrees that the following critical success factors for the ACE program are:
Students’ and families active participation and engagement in learning Students’ and families increased sense of involvement in school Use of assessment data to revise/evaluate student services Implementation of strategies learned through training
The Intermediate Outcomes that LV Intermediate ACE Program has outlined are:1. Increase attendance2. Increase academic performance3. Decrease problem behavior 4. Increase promotion rates5. Increase graduation rates6. Increase family participation
Program Theory of Action
ACE Program Theory of Action – Students in need, spending additional time (min. 30 days) in well-
structured and aligned afterschool activities, taught by qualified personnel, focused on the 4 activity
components will yield improvement in the academic performance, attendance, behavior, and
promotion and graduation rates of students.
Overall School Context and the Students Being Targeted
LV Intermediate ACE Program was required to serve 120 students and 25 adults. However, the
program far exceeded those goals serving 191 Regular students, 59 non-regular students, and 43
adults. With 611 students enrolled on the site campus, 40% of all of the students on the campus are
enrolled in the ACE Program. Although LV Intermediate School has 92% of the student population
receiving Free and Reduced Lunch and 12.4% of the students live in families that are below the
poverty level, the students on the campus have out preformed students of schools of similar
demographics. However, the campus has not scored above the state or regional averages in the last
two years.
2013 All Tests Reading Math Science Soc StudiesState 77% 80% 79% 82%LV Interm 67% 68% 73% 57%Results Below State Below State Below State Below State
10
Average Average Average Average
III. Evaluation strategy/plan
Identify the Type of Research Design
The program research design that has been developed for the La Vega ACE Center is a descriptive
research model that will provide an accurate portrayal of the characteristics of the ACE Program.
The description model will describe the data and characteristics of the IISD ACE Program, discuss
the finding of the data, and make recommendations.
Analysis Strategy That Will Be Employed
The analysis strategies that have been employed are:
Interview forms/questionnaires for ACE staff
Parent survey (Parent Involvement Specialist)
fall online survey for students, parents, and teachers.
Evaluator observations – copies of site observations – project director formal site
observations
Student attendance in ACE & regular school day; student academic achievement; decrease
in student behavior problems during the school day
STAAR scores, AEIS for campuses served
Tx21st Reports
Sampling Plan Described for Surveys
Surveys were developed and each Site Coordinator, Teacher, Regular Day Teacher, and ACE Student
were asked to take the survey in the late fall of 2013. The ESC 12 Task Force composed of the
Project Director, evaluator, representatives from community and educators selected a sample of
elements in the form of a questionnaire for the target population (Regular Teachers, ACE Teachers,
Site Coordinators, and students) to answer. The survey was meant to measure the attitudes of
people who were associated with the ACE Program. The survey was developed at ESC 12 and
distributed to each Site Coordinator through a computer link. The Site Coordinator then made
respondents aware that the survey should be answered prior to the end of the first semester of the
ACE Program. Probability sampling was the type of survey used -where a small randomly selected
sample of the population is used to estimate the distribution of an attitude or opinion. (See VI
Stakeholder Perceptions)
11
Participant Attendance
31.3% (191) of the students on the campus are Regular ACE students. Less than 1% of the
students on the campus are Non-Regular Students in the ACE Program. The average attendance has
remained at a constant daily average as represented by the chart below (TX 21st Center Attendance
Count Calendar Report). On Friday there is no afternoon program; however, Morning All Stars
meets.
Average ACE Attendance 2013-14Monday Tuesday Wednesday Thursday Friday
Students 95 120 107 122 2363 1 0 0 0 0
The reports from the TX21st System are further discussed on page 26.
AEIS site level report 2012-13 (see Demographics Chart on Page 5)
IV. Program Design and Strategy - Logic Model
a. Fall-Spring Logic Model Data Elements
The Logic Model for La Vega Intermediate Center represents the history of the program for the
2013-14 school year. The Logic Model is in the appendix.
Two Examples of Clear Logic Model Elements Descriptions1). The La Vega Intermediate ACE Logic Model clearly describes the Academic Support at each
grade level. Certified teachers work with 12-15 students; for 19 days in the fall for one hour
each day. It is clear from the Logic Model that the purpose of the activity is to assist in reaching
the Intermediate Outcomes listed – increase Academic Performance.
2). Monday Sports Academy is an enrichment activity that provides students with non-UIL
sports that includes the history of the sport, leadership, teamwork and other elements that can
connect to core academic skills. According to the Logic Model 26 students attended this activity
for 22 times during the fall, one hour each day.
Components of the Logic Model:
RESOURCES
Staff: According to the Logic Model Ryan Sparks is the Site Coordinator, 10 certified teachers,
and 7 qualified program staff member’s work in the ACE Program.
12
Students and Adults: The ACE Center is required to serve 120 students and 25 adults in the
program. According to the logic model, 191 regular students, 59 non-regular students and 43
adults were served.
Support for Program: The ACE Program is supported by he Project Director (Lisa Drafahl); the
Family Engagement Specialist (Nina Ruff); the After School Task Force; TX21st web-based
tracking system; the Texas Education Agency; Edvance; La Vega ISD, local businesses and
campus Site Based Committees.
Curriculum: The curriculums that are used in the ACE Program are a valuable resource to the
program. Other than TEKS, the ACE program uses ACE Activity Planning Tools (TEKS
Aligned); Motivation Math, Science & Writing; Success-Maker Software, Mindworks, and
Bridges Training.
IMPLEMENTATION
The implementation of the La Vega Intermediate School ACE Program is to 1) provide
opportunities for academic enrichment to help students meet the local student academic
achievement standards in the core subject areas of reading, mathematics, social studies and
science; 2) to offer students a broad array of additional services, programs, and activities such
as youth development activities, character education, counseling, art, music and recreation
programs all designed to reinforce and complement the regular academic; 3) offer families of
students served opportunities for literacy and related educational development. The ACE
Program implementation is divided into the following areas:
School Program Alignment – ACE activities are aligned to grade level TEKS; District/Campus
improvement plans are aligned to the ACE Program; staff training on lesson plans and
classroom management is provided for staff; needs assessments of the campuses served are
done to identify specific campus needs that are to be addressed in the ACE Program; Cross
Curriculum training and implementation is done; ACE staff have access to regular-day teacher
lesson plans; tutorial materials are provided at the grade level to address specific students’
academic needs; grade level meetings are attended by the ACE Site Coordinator; the ACE Site
Coordinator meets with the principal leadership team and teachers to ensure that there is a
strict alignment of the regular school day and the ACE program.
Recruitment and Retaining Students – La Vega Intermediate ACE Program (4-6 grades) is a
Title 1 school so all students in the district are recruited to participate in the program. Students
are recruited through informational meetings, talking directly with parents and talking with
students directly in pairs or groups (especially students in grades 5 & 6). To retain students the
13
ACE program hires well-educated staff who have demonstrated an ability to connect easily with
students, especially those identified as “at-risk”; offer quality and interactive programs that link
youth to real-world experiences; offer flexible attendance policies and make the program
accessible; overcome barriers for students such as transportation.
Student and Family Voice/Choice - Listening to students and families when developing
programming for students is vital to a well-run program. Surveys are given to students and
family members several times a year to solicit input into the program activities; focus groups and
face-to-face conversations with students and parents are held each semester to solicit input;
lunch bunch program where ACE staff meet with teachers to solicit input about the program and
discuss additional programming that will meet student and family needs.
Ongoing Monitoring (data use and observation) – The Site Coordinator (SC) is responsible for
the ongoing monitoring of the ACE Program on a day-to-day basis. The SC uses regular
classroom teacher lesson plans to make sure there is an alignment from the regular program to
the after school program; the SC observes in regular classroom teachers’ day classrooms to
ensure that there is a continuity in areas of instruction and to observe students; daily and weekly
conversations with teachers and administrators regarding the ACE program activities; 3 and 6
week student report cards are examined by the SC to ensure that student academic progress is
being made; attendance at SBDM meetings by the SC to ensure alignment of the ACE program
and regular programs; results of benchmark testing is provided to the SC as the testing is done.
Professional Development – Staff for teachers who work in the program attend an orientation at
the beginning of the program each year to understand the general rules of the program and to
understand the purpose of the program. Regular teachers training is aligned with the school
day staff development and training. However, if a teacher has a problem or issue, the SC works
with the regular teacher on an individual basis. Staff is encouraged to attend staff development
at ESC 12 on a variety of programs that will enhance their teaching abilities. Paraprofessional
training is done on an individual basis with staff as a need arises.
Qualified Personnel: Staff that work in the academic support are a combination of certified
teachers and trained ACE Staff that are not employees of the district. The Waco YMCA and the
Communities in Schools provide activities for the Enrichment Program. La Vega Intermediate
ACE staff provide additional Enrichment Programs for students. To ensure that all staff is
qualified, all ACE staff attends orientation and staff meetings and engages in daily
conversations with the SC. The staff meetings are held for 3 days at the beginning of the school
year and the ACE staff provides the curriculum for the training. Walk-through and feedback
conducted by the SC provide the teachers with constant feedback as to their implementation of
14
the ACE principles in the program.
OUTPUTS-ACTIVITIES
Academic Support, enrichment, family engagement, and college and career activities are all
available at the La Vega Intermediate ACE Program.
Academic Support – A description of the Academic Program is on Page 6 of this Report.
Enrichment – A description of the Enrichment Program is on Page 6 and 7 of this Report.
College & Career Readiness – A description of the College & Career Readiness Program is on
page 7 of this report.
Family Engagement – A description of the Family Engagement Program is on Page 7 of this
Report.
A summary of the four components of the ACE Program is on page 8 of this Report.
Outputs-Participation
The La Vega ACE Program ran for 62 days in the fall and 85 days in the spring for a total of 147
days. The Logic Model clearly defines the number of days each activity was held, the hours and
the number of students who attended that activity. See Page 8 for modifications made to the ACE Program.
Intermediate Outcomes for La Vega Intermediate ACE Program
Increase Attendance Increase Academic Performance Decrease Problem Behavior Increase Promotion Rates Increase Graduation Rates Increase Family Engagement
Impact
The La Vega Intermediate ACE Program has as the overall goal to impact each student at such
a high level that all students will graduate ready for college and career. La Vega ISD has a
15
graduation rate of 83% for 2014, and the requirements for promotion and graduation continue to
increase. Therefore, for students to keep up with increasing graduation and promotion
requirements, additional academic assistance is necessary- especially at the early grades so
students are able to master basic skills and make grade-level progress each year.
b. Modifications
As previously stated on Page 8, the modifications made to the program are minimal. Certified
teachers from the campus and ACE Staff work in the Academic part of the program. Morning
ACE Stars is held on Friday morning but regular afternoon classes are offered only 4 days a
week. The YMCA and CIS organizations contract to work in the Enrichment Program.
C. Research Questions
i. Program Structure: Was the program implemented as intended?
Overall the La Vega Intermediate ACE Program was implemented as intended. The program
provided an academic-focused program that is strongly aligned with the academic day in both the
Academic Support and the Enrichment components. STAAR scores have exceeded the state and the
region average during the last two years. According to staff focus groups, the ACE Program has
been a major reason for the increase in student achievement. The Community Task Force and
school administrators agree that improving the academic program is the main focus of the ACE
Program. However, the Task Force understands that students need enrichment activities because
these are students who live in rural areas on farms and ranches and do not have access to activities
outside the school.
Areas that are considered weaknesses in the program are:
Parent involvement activities that include parent-training type activities were not offered.
Although 43 parents were served during the year, these were usually one-time activity-
based programs. Low numbers of adults are participating in the ESL and GED Program.
Although the Site Coordinator did host some parent and family activities, the Family
Engagement Specialist will need to assist in individualizing the activities for the LV
Intermediate Center. This will also be a recommendation.
College and career readiness is a weakness in the La Vega Intermediate ACE Program.
Some college and career activities were embedded within the enrichment activities during
fall and spring (in lesson plans). However, rather than embedded within other activities,
college and career activities need to be distinguished. Almost all of the students that attend
16
the ACE Program are from families that are Economically Disadvantaged there needs to be
a focus for students in this area on careers that are currently in demand so students can
continue their post-secondary education or enter the world of work once they graduate
from high school.
Increase the amount of time (student dosage) that students who are enrolled in the ACE
Program attend the Academic and Enrichment Programs.
Very few modifications in the Enrichment Program have been made although some of the
activities have very few students attending the activities.
Implementation on 10-Point Scale
Logic Model Areas Documentation for Implementation (Why do you think that your rating is sound)
1-10 Points
Targeted numbers (Operations Criteria) are met in all areas.
Required student numbers were met
TX21st System
10
All 4 components are incorporated in activity planning.
College and Career and Family Engagement were not served at a high level.
Logic Model; TX 21st Activity Attendance Participation
6
Student participants are intentionally targeted.
There is a system implemented for targeting students –report card grades; 3-week reports from teachers
TX21st System
8
Planning is intentional and specific to the needs of the student participants.
It is evident from the student Voice/Choice Sheets, teacher input regarding activities; meetings with grade levels of teachers and the campus site based committee that planning is taken seriously.
8
Planning is done in collaboration with the campus leadership team.
The Site Coordinator has monthly meetings with the principal & Instructional Facilitator where a plan for the next month of activities, lists of students, student attendance, and other pertinent information is shared.
8
Activities are monitored and The Site Coordinator visits in ACE classrooms and 8
17
adjusted to ensure higher quality programming.
regular classrooms during the day. Modifications are made in programming as necessary; student voice and choice is apparent.
Classroom visit logs; list of activity changes
Intermediate outcomes are monitored and improved/revised.
Student Voice/Choice; 3 week student reports; report card grades; minutes of meetings with teachers & administrators
8
Budgets are monitored carefully to ensure expenditures are going to meet student needs and budget amounts are expended to meet those needs but not exceeded.
Site Coordinator keeps a spreadsheet with all expenses by category as well as a payroll planning sheet each semester to predict how much will spend in contract services and in payroll expenses. The Project Director gives the Site Coordinator high marks in budget monitoring.
8
Regular communication with all participants (parent & student) is a standard practice along with outreach and community involvement
Documentation to show communicate with parents and students; parent letters; phone calls, emails, sign-in sheets
8
Total 7.2
ii. Resources: Were requisite resources available for program success?
La Vega ISD has worked as a partner with the ACE Program from its beginning to ensure that
the ACE Program is a success. The quality of the district contribution to the ACE program
contributes to the quality of the program.
The district has made sure that rooms and space are available for the program to run
smoothly- classrooms, computer rooms, library, and cafeteria.
District employees are encouraged to work in the program to ensure that there is a
strong alignment between the regular school day and the after school program.
The district provides every student a laptop computer and these computers were
available for students during the ACE Program as well as software programs
The district allows the ACE students access to technology labs.
The district provide snacks at no charge to the ACE Program to assist with the Breakfast
Club;
The district does not charge the ACE Program for the copy machine and miscellaneous
materials and supplies for student and teacher use.
18
iii. Implementation Practices: Were program practices well implemented?
School program alignment- The ACE Academic Program is 100% aligned with the school day
and the Enrichment Program is 75% aligned with the school day. Documentation for this is that
100% of Academic activities are related to the school day; TEKS and STAAR objectives.
50% of the teachers who work in ACE Academic Program are also regular classroom
teachers.
ACE staff has access to teachers’ lesson plans and have received training.
There is constant communication between the Site Coordinator and teachers on a daily
basis as documented by the Site Coordinator and regular classroom teachers (focus
meeting, logs)
The SC attends campus and district Leadership Meetings and presents the progress of
the ACE Program at District and Campus Site Based Meetings.
Recruiting and retaining students – Recruiting and retaining students to the ACE Program is done
through teacher and administrator (principal/counselor) recommendation. The Site Coordinator
attends the Orientation Meeting at the campus and provides registration forms to students and
parents. The SC also provides teachers with ACE Student Referral forms at the beginning of the
school year and asks for students that met the criteria for the program (did not pass STAAR or last
benchmark assessment in reading or mathematics) to be recommended. As the semester passed,
these forms are again provided to teachers every three weeks to recruit students that are new to
the district or the teachers see falling behind. Teachers, parents and community members can
recommend students for the ACE Program throughout the year. However, it is important that
teacher recommendations are not only academic in nature– students with behavior issues and
attendance issues are also recommended and enrolled in the program.
Integrating student and family voice – The ACE staff receives input from students and parents
through surveys every six weeks for parents and students, direct conversation with students and
parents; focus groups of students at various grade levels; communicating with individual parents by
sending home newsletters and information letters and inviting parents to activities that students
are involved in. The ACE Program has an email system that is set up on district server and parents
can ask questions about the program. Information is also printed in the local newspaper on a
periodic basis. Periodically students discuss the activities that being offered and provide input
about the activities and how they have enjoyed them.
Observing and monitoring program participation – The SC and the Project Director monitor the
19
program through periodic “Walk through” monitoring of classes as they are being taught during the
regular day and in the afternoon. The Site Coordinator also visits in classrooms of students who
may have had behavior or other issues in the ACE program to determine alternatives that may be
implemented in the ACE program for student behavior. The Site Coordinator visits with teachers
on a frequent basis about student progress and discusses with teachers how the students are
progressing in academics, attendance, and behavior.
Using report data - The LV Intermediate ACE Program staff have access to student report cards and
progress reports on a three and six weeks basis. Benchmarking testing results are available for the
ACE staff as well as data on attendance and behavior of ACE students. STAAR results are provided
to the ACE staff. Any other information such as medical issues is also made available to the ACE
staff.
Staff professional development needs - The Site Coordinator holds an orientation meeting at the
beginning of the program to provide ACE Staff (that are not employees of the district) with up-to-
date information on the program. This training is a 3-day training with topics such as classroom
management; TEKS implementation; communication with regular teachers. Any new staff are
provided additional time to go over the ACE philosophy and other information they will need.
Staff development needs are done on an individual basis for certified teachers who work in the
program. Problems that arise with the staff are solved on an individual basis. The teachers in the
Enrichment ACE Program (2nd hour teachers) are trained by the Site Coordinator on classroom
management, software training, and any skills that the teachers feel they need. There is also a need
for the Site Coordinator to refresh classroom management training more than once a year. As soon
as the Site Coordinator sees that there is a problem, the SC meets with the teacher to discuss the
problem and ways to solve the problem. The certified teaching staff and the Site Coordinator do not
do any formal training since all the teachers are certified teachers and they attend trainings
through the school. However, staff meetings to discuss issues within the ACE Program are held on
an as-needed basis.
IV. Outputs-Activities: Are activities targeted to student needs and well implemented?
Are activities targeted to student needs and well implemented? Activities in the ACE Program
are targeted to student needs in the academic program. There is a 100% alignment between
the school day and the ACE Program. This is evidenced throughout the academic program by
comprehensive lesson plans that are shared with the ACE staff. District and campus needs
assessments for the district and campuses are carried through to the ACE Program. The
20
Enrichment Program is 75 % aligned with the school day. Although the Enrichment activities
are “fun” for students, there are skills that are woven throughout the program that focus on
skills that are being taught in the classroom. However, College and Career Readiness are not
aligned to the school day. Other than careers that apply to the activity, there is no clear trail of
alignment in the College and Career Readiness activities.
Were program modifications made to better align activities offered with school learning
objectives? There have been few modifications made in the program offerings that were not
well attended by students.
Strategies and processes utilized to align activities to student needs – The alignment of
students’ needs to the ACE Program activities began at the end of the 2013 school year with a
thorough needs assessment that looked at STAAR scores for each student, classroom grades in
all the core areas, behavior records on each ACE student, attendance and attendance for ACE
students. During the year 3 and 6-week academic reports are received from classroom teachers
and provided to the ACE staff so that alignment can be intentional and well streamlined with
both the regular day program and the after school program.
How was instructional quality managed or assessed? The Site Coordinator observes ACE
teachers while activities are being taught in the ACE program to assess how well the ACE
teachers are targeting the individual needs of students. Attending teacher staff meetings where
student academic achievement goals and monitoring are taking place helps with the
instructional quality of the ACE program. All ACE staff is provided job descriptions. The Site
Coordinator does informational evaluations with ACE staff teachers each semester. Constant
visits to the ACE classrooms in “walk-by” evaluations are done monthly or on an as-needed
basis.
Basically, how were program modifications managed? Major modifications such as a program
changes have to be approved by the Project Director in conjunction with the Site Coordinator.
Modification also are discussed in the Leadership Team; no major modifications at the ACE
program have been made.
V. Outputs-Participation: Were program modifications made to increase participation in
program activities.
Only one activity was modified. Imagination Station was cancelled after the fall semester due to
discussions with classroom teachers and ACE Staff. The SC made the decision to avert the
students who had preciously been attending this program to a more academic-focused
21
program. No staff changes were made in the ACE Program in either semester
How were they addressed? If enrollment decreased in activities, the Site Coordinator would
talk with students in the program and asked for their input. Decisions to eliminate a program
or add another program would be the result of student interest decline, teacher or ACE Staff
suggestions, or a review of student grades and benchmark assessments.
VI. Opportunity Analysis: How many and how varied were the proposed activities
allocated to academic support, enrichment, family engagement, college and
career?
How varied were the activities in the four areas?
Academic Support has three major activities for both fall and spring semesters- ACE All Stars
(homework help with tutorials), reading and mathematics intervention, and Morning All Stars
(homework help with technology). The Academic Support Program is 100% aligned with the
regular school day. This is evidenced by the fact that regular classroom teacher lesson plans and
the ACE teacher lesson plans are coordinated at a high level. Skills that are being taught in the
classroom are transferred to the ACE Program in a diligent manner. Rosters of students, the skills
they are lacking, and the skills that they have mastered are available in the SC’s office. The first
hour of the program is devoted to Homework and Study Skills Monday through Thursday. The
second hour of the program is reading and mathematics interventions. Small group interventions
are held for students who are in need of additional and intense one-on-one instruction (identified
through teacher referrals and STAAR benchmark assessments). Students are referred to the
program by a teachers or campus administrators. Teacher-assigned homework as well as project-
work makes up most of the instruction in the program.
LV Intermediate ACE Program offers Enrichment Activities during the school year (Logic Model,
Interim Report # 2, Participant Activity Attendance Detail, and Participant Attendance Reports) – CIS,
YMCA Sports Academy, and a host of other Enrichment Activities that are taught by teachers and
ACE Staff (14 or more additional enrichment activities). Enrichment Classes, like the Academic
Program, are divided into grade appropriate classes and a variety of classes are offered. The
enrichment program takes up approximately 10% of the ACE program. CIS activities include health,
social skills, self-esteem, counseling, and family issues. YMCA Sports Academy provides non-UIL
22
sports that include teamwork and leadership skills. Math and reading skills are embedded in all of
the activities.
Family Engagement (per Logic Model) composes a small percentage of the ACE Program. GED and
ESL programs are supervised by the FES and some campus family activities have been held.
College and Career Readiness activities were not as extensive or varied as the Academic or
Enrichment components. Some career information was provided during the activities but no
formal College and Career Readiness program was evident.
Summary: In looking at the variety of activities (Logic Model, Interim Report # 2, Participant
Activity Attendance Detail, and Participant Attendance Reports) in LV Intermediate ACE Center’s
program the Academic and Enrichment program were varied enough for students in grades 4th
through 6th. However, the College Readiness and the Family Support components are not varied
enough to offer a program that meets the ACE requirements.
Rationale for the allocation of activities to each of the four program components areas (academic
support, enrichment, family engagement, college and career) and its relationship to the
program’s intermediate outcomes:
According to the Site Coordinator the majority of activities that the ACE Program focuses on are
academic in nature and tied to the intermediate outcomes of improving student academic success
by improving STAAR scores, improving attendance, and decreasing behavior problems for ACE
students. Each three-weeks regular classroom teachers provide important information regarding
each student’s progress in academics, attendance and behavior. Specific, detailed information for
each student’s academic progress was detailed by specific math and reading skills. Therefore, the
ACE staff knows exactly what skills each individual student needs to work on. The accumulation of
the mastery of each of the skills pushed the students along to the program’s intermediate outcomes
of increased academic performance; increased attendance; decreased problem behavior; increase
promotion rates; increase graduation rates; increase family engagement.
Intermediate Outcome #1: Increase Attendance2011-12 2012-13 2013-14 Increase/Decrease
LV Intermediate 96.5% 96.2% 96.3% Slight Increase
Intermediate Outcome #2: Increase Academic Performance (STAAR Scores)LV Intermediate 2011-12 2012-13 2013-14 * Increase/DecreaseAll Subjects 66% 67% 69% IncreaseReading 71% 68% 68% Remained SameMath 70% 73% 70% Decrease from 2013
23
Science*These results are preliminary results (all students tested) because testing has not been completed in several grade levels for students who are retaking STAAR tests.
STAAR scores at the LV Intermediate Campus are above the State and Regional averages for the last
two years and again in 2014. However, there is a continued focus in the ACE Program on grade
level TEKS.
Intermediate Outcome #3: Decrease Problem BehaviorMandatory Removals 2013 0Mandatory Removals 2014 0Decrease/Increase Stayed the Same
Discretionary Removals 2013 72Discretionary Removals 2014 63Decrease/Increase Decrease in discipline incidents from 2013
Intermediate Outcome #4: Increase Promotion Rates2011-12 2012-13 2013-14 Increase/Decrease
LV Intermediate 100% 100% 100% Stayed the same*CISD Promotion Data – 8 students on the campus of 978 students were retained; 3 ACE students
were retained.
Intermediate Outcome #5: Increase Graduate Rates 2011-12 2012-13 2013-14 Increase/Decrease
92% DNA DNA
Intermediate Outcome #6: Increase Family Engagement Activities2011-12 2012-13 2013-14 Increase/Decrease
10 activities 17 activities
V. Program Participation
a. Reports from the TX 21 st system are to be used for this section of the report
Center Attendance Count Calendar was used to determine the average number of ACE
students who attended by the day of the week. This data shows that the number of students
attending the ACE program is quite consistent -most students attend toward the beginning
of the week.
The Participant Attendance Report was used to determine the number of days students
attended during the program, the total hours the student attended, and the number of
regular and non-regular students in the program.
24
21% of the students attended from 1 to 49 days;
29% of the students attended from 50 to 99 days;
26% of the students attended from 100 to 149 days;
0 student attended150 or more days;
Student Attendance Percentage – Center Level report details in graph format. During the
fall 63% students attended the program from 41-81+% of the time and during the spring
49% students attended the ACE program 41-80+% of the time. The attendance rate of
students in the ACE program is 44%. Student attendance decreased in the spring due
to extracurricular and community sports.
Participant Activity Attendance Detail - report depicts the attendance count of each
activity by date and time. Students in large numbers attended the Academic Assistance
and the Enrichment Program.
Interim Report 2 – Fall Term - This report was used to determine the number of
academic, enrichment, and career and college activities for the fall semester and the
number of students enrolled in each activity as well as the hours of attendance per day,
total hours attended and he median student attendance and an ADA of the students.
b. Research Questions
i. Right Students:
Characteristics of program participants:
214 of the ACE students in the fall and 191 in the spring were eligible for the Federal Free and Reduced Lunch Program (Student Economic Disadvantaged Report)
62 LEP ACE students attended in the fall and 51 LEP ACE students attended in the spring
39 White students attended the ACE Program in the fall and 34 in the spring
115 Hispanic students attended the ACE Program in the fall and 97 in the spring
40.9% of the students in the program are classified as At Risk for not graduating high school
Do the regular program students differ from the non-regular or total school population?
The student population, regular students and non-regular students at the LV Intermediate ACE
Program do not differ. The characteristics of the students remain constant. Fall and spring
participants do not differ. Since the characteristics of the students in the program are basically
similar, recruitment and retention strategies for all students are the same. Since STAAR scores
25
exceeded the state and regional average, grades of all students increased, and attendance in the ACE
program increased, the right students were recruited and targeted for the ACE Program.
ii. Right Activities
What are offered activities? The following activities are offered to students in the LV Intermediate
ACE Program and divided into Academic, Enrichment and College and Career Readiness.
Academic Support (Interim Report 2 Workbook) - The right Academic Support (78% of the ACE
Program) activities have been developed and implemented in the ACE Program. The ACE
Academic Program consists of Morning All Stars and a series of ACE All Stars (homework help and
tutorials) divided by grade levels. Tech Girl, Angry Birds, and Reading were among the highest
attended activities for the fall. With 68% of the ACE students passing the reading STAAR test, 70%
of ACE students passing the mathematics STAAR test, and 70% of ACE students increasing or
maintaining their GPA from fall to spring, the right activities for Academic Support were provided.
Enrichment Activities (Interim Report 2 Workbook) - Enrichment Activities (10% of the ACE
Program)–include the YMCA Sports Academy, Communities in Schools (bullying, job prep, and
college readiness), and 12 to 14 additional enrichment activities such as choir, sewing, computers,
Yearbook, and Imagination Station. CIS activities include health, social skills, self-esteem,
counseling, and family issues. YMCA offers a variety of different sports and the rules and history of
the specific games. Math and reading skills are embedded in all of the activities. There is
consistent attendance in the YMCA enrichment programs. The other enrichment programs are not
as heavily attended. To make sure that the right activities are being offered for these students, the
Task Force should look at the activities within each of the major activities and examine the number
of students attending on a daily basis.
College and Career (Interim Report 2 Workbook) - A very small amount of the time (11%) was
allocated to College and Career Readiness according to the Interim Report # 2. The purpose of the
ACE Program’s College and Career Program is to expose students to age-appropriate activities
regarding careers. One of the activities in the CIS Enrichment Component was job prep and college
readiness. However, there was a lack of College and Career Readiness activities.
Family and Parental Support –
Less than 10% of the time was spent in working with the Family and Parent Support Program from
26
both the Center Level. 43 adults (parents and community members) have been served through the
ACE program. Other than ESL and GED supervised by the FES, there is a lack of Family Support
Activities. The right activities for family support and parent involvement have not been offered to
adults in the ACE program.
Program Response to Low Attendance: There are some Enrichment Activities that have low
attendance (both fall and spring). These activities should be monitored and if it becomes evident
that the activity enrollment is not going to increase, the SC should talk with students in the activity
to get an understanding of why the activity had a low attendance. In conjunction with the ACE staff
and at times the Leadership Team, the decision would be made as to the continued status of the
activity.
Percent of Time Allocated to Activities (Interim Report 2)
Area of Activities Fall Spring
What is the % of time allocated to academic support 78% 78%
What is the % of time allocated to enrichment 10% 10%
What is the % of time allocated to family engagement 11% 11%
What is the % of time allocated to college & career <10% <10%
III. Right Student Level of Participation – Are students participating at appropriate levels to benefit form the activities.
Student Attendance Percentage Report:
Attendance Percentage Fall Spring Total0-20 43 61 10421-40 46 47 9341-60 48 32 8061-80 89 63 15281+ 16 9 25
As the chart above details, 242 students in the fall and 212 students in the spring attended the
program. 153 students in the fall and 104 in the spring attended the ACE Program from 41% to 81+
% of the time. No students in the program attended 150 or more days. Only 66 students attended
from 100 to 149 days and the majority of students (126 students) attended from 1 to 99 days. This
27
provides evidence to the fact that the ACE Program targeted and recruited students into the
program; however, a greater number of students need to attend the program for more days to
benefit at high levels from the program. The Activity Attendance Percentage Chart (See Page 8)
provides examples of activities with low dosages of student attendance.
The Participant Attendance Report was used to determine the number of days students attended
during the program, the total hours the student attended, and the number of regular and non-
regular students in the program. See Student Attendance Percentage Report on Page 27.
This provides evidence to the fact that the ACE Program during the first year of operation targeted
and recruited students into the program; however, a greater number of students need to attend
the program for more days to benefit at high levels from the program.
Participant Activity Attendance Detail report depicts the attendance count of each activity by
date and time. As other reports have indicated, large numbers of student attend the afternoon
Academic and Enrichment ACE Program. Again, more students need to attend the program for
more days to get the full benefit of the program.
I nterim Report 2 – Fall Term - this report was used to determine the number of academic,
enrichment, and career and college activities for the fall semester and the number of students
enrolled in each activity as well as the hours of attendance per day, total hours attended and he
median student attendance and an ADA of the students.
Are students participating at appropriate levels to benefit from the activities?
Students are attending the ACE Program at levels to be considered appropriate; however, is the
level of attendance enough to make a difference for students? Students have shown positive
gains in mathematics achievement and reading is above the state and regional averages. However,
large numbers of activities are showing attendance numbers that are in the first and second
quartiles of dosage rather than in the third or fourth quartile
Right student level of participation for the overall program:
Overall the student participation in the program appears to be at a level that is considered
appropriate. Students participated in the afternoon program and they participated in both
Academic Assistance and Enrichment programs. The exact level of participation for students to
28
benefit has not been determined but only 0 student attended from 100 to 150 days. Although 63%
in the fall and 49% in the spring participated from 41% to 81+ %, it is clear that more students
need to participate for more days and receive a larger dosage of activities.
Right student level of participation relative to other students:
The average attendance for both Regular and Non-Regular students who attended the ACE Program
was 44%. The chart below outlines the number of ACE students who tested in each area of the
STAAR, the number of students who passed the STAAR at that subject’s area and the percentage of
ACE students who passed the STAAR. There were 191 4th-6th-grade Regular ACE students who took
the STAAR test. These results point to the fact that the students who attended ACE performed well
compared to other students on the campus and across the region and state.
Regular ACE Students Who Took STAAR
# Regular ACE Students Passing STAAR
% Regular ACE Students Passing STAAR
Reading 191 109 57%Mathematics 191 126 66&
Right student level of participation relative to their own set of activities: At this time there is no
data to distinguish the ACE students who passed the STAAR and how many days they attended the
ACE Program. Therefore, it is difficult to draw a conclusion as to the level of participation and each
student’s own circumstances.
VI. Program Intermediate Outcomes
3 Research Questions:
Question # 1: Are There a Greater Number of Students Experiencing Improvement?2012-13 2013-14 Increase/Decrease
Increased Academic Performance (GPA)
158 175 students increased GPA
Increase in # from 2013
Increased Attendance (School Days Absent)
96.2% 96.3% Slight Increase
Decreased Behavior (Criminal referrals)
0 0 Same as 2013
Decreased Behavior(Non-criminal referrals)
72 63 Decrease from 2013
Increased Promotion Rates 100% 100% Same as 2013Increased Family Engagement Activities
4 Activities 4 Activities Same as 2013
Student Export (Excel Spreadsheet 2012-13 & 2013-14)
29
Question # 2: Are There a Greater Percent (%) of Students Experiencing Improvement?2012-13 2013-14 Increase/Decrease
Increased Academic Performance (GPA)
69% 70% Increase from 2013
Increased Attendance (School Days Absent)
96.2% 96.3% Slight Increase
Decreased Behavior (Criminal referrals)
0 0 Same as 2013
Decreased Behavior(Non-criminal referrals)
31% 25% Decrease from 2013
Increased Promotion Rates
100% 100% Same as 2013
Increased Family Engagement Activities
4 activities 4 activities Same as 2012
*Student Export (Excel Spreadsheet 2012-13 & 2013-14
Question # 3: Are There Greater Amounts of Improvements by Students?Increased Academic Performance (GPA) 1% more students increase or maintained their GPA
in 2014 than in 2013. However, the program served more students in 2014.
Increased Attendance (School Days Absent) In the regular school day, the average daily attendance for all students lightly increased. For ACE students the attendance rate was 44% during the regular school day. However, there is no data on from 2013.
Decreased Behavior (Criminal referrals) No criminal behaviors for 2013 or 2014Decreased Behavior(Non-criminal referrals)
Referrals decreased from 2013 to 2014
Increased Promotion Rates 100% promotion rate for 2013 and 2014Increased Family Engagement Activities Same from 2013 to 2014Summary:
Not as many Regular ACE students passed the STAAR reading and mathematics tests as All Students Tested.
57% of Regular ACE students passed the STAAR reading test in 2013 (57% in 2014) 68% of Regular ACE students passed the STAAR mathematics test in 2013 (66% in 2014) Report card grades for the majority of students (77%) have shown increases or maintained
grades that are “mostly As and Bs.” There were 72 non-criminal incidents in 2013 and 63 in 2014 The attendance rate of ACE students in the regular school day is 44% while the campus
attendance rate is 95.4% - which translates to ACE students missing an average of 79 days during the school year.
VII. Program Impacts
This section of the report is necessary if a QED is being used to analyze program impact
30
VIII. Stakeholder Perceptions
ACE Teachers’ Survey:La Vega Intermediate ACE Program had 1 ACE Teachers and 0 Regular Classroom Teachers respond
the survey. There is not enough data to report.
Student Survey:
37 Students responded to the survey; however, 43% of the students reported that they do not
participate in the ACE Program (however, students who took this survey were only morning
students and do not realize that the morning program is part of the ACE Program.
Never Sometimes Often Total
Get homework help or tutoring at the 21st CCLC before/after school program?
52%17
33% 11
155
33
Do art, dance, drama, music, and graphic arts at the 21st CCLC before/after school program?
41%13
34%11
25%8
32
Do sports or games 21st CCLC before/after school program?
28%
8
31%9
41%12
29
Do college awareness and preparation activities at the 21st CCLC before/after school program?
50%16
25%8
25%8
32
Do job and career activities at the 21st CCLC before/after school program?
33%
11
45%
15
21%7
33
Get to use technology/computers to do your school work at the 21st CCLC before/after school program?
19%6
41%13
41% 13
32
31
Of the students who responded to the survey, 73% stated that they attend the ACE Program daily.
80% said they attend the afternoon sessions. Students also gave the ACE Program high marks for:
I get a chance to do a lot of new things – 77% agree The activities before and after school are fun and educational – 83% agree. 96% said that they think they are a better student now than before they enrolled in the ACE
Program
IX. Evaluator Commentary & Recommendations –
The evidence examined in this report suggests that the La Vega Intermediate ACE Center in
operation for the third year during the 2013-14 school year made progress in providing
programming that contributed to student growth and development in Academic Support and
Enrichment. College and Career Readiness and Family Support did not provide enough student
dosage to make a difference in these two areas. The strongest evidence for such a conclusion was
the finding that of the Intermediate Outcomes defined in the Logic Model, five of the five
(Academic Performance; Attendance; Behavior; Promotion Rates; and Graduation Rates) were met.
Outcomes yielded evidence that the program is having a significant impact on student performance
and a greater number and percentage of students are experiencing improvement (Research
Question):
1) 76% increase in students’ GPA from fall to spring (Academic);
2) 91.9% of 3rd Grade ACE students passed the Reading STAAR test; 86.5% of 3rd Grade ACE
students passed the mathematics STAAR test. These ACE students out-performed students
in the region and the state on the STAAR test (Academic);
3) 100% of students were promoted to the next grade level (Increase Promotion)
4) 37 students did increase their attendance from fall to spring (Increase Attendance)
5) Behavior incidences decreased from 72 in 2013 to 63 in 2014.
6) The graduation rate for LVISD is 83%; however, it appears that the students on this campus
are on track for a high graduation rate.
Recommendations:
The LV Intermediate ACE program has made progress in adjusting to the challenges of
implementing an after school program that addresses family and children’s needs as well as
meeting the demands of complying with program regulations in the first year of a project. In
addressing program objectives the program met criteria standards or made progress toward
meeting standards in the objectives set forth in the grant application. However, there are some
program objectives that remain particularly challenging. To assist with focusing program
32
improvement efforts, recommendations are offered in four areas: staff awareness of goals and
objectives, staff training, and program-classroom teacher collaboration. Many of these
recommendations are interrelated.
1). Expand the Parent Involvement Activities – It is recommended that additional parent
involvement activities that are more educational in nature be offered to parents such as a Parent
University offered several times a year in a seminar-type format. A variety of sessions should be
offered to parents so they can choose two or three sessions to attend and over the course of a year
they would have attended eight to ten information session on various topics. The SC should work
with the FES to develop a series of parent involvement activities that meet the needs of this campus.
2). Expand the College and Career Readiness Activities for Students- According to the Interim
Report # 2 the college and career readiness activities did not meet the standard for activities that
make a difference for students. It is recommended that the College and Career Readiness
component of the ACE Program be intentionally planned to provide students with college and
career readiness activities that are age and grade appropriate. The TASK Force can investigate
College and Career Readiness Curriculums that are age and grade appropriate.
3). More students need to attend the ACE Program a greater percent of the time. 26% of the
students attended from 100 to 149 days in the program. It is recommended that the Task Force
investigate ways to encourage students to increase the number of days they attend the program.
4.). Examine Enrichment Program to see if any modifications in the activities should be made
and if they are meeting the needs of the students. Also, examine each activity to see if enough
students are attending the activities to make them worthwhile fiscally and for the students.
X. Site Coordinator commentary and next steps
Response to Evaluation As the Site Coordinator for the La Vega Intermediate Center Cycle 7 ACE Program, I agree with the evaluator’s summary of this year program. I feel that the ACE Program has accomplished many requirements. Evaluator’s Recommendations:
1. More students need to attend the ACE Program a greater percent of the time. Steps: I plan to meet with the TASK Force as well as the administrative team on my campus and present the data to them that clearly shows that lots of students are attending the program but that the amount of days and hours in the program has to be increased for students to receive the maximum benefit from the program. I will encourage these groups to become involved in talking with parents and students and explaining the benefits of the ACE Program.
2. Expand the Parent Involvement Activities. Steps: A designated parent room will be available for parents to come at certain
33
times during the day, as well as during the ACE activities. Parenting mini workshops designed according to parent surveys will be available at these times. There will also be scheduled parent/student nights throughout the school year; some informational and some “social” events. A parent “Board of Directors” will be encouraged to help plan special parent/student events.
3. Expand the College and Career Readiness Activities for Students. Steps: Intentionally planned activities that foster college and career readiness will be scheduled throughout the year. Activities that engage students in the process of learning about college and career such as, having ACE teachers and ACE students collage activities for their favorite college to be displayed during the year. A college day will be planned in which all teachers and students wear their favorite college T-shirt or Jersey. A cafeteria -style format will display the different colleges. Students will rotate through the cafeteria to view the displays. A career day is also planned to include representatives from local businesses in town.
4. Examine Enrichment Program to see if any modifications in the activities Steps: The Task Force will examine each activity to see if enough students are attending the activities to make them worthwhile fiscally and for the students. If not, the activities will be cancelled.
Ryan SparksLa Vega Intermediate Center # 2August 10, 2014
XI. Appendices
All Tx21st reports used in the analysis (we do not want the student export data)
34