KTG Education group has 4 colleges. The main college is LINTON University College. The 3 college are Pertama Institute of Technology, Jati Institute, and The International Institute of Science Mantin (IASM).
Figure 1: Logo Linton (Linton Admin, 2017)
All of the college has own objective LINTON University a provider of premier education in a wide variety of fields spanning humanities, sciences, business, engineering and accounting & finance.
Figure 2: Logo Pertama Institute of Technology (Linton Admin, 2017)
While the, Pertama Institute of Technology offers courses in four major areas, namely engineering, built environment, computing and business, with specialized fields of study in engineering, architecture, information technology and business.
Figure 3: Logo Jati (Linton Admin, 2017)
In addition, Jati Institute established private institutions of higher learning in the state, specializing in professional courses in accounting and business.
Figure 4: Logo the International Institute of Science Mantin (Linton Admin, 2017)
And lastly The International Institute of Science Mantin (IASM) focus on allied health, IASM prides itself on offering students unparalleled real work experience in the demanding field of nursing.
http://www.ktg.edu.my/
KTG group has an English Centre, School of Business and Management (SOBM), School of Applied Arts and Design (AAVA), School of Fashion and Textiles (SOFD), School of Accounting and Finance (SOF) , School of Mechanical Engineering (SOME), School of Media Art and Design (SOMAD), School of Computer Science and Information Technology (SOCS), School of Electrical and Electronic Engineering (SOEAE) and School of Architecture Design (SOAD) in LINTON University College. __ Students in all of the school and __staff include lecturers and admin management. The entire course has own office and class.
A1 to A5 Block is used by School of Accounting and Finance (SOF), School of Computer Science and Information Technology (SOCS), School of Electrical and Electronic Engineering (SOEAE), English Centre, School of Business and Management (SOBM), and Café.
Besides block A1 to A5, B1 and B2 are also used by several schools namely School of Applied Arts and Design (AAVA), School of Fashion and Textiles (SOFD), ), School of Electrical and Electronic Engineering (SOEAE) and School of Architecture Design (SOAD).
The chart below shows the floor and room use on A1 to A5 and each the floor:
Chart 1 : floor in block A1 to A5
Each color represents the floors :
* Red : Ground Floor
* Blue Black : 1st Floor
* Yellow : 2nd Floor
* Green : 4th Floor
* Purple : 5th Floor
All in
Task 1: Brainstorming
Proposed concept and idea
Concept and idea for the exhibition:-
Theme : Urban
Title : Linton Sport Center
Logo :
A1office lecturer A2office lecturer A3SOBMoffice lecturerOrentation Hall A4office lecturer Mosque A5cafe
In this election the researcher chose to build a sports centre. Because this college has sports-athletes and students. From the research is conducted, this will use sketch up software to draw ideas. This construction is cantered on a college volleyball court. This shows the adaptability to the situation. For example, adjacent to the hostel and within the college area.
There are the references :
Figure 5: urban concept sport centre (Archdaily, 2005)
The capacity of the building is 1000 persons included lecturers, students and staff. Every intake student show increase of the student joins this college.
There are schedule every week need to do.
The table below shows grant chart we plan for to do the work:
Week / plan1 2 3 4 5 6 7 8 9 10 11 12 13 14
Brainstorming
Project Management And Team Management
Developing An Exhibition / Production Proposal
Exhibition Design And Implementation
Marketing Production
Planning And Curetting
Guest Management
Table 1.0: Grant Chart
Task 2: Project Management and Team Management
The hierarchy of the project
Figure 6.0: The hierarchy of the project
In a group project Zheng Bo and me has own work need to settle but after finish our part we’ll combined in a project. My part more focus to on research and design but I still do 3D building for represent my concept. Zheng Bo more focus on builds sport centre in Maya and detail every part of building.
Project3.0 Build
This is my sketches before do in sketch up software.
Figure 7: ground floor idea
Figure 8: first floor idea
Figure 9: front view idea
2D
Do it in sketch up software :
Figure 10: 2d building
Figure 11: 2d building
Figure 12: 2d building
Figure 13: 2d building
Figure 14: 2d building
Figure 15: 2d building
Figure 16: 2d building
Figure 17: 2d building
Figure 18: 2d building
Figure 19: 2d building
Figure 20: 2d building
Figure 21: 2d building
Figure 22: 2d building
Figure 23: 2d building
Figure 24: 2d building
Figure 25: 2d building
Figure 26: 2d building
Figure 27: 2d building
Figure 28: 2d building
3D Maya Sport Centre
Figure 29: 3d building
Figure 30: 3d building
Figure 31: 3d building
Figure 32: 3d building
The final result from 2D Sketch up
Figure 33: 2D Sport Centre
Figure 34: 2D Sport Centre
Figure 35: 2D Sport Centre
Figure 36: 2D Sport Centre
Figure 37: 2D Sport Centre
Figure 38: 2D Sport Centre
Figure 39: 2D Sport Centre
Figure 40: Poster
Figure 40: Pamplete
Conclusion
In conclusion, good projects should have high hopes, easy to use and reasonable cost to be acceptable to consumers. This project has achieved the aspects that have been put forward and it has the potential to become a popular tool among the community today.
From the project I had a lot of problems. One of them is teamwork and skills. However, I can handle it despite much disappointment. I can also learn new software and skills. This project can enhance the knowledge and experience about the process of creating a banner. In the process of creating this project, be creative, innovative and independent to produce products and bring progress to everyday life.