: :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of...

47

Transcript of : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of...

Page 1: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received
Page 2: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received
Page 3: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received
Page 4: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received
Page 5: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received
Page 6: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received
Page 7: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received
Page 8: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received
Page 9: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received
Page 10: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received
Page 11: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received
Page 12: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received
Page 13: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received
Page 14: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received
Page 15: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received
Page 16: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received
Page 17: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received
Page 18: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received
Page 19: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received
Page 20: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received
Page 21: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received

Ann

ex 1

9. S

umm

ary

Res

ults

Tab

le o

f PQ

, MFT

and

PV

per

form

ance

sSu

mm

ary

Res

ults

Tab

le o

f PQ

, MFT

and

PV

perf

orm

ance

s

Acce

ptan

ce C

riter

iaR

es

ul

ts

Tem

p.:3

7℃37

±2℃

Min

:36.

1℃ M

ax:3

7.1℃

CO

2:5%

5±1

%M

in:5

.4%

Max

:5.6

%Te

mp.

:37℃

37±2

℃M

in: 3

6.3℃

Max

: 38.

0℃C

O2:5

%5±

1%

Min

:4.5

% M

ax:5

.2%

Tem

p.:3

7℃37

±2℃

Min

:36.

1℃ M

ax:3

6.9℃

CO

2:5%

5±1

%M

in:4

.5%

Max

:5.2

%Te

mp:

37℃

37±2

℃M

in:3

6.8℃

Max

:37.

4℃H

umid

: 62%

60±1

0%M

in:6

3% M

ax:6

7%M

in:1

19.7℃

Max

122.

2℃

Min

:119

.4℃

Max

122.

6℃

Min

:120

.6℃

Max

:122

.8℃

BI(3

/3:-),

Tem

p.&t

ime

: ≧12

1℃,1

4min,

F0 :

Min

21.1

,Max

22.3

BI(3

/3:-),

Tem

p.&t

ime

: ≧12

1℃,1

3min,

F0 :

Min

20.0

,Max

21.9

BI(3

/3:-),

Tem

p.&t

ime

: ≧12

1℃,1

4min,

F0 :

Min

20.3

,Max

22.9

BI(1

0/10

:-),

Tem

p.&T

ime

: ≧19

0℃, 2

8min

.BI

(10/

10:-),

Tem

p.&T

ime

: ≧19

0℃, 2

8min

.BI

(10/

10:-),

Tem

p.&T

ime

: ≧19

0℃, 3

0min

.BI

(Gra

de B

: 12

/12:

- ,

Gra

de C

: 18

/18:

- )

Form

alin

resi

dual

: N

on d

etec

t1s

t: Ai

rbor

ne: O

k; S

ettin

g pl

ate:

Ok;

Con

tact

pla

te: O

k; P

artic

le c

ount

: Ok

2nd:

Airb

orne

: Ok;

Set

ting

plat

e: O

k; C

onta

ct p

late

: Ok;

Par

ticle

cou

nt: O

k3r

d: A

irbor

ne :

Ok;

Set

ting

plat

e: O

k; C

onta

ct p

late

: Ok;

Par

ticle

cou

nt: O

k1s

t: O

K2n

d: O

K3r

d: O

kR

inse

(3 L

ocat

ions

) : 0

,0,0

Sw

ab (1

Loca

tion)

: sa

me

as c

ontro

l (Bo

th d

ata≦

500p

pb)

Rin

se (3

Loc

atio

ns) :

70,

90,1

20 S

wab

(1Lo

catio

n) :

sam

e as

con

trol (

Both

dat

a≦50

0ppb

)R

inse

(3 L

ocat

ions

) : 7

0,13

0,12

0 Sw

ab (1

Loca

tion)

: sa

me

as c

ontro

l (Bo

th d

ata≦

500p

pb)

BI:(1

2/12

:-), T

emp.

:OK,

F0:

46.6

7BI

:(12/

12:-)

, Tem

p.:O

K, F

0:46

.99

BI:(1

2/12

:-), T

emp.

: OK,

F0:

43.7

2Sa

mpl

es (1

6 Lo

catio

ns):

Min

150,

Max

250

,C

ontro

l (16

loca

tions

) : M

in11

0, M

ax43

0Sa

mpl

es (1

6 Lo

catio

ns):

Min

30, M

ax17

0,C

ontro

l (16

loca

tions

) : M

in11

0, M

ax43

0ok

≤ 60

00pa

rticl

e/vi

alR

ubbe

r sto

pper

for W

FI: P

artic

le c

ount

: ok;

End

otox

in: o

k≤

0.25

EU

/ml

Rub

ber s

topp

er fo

r Vac

cine

: Par

ticle

cou

nt: o

k; E

ndot

oxin

: ok

For W

FI :

0.18

~0.

25%,

For F

reez

e D

ry :

0.20

~0.

24%

For W

FI :

0.20

~0.

31%,

For F

reez

e D

ry :

0.18

~0.

28%

For W

FI :

0.13

~0.

26%,

For F

reez

e D

ry :

0.18

~0.

22%

Endo

toxi

n (9

Loca

tions

: ≧

6 Lo

g re

duct

ion,

Max

tem

p. (9

sen

sors

) 300

.30 C

~31

9.4

0 CEn

doto

xin

(9Lo

catio

ns : ≧

5 Lo

g re

duct

ion,

Max

tem

p. (9

sens

ors)

: 301

.8 0 C

~31

9.9

0 C

Endo

toxi

n (9

Loca

tions

: ≧

5 Lo

g re

duct

ion,

Max

tem

p.(9

sen

sors

) :30

0.0

0 C ~

312.

3 0 C

1st:

BI (1

8/18

:-): O

K; F

orm

alin

resi

dual

: non

det

ect

2nd:

BI (

18/1

8:-):

OK;

For

mal

in re

sidu

al: n

on d

etec

t3r

d: F

orm

alin

resi

dual

: non

det

ect

1st:

OK

2nd:

Ok

3rd:

Ok

1st:

one

pers

on is

out

of c

riter

ia =

> in

stru

ctio

n =>

alre

ady

impl

emen

t aga

in a

nd re

sult

OK;

oth

ers:

OK

2nd:

Ok

3rd

: Ok

1st:

Ok

2nd:

Ok

3rd:

Ok

3rd

day:

Ok;

5th

day

: Ok;

7th

day

: Ok

14th

day

: Ok

MFT

Sam

e as

nor

mal

prod

uctio

n3

times

No

cont

amin

atio

n fo

r all

lots

No

cont

amin

atio

n fo

r all

3 lo

tsPa

ss

PVSa

me

as n

orm

alpr

oduc

tion

3 tim

es

Mee

t all

crite

ria fo

r mea

sles

vac

cine

in:

Iden

tity

test

, Ste

rility

test

, pot

ency

and

ther

mo

stab

ility

test

, Gen

eral

saf

ety

test

,R

esid

ual m

oist

ure

cont

ent a

ndIn

spec

tion

of fi

nal c

onta

iner

QC

test

s ar

e in

pro

gres

s of

impl

emen

ting.

Rin

se(3

Loc

atio

ns) :

360,

500,

270,

Swab

(3 L

ocat

ions

) : S

ame

as c

ontro

l (Al

l dat

a≦50

0ppb

) R

inse

(3 L

ocat

ions

) : 1

40,1

30,1

40,

Swab

(3Lo

catio

ns) :

Sam

e as

con

trol (

All d

ata≦

500p

pb)

Rin

se(3

Loc

atio

ns) :

150

,170

,150

,Sw

ab (3

Loca

tions

) : S

ame

as c

ontro

l (Al

l dat

a≦50

0ppb

)BI

(4/4

: - ),

Tem

p.&T

ime

: ≥21

9.3

o C; 3

0m B

I(4/4

: - ),

Tem

p.&T

ime

: ≥21

8.5

o C; 3

0m B

I(4/4

: - ),

Tem

p.&T

ime

: ≥21

9.7

oC; 3

0m

BI (1

5/15

: -);

form

alin

resi

due:

0.1

8ppm

; 0.1

35pp

m; 0

.09p

pmBI

(15/

15 :

-),fo

rmal

in re

sidu

e: n

one

dete

ctBI

(15/

15 :

-), F

orm

alin

resi

due:

non

det

ect

B gr

ade:

Airb

orne

: Ok;

Set

tling

pla

te: O

k; C

onta

ct p

late

: Ok;

Par

ticle

cou

nt: O

kC

gra

de: C

onta

c pl

ate:

1 p

oint

out

=>

inst

ruct

ion

=> im

plem

ent 3

tim

es a

gain

. Oth

ers:

OK

C g

rade

: rei

mpl

emen

tatio

n: O

K1s

t: O

K2n

d: O

K3r

d: O

k1s

t: O

K2n

d: O

k3r

d: O

kpH

Ster

ilized

test

P.1:

(BI:1

5/15

:- ),T

emp&

time:

OK

F0:4

2.83

P.4:

(BI:1

4/14

:-),T

emp&

Tim

e:O

K,F0

:47.

25P.

1:(B

I:15/

15:-

),Tem

p&tim

e:O

K F0

:43.

98P.

4:(B

I:14/

14:-)

,Tem

p&Ti

me:

OK,

F0:4

8.14

P.1:

(BI:1

5/15

:- ),T

emp&

time:

OK

F0:4

5.95

P.4:

(BI:1

4/14

:-),T

emp&

Tim

e:O

K,F0

:48.

52P.

2:(B

I:15/

15:-

),Tem

p&tim

e:O

K F0

:45.

5; P

.3:(B

I:14/

14:-)

,Tem

p&Ti

me:

OK,

F0:3

5.13

P.2:

(BI:1

5/15

:- ),T

emp&

time:

OK

F0:5

3.19

;P.3

:(BI:1

4/14

:-),T

emp&

Tim

e:O

K,F0

:37.

3P.

2:(B

I:15/

15:-

),Tem

p&tim

e:O

K F0

:39.

3;P.

3:(B

I:14/

14:-)

,Tem

p&Ti

me:

OK,

F0:3

9.3

P.1:

(BI:1

0/10

:-), T

emp.

:OK,

P.2:

(BI:1

0/10

:-),T

emp.

:OK,

P.3:

BI(7

/7:-)

,Tem

p.:O

KP.

1:(B

I:10/

10:-)

, Tem

p.:O

K,P.

2:(B

I:10/

10:-)

,Tem

p.:O

K,P.

3:BI

(7/7

:-),T

emp.

:OK

P.1:

(BI:1

0/10

:-), T

emp.

:OK,

P.2:

(BI:1

0/10

:-),T

emp.

:OK,

P.3:

BI(7

/7:-)

,Tem

p.:O

K

Oth

er re

sult:

Ok

1st:

form

alin

resi

due:

ok;

BI:

Ok

2nd:

form

alin

resi

due:

ok;

BI:

Ok

3rd:

form

alin

resi

due:

ok;

BI:

Ok

Con

tact

pla

te: o

kPa

rticl

e co

unte

r: O

kAi

r sam

pler

: Ok;

set

tling

pla

te: O

k1s

t: Ai

rbor

ne: O

k; S

ettli

ng p

late

: Ok;

Con

tact

pla

te: O

k; P

artic

le c

ount

: Ok

2nd:

Airb

orne

: Ok;

Set

tling

pla

te: O

k; C

onta

ct p

late

: Ok;

Par

ticle

cou

nt: O

k

1st:

Ok

2nd:

Ok

3rd:

Ok

1st:

Ok

2nd:

Ok

1st:

Ok

one

time:

out

of s

peci

ficat

ion

due

to A

utoc

lave

doo

r ope

n w

hen

mea

surin

g te

mp.

and

hum

idity

=>

alre

ady

impl

emen

t aga

in.

Pass

Pass

Pass

Pass

Tem

p: 3

-8℃

Mic

roor

gani

sm: A

irbor

ne o

rgan

ism

,se

ttlin

g pl

ate,

Con

tact

pla

teM

icro

parti

cle:≦

5μm

,>5μ

m

Mic

roor

gani

sm: A

irbor

ne o

rgan

ism

,se

ttlin

g pl

ate,

Con

tact

pla

teM

icro

parti

cle:≦

5μm

,>5μ

m

Mic

roor

gani

sm: A

irbor

ne o

rgan

ism

,se

ttlin

g pl

ate,

Con

tact

pla

teM

icro

parti

cle:≦

5μm

,>5μ

m

Mic

roor

gani

sm: A

irbor

ne o

rgan

ism

,se

ttlin

g pl

ate,

Con

tact

pla

teM

icro

parti

cle:≦

5μm

,>5μ

m

Rin

se s

olut

ion:≦

500p

pbSw

ab: s

ame

as c

ontro

l

BI:(-

),Te

mp.

&Tim

e:≧

190℃

,≧30

min

.,

Mic

roor

gani

sm (C

onta

ct P

late

)

Mic

roor

gani

sm (C

onta

ct P

late

)

Mic

roor

gani

sm (C

onta

ct P

late

)

Mic

roor

gani

sm (C

onta

ct P

late

)

Mic

roor

gani

sm (C

onta

ct P

late

)

Pro

cess

con

trol i

tem

s L

ot u

nifo

rmity

Pro

cess

con

trol i

tem

s L

ot u

nifo

rmity

Mic

roor

gani

sm (C

onta

ct P

late

)

Tem

p.:2

2±4℃

Hum

i.:50

±20%

Tem

p.:2

2±4℃

Hum

i.:50

±20%

Mic

roor

gani

sm: A

irbor

ne o

rgan

ism

,se

ttlin

g pl

ate,

Con

tact

pla

teM

icro

parti

cle:≦

5μm

,>5μ

m M

icro

orga

nism

: Airb

orne

org

anis

m,

settl

ing

plat

e, C

onta

ct p

late

Mic

ropa

rticl

e:≦

5μm

,>5μ

m

Mic

roor

gani

sm (C

onta

ct P

late

)

Mic

roor

gani

sm (C

onta

ct P

late

)

BI:(-

),Te

mp.

&Tim

e:≧

190℃

,≧30

min

.,

BI:(-

)Te

mp.

&Tim

e:≧

121℃

,≧20

min

.D

ev.te

mp.

:±2℃

, F0

:≧12

BI:(-

)Te

mp.

&Tim

e:≧

121℃

,≧20

min

.D

ev.te

mp.

:±2℃

, F0

:≧12

Tem

p.:3

7.6±

1℃,

Hum

id.:

50-7

0%

Tem

p.:3

7.5±

1℃

Tem

p.: 3

2±1℃

Pass

Pass

Pass

Pass

Pass

Pass

Pass

Min

4.0℃

,M

ax 8

.0℃

With

out e

gg in

side

: Tem

p. (M

ax: 3

8.60 C

, Min

:36.

70 C)

Hum

id.:(

Max

: 63%

; Min

: 52%

)W

ith e

gg in

side

: Tem

p. (M

ax: 3

8.10

C, M

in:3

6.80

C)

Hum

id.:(

Max

: 64%

; Min

: 61%

)

Qua

lific

atio

n of

SO

P(R

out)

NC→D

,D→

C,

C→

B

Dec

isio

n of

sto

rage

perio

d in

Ste

rile

room

Stor

age

Loca

tion:

Gra

deB

Con

firm

atio

n of

envi

ronm

enta

lco

nditi

on

Gra

de: B

,C,D

(at d

ynam

ic)

Con

firm

atio

n of

qual

ifica

ted

pers

on9

pers

ons

Gra

de: B

,C,D

Con

firm

atio

n of

envi

ronm

enta

lco

nditi

on

Gra

de: B

,C,D

(at s

tatic

)

Effe

ct o

f ste

riliz

atio

nG

rade

: B,C

BI: ≧

3 lo

g re

duct

ion,

Res

idua

l for

mal

in in

3rd

tim

e:≦

0.1p

pm

Effe

ct o

f ste

riliz

atio

nLo

adin

g Pa

ttern

1,2

,3

Tem

pera

ture

dist

ribut

ion

Tem

p.: 3

7.5℃

Tem

p.: 3

2℃

Tem

p.:5℃

Tem

p.: 3

7.6℃

,H

umi.:

60%

1 tim

e

Con

firm

atio

n of

envi

ronm

enta

lco

nditi

on

Effe

ct o

f ste

riliz

atio

nLo

adin

g Pa

ttern

1,4

Effe

ct o

f ste

riliz

atio

nLo

adin

g Pa

ttern

2,3

3 tim

es

3 tim

es

3 tim

es

1tim

e

3 tim

es

3 tim

es

1 tim

e

1 tim

e

1 tim

e

3 tim

es

3 tim

es

3 tim

es

1 tim

e

Pass

Pass

Pass

Pass

Pass

Pass

Pass

Pass

Pass

Pass

Pass

Pass

Pass

Pass

Pass

Pass

Pass

Pass

Pass

Pass

Pass

Pass

Pass

Pass

Qua

lific

atio

n of

SO

P(R

out)

NC→D

,D→

C,

C→

B3

times

Con

firm

atio

n of

filtra

tion

proc

ess

Sam

e as

nor

mal

prod

uctio

n3

times

Con

firm

atio

n of

envi

ronm

enta

lco

nditi

on

Gra

de: B

,C,D

(at

dyna

mic

)3

times

Con

firm

atio

n of

qual

ifica

ted

pers

on5

pers

ons

3 tim

es

Gra

de: B

,C3

times

BI:≧

3 lo

g re

duct

ion,

Form

alin

resi

dual

in 3

rd ti

me:≦

0.1p

pm

Con

firm

atio

n of

envi

ronm

enta

lco

nditi

onG

rade

: B,C

,D (a

t sta

tic)

1 tim

e

Gra

de: A

,BEf

fect

of s

teril

izat

ion

3 tim

esBI

:≧3

log

redu

ctio

n,Fo

rmal

in re

sidu

al in

3rd

tim

e:≦

0.1p

pm

Gra

de: A

,B,D

(at

dyna

mic

)

Con

firm

atio

n of

qual

ifica

ted

pers

on6

pers

ons

Qua

lific

atio

n of

SO

P(R

out)

NC→D

,D→B

,B→A

Valid

atio

n Br

ingi

ng s

ubst

ance

into

room

Stor

age

of s

teril

ized

sub

stan

ce

Bulk

Con

firm

atio

n of

envi

ronm

enta

lco

nditi

on

Con

firm

atio

n of

envi

ronm

enta

lco

nditi

on

Dec

isio

n of

sto

rage

perio

d in

Ste

riliz

e ro

om

Con

firm

atio

n of

all

proc

ess

for V

irus

man

ufac

turin

g

Con

firm

atio

n of

all

proc

ess

for W

FI m

anuf

actu

ring

Form

alin

Fum

igat

ion

Effe

ct o

f ste

riliz

atio

n

Mea

surin

g of

Tem

p.&

Hum

id.

Pre-

envi

ronm

enta

l Mon

itorin

g

Envi

ronm

enta

l Mon

itorin

g

Gow

ning

Val

idat

ion

Form

alin

Fum

igat

ion

Rev

olvi

ng T

ype

egg

Incu

bato

r

Incu

bato

r Roo

m 1

Incu

bato

r Roo

m 2

Col

d R

oom

Qua

lity

ofVi

rus

dilu

ted

solu

tion

Auto

clav

e(C

ell s

olut

ion)

Auto

clav

e(V

irus

Cul

ture

)

Dry

Ove

n(C

ell C

ultu

re &

Viru

s)

Pre-

envi

ronm

enta

l Mon

itorin

g

Envi

ronm

enta

l Mon

itorin

g

Gow

ning

Val

idat

ion

Valid

atio

n Br

ingi

ng s

ubst

ance

into

room

Mea

surin

g of

Tem

p.&

Hum

id.

Con

firm

atio

n of

envi

ronm

enta

lco

nditi

onG

rade

: B,C

,D2d

ays

3 tim

es

Dry

Ove

nEf

fect

of s

teril

izat

ion

Load

ing

Patte

rn 1

(Set

par

amet

er)

Tem

p.:

240℃

,Tim

e:30

min

.3

times

Sam

e as

nor

mal

prod

uctio

n

Stor

age

Loca

tion:

Gra

deB

Sam

e as

nor

mal

prod

uctio

n

Was

hing

of E

quip

men

tsEf

fect

of w

ashi

ngBy

man

ual

Stor

age

of s

teril

ized

sub

stan

ce

Tem

p.:2

2±4℃

Hum

i.:50

±20%

1 tim

e

1 tim

e

1 tim

e

1 tim

e

3 tim

es

3 tim

es

3 tim

es

Con

firm

atio

n of

envi

ronm

enta

lco

nditi

onG

rade

: A,B

,D5d

ays

Tunn

el S

teril

izer

Effe

ct o

f de-

endo

toxi

n

3 tim

esR

ubbe

r Sto

pper

for W

FI:≦

0.5%

Rub

ber S

topp

er fo

r Fre

eze

Dry

:≦0.

3%

(Set

Par

amet

er)

Hot

zon

e te

mp.

: 320

℃Be

lt Sp

eed:

137m

m/m

in3

times

Endo

toxi

n: ≧

3 lo

g re

duct

ion

Max

Tem

p.:≧

300℃

,

1 tim

e

Was

hing

of F

reez

e D

ryer

Rin

se s

olut

ion:≦

500p

pb (T

OC

)Sw

ab: s

ame

as c

ontro

l (TO

C)

Effe

ct o

f was

hing

Was

hing

of E

quip

men

ts

4 pe

rson

s

CIP

Swab

; sam

e as

con

trol

(TO

C) ≤

500

ppb

BI:(-

)Te

mp.

&Tim

e:≧

121℃

,≧20

min

.D

ev.te

mp.

:±2℃

, F0

:≧12

3 tim

es

3 tim

es

3 tim

es

By m

anua

l

Envi

ronm

enta

l Mon

itorin

g

Pass

Pass

Pass

Gra

de: A

,B,C

(at s

tatic

)

Dry

Ove

nEf

fect

of s

teril

izat

ion

Load

ing

Patte

rn 1

(Set

par

amet

er)

Tem

p.: 2

40℃

, Tim

e: 7

0m3

times

BI:(-

),Te

mp.

&Tim

e:≧

190℃

,≧20

min

Pass

Gow

ning

Val

idat

ion

3 tim

es

1 tim

eBI

:≧3

log

redu

ctio

n,Fo

rmal

in re

sidu

al o

f 3rd

tim

e: ≦

0.1p

pm

3 tim

es

Mic

roor

gani

sm: A

irbor

ne o

rgan

ism

,se

ttlin

g pl

ate,

Con

tact

pla

teM

icro

parti

cle:≦

5μm

,>5μ

m

Mic

roor

gani

sm (C

onta

ct P

late

)

Con

firm

atio

n of

envi

ronm

enta

lco

nditi

on

Con

firm

atio

n of

qual

ifica

ted

pers

on

Pass

Pass

Pass

3 tim

esBI

:(-),

Tem

p.&T

ime:≧

121℃

,≧12

min

.F0≧

12Pa

ss

Pass

Pass

1 tim

e

Gra

de: A

,B,D

(at s

tatic

)

Auto

clav

e (T

ray

of F

.D)

Effe

ct o

f ste

riliz

atio

nLo

adin

g Pa

ttern

1

Effe

ct o

f was

hing

Qua

lity

of ru

bber

sto

pper

rece

ived

Con

firm

atio

n of

supp

lier's

cer

tific

atio

n-

Qua

lific

atio

n of

dryi

ng T

ime

(Set

Par

amet

er)

V

acuu

m d

rytim

e:90

min

H

ot D

rytim

e:90

min

.

Moi

stur

e co

nten

t of r

ubbe

r sto

pper

afte

r dry

ing

by A

utoc

lave

Mea

surin

g of

Tem

p.&

Hum

id.

Fina

lPr

oduc

tion

Pre-

envi

ronm

enta

l Mon

itorin

g

Envi

ronm

enta

l Mon

itorin

g

Gow

ning

Val

idat

ion

Valid

atio

n Br

ingi

ng s

ubst

ance

into

room

Med

ium

Form

alin

Fum

igat

ion

Tem

pera

ture

dist

ribut

ion

Load

ing

Patte

rn 1

(Set

par

amet

er)

Tem

p.:1

21℃

,Tim

e: 1

hour

QC

Form

alin

Fum

igat

ion

Effe

ct o

f ste

riliz

atio

nG

rade

: A,B

,C

CO

2 In

cuba

tor C

CO

2 In

cuba

tor A

Dep

artm

ent

Mac

hine

Nam

e &

PQ

Item

sPQ

con

tent

Sum

mar

y of

PQ c

ondi

tion

Judg

men

tE

va

lu

at

io

nN

umbe

r of

tim

es

Lab.

Aut

ocla

ve D

for B

iolo

gica

l lab

Effe

ct o

f ste

riliz

atio

nLo

adin

g Pa

ttern

1(S

et p

aram

eter

)Te

mp.

:123

℃,T

ime:

20m

121±

2℃

Egg

Incu

bato

rTe

mp.

&H

umid

.dis

tribu

tion

1 tim

e

CO

2 In

cuba

tor B

1 tim

e

1 tim

e

3 tim

esLa

b. A

utoc

lave

Efo

r Che

mic

al la

b

Tem

pera

ture

dist

ribut

ion

Dis

infe

ctio

n R

m.&

Vial

was

hing

Rm

:1da

y⇒H

umid

ity :

Out

of C

riter

ia =

> S

olut

ion:

atta

ch th

e ha

ndle

devi

atio

n re

port

with

PQ

repo

rtAl

l of a

noth

er d

ata

: with

in C

riter

ia

1 R

oom

:1da

y ⇒

Tem

pera

ture

: O

ut o

f Crit

eria

=>

Solu

tion:

atta

ch th

e ha

ndle

dev

iatio

n re

port

with

PQ

repo

rtAl

l of a

noth

er d

ata

: with

in C

riter

ia

Min

36.

5℃,

Max

38.0℃

Min

31.

1℃,

Max

32.5℃

Airb

orne

: Ok;

Set

tling

pla

te: O

k; C

onta

ct p

late

: Ok;

Par

ticle

cou

nt: O

k

Air b

orn:

Ok;

Set

tling

pla

te: O

k; C

onta

ct p

late

: Ok;

Par

ticle

cou

nt: O

k

with

in c

riter

ia

All r

esul

ts: w

ithin

crit

eria

All r

esul

ts: w

ithin

crit

eria

- 113 -

Page 22: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received
Page 23: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received
Page 24: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received
Page 25: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received
Page 26: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received
Page 27: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received

2.円卓会議プレゼンテーション資料・議事録

Outstanding issues on vaccine regulation in Viet Nam: Towards

WHO-accreditation of Viet Nam NRA

Hanoi, 17 Dec 2007

Hitoshi MurakamiJICA mid-term evaluation team for Polyvac

measles vaccine production project

Future exportation of Vietnamese vaccines to region and the world

• Beneficial in terms of:– Global diversification of basic vaccines production– Regional vaccine security– Application of international quality standard →better quality of domestic vaccines and assurance of safety among Vietnamese children

– Financial sustainability of manufacturers

Polyvac measles vaccine aims at WHO pre-qualification for possible export through UN.

• There are two requirements if Vietnamese vaccine to be WHO pre-qualified and exported through United Nations:

1) National Regulatory Authority (NRA) for vaccines should be accredited by WHO for its 6 critical functions.

2) Manufacturers meet the WHO pre-qualification requirement for the product

Source of vaccinesUN agency Procure Produce

FunctionsUndertakenby WHO onBehalf of

UN agencies or producing

countries

Functionsundertaken

By theproducing country

National Regulatory Functions depend on vaccine source

Licensing

Laboratory access

GMP inspections

Lot release

Supervision of clinical trials

Postmarketing: AEFI

Regulatory system

Regu

lato

ry f

unct

ions

Regulatory functions

Ideal vaccine regulation processPre -Marketing: marketing Authorization/ Licensing

Post Marketing

AEFIsurveillance

Lot release

GMPinspections

Market distribution

Clinical trialsEthics, GLP;GMP,GCP

Quality

Safety

Efficacy

Product Evaluation

GMP compliance

Licensingfacility

Laboratory testing

Dossier

Difference between biologicals and pharmaceuticals regulations

• Biological process, unlike chemical process, derives obvious fluctuation of product quality by each lot (e.g. wine fermentation)

lot by lot market release certification (lot release) by the National Regulatory Authority (NRA) is required.

• NICVB has been trained and is capable of undertaking the vaccine lot release.

• Lot (batch) release with quality assurance is primarily the responsibility of manufacturers in the case of pharmaceuticals.

- 119 -

Page 28: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received

• In early 2006, Viet Nam NRA met only 2/6 WHO accreditation criteria. Only NICVB and National EPI (for post-marketing surveillance) has been assessed.

1) GMP inspection Passed

2) Lot release Passed

3) Clinical trials supervision Not passed yet

4) Licensing Not passed yet

5) Laboratory access Not passed yet

6) Post-marketing surveillance Not passed yet

• For current status, re-evaluation is needed.

Outstanding vaccine regulatory issues: 1. Technical issues

Outstanding vaccine regulatory issues: 2. Organizational/institutional issues

• Following 3 conflicts of interest existing within the regulatory system addressed by Dr. Omi, Regional Director, WPRO-WHO in 2005:

1) Having both state-owned vaccine manufacturers and NICVB report to the same department within MOH.

2) Involvement of NIHE in the licensing board while the Institute held a manufacturer as part of it.

3) Involvement of vaccine manufacturers in GMP inspection team (ref. Circular 19/2005/TT-BYT).

Our current understanding of the status of conflicts of interest addressed by Dr. Omi, WHO

Revise circular 19 and form GMP inspection team only by inspectors without any relation with manufacturer(s).

Circular 19/2005/TT-BYT still in effect but under review.

3) Involvement of vaccine manufacturers in GMP inspection team

None (resolved!)NIHE and manufacturer are organizationally and financially separated.

2) NIHE represents a manufacturer and sits in licensing board.

Divert departments reported by manufacturers and regulatory body.

Both still report to the same Dept of Drug admin.

1) Manufacturers & NICVB report to same dpt.

Actions needed

Current statusItems

Further potential conflicts of interest

Avoid inclusion of manufacturers in the science/ethical committees.

New science/ethical committee members are yet to be determined.

Independence of science/ethical committees from manufacturers

Appoint a new implementer not having seat in licensing /ethical boards.

NIHE is considered to be contracted as an implementer of CT for Polyvac MV.

Clinical trials implementers

Actions needed

Current statusItems

Outstanding questions

• Which of the followings is the NRA in Viet Nam for vaccines?– NICVB?– Dept of Drug Administration, MOH?– Dept of Science and Training, MOH?– A combination or all of above?

• If a combination or all of above are to be the Viet Nam NRA, are they ready to be inspected for NRA accreditation by WHO?

• If not, when will NRA be ready for the WHO accreditation?

Particular concerns related with Polyvac measles vaccine project

• How can Polyvac ensure that their upcoming measles vaccine clinical trial (planned in Jan 2008) is accepted in future WHO pre-qualification assessment by selecting an implementer without any connection with clinical evaluation/ licensing process?

• Who will issue GMP certificate to Polyvac measles vaccine facility, NICBV (planning inspection in Dec 2007) or Dept of Drug Administration? – Certification must be essential for the product licensing

of the measles vaccine.• Can Polyvac measles vaccine be licensed

according to the project schedule (vaccine from bulk in 2008 and that from the seed in 2009)?

- 120 -

Page 29: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received

Minutes of Vaccine Regulation Roundtable Meeting

Time and date: 14-16:00, 17 December 2007 (Monday) Location: Conference room, WHO Viet Nam Office Objective: To clarify the current status of the national regulatory system of vaccine in Viet Nam on the basis of the findings of the Japan International Cooperation Agency (JICA) mid-term evaluation team for the POLYVAC measles vaccine production project and discuss the outstanding constraints for the regulatory authority (NRA) to be accredited by the World Health Organization (WHO). Participants: Dr. Tran Thi Giang Huong, Department of International Cooperation, MOH Dr. Dang Thi Minh Hang, Department of Drug Administration, MOH Dr. Nguyen Xuan Tung, Vietnam Administration of Preventive Medicine, MOH Dr. Dang Duc Anh, Deputy Director, NIHE (National Institute of Hygiene and Epidemiology) Dr. Duong Thi Hong, National Expanded Programme on Immunization Office, NIHE Dr. Hoang Thi Hong, Deputy Director, NICVB* Dr. Nguyen Dang Hien, Director, POLYVAC Mr. Hiroaki Nakagawa, Resident Representative, JICA** Viet Nam Office Mr. Yosuke Kobayashi, Deputy Resident Representative, JICA Viet Nam Office Ms. Kaori Takai, Assistant Resident Representative,JICA Viet Nam Office Ms. Chu Xuan Hoa, Assistant Program Officer, JICA Viet Nam Office Dr. Tomio Lee, Kitasato Institute Mr. Shuzo Ishikawa, Kitasato Institute Dr. Katsuyuki Tsukamoto, Medical Officer, WHO Viet Nam Office Mr. Tomomi Ibi, Mid-term Evaluation Team Member (JICA Headquarters) Ms. Chiaki Kido, Mid-term Evaluation Team Member (System Science Consultants Co. Ltd) Dr. Hitoshi Murakami, Mid-term Evaluation Team Member (IMCJ***)

*National Institute for Control of Vaccines and Biologicals

**Japan International Cooperation Agency

***International Medical Center of Japan

Chairperson, Dr. Tsukamoto, the EPI Medical Officer, WHO Viet Nam Office officially commenced the meeting.

- 121 -

Page 30: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received

1. Address by Mr. Nakagawa, JICA Resident Representative to Viet Nam He addressed the following key points: 1) JICA has been working on the POLYVAC measles vaccine production project since the

beginning of 2006. 2) Initially the project intends to ensure a stable supply of measles vaccine in Viet Nam but

eventually also assumes export to neighbouring countries to further ensure regional vaccine security to fundamentally contribute to the WPRO’s measles elimination goal of 2012.

3) For Vietnamese vaccines to be exported through the United Nations, the NRA needs to be WHO-accredited.

4) For above, two conditions need to be met soon: first to establish a regulatory system without any conflict of interest within and second to upgrade its six critical regulatory functions up to the WHO-accreditation level.

5) JICA asks the relevant organizations in Vietnam, especially the Ministry of Health, to take the initiative in solving this issue. JICA also asks the WHO office for its continuous support.

2. Self-introduction of each participant According to the chairperson’s suggestion, each participant introduced him/herself. 3. Presentation on outstanding issues in the Viet Nam NRA in relation with the POLYVAC measles vaccine project proceedings Dr. Murakami, a member of the JICA mid-term evaluation team for the POLYVAC measles vaccine production project, has presented conditions for vaccine export through the UN, WHO requirement of national regulatory authority (NRA) functions, its current status in Viet Nam and outstanding issues for the NRA to be WHO-accredited. The outstanding regulatory issues in Viet Nam addressed included the followings: 1) Manufacturers and NICVB, which is regarded as the main component of the Vietnam NRA,

have been reporting to same MOH department (currently to Department of Drug Administration and formerly to Vietnam Administration of Preventive Medicine), constituting a fundamental conflict of interest.

2) Involvement of vaccine manufacturers in GMP (good manufacturing practice) inspection team as stipulated by the MOH Circular No. 19/2005/TT-BYT that is still in effect (but under review).

- 122 -

Page 31: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received

3) For clinical trials supervision, the Science and Technology Committee and Ethical Committee, both organized by the Department of Science and Training, Ministry of Health (MOH), do not have specified membership but rather the members are called upon on protocol-by-protocol basis. This arrangement does not ensure avoidance of the conflict of interest by itself unless additional regulation to ban such conflict is settled.

4) NIHE is considered to be contracted to be an implementer of the clinical trial of the POLYVAC measles vaccine that had been produced from an imported bulk. This constitutes a potential conflict of interest because NIHE is a member of the Licensing Committee organized by the Department of Drug Administration, MOH.

He also posed the following questions for discussion: 1) Which entity is ultimately the NRA in Viet Nam (NICVB, Department of Science and

Training, Department of Drug Administration, or a combination or all of them)? 2) How can POLYVAC ensure that their upcoming measles vaccine clinical trial (planned in

Jan 2008) is accepted in future WHO-prequalification assessment by selecting an implementer without any connection with clinical evaluation/ licensing process?

3) Who will issue GMP certificate to POLYVAC measles vaccine facility, NICBV (planning inspection in Dec 2007) or Department of Drug Administration (the certification must be essential for the product licensing of the measles vaccine)?

4) Can POLYVAC measles vaccine be licensed according to the project schedule (vaccine from bulk in 2008 and that from the seed in 2009)?

4. Comments from the WHO Viet Nam Office Dr. Tsukamoto reiterated the following three principal WHO standpoints: 1) Lack of conflict of interest amongst the NRA, MOH and vaccine manufacturers is a

prerequisite for the product prequalification and NRA accreditation by the WHO. 2) WHO requests MOH to clarify current structure of the Viet Nam NRA and issues related to

the NRA system. 3) Based on above, WHO will provide supports in conducting re-assessment of the NRA and

its accreditation if appropriate, as well as technical supports if needed. 5. Discussions Discussion on clinical trial of POLYVAC measles vaccine produced from bulk: (Dr. Duc Anh, NIHE) Clinical trial supervision is now regulated by the MOH Decision No. 01/2007/QD-BYT. It does not stipulate the fixed members of both the Science and Technology,

- 123 -

Page 32: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received

and the Ethical Committee. MOH is working on a document to further define the membership with an involvement of the Vice-Minister Dr. Tien. NIHE has not been and will not be involved in the clinical trial protocol approval of the POLYVAC measles vaccine, therefore does not have any conflict of interest. In the Licensing Committee, NIHE certainly holds a seat. However, the Institute has extensive experiences in clinical trials and also is GCP certified, therefore a suitable entity to conduct the clinical trial. The half million doses of measles vaccine produced from an imported bulk requires an urgent implementation of the clinical trial. The vaccine produced from a seed virus will eventually require a full set of clinical trial from phase one. It is not a big matter who conducts the clinical trial of the initial product from the bulk with limited amount because the eventual clinical trial of the vaccine from a seed is much more important and can be done by others. (Ms. Ibi, JICA mid-term evaluation team) Can I reconfirm whether the members of the Science and Technology as well as the Ethical Committee are fixed or not? (Dr. Anh Duc, NIHE) No, the membership is not fixed. As mentioned, NIHE surely sits in the Licensing Committee but it is quite experienced in conducting clinical trials. The clinical trial of the POLYVAC measles vaccine that was produced from the imported bulk should be done by NIHE according to the schedule without any delay. (Dr. Lee and Mr. Ishikawa, JICA POLYVAC Project) We concern that the above arrangement suggested by Dr. Anh Duc might possibly undermine the credibility of the clinical evaluation of the measles vaccine that will eventually be produced from a seed virus because we assume to apply a bridging study between the one produced from the imported bulk and the one from the seed. (Dr. Anh Duc, NIHE) Bridging study is not permitted because such method is not allowed according to the MOH Decision No. 1893/QD-BYT. (Dr. Hien, POLYVAC) The document mentioned above needs to be later reviewed and point to be clarified. The bridging study, from scientific point of view, is considered enough to prove the effectiveness and safety of our measles vaccine produced from a seed virus, but different people seem to have different opinion on it. We are waiting for the quality certification of our measles vaccine produced from the imported bulk by the end of December 2007. We then need to submit the clinical trial protocol along with the quality certificate for the approval of the undertaking of the clinical trial of this vaccine by the Science and Technology Committee and the Ethical Committee. The acceptability of the planned bridging study is a critically matter. If it is not accepted, the JICA project time-frame collapses. The quality certificate currently

- 124 -

Page 33: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received

required by the Department of Science and Training as a condition to approve the clinical trial protocol is technically not needed. (Dr. Hong, NICVB) The NICVB is authorized to issue the quality certificate according to the quality control tests conducted on the lot samples at the national reference laboratory. There is also a team for the clinical trial supervision and both will submit reports to the MOH. That, I understand, is the procedure. Discussion on the party(s) in charge of the GMP inspection and certification: (Dr. Hang, Department of Drug Administration) One significant difficulty in streamlining the vaccine regulatory system is that different regulatory functions are administered by different Vice-Ministers: VM Dr. Tien administers clinical trials supervision, VM Dr. Huan the Expanded Programme on Immunization (EPI) that actually implements the post-marketing surveillance of adverse events following immunization (AEFI), VM Dr. Quang licensing and VM Dr. Lien the POLYVAC project. In order to streamline the NRA issues, all VM need to work together. Currently, it is perceived that the Department of Drug Administration is officially in charge only of GMP inspection. The MOH Circular No.19/2005/TT-BYT is under review and will be amended soon. The Department is also planning to draft a new regulation on the GMP inspection separately from the Circular No. 19. Aside from the GMP, a new regulation on laboratory access is planned to be issued. (Dr. Hong, NICVB) NICVB’s terms of reference is stipulated by the MOH Decision No. 4268/2006/QD-BYT and accordingly involves all six critical vaccine regulatory functions. The Director of NICVB, Dr. Phung, will submit a new master plan very soon. Despite the above stipulations, the current regulatory functions and authorities entrusted to the NICVB is uncertain and ambiguous. For the GMP inspection, a lot of staff had been trained and participated in this activity. Likewise, the inspection on the POLYVAC measles vaccine facility is planned during 24-27 December 2007. Knowing that the Department of Drug Administration also assumes the responsibility in the GMP inspection, it is uncertain if a duplicated inspection might be conducted by the Department aside from the one already planned by NICVB in late December. (Dr. Tung, Vietnam Administration of Preventive Medicine) The MOH Circular No. 19/2005/TT-BYT is still effective and according to it the final authorizer of the GMP status is the Vietnam Administration of Preventive Medicine (VAPM). Now that all regulatory responsibility held by the VAPM have been transferred to the Department of Drug Administration, the Department holds the final authority over the GMP issue.

- 125 -

Page 34: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received

(Dr. Hong, NICVB) As part of the comprehensive GMP inspections, the facility licensing of the POLYVAC measles vaccine facility that focused on the facility aspect of GMP has already been conducted by the NICVB. The inspection of the production process will commence by the planned inspection during 24-27 December 2007. All these undertakings need consistency among each other. (Dr. Huong, Department of International Cooperation) Which of the six critical regulatory functions is the NICVB formally responsible for? (Dr. Hong, NICVB) The MOH Circular No. 19/2005/TT-BYT lacks logical integrity in various aspects. It should be streamlined and will be amended next year. Conclusive remarks: (Dr. Huong, Department of International Cooperation) I understood of the overview of the problems lying in the vaccine regulatory system. I want the POLYVAC to later report the issues in more details to the MOH, and after considerations among the MOH, we will officially respond to the JICA. Probably, when POLYVAC is called upon and confer with the MOH, both WHO and JICA Viet Nam Offices will also be involved. (Dr. Murakami, JICA evaluation team) For the implementer of the upcoming measles vaccine clinical trial (planned in Jan 2008), I propose myself and Dr. Tsukamoto to clarify with the WHO Headquarters whether it is acceptable for the future WHO-prequalification if NIHE, which is involved in the licensing process, actually conducts the clinical trial. For the issue of who the GMP inspector vis-à-vis the authorizer of the GMP certification should be, the planned amendment of the Circular No. 19 next year, drafting of other GMP related regulations and the discussion among POLYVAC and the MOH proposed by Dr. Huong are all very important and we will be anxiously and attentively waiting for the developments. The chairperson, Dr. Tsukamoto, WHO Viet Nam Office thanked all participants for their active participation and officially closed the meeting. 6. Conclusions The following actions are needed to follow up the roundtable discussions: 1) POLYVAC to report the outstanding regulatory issues related to its measles vaccine

- 126 -

Page 35: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received

production project. 2) The MOH to call upon POLYVAC, WHO and JICA to take up issues. 3) The MOH to provide official responses to the questions raised by the mid-term evaluation

team. 4) Dr. Murakami and Dr. Tsukamoto to clarify with the WHO Headquarters if the NIHE’s

conducting of the clinical trial of the POLYVAC measles vaccine produced from the bulk may undermine the future WHO prequalification or not.

5) The acceptability of the bridging clinical study between the one produced from the imported bulk and the one from the seed need to be clarified as soon as possible by the relevant authority (the acceptance was once confirmed by NICVB already during the preliminary study of the JICA POLYVAC measles vaccine production project) since it may critically undermine the JICA project time-frame thus the achievement of the project purpose.

- 127 -

Page 36: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received
Page 37: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received

/ 指

報源

/ 調

査対

調査

結果

1. 妥

当性

1-1.

ベトナ

ム側

のニ

ーズ

は十

分把

され

てい

たか

1) 案

件目

標は

ベトナ

ム国

の保

健政

策と

一致

して

いる

か。

-

長期

保健

医療

政策

(20

01-2

010)

期保

健医

療政

策の

目標

であ

る乳

児死

亡率

25、

5歳未

満児

死亡

出32

(各

出生

1000

対)を

達成

に向

けて

、麻

疹ワ

クチ

ンの

2回

接種

定着

によ

り、

小児

の主

要死

因で

ある

麻疹

によ

る死

亡を

減ら

すこ

とが

急務

とな

って

いる

。先

進国

がよ

り高

利潤

のワ

クチ

ン製

造に

シフ

トす

中、

麻疹

ワク

チン

の安

定供

給に

向け

て、

国内

での

生産

体制

の確

が必

要と

なっ

てお

り、

本プ

ロジ

ェク

トは

ベトナ

ム国

の保

健政

策に

十分

合致

して

いる

3.評価グリッド

2)

カウ

ンタ

ーパ

ートは

麻疹

ワク

チン

製造

を担

う機

関と

して

適し

てい

か。

ウン

ター

パー

JIC

A専

門家

ウン

ター

パー

トで

ある

POLY

VA

Cは

1994

年よ

りポ

リオ

ワク

チン

の製

造を

行っ

てお

り、

国内

需要

を10

0%満

たし

てい

る。

本プ

ロジ

ェク

トに

おけ

る麻

疹ワ

クチ

ンの

生産

課程

の中

心部

分は

生ワ

クチ

ンの

製造

術を

有す

るス

タッ

フが

担っ

てお

り、

POLY

VA

Cは

カウ

ンタ

ーパ

ート機

関と

して

最適

であ

った

1-2

協力

計画

の策

定過

程は

妥当

であ

った

か。

1)

アウ

トプ

ット目

標の

設定

は妥

当で

あっ

たか

ウン

ター

パー

JIC

A専

門家

G

MP

基準

に適

合し

た麻

疹ワ

クチ

ンの

製造

とい

う点

で、

アウ

トプ

ット目

標の

設定

は妥

当で

あっ

た。

2) 案

件目

標の

設定

は妥

当で

あっ

たか

ウン

ター

パー

JIC

A専

門家

件目

標の

一つ

、「年

間75

0万

ドー

スの

製造

ペー

スで

稼動

」に

つい

ては

、す

でに

各工

程の

基本

的な

生産

技術

が移

転さ

れ、

達成

の見

みは

十分

であ

るが

、も

う一

つの

案件

目標

であ

る「

NR

Aに

よる

GM

P認

証」に

つい

ては

、現

段階

では

十分

なN

RA

機能

が存

在し

ない

ため

ベトナ

ム政

府に

よる

早急

な体

制整

備が

必要

であ

る。

3) ア

ウトプ

ットの

内容

は案

件目

標を

達成

する

ため

の必

要事

項を

全て

含ん

でい

たか

ウン

ター

パー

JIC

A専

門家

要事

項は

網羅

され

てい

た。

4)

ベトナ

ム側

の協

力実

施体

制を

握し

てい

たか

JI

CA

専門

POLY

VA

Cの

体制

とカ

ウン

ター

パー

トの

技術

レベ

ルは

十分

に把

握さ

れて

いた

5)

計画

策定

過程

は妥

当で

あっ

か。

加型

の計

画策

定方

式で

あっ

か。

ウン

ター

パー

JIC

A専

門家

里研

究所

の専

門家

とベ

トナ

ム側

の協

議に

基づ

いて

計画

が策

定さ

れた

1-3

実施

スケ

ジュ

ール

の設

定は

妥当

であ

った

か。

1)

それ

ぞれ

の活

動の

期間

は技

移転

のた

めに

十分

であ

った

か。

ウン

ター

パー

JIC

A専

門家

G

MP

に適

合し

た麻

疹ワ

クチ

ン製

造の

ため

の技

術移

転を

行う

期間

とし

て、

4年間

とい

う期

間は

非常

にタ

イトで

あっ

たが

、綿

密な

スケ

ジュ

ール

管理

によ

り効

率的

なプ

ロジ

ェク

ト運

営が

なさ

れて

いる

1-4

我が

国の

援助

政策

に合

致し

てい

たか

JI

CA

の国

別事

業実

施計

画に

おい

ては

、感

染症

対策

支援

プロ

グラ

の中

で麻

疹の

抑制

が位

置づ

けら

れて

おり

、本

プロ

ジェ

クトは

無償

金協

力「麻

疹ワ

クチ

ン製

造施

設建

設計

画」の

後を

受け

る技

術協

力プ

ロジ

ェク

トと

して

実施

され

てい

る。

2.

有効性

2-

1. ア

ウトプ

ット目

標の

達成

状況

はど

れだ

けか

1) プ

ロジ

ェク

トに

必要

な施

設・機

は整

備さ

れた

か。

与機

与機

材リ

スト

主要

な麻

疹ワ

クチ

ン生

産施

設お

よび

機材

は無

償資

金協

力に

より

備さ

れ、

その

他の

バリ

デー

ション

機材

は本

プロ

ジェ

クトに

より

供与

れた

果1

2) P

OLY

VA

Cス

タッ

フは

VN

-GM

P基

準に

適合

した

麻疹

ワク

チン

造技

術を

習得

でき

る見

込み

か。

- 各

部門

別の

指導

者レ

ベル

の技

術者

の人

- 各

部門

別の

責任

者の

職務

に対

する

自信

- 中

間評

価準

備調

査報

告書

-

カウ

ンタ

ーパ

ート

GM

P基

準に

合致

した

麻疹

ワク

チン

の製

造技

術に

関し

て、

基本

的な

技術

移転

は終

了し

てい

る。

2008

年12

月24

~26

日に

実施

され

GM

Pイ

ンス

ペク

ション

の結

果を

もっ

て、

「V

N-G

MP

基準

に適

合し

てい

るか

どう

か」が

判断

され

る。

活動

1 -

指導

者レ

ベル

の技

術者

の人

- 中

間評

価準

備調

査報

2007

年10

月、

輸入

ワク

チン

原液

から

最終

製品

を作

る過

程の

基本

- 129 -

Page 38: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received

/ 指

報源

/ 調

査対

調査

結果

- 輸

入ワ

クチ

ン原

液か

ら最

終製

を製

造す

る過

程を

通し

て、

最終

バル

ク構

成、

充填

、凍

結乾

燥技

術を

中心

とし

た技

術移

転が

行わ

れた

- 部

門責

任者

の職

務に

対す

る自

告書

-

カウ

ンタ

ーパ

ート

製造

技術

の移

転が

ほぼ

完了

した

活動

2 -

種ウ

イル

スか

らワ

クチ

ン原

液を

造す

る過

程を

通し

て、

原液

製造

の技

術移

転は

行わ

れた

- 指

導者

レベ

ルの

技術

者の

人数

-

部門

責任

者の

職務

に対

する

- 中

間評

価準

備調

査報

告書

-

カウ

ンタ

ーパ

ート

2007

年11

月ま

でに

試験

バル

ク製

造が

11回

行わ

れ、

基本

的な

技術

移転

はほ

ぼ終

了し

た。

2008

年10

月、

最後

のPV

の実

施を

もっ

て技

術移

転が

完了

する

予定

であ

る。

活動

3 -

年間

750

万ド

ース

を定

常的

に製

造す

るた

めの

オペ

レー

ション

、施

設及

び生

産機

材の

維持

管理

資機

材の

調達

に関

する

技術

転が

行わ

れた

- 指

導者

レベ

ルの

技術

者の

人数

-

部門

責任

者の

職務

に対

する

- 中

間評

価準

備調

査報

告書

-

カウ

ンタ

ーパ

ート

2008

年1

月中

旬以

降、

種ウ

イル

スか

ら製

造し

た原

液を

用い

てス

ケー

ルア

ップ

の実

験を

行う

予定

であ

る。

2008

年以

降の

フル

稼働

に向

けて

動線

の検

討、

作業

時間

およ

び資

材の

管理

等の

マネ

ジメ

ントの

強化

に向

けて

専門

家に

よる

指導

が行

われ

る。

活動

4 -

ワク

チン

の品

質管

理に

関す

る技

術移

転が

行わ

れた

- 指

導者

レベ

ルの

技術

者の

人数

-

部門

責任

者の

職務

に対

する

- 中

間評

価準

備調

査報

告書

-

カウ

ンタ

ーパ

ート

品質

管理

試験

に関

する

必要

な技

術移

転が

行わ

れ、

QC

部門

のス

タッ

フに

より

PQ、

PV用

の品

質管

理試

験が

実施

され

た。

今後

は、

すで

習得

した

技術

の維

持と

、レ

ベル

4の

スタ

ッフ

から

レベ

ル1、

2の

スタ

フへ

の技

術指

導が

必要

であ

る。

果2

3) 製

造・品

質管

理が

VN

-GM

P基

準に

準拠

した

もの

とな

る見

込み

-

保健

省、

WH

Oイ

ンタ

ュー

造工

程に

おけ

るG

MP

シス

テム

の構

築は

進ん

でお

り、

基本

的な

書は

整備

され

た。

今後

は各

スタ

ッフ

にG

MP

の理

念が

定着

する

よう

解を

深め

る必

要が

ある

活動

1 -

原液

から

製造

する

ワク

チン

につ

いて

稼動

時適

格性

検証

(PQ

)、

製造

工程

適格

性検

証(

PV)が

施さ

れる

見込

みか

- 実

施時

期、

回数

、結

-

中間

評価

準備

調査

告書

-

カウ

ンタ

ーパ

ート

2007

年9

月ま

でに

PQお

よび

3回

のM

FTが

終了

し、

PVに

関し

は3

バッ

チの

生産

が20

07年

12月

の時

点で

終了

して

おり

、品

質管

試験

の部

分を

除き

、ほ

ぼ完

了し

た。

活動

2 -

一貫

製造

する

ワク

チン

につ

いて

PQ、

PVが

実施

され

る見

込み

- 実

施時

期、

回数

、結

-

中間

評価

準備

調査

告書

-

カウ

ンタ

ーパ

ート

主要

なPQ

は終

了し

てお

り、

2008

年3

月ま

での

MFT

の実

施と

2008

年度

に予

定さ

れて

いる

3回

のPV

を待

って

完了

する

予定

であ

る。

活動

3 -

バリ

デー

ション

(V

alid

atio

n)実

体制

が整

備さ

れ、

実施

技術

が移

転さ

れる

見込

みか

- 実

施体

制(責

任者

、組

織)

-

技術

移転

の状

- 中

間評

価準

備調

査報

告書

-

カウ

ンタ

ーパ

ート

実施

体制

が構

築さ

れ、

技術

移転

はお

おむ

ね完

了し

てい

るが

、担

者が

習得

した

技術

を維

持で

きる

よう

フォ

ロー

アッ

プが

必要

であ

る。

活動

4 - V

N-G

MP

に準

拠し

た品

質管

理機

能が

整備

され

、実

行さ

れる

見込

みか

- G

MP

体制

の確

立に

向け

た活

の実

施記

- 中

間評

価準

備調

査報

告書

-

カウ

ンタ

ーパ

ート

文書

作成

、管

理に

つい

ての

基礎

的な

部分

の技

術移

転は

完了

し、

QA

部門

がG

MP

文書

の管

理を

行っ

てい

る。

今後

はマ

ネジ

ャー

クラ

には

高度

なG

MP

体制

構築

に向

けた

モニ

タリ

ング

と追

加指

導を

行う

とも

に、

スタ

ッフ

に対

して

は基

礎的

なG

MP

の理

解を

深め

るた

めの

育が

実施

され

る予

定で

ある

活動

5 -

製造

工程

、搬

出入

、保

管等

に関

する

SOP

が作

成さ

れ、

運用

され

- 作

成さ

れた

SOP

の有

- 運

用状

- 中

間評

価準

備調

査報

告書

-

カウ

ンタ

ーパ

ート

製造

工程

、搬

出入

、保

管に

つい

ての

SOP

は整

備さ

れ、

運用

され

いる

。施

設、

機材

のメ

ンテ

ナン

スに

関す

るSO

Pの

一部

はま

だ整

備さ

れて

おら

ず、

今後

作成

され

る予

定で

ある

- 130 -

Page 39: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received

/ 指

報源

/ 調

査対

調査

結果

たか

動6

- VN

-GM

P基

準に

準拠

する

ため

必要

な関

連書

類の

整備

に関

る技

術移

転が

行な

われ

たか

- 作

成さ

れた

書類

の種

- 文

書作

成に

おけ

る技

術移

転の

状況

- 中

間評

価準

備調

査報

告書

-

カウ

ンタ

ーパ

ート

基本

的な

GM

P書

類の

作成

と技

術移

転は

完了

して

いる

が、

一部

マネ

ジャ

ーの

GM

P文

書作

成能

力に

つい

ては

引き

続き

強化

が必

要で

る。

4)

アウ

トプ

ット目

標の

達成

を促

進/

阻害

した

要因

は何

か。

カウ

ンタ

ーパ

ート

JI

CA

専門

特に

なし

2-2.

案件

目標

の達

成は

見込

める

か。

1)

協力

の結

果、

実施

機関

の能

は向

上し

たか

ウン

ター

パー

JIC

A専

門家

疹ワ

クチ

ン製

造に

向け

ての

技術

移転

は計

画通

り進

んで

おり

POLY

VA

Cの

キー

パー

ソン

たち

の能

力は

着実

に向

上し

てい

る。

2) ア

ウトプ

ットが

案件

目標

達成

つな

がる

のを

促進

/阻害

した

要因

は何

か。

ウン

ター

パー

JIC

A専

門家

N

RA

の6

つの

機能

のう

ち、

WH

Oの

プレ

アセ

スメ

ントを

パス

した

のは

2つ

のみ

であ

り、

残り

の4

つの

機能

につ

いて

は保

健省

によ

る体

制整

備が

必要

であ

る。

マス

ター

スケ

ジュ

ール

にお

いて

は、

2008

年8

月以

降、

許認

可を

得た

後、

20万

ドー

スの

生産

に入

る予

定で

ある

が、

許認

可が

得ら

れな

い場

合、

スケ

ジュ

ール

に遅

延が

生じ

る可

能性

もあ

る。

2-

3. 上

位目

標の

達成

は見

込め

るか

1) 麻

疹罹

患率

の低

下は

達成

可能

か。

-

2回

接種

制の

普及

ウン

ター

パー

JIC

A専

門家

20

06年

のM

PV2

の接

種率

は98

%に

達し

てい

る。

ただ

し、

1回

目、

2回

目の

予防

接種

率10

0%を

達成

して

も、

予防

接種

を受

けて

いな

い世

代に

おい

てア

ウトブ

レイ

クが

発生

する

可能

性は

排除

でき

ない

2)

アウ

トプ

ットが

上位

目標

達成

つな

がる

のを

促進

/阻害

した

要因

は何

か。

ウン

ター

パー

JIC

A専

門家

プロ

ジェ

クトは

麻疹

ワク

チン

の製

造プ

ロジ

ェク

トで

あり

、麻

疹罹

患率

の低

下に

貢献

する

要因

の一

つに

はな

りう

るが

、ワ

クチ

ン生

産活

動が

直接

罹患

率の

低下

をも

たら

すこ

とは

ない

3.

効率

3-1.

開発

目標

、案

件目

標に

比較

した

協力

規模

は適

正で

あっ

たか

1) 派

遣さ

れた

専門

家の

人数

及び

その

期間

は適

正で

あっ

たか

アサ

イン

JIC

A

カウ

ンタ

ーパ

ート

JI

CA

専門

2006

年度

の投

入は

49.5

MM

で計

画通

りに

進ん

でお

り、

2007

年度

52.4

MM

の投

入計

画が

予定

通り

達成

され

る見

込み

であ

る。

専門

家は

全員

麻疹

ワク

チン

製造

過程

にお

ける

高度

の専

門性

を有

して

おり

、投

入量

、投

入期

間と

も適

正で

あっ

た。

2) 供

与機

材の

品目

、数

量、

金額

びそ

の管

理状

況は

適正

であ

った

か。

JI

CA

専門

一部

不足

して

いる

機材

があ

り、

2007

度中

に投

入予

定で

ある

。そ

の他

の機

材に

つい

ては

数量

、金

額と

もに

適正

で、

定期

的な

メン

テナ

ンス

がな

され

てい

る。

3)

日本

への

研修

員受

入れ

人数

びそ

の期

間は

適正

であ

った

か。

2名

JI

CA

専門

カウ

ンタ

ーパ

ート

20

06年

度は

QC

部門

スタ

ッフ

2名

を2

ヶ月

間派

遣し

、20

07年

度は

QA

部門

長お

よび

QC

部門

長の

2名

を1

ヶ月

間日

本に

派遣

する

定で

あり

、目

的の

成果

を得

た。

人数

、期

間と

もに

適正

であ

った

4)

プロ

ジェ

クトは

スケ

ジュ

ール

通り

実施

され

たか

2006

年3

月~

2010

年2

カウ

ンタ

ーパ

ート

JI

CA

専門

マス

ター

スケ

ジュ

ール

に沿

って

すべ

ての

活動

が順

調に

実施

され

てい

る。

5)

プロ

ジェ

クトの

総額

予算

は適

であ

った

か。

本側

: 約

3億

7,00

0万

円(予

額)

トナ

ム側

: 運

営・経

常費

用並

に維

持管

理費

カウ

ンタ

ーパ

ート

JI

CA

間評

価の

時点

まで

は適

正で

あっ

た。

今後

の予

算に

つい

ては

中間

評価

の結

果を

踏ま

えて

検討

する

必要

があ

る。

6)

カウ

ンタ

ーパ

ートの

人数

は適

であ

った

か。

カウ

ンタ

ーパ

ートは

常勤

であ

った

か。

カウ

ンタ

ーパ

ートの

人数

カウ

ンタ

ーパ

ート

JI

CA

専門

カウ

ンタ

ーパ

ートは

キー

パー

ソン

の5

名を

含む

POLY

VA

Cス

タッ

全員

あり

、全

員フ

ルタ

イム

で勤

務し

てお

り、

体制

とし

て問

題は

なか

った

3-2.

協力

実施

のタ

イミ

ング

は適

正で

った

か。

1)

専門

家は

タイ

ミン

グよ

く派

遣さ

たか

ウン

ター

パー

JIC

A専

門家

材料

の到

着時

期に

合わ

せて

、現

地派

遣の

調整

が適

宜行

われ

が、

おお

むね

計画

に沿

って

タイ

ミン

グよ

く派

遣さ

れた

- 131 -

Page 40: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received

/ 指

報源

/ 調

査対

調査

結果

2)

機材

はタ

イミ

ング

よく

供与

され

か。

与機

材リ

スト及

び供

与ス

ケジ

ュー

カウ

ンタ

ーパ

ート

JI

CA

専門

機材

調達

に関

して

はベ

トナ

ム政

府に

よる

承認

プロ

セス

に時

間を

し、

必要

時期

に確

保さ

れな

いと

いう

トラ

ブル

があ

った

が、

専門

家が

ンタ

ルで

持ち

込み

対応

した

3)

カウ

ンタ

ーパ

ートは

タイ

ミン

グよ

日本

での

研修

を受

けた

か。

邦研

修2

名/

ウン

ター

パー

JIC

A専

門家

20

06年

度に

つい

ては

、プ

ロジ

ェク

トの

進捗

に応

じて

タイ

ミン

グよ

く本

邦研

修が

実施

され

た。

2007

年度

につ

いて

も同

様に

タイ

ミン

グよ

く実

施の

見込

みで

ある

4)

プロ

ジェ

クトは

タイ

ミン

グよ

く実

され

たか

(総

括的

に)。

カウ

ンタ

ーパ

ート

JI

CA

専門

無償

資金

協力

によ

る20

06年

3月

の麻

疹ワ

クチ

ン製

造施

設の

完成

後、

同年

7月

から

本プ

ロジ

ェク

トの

技術

移転

がス

ター

トし

てお

り、

タイ

ミン

グよ

く実

施さ

れた

3-3.

プロ

ジェ

クトの

支援

体制

は適

正で

あっ

たか

1) 合

同調

整委

員会

は機

能し

たか

。-

開催

回数

カウ

ンタ

ーパ

ート

JI

CA

専門

JCC

はこ

れま

でに

第1

回(

2006

年9

月28

日)、

第2

回(

2007

年9

月20

日)の

2回

開催

され

てい

る。

この

ほか

、毎

週木

曜日

に開

催さ

る週

例会

議の

結果

を踏

まえ

、検

討事

項が

あれ

ば適

宜保

健省

等と

意見

交換

が行

われ

てい

るた

め、

関係

機関

との

調整

の点

では

問題

ない

2)

関連

機関

から

の支

援は

得ら

れた

か。

(a

) ベ

トナ

ム側

(b

) 日

本側

ウン

ター

パー

JIC

A専

門家

W

HO

WH

Oは

、国

家検

定機

関の

機能

強化

のた

めの

研修

を実

施し

てき

た。

3-4.

他の

協力

形態

との

リン

ケー

ジは

正で

あっ

たか

1) 無

償、

第三

国、

国際

援助

機関

よる

協力

との

リン

ケー

ジは

良か

たか

(a)

その

他の

JIC

Aプ

ロジ

ェク

(b)

他国

によ

る援

助プ

ロジ

ェク

カウ

ンタ

ーパ

ート

JI

CA

専門

JIC

A技

プロ

の入

って

いる

NIH

Eと

は適

宜情

報交

換を

行っ

てお

り、

術者

1名

をPO

LYV

AC

に1

ヶ月

間受

け入

れ、

無菌

室に

おけ

るバ

デー

ション

技術

の指

導を

行っ

たこ

とが

ある

など

、良

好な

連携

関係

保た

れて

いる

4. イ

ンパ

クト

4-

1. プ

ロジ

ェク

トの

当該

セク

ター

の開

発へ

の貢

献度

はど

れほ

どで

あっ

たか

1) プ

ロジ

ェク

トの

実施

によ

り当

該セ

クタ

ーの

社会

経済

的な

レベ

ルア

ップ

はど

の程

度み

られ

るか

- ワ

クチ

ン製

造基

準整

備の

状況

-

国家

検定

体制

整備

の進

捗状

WH

O

保健

省、

NIC

VB

プロ

ジェ

クトは

ベトナ

ム初

のG

MP

基準

適合

ワク

チン

製造

施設

であ

り、

国内

のワ

クチ

ン製

造基

準の

レベ

ルア

ップ

に貢

献す

るこ

とが

期待

れる

。N

RA

体制

につ

いて

は、

プロ

ジェ

クト開

始前

から

大き

な変

化は

見ら

れず

、ベ

トナ

ム政

府に

よる

強い

イニ

シア

チブ

が必

要で

ある

2)

プロ

ジェ

クトが

当該

セク

ター

の開

発に

つな

がる

のを

促進

/阻害

した

要因

は何

か。

ウン

ター

パー

その

他関

連機

特に

なし

4-2

プロ

ジェ

クトの

その

他の

貢献

度/マ

イナ

スの

作用

はど

れほ

どあ

った

か。

1) プ

ロジ

ェク

トの

実施

によ

り、

その

他の

イン

パク

トは

生じ

たか

JI

CA

専門

日本

語・英

語教

室の

実施

によ

るプ

ロジ

ェク

ト関

係者

間の

連帯

感の

成お

よび

スタ

ッフ

のモ

チベ

ーシ

ョン

の強

5. 自

立発

展性

5-

1. 組

織面

での

自立

発展

性は

ある

か。

1)

カウ

ンタ

ーパ

ートは

プロ

ジェ

クト

活動

を継

続す

る意

欲が

ある

か。

ウン

ター

パー

POLY

VA

Cは

国内

唯一

の麻

疹ワ

クチ

ン生

産施

設で

あり

、国

内需

をカ

バー

する

ため

、十

分に

活動

を継

続す

る意

欲を

持っ

てい

る。

2) カ

ウン

ター

パー

トは

プロ

ジェ

クト

活動

を継

続す

るた

めに

十分

なス

タッ

フを

有す

るか

スタ

ッフ

カウ

ンタ

ーパ

ート

JI

CA

専門

プロ

ジェ

クト開

始時

のス

タッ

フ数

は43

名、

中間

評価

時点

での

スタ

ッフ

数は

59名

であ

り、

多忙

では

ある

もの

の数

は充

足さ

れて

いる

。本

格生

産段

階で

は70

~80

名程

度の

スタ

ッフ

が必

要に

なる

見込

みで

あり

、時

期を

みて

増員

の予

定で

ある

3)

カウ

ンタ

ーパ

ートに

対す

る外

関係

機関

の支

援は

ある

か。

その

他関

連機

関(

WH

O、

UN

ICEF

、G

AV

I、ル

クセ

ンブ

ルク

WH

Oは

NR

Aの

強化

に向

けて

、短

期専

門家

を招

聘し

、M

OH

の関

者を

対象

とす

るG

MP

イン

スペ

クシ

ョン

のトレ

ーニ

ング

を継

続的

に実

施し

てい

る。

5-

2. 財

務面

での

自立

発展

性は

ある

1) 麻

疹ワ

クチ

ン製

造プ

ロジ

ェク

トの

JI

CA

専門

当初

計画

通り

2009

年か

らの

一貫

製造

によ

るワ

クチ

ンの

販売

が実

- 132 -

Page 41: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received

/ 指

報源

/ 調

査対

調査

結果

か。

立採

算性

は見

込め

るか

ウン

ター

パー

すれ

ば、

2009

年以

降、

独立

採算

が達

成さ

れる

見込

みで

ある

2)

保健

省に

よる

必要

予算

確保

見込

みは

ある

か。

保健

2006

年、

2007

年の

予算

は確

保さ

れて

おり

、20

08年

以降

も引

き続

確保

され

るこ

とが

見込

まれ

る。

5-

3. 技

術的

自立

発展

性は

ある

か。

1)

移転

され

た技

術は

適切

に使

用さ

れて

いる

か。

-

マニ

ュア

ル類

ウン

ター

パー

JIC

A専

門家

間評

価時

点で

は基

本的

な技

術移

転は

ほぼ

完了

して

いる

。今

後は

すべ

ての

スタ

ッフ

がル

ール

を遵

守し

て生

産活

動に

従事

する

こと

が望

まれ

る。

2) 訓

練さ

れた

要員

は適

切に

配置

れて

いる

か。

-

要員

配置

計画

ウン

ター

パー

JIC

A専

門家

職や

配置

転換

はな

く、

訓練

を受

けた

要員

は計

画通

りの

ポス

トで

務を

継続

して

いる

3)

施設

・機

材は

適切

に管

理さ

れて

いる

か。

-

維持

管理

台帳

ウン

ター

パー

JIC

A専

門家

切に

バリ

デー

ション

を含

めた

メン

テナ

ンス

がな

され

てい

る。

4)

カウ

ンタ

ーパ

ートか

ら他

の要

への

技術

移転

はど

のよ

うに

行わ

れる

か。

- 訓

練計

カウ

ンタ

ーパ

ート

ベル

4の

スタ

ッフ

から

レベ

ル1

、2

のス

タッ

フに

対し

て、

業務

の過

で必

要に

応じ

て指

導が

行わ

れて

いる

が、

QA

部門

を除

き、

部門

内で

定期

的な

トレ

ーニ

ング

を実

施す

るま

でに

は至

って

おら

ず、

内部

の技

術移

転の

促進

は今

後の

課題

であ

る。

6.

教訓

と提

6-1.

協力

期間

の延

長の

必要

性は

ある

か。

1)

どの

分野

にお

いて

延長

が必

か。

JIC

Aベ

トナ

ム事

務所

JI

CA

専門

カウ

ンタ

ーパ

ート

特に

必要

は認

めら

れな

い。

2)

延長

の期

間は

どの

くら

いか

JI

CA

ベトナ

ム事

務所

JI

CA

専門

特に

必要

は認

めら

れな

い。

6-2.

技術

協力

の実

施上

、改

善す

べき

事項

は何

か。

1)

本件

に関

する

協力

実施

上の

題点

及び

改善

点は

何か

JI

CA

ベトナ

ム事

務所

JI

CA

専門

前提

条件

であ

るN

RA

体制

の早

期整

備が

最大

の課

題で

ある

6-3.

制度

的な

改革

が必

要と

考え

られ

る事

項は

何か

1) 日

本側

が協

力実

施改

善の

ため

に必

要な

制度

的改

革は

何か

(組

織・権

限面

・予

算面

等)。

JI

CA

ベトナ

ム事

務所

JI

CA

専門

特に

必要

は認

めら

れな

い。

2)

ベトナ

ム側

が協

力実

施改

善の

めに

必要

な制

度的

改革

は何

(組

織・権

限面

・予

算面

等)。

JI

CA

ベトナ

ム事

務所

JI

CA

専門

NR

A体

制の

早期

整備

が必

要で

ある

6-4.

教訓

は何

か。

1)

プロ

ジェ

クト目

標達

成を

促進

阻害

した

要因

は何

か。

カウ

ンタ

ーパ

ート

JI

CA

専門

促進

要因

:朝

礼、

夕礼

、週

例会

議の

実施

によ

る緻

密な

スケ

ジュ

ール

管理

が行

われ

たこ

阻害

要因

:特

にな

6-5.

提言

は何

か。

1)

本プ

ロジ

ェク

トに

係る

提言

は何

か。

カウ

ンタ

ーパ

ート

JI

CA

専門

・PO

LYV

AC

内部

にお

ける

技術

移転

の促

進、

リス

ク対

応能

力の

化、

GM

Pに

つい

ての

理解

の促

進、

部門

長の

マネ

ジメ

ント能

力の

・保

健省

によ

るPO

LYV

AC

予算

の確

・SP

F卵

の輸

入ル

ートの

確保

GM

P審

査、

臨床

試験

、許

認可

の適

切か

つ遅

滞の

ない

実現

NR

A体

制の

早期

整備

- 133 -

Page 42: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received
Page 43: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received

プロジェクトチームキーパーソン対象

クエスチョネア

評価分析担当

システム科学コンサルタンツ㈱ 城戸千明 総括 荒井先生 副総括/ワクチン製造管理 李先生 組織管理 田村先生 品質管理 吉田先生

-今回の中間調査の趣旨について-

JICA 事業の評価は、事前・中間・終了時・事後の各段階において、プロジェクトを

はじめとする協力事業の妥当性と協力効果を客観的な視点から判断することを目的と

しています。今回実施される中間評価は、プロジェクトの中間地点で、計画の進捗状

況を確認し、効果の発現に貢献した点や阻害要因を分析したうえで、評価結果を関係

者間で共有することにより、プロジェクトの今後の展開を円滑化することが目的です。

評価という用語はプロジェクトを外部から一方的に批判するようなネガティブな印象

を与えがちですが、そうした趣旨ではなく、評価調査団が関係者の方のご協力を得なが

ら、成果の確認作業を共同で行うプロセスだとお考えください。プロジェクトチーム

の方々のご理解をいただけますようお願いいたします。

なお、評価は「調査 5 項目(妥当性、有効性、効率性、インパクト、自立発展性)」

の観点から行い、これに基づいて今後の「提言」の整理を行いますので、質問票もこの

視点から整理を行っています。各項目の概要は以下の通りです。

妥 当 性:プロジェクト実施の必要性、妥当性について 有 効 性:プロジェクト目標や計画の達成度について 効 率 性:人材や機材等の投入の効率性について インパクト:プロジェクトによる正負の効果について 自立発展性:協力期間終了後の自立発展性について 提 言:プロジェクトの関係者(プロジェクトチーム、ベトナム保健省、JICA

など)に向けた提言について

次ページに質問項目を整理しています。

4.インタビュー用質問票

この 2点は、中間評価におい

ては十分に評価を行うこと

はできませんので、現時点で

の「見通し」を整理します。

- 135 -

Page 44: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received

まず、プロジェクト全体についての質問です。

全体スケジュールについて ・ 全体のスケジュールは、作業計画書に基づいて予定通りに進捗している、という理

解でよろしいでしょうか。スケジュール遵守の上でポイントになった活動やキーパ

ーソンがいらっしゃいましたらお聞かせください。

妥当性について ・ NIHE の NEPI から POLYVAC に対して、ワクチン製造・出荷の早期実現を目指すよ

う要望が寄せられているとの記述がありますが、これは早期の販売許可取得の追い

風とならないのでしょうか。

有効性について ・ 2 年目の半ばの時点で計画は予定通りに進行していると伺っています。大規模プロ

ジェクトを計画通りに進めていらっしゃる背景には、①当初計画が十二分に練られ

たものであった、②徹底したマネジメント(調整会議や朝礼・夕礼)が行われた、

の二点があると推察します。(他の要因についてもお聞かせください。)①および②

の二点について、留意された点、工夫された点などを教えてください。他にも成果

達成のために工夫されていることがあれば教えてください。

効率性について ・ プロジェクトの目標達成を図る上で、日本人専門家、カウンターパート(POLYVAC

職員)をはじめとする人材、薬品、機材のそれぞれについて効率的な投入が行われ

たと考えられますか?

インパクト ・ JCC への副大臣の参加、関係者による視察などベトナム側の関心が高く、今後のプ

ロジェクト運営の円滑化に貢献すると見込まれています。TV、新聞等のメディアに

よって取り上げられた事例はありますか? ・ POLYVAC での日本語教室の開催は、他のプロジェクトにおいても参考となる好事

例だと考えられます。スタートのきっかけを教えてください。 ・ マイナスのインパクトはとくにないと伺っていますが、何かありましたら教えてく

ださい。

自立発展性 ・ ベトナム国内での麻疹ワクチンの販売許可が早期に得られれば、事業は独立採算ベ

ースに乗り、自立発展性は十分に見込めると考えられます。この理解でよろしいで

しょうか。

- 136 -

Page 45: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received

成果の発現に貢献した要因について ・ WHO-GMP の基準に準拠するために工夫された点はありますか。 ・ ここまでの過程で、大きな問題となった点はありますか。(供与機材調達の遅れが指

摘されていましたが、ほかにもありますか。) ・ 類似案件である「インドネシア共和国生ワクチン製造基盤技術プロジェクト」に関

して、本プロジェクトの参考にされた点はありますか。

今後の提言 ・ 今後の提言として、「SPF 卵の自国生産に向けた MOH の取り組み強化」「MOH によ

る麻疹ワクチンの承認の早期実現」を含めたいと考えています。このほかにありま

したら教えてください。

教訓 ・ 今後、類似プロジェクトの教訓となる点がありましたら教えてください。

プロジェクト全体についての質問は以上です。

以下は、李先生、田村先生、吉田先生の各ご担当分野について、個別にお尋ねしたい質

問です。

・ ご担当分野の概要と、同一分野の専門家との業務の分担について教えてください。 ・ 全体の作業計画はほぼ予定通りに進んでいる、と理解していますが、ご担当分野の

作業をスケジュール通りに進める上で、工夫された点や、苦心された点はあります

か。 ・ 技術指導の上で工夫された点、留意された点の主なものについて教えてください。 ・ 技術指導の上で問題となった点はありますか。ありましたら、どのように解決した

かを教えてください。 ・ 今後、解決すべき課題はありますか。

以上、お忙しいところお時間をいただきまして恐縮ですが、どうぞよろしくお願い申

し上げます。

- 137 -

Page 46: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received

Questionnaire to the counterparts at POLYVAC for the Mid-term Evaluation

of Measles Vaccine Production Project in Vietnam

The Director, Dr. Nguyen Dang Hien Vice Director, Dr. Le Thi Luan

Please accept this questionnaire for the mid-term evaluation of Measles Vaccine Production

Project in Vietnam, which will be held during December 5th to 19th, 2007. This is prepared for the information collection by the counterparts at POLYVAC, because all of you are the key persons being responsible of measles vaccine production in the future. I would like to request to the Director and your staffs to share some time for interview during my visit to POLYVAC during December 6th to 10th. I am grateful for your cooperation in advance.

Ms. Kido Chiaki, Evaluation Analysis 1. In general

・ How do you evaluate the progress of the capacity building of your staff at POLYVAC since the beginning of the Project?

・ What do you consider as the biggest factor of the steady progress of the Project so far? 2. Current situation

Technology transfer

・ Currently POLYVAC has sufficient number of staffs to manage the activities of the Project? ・ Do you consider that staffs at POLYVAC are confident enough to perform the required tasks at

this moment? What is the expectation at the end of the Project? ・ Are you satisfied with the process and contents of technology transfer by Japanese experts so

far?

Finance

・ Currently do you have sufficient budget for the operation of POLYVAC?

3. Difficulties or problems

・ Do (or Did) you feel/ any difficulties or problems for the implementation of this project? If so, what are (or were) the main problems?

・ Do (or Did) you feel any cultural or customary complications for the implementation of the Project with Japanese experts?

4. For the latter half of the Project

・ Do you have any points to focus on for the latter half of the Project? 5. Recommendations

・ Do you have any recommendations or requests to the relevant organizations (MOH, NICVB, WHO, POLYVAC staff, Japanese experts, JICA Vietnam etc.)?

- 138 -

Page 47: : :w: : :w: · Washing of Freeze Dryer Rinse solution: ... Autoclave (Tray of F.D) Effect of sterilization Loading Pattern 1 Grade: A,B,D (at static) Quality of rubber stopper received

Questionnaire to the counterparts at POLYVAC for the Mid-term Evaluation

of Measles Vaccine Production Project in Vietnam

To the managers of QA, QC, Final dept., Bulk dept., Medium dept, Technical dept.

Please accept this questionnaire for the mid-term evaluation of Measles Vaccine Production Project in Vietnam, which will be held during December 5th to 19th, 2007. This is prepared for the information collection by the counterparts at POLYVAC, because all of you are the key persons being responsible of measles vaccine production in the future. I would like to request to the Managers and your staffs to share some time for interview during my visit to POLYVAC during December 6th to 10th. I am grateful for your cooperation in advance.

Ms. Kido Chiaki, Evaluation Analysis 1. In general

・ How do you evaluate the progress of the capacity building of you and the staff at your department since the beginning of the Project?

・ What do you consider as the biggest factor of the steady progress at your department so far?

2. Current situation

Technology transfer

・ Currently your department has sufficient number of staffs to manage the activities of the Project?

・ Do you consider that staffs at your department are confident enough to perform the required tasks at this moment? What is the expectation at the end of the Project?

・ Are you satisfied with the process and contents of technology transfer by Japanese experts so far?

3. Difficulties or problems

・ Do (or Did) you feel/ any difficulties or problems for the implementation of this project? If so, what are (or were) the main problems?

・ Do (or Did) you feel any cultural or customary complications for the implementation of the Project with Japanese experts?

4. For the latter half of the Project

・ Do you have any points to focus on for the latter half of the Project?

5. Recommendations

・ Do you have any recommendations or requests to the relevant organizations (MOH, NICVB, WHO, POLYVAC director/other departments/your staff, Japanese experts, JICA Vietnam etc.)?

- 139 -