€¦ · Title: Slide 1 Author: hopfgart Created Date: 9/26/2012 2:14:40 PM
Transcript of €¦ · Title: Slide 1 Author: hopfgart Created Date: 9/26/2012 2:14:40 PM
3rd PSC meeting
19-20 September 2012
Zarnesti
WP leader DINPI - WP6
Overview
1. Technical progress of WP6
a) General description
b) Project implementation – Status/forecast of outputs/results/
deliverables
c) Outlook
2. Co-operation with other project partners
3. Other topics
WP6 – Pilot areas
1a) General description – pilot areas
Pilot areas involved:
Poiple (SK) / Duna-Ipoly National Park (HU)
Iron Gates Nature Park (RO) / Djerdap National Park (SRB)
Maramures Nature Park (RO) / Carpathian Biosphere Reserve (UA)
The identified pilot areas are located in the 5 Carpathian Countries members of the SEE Programme Area
1a) General description - activities
act 6.1. Identification and planning of cooperation activities
Timing: 31. 12. 2012. (period 4)
With prolongation: 31. 12. 2013.
Task for each partner:
- Drafting of a report identifiying the fields of cooperation and the related common activities to develop in the pilot areas and planning of the activities.
- Prepare pilot action
1a) General description - activities
Act 6.2. Common integrated management measures (CIMM) implementation
Timing: 31. 12. 2013. (period 6)
With prolongation: 31. 12. 2013.
Task for each partner:
- Elaboration of cooperation agreements for the development of the identified common activities in transboundary PAs.
- Integration of the CIMM elaborated at transnational level in WP 4 in the cooperation agreements. Conclusion of cooperation agreements
- Implementation of pilot action
Task of DINPI/Poiple:
Development of an integrated management plan for Poiplie / Duna-Ipoly NP on the basis of the CIMM elaborated in WP 4.
1a) General description – outputs and results
indicator Target value ERDF Period of
delivery
output Management plans 1 (DINPI/Poiple) 6
output CIMM implemented 10 (approx 3 / pilot area pair) 6
output Project meetings held 4 4, 6
result Agreements formulated 3 (1 for each pilot area pair) 6
result Pilot actions prepared 3 (1 for each pilot area pair) 4
result Pilot actions implemented
3 (1 for each pilot area pair) 6
result
Individuals benefiting through improved services
100 (33 for each pilot area pair)
6
1a) General description – deadlines agreed on the Budapest
meeting, May 2012
Overview of existing management plans/measures 2012 August-September
Bilateral field study 2012 September-October
Selection of common problems/interests/measures 2012 November
Pilot action prepared 2012 December
Drafting of a report identifying the fields of cooperation 2012 December
WP6 meeting 2013 March
Pilot action implemented 2013 September
Compilation and approval of agreement text according to CIMM 2013 September
Official signing (local event and/or media release) 2013 November
I. Main current activities:
- Overview of existing management plans/measures 2012 August-September
- Bilateral field study 2012 September-October
- Selection of common problems/interests/measures 2012 November
- Pilot action prepared 2012 December
- Drafting of a report identifying the fields of cooperation 2012 December
[pls list in bullet points]
Technical progress of WP a) General description
II. Problems and/or delays and how they are addressed:
• No delay in the progress of Poiple / DINPI pilot area
• Is there any delay for the Djerdap/Iron Gate pair?
• Problems with the Ukraine partner
Technical progress of WP a) General description
III. Linkage with other WPs:
• WP 2: promotion of the pilot project results to relevant stakeholder – ecotourism
• WP 3: participation and contribution to the Protected Areas Conference – in progress, WP6 will be presented in a workshop
• WP4: The linkage with WP4 will be established in the frame of act 6.2, implementation of CIMM
• WP 5: provide data on the legal, natural and economic barriers in pilot areas
• WP 7: participation and contribution to the stakeholders consultation process - in progress, to be held in the beginning of November
Technical progress of WP a) General description
Outputs/results: The following outputs or results have been achieved until September 2012
1b) Project implementation - Status of outputs/ results
deliverables
Output/result Date of achievement (month/year - RP)
Reason for delay (if appl.)
Project meetings held (4) 06. 2012. - Budapest (HU) 09. 2012. - Tesmak (SK)
No delay
Pilot actions prepared (3- 1 for each pilot area)
09. 2012. 1 is ready Others?
1b) Forecast of outputs/results/deliverables
Output/result Actual achieved (month/year -
RP)
Planned achievement (month/year - RP)
Reason for delay (if appl.)
Management plans - 31. 12. 2013 -
CIMM implemented - 31. 12. 2013 Prolongation?
Project meetings held 06. 2012 09. 2012.
03. 2013 WP6 Several bilateral meetings; SK-HU: 12. 2012, 01. 2013., UK-RO: 10. 2012, SRB-RO:
-
Agreements formulated - 31. 12. 2013 Prolongation?
Pilot actions prepared 09. 2012 31. 12. 2012. Other partners?
Pilot actions implemented - 31. 12. 2013 -
Individuals benefiting through improved services
- 31. 12. 2013 -
• Several bilateral meetings, one WP6 meeting March of 2013, probably
jointly with WP4
• Process the
- elaboration of cooperation agreements for the development of the identified common activities in transboundary PAs.
- integration of the CIMM elaborated at transnational level in WP 4 in the cooperation agreements
- implementation of pilot action
- harmonization of the content of the management plans of Poiple-Ipel valley
1c) Outlook until end of RP5 (May13)
[pls list what feedback/input/support you need from which PP, if applicable until when…]
2. Co-operation with other project partners
PP no/acronym What until when
Djerdap – Iron Gate
Draft report on the identified cooperation activities
31. 12. 2012.
Djerdap – Iron Gate
Draft report on the identified cooperation activities
31. 12. 2012.
Maramures NP – Carpathian BR
Pilot action prepared 31. 12. 2012.
Maramures NP – Carpathian BR
Pilot action prepared 31. 12. 2012.
WP6 meeting
18-19th September
Ipel valley
Presentation of the RAMSAR sites and overview of existing management plans/measures
Results of the meeting 18-19th September, Ipel valley
- Overview of existing management plans/measures
- Bilateral field study
- Selection of common problems/interests/measures (identifying the cooperation activities)
Common management measure guidelines for EU habitats and species
Elaboration of common researc plans or uniform methodology for monitoring (for example: counting of birds)
Ecotourism – plans on bridges
Results of the meeting 18-19th September, Ipel valley;
- Prepare pilot action The RAMSAR information sheet could be filled mutually in the frame of a consultation - Common management plan – the harminization of the content of the Slovakian and the Hungarian management plans are planned/ongoing