Overview

1. Technical progress of WP6

a) General description

b) Project implementation – Status/forecast of outputs/results/

deliverables

c) Outlook

2. Co-operation with other project partners

3. Other topics

WP6 – Pilot areas

Page 3: €¦ · Title: Slide 1 Author: hopfgart Created Date: 9/26/2012 2:14:40 PM

1a) General description – pilot areas

Pilot areas involved:

Poiple (SK) / Duna-Ipoly National Park (HU)

Iron Gates Nature Park (RO) / Djerdap National Park (SRB)

Maramures Nature Park (RO) / Carpathian Biosphere Reserve (UA)

The identified pilot areas are located in the 5 Carpathian Countries members of the SEE Programme Area

Page 4: €¦ · Title: Slide 1 Author: hopfgart Created Date: 9/26/2012 2:14:40 PM

1a) General description - activities

act 6.1. Identification and planning of cooperation activities

Timing: 31. 12. 2012. (period 4)

With prolongation: 31. 12. 2013.

Task for each partner:

- Drafting of a report identifiying the fields of cooperation and the related common activities to develop in the pilot areas and planning of the activities.

- Prepare pilot action

Page 5: €¦ · Title: Slide 1 Author: hopfgart Created Date: 9/26/2012 2:14:40 PM

1a) General description - activities

Act 6.2. Common integrated management measures (CIMM) implementation

Timing: 31. 12. 2013. (period 6)

With prolongation: 31. 12. 2013.

Task for each partner:

- Elaboration of cooperation agreements for the development of the identified common activities in transboundary PAs.

- Integration of the CIMM elaborated at transnational level in WP 4 in the cooperation agreements. Conclusion of cooperation agreements

- Implementation of pilot action

Task of DINPI/Poiple:

Development of an integrated management plan for Poiplie / Duna-Ipoly NP on the basis of the CIMM elaborated in WP 4.

Page 6: €¦ · Title: Slide 1 Author: hopfgart Created Date: 9/26/2012 2:14:40 PM

1a) General description – outputs and results

indicator Target value ERDF Period of

delivery

output Management plans 1 (DINPI/Poiple) 6

output CIMM implemented 10 (approx 3 / pilot area pair) 6

output Project meetings held 4 4, 6

result Agreements formulated 3 (1 for each pilot area pair) 6

result Pilot actions prepared 3 (1 for each pilot area pair) 4

result Pilot actions implemented

3 (1 for each pilot area pair) 6

result

Individuals benefiting through improved services

100 (33 for each pilot area pair)

6

Page 7: €¦ · Title: Slide 1 Author: hopfgart Created Date: 9/26/2012 2:14:40 PM

1a) General description – deadlines agreed on the Budapest

meeting, May 2012

Overview of existing management plans/measures 2012 August-September

Bilateral field study 2012 September-October

Selection of common problems/interests/measures 2012 November

Pilot action prepared 2012 December

Drafting of a report identifying the fields of cooperation 2012 December

WP6 meeting 2013 March

Pilot action implemented 2013 September

Compilation and approval of agreement text according to CIMM 2013 September

Official signing (local event and/or media release) 2013 November

Page 8: €¦ · Title: Slide 1 Author: hopfgart Created Date: 9/26/2012 2:14:40 PM

I. Main current activities:

- Overview of existing management plans/measures 2012 August-September

- Bilateral field study 2012 September-October

- Selection of common problems/interests/measures 2012 November

- Pilot action prepared 2012 December

- Drafting of a report identifying the fields of cooperation 2012 December

[pls list in bullet points]

Technical progress of WP a) General description

Page 9: €¦ · Title: Slide 1 Author: hopfgart Created Date: 9/26/2012 2:14:40 PM

II. Problems and/or delays and how they are addressed:

• No delay in the progress of Poiple / DINPI pilot area

• Is there any delay for the Djerdap/Iron Gate pair?

• Problems with the Ukraine partner

Technical progress of WP a) General description

Page 10: €¦ · Title: Slide 1 Author: hopfgart Created Date: 9/26/2012 2:14:40 PM

III. Linkage with other WPs:

• WP 2: promotion of the pilot project results to relevant stakeholder – ecotourism

• WP 3: participation and contribution to the Protected Areas Conference – in progress, WP6 will be presented in a workshop

• WP4: The linkage with WP4 will be established in the frame of act 6.2, implementation of CIMM

• WP 5: provide data on the legal, natural and economic barriers in pilot areas

• WP 7: participation and contribution to the stakeholders consultation process - in progress, to be held in the beginning of November

Technical progress of WP a) General description

Page 11: €¦ · Title: Slide 1 Author: hopfgart Created Date: 9/26/2012 2:14:40 PM

Outputs/results: The following outputs or results have been achieved until September 2012

1b) Project implementation - Status of outputs/ results

deliverables

Output/result Date of achievement (month/year - RP)

Reason for delay (if appl.)

Project meetings held (4) 06. 2012. - Budapest (HU) 09. 2012. - Tesmak (SK)

No delay

Pilot actions prepared (3- 1 for each pilot area)

09. 2012. 1 is ready Others?

Page 12: €¦ · Title: Slide 1 Author: hopfgart Created Date: 9/26/2012 2:14:40 PM

1b) Forecast of outputs/results/deliverables

Output/result Actual achieved (month/year -

RP)

Planned achievement (month/year - RP)

Reason for delay (if appl.)

Management plans - 31. 12. 2013 -

CIMM implemented - 31. 12. 2013 Prolongation?

Project meetings held 06. 2012 09. 2012.

03. 2013 WP6 Several bilateral meetings; SK-HU: 12. 2012, 01. 2013., UK-RO: 10. 2012, SRB-RO:

-

Agreements formulated - 31. 12. 2013 Prolongation?

Pilot actions prepared 09. 2012 31. 12. 2012. Other partners?

Pilot actions implemented - 31. 12. 2013 -

Individuals benefiting through improved services

- 31. 12. 2013 -

Page 13: €¦ · Title: Slide 1 Author: hopfgart Created Date: 9/26/2012 2:14:40 PM

• Several bilateral meetings, one WP6 meeting March of 2013, probably

jointly with WP4

• Process the

- elaboration of cooperation agreements for the development of the identified common activities in transboundary PAs.

- integration of the CIMM elaborated at transnational level in WP 4 in the cooperation agreements

- implementation of pilot action

- harmonization of the content of the management plans of Poiple-Ipel valley

1c) Outlook until end of RP5 (May13)

Page 14: €¦ · Title: Slide 1 Author: hopfgart Created Date: 9/26/2012 2:14:40 PM

[pls list what feedback/input/support you need from which PP, if applicable until when…]

2. Co-operation with other project partners

PP no/acronym What until when

Djerdap – Iron Gate

Draft report on the identified cooperation activities

31. 12. 2012.

Djerdap – Iron Gate

Draft report on the identified cooperation activities

31. 12. 2012.

Maramures NP – Carpathian BR

Pilot action prepared 31. 12. 2012.

Maramures NP – Carpathian BR

Pilot action prepared 31. 12. 2012.

Page 15: €¦ · Title: Slide 1 Author: hopfgart Created Date: 9/26/2012 2:14:40 PM

WP6 meeting

18-19th September

Ipel valley

Page 16: €¦ · Title: Slide 1 Author: hopfgart Created Date: 9/26/2012 2:14:40 PM

Presentation of the RAMSAR sites and overview of existing management plans/measures

Page 17: €¦ · Title: Slide 1 Author: hopfgart Created Date: 9/26/2012 2:14:40 PM
Page 18: €¦ · Title: Slide 1 Author: hopfgart Created Date: 9/26/2012 2:14:40 PM
Page 19: €¦ · Title: Slide 1 Author: hopfgart Created Date: 9/26/2012 2:14:40 PM
Page 20: €¦ · Title: Slide 1 Author: hopfgart Created Date: 9/26/2012 2:14:40 PM
Page 21: €¦ · Title: Slide 1 Author: hopfgart Created Date: 9/26/2012 2:14:40 PM
Page 22: €¦ · Title: Slide 1 Author: hopfgart Created Date: 9/26/2012 2:14:40 PM

Results of the meeting 18-19th September, Ipel valley

- Overview of existing management plans/measures

- Bilateral field study

- Selection of common problems/interests/measures (identifying the cooperation activities)

Common management measure guidelines for EU habitats and species

Elaboration of common researc plans or uniform methodology for monitoring (for example: counting of birds)

Ecotourism – plans on bridges

Page 23: €¦ · Title: Slide 1 Author: hopfgart Created Date: 9/26/2012 2:14:40 PM

Results of the meeting 18-19th September, Ipel valley;

- Prepare pilot action The RAMSAR information sheet could be filled mutually in the frame of a consultation - Common management plan – the harminization of the content of the Slovakian and the Hungarian management plans are planned/ongoing