The supply network perspective, pp.148-151 Deciding whether to outsource + table 6.1, pp.154-155 ...

9
· The supply network perspective, pp.148-151 · Deciding whether to outsource + table 6.1, pp.154-155 · The location of capacity, pp.156-160 · Weighted-score method, p161-162 Chapter# 6 Supply Network Design

Transcript of The supply network perspective, pp.148-151 Deciding whether to outsource + table 6.1, pp.154-155 ...

Page 1: The supply network perspective, pp.148-151  Deciding whether to outsource + table 6.1, pp.154-155  The location of capacity, pp.156-160  Weighted-score.

· The supply network perspective, pp.148-151·  Deciding whether to outsource + table 6.1,

pp.154-155· The location of capacity, pp.156-160· Weighted-score method, p161-162

Chapter# 6 Supply Network Design

Page 2: The supply network perspective, pp.148-151  Deciding whether to outsource + table 6.1, pp.154-155  The location of capacity, pp.156-160  Weighted-score.

Supply chain Network

Supply chain management is defined as: the process of managing the entire chain of raw material supply, manufacture, assembly, and distribution to the end customer.

Page 3: The supply network perspective, pp.148-151  Deciding whether to outsource + table 6.1, pp.154-155  The location of capacity, pp.156-160  Weighted-score.

The supply Network perspective(pp-148-151)

Supply network is the network of suppliers and customers operations that have relationships with an operation.

Supply side is the chain of suppliers that provides parts, information and services to an operation.

Demand side is the chain of customers that receive the products and services produced by an operations.

First–tier is the suppliers and customers who are with immediate relation ship with an operation and with no intermediary relationship.

Second-tier are the customers and suppliers who are separated from the operations only by the first tier suppliers and customers.

Immediate and total supply networks.

Page 4: The supply network perspective, pp.148-151  Deciding whether to outsource + table 6.1, pp.154-155  The location of capacity, pp.156-160  Weighted-score.

Why consider the whole supply network

There are three important reasons for taking a supply networkIt helps an understanding of competitivenessIt help identify significant links in networkIt is focused on long term issues

Page 5: The supply network perspective, pp.148-151  Deciding whether to outsource + table 6.1, pp.154-155  The location of capacity, pp.156-160  Weighted-score.

Design decisions in supply networks

There are three main decisions related to supply networkHow the network should be configured? either it

should outsource or how much network should operations own. Vertical integration concept( do or buy decision)

Where each part of the network should own by the company should be located? Location decision

What physical capacity should each part of the network owned by the company have at any point in time. Long-term capacity planning decision.

Page 6: The supply network perspective, pp.148-151  Deciding whether to outsource + table 6.1, pp.154-155  The location of capacity, pp.156-160  Weighted-score.

Decide whether to outsource(p-154)

If an activity has long-term strategic importance to a company, it is unlikely to outsource.

Do it yourself( in house) or Buy it in( Outsourced supply may have effects of operations performance objectives. Table 6.1 Quality Speed Dependability Flexibility Cost

Page 7: The supply network perspective, pp.148-151  Deciding whether to outsource + table 6.1, pp.154-155  The location of capacity, pp.156-160  Weighted-score.

The location of the capacity(p-156)

Reasons of location decisions are change in demand and supply A change in location may be prompted by customers demand

shift. Change in volume of demand . To meet the high demand ( either

expand existing site or choose a larger site in another location) another reason to change location is change in cost or

availability od supply inputs.The objectives of location decisions are to achieve the

balance between three related objectives Spatially variable cost Service the operation is able to provide its customers Revenue potential of the operations.

Page 8: The supply network perspective, pp.148-151  Deciding whether to outsource + table 6.1, pp.154-155  The location of capacity, pp.156-160  Weighted-score.

Supply and demand side factors in location decisionsD

em

an

d –

sid

e f

act

ors Labour cost

Land costEnergy costTransportation costCommunity cost

Th

e O

pera

tion

Dem

an

d-s

ide f

act

ors Labour skills

Suitability of sideImageConvenience for customers

Page 9: The supply network perspective, pp.148-151  Deciding whether to outsource + table 6.1, pp.154-155  The location of capacity, pp.156-160  Weighted-score.

Location techniques( p-161-162)

The weighted score methodIt is the technique to compare the attractiveness of alternatives location's that allocates a score to the factor that are significant in the decision and weights each score by significance of the factorIt follows three main steps.1. Identify the criteria to evaluate various locations2. Establish the relative importance and give them

weighting score3. Rate each location arbitrary ( from scale 0-100)