Agendau TCAG Introduction

u High Level Facts

u Overview of Revised Red Line Routeu North Thames Portal

u Rail & Muckingford Road Crossing

u New ‘Area’ By Coalhouse Fort

u Short & Long Term Impacts of Route 3u Construction - Route Legacy – Communities - Growth

u Communicate

u What Can I do?

u Revised Timing

u Sales Pitch

u CPRE – Alternatives – Lobby Groups

u Question Time (Q&A)

Matt Jackson 2017 WWW.TCAG.INFO

The Teamu Roger (Chair) - Matt (Vice Chair)

u Laura (Webmaster) – Mark (IT & Technical)

u Kim (Secretary) – Leigh (Legal)

u Su Sammons (Ward Cllr)

u Cllr Smith (Chair Thurrock Council Task Force)

u Alex (CPRE) – James (Kent Campaigner) – Gordon (Rail)

u Thanks To Jan Fawsitt – Rosie Barnes – Linda Mulley The Forum – All Volunteers

WWW.TCAG.INFOMatt Jackson 2017

High Level Factsu 86% Traffic Will Remain at the Existing Crossing

u £8bn worth of Growth (Claim HE / SELEP Support it)

u 70% Crossing Capacity Increase (Thames Gateway)

u A282 Current Daily Average ~150k Crossings

u Thurrock has 17 Air Quality Management Areas

u 2027 – A282 Crossing remains over capacity

u M25 Continues to cause gridlock across Thurrock

u Poor Weather Conditions Continue to close the A282 (Bridge - Southbound)

u 2027 Thurrock sees rise in the number of vehicles crossing the Borough

u 10% of Thurrock Ports freight forwarding put on rail

WWW.TCAG.INFOMatt Jackson 2017

Revised Route 3

Matt Jackson 2017 WWW.TCAG.INFO

Highways England Development Points

u M25 – New junction design to cross under the M25 to reduce the visual impact. Widening of a section of the M25 to improve traffic flow.

u Ockendon – Realignment to avoid going across the landfill.

u Access to the A13 and Tilbury:

u A13 and A128 – Redesign of the junction with the A13 to reduce congestion. This would allow us to remove the A128 junction from the proposed design.

u New junction near Tilbury – A new junction near east Tilbury and link road to Tilbury to improve traffic flow and provide an alternative route for HGVs.

u A226 junction – Removal of this junction to reduce the traffic impact on local roads.

u A2 – New junction design and widening of A2 to M2, junction 1 to reduce congestion and improve traffic flow.

u Future proofing – Three lanes rather than two for at least some of the route.

u Tunnel portals – Continuing our assessment about the length of the tunnel and where to locate the entrances.

Matt Jackson 2017 WWW.TCAG.INFO

Red Line Overlay

M2

A2

A2

A2M25

HS1

A13

A13

M25

A13

A127

A127

A226

A289

A12

8

A10

89

Grays

M25 J2

Orsett

Tilbury

M25 J30

Dartford

Gravesend

River Thames

East Tilbury

North Ockendon

South Ockendon

Chadwell St.Mary

Chalk

Orsett

Lower Thames Crossing

Client LOWER THAMES CROSSINGDEVELOPMENT PHASE

Project

Drawing t itle

Development BoundaryComparison

Key Plan

Status Original Size Revision

A3Scale

Date -

Date -

Date -

Drawn

Checked

Approved

Drawing number

0 1 2 3 4 5

Kilometres

1:100,000

HE540039-CJV-GEN-GEN-MAP-DCO-00009

JS/KM

TG/T W

SC

10/10/2017

S2 001

Rev Statu s Rev. Date Purpose of revision Drawn Chck'd Apprv'd

JS/KM TG/TW SCS2 Issued for information001

KeyPreviously published boundary

Potential land required to construct and operate the Lower Thames Crossing

Refer to drawing HE540039-CJV-GEN-GEN-MAP-DCO-00010

Refer to drawing HE540039-CJV-GEN-GEN-MAP-DCO-00011

Refer to drawing HE540039-CJV-GEN-GEN-MAP-DCO-00012

Refer to drawing HE540039-CJV-GEN-GEN-MAP-DCO-00013

Refer to drawing HE540039-CJV-GEN-GEN-MAP-DCO-00014

Refer to drawing HE540039-CJV-GEN-GEN-MAP-DCO-00015

Refer to drawing HE540039-CJV-GEN-GEN-MAP-DCO-00016

10/10/2017

16/10/2017

16/10/2017

WWW.TCAG.INFOMatt Jackson 2017

Ask Questionsu How will traffic migrate via Thurrock when the Bridge closes

u Can Highways England provide a simulation showing how route 3 will cope

u How will J30 process traffic efficiently

u Prove to us the A13 Eastbound will cope with M25 traffic diversions to Route 3

u Route 3 cannot allow national traffic to impact our local roads

u Will the docks provide parking provisions for extra HGV shipping

u Construction blight (air, noise, vibration, light, working hours)

u Lasting blight legacy

u 3D Renderings of design

WWW.TCAG.INFOMatt Jackson 2017

What Can You Do?

Matt Jackson 2017

Ockendon

Aveley

Tilbury

Chadwell

Orsett

MPs

Councilors

CommunityGroups

HIGHWAYS ENGLAND

Data Driven

Respectful

Teamwork

Responsibility

Engage

THURROCK

WWW.TCAG.INFO

Next Stepsu Engage with your ward Cllrs & MPs

u Go to Community Forum Meetings

u Submit Your Questions to Thurrock Task Force Meetings

u Take Ownership of your Area

u Write letters / emails to Westminster

Matt Jackson 2017 WWW.TCAG.INFO

Revised Timing

WWW.TCAG.INFOMatt Jackson 2017

Sales Pitch

WWW.TCAG.INFOMatt Jackson 2017

CPRE Presentation

WWW.TCAG.INFOMatt Jackson 2017

QUESTION TIME

u Hands up – your questions will be answered in order

u A mic will come to you to enable the room to hear

u Please be respectful of people speaking

u One question at a time

WWW.TCAG.INFOMatt Jackson 2017

THANK YOU

WWW.TCAG.INFOMatt Jackson 2017

THAMES CROSSINGACTION GROUP

The Communities of E & W Tilbury + Linford

WWW.TCAG.INFO