documents.worldbank.orgdocuments.worldbank.org/curated/pt/140401468320672918/...TABLE OF CONTENT...
Transcript of documents.worldbank.orgdocuments.worldbank.org/curated/pt/140401468320672918/...TABLE OF CONTENT...
NORTH POWER CORPORATION
Electric Network Project Management Board
-------------------------------
RESETTLEMENT PLAN
(RP)
SUBPROJECT:
THE RURAL ENEGY II PROJECT
ADDITIONAL FINANCING – PHASE 4- HA TINH PROVINCE
Hanoi, August, 2012
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
TABLE OF CONTENT
SUMMARY 5
1. INTRODUCTION 14
1.1. SECOND RUAL ENERGY PROJECT......................................................................... 14
1.2. SUB-PROJECT: “ The Rual Energy Project – Additional Financing – Phase 4, Ha
Tinh province” .......................................................................................................................... 14
Specifications medium-voltage line ...............................................................................17
Specifications substation : ..............................................................................................17
Specifications line antihypertensive ..............................................................................17
1.3. OBJECTIVES OF RESETTLEMENT .......................................................................... 17
2. PROJECT IMPACTS 19
2.1. IDENTIFICATION OF PROJECT IMPACTS ............................................................. 19
2.1.1. Identification of Project impact area: ...............................................................19
2.1.2. Identification of the poeple to be affected by the project .................................19
2.2. TYPE OF INFLUENECES IN THE PROJECT ............................................................ 23
2.2.1. Permanently reclaim land .................................................................................23
2.2.2. Temporarily affected cultivating land ...............................................................26
2.2.3. Number and types of affected perennial trees ...................................................29
3. LEGAL FRAMEWORK AND ENTITLEMENT OFDPs 33
4. COMPENSATION AND SUPPORT 41
4.1. COMPENSATION ........................................................................................................ 41
4.1.1. Unit price of land compensation .......................................................................41
4.1.2. Compensation price unit for perennial tree .......................................................45
4.2. SUPPORT TO RECOVER THE DAILY LIFE FORDPs ............................................. 50
5. PUBLIC CONSULTATION AND INFORMATION DISCLOSE 51
5.1. PUBLIC CONSULTATION AND PARTICIPATION OF PEOPLE ........................... 51
5.2. INFORMATION DISCLOSURE .................................................................................. 53
6. REPORT. SUPERVISE AND APPRAISE 54
6.1. Internal supervision monitoring ........................................................................54
6.2. Independent supervisor .....................................................................................56
6.2. Report mechanism ............................................................................................56
7. IMPLEMENTATION PLAN 57
7.1. RESPONSIBILITY........................................................................................................ 57
7.2. IMPLEMENTATION TIME ......................................................................................... 59
8. EXPENSES 61
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 2
8.1. EXPENSES FOR IMPLEMENTING RESETTLEMENT PLAN ................................ 61
8.1.1. Expenses for preparing resettlement plan and detail drawing ..........................61
8.1.2. Expenses for compensation...............................................................................61
8.1.2. Management expense ........................................................................................61
8.1.4. Expense for supervision ....................................................................................62
8.1.5. Backup ..............................................................................................................62
8.2. TOTAL ESTIMATE FOR RESETTLEMENT PLAN IMPLEMENTATION ............. 63
Appendix 64
TABLE OF CONTENTS ...............................................................................................68
INTRODUCTION ..........................................................................................................69
INSTITUTIONAL AND LEGAL FRAMEWORK .......................................................72
SECTION 3 ....................................................................................................................79
ENTITLEMENT POLICY .............................................................................................79
27. Voluntary Donation: For the rehabilitation/expansion of Low Voltage System,
where there are DPs who would be marginally affected on residential land/other assets
and who may choose to contribute affected land/assets in lieu of a cash contribution for
the project construction, a procedure for determining and documenting the voluntary
nature of the contribution are as follows: 82
SECTION 5 ....................................................................................................................83
PEOPLE'S PARTICIPATION .......................................................................................83
BASELINE INFORMATION ........................................................................................83
SECTION 7 ....................................................................................................................84
IMPLEMENTATION ARRANGEMENTS ...................................................................84
43. A Resettlement Plan cannot be considered complete until a completion audit or
survey confirms that all entitlements have been received by beneficiaries and livelihood
restoration is progressing on schedule. ...........................................................................86
SECTION 8 ....................................................................................................................86
COSTS AND BUDGET .................................................................................................86
Allowances: ............................................................................................................................... 92
For DP losing Residential and garden land: .................................................................94
Interview 162
Sr No 163
Name in full .................................................................................................................163
Relationship to Head HH* ...........................................................................................163
Age 163
Nationality ....................................................................................................................163
Education .....................................................................................................................163
Occupation ...................................................................................................................163
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 3
Residential registration status ......................................................................................163
MaMale ................................................................................................................................... 163
Female ..................................................................................................................................... 163
Built on 172
The RE2 Project ultilizes the WB loan to extent and up-grade the rural power network
in 62 communes of 12 districts of Ha Tinh Province will enjoy the power supply through
rehabilitationand expansion of the medium and low voltage system, Investment
structure: 178
1, Project affected household ? 178
Table
Table 1.2. – Project items .........................................................................................................14
Table 2.1.2a – Number ofDPs – distributed by locality ...........................................................20
Table 2.1.2b – Total number ofDPs according to the influence type .......................................23
Table 2.2.1 – Permanently affected land ..................................................................................23
Table 2.2.2 – Temporarily affected cultivating land.................................................................26
Table 2.2.3 – Affected perennial trees ......................................................................................29
Table 4.1.1a – Unit price of permanent land compensation .....................................................41
Table 4.1.1b – Unit price for temporary land compensation (limit the capacity of land use) ..43
Table 4.1.2 – Compensation price unit for perennial tree.........................................................45
Table 4.1.4 – Summary of compensation .................................................................................47
Table 5.1– Summary of opinion of community in the community consultation meeting ........51
Table 6.1 – Some main activities for internal supervision and assessment .............................54
Table 8.2 – Total estimate for resettlement plan implementation ............................................63
Figure
Figure 7.1 – Diagram of institution who implements the resettlement plan ............................ 57
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 4
Appendix
1. Project area
2. Policy Framework
3. Entitlement Matrix
4. Route agreement
5. Minute of community consultation
6. “Questionnaire” sample
7. “Leaflet” sample
8. List of people who are affected by the Project
CPC Commune People‟s Committee
DPC District People‟s Committee
CPH People's Committee of Hanoi city
DOI Deparment of Industry
DPs/PAPs Displaced Person / Project Affected Person
HH Household
OHL Overhead Line
PAH Project Affected Household
PMU Project Management Unit
PCCo Power Company of Ha Tinh Province
ROW Right of Way
RP Resettlement Plan
WB World Bank
Temporarily
affected land
Is land be limited in using ability under Decree of Government No.
81/2009/ND-CP dated 12 October, 2009 amending Decree No.
106/2005/NĐ–CP
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 5
SUMMARY
1. Objectives of project:
- Rehabilitating and extending the power networks in rural areas.
- Conversion management model of rural power by forming organizations manage the
legal by Vietnam's laws.
- Giving capacity support to power distribution unit in local, State Provincial
Government; The participation of the regional power companies and state government
agencies involved in planning and operating rural electrification.
- Checking for model rural power management, the establishment of power
management unit in accordance with current legal, economic independence, capable
management, engineering to be able to operate effectively and interest, payment of loans.
2. Area of Project implementation:
The sub-project “The Rual Energy Project – Additional Financing – Phase 4, Ha
Tinh province” is one of the sub-project which will be deployed in phase 4 of the Second
Rual Energy Project of Vietnam funded by WB. The sub-project shall be deployed in the area
of 62 communes/small town and 12 districts/cities Ha Tinh province
District/small
town
Commune/Small town
1. Ha Tinh Thach Hung commune Lien Ha
2. Cam Xuyen
district Cam Huy commune Cam Vinh
Thien Cam
Small town Cam Loc
3. Duc Tho
district
Trung Le, Yen Ho
commune
Bui Xa, Thai
Yen
Duc Thuy,
Duc Long Duc Thinh
4. Nghi Xuan
district Xuan Giang commune Xuan Hai
5. Can Loc
district Can Loc Small town My Loc
6. Vu Quang
district
Duc Linh, Duc Bong
commune
Duc Huong,
Duc Giang
Huong Tho,
Duc Lien Son Tho
7. Huong Khe
district
Phu Gia, Phuc Dong
commune
Huong Long,
Huong Tra
Phuong Dien,
Huong Binh Huong Giang
8. Huong Son
district
Son Bang, Son Tra
commune
Son Quang,
Son Ha
Son Long, Son
Tien
Son Linh, Son
Hong
9. Ky Anh
district
Ky Xuan, Ky Lam
commune
Ky Nam, Ky
Tay
Ky Thuong,
Ky Hop
Ky Trung, Ky
Son
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 6
10. Loc Ha
district Ho Do commune Mai Phu Thach My
11. Hong Linh
district Trung Luong commune Dau Lieu Thuan Loc Duc Thuan
12. Thach Ha
district
Thach ha Small town
Thach Vinh commune
Viet Xuyen,
Thach Long
Thach Kenh,
Ngoc Son Thach Son
(Refer to Appendix 1 for Location of communes which join the Project)
The activities of sub-project consist of
+ Newly build 226.630 km of low voltage
3. Project implementation :
- Project Owner: Northern Power Corporation
- Design Consultant: Power Engineering Consulting Company Limited No. 1
- Project Manager Unit: Management Unit of Grid Projects
4. Project description:
a) Medium voltage grid:
Newly build 44.286 km Medium voltage grid.
Which :
+ 35kV line : 29.203 km.
+ 10,22kV line : 15.083 km.
Specification of line:
- Voltage grade 35 kV
- Number of circuit 01
- Conductor AC 50/8
- Insulator Post-type insulator
- Pole Concrete
- Pole height from12m to 18m
- pile foundation from MT-2 to MT-6 and MT-K
- cable
- foundation anchor Reinforced concrete cast in situ
grade type 200 # MN-15-5, MN20-5
- earthing Pile the mixture ray RC-2, RC-4
and RC-6.
b) Transformer station:
New construction of 74 substations with the total capacity of: 11,060 kVA.
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 7
Where:
No. Voltage and capacity Unit Quantity
1 35/0.4kV substation: Unit 43
1.1 Capacity 75kVA Unit 05
1.2 Capacity 100kVA Unit 06
1.3 Capacity 160kVA Unit 08
1.4 Capacity 180kVA Unit 20
1.5 Capacity 250kVA Unit 04
2 22/0.4kV substation: Unit 14
2.1 Capacity 75kVA Unit 02
2.2 Capacity 100kVA Unit 06
2.3 Capacity 160kVA Unit 02
2.4 Capacity 180kVA Unit 04
3 10(22)/0.4kV substation: Unit 17
3.1 Capacity 50kVA Unit 02
3.2 Capacity 75kVA Unit 01
3.3 Capacity 100kVA Unit 06
3.4 Capacity 160kVA Unit 04
3.5 Capacity 180kVA Unit 04
Main technical specifications:
- Type: Staying on spun concrete pillars, size 10m and 12m;
- Pillar: Spun concrete, size 10m, 12m (type B and C);
- Pillar foundation: Reinforced concrete, cast-in-place, 150# class, type MT-3, MT-4;
- Supporting frame: Machined from CT3 galvanized steel;
- Atmospheric overvoltage protection: Anti-lightning (LA);
- Medium voltage side breaking: Fuse Cut Out (FCO);
- Low voltage side breaking: Automat (for the main bus bay and outgoing bus bays)
arranged in the transformer cubicle;
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 8
- Low voltage carrying cable: 4-core, XLPE (or PVC) insulation with the insulation class
of 0.6/1kV;
Grounding: Mixed grounding rods, from 12 † 18 rods.
a) Low voltage line:
Construction of 223.649km low voltage line.
Where:
- Transformed low voltage line : 200.411km
- Newly constructed low voltage line : 23.438km
Main technical specifications:
- Voltage level: 0.4/0.22kV.
- Type: Overhead (3-phase, 4-wire and 1-phase, 2-wire).
- Cable: Twisted cable, 0.6/1kV, cross-section of 35 95mm2.
- Accessories: Manufactured in accordance with Vietnam standards (TCVN) and use
purposes.
- Pole: Square pole, 7.5m; 8.5m. Where the lines rung along provincial roads and cross the
roads, spun concrete poles shall be used, 8.5 and 10m high.
- Cable hangers: Manufactured from galvanized steel shape.
- Pole foundation: Reinforced concrete, cast-in-place, 100# class, type MV-1A, MV-1,
MV-2, MV-3 and MV-4 (for square pole), concrete foundation, 100# class, type M1,
M2, M3, M4 (for spun concrete poles);
Repeated grounding: RLL.
5) Impact of Project:
The sub-project will affect 382 households (1497 people). In which. the area of
reclaimed land of households is about 0.048% - 0.05% of total land area that they possess.
Specifically:
DPs who are reclaimed permanently less than 20% of cultivating land: 352
households (1497 people)
DPs who own the crop land which is permanently affected: 382
households (1497 people)
DPs who have perennial trees which are permanently affected: 320
households
DPs who have cultivating land which is temporarily affected: 153
households (688 people)
NA DPs who have crop land which is temporarily affected: 382
households (1497 people).
Permanently affected:
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 9
No Commune
Permanently
affected
(garden
land)
Crop affect
(Rice)
Perennial
affect
Bald public
land affect
Ha Tinh province 2,421 1,452 462 968
I Thach Ha district 184 92 40 61
1 Thach Son commune 12 2 8 2
2 Ngoc Son commune 12 3 4 2
3 Thach Ha Small town 39 17 2 11
4 Thach Vinh commune 23 13 5 8
5 Viet Xuyen commune 51 33 9 22
6 Thach Long commune 12 4 4 3
7 Thach Kenh commune 35 20 8 14
II Huong Khe district 412 261 66 174
8 Phu Gia commune 36 21 13 14
9 Huong Long commune 40 25 14 17
10 Phuc Dong commune 48 33 5 22
11 Huong Giang commune 47 29 7 19
12 Huong Tra commune 58 30 4 20
13 Phong Dien commune 33 19 10 13
14 Huong Binh commune 151 104 13 69
III Huong Khe district 41 23 10 15
15 My Loc commune 21 12 7 8
16 Can Loc Small town 19 10 3 7
IV Cam Xuyen district 209 114 33 76
17 Cam Vinh commune 55 30 6 20
18 Cam Huy commune 53 26 11 18
19 Cam Loc commune 44 27 6 18
20 Thien Cam Small town 57 30 10 20
V Ky Anh district 533 325 87 217
21 Ky Xuan commune 27 14 6 9
22 Ky Lam commune 10 1 9 1
23 Ky Nam commune 11 1 8 1
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 10
24 Ky Tay commune 147 99 16 66
25 Ky Thuong commune 99 62 2 41
26 Ky Hop commune 54 35 16 23
27 Ky Trung commune 109 70 20 46
28 Ky Son commune 76 44 10 29
VI Ha Tinh City 78 36 18 24
29 Thach Ha commune 37 16 6 11
30 Thach Hung commune 41 20 12 13
VII Nghi Xuan district 117 71 25 47
31 Xuan Giang commune 59 39 13 26
32 Xuan Hai commune 58 32 12 21
VIII Duc Tho district 161 100 44 67
33 Trung Le commune 41 22 7 14
34 Yen Ho commune 44 33 6 22
35 Duc Thinh commune 21 10 4 7
36 Duc Thuy commune 11 5 5 3
37 Bui Xa commune 12 3 6 2
38 Duc Long commune 7 6 4
39 Thai Yen commune 33 21 10 14
IX Loc Ha district 141 80 20 53
40 Ho Do commune 84 52 13 34
41 Mai Phu commune 33 22 4 14
42 Thach My commune 24 7 3 4
X Hong Linh Town 168 88 28 59
43 Thuan Loc commune 44 22 7 15
44 Dau Lieu wards 12 6 5 4
45 Duc Thuan wards 67 39 8 26
46 Trung Luong wards 44 21 8 14
XI Loc Ha district 346 204 57 136
47 Son Bang commune 12 4 3 3
48 Son Ha commune 16 6 3 4
49 Son Hoa commune 13 4 3 3
50 Son Hong commune 12 4 4 3
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 11
51 Son Linh commune 12 5 2 3
52 Son Long commune 42 26 6 17
53 Son Tien commune 125 83 22 55
54 Son Quang commune 11 3 4 2
55 Son Tay commune 106 69 10 46
XII Vu Quang district 33 58 34 39
56 Duc Bong commune 11 4 7
57 Duc Giang commune 6 3 4
58 Duc Huong commune 33 20 7 13
59 Duc Lieu commune 5 5 3
60 Duc Linh commune 11 9 7
61 Huong Tho commune 3 4 2
62 Son Tho commune 3 2 2
Temporary affect:
No Commune
Garden land
affect
(m2)
Field land
affect
(m2)
Bald public
land affect
(m2)
Ha Tinh province 59,942 139,865 79,923
I Thach Ha district 3.787 8.873 5.062
2 Thach Son commune 84 196 115
3 Ngoc Son commune 102 238 139
4 Thach Ha Small town 690 1,610 924
5 Thach Vinh commune 520 1,214 694
6 Viet Xuyen commune 1,383 3,227 1,842
7 Thach Long commune 162 378 218
II Huong Khe district 10,767 25,123 14,347
8 Phu Gia commune 883 2,060 1,177
9 Huong Long commune 1,024 2,389 1,365
10 Phuc Dong commune 1,345 3,137 1,790
11 Huong Giang commune 1,207 2,817 1,609
12 Huong Tra commune 1,247 2,909 1,665
13 Phong Dien commune 781 1,822 1,042
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 12
14 Huong Binh commune 4,281 9,989 5,699
III Huong Khe district 937 2,187 1,251
15 My Loc commune 514 1,200 686
16 Can Loc Small town 423 987 565
IV Cam Xuyen district 4,687 10,937 6,257
17 Cam Vinh commune 1,221 2,850 1,631
18 Cam Huy commune 1,082 2,525 1,446
19 Cam Loc commune 1,133 2,644 1,510
20 Thien Cam Small town 1,251 2,918 1,670
V Ky Anh district 13,434 31,347 17,909
21 Ky Xuan commune 576 1,344 770
22 Ky Lam commune 31 71 44
23 Ky Nam commune 55 128 77
24 Ky Tay commune 4,095 9,555 5,453
25 Ky Thuong commune 2,547 5,943 3,394
26 Ky Hop commune 1,429 3,333 1,903
27 Ky Trung commune 2,881 6,723 3,839
28 Ky Son commune 1,821 4,249 2,429
VI Ha Tinh City 1,496 3,490 2,002
29 Thach Ha commune 676 1,578 906
30 Thach Hung commune 820 1,912 1,096
VII Nghi Xuan district 2,937 6,852 3,915
31 Xuan Giang commune 1,611 3,760 2,146
32 Xuan Hai commune 1,325 3,092 1,769
VIII Duc Tho district 4,121 9,616 5,493
33 Trung Le commune 894 2,085 1,193
34 Yen Ho commune 1,353 3,158 1,800
35 Duc Thinh commune 427 995 570
36 Duc Thuy commune 211 493 283
37 Bui Xa commune 107 250 145
38 Duc Long commune 276 644 363
39 Thai Yen commune 853 1,991 1,137
IX Loc Ha district 3,299 7,697 4,401
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 13
40 Ho Do commune 2,129 4,968 2,838
41 Mai Phu commune 896 2,091 1,193
42 Thach My commune 273 638 370
X Hong Linh Town 3,633 8,477 4,852
43 Thuan Loc commune 914 2,132 1,221
44 Dau Lieu wards 250 583 334
45 Duc Thuan wards 1,606 3,746 2,142
46 Trung Luong wards 864 2,016 1,156
XI Loc Ha district 8,420 19,647 11,229
47 Son Bang commune 158 369 213
48 Son Ha commune 266 620 356
49 Son Hoa commune 156 364 210
50 Son Hong commune 157 365 211
51 Son Linh commune 205 477 274
52 Son Long commune 1,077 2,514 1,436
53 Son Tien commune 3,419 7,977 4,553
54 Son Quang commune 136 317 184
55 Son Tay commune 2,847 6,643 3,792
XII Vu Quang district 2,424 5,655 3,206
56 Duc Bong commune 465 1,086 613
57 Duc Giang commune 235 549 310
58 Duc Huong commune 836 1,951 1,114
59 Duc Lieu commune 200 467 264
60 Duc Linh commune 441 1,030 581
61 Huong Tho commune 138 321 181
62 Son Tho commune 108 253 143
The Resettlement plan of sub-project Resettlement Report The Rual Energy Project –
Additional Financing – Phase 4, Ha Tinh province is established based on Involuntary
Resettlement (Operational Policy – OP 4.12) of the World Bank and Resettlement Policy
Frameworkwork (Operational Policy OP 4,12) of World Bank the Resettlement Policy
Frameworkwork of Second Rual Energy Project.
Total budget estimate for Resettlement Plan is VND 1,949,970,052 (will be updated when
deploying the sub-project to ensure the principle of compensation according to the alternative
price), funding for Resettlement Plan will be implemented from funds of the Northern Power
Corporation.
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 14
1. INTRODUCTION
1.1. SECOND RUAL ENERGY PROJECT
The overall objective of project is to contribute to Government‟s poverty alleviation program
in the rural areas by providing basic infrastructure services like electricity. The proposed
project‟s main development objectives are to help Government of Vietnam implement its
objectives of providing electricity to about 20 million rural people through (a) expansion of
community based grids in the remote and isolated areas and renewable energy projects; and
(b) implementation of the national strategy for rural electrification with special focus on (i)
provision of energy to the remote mountainous areas and islands, (ii) capacity building in the
provinces and EVN and (iii) training. The proposed project is expected to provide energy to
about 1 million households in Vietnam, which includes some of the poorest communes
identified in the government‟s special commune program.
The project objectives in Ha Tinh Province is intended to invest in rehabilitation,
upgrade and expansion of power network in 62 communes of 12 districts and improve the
service quality to consumers within the project area.
Resettlement Plan of sub-projects RE 2 Project province was set up under the project's
Policy Framework for Rural Energy Project 2 (RE 2).
1.2. SUB-PROJECT: “ The Rual Energy Project – Additional Financing – Phase 4,
Ha Tinh province”
The Rual Energy Project – Additional Financing – Phase 4, Ha Tinh province” shall cover 62
communes of 12 districts of Ha Tinh province (Refer to Appendix 1:Map of project area).
The sub-project aims at improving effectively the low voltage grid of the area, meet the
strongly developing load demand of 12 district.
Sub-project includes the items:
Table 1.2. – Project items
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 15
No Commune Length of MV
Quantity
of
Stations
Length of LV
I Thach Ha district 2,770 8 15,440
1 Thach Son commune 50 1 800
2 Ngoc Son commune 50 1 1,400
3 Thach Ha Small town 500 2 3,000
4 Thach Vinh commune 350 1 3,340
5 Viet Xuyen commune 1,100 1 2,100
6 Thach Long commune 50 1 3,400
7 Thach Kenh commune 670 1 1,400
II Huong Khe district 8,580 9 15,705
8 Phu Gia commune 700 1 1,425
9 Huong Long commune 800 1 2,130
10 Phuc Dong commune 1,000 1 4,820
11 Huong Giang commune 980 1 1,040
12 Huong Tra commune 1,000 2 1,560
13 Phong Dien commune 600 1 2,030
14 Huong Binh commune 3,500 2 2,700
III Huong Khe district 550 2 9,240
15 My Loc commune 300 1 5,140
16 Can Loc Small town 250 1 4,100
IV Cam Xuyen district 3,698 7 8,320
17 Cam Vinh commune 940 2 3,115
18 Cam Huy commune 871 2 1,225
19 Cam Loc commune 913 1 1,255
20 Thien Cam Small town 974 2 2,725
V Ky Anh district 11,013 12 7,291
21 Ky Xuan commune 460 1 800
22 Ky Lam commune 1 1,020
23 Ky Nam commune 20 1 1,030
24 Ky Tay commune 3,390 2 900
25 Ky Thuong commune 2,100 2 900
26 Ky Hop commune 1,170 1 821
27 Ky Trung commune 2,378 2 920
28 Ky Son commune 1,495 2 900
VI Ha Tinh City 1,024 4 8,900
29 Thach Ha commune 461 2 4,100
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 16
30 Thach Hung commune 563 2 4,800
VII Nghi Xuan district 2,310 3 5,485
31 Xuan Giang commune 1,300 1 1,709
32 Xuan Hai commune 1,010 2 3,776
VIII Duc Tho district 2,420 7 40,572
33 Trung Le commune 550 2 7,789
34 Yen Ho commune 900 1 9,116
35 Duc Thinh commune 300 1 2,220
36 Duc Thuy commune 30 1 5,846
37 Bui Xa commune 40 1 1,965
38 Duc Long commune 9,196
39 Thai Yen commune 600 1 4,440
IX Loc Ha district 2,415 5 13,355
40 Ho Do commune 1,700 2 2,973
41 Mai Phu commune 600 1 5,872
42 Thach My commune 115 2 4,510
X Hong Linh Town 2,600 7 17,102
43 Thuan Loc commune 650 2 4,457
44 Dau Lieu wards 50 1 6,325
45 Duc Thuan wards 1,250 2 3,520
46 Trung Luong wards 650 2 2,800
XI Loc Ha district 6,306 11 28,430
47 Son Bang commune 40 1 3,675
48 Son Ha commune 150 1 2,863
49 Son Hoa commune 70 1 2,398
50 Son Hong commune 40 1 3,618
51 Son Linh commune 40 1 5,217
52 Son Long commune 840 1 2,311
53 Son Tien commune 2,810 2 1,554
54 Son Quang commune 30 1 3,333
55 Son Tay commune 2,286 2 3,461
XII Vu Quang district 600 1 56,790
56 Duc Bong commune 15,508
57 Duc Giang commune 7,840
58 Duc Huong commune 600 1 3,866
59 Duc Lieu commune 6,671
60 Duc Linh commune 14,710
61 Huong Tho commune 4,587
62 Son Tho commune 3,608
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 17
Total 44,286 74 226,630
Specifications medium-voltage line
- Voltage grade 35 kV
- Number of circuit 01
- Safe corridor 9 m
- Conductor AC 50
- Insulator Post-type insulator
- Pole Concrete
- Pole height from 12m to 16m
- Average distance between poles 120 m
- Area of pole foundation 2.52 m2/position
Specifications substation :
- Substation :
+ Medium voltage level : 35/0.4kV and 22/0.4kV
+ Voltage low Voltage : 0.4kV
- Capacity : from 50kVA to 250kVA.
- Building area stations : 5m2/stations
Specifications line antihypertensive
- Voltage grade 0.4 kV
- Number of circuit 01
- Safe corridor 2 m
- Conductor AV 50
- Insulator Post-type insulator
- Pole Concrete
- Pole height from 7.5m to 8.5m
- Average distance between poles 40 m
- Area of pole foundation 1.5 m2/position
1.3. OBJECTIVES OF RESETTLEMENT
The resettlement plan is prepared with the following objectives:
- Prevent or at least minimize the reluctant resettlement by selecting the suitable
design plan.
- In case the reluctant resettlement is unavoidable. the resettlement activities must be
prepared and carried out in accordance with sustainable development programs and
supply the reasonable investment support plans. enableDPs to Entitlement from the
sub-project.DPs shall receive the full advisory and can participate in the preparation
and deployment of Resettlement Plan.
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 18
- NA shall be compensated for their loss. receive the full living recovery measures for
them to enhance their living standard or at least maintain their living standard as
well as income and production capacity as before the Project.
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 19
2. PROJECT IMPACTS
2.1. IDENTIFICATION OF PROJECT IMPACTS
2.1.1. Identification of Project impact area:
Sub-prroject shall cover 62 communes of 12 districts of of Ha Tinh province
The affected area of this sub-project only includes:
The area at the position of pole foundation construction (1.5 m2/pole).
The area around the pole construction area during the construction process.
temporarily affected area in the drageline route – with average of 2m of width –
the route is only calculated for crop cultivation land. The land area may be
affected from 1 to 2 months.
Temporary land reclaimation for approaching road in construction area is unnecessary
because the current road. lane. alley and safe corridor shall be used during the construction
phase.
2.1.2. Identification of the poeple to be affected by the project
According to the survey result. there are 382 households (1497 people) who are affected by
sub-project. in which those households with land reclaimation rate of 0.01% . include:
Those who have cultivating land which is affected partly or entirely (temporarily
or permanently);
Those who own perennial trees/or crops which are affected partly or entirely
(temporarily or permanently);
The vulnerable group who are affected in this sub-project is mainly female households (153
households).
The summarized result shall be shown in the following table (refer to appendix 8: List up the
NA):
House
hold People
All DPs
In which: 382 1497
DPs who are permanently affected
–DPs who are reclaimed permanently less than 20% of total
cultivating land (under 10% for poor and vulnerable people) 352 1322
–DPs who own the crop land which is permanently affected 382 1497
–DPs who own perennial trees which are permanently affected 320 688
Total number of DPs who are permanently affected 382 1497
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 20
House
hold People
NA who are temporarily affected
–DPs who own cultivating land which is temporarily affected 153 688
–DPs who own crop land which is temporarily affected 382 1497
Total number of DPs who are permanently affected 382 1497
Note: Some households may be affected by both types.
Table 2.1.2a – Number ofDPs – distributed by locality
TT City / district / commune Number of households
affected People
Ha Tinh province 382 1,497
I Thach Ha district 30 115
1 Thach Son commune 3 12
2 Ngoc Son commune 2 7
3 Thach Ha Small town 5 19
4 Thach Vinh commune 3 11
5 Viet Xuyen commune 10 38
6 Thach Long commune 2 8
7 Thach Kenh commune 5 20
II Huong Khe district 62 234
8 Phu Gia commune 6 25
9 Huong Long commune 7 25
10 Phuc Dong commune 6 22
11 Huong Giang commune 6 23
12 Huong Tra commune 9 34
13 Phong Dien commune 5 20
14 Huong Binh commune 23 85
III Huong Khe district 5 86
15 My Loc commune 3 79
16 Can Loc Small town 2 7
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 21
IV Cam Xuyen district 22 78
17 Cam Vinh commune 6 21
18 Cam Huy commune 5 18
19 Cam Loc commune 5 18
20 Thien Cam Small town 6 21
V Ky Anh district 90 314
21 Ky Xuan commune 3 10
22 Ky Lam commune 4 15
23 Ky Nam commune 4 16
24 Ky Tay commune 21 71
25 Ky Thuong commune 2 8
26 Ky Hop commune 24 90
27 Ky Trung commune 22 70
28 Ky Son commune 10 34
VI Ha Tinh City 9 27
29 Thach Ha commune 4 13
30 Thach Hung commune 5 14
VII Nghi Xuan district 19 66
31 Xuan Giang commune 10 33
32 Xuan Hai commune 9 33
VIII Duc Tho district 31 121
33 Trung Le commune 4 16
34 Yen Ho commune 8 27
35 Duc Thinh commune 2 9
36 Duc Thuy commune 4 17
37 Bui Xa commune 4 16
38 Duc Long commune 5 19
39 Thai Yen commune 4 17
IX Loc Ha district 19 77
40 Ho Do commune 12 49
41 Mai Phu commune 4 15
42 Thach My commune 3 13
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 22
X Hong Linh Town 19 73
43 Thuan Loc commune 4 14
44 Dau Lieu wards 4 16
45 Duc Thuan wards 7 28
46 Trung Luong wards 4 15
XI Loc Ha district 47 186
47 Son Bang commune 4 16
48 Son Ha commune 3 13
49 Son Hoa commune 3 12
50 Son Hong commune 4 16
51 Son Linh commune 5 17
52 Son Long commune 5 21
53 Son Tien commune 11 47
54 Son Quang commune 4 15
55 Son Tay commune 8 29
XII Vu Quang district 29 120
56 Duc Bong commune 5 21
57 Duc Giang commune 4 17
58 Duc Huong commune 5 20
59 Duc Lieu commune 4 16
60 Duc Linh commune 3 14
61 Huong Tho commune 4 16
62 Son Tho commune 4 16
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 23
Table 2.1.2b – Total number ofDPs according to the influence type
Type of influence Household People
1 Temporarily reclaim cultivating land in safe corridor 205 893
2 Temporarily reclaim garden land in safe corridor
without houses or structures in safe corridor 205 893
3 Permanently reclaim land for pile foundation. station
forDPs who own cultivating land which is reclaimed less
than 20% of possessed land. and 10% for poor and
vulnerable people
123 530
Note: Refer to Appendix 2. Entitlement Matrix for details of Entitlement of DPs.
Compensation policy. Implementation Items for types of influence
2.2. TYPE OF INFLUENECES IN THE PROJECT
Type of influence onDPs in this sub-project only includes:
Permanently reclaim cultivating land (field land) to build pole foundation and
station.
Temporarily reclaim cultivating land (garden and field land) during the
deployment of Project.
Permanently affect the perennial trees in the planned area for building pole
foundation and transformer station.
Temporarily affect the area around pole foundation. lines and safe corridor.
Affect the trees in electricity safe corridor. the high trees shall be cut down (the
distance from tree peak to the lowest line shall not be less than 4m) and the high
tree near safe corridor my touch the conducting line in case it falls down.
Beside the influence onDPs as above. the sub-project also temporarily affect 69.384m2 of
bald public land (because the route corridor runs through dike. traffic road and other bald land
managed by the State)
The result is shown in the following table:
2.2.1. Permanently reclaim land
Table 2.2.1 – Permanently affected land
Unit: m2
No` Commune Household
Type of land Sub –
total Field
land
Garden
land
Forest
land Other
Total 382 1,452 2,421 968 4,841
I Thach Ha district 30 92 184 61 337
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 24
No` Commune Household
Type of land Sub –
total Field
land
Garden
land
Forest
land Other
1 Thach Son commune 3 2 12 2 16
2 Ngoc Son commune 2 3 12 2 17
3 Thach Ha Small town 5 17 39 11 67
4 Thach Vinh commune 3 13 23 8 44
5 Viet Xuyen commune 10 33 51 22 106
6 Thach Long commune 2 4 12 3 19
7 Thach Kenh commune 5 20 35 14 69
II Huong Khe district 62 261 412 174 847
8 Phu Gia commune 6 21 36 14 71
9 Huong Long commune 7 25 40 17 82
10 Phuc Dong commune 6 33 48 22 103
11 Huong Giang commune 6 29 47 19 95
12 Huong Tra commune 9 30 58 20 108
13 Phong Dien commune 5 19 33 13 65
14 Huong Binh commune 23 104 151 69 324
III Huong Khe district 5 23 41 15 79
15 My Loc commune 3 12 21 8 41
16 Can Loc Small town 2 10 19 7 36
IV Cam Xuyen district 22 114 209 76 399
17 Cam Vinh commune 6 30 55 20 105
18 Cam Huy commune 5 26 53 18 97
19 Cam Loc commune 5 27 44 18 89
20 Thien Cam Small town 6 30 57 20 107
V Ky Anh district 90 325 533 217 1,075
21 Ky Xuan commune 3 14 27 9 50
22 Ky Lam commune 4 1 10 1 12
23 Ky Nam commune 4 1 11 1 13
24 Ky Tay commune 21 99 147 66 312
25 Ky Thuong commune 2 62 99 41 202
26 Ky Hop commune 24 35 54 23 112
27 Ky Trung commune 22 70 109 46 225
28 Ky Son commune 10 44 76 29 149
VI Ha Tinh City 9 36 78 24 138
29 Thach Ha commune 4 16 37 11 64
30 Thach Hung commune 5 20 41 13 74
VII Nghi Xuan district 19 71 117 47 235
31 Xuan Giang commune 10 39 59 26 124
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 25
No` Commune Household
Type of land Sub –
total Field
land
Garden
land
Forest
land Other
32 Xuan Hai commune 9 32 58 21 111
VIII Duc Tho district 31 100 161 67 328
33 Trung Le commune 4 22 41 14 77
34 Yen Ho commune 8 33 44 22 99
35 Duc Thinh commune 2 10 21 7 38
36 Duc Thuy commune 4 5 11 3 19
37 Bui Xa commune 4 3 12 2 17
38 Duc Long commune 5 7 4 11
39 Thai Yen commune 4 21 33 14 68
IX Loc Ha district 19 80 141 53 274
40 Ho Do commune 12 52 84 34 170
41 Mai Phu commune 4 22 33 14 69
42 Thach My commune 3 7 24 4 35
X Hong Linh Town 19 88 168 59 315
43 Thuan Loc commune 4 22 44 15 81
44 Dau Lieu wards 4 6 12 4 22
45 Duc Thuan wards 7 39 67 26 132
46 Trung Luong wards 4 21 44 14 79
XI Loc Ha district 47 204 346 136 686
47 Son Bang commune 4 4 12 3 19
48 Son Ha commune 3 6 16 4 26
49 Son Hoa commune 3 4 13 3 20
50 Son Hong commune 4 4 12 3 19
51 Son Linh commune 5 5 12 3 20
52 Son Long commune 5 26 42 17 85
53 Son Tien commune 11 83 125 55 263
54 Son Quang commune 4 3 11 2 16
55 Son Tay commune 8 69 106 46 221
XII Vu Quang district 29 58 33 39 130
56 Duc Bong commune 5 11 7 18
57 Duc Giang commune 4 6 4 10
58 Duc Huong commune 5 20 33 13 66
59 Duc Lieu commune 4 5 3 8
60 Duc Linh commune 3 11 7 18
61 Huong Tho commune 4 3 2 5
62 Son Tho commune 4 3 2 5
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 26
2.2.2. Temporarily affected cultivating land
Table 2.2.2 – Temporarily affected cultivating land
Unit: m2
No Commune Household Type of land
Sub – total Crops Crops Crops Crops Crops
Total 382 97,906 41,960 59.942 79.923 279,731
I Thach Ha
district 30 6,186 2,651 3,787 5,062 17,686
1 Thach Son
commune 3 137 59 84 115 395
2 Ngoc Son
commune 2 167 71 102 139 479
3 Thach Ha Small
town 5 1,127 483 690 924 3,224
4 Thach Vinh
commune 3 850 364 520 694 2,428
5 Viet Xuyen
commune 10 2,259 968 1,383 1,842 6,452
6 Thach Long
commune 2 265 113 162 218 758
7 Thach Kenh
commune 5 1,382 592 846 1,128 3,948
II Huong Khe
district 62 17,586 7,537 10,767 14,347 50,237
8 Phu Gia
commune 6 1,442 618 883 1,177 4,120
9 Huong Long
commune 7 1,672 717 1,024 1,365 4,778
10 Phuc Dong
commune 6 2,196 941 1,345 1,790 4,482
11 Huong Giang
commune 6 1,972 845 1,207 1,609 5,633
12 Huong Tra
commune 9 2,036 873 1,247 1,665 5,821
13 Phong Dien
commune 5 1,275 547 781 1,042 3,645
14 Huong Binh
commune 23 6,992 2,997 4,281 5,699 19,969
III Huong Khe
district 5 1,531 656 937 1,251 4,375
15 My Loc
commune 3 840 360 514 686 2,400
16 Can Loc Small
town 2 691 296 423 565 1,975
IV Cam Xuyen
district 22 7,656 3,281 4,687 6,257 21,881
17 Cam Vinh
commune 6 1,995 855 1,221 1,631 5,702
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 27
No Commune Household Type of land
Sub – total Crops Crops Crops Crops Crops
18 Cam Huy
commune 5 1,767 757 1,082 1,446 5,052
19 Cam Loc
commune 5 1,851 793 1,133 1,510 3,777
20 Thien Cam
Small town 6 2,043 875 1,251 1,670 4,169
V Ky Anh district 90 21,943 9,404 13,434 17,909 62,690
21 Ky Xuan
commune 3 941 403 576 770 2,690
22 Ky Lam
commune 4 50 21 31 44 146
23 Ky Nam
commune 4 90 38 55 77 260
24 Ky Tay
commune 21 6,689 2,867 4,095 5,453 19,104
25 Ky Thuong
commune 2 4,160 1,783 2,547 3,394 11,884
26 Ky Hop
commune 24 2,333 1,000 1,429 1,903 6,665
27 Ky Trung
commune 22 4,706 2,017 2,881 3,839 13,443
28 Ky Son
commune 10 2,974 1,275 1,821 2,429 8,499
VI Ha Tinh City 9 2,443 1,047 1,496 2,002 6,988
29 Thach Ha
commune 4 1,104 473 676 906 3,159
30 Thach Hung
commune 5 1,339 574 820 1,096 3,829
VII Nghi Xuan
district 19 4,796 2,056 2,937 3,915 13,704
31 Xuan Giang
commune 10 2,632 1,128 1,611 2,146 7,517
32 Xuan Hai
commune 9 2,165 928 1,325 1,769 6,187
VIII Duc Tho
district 31 6,731 2,885 4,121 5,493 19,230
33 Trung Le
commune 4 1,460 626 894 1,193 4,173
34 Yen Ho
commune 8 2,211 947 1,353 1,800 4,511
35 Duc Thinh
commune 2 697 299 427 570 1,993
36 Duc Thuy
commune 4 345 148 211 283 987
37 Bui Xa
commune 4 175 75 107 145 502
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 28
No Commune Household Type of land
Sub – total Crops Crops Crops Crops Crops
38 Duc Long
commune 5 451 193 276 363 1,283
39 Thai Yen
commune 4 1,394 597 853 1,137 3,981
IX Loc Ha district 19 5,388 2,309 3,299 4,401 15,397
40 Ho Do
commune 12 3,478 1,490 2,129 2,838 9,935
41 Mai Phu
commune 4 1,464 627 896 1,193 4,180
42 Thach My
commune 3 446 191 273 370 1,280
X Hong Linh
Town 19 5,934 2,543 3,633 4,852 16,962
43 Thuan Loc
commune 4 1,492 640 914 1,221 4,267
44 Dau Lieu wards 4 408 175 250 334 1,167
45 Duc Thuan
wards 7 2,622 1,124 1,606 2,142 7,494
46 Trung Luong
wards 4 1,411 605 864 1,156 4,036
XI Loc Ha district 47 13,753 5,894 8,420 11,229 30,876
47 Son Bang
commune 4 258 111 158 213 740
48 Son Ha
commune 3 434 186 266 356 1,242
49 Son Hoa
commune 3 255 109 156 210 730
50 Son Hong
commune 4 256 110 157 211 734
51 Son Linh
commune 5 334 143 205 274 956
52 Son Long
commune 5 1,760 754 1,077 1,436 5,027
53 Son Tien
commune 11 5,584 2,393 3,419 4,553 15,949
54 Son Quang
commune 4 222 95 136 184 637
55 Son Tay
commune 8 4,650 1,993 2,847 3,792 13,282
XII Vu Quang
district 29 3,959 1,697 2,424 3,206 11,286
56 Duc Bong
commune 5 760 326 465 613 2,164
57 Duc Giang
commune 4 384 165 235 310 1,094
58 Duc Huong 5 1,365 585 836 1,114 3,900
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 29
No Commune Household Type of land
Sub – total Crops Crops Crops Crops Crops
commune
59 Duc Lieu
commune 4 327 140 200 264 931
60 Duc Linh
commune 3 721 309 441 581 2,052
61 Huong Tho
commune 4 225 96 138 181 640
62 Son Tho
commune 4 177 76 108 143 504
2.2.3. Number and types of affected perennial trees
Table 2.2.3 – Affected perennial trees
Unit: Tree
No Commune
Type of tree
Total Bead-
tree
Bead-
tree
Bead-
tree
Bead-
tree Bead-tree
Total 87 90 179 106 462
I Thach Ha
district 7 8 15 10 40
1 Thach Son
commune 1 5 2 8
2 Ngoc Son
commune 1 1 1 1 4
3 Thach Ha Small
town 1 1 2
4 Thach Vinh
commune 2 1 1 1 5
5 Viet Xuyen
commune 2 2 3 2 9
6 Thach Long
commune 1 1 1 1 4
7 Thach Kenh
commune 1 1 4 2 8
II Huong Khe
district 11 6 31 18 66
8 Phu Gia
commune 2 3 6 2 13
9 Huong Long
commune 3 8 3 14
10 Phuc Dong
commune 1 2 2 5
11 Huong Giang
commune 2 1 3 1 7
12 Huong Tra
commune 1 1 2 4
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 30
No Commune
Type of tree
Total Bead-
tree
Bead-
tree
Bead-
tree
Bead-
tree Bead-tree
13 Phong Dien
commune 1 1 5 3 10
14 Huong Binh
commune 1 1 6 5 13
III Huong Khe
district 3 4 3 10
15 My Loc
commune 2 3 2 7
16 Can Loc Small
town 1 1 1 3
IV Cam Xuyen
district 11 6 10 6 33
17 Cam Vinh
commune 1 3 2 6
18 Cam Huy
commune 4 3 2 2 11
19 Cam Loc
commune 1 4 1 6
20 Thien Cam
Small town 5 3 1 1 10
V Ky Anh district 15 18 37 17 87
21 Ky Xuan
commune 2 1 2 1 6
22 Ky Lam
commune 2 2 2 3 9
23 Ky Nam
commune 2 2 3 1 8
24 Ky Tay
commune 1 2 11 2 16
25 Ky Thuong
commune 1 1 2
26 Ky Hop
commune 3 2 8 3 16
27 Ky Trung
commune 3 7 6 4 20
28 Ky Son
commune 1 2 4 3 10
VI Ha Tinh City 5 6 4 3 18
29 Thach Ha
commune 1 2 2 1 6
30 Thach Hung
commune 4 4 2 2 12
VII Nghi Xuan
district 3 3 15 4 25
31 Xuan Giang
commune 1 2 8 2 13
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 31
No Commune
Type of tree
Total Bead-
tree
Bead-
tree
Bead-
tree
Bead-
tree Bead-tree
32 Xuan Hai
commune 2 1 7 2 12
VIII Duc Tho
district 9 9 13 13 44
33 Trung Le
commune 2 1 2 2 7
34 Yen Ho
commune 1 1 3 1 6
35 Duc Thinh
commune 1 1 1 1 4
36 Duc Thuy
commune 1 1 1 2 5
37 Bui Xa
commune 1 2 1 2 6
38 Duc Long
commune 1 2 2 1 6
39 Thai Yen
commune 2 1 3 4 10
IX Loc Ha district 4 5 7 4 20
40 Ho Do
commune 3 3 5 2 13
41 Mai Phu
commune 1 1 1 1 4
42 Thach My
commune 1 1 1 3
X Hong Linh
Town 6 5 10 7 28
43 Thuan Loc
commune 2 1 3 1 7
44 Dau Lieu wards 1 1 1 2 5
45 Duc Thuan
wards 1 2 4 1 8
46 Trung Luong
wards 2 1 2 3 8
XI Loc Ha district 9 12 23 13 57
47 Son Bang
commune 1 1 1 3
48 Son Ha
commune 1 1 1 3
49 Son Hoa
commune 1 2 3
50 Son Hong
commune 1 1 1 1 4
51 Son Linh
commune 1 1 2
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 32
No Commune
Type of tree
Total Bead-
tree
Bead-
tree
Bead-
tree
Bead-
tree Bead-tree
52 Son Long
commune 1 1 3 1 6
53 Son Tien
commune 4 3 10 5 22
54 Son Quang
commune 1 1 1 1 4
55 Son Tay
commune 2 2 3 3 10
XII Vu Quang
district 4 8 11 11 34
56 Duc Bong
commune 1 2 1 4
57 Duc Giang
commune 1 1 1 3
58 Duc Huong
commune 1 2 1 3 7
59 Duc Lieu
commune 1 3 1 5
60 Duc Linh
commune 1 2 4 2 9
61 Huong Tho
commune 1 1 2 4
62 Son Tho
commune 1 1 2
2.3. SOCIOECONOMIC CONDITION OF COMMUNITY WHICH IS AFFECTED
BY THE PROJECT
In this sub-project. there is no serious impact in project area as: house movement. demolish
architectural works etc… Therefore. we shall not mention the socioeconomic condition of
affected community.
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 33
3. LEGAL FRAMEWORK AND ENTITLEMENT OFDPs
Resettlement plan of sub-project The Rual Energy Project – Additional Financing – Phase
4, Ha Tinh province is prepared according to the Policy Framework of Second Rual Energy
Project accordingly the legal Framework for compensation and resettlement activities shall
base on Resettlement Policy Framework of Second Rual Energy Project
Law and policy applied for the compensation and resettlement includes: (i) policy of World
Bank; (ii) current compensation. support. resettlement policy of Vietnamese Government; and
(iii) procedure of compensation. support and resettlement of local authority (Ha Tinh
province).
3.1. VIETNAMESE GOVERNMENT‟S REGULATION
The legal framework of the Government of Vietnam: The key national laws, decrees
governing land acquisition, compensation and resettlement in Vietnam consists of the
following:
- The Constitution of Vietnam, 1992 confirms the right of citizens to own a house and
to protect the ownership of the house.
- The Civil Law (28 October 1995)
- GOV Decree No.64/CP dt.27 September 1993 on the distribution of long term
agricultural land to the household for agricultural purpose.
- GoV Decree 60/CP dt. July 5, 1994 regulates property ownership and Land Use
Rights in urban areas.
- GOV Decree 61/CP dt. July 15, 1994 regulates residential house purchases sales and
business.
- GOV Decree 45/CP dt.3 August 1996 regulates the Amendment of Article 10 of
60/CP (5/7/1994)
- GOV Decree 88/CP dt.17 August 1994 regulates the Management and Use of Urban
Land
- Ordinance for Regulation and Amendment of Ordinance on tax of Land and Housing
(1 January 1994)
- Law on Taxation of Land Use Right Transfer (22 June 1994)
- GOV Decree 94/CP dt.25 August 1994 regulates the Implemantation of Ordinance for
Tax of Land and Housing.
- MOF official Letter No.2944/TC-TCT dt.28 October 1995 regulates the tax remission
of housing program.
- Law on Petiton and Accusation dt.02 December 1998
- GOV Decree 54/1999/ND-CP dt.8 July defined the protection of high voltage
systems.
- GOV Decree 67/1999/ND-CP dt.07 August 1999 regulates in detail the Law on
Petition and Accusation
- GOV Decree No.17/2001/ND-CP dt.4 May 2001 stipulated procedures of using and
management of ODA
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 34
- The 2003 Land Law (passed by the National Assembly on November 26, 2003)
regulates the land management and land uses, with effective data of July, 01, 2004,
provides that “the persons with land to be recovered shall be compensated with the
assignment of new land of the same use puposes; if having no land for compensation,
shall be compensated with the land use right valua at the time of issuance of the
recovery decisions. The People‟s Committees of the provinces and cities directly
under the central government shall elaborate and execute resettlement projects before
the land recovery for compenstion with dwelling houses, residential land for persons
having residential lanf recovered and having to move their places of residence. The
resettlement sites must have developement condictions being equal to or better than
the condictions in the former places of residence. In cases of having no resettlement
land, the persons having land recovered shall be compensated with money and given
priority to purchase or lease dwelling houses under the State‟s ownership, for urban
areas; be compensated with residential land for rural areas. In case of recovering land
of household and/or individuals, that are directly engaged in production, but having
no land for compensation for continued production, apart from pecuniary
compensations, the persons having land recovered shall be supported by the State to
stabilize their lives, with training for change of their production and/or business lines,
with the arrangement of new job
Item 4 – Land Acquisition
Art. 39 Regulates the land acquisition for the purposes of national defense, security,
national interests and public interests. Clause 2 of this Article clearly defined the
public info (at least 3 months prior to agricultural land acquisition and 6 months prior
to non agricultural land acquisition) on the reasons of land acquisition, time schedule,
resettlement plan, and compensation/ground clearance mater plan for land acquisition.
Art. 42 Regulates the compensation and resettlement of the people who have land being
acquired:
Clause 1 „… people, who have LURC or having sufficient conditions to
have LURC shall be compensated for their acquired land…‟
Clause 2 „… the acquired land shall be compensated with new land of
similar using purpose; in case of lack of resettlement land, the
compensation shall be equal to the value of land use right at the
time of land acquisition…‟
Clause 3 „… provincial People‟s Committees and Cities directly under the
central government prepare and implement the resettlement plans
prior to the land acquisition … The resettlement sites planed for
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 35
various projects in the same area and should have similar to or
better development conditions than the old dwelling sites.‟
In case of lack of resettlement sites: (i) in urban areas „ DPs shall
be compensated in cash and have the priority to buy or rent the
state –owned houses, and (ii) in rural areas „in case the value of the
acquired residential land is higher than that of the resettlement in
cash for the differences‟.
Clause 4 „…in case DPs whose productive land being acquired and there is
no productive land for „land for land‟ compensation, apart from the
cash compensation, DPs shall receive assistance for resettlement,
training for new trades, employing in new trades.‟
Clause 49, 50 define the conditions for issuance of LURC to the extend that (i)
„HH or individual who directly using the land for agricultural,
forestry, aquaculture and salt productive in the areas of socio-
economic difficulties in the mountainous areas or islands and who
have their residential registration and certification from their
commune People‟s Committee that they had been using the land
stably and without disputes are being issued with LURC and do not
have to pay for the land use‟, (ii) „HH or individual who had been
stably using the land before Oct. 15,1993 but without any legal
papers and their commune People‟s Committee certifies that their
land is without disputes and apt to the approved local land use plan
are being issued with LURC and do not have to pay for the land
use‟,(iii) „HH or individual who had been stably using the land
from Oct.15,1993 till the effective of this Law, but without any
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 36
legal papers and their commune People‟s Committee certifies that
their land is without disputes and apt to the approved local land use
plan are being issued with LURC and do have to pay for the land
use‟.
Clauses 56 define the State controlled Land Price: (i) the land price verification
by the State should ensure the principles i.e. „close to the actual
value of the transfer of land use rights on the market and when
there is large difference between the verified land price and the
actual value of the transfer of land use rights on the market,
adjustment should be carried out, (ii) „Government regulates the
method of land price verification for each region at each period and
land price adjustment and dealing with differences of land prices at
the borders of the provinces and cities directly under the central
government „ , and (iii) „Land price defined by the People‟s
Committee of the provinces and cities directly under the central
government is publicly announce on January 1st every year…‟
- GOV Decree No.181/2004 ND-CP dt. 29 October, 2004 defined the Implemantation
of The 2003 Land Law as defined the methodology for defining prices framework of
various types and categories of land, compensation, assistance and resettlement in
case of land acquisition by the State.etc.
- GOV Decree No.188/2004 ND-CP dt. 16November, 2004 on methodology for
defining prices and prices framework of various types and categories of land.
This Decree setforth the minimum and maximum prices of different types and
categories of land covering the whole country. These have been established for the
purpose of land acquisition by Government, tax value for transfer of land use rights,
leasing government land national and public purpose.
The methodologies for the land price verification elaborated in this Decree are to
ensure the substitution cost of the land.
- Circular No.114/2004/TT-BTC dt. 26 November 2004 of the Ministry of Finance
guiding the implementation of the above stated Decree.
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 37
This Circular elaborates in details the methodologies (i.e. direct comparison method
and income method) for the land price verification of different types and categories of
land in different regions/areas to ensure the replacement cost.
- GOV Decree No.197/2004/ND-CP dt. 03 December 2004 on the compensation,
assistance and resettlement in case of land acquisition by the State.
Art. 6 „… people who have land being acquired shall be compensated with land of similar
land use purpose. If there is no land for compensation, cash compensation equal to
land use rights value at the time of land acquisition shall be applied. If there is any
difference in value, in case of compensation by new land or house, such differences
shall be settled in cash.
Art.19 „…. houses and structures of domestic use of the household or individual shall be
compensation with the value of construction of new house, structures of similar
technical standard…‟
- Circular No.116/2004/TT-BTC dt. 07 December 2004 of the Ministry of Finance
guiding the implementation of Decree No.197/2004/ND-CP.
- Decisions of Ha Tinh Provincial People‟s Committees on the applicable unit prices
for compensation.
Priorities to Ethnic Minority Peoples
Equality right of ethnic people was stipulated clearly in the Vietnam Law. Article 5 in the
Vietnam Constitution (1992) stipulated as follows:
The Socialist Republic of Vietnam is an united nation with many nationalities. The State
implements an equality and united policy and supports spiritually all nationalities and
prohibits race discrimination and separation. Each nationality has the right to use its
own language and ways of living to preserve their characteristics and to improve its own
good traditional and cultural custom. The State carries out minorities in Vietnam
physically and spiritually.
Notes: There are no EM‟s HHs in the project areas.
3.2. WORLD BANK‟S POLICIES
(i) The primary objective of WB policies is to explore all alternatives to avoid or at least
minimize involuntary resettlement. Where resettlement is unavoidable, the living
standards of displace persons should be restored or improved relative to those
conditions that prevailed prior to the project. The policy applies to the taking of land
and other assets when land acquisition results in the loss of shelter, the loss of all or part
of productive assets, or access to them, and the loss of income sources or other means
of livelihood.
(ii) Measures required to ensure that resettlement has a positive outcome include:
- Consulting with potential Project-affected people on feasible measures for
resettlement and rehabilitation;
- Providing Project-affected persons with options for resettlement and rehabilitation;
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 38
- Enabling their participation in planning and selecting these options
- Choosing relocation sites that provide, at a minimum, the same benefits and services
as the sites the replace;
- Providing allowances, training and income support to assist in making a smooth
transition;
- Identifying vulnerable groups and providing special assistance to these groups; and
- Establishing an institutional and organizational structure that supports this process to
a successful end.
(iii) Eligibility Criteria and Compensation
- The displaced or project-affected people eligible for compensation will include:
(a)those who have formal legal right to land or other assets; (b)those who initially do
not have formal legal rights to land or other assets but have a claim to legal rights
based upon the laws of the country; upon the permission of local authorities to
occupy or use the project affected plots; and c)those who have no recognizable legal
right or claim to the land they are occupying.
- Persons covered under (a) and (b) are provided compensation for the land they lose
and other assistance. Persons covered under (c) are provided resettlement assistance,
in lieu of compensation for the land they occupy and other assistance, as necessary,
to achieve the objectives set out in this policy, if they occupy the project area prior
to a cut-off dates defined in RPs. Persons who encroach on the areas after the cut-off
data defined in the RPs are not entitled to compensation or any form of resettlement
assistance.
(iv) Valuation of Compensation for losses
The methodology to be used in the valuation of losses for Bank-associated Project is based on
their replacement cost. In this project, losses comprise land, structures and other assets.
Replacement cost for land includes the value of land at market price plus the cost taxes and
fees to get Land Use Right Certificate (LURC). For houses and other structures, the market
cost of the materials should be used to calculate the replacement cost to build a replacement
structures with an area and the quality should be at least as good as those affected. For both
totally and partially affected structures, compensation includes market cost of material, plus
the costs of material transport, labor and constructor fees, registration and transfer taxes.
Depreciation of the asset and amount saved in materials will not form apart of replacement
cost.
3.3. APPLIED POLICIES
Current regulations on compensation. support. resettlement of local authority are applied in
resettlement plan of sub-project includes:
Circular No. 145/2004/ND-CP of the Treasury. Compensation for fruit trees identified on the
basis of perennial crops and the rest will be compensated according to price instead. The
season will be compensated according to the average production of three years.
- Decision No. 3927/QD-UBND December 28, 2010 of Ha Tinh province, "On the issue of
land prices in the province."
- Decision No. 02/QD-UBND on 11 May 2011 02 of Ha Tinh province "Promulgating the
compensation unit price tree crops in the province."
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 39
Comparison between Government of Viet Nam and World Bank Approaches required
Waivers
There are many ways in which the approaches of the GOV – either in policy or practice
– are compatible with WB guidelines. The most important compatibilities are:
Vietnam has a process whereby most people without legal land rights may meet
conditions of legalization and receive compensation for losses.
Permanent residents are provided with options that include relocation to an improved
site, or cash, or a combination of the two.
Resettlement sites offer not only better-improved infrastructure and services but
represent a higher standard of living.
Allowances are to help the DPs in the transition period and there is and there is an
institutional structure through which people are informed, can negotiate compensation,
and can appeal.
On the issue of land tenure and the legal right to compensation, the Government and
World Bank approaches are compatible. The government has its own process in place
whereby land occupied without legal documentation can be legalized; this land,
however, is compensated for at a rate equal to 100% of land price minus the taxes and
fee for land use right registration from 15 October 1993. (Clause 49, 50 of Art .42 of
the 2003 Land Law).
Compensation at replacement cost is ensured in Art. 6 of Decree 197/2004/ND- Cp dt. 03 Dec,
2004.
In order to carry out the RP in accordance to World Bank OP 4.12 on Involuntary
Resettlement a number of articles in various Vietnamese laws and regulations which do not
ensure compensation at replacement cost or set eligibility provisions which do not extend the
right to compensation and rehabilitation to households to households without proper land
papers.
Principles of compensation and resettlement appliedfor sub-project:
Principles and objectives of this RP are defined in accordance with Vietnamese laws and
Operational Policies 4.12 of WB. Vietnamese legislation and WB Policies have been adapted to
fit the specific conditions of the project as defined below:
(i) Acquisition of land and other assets, and resettlement of people will be minimized as
much as possible.
(ii) All DP‟s residing, working, doing business or cultivating land in right of way (ROW) of
distribution line (D/L), surrounding areas of tower foundation, the Substation areas, in
the service roads under the project as of the date of the baseline surveys are entitled to be
provided with rehabilitation measures sufficient to assist them to improve or at least
maintain their pre-project living standards, income earning capacity and production
levels. Lack of legal rights to the assets lost should not bar the DP from entitlement to
such rehabilitation measures
(iii) The rehabilitation measures to be provided are:
- Compensation at replacement cost, without deduction for depreciation or salvage
materials for houses and other structures
- Agricultural land for land of equal productive capacity acceptable to the DPs or in cash
at replacement cost according to DP‟s choice;
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 40
- replacement of residential/premise land of equal size acceptable to the DP or in cash at
replacement cost according to DP‟s choice; and
- Transfer and subsistence allowances
(iv) Replacement residential and agricultural land will be as nearby as possible to the land
that was lost, and acceptable to the DPs
(v) The resettlement transition period will be minimized and the rehabilitation means will be
provided to the DP‟s prior to the expected star-up date of works in the respective project
site.
(vi) plans for acquisition of land and other assets and provision of rehabilitation measures
will be carried out in consultation with the DP‟s, to ensure minimal disturbance.
Entitlements will be provided by DP‟s prior to expected start-up of works at the
respective project site.
(vii) The previous level of community services and resources will be maintained or improved.
(viii) Financial and physical resources for resettlement and rehabilitation will be made
available and as where and when required
(ix) Institutional arrangements will ensure effective and timely design, planning, consultation
and implementation of RPs
(a) Effective and timely supervision, monitoring and evaluation of the implementation of
RPs will be carried out.
Entitlement matrix: refer to appedix 2. Entitlement matrix.
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 41
4. COMPENSATION AND SUPPORT
4.1. COMPENSATION
Date of Project announcement: date of project announcement has been fixed during
surveying and inventorying. The date of project annoucenment has been officially announced
by local authority.
Those households which encroach and move to inhabit in the area which is planned to be
reclaimed after the date of announcement shall not receive any resettlement and
compensation Entitlement. They shall be requested to remove the structure. cut down trees or
harvest crops for site clearance for the project. However. they do not have to pay any fine.
The date of announcement and the provision „do not compensate for encroaching households
and people‟ had been clearly announced in the community meeting and printed in the
pamphlets.
Alternative price: In this sub-project. the loss only includes land. perennial tress and crops.
The survey result shows that the line and transformer station in sub-project are constructed in
rural area. almost are garden and crop of long term stability. In these areas. there is almost no
case of buying and selling land. tree or crops (most of people transfer the land to their
offsprings. relatives) and via consultation with local authority. the compensation price for
land. tree and crops shall be applied according to the Unit price issued by provincia people‟s
committee. Unit price for compensation has been widely announced in the community
consultation and accepted by affected households.
Compensation prices have been defined in this RP are tariffs established by the provinces based
on the Decrees 197/2004/ND-CP and 188/2004/ND-CP.
Please note that. Unit price of land used in this resettlement plan is only used for the purpose
of budget estimate (during the period of preparing this Resettlement plan). In the period of
deploying resettlement plan (expected to be the year 2012). Unit price for land compensation
shall be upgraded to ensure that affected people shall be compensated at the alternative price
for their loss.
4.1.1. Unit price of land compensation
Table 4.1.1a – Unit price of permanent land compensation
Unit price: VND/m2
No Province/District/Commune Field land
Ha Tinh province
I Thach Ha district
1 Thach Son commune 31,500
2 Ngoc Son commune 25,200
3 Thach Ha Small town 37,800
4 Thach Vinh commune 31,500
5 Viet Xuyen commune 25,200
6 Thach Long commune 31,500
7 Thach Kenh commune 31,500
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 42
II Huong Khe district
8 Phu Gia commune 20,100
9 Huong Long commune 31,500
10 Phuc Dong commune 25,200
11 Huong Giang commune 20,100
12 Huong Tra commune 31,500
13 Phong Dien commune 25,200
14 Huong Binh commune 25,200
III Huong Khe district
15 My Loc commune 20,100
16 Can Loc Small town 31,500
17 Cam Xuyen district 31,500
18 Cam Vinh commune 31,500
19 Cam Huy commune 25,200
20 Cam Loc commune 31,500
V Thien Cam Small town
21 Ky Anh district 25,200
22 Ky Xuan commune 25,200
23 Ky Lam commune 25,200
24 Ky Nam commune 25,200
25 Ky Tay commune 20,100
26 Ky Thuong commune 20,100
VI Ky Hop commune
29 Ky Trung commune 27,400
30 Ky Son commune 27,400
VII Ha Tinh City
31 Thach Ha commune 31,500
32 Thach Hung commune 31,500
VIII Nghi Xuan district
33 Xuan Giang commune 31,500
34 Xuan Hai commune 31,500
35 Duc Tho district 31,500
36 Trung Le commune 20,100
37 Yen Ho commune 31,500
38 Duc Thinh commune 31,500
39 Duc Thuy commune 31,500
IX Bui Xa commune
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 43
40 Duc Long commune 31,500
41 Thai Yen commune 25,200
42 Loc Ha district 31,500
X Ho Do commune
43 Mai Phu commune 27,200
44 Thach My commune 32,000
45 Hong Linh Town 32,000
46 Thuan Loc commune 32,000
XI Dau Lieu wards
47 Duc Thuan wards 31,500
48 Trung Luong wards 25,200
49 Loc Ha district 31,500
50 Son Bang commune 20,100
51 Son Ha commune 20,100
52 Son Hoa commune 25,200
53 Son Hong commune 20,100
54 Son Linh commune 25,200
55 Son Long commune 25,200
XII Son Tien commune
56 Son Quang commune 25,200
57 Son Tay commune 25,200
58 Vu Quang district 25,200
59 Duc Bong commune 25,200
60 Duc Giang commune 25,200
61 Duc Huong commune 25,200
62 Duc Lieu commune 25,200
Table 4.1.1b – Unit price for temporary land compensation (limit the capacity of
land use)
Unit: VND/m2
District/Commune Field land Garden land
I Thach Ha district
1 Thach Son commune 18900 18900
2 Ngoc Son commune 15120 15120
3 Thach Ha Small town 22680 22680
4 Thach Vinh commune 18900 18900
5 Viet Xuyen commune 15120 15120
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 44
6 Thach Long commune 18900 18900
7 Thach Kenh commune 18900 18900
II Huong Khe district
8 Phu Gia commune 12060 12060
9 Huong Long commune 18900 18900
10 Phuc Dong commune 15120 15120
11 Huong Giang commune 12060 12060
12 Huong Tra commune 18900 18900
13 Phong Dien commune 15120 15120
14 Huong Binh commune 15120 15120
III Huong Khe district
15 My Loc commune 12060 12060
16 Can Loc Small town 18900 18900
17 Cam Xuyen district 18900 18900
18 Cam Vinh commune 18900 18900
19 Cam Huy commune 15120 15120
20 Cam Loc commune 18900 18900
V Thien Cam Small town
21 Ky Anh district 15120 15120
22 Ky Xuan commune 15120 15120
23 Ky Lam commune 15120 15120
24 Ky Nam commune 15120 15120
25 Ky Tay commune 12060 12060
26 Ky Thuong commune 12060 12060
VI Ky Hop commune
29 Ky Trung commune 16440 16440
30 Ky Son commune 16440 16440
VII Ha Tinh City
31 Thach Ha commune 18900 18900
32 Thach Hung commune 18900 18900
VIII Nghi Xuan district
33 Xuan Giang commune 18900 18900
34 Xuan Hai commune 18900 18900
35 Duc Tho district 18900 18900
36 Trung Le commune 12060 12060
37 Yen Ho commune 18900 18900
38 Duc Thinh commune 18900 18900
39 Duc Thuy commune 18900 18900
IX Bui Xa commune
40 Duc Long commune 18900 18900
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 45
41 Thai Yen commune 15120 15120
42 Loc Ha district 18900 18900
X Ho Do commune
43 Mai Phu commune 16320 16320
44 Thach My commune 19200 19200
45 Hong Linh Town 19200 19200
46 Thuan Loc commune 19200 19200
XI Dau Lieu wards
47 Duc Thuan wards 18900 18900
48 Trung Luong wards 15120 15120
49 Loc Ha district 18900 18900
50 Son Bang commune 12060 12060
51 Son Ha commune 12060 12060
52 Son Hoa commune 15120 15120
53 Son Hong commune 12060 12060
54 Son Linh commune 15120 15120
55 Son Long commune 15120 15120
XII Son Tien commune
56 Son Quang commune 15120 15120
57 Son Tay commune 15120 15120
58 Vu Quang district 15120 15120
59 Duc Bong commune 15120 15120
60 Duc Giang commune 15120 15120
61 Duc Huong commune 15120 15120
62 Duc Lieu commune 15120 15120
4.1.2. Compensation price unit for perennial tree
Table 4.1.2 – Compensation price unit for perennial tree
Price unit : VND/tree
Type of tree Price unit
orange 320.000
Banana 20.000
tree label 250.000
grapefruit 200.000
- Đơn giá đền bù cho mùa vụ
Rice 1.500
Vegetables 10.000
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 46
Note The above mentioned decision classifies many different unit price for trees of different
ages (usually 2 – 8 types according to tree age). the highest rates in the
compensation unit preices of relevant type of trees affected are applied as listed in
the above table.
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 47
Table 4.1.3 – Summary of compensation
Commune
Permanent
land
compensation
Temporary land
compensation
(limit capacity of land
use)
Tree
compensation
Compensation for crops
which
permanently/temporarily
affected
Total
I Thach Ha district 2,255,400 3,383,100 6,400,000 18,936,000 30,974,500
1 Thach Son commune 149,625 224,438 750,000 420,000 1,544,063
2 Ngoc Son commune 119,700 179,550 770,000 510,000 1,579,250
3 Thach Ha Small town 585,900 878,850 450,000 3,450,000 5,364,750
4 Thach Vinh commune 291,375 437,063 1,070,000 2,601,000 4,399,438
5 Viet Xuyen commune 516,600 774,900 1,560,000 6,915,000 9,766,500
6 Thach Long commune 149,625 224,438 770,000 810,000 1,954,063
7 Thach Kenh commune 442,575 663,863 1,030,000 4,230,000 6,366,438
II Huong Khe district 4,226,820 6,340,230 9,020,000 53,835,750 73,422,800
8 Phu Gia commune 291,450 437,175 1,870,000 4,413,750 7,012,375
9 Huong Long commune 504,000 756,000 1,660,000 5,119,500 8,039,500
10 Phuc Dong commune 478,800 718,200 740,000 6,723,000 8,660,000
11 Huong Giang commune 375,870 563,805 1,110,000 6,036,000 8,085,675
12 Huong Tra commune 724,500 1,086,750 720,000 6,234,000 8,765,250
13 Phong Dien commune 327,600 491,400 1,250,000 3,904,500 5,973,500
14 Huong Binh commune 1,524,600 2,286,900 1,670,000 21,405,000 26,886,500
III Huong Khe district 414,975 622,463 1,960,000 4,686,000 7,683,438
15 My Loc commune 170,850 256,275 1,390,000 2,571,000 4,388,125
16 Can Loc Small town 244,125 366,188 570,000 2,115,000 3,295,313
IV Cam Xuyen district 2,517,827 3,776,740 6,200,000 23,436,000 35,930,566
17 Cam Vinh commune 696,150 1,044,225 760,000 6,107,250 8,607,625
18 Cam Huy commune 663,548 995,321 2,390,000 5,409,750 9,458,619
19 Cam Loc commune 445,914 668,871 580,000 5,666,250 7,361,035
20 Thien Cam Small town 712,215 1,068,323 2,470,000 6,252,750 10,503,288
V Ky Anh district 4,683,275 7,024,912 13,140,000 67,171,650 92,019,836
21 Ky Xuan commune 274,680 412,020 1,090,000 2,880,000 4,656,700
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 48
22 Ky Lam commune 100,800 151,200 1,740,000 153,000 2,145,000
23 Ky Nam commune 108,360 162,540 1,360,000 274,500 1,905,400
24 Ky Tay commune 1,483,020 2,224,530 1,420,000 20,475,000 25,602,550
25 Ky Thuong commune 793,950 1,190,925 320,000 12,735,000 15,039,875
26 Ky Hop commune 433,155 649,733 2,160,000 7,143,150 10,386,038
27 Ky Trung commune 877,767 1,316,651 3,570,000 14,406,000 20,170,418
28 Ky Son commune 611,543 917,314 1,480,000 9,105,000 12,113,856
VI Ha Tinh City 859,264 1,288,896 3,680,000 7,479,000 13,307,160
29 Thach Ha commune 408,671 613,007 1,040,000 3,381,000 5,442,678
30 Thach Hung commune 450,593 675,890 2,640,000 4,098,000 7,864,483
VII Nghi Xuan district 1,469,475 2,204,213 2,750,000 14,682,750 21,106,438
31 Xuan Giang commune 740,250 1,110,375 1,360,000 8,056,350 11,266,975
32 Xuan Hai commune 729,225 1,093,838 1,390,000 6,626,400 9,839,463
VIII Duc Tho district 1,974,720 2,962,080 7,810,000 20,605,800 33,352,600
33 Trung Le commune 511,875 767,813 1,290,000 4,468,350 7,038,038
34 Yen Ho commune 551,250 826,875 810,000 6,767,400 8,955,525
35 Duc Thinh commune 267,750 401,625 770,000 2,133,000 3,572,375
36 Duc Thuy commune 89,445 134,168 970,000 1,056,900 2,250,513
37 Bui Xa commune 144,900 217,350 1,220,000 534,750 2,117,000
38 Duc Long commune 1,040,000 1,379,400 2,419,400
39 Thai Yen commune 409,500 614,250 1,710,000 4,266,000 6,999,750
IX Loc Ha district 1,689,188 2,533,781 3,390,000 16,493,250 24,106,219
40 Ho Do commune 1,055,250 1,582,875 2,150,000 10,645,950 15,434,075
41 Mai Phu commune 327,600 491,400 770,000 4,480,800 6,069,800
42 Thach My commune 306,338 459,506 470,000 1,366,500 2,602,344
X Hong Linh Town 2,058,800 3,088,200 4,650,000 18,165,300 27,962,300
43 Thuan Loc commune 482,800 724,200 1,110,000 4,568,550 6,885,550
44 Dau Lieu wards 152,000 228,000 970,000 1,248,750 2,598,750
45 Duc Thuan wards 856,000 1,284,000 1,080,000 8,028,000 11,248,000
46 Trung Luong wards 568,000 852,000 1,490,000 4,320,000 7,230,000
XI Loc Ha district 3,250,578 4,875,867 8,760,000 42,100,500 58,986,945
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 49
47 Son Bang commune 144,900 217,350 470,000 791,250 1,623,500
48 Son Ha commune 157,500 236,250 470,000 1,329,450 2,193,200
49 Son Hoa commune 159,075 238,613 290,000 779,700 1,467,388
50 Son Hong commune 92,460 138,690 770,000 782,700 1,783,850
51 Son Linh commune 92,460 138,690 270,000 1,022,550 1,523,700
52 Son Long commune 418,320 627,480 810,000 5,386,650 7,242,450
53 Son Tien commune 1,008,015 1,512,023 3,150,000 17,093,100 22,763,138
54 Son Quang commune 112,140 168,210 770,000 679,950 1,730,300
55 Son Tay commune 1,065,708 1,598,562 1,760,000 14,235,150 18,659,420
XII Vu Quang district 327,600 491,400 5,620,000 12,118,500 18,557,500
56 Duc Bong commune 490,000 2,326,200 2,816,200
57 Duc Giang commune 750,000 1,176,000 1,926,000
58 Duc Huong commune 327,600 491,400 1,420,000 4,179,900 6,418,900
59 Duc Lieu commune 510,000 1,000,650 1,510,650
60 Thach Ha district 1,280,000 2,206,500 3,486,500
61 Thach Son commune 670,000 688,050 1,358,050
62 Ngoc Son commune 500,000 541,200 1,041,200
Total 25,727,921 38,591,881 73,380,000 299,710,000 437,410,301
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 50
4.2. SUPPORT TO RECOVER THE DAILY LIFE FORDPs
Beside the direct compensation for loss. those seriousDPs (must move or lose more than 10%
of land area and vulnerable households), they are entitled to enjoy other support as
(subsidiary/allowance) according to Policy Framework of the Project. However, in this sub-
project. there is noDPs which belongs to the above mentioned affected group. Thus this
resettlement plan do not have the activities of supporting daily life recovery…
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 51
5. PUBLIC CONSULTATION AND INFORMATION DISCLOSE
5.1. PUBLIC CONSULTATION AND PARTICIPATION OF PEOPLE
The community consultation is carried out under 02 forms: issue the leaflet Essential
information of compensation policy. resettlement and safe electricity of the Project; and
community meeting.
leaflet Essential information of compensation policy. resettlement and safe electricity of the
RE2 has been prepared (in question-answer form with image) and has been issued to 100%
of affected households and openly announced in project areas (June 2011) – this is the basis
for the community andDPs to participate in different phases of the construction work. This
document includes 2 main parts. specifically: (1) FAQs of affected people; (2) Images which
describe the measures to prevent electricity accident and protect the safe grid corridor.
Based on the information stated in the leaflet. survey result of loss and damage. compensation
and support plan. Entitlement matrix and other works relating to compensation. local
community and can directly participate in the supervision to carry out this plan.
Compensation Council of districts shall hold the meetings with relevant commune/hamlet to
inform them of this sub-project. In addition. commune leaders also inform the relevant local
people regarding this sub-project and potential impacts of it. especially the Entitlement
matrix.
The community consultation meeting has been held at (i) office of People‟s Committee of
Huong Giang commune Huong Khe district; (ii) office of People‟s Committee of Phuong
Dien commune Ha Tinh province. Project Owner and Consulting Company consults the
opinion of people on Resettlement Plan of sub-project “The Rual Energy Project –
Additional Financing – Phase 4, Ha Tinh province”. Representative of Project Owner and
Consulting Company has stated with community on the following main points:
Project description: plan on route for building line. position of station and the
necessity to build the above mentioned work. financial resource for the project.
objectives of project and items of project.
Compensation policies of the project;
Mitigation measure to minimize the loss for people etc…
Representatives of people is invited to attend the consultation meeting include: representative
of affected households. representative of local and relevant authorities. bodies. NGOs
(Women‟s Union. Farmer Association. Association of Veterans…) and local power company
(Refer to appendix 5 for detail).
Table 5.1– Summary of opinion of community in the community consultation
meeting
NO Location/ Time/
Number of attendants Opinion
1 – office of People‟s
Committee of Huong
Giang commune
Huong Khe district.
– Request Project Owner and Consulting Company give
detailed information of affected land area; openly
announce the Unit price of land. tree. assets
compensation.
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 52
NO Location/ Time/
Number of attendants Opinion
Ha Tinh province
– Time: 7/06/2010
– Attendants: 11
– Request Project Owner to explain how the Project will
compensate for the temporary occupied land during the
construction phase; during the project implementation.
if the rice planted in the ponds and route corridor suffer
from any impacts? What are they?
– Request to inform the compensation policy for the
project;
– Request Project Owner and Design Unit to thorougly
survey and issue the optimum measures to minimize the
environmental impacts on people;
– The Project is of big significance for the locality and for
people. It should be widely announced to people in the
area.
2 – Office of People‟s
Committee of Phuong
Dien commune Ha
Tinh province
– Time: 12/06/2010
– Attendants: 14
– Request Project Owner and Consultant to present more
impacts of Project on rice planting ponds; correct and
compensation measures
– Project Owner should choose the time of construction
after the farmers harvest rice to minimize the loss;
– The transportation of sand. stone badly affect the
environment and cause loss for people. then the
construction unit will compensate;
– Request Project Owner to widely popularize the
compensation policy of Project for the affected people
to encounter.
Representative of Project Owner and Consulting company has provided the information
relating the questions on Project implementation time. land area of route corridor etc… and
collect the opinion and shall consider to update into the report of Resettlement Plan. In
addition to other information which are available in the documents which are announced to
delegates. the following information has been supplemented for meeting attendants:
Collect the opinion on wide announcement on compensation policy for affected
households; The information shall be provided in People‟s committee of Huong Giang
commune – Huong Khe district and People‟s Committee of Phuong Dien commune
Ha Tinh province. Moreover, it is also announced in Ha Tinh Electricity Company;
Those temporarily occupied land during the construction phase shall be calculated and
reasonably compensated by Project Owner.
During the period of line operation. rice ponds in route corridor still work normally;
The design solutions when building inner pole foundation or near rice field and must
select the construction time in order to minimize the impact on rice and aquatic
creatures etc…
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 53
The above mentioned opinions and the collected opinions have been updated into the content
of this resettlement plan.
5.2. INFORMATION DISCLOSURE
The Resettlement Plan Report in Vietnamese language shall be announced in People‟s
Committee of districts which are affected by the Project and in office of People‟s Committee
of Huong Giang commune – Huong Khe district and in People‟s Committee of Phuong Dien
commune Ha Tinh province for people and community to encounter and study.
The Resettlement Plan Report in Vietnamese language and English language shall be sent to
Center for Information and Vietnam Developemtn in No. 63 Ly Thai To – Hanoi for those
who care about this project to read. study and contribute opinion;
The Resettlement Plan Report in English language shall be sent to Info shop of World Bank
in Washington for announcement.
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 54
6. REPORT. SUPERVISE AND APPRAISE
The implementation of Resettlement Plan must be regularly checked by Project Management
Unit with close cooperation with People‟s Committee at various levels and with independent
consulting units. The findings shall be recorded in the quarterly report and submitted to PMU,
and WB.
6.1. Internal supervision monitoring
PMU shall have to carry out the internal monitoring for the implementation of the RP. The
inspection and internal monitoring are aimed to:
Verify that the baseline information of all DP‟s has been carried out and that the
valuation of assets lost or damaged, and the provision of compensation, resettlement
and other rehabilitation entitlements has been carried out in accordance with the
provisions of this Policy Framework and the respective RP.
Oversee that the RPs are implemented as designed and approved.
Verify that funds for implementing the RPs are provided to the respective PMBs in a
timely manner and in amounts sufficient for their purposes, and that such funds are used
by the respective PMB‟s in accordance with the provisions of the RP and policy
framework.
Record all grievances and their resolution and ensure that complaints are dealt with in a
timely manner.
The staff who takes charge of resettlement, site clearance compensation of Unit which carry
out sub-project must update the information based on some main activities as follows:
Table 6.1 – Some main activities for internal supervision and assessment M
NO Activities in Resettlement Plan
Implementatio
n Description
Yes No
1. Inform people and local authority
of the Project
2. List the loss
3. Investigate alternative price
4. Build resettlement plan
5. Accept resettlement plan
- People‟s Committee of Ha
Tinh Province
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 55
NO Activities in Resettlement Plan
Implementatio
n Description
Yes No
- WB
6. Announce resettlement plan
- Project area: 62 commune of
Ha Tinh Province
- 12 power company and Ha
Tinh city power company
- VDIC/Infoshop
7. Calculate and measure the land
lot
8. Apply the compensating price
(transfer from resettlement plan)
9. Build the specific compensation
plan
10. Approve the compensation plan
11. Announce the compensation plan
12. Adjust and approve (if any)
13. Pay the compensation (including
the update from resettlement
plan– for example: number of
NA. expenditure. affect degree
etc…
14. Internal supervision
15. Independent supervision
16. Report on plan implementation
17. Collect and deal with claim
18. Consultation and participation of
people
- Community meeting
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 56
NO Activities in Resettlement Plan
Implementatio
n Description
Yes No
- Provide leaflet
19. Cooperate with other bodies
(especially compensation council)
20. Mid term and end of term
appraisal (in general with project)
6.2. Independent supervisor
A Independent Monitoring: An independent agency or agencies or individual consultant will
be retained by PMU of CPH to periodically carry out external monitoring and evaluation of
the implementation of RPs. The independent agencies will be academic or research
institutions, non-Governmental Organizations (NGO) or independent consulting firms, all
with qualified and experienced staff and terms of reference acceptable to the World Bank.
Independent monitoring begins about the same time as implementation activities and
continues until the end of project/subproject. The scope of work, method of implementation
along with other related content will be specified in the terms of reference of this work.
6.2. Report mechanism
Internal supervision unit shall prepare quarterly report with details of schedule of resettlement
plan. this report shall be sent to CPH, PMU. Ha Tinh power company. World Bank and
independent off-line supervision unit. The terms for independent off-line supervision unit
shall be shown in details when signing contract with PMU
A Resettlement Plan cannot be considered complete until a completion audit or survey
confirms that all entitlements have been received by beneficiaries and livelihood restoration
is progressing on schedule. If possible, the (internal/external) monitoring activities of RPs
could be considered to be combined with similar action under Ethnic Minority Development
Plan of the same subproject.
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 57
7. IMPLEMENTATION PLAN
7.1. RESPONSIBILITY
Figure 7.1 – Diagram of institution who implements the resettlement plan
People's Committee of Ha Tinh province (CPH): is the Project Owner and takes charge of
management and organization of survey, design, expenditure arrangement, payment and
supervise the implementation of resettlement plan. PMU of RE2 belong to NPC has been
assigned to be the Unit which directly manages the RE2
Northern Power Cormporation (NPC): is responsible for hiring Consultant of high
qualification to prepare the resettlement plan report; appoint the personnel who have
knowledge and experience in social safety in NPC and PMU, appoint personnel to participate
in the Resettlement and Compensation Council.
Project Management Unit: PMU of DOI is directly responsible for daily management on all
facets of the Project. including the plan preparation. programs. expenses and ensure the total
coordination and cooperation of the supervision in resettlement compensation. design.
execution. appraise and cooperate with CPH and WB.
NPC
PMU
People’s Committee of
district
NA
Communal People’s
Committee
City People’s Committee
Independent
offline supervision unit
Compensation Council of district
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 58
People‟s Committee of the district: Steer the compensation and resettlement activities in the
district area:
Conduct the units to survey the impact of project. community consultation. launch
the information on resettlement. compensation and its implementation.
Establish Compensation Council of the district.
Identify the legal status of land use right or possession right of other real estates.
Within its scope of right. appraise and adopt the compensation plans for DPs.
Issue the regulations. procedures to solve the administrative issues relating to the
implementation of resettlement and compensation of project on their own area.
Is responsible for solving the claim ofDPs in district level.
Compensation Council of the district: leaded by a Vice chairman of People‟s Committee of
district. Compensastion Council of the district includes representative of Department of
Finance. Department of National Resources and Environment (Department of Land Survey
and House). Authority of Planning and Investment. Authority of Industry and Trade. People‟s
Committee of affected communes.DPs and PMU. Compensation Council of the district is key
unit which is responsible for implementing resettlement plan in its area. Compensation
Council will be responsible for:
Check the Unit price for compensation applied in resettlement plan. propose the
adjust of Unit price to suit the market/alternative price (if necessary).
Cooperate with PMU to hold the meeting withDPs and community to distribute
documents on resettlement compensation. detailed drawings and diagrams on
Entitlement Framework of DPs.
On the basis of policies and procedures which have been approved in resettlement
plan. prepare the detailed execution plan (quarterly. six month and annually plan)
and cooperate with PMU to solve the Entitlements forDPs on schedule.
Especially. focus on demand and requirement of typical community group (ethnic
minority group) and vulnerable community group (children. the elder/female
householder/single people)
Solve the claim of DPs. deal with difficulties during the project execution and
propose the solutions for the unsolved issues to Provincial People‟s Committee.
Communal People‟s Committee: Communal People‟s Committee shall be responsible for:
Appoint the specialized staff to support in the deployment of all compensation and
resettlement activities on the commune area.
Join the population survey. detailed statistics and drawing. help the units which
take charge of population survey. alternative price survey. detailed drawing and
other compensation and resettlement activities.
Cooperate with Compensation Council of district in community meeting. launch
the information. pay the compensation/support for DPs.
Check and confirm the legal status of affected assets as land. house. structure and
other assets of DPs.
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 59
Participate in such activities relating to land reclaimation. land distribution.
resettlement. measures to recover daily life as well as social development
activities.
SupportDPs in resettlement activities and daily life recovery. Co-confirm (sign)
the compensation documents with DPs.
Identify the list of poor and difficult DPs.
Ensure the suitable and ready claim resolvement. Deal with claim at district level
and transfer all opinions ofDPs to Compensation Council of district and propose
the solutions for existing issues (if any). Show proof on the claim ofDPs and
maintain the record of claims. Assist and give consultation toDPs in rapid solution
of their claim.
Help local people in correcting the difficulties during construction phase. helpDPs
in repairing their houses. Arrange land in caseDPs need compensation by land.
People who are affected by the project (DPs)DPs prepares all documents relating
to resettlement plan as Certificate of Land use right. Certificate of other real estate
ownership.DPs is responsible for thoroughly checking the affected assets along
with their compensation Entitlement. and once they have receive the full amount
of compensation. they must promptly prepare for site clearance.
Independent offline supervision unit: supervise and appraise the resettlement plan
for the entire project. Independent offline supervision unit will submit regular
supervision report during the compensation and resettlement and issue the
proposal to deal with issues for PMU and WB.
7.2. IMPLEMENTATION TIME
Expected implementation time:
PMU and Compensation Council:
1. Establish Compensation Council (existing)*
2. Start to deploy community information announcement month firstly
3. Start the detail drawing. asset inventory second month
4. Start to pay the compensation third month
NA:
1. Start to declare the amount and legal status of asset month fourthly
2. Start to receive compensation and site clearance month fifly
Bid invitation:
Start to bid the equipment tenth month
Construction work:
Start to deploy the construction work month fifteenthly
(Schedule of construction work is estimated to be about 10 months)
* Compensation Council of the district has been existing for the projects which are being deployed in the
localities.
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 60
Supervision: eighteenth month – twenty five month
Note With insignificant impacts (excluding resettlement) and with suitable workforce.
the community information and detail drawing as well as inventory shall be
expected to finish within 2 months and the real compensation shall also be
completed in 2 months.
The above mentioned schedule has been discussed by Consultant and
PMU with consideration of amount of project works. the number of relevant
communes in each district. suitable personnel force and the ability to deploy
various activities concurrently.
All activities of resettlement plan must be completed perfectly before WB issue the document
for not protest against the sub-projects. Any changes in resettlement plan after the WB had
adopted must be considered by representative of WB in Hanoi before deployment.
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 61
8. EXPENSES
Expenses for implementing resettlement plan: CPH.
DOI shall transfer these expenses to PMU. PMU and Compensation Council of the District
shall be responsible for:
(i) Pay the compensation to DPs and
(ii) Pay the expenses of all activities of resettlement plan.
8.1. EXPENSES FOR IMPLEMENTING RESETTLEMENT PLAN
Expenses for implementing resettlement plan includes:
8.1.1. Expenses for preparing resettlement plan and detail drawing
Expenses for preparing resettlement plan
In the first phase for preparing the resettlement plan. a survey workforce has been established.
This force shall carry out (a) the research on design and site survey. (b) set up survey
datasheet and statistic datasheet (with primary measurement of real estate and asset
inventory). (c) hold the community meeting and consultation meeting and issue
Leaflet/Questionnaire relating to the project etc…(d) process data and (e) prepare
resettlement plan for approval.
PUM of NPC has signed the contract with Consultant to deploy the above mentioned tasks:
Value of contract with Consultant : VND 312,000,000
Expenses for detail drawing and inventory
In preparing resettlement plan. the supportive team of Compensation Council of the district
has been mobilized to deploy as (a) prepare the detail drawing and statistic tables.
documentes on resettlement. (b) hold community meeting. (c) detail drawing and inventory.
(d) negotiate withDPs and (e) finalize the compensation tables forDPs and submit to
Compensation Council of district for approval. The herein workforce is estimated on the basis
of the number ofDPs in the area as well as their affected real estate.
Expenses for detail drawing and inventory (estimated) VND 500,000,000
Total expenses for preparing resettlement plan and detail drawing:VND 812.000.000
8.1.2. Expenses for compensation
Compensation for permanently and temporarily reclaimed land.
Compensation for perennial tress (including the expenses for cutting down trees)
and permanently and temporarily affected farm produces.
(Refer to item 4.1.4. Total expenses for compensation of Project) for more details
8.1.2. Management expense
Expense for personnel of PMU and Compensation Council: including basic salary and
allowance for administrative unit. PMU and local Compensation Council shall deploy many
tasks during the project implementation process and there are only some members who can
sign the contract to work in certain period.
Expense for management (estimated) VND 458,160,000
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 62
Expense for training. conference and information launching: One intermediate and primary
training course is expected to take place when starting to implement resettlement plan. and a
conference is planned to be held when starting to deploy the compensation payment. To
create favorable condition for local bodies in Project area. the training course and conferences
are requested to be held shortly: 01 day in Hoai Duc district.
Expense for training course and conference VND 30,000,000
(including the expense for consulting technology. document and administration)
8.1.4. Expense for supervision
Expense for Independent offline supervision unit: we cannot estimate the exact expense. so
we give the estimate of about 2% of total compensation and resettlement plan preparation
expense.
8.1.5. Backup
Up to the expected time to implement resettlement plan (planned in 2012) and experience
from the projects of same nature which had been deploying. the backup expense is estimated
at about 20% of total compensation and resettlement plan preparation expense.
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd, Page 63
8.2. TOTAL ESTIMATE FOR RESETTLEMENT PLAN IMPLEMENTATION
Table 8.2 – Total estimate for resettlement plan implementation
Unit: VND
Item Total
1. Prepare resettlement plan and detail drawing
Initial phase (Prepare resettlement plan) 312,000,000
Resettlement plan implementation phase (detail
measurement and drawing and inventory) 500,000,000
Sub-total1 812,000,000
2, Compensation
Permanent land compensation 25,727,921
Temporary land compensation (Limit the capacity of
land use) 38,591,881
Tree compensation 73,380,000
Compensation for permanently/temporarily affected
crops
299,710,000
Sub-total2 437,410,000
3, Management
Management 458,160,000
Training, conference, information launching etc,,, 30,000,000
Sub-total3 488,160,000
4, Off-line supervision = 2%(1+2) 24,988,200
Sub-total4
24,988,200
5, Backup =20%(1+2) 187,411,545
Sub-total5 187,411,545
Total (1+2+3+4+5)
1,949,970,052
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Ap
pen
dix
1, Project area
2, Policy Framework
3, Entitlement matrix
4, Route agreement
5, Minute and photos of community consultation meeting
6, “Questionnaire” sample
7, “Leaflet” sample
8, List up the people affected by the Project
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
ANNEX 1
Project map
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
ANNEX 2
Policy Frameworkwork
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND
REHABILITATION OF PROJECT AFFECTED PERSONS
(Draft Version)
TABLE OF CONTENTS
Section 1: Introduction
A. The Project
B. Policy Framework
C. Project Affected People
D. Principles and Objectives
E. Resettlement Plans
Section 2: Institutional and Legal Framework
A. Institutional Framework
B. Legal Framework
Section 3: Entitlement Policy
Section 4: Site selection, site preparation, and relocation
Section 5: People's Participation
Section 6: Baseline Information
A. Inventories
B. Resettlement Action Plans
Section 7: Implementation Arrangements
A. Implementation Schedules
B. Complaints and Grievances
C. Supervision, Monitoring and Evaluation
Section 8: Costs and Budget
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
SECTION 1
INTRODUCTION
A. The Project
1. Objectives: The proposed development objective of the project is to improve
efficiency, availability and reliability of power supply and as well the efficiency of its
utilization. This would be achieved through (a) rehabilitation of the distribution system from
below 110 kV; and (b) modernization of the distribution system through introduction of smart
metering and smart grid technologies.
2. Preliminary project description: The project activities will be rehabilitation and
expansion of power distribution system from 110 kV and down, including distribution line,
substations of 110 kV, 35 KV, 22kV, and to 0.4 kV.
3. To implement subprojects components, land acquisition will be required. However,
rehabilitating and increasing the capacity of existing distribution lines and substations would
not cause large scale of land acquisition and resettlement. For the ownership and
implementation arrangements, separate Resettlement Plans (RPs) will be prepared prior to the
appraisal one for each participating PC.
B. Policy Framework
4. This resettlement policy framework prepared based on the OP/BP 4.12 of the World
Bank on involuntary resettlement (December, 2001). The principle objective of the Policy
Framework is to ensure that all displaced persons (DP's) 1 will be compensated for their
losses at replacement cost 2 and provided with rehabilitation measures to assist them to
improve, or at least maintain, their pre-project living standards and income earning capacity.
5. The Policy Framework lays down the principles and objectives, eligibility criteria of
DP's, entitlements, legal and institutional framework, modes of compensation and
rehabilitation, peoples participation features and grievances procedures that will guide the
compensation, resettlement and rehabilitation of the DP's.
C. The Displaced Persons (DPs)
6. The DP's include the following persons to be identified by the baseline information
collected for each Resettlement Plans (RPs):
(a) persons whose houses are in part or in total affected (temporarily or
permanently) by the project;
(b) persons whose residential and premise and/or agricultural land is in part or in
total affected (permanently or temporarily) by the project;
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
(c) persons whose businesses are affected in part or in total (temporarily or
permanently) by the project; and
(d) persons whose crops (annual and perennial) and trees are affected in part or in
total by the Project.
D. Principles and Objectives
7. The principles outlined in the World Bank's Operational Policies 4.12 (OP/BP 4.12)
have been adopted in preparing this Policy Framework. In this regard the following principles
and objectives would be applied:
(a) Acquisition of land and other assets, and resettlement of people will be minimized
as much as possible.
(b) All DP's residing, working, doing business or cultivating land in right of way
(ROW) of transmission line (T/L), surrounding areas of tower foundation, the
substation areas, in the service roads under the project as of the date of the
baseline surveys are entitled to be provided with rehabilitation measures
sufficient to assist them to improve or at least maintain their pre-project living
standards, income earning capacity and production levels. Lack of legal rights to
the assets lost should not bar the DP from entitlement to such rehabilitation
measures.
(c) The rehabilitation measures to be provided are: (i) compensation at replacement
cost, without deduction for depreciation or salvage materials for houses and other
structures; (ii) agricultural land for land of equal productive capacity acceptable to
the DPs or in cash at replacement cost according to DP‟s choice ; (iii) replacement
of residential/premise land of equal size acceptable to the DP or in cash at
replacement cost according to DP‟s choice; and (iv) transfer and subsistence
allowances.
(d) Replacement residential and agricultural land will be as nearby as possible to the
land that was lost, and acceptable to the DPs.
(e) The resettlement transition period will be minimized and the rehabilitation means
will be provided to the DP's prior to the expected start-up date of works in the
respective project sites.
(f) Plans for acquisition of land and other assets and provision of rehabilitation
measures will be carried out in consultation with the DPs, to ensure minimal
disturbance. Entitlements will be provided by DPs prior to expected start-up of
works at the respective project site.
(g) The previous level of community services and resources will be maintained or
improved.
(h) Financial and physical resources for resettlement and rehabilitation will be made
available and as where and when required.
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
(i) Institutional arrangements will ensure effective and timely design, planning,
consultation and implementation of RPs.
(j) Effective and timely supervision, monitoring and evaluation of the implementation
of RPs will be carried out.
E. Resettlement Plan (RP)
8. The scope and level of detail of the resettlement plan vary with the magnitude and
complexity of resettlement.
Abbreviated Resettlement Plan
9. In case impacts on the entire displaced population are minor, 3 or fewer than 200
people are displaced, an Abbreviated Resettlement Plan (ARP) will be prepared by the
respective PCs (under EVN) and consolidated by the project provinces for any given project
phase and furnished to the World Bank for its concurrence.
10. Each Abbreviated Resettlement Plan will cover the following minimum elements: (1)
a census survey of displaced persons, and valuation of assets; (2) description of compensation
and other resettlement assistance to be provided: (3) consultation with displaced persons
about acceptable alternatives; (4) institutional responsibility for implementation and
procedures for grievances redress; and (5) a timetable and budget. In the case some displaced
persons, lose more than 10% of their productive assets or require physical relocation, the plan
also covers a socioeconomic survey and income restoration measures.
11. The Abbreviated Resettlement Plan will be completed by no later than four months
prior to the estimated date for commencement of the works under the project phases. Each
Abbreviated Resettlement Plan will be furnished to the World Bank for consideration no later
than three months prior to the actual initiation of the works under the Project. Compensation,
resettlement and rehabilitation activities will only commence after the World Bank has found
acceptable the respective Abbreviated Resettlement Plan and the EVN has approved it. The
compensation, resettlement and rehabilitation activities will be completed before awarding the
contracts of civil works under each sub-project.
Resettlement Plan
12. In case more than 200 people are affected by the project, a full Resettlement Plan (RP)
will be prepared by the respective PC in accordance with the provisions of this Policy
Framework. The RP will be furnished by PC under EVN to the World Bank for its
concurrence.
13. Each RP will include: (1) description of the project; (2) project potential impacts; (3)
objectives; (4) socio-economic studies; (5) legal framework; (6) institutional framework; (7)
eligibility; (8) valuation and compensation for losses; (9) resettlement measures; (10) site
selection, site preparation and relocation; (11) housing, infrastructure, and social services; (12)
environmental protection and management; (13) participation and consultation; (14) integration
with host populations; (15) grievances procedures; (16) organizational responsibilities; (17)
implementation schedule; (18) cost and budget; and, (19) monitoring and evaluation.
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
14. Each RP will be completed by no later than six months prior to the estimated date for
commencement of the works. Each RP will be furnished to the World Bank for consideration by
no later than three months prior to the actual initiation of the works under the Project.
Rehabilitation and assistance activities will only commence after the World Bank has found
acceptable the respective RP and EVN has approved it. Rehabilitation and assistance activities
will be completed before awarding contracts of civil works under each sub-project.
SECTION 2
INSTITUTIONAL AND LEGAL FRAMEWORK
A. Institutional Framework
15. The responsibility for preparing and implementing the Policy Framework and RPs are
as follows:
(a) The overall responsibility for enforcement of the Policy Framework and for planning
and implementing RPs rests with PCs under EVN. The PCs and their Project
Provincial Powers (PPPs) are responsible for carrying out census, socioeconomic
survey and inventories and preparing RPs and for the day-to-day implementation
thereof within their respective jurisdiction. The people‟s committees at the district
and commune levels will participate in the RP preparation and implementation.
These administrative units will also ensure the active and effective participation of
the DPs in the RP preparation and implementation. In order to have RPs acceptable
to the World Bank and to implement RP smoothly, PCs under EVN are responsible
for i) hiring qualified consultants to prepare RPs; ii) appointing qualified social
safeguard staff at each PC and its Project Management Board (PMB) and
Compensation and Resettlement Committees at provincial and district levels.
(b) Funds for compensation will be from EVN and budgetary requirements for economic
restoration, other assistance would be either from counter part funds or from IDA.
B. Legal Framework
16. This section reviews the legal framework and policies of the Government of Vietnam
and IDA policies related to land acquisition, compensation and resettlement. It then
compares the two approaches. Since there are differences between the WB‟s policy and the
Vietnamese‟s, the project requires a waiver of the Vietnamese Government articles of decrees
and regulations concerning compensation and resettlement. Subsequently, compensation and
resettlement plans will be implemented according to the project policies.
17. The Legal Framework of the Government of Vietnam: The key national laws, decrees
governing land acquisition, compensation and resettlement in Vietnam consist of the
following:
The Constitution of Vietnam, 1992 confirms the right of citizens to own a house and
to protect the ownership of the house.
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
The Land Law 2003 issued on December 10th
, 2003.
Decree 181/2004/ND-CP issued on October 29, 2004 guiding the implementation of
the Land Law revised 2003.
Decree 197/2004/ND-CP issued on December 3, 2004 on compensation, support and
resettlement when land is recovered by the state.
Circular 116/2004/TT-BTC issued on December 7, 2004 guiding the implementation
of compensation, support and resettlement when land is recovered by the State.
Decree 188/2004/ND-CP issued on November 16, 2004 on methods to determine land
prices and assorted land price brackets.
Circular 114/2004/TT-BTC issued by November 26, 2004 guiding the implementation
of the Government‟s decree No 188/2004/ND-CP
Decree 17/2006/ND-CP dated January 27, 2006 on revision and supplementation of
some regulations in decrees guiding the implementation of the Land Law.
Decree 84/2007/ND-CP dated May 25th
2007 on revision of issuing LURC, land
acquisition, implementation of land use right, procedure for compensation,
resettlement when land acquired by State and grievance redress.
Decree No. 69/2009/ND-CP, effective 1st October 2009; an amendment to Decree
No. 197/2004/ND-CP; supplementary regulations on land use planning, land prices,
land acquisition, compensation, support and resettlement.
Circular 14/2009/TT-BTNMT dated October 1, 2009 providing detailed regulations
on compensation, assistance, relocation, and process and procedures for land
acquisition, land han-over and lean lease.
18. World Bank Policy on Involuntary Resettlement (OP/BP 4.12)
18.1 The primary objective of the World Bank policy is to explore all alternatives to
avoid or at least minimize involuntary resettlement. Where resettlement is unavoidable, the
living standards of displaced persons should be restored or improved relative to those
conditions that prevailed prior to the Project. The policy applies to the taking of land and
other assets when land acquisition results in the loss of shelter, the loss of all or part of
productive assets, or access to them, and the loss of income sources or other means of
livelihood.
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
18.2 Measures required ensuring that resettlement has a positive outcome include:
Consulting with potential Project-affected people on feasible measures for
resettlement and rehabilitation;
Providing Project-affected persons with options for resettlement and rehabilitation;
Enabling their participation in planning and selecting these options;
Providing compensation at full replacement cost for losses;
Choosing relocation sites that provide, at a minimum, the same benefits and services
as the sites they replace;
Providing allowances, training and income support to assist in making a smooth
transition;
Identifying vulnerable groups and providing special assistance to these groups; and,
Establishing an institutional and organizational structure that supports this process to
a successful end.
18.3 Eligibility Criteria and Compensation:
18.3.1 The displaced or project-affected people eligible for compensation will include: (a)
those who have formal legal rights to land or other assets; (b) those who initially do not have
formal legal rights to land or other assets but have a claim to legal rights based upon the laws
of the country; upon the possession of documents such as land tax receipts and residence
certificates; or upon the permission of local authorities to occupy or use the project affected
plots; and (c) those who have no recognizable legal right or claim to the land they are
occupying.
18.3.2 Persons covered under (a) and (b) are provided compensation for the land they lose,
and other assistance. Persons covered under (c) are provided resettlement assistance, 4 in
lieu of compensation for the land they occupy, and other assistance, as necessary, to achieve
the objectives set out in this policy, if they occupy the project area prior to a cut-off dates
defined in RPs. Persons who encroach on the areas after the cut-off date 5 defined in RPs are
not entitled to compensation or any other form of resettlement assistance.
19. Project Principles of Resettlement. The principle for resettlement policy in the project
will be described as follows:
(i) Acquisition of land and other assets, and resettlement of people will be minimized as
much as possible.
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
(ii) All DPs residing, working, doing business or cultivating land within the recovered
area under the Project as of the cut-off-date are entitled to be provided with
rehabilitation measures sufficient to assist them to improve or at least maintain their
pre-Project living standards, income earning capacity and production levels. Lack of
legal rights to the assets lost will not bar the DP from entitlement to such rehabilitation
measures.
(iii) The rehabilitation measures to be provided are: (i) compensation at replacement cost,
without deduction for depreciation or salvage materials for houses and other
structures; (ii) priority given for agricultural land-for-land of equal productive capacity
acceptable to the DPs; (iii) replacement of premise land (if any) of equal size and
acceptable to the DPs; (iv) transportation and subsistence allowances, and (v)
business/ income rehabilitation allowances.
(iv) The project will cover the scope of the vulnerable groups as defined under the World
Bank OP 4.12. The project will provide additional assistance to those households that
fall within the definition of vulnerable groups. The project will use the criteria applied
by the MOLISA benchmark to assess the poverty line for residents of the project area
to further define the additional allowances (e. g. monthly income per capita), which
will be provided by the project to vulnerable households in both urban and rural areas.
For the project‟s RPs, vulnerable groups under the poverty line set for by Molisa will
include the landless, the elderly, and women headed households, disable persons and
those households eligible to the Social Policy - defined as those with heroes –mother,
and/or with member who lay down one‟ life for country and/ or wounded in the war.
All poor vulnerable groups under the poverty line, including those covered by the
social policy, will get additional assistance as follows: (i) for landless households, the
project will provide assistance through the provision of land-for-land with secure
tenure at no cost to landless households. The project's RPs will define the size of land
for urban and rural areas, or cash equivalent if DPs upon consultation prefer self-
relocation; (ii) poor households who fall below the poverty line and whose 10% or
more of their productive land/assets, will be entitled to income restoration assistance.
Other vulnerable groups, such as female headed households, households with disabled
persons, and elderly without any source of support, will get the same assistance given
to poor households. Income restoration will be tailored to households‟ specific needs
and based on consultations with affected people.
(v) Replacement of premise and agricultural land or residential land will be as near as
possible to the land that was lost, and acceptable to the DP. In the event that there is
no land available for compensation „land for land‟, or if it is the choice of DPs, then
compensation in cash or provision of apartment (for DPs losing residential land and
relocating) may be applied. If the DPs lose 10% or more of their holding, then in
addition to compensation for lost land, the Project will provide rehabilitation
/assistance measures.
(vi) The resettlement transition period will be minimized and the DPs shall be supported
for transportation allowance, house renting allowances as specified by the PPC and for
the means of rehabilitation no later than one month prior to the expected start-up date
of civil work on the respective sub-project site.
(vii) Plans for acquisition of land and other assets, and provision of rehabilitation measures,
will be carried out in consultation with the DPs to ensure minimal disturbance.
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Entitlements will be provided to DPs no later than one month prior to expected start-
up of civil works at the respective sub-project site.
(viii) The previous level of community services and resources will be maintained or
improved.
(ix) Adequate budgetary support will be fully committed and be made available to cover
the costs of land acquisition and resettlement and rehabilitation within the agreed
implementation period. Physical resources for resettlement and rehabilitation will be
made available as and when required.
(x) Civil works contractors will not be issued a notice of possession or a notice to proceed
for any sub-project unless the Government has (a) Completed, satisfactorily and in
accordance with the approved RP for that sub-project, compensation payments, and
(b) ensured rehabilitation assistance is in place prior to starting civil work.
Entitlements will be provided to DPs no later than one month prior to expected start-
up of civil works at the respective project site.
(xi) Institutional arrangements will ensure effective and timely design, planning,
consultation and implementation of the RPs; and
(xii) Appropriate reporting, monitoring and evaluation mechanisms will be identified and
set in place as part of the resettlement management system. Evaluation of the land
acquisition process and the final outcome will be conducted independent of the
executing agency.
20. Valuation of and Compensation for Losses:
The methodology to be used in the valuation of losses for Bank-associated Projects is based
on their replacement cost. In this Project, losses comprise land, structures and other assets.
Replacement cost for land includes the value of land at market price plus the cost taxes and
fees to get Land Use Right Certificate (LURC). For houses and other structures, the market
cost of the materials should be used to calculate the replacement cost to build a replacement
structure with an area and the quality should be at least as good as those affected. For both
totally and partially affected structures, compensation includes market cost of material, plus
the costs of material transport, labor and contractor fees, registration and transfer taxes.
Depreciation of the asset and amount saved in materials will not form a part of replacement
cost. During the implementation phase, an independent land appraiser (s) will be mobilized to
survey and propose a set of replacement costs for all types of affected land (both agriculture
and residential land) and assets, which will be approved by sub-project provincial PC (s) and
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
acceptable to WB. And the replacement cost survey, done by the independent land appraiser,
will ensure the land/assets be compensated at the replacement cost (according to the OP 4.12
definition).
21. Comparison between Government of Vietnam and World Bank Approaches
Recent Laws, Decrees and Regulations bring the Government of Viet Nam resettlement
policies and practices to be more consistent with the World Bank‟s resettlement policies. In
the event of discrepancies between the Borrower‟s laws, regulations, and procedures and the
World Bank's policies and requirements, the latter will prevail. This is in accordance with
Decree No. 131/2006/ND-CP, which states that in case of “discrepancy between any
provision in an international treaty on Official Development Assistance, to which the
Socialist Republic of Viet Nam is a signatory, and the Vietnamese Law, the provision in the
international treaty on ODA shall take precedence” (Article 2, Item 5). The differences
between the Government‟s Laws and Decrees and World Bank Policy with regard to
resettlement and compensation, and how to address these gaps are shown in Table 1.
Table 1: Differences between National Laws and the World Bank Policy and the DEP Policy
Key Issues National Laws World Bank Policy Project Policy
Non-titled
users
Decree 69/2009, Article 14
(replacing Decree 197/2004,
Article 6), the Peoples‟
Committees of the provinces
or centrally-run cities shall
consider providing such
support on case-by-case basis.
The absence of formal
legal title to land by
some affected persons
should not prevent
compensation.
All project-affected
people, irrespective
of tenure status,
social or economic
standing, will be
entitled to be
compensated or
assisted for their
lost assets, incomes,
and businesses, at
full replacement
cost and provided
with rehabilitation
measures sufficient
to assist them to
improve or at least
restore their pre-
project living
standards, income
levels and
productive capacity.
Compensation
of land at
replacement
cost
Decree 123/2007 (amending
Decree 188/2004), sets price
limits of land and authorizes
Provincial Peoples‟
Committees to set local land
prices by establishing ranges
for all categories of land and
Compensate or assist
all affected persons,
including those without
title to land, for all their
losses at replacement
rates.
Replacement cost
surveys have to be
carried out to
ensure that project
compensation rates
for all categories of
loss will be
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Key Issues National Laws World Bank Policy Project Policy
land prices in each category.
The price limit would not be
allowed to exceed a bench-
mark price by more than 20 per
cent nor undercut the
benchmark price by more than
20 per cent. However, in
remote, isolated areas, or an
area with socio-economically
difficult conditions, poor
infrastructure, when the actual
price of land in the market is
lower than minimum price
limit in the Decree, the PPC
will adjust the specific price to
be applied locally and report it
to the Ministry of Finance.
Article 11 of Decree
69/2009ND-CP stipulates that,
If at the time of land recovery,
the land price specified by the
PPC is different to the actual
market price under normal
conditions; the PPC shall
determine the land price again
so that it is specific and
suitable.
equivalent to
replacement cost to
be updated at the
time of resettlement
implementation.
Non-
registered
business
Decree 187/2004, Articles 26-
28: Only registered businesses
are eligible for assistance.
For non-land assets, all
eligible affected people,
whether titled,
legalizable, or non-
titled, need to be
compensated at
replacement cost,
through cash or
replacement assets.
Included among these
DPs are renters of
buildings, tenants and
employees of affected
businesses.
Non-registered
businesses will be
eligible for cash or
in-kind assistance,
this includes renters
of structures,
tenants and
employees
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Key Issues National Laws World Bank Policy Project Policy
Provision of
rehabilitation
assistance
Decree 69/2009, Article 20 &
22: DPs losing 30% or more of
productive land will be entitled
to living stabilization and
training/job creation
assistance. Decree 17/2006
strengthens this provision and
provides for long-term
assistance to poor households.
As per the WB
policy, “minor” impacts
are considered if
affected people are not
displaced and less than
10% of their productive
assets are lost.
The project will
provide additional
support and income
rehabilitation
assistance/
allowances to all
DPs with land-
based livelihoods
who are severely
affected by the loss
of less than 10% of
total productive
land, assets
C. Required Waivers
22. To satisfy WB OP/BP 4.12 policy on Involuntary Resettlement, articles in the laws
and regulations of Vietnam that do not guarantee the DPs‟ right to compensation at
replacement costs, or eligibility articles that do not extend the right of being restored and/or
assisted to households without valid land papers, or otherwise limit the compensation
required by WB OP/BP 4.12, will not apply. The requirements of WB OP/BP 4.12 will fully
apply in all cases.
SECTION 3
ENTITLEMENT POLICY
23. DP's will be entitled to the following types of rehabilitation and assistance measures:
(a) DPs losing agricultural/productive land and crops.
The general mechanism for compensation of lost agricultural land will be
through provision of "land for land" of equal productive capacity, and
satisfactory to the DP. If replacement land is smaller in size or of lower quality,
DPs will be entitled to compensation in the cash equivalent of the differences.
However, if land is not available or if the DPs prefer to receive cash
compensation then the following will apply:
(i) if the portion of the land to be lost represents 10% or less of the total area
of the landholding, and the remaining land is still a viable economic
holding, cash compensation, at full replacement cost for the acquired
area may be provided to the DP
(ii) if the portion of the land to be lost more than 10% of the total area of the
landholding and the remaining holding is not viable then the project will
acquire the entire landholding and provide "land for land" arrangements
of equal productive capacity, satisfactory to the DP. However, if the DP
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
prefers to receive cash instead of land, then cash compensation at
replacement cost is applied.
(iii) DP‟s will be compensated for the loss of standing crops at market price,
productive trees will be compensated at replacement cost.
(iv) DP‟s whose land is temporarily taken by the works under the project will
be compensated for their loss of income, standing crops and for the cost
of soil restoration and damaged infrastructure. Land will be rehabilitated
after the project construction by each PC and its PMB.
(v) With respect to garden land or ponds which are attached to the affected
residential land, and the affected agricultural land which is located within
the residential/settlement area, the Project will provide an assistance of
50% of price of the neighboring residential land in addition to
compensation at replacement cost for agricultural land as regulated by
the laws.
(b) DPs losing residential land and house/structure
(i) The mechanism for compensating loss of residential land and structures
will be: (1) the provision of replacement residential land (house site and
garden) of equivalent size, satisfactory to the DP or cash compensation at
replacement cost according to DPs‟ choice; and (2) cash compensation
reflecting full replacement cost of the house/structures, without deduction
for depreciation or salvage materials or compensate in kind according to
DPs‟ options.
(ii) If residential land is only partially being affected by the project and the
remaining areas are not sufficient for reorganizing DP‟s house then at the
request of the DP, the entire residential land will be acquired at full
replacement cost.
(iii) If house/other structure is only partially being affected by the project and
the remaining areas are not convenient to using, the house/ structure will
be acquired at full replacement cost, without depreciation.
(iv) Tenants, who have leased a house for residential purposes will be provided
with a cash grant of six months rental fee at the prevailing market rate in
the area, and will be assisted in identifying alternative accommodation.
(c) DPs losing business
(i) The mechanism for compensating loss of business will be: (1) the provision
of alternative business site of equal size and accessibility to customers,
satisfactory to the DP; (2) cash compensation for lost business structure
reflecting full replacement cost of the structures, without depreciation; and
(3) cash compensation for the loss of income during the transition period.
(d) DPs will also be provided compensation at full replacement cost, without
deduction for depreciation and salvage materials for any other fixed assets
affected in part or in total by the project, such as tombs and water wells, etc.
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
24. In cases where community infrastructure such as schools, factories, water sources, roads,
sewage systems is damaged, the PPC of the project provinces and EVN will ensure that these
would be restored or repaired as the case may be, at no cost to the community.
25. Besides the direct compensation for the losses, DPs also will be entitled to additional
assistance (subsidies/allowances) as stipulated in the Decree No.197/2004/ND-CP and
Decree No.69/2009/ND-CP. These subsidies/ allowances are as below:
a) Transportation allowance
All DPs relocating within the province are entitled to a maximum allowance of (04)
million VND. All DP relocating out of the province are entitled to a maximum
allowance of 05 million VND. This subsidy allowance is for the transportation of their
salvageable materials and living facilities. All DP relocating and while waiting for
establishment of new resettlement residences at resettlement sites are (i) to be
provided with temporary residence or (ii) temporary rent cost.
b) Subsistence allowance for relocating
All DPs (i) relocating within province shall receive a cash allowance equal to 30 kg of
rice per month in uninterrupted 03 months; (ii) relocating out of province shall receive
a cash allowance equal to 30 kg of rice per month in uninterrupted 06 months; (iii)
who are in a severe socioeconomic difficulty or who relocating to areas of
socioeconomic difficulty shall be receive cash allowance equal to 30 kg of rice per
month in uninterrupted 12 months.
c) Production and Living Rehabilitation:
All DPs DP whose portion of the land to be lost more than 10% of the total area of the
landholding, will be entitled to supported by cash equivalent to 30 kg rice or VND
300.000 per month per person for duration of 6 months if not to be relocated and for
duration of 12 months if relocated. In case more than 70% agricultural land acquired,
the users will be supported for duration of 12 months if not to be relocated and for
duration of 24 months if relocated;
d) Vocational Training and Job Creation:
The minimum support will be at least 1.5-5 times of agricultural land price for the
whole acquired area (the land for annual tree only);
AND in case, households need a vocational training, they will be admitted to a
vocational center in the province and are exempted from tuition fees for such training
course (including level of primary, secondary training and vocational college) for those
in the working age (not applicable for those who enroll for a vocational training
outside the province)1.
e) Relocation bonus
A bonus of maximum 5 million VND will be awarded to DP
who dismantle their houses and vacate their premises in
accordance with the resettlement schedule..
1 Based on Decree 69/2009, all households whose agriculture land is affected by the project will be entitled to
participate in vocational training program, that fee for the training course is calculated as
compensation/assistance expenses.
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
f) Other Rehabilitation Measures
In addition to aforementioned information, any DP exposed to
any impact other than those considered to be minor, will have a
range of programs to support their full livelihood restoration
and assure asset compensation at replacement values either
consider each structure separately or if they consider structures
by “types” to consider the most expensive structure in that
group as bench mark.
26. By the nature of the project impacts, the potential impacted categories are classified
into seven (07) categories. The entitlement matrix is attached (see Annex 1)
27. Voluntary Donation: For the rehabilitation/expansion of Low Voltage System, where
there are DPs who would be marginally affected on residential land/other assets and who may
choose to contribute affected land/assets in lieu of a cash contribution for the project
construction, a procedure for determining and documenting the voluntary nature of the
contribution are as follows:
Step 1: Local authorities clearly inform to all DP about this project resettlement
policy, and the actual entitlement to compensation.
Step 2: Volunteer DPs sign in the DMS and Entitlement forms for the affected assets
and asset(s) which they choose to contribute for the project, and these forms will be
filed in Provincial/District Compensation Committees‟ offices.
Step 3: a sample of about 20% of volunteer households will be checked by
independent monitoring agencies at the beginning times of RPs implementation and
reports of independent monitors on this matter will be submitted to IDA for its
concurrence.
The above procedure will also be clearly guided in Project Implementation Manual (PIM).
SECTION 4: SITE SELECTION, SITE PREPARATION, AND RELOCATION
28. If there are families have to be relocated because of the project impacts and
resettlement sites are required. The PCs and local authorities will clearly describe in RP about
alternative relocation sites considered and explanation of those selected, covering:
(a) institutional and technical arrangements for identifying and preparing relocation
sites, for which a combination of productive potential, location advantages, and other
factors is at least comparable to the advantages of the old sites, with an estimate of the
time needed to acquire and transfer land and ancillary resources;
(b) any measures necessary to prevent land speculation or influx of ineligible persons
at the selected sites;
(c) procedures for physical relocation under the project, including timetables for site
preparation and transfer; and
(d) legal arrangements for regularizing tenure and transferring titles to resettlers.
(e) housing, infrastructure, and social services. Plans to provide (or to finance
resettlers' provision of) housing, infrastructure (e.g., water supply, feeder roads), and
social services (e.g., schools, health services); plans to ensure comparable services to
host populations; any necessary site development, engineering, and architectural
designs for these facilities.
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
(f) a description of the boundaries of the relocation area; and an assessment of the
environmental impacts of the proposed resettlement and measures to mitigate and
manage these impacts (coordinated as appropriate with the environmental assessment
of the main investment requiring the resettlement).
SECTION 5
PEOPLE'S PARTICIPATION
29. The local authorities and its relevant organizations, DPs and host communities will
participate throughout the various stages of the planning and implementation of RPs. The DPs
will be fully informed of the provisions of this Policy Framework at public meetings held by
the respective PC, its PMB and local authorities.
30. Each DP will be fully informed and consulted by the relevant District Peoples'
Committee and/or Communes Peoples' Committees of their entitlements and rehabilitation
choices under the respective.
SECTION 6
BASELINE INFORMATION
A. Census and Inventory
31. The baseline information will include the following information for each household:
(a) number of persons and names;
(b) number, type, and area of the houses lost;
(c) number and area of all the residential plots lost;
(d) number, category and area of agricultural land lost;
(e) quantity and types of crops and trees lost;
(f) businesses lost including structures, land and other fixed assets;
(g) productive assets lost as a percentage of total productive assets;
(h) quantity and category of other fixed assets affected by each sub-Project; and
(i) temporary damage to productive assets.
The proposed census and inventory form is attached (see Annex 2)
B. Resettlement Plan
32. The baseline information for a RP will include: (a) an Census and Inventory (see
above); and (b) a detailed socioeconomic survey of all DP‟s describing their age, sex,
ethnicity, education, occupation, sources of income, and total household income.
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
33. The entitlements of DPs will be calculated based on the above information.
SECTION 7
IMPLEMENTATION ARRANGEMENTS
A. Implementation Schedule
34. A detailed implementation schedule of the various activities to be undertaken will be
included in each RP. The RP implementation schedule must be developed based on the linkage
to the civil work implementation schedule.
35. Payment of rehabilitation and furnishing of other restoration/assistance entitlements
(in cash or in-kind), and relocation if that be the case, have to be completed prior awarding
contracts for civil works.
B. Institutional Arrangement
36. PCs and all project provinces will arrange adequate and experience staff to make sure
that RP will be implemented smoothly as approved schedules.
C. Complaints and Grievances
37. Complaints and grievances related to any aspect of RP implementation, including the
determined the quantity and price of the lost assets, will be handled as follows:
First step:
If any person is aggrieved by any aspect of the resettlement and rehabilitation
program, he/she can lodge an oral or written grievance with commune authorities. Commune
People‟s Committee will resolve the issue within fifteen days from the date it receive the
complaint.
Second step:
If any aggrieved person is not satisfied with the decision in stage 1, he/she can bring
the complaint to the District People‟s Committee (DPC) or District Resettlement Committee
(DRC) within fifteen days from the date of the receipt of the decision in stage 1. The District
People‟s Committee (DRC) or District Resettlement Committee (DRC) will reach a decision
on the complaint within fifteen days.
Third step:
If the DP is still not satisfied with the decision at district level, he/she can appeal to
the Provincial People‟s Committee (PCC) or Provincial Resettlement Committee (PRC)
within 15 days of receiving the decision of the DPC or DRC. The Provincial People‟s
Committee (PRC) or Provincial Resettlement Committee (CRC) will reach a decision on the
complaint within fifteen days.
Fourth step:
If the DP is not satisfied with the decision of the Provincial level, the case may be
submitted for consideration by the District Court within 15 days of receiving the decision of
the PPC or PRC.
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
38. DP‟s will be exempted from all administrative and legal fees.
D. Supervision, Monitoring and Evaluation
39. Implementation of RPs will be periodically supervised and monitored by the respective
PC/its PMB in a close coordination with the respective Peoples' Committees at different
administrative units and independent monitoring agencies. The findings will be recorded in
quarterly reports to be furnished to EVN, PCs and Project Provincial Powers.
40. Internal monitoring and supervision will:
Verify that the baseline information of all DP‟s has been carried out and that the
valuation of assets lost or damaged, and the provision of compensation,
resettlement and other rehabilitation entitlements has been carried out in
accordance with the provisions of this Policy Framework and the respective .
Oversee that the RPs are implemented as designed and approved.
Verify that funds for implementing the RPs are provided to the respective PMBs
in a timely manner and in amounts sufficient for their purposes, and that such
funds are used by the respective PMB‟s in accordance with the provisions of.
Record all grievances and their resolution and ensure that complaints are dealt
with in a timely manner.
41. Independent Monitoring: An independent agency or agencies or individual consultant
will be retained by PCs of EVN to periodically carry out external monitoring and evaluation of
the implementation of RPs. The independent agencies will be academic or research
institutions, non-Governmental Organizations (NGO) or independent consulting firms, all with
qualified and experienced staff and terms of reference acceptable to the World Bank.
42. In addition to verifying the information furnished in the internal supervision and
monitoring reports of the respective PCs, the external monitoring agency will visit a sample of
20% of household DPs in each relevant province six months after each implementation to:
(a) Determine whether the procedures for DPs participation and delivery of
compensation and other rehabilitation entitlements has been done in accordance
with this Policy Framework; and
(b) Assess if the Policy Framework objective of enhancement or at least restoration
of living standards and income levels of DPs have been met.
(c) Gather qualitative indications of the social and economic impact of Project
implementation on the DPs.
(d) Suggest modification in the implementation procedures of s, as the case may be,
to achieve the principles and objectives of this Policy Framework.
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
43. A Resettlement Plan cannot be considered complete until a completion audit or survey
confirms that all entitlements have been received by beneficiaries and livelihood restoration is
progressing on schedule.
SECTION 8
COSTS AND BUDGET
44. Each RP will include detailed cost of rehabilitation and other restoration/assistance
entitlements and relocation of DPs, if that be the case, with a breakdown by agricultural land,
residential land, business land, houses, businesses and other assets. The cost estimates will
make adequate provision for contingencies.
45. Sources of funding for the various activities will be clearly specified in the cost tables.
For Distribution Efficiency sub-projects, funds for implementing RPs will be from
counterparts: EVN and/or PCs will arrange budget for implementing RPs.
Annexes
1. Annex 1 : Entitlement Matrix
2. Annex 2 : Proposed Inventory form of Project Affected People
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Note: 1 The term "displaced persons" refers to persons who are affected in any of the ways
described in para. 7(c) and 19.3.1 of this RPF.
2 “Replacement cost” is the method of valuation of assets that helps determine the
amount sufficient to replace lost assets and cover transaction costs. In applying this method
of valuation, depreciation of structures and assets should not be taken into. For losses that
cannot easily be valued or compensated for in monetary terms (e.g., access to public services,
customers, and suppliers; or to fishing, grazing, or forest areas), attempts are made to
establish access to equivalent and culturally acceptable resources and earning opportunities.
Where domestic law does not meet the standard of compensation at full replacement cost,
compensation under domestic law is supplemented by additional measures necessary to meet
the replacement cost standard.
3 “Entire displaced population are minor”: Impacts are considered "minor" if the affected
people are not physically displaced and less than 10% of their productive assets are lost.
4 Resettlement assistance: Resettlement assistance may consist of land, other assets,
cash, employment, and so on, as appropriate.
5 the cut-off date: Normally, the cut-off date is the date the census begins. The cut-off
date could also be the date the project area was delineated, prior to the census, provided that
there has been an effective public dissemination of information on the area delineated, and
systematic and continuous dissemination subsequent to the delineation to prevent further
population influx.
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
ANNEX 3
Entitlement Matrix
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
No Type of loss Application Definition of
entitled DPs
Compensation Policy Implementation Issues
1 Temporary
acquisition of
productive land in ROW
All DPs
have trees,
crops, other
assets in
ROW
DPs
with/without
land certificate
included in the
inventory or
able to prove
land
occupancy
prior to cut-off
date,
- Cash compensation for affected trees
at the replacement cost plus cost for
cutting trees, crops at market price,
Number of crop patterns to be
compensated based on the time of
temporarily acquired of land,
- No compensation for land
- Rehabilitate land after the project
construction,
- Trees have to be cut are regulated by Article 5 of
the Government Decree 106/2005/ND-CP dt,Aug
17th
, 2005 on the protection of the high voltage
networks,
- PCs and local authorities determine and ensure
that compensation for trees will be at the
replacement cost and for crops at the market price,
If DP is requested for cutting affected trees, PCs or
Provinces will pay money for this work, DP has
right for using salvageable trees,
- Full compensation at least 01 month before land
clearance, Payment to DPs will be delivered by PC
and/or District Resettlement Committees (DRCs),
- Affected land in ROW will be rehabilitated by
contractors after the project construction and land
in ROW could be used with the restricted purposes,
- Finance available for compensation and well
information disclose/ disseminate to DPs and key
stake holders,
2 Temporary
acquisition of
residential and
garden land in
ROW without
house or
structures in
ROW
All DPs
with
orchards or
trees in
ROW
-do- - Cash compensation for affected fruit
trees and trees at replacement cost,
- No compensation for land
- Rehabilitate land after the project
construction,
- Trees have to be cut are regulated by Article 5 of
the Government Decree 106/2005/ND-CP dt,Aug
17th
, 2005 on the protection of the high voltage
networks,
- PCs and local authorities determine and ensure
that compensation for trees will be at the
replacement cost, If DP is requested for cutting
affected trees, PC or Provinces will pay money for
this work, DP has right for using salvageable trees,
- Full compensation to DPs at least 01 month
before land clearance, Affected land in ROW will
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
No Type of loss Application Definition of
entitled DPs
Compensation Policy Implementation Issues
be rehabilitated by contractors after the project
construction
- Payment to DPs will be delivered by PCs and
DRCs
- Finance available for compensation and well
information disclose/ disseminate to DPs and key
stake holders,
3 Temporary impact
on residential and
garden land,
Partial
house/building
within ROW (area
in ROW less than
10% of total area)
and the demolished
area does not
impact to the
remaining
house/building,
Residential land
and garden land
outside of ROW is
sufficient for re-
organizing (not
less than 60 m2),
All DPs
have
house/buildi
ng and
trees/fruit
trees in
ROW
-do- House/ building:
- DP can opt for : i) Remain their
houses or building in ROW with the
conditions regulated by Article 6 of the
Government Decree 106/2005/ND-CP
dt,Aug 17th
, 2005 on the protection of
the high voltage networks, Subsidy
allowance for fireproof materials and
lightning arrestors for the existing
house/building; or ii) Cash
compensation for the directly affected
rooms at the replacement cost and cost
for demolishing an affected room,
- No compensation for land,
- Rehabilitate land after the project
construction by contractors,
Tree and fruit tree
- Compensation for affected trees and
fruit trees at the replacement cost,
Allowances:
- Relocating allowance of 30 kg of rice
equivalent per person per month in six
months,
- House and building have to be demolished or
could be existed are regulated by Article 5,6 of the
Government Decree 106/2005/ND-CP dt,Aug 17th
,
2005 on the protection of the high voltage
networks,
- PCs and local authorities determine and ensure
that compensation will be paid at the replacement
cost, without deduction for salvageable materials,
- DPs will demolish the impacted part/ room and
reconstruct/or improve their houses themselves,
- Full compensation for trees and fruit trees at least
01 month before land clearance, If DP is requested
for cutting affected trees, PC or project provinces
will pay money for this work, DP has right for
using salvageable trees,
- Full entitlement payment to DPs impacted on
house/building at least 03 months before land
clearance,
- Payment to DPs will be delivered by PCs and/or
DRCs
- Land in ROW could be used with restricted
purposes,
- Finance available for compensation and well
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
No Type of loss Application Definition of
entitled DPs
Compensation Policy Implementation Issues
information disclose/ disseminate to DPs and all
key stake holders,
4 Temporary impact
on residential and
or garden land,
Impact more than
10% of total
house/building
area but the
demolished area
will impact to the
remaining of
house/structure,
Land outside of
ROW is sufficient
for reorganizing
(not less than 60
m2),
All DPs
have
house/buildi
ng and
trees/fruit
trees in
ROW
-do- House/ building:
- DP can opt for : i) Remain their
houses or building in ROW with the
conditions regulated by Article 6 of the
Government Decree 106/2005/ND-CP
dt,Aug 17th
, 2005 on the protection of
the high voltage networks, Subsidy
allowance for fireproof materials and
lightning arrestors for the existing
house/building; or ii) Cash
compensation at replacement cost for
full areas of impacted house/building
and demolish DP‟s house in ROW,
- No compensation for land,
- Rehabilitate land after the project
construction by contractors,
Tree and fruit tree
- Compensation for affected trees and
fruit trees at the replacement cost,
Allowances:
- Relocation allowance of 30 kg of rice
equivalent per person per month in six
months,
- House and building have to be demolished or
could be existed are regulated by Article 6 of the
Government Decree 106/2005/ND-CP dt,Aug 17th
,
2005 on the protection of the high voltage
networks,
- Consultation for DP‟s options on remains their
house in ROW or move out of ROW,
- PCs and local authorities determine and ensure
that compensation will be replacement cost at the
time of payment,
- DPs will demolish the impacted areas and
reconstruct/or improve their houses themselves,
- Full compensation for trees and fruit trees to DPs
at least 01 month before land clearance, If DP is
requested for cutting affected trees, PMB will pay
money for this work, DP has right for using
salvageable trees,
- Full compensation payment for impacted house
and allowances to DPs at least 03 months before
land clearance,
- Payment to DPs will be delivered by PCs and
DRCs
- Cleared residential could be reused with other
restricted purposes,
- Finance available for compensation/
rehabilitation and well information disclose/
disseminate
5 Temporary impact All DPs have -do- DPs can opt for one of the followings: - House and building have to be demolished or
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
No Type of loss Application Definition of
entitled DPs
Compensation Policy Implementation Issues
on residential and
or garden land in
ROW, Full or
partial
house/building
impacted and land
outside of is not
sufficient for
reorganizing (less
than 60 m2)
house/buildin
g and trees,
fruit trees in
ROW
i) Remain their houses or building in
ROW with the conditions regulated by
Article 6 of the Government Decree
106/2005/ND-CP dt,Aug 17th
, 2005 on
the protection of the high voltage
networks, Subsidy allowance for
fireproof materials and lightning
arrestors for the existing
house/building; or ii) Cash
compensation for the whole residential
area which DP occupied (not only for
the impacted areas) and properties
associated with occupied land at
replacement cost, Impacted land will be
obtained by local authorities; or iii)
“Land for land” with the same area
which DP occupied and cash at
replacement cost for the affected assets
associated with land, Land occupied by
DP will be obtained by local authorities,
- Compensation for affected trees and
fruit trees at the replacement cost,
Allowances:
- Relocating allowance of 30 kg of rice
equivalent per person per month in six
months
- Transportation allowance for relocating
DP according to the Compensation
Decree 197/2004/ND-CP dated Dec 3rd
,
2004 of GOV,
could be existed are regulated by Article 6 of the
Government Decree 106/2005/ND-CP dt,Aug 17th
,
2005 on the protection of the high voltage
networks,
- Consultation for DP‟s options on remain their
house in ROW or move out of ROW
- PMB and local authorities determine and ensure
that compensation will be at replacement cost at
the time of payment,
- Replacement land, and resettlement sites
development
- DPs receive compensation will demolish the
impacted house areas and reconstruct/or improve
their houses themselves,
- Full compensation payment for trees and fruit
trees to DPs at least 01 month before land
clearance, If DP is requested for cutting affected
trees, PCs or project provinces will pay money for
this work, DP has right for using salvageable trees,
- Full compensation for impacted house and
allowances to DPs at least 05 months before land
clearance,
- Payment to DPs will be delivered by PCs and
DRCs
- Cleared residential could be used with other
restricted purposes,
- Finance/ land available for rehabilitation and
restoration and well information disclose/
disseminate to DPs and key stake holders,,
- PCs and local authorities will consult with DP
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
No Type of loss Application Definition of
entitled DPs
Compensation Policy Implementation Issues
- Rehabilitation assistance if DPs
permanently losing business or more
than 10% of their incomes,
- Incentive for relocating in a timely
manner: maximum 5,000,000 VND/HH
who are eligible to restoration programs for their
options and prepare proposal for restoration
programs in the period of RAP implementation,
6 Permanent
acquisition of land
for tower
foundations,
substation and
access roads etc,
All DPs
occupied land
and
properties
associated
with land
permanently
impacted by
towers
foundations,
substation
and access
roads etc,
-do- For DP losing productive land:
a. Land loss less than 10% of their total
landholdings
- Cash compensation for the lost area if
the remaining plot is still economically
viable,
- Cash compensation for
the whole impacted plot
if the remaining plot is
not economically viable,
- Cash compensation for
properties associated
with land
b. Land loss equal or more than 10% of
their total landholdings:
DP can
opt for the
following
s:
i)“Land for land” with
the same area and
productive of impacted
area if the remaining
plots are still economic
viable and for the whole
- Consultation for DP‟s options on land
compensation,
- PMB and local authorities determine and ensure
that compensation will be at replacement cost at
the time of payment,
- Replacement land, and resettlement sites
development,
- DPs receiving compensation will demolish the
impacted areas and reconstruct/or improve their
houses themselves,
- Full compensation for trees and fruit trees to DPs
at least 01 month before land clearance, If DP is
requested for cutting affected trees, PMB will pay
money for this work, DP has right for using
salvageable trees,
- Full compensation for impacted house and
allowances to DPs at least 03 months before land
clearance,
- No award civil work contract before completion
of compensation and reorganizing houses or
relocation,
- Payment to DPs will be delivered by PCs and
DRCs
- Finance/ land available for compensation/
rehabilitation and well information disclose/
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
No Type of loss Application Definition of
entitled DPs
Compensation Policy Implementation Issues
impacted plots if the
remaining plots are not
economic viable
ii) Cash for land at the
replacement cost,
- Compensation for trees and affected
fruit trees at the replacement cost,
- Rehabilitation assistance,
For DP losing Residential and
garden land:
- If remaining land is sufficient for
reorganizing (not less than 60 m2):
Cash compensation for lost area and
assets associated with land,
- If remaining land is not sufficient for
reorganizing:
DP can opt for i) cash compensation at
replacement cost for land and assets on
land, or ii) “land for land” compensation
for the whole residential area which DP
occupied (not only for the impacted
areas) and properties associated with
occupied land, For affected house and
building, the same entitlement to DP of
categories 3 or 4 or 5,
disseminate,
- PCs and local authorities will consult with DP who
are eligible to restoration for their options and
prepare proposal for restoration programs in the
period of RAP implementation,
- DPs will be granted with Land Use Right
Certificate without payment of administrative fees,
7 DP impacted on
business or other
services
All DPs
impacted on
business and
other services
-do- (a) Temporary impact on business or
other services,
Compensation for income lost in the
affected time
(b) Permanent impact on business or
- Full compensation for incomes lost to DPs at
least 01 month before land clearance,
- PCs and local authorities will consult with DP
who are eligible to rehabilitation for their options
and prepare proposal for rehabilitation programs in
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
No Type of loss Application Definition of
entitled DPs
Compensation Policy Implementation Issues
other services,
(c) Rehabilitation assistance,
the period of RAP implementation,
8 Public Work
Temporary Impacts All impacted
institutional
DPs (who
directly
manage and
operate such
impacted
public work
system)
All impacted
institutional DPs
shall be
approached in
advance for
cooperation for
impact
mitigation
measure as well
as measure for
maintaining the
normal
functioning of
their impacted
system by the
Contractor (s)
Alternative measures to maintain the
normal functional of the public work
(i,e road, water supply, drainage
system, telephone line ect)
Reinstatement after the project
construction
All expense on alternative measures to
maintain the normal functioning of the
impacted system shall be born by
Contractor (s)
Contract (s) with Contractor (s) should bear one
article on this specific responsibility of the
contractor (s)
Approach for institutional DPs for cooperation
Arrange and pay the expenses for te alternative
measures to maintain the normal functioning of the
impacted system to the satisfaction of the
institutional DPs,
Permanent Impacts -do- -do- Alternative measures to maintain the
normal functional of the public work
(i,e road, water supply, drainage
system, telephone line ect)
All expense on alternative measures to
maintain the normal functioning of the
impacted system shall be born by
Contractor (s)
-do-
Complete the work for “alternative solution” prior
to commencement of the project work,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
ANNEX 4
Agreement on the line
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
ANNEX 5
Records of the consultation
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
ANNEX 6
Questionnaire
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
PMU under CPH is preparing a FS for the Second Rual Energy Project – Phase 2 - Additional
of low voltage Transmision lines in a number of 12 communes belong to 09 districts of Ha
Tinh Province in Northern Vietnam for WB financing,
The plan is the extension of the medium and low voltage T/L and installation of distribution
substations in the project areas, The RE2 is being carried out as required by the GOV and
WB to identify potential impacts likely caused by the projects and mitigation measures,
Please provide your viewpoints by filling in the questionnaire for our consideration, Opinions
expressed will be treated as confidential and will only used for project planning,
Code
Interview
Adress: …………………………………………………………………
House No, …………………………………………………………………
Road/Street …………………………………………………………………
Hamlet …………………………………………………………………
Commune/Ward …………………………………………………………………
District …………………………………………………………………
Province …………………………………………………………………
Name of interviewer …………………………………………………………………
- Head of HH
- Family member
RE2-
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
1 General HH Census
Sr
No
Name in
full
Rel
ati
on
ship
to
Hea
d H
H*
Age
Nati
on
ali
ty
Ed
uca
tion
Occupation
Residential
registration
status
MaM
ale
Fem
ale
Farm
ing
Bu
sin
ess
Han
dicra
ft
Sala
ry
earn
ing
Oth
ers
Adult member
1
2
3
4
5
Under 17 yr,old
1
2
3
4
5
Total family member………………,,= Total number of adult………+ total number of
children………,
(*) Relation to Head of HH
1,Wife/husband 4, Grandchildren
2, Father/Mother 5, Grandparents
3, Children 6, Others
(**
) Education qualification
1, Illiterate 4, Secondary
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
2, Can read and write 5, High school
3, Primary 6, University graduate
EM households:
Attending school
Elementary Primary Secondary University
Male Female Male Female Male Female Male Female
(***
) Residential registration status
1. Permanent residential registration 3, Temporary absence
2. Temporary residential registration 4, No residential registration
1.1 Occupation and average monthly income of family members
Sr No Names Occupation Income per month Total
Regular Other sources
1
2
3
4
5
Total family income
(*) Occupation
1. Gov, servant 7, Unstable occupation
2. Retired 8, Other occupation
3. Worker 9, Housewife
4. Farmer 10, Schooling/ training
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
5. Aquaculture/fishing 11, Unemployment
6. Business 12, Eligible for Special Assistance
The family is in the income group of
- Low
- Middle
- Above middle
(in relation with provincial income)
1,2 Average monthly expenses iof HH (VND)
Amount
………,……………………………
Food ………,……………………………
Electricity ………,……………………………
Water ………,……………………………
Education
………,……………………………
Travelling ………,……………………………
Cloth ………,……………………………
Medical
………,……………………………
Taxes, Fees ………,……………………………
Others ………,……………………………
………,……………………………
Total
1.3 Irregular expenses of HH during last year (VND)
Amount
………,……………………………
Festivals
………,……………………………
Ceremonies
………,……………………………
Purchasing household appliance
………,……………………………
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Repairs of house
………,……………………………
Repaires of motobike/motor boat
………,……………………………
Others
………,……………………………
………,……………………………
Total
1.4 Household appliaces in possession
Motorbike
Motor-board
Bicycle
TV set
Refrigerator
Washing machine
Electronics
Telephone
Others
Economic status of the family
High
Medium
Low
(In relation with possession of facilities)
1.5 Does the HH has any disable members
Yes
No
1,6 If „Yes‟ to 1,5 , ascertain the Types of Disability
Sr Names Age Type of disability Level if disability
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
No Male Female Totally Partially Male
Blind
Hearing impairs
Mentally retarded
Orthopaedically
handicaped
Others
If „Yes‟ , give details about age, physical condition, dependency status etc,
…………………………………………………………………………………………
…………………………………………………………………………………………
…………………………………………………………………………………………
…………………………………………………………………………………………
……………………………………………………………………………
1.8 What are the special needs of the elderly and disabled persons as stated by the
Head of the HH or other members of the family (Ex: medical care, mobility,
food, social…)
…………………………………………………………………………………………
…………………………………………………………………………………………
…………………………………………………………………………………………
…………………………………………………………………………………………
……………………………………………………………………………
1.9 Would any one loose jobs or occupation in the family in case the HH has to move
out?
Yes
No
Do not know
If „Yes‟, give details
………………………………………………………………………………………………
………………………………………………………………………………………………
………………………………………………………………………………………………
………………………………………………………………………………………………
………………………………………………………
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
2, Use of the house
Exclusively for living
Exclusively for business
Partly living and partly business
Leasing
Vacant
Others
Does the house has
2,1 Toilet
Yes
No
If „Yes‟ the toilet is
Inside the house
Outside the house
2,2 Kitchen
Inside the house
Outside the house
2,3 Water connection from network
Yes
No
If „Yes‟ water meter
Yes
No
Or using water on fixed amount
connection from neighbor
2,4 Electricity
Yes
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
No
If „Yes‟ electricity meter
Yes
No
Or using water on fixed amount
connection from neighbor
3, Assets
3,1 Residental Land
Land for Housing and Land for Business
Unit:m2
Total Existing Residental Land Legal Status
Land for
housing Land for
business Total
Land for housing Land for business
With
ownership
Without
ownership
With
ownership
Without
ownership
Unit:m2
Reason of
impact
Impacted Residental Land
Permanent impact Temporary impact
Land for
housing
Land for
business Total
Land for
housing
Land for
business Total
S/S
Tower
ROW
Access Rd
Const, Rd
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Related papers to residental land :
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
3.2 Cultivation land
Agricultural land holding Legal Status
Ric
e
Veg
etab
le
Ric
e+S
hri
mp
Gard
en
Fore
st
Pon
d
Tota
l
Havin
g
ow
ner
ship
Wit
hou
t
ow
ner
ship
Tem
pora
ry
use
Impacted Agricultural Land
Ric
e
Veg
etab
ler
Ric
e +
Sh
imp
Gard
en
Pon
d
Fore
st
Tota
l
Ric
e
Veg
etab
le
Ric
e +
Sh
rim
p
Gard
en
Pon
d
Fore
st
Tota
l
Note : Pls note the reasons of impact (i,e, tower foundation, T/L, S/S, access road,
construction road etc,) in the bottom column,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Related papers to agricultural land :
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
3,3 Perenial Trees and Crops
Impacted Perenial and Fruit Trees
Unit :Tree
Type of trees Permanen
t Impact
Tempo
,
Impact
Type of trees Permanen
t Impact
Tempo
,
Impact
Eucalyptus Longan
Bed tree Durian
Bambo Peeper
Hard wood Cashew
Orange Coffee
Palmyra Jack
Star Apple Grape Fruit
Coconut Lechee
Rambutan Mangustan
Apple Others
,,,,,,,,,,,, ,,,,,,,,,,,,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Impacted Crops
Unit :m2
Type of trees Permanen
t Impact
Tempo
,
Impact
Type of trees Permanen
t Impact
Tempo
,
Impact
Rice Maize
Sugar cane Pineapple
Bean Vegetables
Manioc ,,,,,,,,,,
3,4 House
Unit: m2
Housing
Category
Existing House
Construction Permit Built on Total
Land
Plot
Total
Construction
Surfaces Yes No Owned
land
encroached
land
Cat, 1
Cat, 2
Cat, 3
Cat, 4
„Temporary”
Unit : m2
Housing
Category
Permanent Imacted House
Total Land Plot Total Construction Surface
Owned
land
Encroached
land Total
Owned
land
Encroached
land Total
Cat, 1
Cat, 2
Cat, 3
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Cat, 4
„Temporary”
Note : Pls note the reasons of impact (i,e, tower foundation, T/L, S/S, access road,
construction road etc,) in the bottom column,
Unit: m2
Housing
Category
Temporary Imacted House
Total Land Plot Total Construction Surface
owned
land
encroached
land Total
owned
land
encroached
land Total
Cat, 1
Cat, 2
Cat, 3
Cat, 4
„Temporary”
Note : Pls note the reasons of impact (i,e, tower foundation, T/L, S/S, access road,
construction road etc,) in the bottom column,
3,5 Other Structures Affected
Permanently Impacted Structures
Type Measurement Price* Related
Paper
Kitchen
Toilet
Livestock/cattle house
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Water tank
Swallow dug/drilled well
Pond
Yard
Boundary fence
Power supply system
Water supply system
Road
Bridge
Gate
Alta
Tomb
Others
* Estimated prices by DPs,
Pls note the reasons of impact in the bottom column
_______________________
Clearly stated “pond” or “paddy field mixed with shrimp/fish rearing“
Temporarily Impacted Structures
Components Type Measurement Price* Related
Paper
Kitchen
Toilet
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Livestock/cattle house
Water tank
Swallow dug/drilled well
Pond
Yard
Boundary fence
Power supply system
Water supply system
Road
Bridge
Gate
Alta
Tomb
Others
* Estimated prices by DPs,
Pls note the reasons of impact in the bottom column
4. Resettlement
4.1 Willing to Resettlement
Yes
No
If “No” , what are DP‟s suggestion
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
Apart from this plot of land and this house, the HH has any other land or house in
the commune/district/province
Yes
No
If “Yes” , where ?
____________________________
Clearly stated “pond” or “paddy field mixed with shrimp/fish rearing“
4.2 Choice for resettlement
Land for land
Cash for land
4.3 Choice for compensation of structures
Substitute materials and labor for construction of house at self-selected location
Cash for structures for self-relocation
Independent house settled by Project
Other options
………………………………………………………………………………………………
………………………………………………………………………………………………
………………………………………………………………………………………………
…………………………………………………………………………,,
4,4 Selected options for income restoration by the Dps
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Financial assitance
Allocation of an area
Assistance in employment seeking
Assistance for training
Training for appropriate new skill
Assistance in credit for restoration of business
Other proposals
4,5 Priorities in resettlement
Mark the items in order of 1,2,3… of priorities
Satisfactory compensation at market value
New site near to existing paddy field/aquaculture pond
New site within the remaining land
Adequate technical infrastructures (water supply, electricity…at new site)
Adequate social infrastructures (market, school,,) at new site
Easy to open business at new site
Good community at new site
Good environment quality
Erect housing at new site without incurring debt
Training and employment
Additional suggestions, if any
Date of interview
………………………………………………
Name in full and signature
………………………………………………
Of Surveyor
………………………………………………
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
ANNEX 7 Pamphlet
The RE2 Project ultilizes the WB loan to extent and up-grade the rural power network in 62
communes of 12 districts of Ha Tinh Province will enjoy the power supply through
rehabilitationand expansion of the medium and low voltage system, Investment structure:
People‟s Committee of Ha Tinh Province RP/EMP implementation
Construction and installation of LV T/L and stations
HHs Household connection
1, Project affected household ?
All households, institutions, individuals having land and properties on such land i,e,
houses, structures, trees, crops in the safely corridor of the power networks (T/L and
step-down transformer stations) to be constructed and installed by the project,
2. Who will define the affected areas and affected properties ?
PMB of will supply the District and Commune Compensation Committees
with the layouts of medium voltage T/Ls , LV T/Ls along with location of
step-down transformer stations,
The District and Commune Compensation Committees are responsible for
defining the affected areas and carrying out the surveys and inventory of
affected properties,
Affected areas are areas lying within the safely corridor of the aerial T/L,
Such safely corridor is defined by distance from the outer most cable to
each side at the static state (Gov, Decree No,106/2005/ND-CP dt,17 Aug
2005):
- 2m applicable to 15 – 22 kV
- 1m applicable to 0,4 kV
3. Types of impacts ?
Permanent Impact : land, houses, structures, other properties and trees
(high than 4m) lying in the safely corridor of T/L and transformer stations,
Temporary impact: trees, crops and other properties affected during the
construction works,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
4. Land in the safely corridor of T/L and transformer stations will be taken for the
project?
No, But such land use is limited to cultivaition of crops and trees not
higher than 4m,
5. Who will be compensated and who will not be compensated ?
All families, institutions , individuals who have properties (land, houses,
structures, trees, crops) affected by the project and who could legally
claimed their land use rights and ownership of their properties prior to the
cut-off-date will be compensated and assisted,
Encroached land and/or structures erected after the cut-off-date will not be
compensated, Such properties shall be removed by their owners,
6. Compensation tariff ?
Compensation tariff shall be established by the Provincial Compensation/
Resettlement Committee, that reflects the actual market prices of the locality, and
approved by the Provincial People‟s Committee,
All Dps shall be compensated with replacement cost – the actual market prices at
the time of compensation – for their affected properties without depreciation and
without deduction of reused materials,
Affected land shall be compensated by land of similar category or cash,
7, In case of houses partly affected ?
In case the affected part does not affect the struture of the house and the
residential purpose in the remaining part, the affected part shall be
compensated,
In case the affected part affects the structure of the house and the
remaining part can not be used for the residential purpose, the whole house
shall be compensated,
8 When DPs will receive the compensation and move ?
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
DPs required to be settled shall be compensated for land, houses,
structures, trees, crops…, at least 3 months prior to land acquisition,
DPs with partly affected properties and be resettled on their own land plot
shall be compensated for the affected houses, structures, trees, and crops
…, at least 2 months prior to land acquisition,
DPs with affected trees, crops only shall be compensated at least 1 month
prior to construction,
9, Are there any entitlements apart from compensation for DPs required to be
resettled?
Yes,
Apart from compensation for land and other properties, DPs required to be
resettled shall enjoy the transport allowance, livelihood assistance… All
allowances, supports… will be clearly defined in the RP,
10, In case DPs are paid with parts of compensation and other allowances but
already asked to move or clear the ground?
DPs only hand-over their land or clear their ground when already received full
compensation and other entitlements,
11. When receiving compensation, DPs may be asked to contribute a certain amount
to a certain organization or a certain amount withheld by the Compensation
Committee?
Nobody is authorised to collect or withhold any amount from DPs‟ compensation
and other entitlements,
If such is the case, DPs have to report immediately to district compensation
committee, PMU of local authorities for settlement,
12. Who will inform DPs of the time-schedule for compensation, land acquisition,
ground clearance and other related information?
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
PMB, Provincial Compensation Committee, District Compensation Committee
are responsible for the information to DPs‟ entitlements, RP, compensation policy
and tariff, time-schedule for payment of compensation, land acquisition, ground-
clearance and construction,
13. In case DPs disagreed with DMS results or other related issues, where can they
lodge their complain ?
Lodge their complain to the Commune People‟s Committee,
In case DPs disagree with the resettlement of the commune People‟s
Committee, lodge their complaint to the District People‟s Committee
where settlement should be processed within 15 days,
In case DPs disagreed with the settlement of the District People‟s
Committee, such case will be bought to the court,
Administrative fees are exempted at all levels,
14. Who will supervise the compensation?
An internal mornitoring unit will be set up within the PMU to carry out the
internal monitoring of RP, and
An internal mornitoring unit will be contracted by PMU to carry out the external
monitoring of RP,
15. DPs’ responsibilities ?
Participate in all related community meetings and read all related
information;
Be ready with all related papers i,e, LURC, residential registration,
ownership of other properties…
Read and thoroughly understand all related forms i,e, socio-economic
survey, DMS property inventory, compensation and resettlement
commitment… and participate in all such activities,
Timely resettlement or ground-clearance after receiving full compensation
and other entitlements,
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
16. Any DPs with any related query and at any time can approach the following
institutions:
HHs affected by medium voltage T/L
Power Company
PMU
HHs affected by low voltage T/L
Department of Industry
PMU (Low voltage networks project)
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
ANNEX 8 List up the people affected by the Project
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Appendix 8 : social - economic household data sheet of displaced
persons
Sur
vey
No
Addr
ess of
HHs
Malee of HH's
members Sex Age
Ethn
ic
grou
p
Educat
ion
Employ
ment
Occup
ation
and
source
of
income
Estimated
total income
per year
Thach ha Town - Thach Ha District
1 Tow
n Tran Xuan Loc Man 46 Kinh 7/10 farmer Stable 10,000,000
Nguyen Thi
Minh Women 42 Kinh 7/10 farmer
Tran Thi Lien Women 20 Kinh 12/12 Pupil
Tran Van Tung Man 16 Kinh 10/12 Pupil
2 Pham Van Huu Man 35 Kinh 12/12 farmer Stable 15,000,000
Nguyen Thi
Loan Women 34 Kinh 12/12 farmer
Pham Van
Hoang Man 14 Kinh 8/12 Farmer
3 Đinh Van
Khuyen Man 61 Kinh 1/12 Farmer Stable 19,000,000
Nguyen Thi
Nham Women 57 Kinh 7/10 Farmer
Dinh Van Hieu Man 22 Kinh 12/12 Student
Đinh Thi
Chung Women 28 Kinh 12/12 Pupil
4 Tran Xuan
Truyen Man 41 Kinh 12/12 Farmer Stable 18,000,000
Bui Thi Thoan Women 42 Kinh 7/10 Farmer
Tran Thi Hien Women 20 Kinh 7/12 Farmer
Trần Thị Yến Women 17 Kinh 11/12 Pupil
5 Phạm Văn
Quang Man 40 Kinh 4/10 Farmer Stable 26,000,000
Đinh Thị Liễu Women 41 Kinh 3/10 Farmer
Phạm Thị
Quỳnh Women 16 Kinh 9/12 Farmer
Phạm Thị Mai Women 14 Kinh 9/12 Farmer
Thach Vinh commune - Thach Ha District
1 Phạm Văn Đính Man 45 Kinh 10/10 farmer Stable 15,000,000
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Vũ Thị Huyền Women 44 Kinh 9/10 farmer
Phạm Công Hội Man 22 Kinh 12/12 Pupil
Phạm Thị Hoa Women 18 Kinh 12/12 Pupil
2 Nguyễn Văn
Hoàng Man 32 Kinh 10/12 farmer Stable 10,000,000
Trần Thị Lan Women 32 Kinh 10/12 farmer
Nguyễn Thị
Luyến Women 10 Kinh 4/12 Pupil
Nguyễn Thị
Loan Women 7 Kinh 2/12 Pupil
3 Phan Trọng Hà Man 39 Kinh 9/12 farmer Stable 10,000,000
Trần Thị Tuyến Women 37 Kinh 9/12 farmer
Phan Trọng
Hoàng Man 12 Kinh 6/12 Pupil
Viet Xuyen commune - Thach Ha District
1 Nguyến Văn
Tính Man 35 Kinh 12/12 farmer Stable 15,000,000
Lê Thị Tam Women 33 Kinh 12/12 farmer
Nguyễn Văn
Sáng Man 17 Kinh 11/12 Pupil
2 Phạm Văn Bắc Man 30 Kinh 12/12 Farmer Stable 15,000,000
Trần Thị Duyên Women 29 Kinh 12/12 Farmer
Phạm Thị Lý Women 5 Kinh
3 Nguyễn Văn
Thép Man 50 Kinh 7/10 Farmer Stable 13,000,000
Nguyễn Thị
Quyết Women 50 Kinh 3/10 Farmer
Nguyễn Thị
Mai Women 25 Kinh 7/12 Farmer
Nguyễn Văn
Thêm Man 20 Kinh 7/12 Farmer
4 Nguyễn Thế
Gia Man 41 Kinh 12/12 Farmer Stable 8,000,000
Nguyễn Thị
Hợi Women 39 Kinh 12/12 Teacher
Nguyễn Văn
Giang Man 16 Kinh 10/12 Pupil
Nguyễn Thị Tú Women 13 Kinh 7/12 Pupil
5 Nguyễn Văn
Dạy Man 43 Kinh 7/10 Farmer Stable 15,000,000
Trần Thị Trơng Women 40 Kinh 7/10 Farmer
Nguyễn Văn Man 15 Kinh 9/12 Pupil
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Trai
Nguyễn Thị
Liên Women 10 Kinh 5/12 Pupil
6 Lu Văn Hạnh Man 44 Kinh 7/10 Farmer Stable 15,000,000
Trần Thị Chiêm Women 40 Kinh 7/10 Farmer
Lu Thị Chinh Women 21 Kinh 12/12 Student
Lu Văn Thinh Man 18 Kinh 12/12 Pupil
7 Bùi Văn Thịnh Man 48 Kinh 7/10 Farmer Stable 19,000,000
Nguyễn Thị
Huế Women 45 Kinh 4/10 Farmer
Bùi Văn Xây Man 25 Kinh 9/12 Farmer
Bùi Văn Thơng Man 20 Kinh 9/12 Farmer
8 Trần Văn Trung Man 50 Kinh 7/10 Farmer Stable 16,000,000
Nguyễn Thị
Nguyệt Man 47 Kinh 4/10 Farmer
Trần Văn Liên Man 23 Kinh 12/12 Saler
Trần Thu Thuỷ Women 20 Kinh 12/12 worker
9 Nguyễn Thanh
Dậu Man 42 Kinh 7/10 Farmer Stable 16,000,000
Nguyễn Thanh
Huyền Women 40 Kinh 4/10 Farmer
Nguyễn Thanh
Toàn Man 18 Kinh 12/12 Pupil
Nguyễn Gia
Hân Women 16 Kinh 10/12 Pupil
10 Nguyễn Văn
Tiếu Man 38 Kinh 7/10 Farmer Stable 17,000,000
Bùi Thị Mai Women 35 Kinh 7/10 Farmer
Nguyễn Thị H-
ơng Women 15 Kinh 8/12 Pupil
Nguyễn Văn
Cao Man 12 Kinh 5/12 Pupil
Thach Kenh commune - Thach Ha District
1 Lê Thanh Hùng Man 42 Kinh 7/10 Farmer Stable 10,000,000
Trần Thị Dung Women 40 Kinh 7/10 Farmer
Lê Thanh Hải Man 20 Kinh 12/12 Pupil
Lê Thị Hoa Women 17 Kinh 11/12 Pupil
2 Nguyễn Văn
Toàn Man 35 Kinh 9/12 Farmer Stable 24,000,000
Vũ Thị Tuyến Women 32 Kinh 9/12 Farmer
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Nguyễn Thị
Tâm Women 11 Kinh 5/12 Pupil
Nguyễn Văn Tú Man 7 Kinh 2/12 Pupil
3 Trần Văn Thu Man 43 Kinh 7/10 Farmer Stable 19,000,000
Hồ Thị Hợi Women 40 Kinh 7/10 Farmer
Trần Thị Mai Women 18 Kinh 12/12 Pupil
Trần Văn Hải Man 16 Kinh 10/12 Pupil
4 Nguyễn Văn
Luận Man 50 Kinh 4/7 Farmer Stable 17,000,000
Nguyễn Thị
Tám Women 48 Kinh 4/7 Farmer
Nguyễn Văn
Toán Man 25 Kinh 4/7 Farmer
Nguyễn Thị
Lan Women 20 Kinh 4/7 Farmer
5 Nguyễn Năng
Vĩ Man 48 Kinh 3/7 Farmer Stable 18,000,000
Hoàng Thị
Thuý Women 46 Kinh 7/10 Farmer
Nguyễn Văn
Tùng Man 21 Kinh 12/12 Farmer
Nguyễn Anh
Phơng Women 18 Kinh 12/12 Pupil
Thach Son commune - Thach Ha District
1
Nam
Khe
Haml
et
Mai Viết Chơng Man 50 Kinh 10/10 worker Stable 10,000,000
Đặng Thị Lý Women 45 Kinh 4/10 Teacher
Mai Thị Tuyết Women 20 Kinh 12/12 Pupil
Mai Viết Anh Man 23 Kinh 12/12 Student
Mai Thị Hoài
Thanh Women 1 Kinh 5/12 Pupil
2 Nguyễn Văn
Đao Man 35 Kinh 12/12 Farmer Stable 10,000,000
Trần Thị Trang Women 32 Kinh 12/12 Farmer
Nguyễn Văn
Chung Man 11 Kinh 5/12 Pupil
3 Nguyễn Văn
Xuân Man 52 Kinh 7/10 Farmer 16,000,000
Nguyễn Thị Bé Women 50 Kinh 7/10 Farmer
Nguyễn Văn
Tuân Man 25 Kinh 12/12 Farmer
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Nguyễn Thị
Vân Women 21 Kinh 12/12 Pupil
thach long commune - Thach Ha District
1 Đỗ Thanh Hải Man 40 Kinh 9/12 Farmer Stable 10,000,000
Nguyễn Thị
Xuân Women 39 Kinh 9/12 Farmer
Đỗ Văn Minh Man 20 Kinh 12/12 Farmer
Đỗ Văn Sơn Man 16 Kinh 10/12 Pupil
2 Nguyễn Viết
Hợp Man 42 Kinh 9/12 Farmer Stable 12,000,000
Lê Thị Thu Women 37 Kinh 9/12 Farmer
Nguyễn Thị Hải Women 22 Kinh 12/12 Pupil
Nguyễn Thị
Mai Women 19 Kinh 12/12 Pupil
Ngoc Son commune - Thach Ha District
1
Khe
Giao
I
Haml
et
Phan Văn Huy Man 35 Kinh 12/12 Farmer Stable 20,000,000
Nguyễn Thị
Quế Women 32 Kinh 12/12 Farmer
Phan Thị Hoà Women 10 Kinh 5/12 Pupil
2 Nguyễn Văn
Hoàn Man 32 Kinh 10/12 Farmer Stable 25,000,000
Lê Thị Tuyết Women 32 Kinh 12/12 Farmer
Nguyễn Văn
Hùng Man 10 Kinh 5/12 Pupil
Nguyễn Thị
Lan Women 7 Kinh 2/12 Pupil
Huong Long commune - Huong Khe District
1 Phạm Văn C-
ờng Man 35 Kinh 12/12 Farmer Stable 10,000,000
Nguyễn Thị
Lanh Women 34 Kinh 12/12 Farmer
Phạm Thị Lan Women 16 Kinh 10/12 Pupil
2 Lê Trọng Hải Man 40 Kinh 9/12 Farmer Stable 15,000,000
Đặng Thị Ph-
ợng Women 40 Kinh 9/12 Farmer
Lê Văn Hoàng Man 20 Kinh 12/12 Pupil
3 Phan Trọng
Thanh Man 34 Kinh 12/12 Farmer Stable 15,000,000
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Nguyễn Thị
Hạnh Women 32 Kinh 12/12 Farmer
Phan Văn
Thông Man 14 Kinh 9/12 Pupil
4 Nguyễn Văn
Định Man 43 Kinh 9/12 Farmer Stable 17,000,000
Nguyễn Thị
Liên Women 40 Kinh 7/10 Farmer
Nguyễn Văn
Lân Man 12 Kinh 6/12 Pupil
Nguyễn aăn Tr-
ờng Man 9 Kinh 3/12 Pupil
5 Nguyễn Ngọc
Minh Man 44 Kinh 7/10 Farmer Stable 21,000,000
Nguyễn Thị
Nga Women 42 Kinh 7/10 Farmer
Nguyễn Ngọc
Lợi Man 19 Kinh 10/12 worker
Nguyễn Ngọc
Toàn Man 17 Kinh 11/12 Pupil
6 Nguyễn Văn
Sơn Man 40 Kinh 4/10 Farmer Stable 21,000,000
Hồ Thị Bình Women 39 Kinh 7/10 Farmer
Nguyễn Thị
Duyên Women 14 Kinh 8/12 Pupil
Nguyễn Văn
Hải Man 11 Kinh 5/12 Pupil
7 Nguyễn Văn
Quyết Man 48 Kinh 12/12 Farmer Stable 20,000,000
Nguyễn Thị
Hiền Women 44 Kinh 7/10 Farmer
Nguyễn Văn
Quý Man 21 Kinh 12/12 Soldier
Nguyễn Văn
Tiến Man 19 Kinh 12/12 Student
Phuong Dien commune - Huyện hơng khê
1 Trần Văn Liên Man 61 Kinh 7/10 Farmer Stable 5,000,000
Bạch Thị Thuỷ Women 55 Kinh 7/10 Farmer
Trần Văn
Phong Man 23 Kinh 12/12 Farmer
Trần Văn Sáng Man 21 Kinh 12/12 worker
2 Phạm Văn Huy Man 35 Kinh 12/12 Farmer Stable 10,000,000
Nguyễn Thị
Huê Women 34 Kinh 12/12 Farmer
Phạm Thị Hoa Women 14 Kinh 9/12 Pupil
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Phạm Thị Hoài Women 10 Kinh 5/12 Pupil
3 Nguyễn Thế
Long Man 47 Kinh 10/12 Farmer Stable 25,000,000
Nguyễn Thị
Thơm Women 45 Kinh 5/10 Farmer
Nguyễn Thị
Hoa Women 12 Kinh 6/12 Pupil
Nguyễn Thị
Liên Women 10 Kinh 4/12 Pupil
4 Nguyễn Thị
Dung Women 44 Kinh 7/10 Farmer Stable 23,000,000
Hồ Anh Dũng Man 48 Kinh 7/10 Farmer
Hồ Thị Mai Women 25 Kinh 10/12 Farmer
Hồ Anh Tám Man 21 Kinh 12/12 Soldier
5 Nguyễn Văn
Bình Man 40 Kinh 7/10 Farmer Stable 14,000,000
Phạm Thị Tám Women 38 Kinh 7/10 Farmer
Nguyễn Thị
Thu Women 12 Kinh 4/12 Pupil
Nguyễn Tân
Giang Man 5 Kinh Children
Huong Tra commune - Huong Khe District
1 Phan Duy Châu Man 50 Kinh 10/10 worker Stable 20,000,000
Đoàn Thị Hà Women 42 Kinh 10/10 Teacher
Phan Thị Trang
Nhi Women 18 Kinh 12/12 Pupil
Phan Hà Vũ Man 12 Kinh 10/12 Pupil
Phan Duy Hiếu Man 8 Kinh 3/12 Pupil
2 Phạm Thế Anh Man 27 Kinh 12/12 worker Stable 20,000,000
Nguyễn Thị Lê Women 26 Kinh 12/12 worker
3 Nguyễn Văn
Đợi Man 45 Kinh 12/12 Farmer Stable 18,000,000
Phan Thị Tuất Women 45 Kinh 7/10 Farmer
Nguyễn Thị
Hạnh Women 18 Kinh 12/12 Pupil
4 Ninh Văn Duê Man 45 Kinh 10/12 Farmer Stable 25,000,000
Nguyễn Thị
Duyên Women 45 Kinh 5/10 Farmer
Ninh Thị Hoa Women 12 Kinh 6/12 Pupil
Ninh Thị Lien Women 10 Kinh 4/12 Pupil
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
5 Bùi Văn Xuyến Man 47 Kinh 5/10 Farmer Stable 19,000,000
Nguyễn Thị
Thích Women 46 Kinh 5/10 Farmer
Bùi Thị Trang Women 13 Kinh 7/12 Pupil
Bùi Thị Giang Women 10 Kinh 4/12 Pupil
6 Mai Văn Tình Man 42 Kinh 12/12 worker Stable 17,000,000
Nguyễn Thị Nụ Women 39 Kinh 7/10 Farmer
Mai Thị Tú Women 22 Kinh 9/12 Farmer
Mai Thị Phơng Women 20 Kinh 12/12 Student
7 Hoàng Văn
Khoa Man 48 Kinh 12/11 Farmer Stable 15,000,000
Nguyễn Thị
Khánh Women 45 Kinh 5/10 Farmer
Hoàng Văn
Việt Man 17 Kinh 11/12 Pupil
Hoàng Văn
Đức Man 15 Kinh 9/12 Pupil
8 Hoàng Văn Học Man 47 Kinh 7/10 Farmer Stable 20,000,000
Nguyễn Thị
Linh Women 46 Kinh 5/10 Farmer
Hoàng Văn Lai Man 20 Kinh 9/12 Farmer
Hoàng Văn Đại Man 17 Kinh 11/12 Pupil
9 Ngô Bảo Tờng Man 45 Kinh 5/10 Farmer Stable 21,000,000
Nguyễn Thị
Liên Women 44 Kinh 10/10 Farmer
Ngô Bảo Liên Women 21 Kinh 12/12 Student
Ngô Bảo Châu Man 20 Kinh 12/12 Student
Huong Giang commune - Huong Khe District
1 Trần Thị Thanh Women 51 Kinh 7/10 Farmer Stable 15,000,000
Nguyễn Thị
Thắm Women 24 Kinh 12/12 worker
Nguyễn Thị
Giang Women 26 Kinh 12/12 worker
Nguyễn Thị
Vân Women 18 Kinh 12/12 Pupil
2 Phạm Ngọc
Hiếu Man 30 Kinh 12/12 Farmer Stable 10,000,000
Lê Thị Thêu Women 29 Kinh 12/12 Farmer
Phạm Văn Hiệu Man 3 Kinh
3 Hoàng Ngọc Man 47 Kinh 10/12 Farmer Stable 20,000,000
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Quang
Nguyễn Thị
Trâm Women 45 Kinh 7/10 Farmer
Hoàng Thị Ph-
ơng Women 21 Kinh 12/12 Pupil
Hoàng Thị
Thuý Women 19 Kinh 12/12 Pupil
4 Ninh Văn Quý Man 45 Kinh 8/12 Farmer Stable 18,000,000
Nguyễn Thị
Ngân Women 44 Kinh 5/10 Farmer
Ninh Thị Dơng Women 18 Kinh 12/12 Pupil
Ninh Văn
Quyền Man 17 Kinh 11/12 Pupil
5 Trần Ngọc Mai Man 41 Kinh 11/12 Farmer Stable 19,000,000
Nguyễn Thị
Nga Women 41 Kinh 7/12 Farmer
Trần Quang
Hợp Man 16 Kinh 9/12 Pupil
Trần Thị Huệ Women 15 Kinh 8/12 Pupil
6 Đàm Văn Long Man 48 Kinh 7/10 Farmer Stable 17,000,000
Nguyễn Thị
Vịnh Women 42 Kinh 7/10 Farmer
Đàm Văn
Chung Man 19 Kinh 9/12 Pupil
Đàm Thị Thuỷ Women 17 Kinh 9/12 Pupil
Phuc Dong commune - Huong Khe District
1 Haml
et 1 Trần Văn Bảo Man 34 Kinh 12/12 Farmer Stable 10,000,000
Phan Thị Vinh Women 33 Kinh 12/12 Farmer
Trần Thị Trang Women 14 Kinh 7/12 Pupil
2 Phạm Văn
Hạnh Man 30 Kinh 12/12 Farmer Stable 15,000,000
Nguyễn Thị Nụ Women 28 Kinh 12/12 Farmer
Phạm Văn
Hùng Man 8 Kinh 3/12 Pupil
3 Trần Văn Cốc Man 42 Kinh 12/12 Farmer Stable 15,000,000
Buùi Thị Oanh Women 40 Kinh 10/10 worker
Trần Văn
Thắng Man 16 Kinh 9/12 Pupil
Trần Văn
Thành Man 14 Kinh 7/12 Pupil
4 Hoàng Thị Women 50 Kinh 7/10 Farmer Stable 19,000,000
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Diễm
Nguyễn Ngọc
Nhâm Man 50 Kinh 10/10 Farmer
Nguyễn Thị
Dung Women 21 Kinh 12/12 Pupil
Nguyễn Ngọc
Hùng Man 12 Kinh 6/12 Pupil
5 Hoàng Văn
Chung Man 45 Kinh 12/12 worker Stable 16,000,000
Bùi Thị Lan Women 42 Kinh 7/10 Farmer
Hoàng Văn
Quân Man 18 Kinh 12/12 Pupil
Hoàng Thị Nhi Women 16 Kinh 9/12 Pupil
6 Phan Thanh
Chơng Man 46 Kinh 12/12 Farmer Stable 15,000,000
Nguyễn thị
Trang Women 44 Kinh 7/10 Farmer
Phan Thanh
Điện Man 19 Kinh 7/12 Farmer
Phan Thị Xinh Women 17 Kinh 10/12 Pupil
Huong Binh commune - Huong Khe District
1 Nguyễn Văn
Dần Man 46 Kinh 7/10 Farmer Stable 10,000,000
Phạm Thị Thơ Women 44 Kinh 7/10 Farmer
Nguyễn Thị
Thanh Women 18 Kinh 12/12 Pupil
Nguyễn Thị
Dung Women 14 Kinh 9/12 Pupil
Nguyễn Văn
Tuân Man 6 Kinh 1/12 Pupil
2 Lu Đức Hùng Man 39 Kinh 12/12 Farmer Stable 15,000,000
Nguyễn Thị
Dung Women 37 Kinh 12/12 Farmer
Lu Văn Thắng Man 17 Kinh 11/12 Pupil
Lu Thị Hơng Women 12 Kinh 6/12 Pupil
3 Trần Văn
Thắng Man 35 Kinh 12/12 Farmer Stable 20,000,000
Vũ Thị Hải Women 33 Kinh 12/12 Farmer
Trần Thị Phơng Women 18 Kinh 12/12 Pupil
Trần Văn Sơn Man 15 Kinh 9/12 Pupil
4 Lã Văn Ngọc Man 43 Kinh 6/10 Farmer Stable 12,000,000
Hồ Thị Loan Women 40 Kinh 7/10 Farmer
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Lã Văn Năm Man 17 Kinh 9/12 Pupil
Lã Thị Sáu Women 15 Kinh 7/12 Pupil
5 Trần Thu Huệ Women 34 Kinh 12/12 Farmer Stable 15,000,000
Nguyễn Tất
Sơn Man 35 Kinh 9/12 Farmer
Nguyễn Tất
Thành Man 10 Kinh 4/12 Pupil
6 Hoàng Thế
Long Man 48 Kinh 12/12 Farmer Stable 21,000,000
Nguyễn Thị
Tuyết Women 46 Kinh 7/10 Farmer
Hoàng Thế
Tuyền Man 22 Kinh 12/12 Soldier
Hoàng Thế
Thuận Man 20 Kinh 12/12 Farmer
7 Lã Đức Thi Man 42 Kinh 7/10 Farmer Stable 26,000,000
Nguyễn Hoài
Anh Women 40 Kinh 7/10 Farmer
Lã Đức Nam Man 17 Kinh 11/12 Pupil
Lã Thị Sen Women 15 Kinh 9/12 Pupil
8 Phạm Văn
Tùng Man 45 Kinh 7/10 Farmer Stable 18,000,000
Nguyễn Tuyết
Mai Women 43 Kinh 12/12 Farmer
Phạm Văn D-
ơng Man 18 Kinh 12/12 Pupil
Phạm Thu Thuỷ Women 17 Kinh 11/12 Pupil
9 Lê Đình Bảo Man 57 Kinh 7/12 Farmer Stable 21,000,000
Hoàng Thị Liên Women 52 Kinh 10/10 Farmer
Lê Văn Toán Man 28 Kinh 12/12 Farmer
Lê Văn Thanh Man 26 Kinh 12/12 Farmer
Lê Văn Thuận Man 24 Kinh 12/12 Farmer
10 Dơng Văn
Thành Man 56 Kinh 7/10 Farmer Stable 16,000,000
Dơng Thị Kiểm Women 27 Kinh 7/12 Farmer
Dơng Văn
Quỳnh Man 25 Kinh 7/12 Farmer
11 Lơng Văn Tuấn Man 45 Kinh 9/12 Farmer Stable 20,000,000
Nguyễn Thị
Đào Women 43 Kinh 7/10 Pupil
Lơng Thị Hơng Women 22 Kinh 12/12 Student
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
12 Đờng Văn Huê Man 50 Kinh 5/10 Farmer Stable 18,000,000
Lê Thị Hoàn Women 42 Kinh 7/10 Farmer
Dơng Thị Liên Women 18 Kinh Pupil
13 Hoàng Văn Sơn Man 41 Kinh 5/10 Farmer Stable 8,000,000
Nguyễn Thị
Uyên Women 41 Kinh 5/10 Farmer
Hoàng Đại
Phong Man 15 Kinh 10/12 Farmer
Hoàng Hồng
Thái Man 9 Kinh 3/12 Pupil
14 Trần Thị Sen Women 51 Kinh 4/10 Retirem
ent Stable 21,000,000
Vũ Tú Linh Women 30 Kinh 12/12 Farmer
Vũ Việt Hùng Man 25 Kinh 12/12 worker
15 Tạ Hồng Chiều Man 46 Kinh 10/12 Farmer Stable 9,000,000
Phan Thị Xuân Women 40 Kinh 5/10 Farmer
Tạ Hồng Phong Man 17 Kinh 11/12 Pupil
Tạ Hồng Đức Man 15 Kinh 9/12 Pupil
16 Nguyễn Kim
Thành Man 44 Kinh 8/12 Farmer Stable 12,000,000
Nguyễn Thị Ph-
ơng Women 43 Kinh 5/10 Farmer
Nguyễn Văn
Minh Man 19 Kinh 12/12 Pupil
Nguyễn Mai An Man 17 Kinh 11/12 Pupil
17 Trần Đình
Hoàn Man 36 Kinh 12/12 Farmer Stable 14,000,000
Cao Thị Lan Women 29 Kinh 12/12 Farmer
Trần Hoài Thu Women 11 Kinh 4/12 Pupil
Trần Đình
Thiện Man 6 Kinh 1/12 Pupil
18 Lê Văn Tuân Man 40 Kinh 10/10 Farmer Stable 9,000,000
Đỗ Thị Loan Women 36 Kinh 10/10 Farmer
Lê Văn Định Man 13 Kinh 6/12 Pupil
Lê Thị Hoa Women 4 Kinh Children
19 Nguyễn Văn
Đăng Man 45 Kinh 7/10 Farmer Stable 15,000,000
Hoàng Thị Nga Women 41 Kinh 7/10 Farmer
Nguyễn Thị
Thuỷ Women 20 Kinh 12/12 Pupil
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Nguyễn Văn
Nam Man 16 Kinh 10/12 Pupil
Nguyễn Văn
Đạt Man 14 Kinh 8/12 Pupil
20 Hoàng Văn
Tám Man 42 Kinh 7/10 Farmer Stable 20,000,000
Nguyễn Thị L-
ơng Women 38 Kinh 5/10 Farmer
Hoàng Thị La Women 16 Kinh 10/12 Pupil
Hoàng Thị
Giang Women 14 Kinh 8/12 Pupil
21 Nguyễn Kế
Nhiệm Man 30 Kinh 7/10 Farmer Stable 17,000,000
Nguyễn Thị
Hậu Women 30 Kinh 7/12 Farmer
Nguyễn Kế Hà Man 7 Kinh 2/12 Pupil
22 Trịnh Thị
Thanh Women 28 Kinh 12/12 Farmer Stable 18,000,000
Nguyễn Văn
Tuấn Man 28 Kinh 12/12 Farmer
23 Nguyễn Thị Nh Women 23 Kinh 3/12 Farmer Stable 16,000,000
Nguyễn Thanh
Thiện Man 25 Kinh 7/12 Farmer
Phu Gia commune - Huong Khe District
1
Phu
Vinh
Haml
et
Phan Văn Sơn Man 46 Kinh 7/10 Farmer Stable 20,000,000
Đậu Thị Định Women 42 Kinh 7/10 Farmer
Phan Thị Giang Women 18 Kinh 12/12 Pupil
Phan Anh Cờng Man 16 Kinh 10/12 Pupil
Phan Ngọc
Mạnh Man 6 Kinh 1/12 Pupil
2 Phạm Văn Đức Man 38 Kinh 12/12 Farmer Stable 30,000,000
Nguyễn Thị
Lan Women 37 Kinh 12/12 Farmer
Phạm Thị Hơng Women 12 Kinh 7/12 Pupil
Phạm Thị Ph-
ơng Women 7 Kinh 2/12 Pupil
3 Trần Văn Mạnh Man 40 Kinh 8/10 Farmer Stable 25,000,000
Phan Thị Trang Women 40 Kinh 7/10 Farmer
Trần Văn
Tuyến Man 18 Kinh 12/12 Pupil
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Trần Văn Tớp Man 16 Kinh 10/12 Pupil
4 Nguyễn Thị
Linh Women 48 Kinh 4/10 Farmer Stable 17,000,000
Phạm Thành
Lộc Man 51 Kinh 7/10 Farmer
Phạm Thành
Trung Man 28 Kinh 12/12 Farmer
Phạm Thành
Tài Man 24 Kinh 12/12 worker
5 Vũ Huy Sơn Man 52 Kinh 7/10 Farmer Stable 28,000,000
Mai Thị Chiến Women 50 Kinh 7/10 Farmer
Vũ Huy Dũng Man 22 Kinh 12/12 worker
Vũ Huy Toàn Man 20 Kinh 12/12 Farmer
6 Phạm Văn
Quang Man 42 Kinh 7/10 Farmer Stable 23,000,000
Nguyễn Thị
Duyên Women 40 Kinh 5/10 Farmer
Phạm Văn Kiên Man 17 Kinh 11/12 Pupil
Phạm Thị
Huyền Women 15 Kinh 9/12 Pupil
Can loc town - Can Loc district
1 Đặng Thế Xuân Man 35 Kinh 12/12 Farmer Stable 15,000,000
Nguyễn Thị
Hằng Women 34 Kinh 12/12 Farmer
Đặng Thị
Huyền Women 16 Kinh 10/12 Pupil
2 Nguyễn Văn
Nam Man 46 Kinh 9/10 Farmer Stable 17,000,000
Phạm Thị Hơng Women 44 Kinh 7/10 Farmer
Nguyễn Đức
Hoàng Man 20 Kinh 12/12 Pupil
Nguyễn Thị Ph-
ợng Women 15 Kinh 9/12 Pupil
My Loc commune - Can Loc district
1 Trần Nhân Hiền Man 53 Kinh 9/12 Farmer Stable 10,000,000
Nguyễn Thị
Hạnh Women 52 Kinh 9/12 Farmer
Trần Văn Hải Man 22 Kinh 12/12 Farmer
Trần Thị Hơng Women 18 Kinh 12/12
2 Hoàng Văn
Hùng Man 43 Kinh 12/12 Farmer Stable 20,000,000
Trần Thị Lan Women 40 Kinh 12/12 Farmer 10,000,000
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Hoàng Thế Sơn Man 14 Kinh 9/12 Pupil
Hoàng Văn
Anh Man 12 Kinh 7/12 Pupil
3 Hoàng Văn
Tuyên Man 35 Kinh 12/12 Farmer Stable 15,000,000
Nguyễn Thị
Nhãn Women 32 Kinh 12/12 Farmer 7,000,000
Hoàng Văn
Đăng Man 10 Kinh 5/12 Pupil
Hoàng Văn
Thông Man 7 Kinh 2/12 Pupil
Thien Cam town - Cam Xuyen district
1 Nguyễn Công
Nhân Man 38 Kinh 12/12 Farmer Stable 18,000,000
Trần Thị Loan Women 35 Kinh 12/12 Farmer
Nguyễn Công
Minh Man 14 Kinh 8/12 Pupil
Nguyễn Thị Ph-
ơng Women 12 Kinh 6/12 Pupil
2 Nguyễn Văn C-
ơng Man 29 Kinh 7/10 Farmer Stable 19,000,000
Ngô Thị Chinh Women 28 Kinh 12/12 Farmer
Nguyễn Văn
Bình Man 7 Kinh 1/12 Pupil
3 Phạm Văn
Công Man 55 Kinh 7/10 Officer Stable 37,000,000
Trần Thị Mơ Women 53 Kinh 7/10 Farmer
Phạm Văn
Chiến Man 16 Kinh 11/12 Pupil
4 Trần Văn Thêm Man 51 Kinh 10/12 Farmer Stable 17,000,000
Nguyễn Thị
Ngoan Women 48 Kinh 7/10 Farmer
Trần Văn Trờng Man 25 Kinh 7/10 Farmer
Trần Văn Phi Man 21 Kinh 12/12 Farmer
5 Đỗ Văn Mạc Man 48 Kinh 10/10 Farmer Stable 16,000,000
Nguyễn Thị
Nhung Women 43 Kinh 3/10 Farmer
Đỗ Văn Lộc Man 20 Kinh 9/12 Farmer
6 Đặng Đình
Chiến Man 45 Kinh 9/12 Farmer Stable 19,000,000
Ngô Thị Hằng Women 42 Kinh 7/10 Farmer
Đặng Đình
Long Man 19 Kinh 12/12 Pupil
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Đặng Đình Hng Man 17 Kinh 11/12 Pupil
Cam huy commune - Cam Xuyen district
1 Triệu Văn Ngô Man 32 Kinh 10/10 Farmer Stable 24,000,000
Trần Thị Thủy Women 30 Kinh 10/10 Officer
Triệu Thị
Quỳnh Women 7 Kinh 2/12 Pupil
2 Hoàng Văn
Tuyên Man 30 Kinh 8/12 Farmer Stable 22,000,000
Hồ Thị Tình Women 30 Kinh 9/12 Farmer
Hoàng Văn
Anh Man 10 Kinh 4/12 Pupil
Hoàng Thị
Nguyệt Women 7 Kinh 2/12 Pupil
3 Phạm Văn Tuấn Man 38 Kinh 2/12 Farmer Stable 21,000,000
Nguyễn Thị
Xoan Women 33 Kinh 7/10 Farmer
Phạm Văn Mỹ Man 10 Kinh 4/12 Pupil
4 Nguyễn Văn Lý Man 44 Kinh 10/10 Farmer Stable 19,000,000
Phạm Hồng Nụ Women 40 Kinh 5/10 Farmer
Nguyễn Văn Tú Man 19 Kinh 12/12 Pupil
Nguyễn Thị
Đào Women 17 Kinh 11/12 Pupil
5 Trần Minh Độ Man 42 Kinh 7/10 Farmer Stable 20,000,000
Nguyễn Thùy
Chi Women 40 Kinh 4/10 Farmer
Trần Minh
Thăng Man 16 Kinh 10/12 Pupil
Trần Thị Thu Women 14 Kinh 8/12 Pupil
Cam Loc commune - Cam Xuyen district
1 Trần Văn
Thắng Man 47 Kinh 7/10 Farmer Stable 10,000,000
Bùi Thị Lam Women 45 Kinh 7/10 Farmer
Trần Văn Tình Man 19 Kinh 12/12 Farmer
2 Nguyễn Thị
Lan Anh Women 41 Kinh 7/10 Farmer Stable 12,000,000
Lê Văn Hùng Man 45 Kinh 10/10 Farmer
Lê Văn Thủy Man 19 Kinh 7/12 army
Lê Thị Hoa Women 17 Kinh 11/12 Pupil
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
3 Nguyễn Thanh
Hiếu Man 60 Kinh 5/10 Farmer Stable 22,000,000
Nguyễn Thị
Sinh Women 60 Kinh 7/10
Retirem
ent
Nguyễn Thanh
Dơng Man 35 Kinh 12/12 Officer
Nguyễn Thanh
Chơng Man 33 Kinh 12/12 Officer
4 Hoàng Văn Th-
ởng Man 55 Kinh 4/10 Farmer Stable 15,000,000
Nguyễn Thị Kỳ Women 50 Kinh 5/10 Farmer
Hoàng Văn
Chiến Man 27 Kinh 10/12 Farmer
5 Phan Văn Lang Man 46 Kinh 12/12 Farmer Stable 15,000,000
Ngô Thị Vui Women 46 Kinh 7/10 Farmer
Phan Văn Hậu Man 22 Kinh 12/12 worker
Phan Thị Lợi Women 19 Kinh 12/12 Pupil
Cam Vinh commune - Cam Xuyen district
1 Đỗ Thị Lanh Women 40 Kinh 7/10 Farmer Stable 9,000,000
Nguyễn Hoàng
Vinh Man 40 Kinh 12/12 Officer
Nguyễn Hoàng
Tân Man 16 Kinh 10/12 Pupil
Nguyễn Thị
Hằng Women 13 Kinh 7/12 Pupil
2 Phạm Văn Lang Man 32 Kinh 9/12 Farmer Stable 18,000,000
Đoàn Thị
Xuyên Women 32 Kinh 9/12 Farmer
Phạm Văn
Trung Man 10 Kinh 4/12 Pupil
Phạm Văn Tình Man 8 Kinh 2/12 Pupil
3 Nguyễn Văn
Bích Man 72 Kinh 7/10 Farmer Stable 18,000,000
Trần Thị Thu Women 70 Kinh 7/10 Farmer
Nguyễn Văn
Hùng Man 30 Kinh 12/12 Farmer
4 Vũ Văn Cận Man 52 Kinh 7/10 Farmer Stable 7,000,000
Vũ Thị Linh Women 16 Kinh 10/12 Pupil
5 Tạ Thanh Long Man 54 Kinh 7/10 Farmer Stable 24,000,000
Mai Thị Hợi Women 54 Kinh 3/10 Farmer
Tạ Văn Thịnh Man 23 Kinh 12/12 Farmer
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Tạ Thị Loan Women 21 Kinh 12/12 Farmer
6 Phạm Thị
Luyến Women 47 Kinh 7/10 Farmer Stable 16,500,000
Phạm Văn C-
ơng Man 16 Kinh 10/12 Pupil
Phạm Văn
Khánh Man 14 Kinh 7/12 Pupil
Phạm Thị
Trang Women 8 Kinh 2/12 Pupil
Ky Son commune - Ky Anh district
1 Vũ Ngọc Hải Man 36 Kinh 10/10 Farmer
5,000,000
Đỗ thị Nhị Women 31 Kinh 10/10 Farmer
Vũ Thị Ly Women 4 Kinh
2 Vũ Văn Mẫn Man 50 Kinh 7/10 Farmer
9,000,000
Phạm Thị Hờng Women 42 Kinh 7/10 Farmer
Vũ Văn Điệp Man 21 Kinh 12/12 Farmer
3 Nguyễn Thế Nh Man 37 Kinh 12/12 Farmer
8,000,000
Hoàng Thị Hồi Women 35 Kinh 12/12 Farmer
Nguyễn Thế
Khoa Man 16 Kinh HS Pupil
Nguyễn Thế
Tân Man 12 Kinh HS Pupil
Nguyễn Thị
Anh Women 2 Kinh
4 Phạm Văn Ước Man 82 Kinh 3/7 Farmer
12,600,000
Trần thị Nê Women 70 Kinh 3/7 Farmer
Phạm Văn Tạo Man 39 Kinh 10/10 Farmer
Phạm thị Đào Women 37 Kinh 10/10 Farmer
Phạm thị Thêm Women 34 Kinh 10/10 Farmer
Phạm Thị
Thơm Women 31 Kinh 10/10 Farmer
5 Nguyễn Văn
Ngà Man 34 Kinh 7/10 Farmer
11,400,000
Phạm Thị Toan Women 28 Kinh 9/12 Farmer
Nguyễn Văn
Phong Man 2 Kinh
6 Lê Ngọc Sơn Man 32 Kinh 7/10 Farmer
25,000,000
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Nguyen Thi
Thảo Women 30 Kinh 7/10 Farmer
Le Thi Phuong Women 7 Kinh 2/12 Pupil
7 Nguyễn Thị
Thoi Women 50 Kinh 10/10 Farmer
15,000,000
8 Nguyễn Đình
Oánh Man 51 Kinh 7/10 Farmer
20,000,000
Trần thị Yến Women 45 Kinh 7/10 Farmer
Nguyễn Tuấn
Anh Man 25 Kinh 9/12 Farmer
Nguyễn Đình
Tuấn Man 23 Kinh 9/12 Farmer
9 Bùi Công Liên Man 55 Kinh 10/10 Farmer
10,000,000
Nguyễn Thị Nụ Women 52 Kinh 10/10 Farmer
10 Nguyễn Văn
Vĩnh Man 50 Kinh 7/10 Farmer
25,000,000
Lơng thị Hải Women 46 Kinh 7/10 Farmer
Nguyễn Văn
Vũ Man 24 Kinh 12/12 worker
Nguyễn thị Huệ Women 14 Kinh 10/12 Pupil
Ky Trung commune - Ky Anh district
1 Lê Ngọc Tênh Man 75 Kinh 6/10 Farmer Stable
8,643,000
Nguyễn Thị Tíu Women 78 Kinh 6/10 Farmer
2 Lê Thanh Bờng Man 31 Kinh 12/12 Farmer Stable
17,689,000
Lê Thị Huế Women 27 Kinh 9/12 Farmer
Lê Trọng Hoà Man 06 Kinh 1/12
Nguyễn Thị
Huyên Women 61 Kinh 7/10 Farmer
3 Lê Quý Sứng Man 37 Kinh 10/10 Farmer Stable
6,796,000
Nguyễn Thị
Nguyệt Women 36 Kinh 10/10 Farmer
Lê Đức Anh Man 13 Kinh 8/12
Lê Minh Đức Man 06 Kinh 1/12
4 Đặng Xuân
Đình Man 62 Kinh 7/10 Farmer Stable
16,289,000
Nguyễn Thị Đệ Women 61 Kinh 6/10 Farmer
Đặng Văn Định Man 21 Kinh 12/12 Farmer
5 Nguyễn Đình Man 40 Kinh 12/12 Farmer Stable
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Huấn 10,800,000
Nguyễn Thị
Nga Women 38 Kinh 12/12 Farmer
6 Nguyễn Thị
Phả Women 45 Kinh 7/10 Farmer Stable
4,820,000
7 Nguyễn Nh
Hiền Man 49 Kinh 7/10 Farmer Stable
13,200,000
Đặng Thị Thuý Women 47 Kinh 7/10 Farmer
Nguyễn Nh ánh Man 22 Kinh 12/12
Nguyễn Nh
Sáng Man 19 Kinh 12/12
Nguyễn Nh
Lành Man 14 Kinh 9/12
8 Nguyễn Nh
Duyên Man 45 Kinh 12/12 Farmer Stable
9,700,000
Nguyễn Thị
Hiếu Women 42 Kinh 12/12 Farmer
9 Nguyễn Văn
Xuân Man 52 Kinh 7/10 Farmer
16,000,000
Nguyễn Thị Bé Women 50 Kinh 7/10 Farmer
Nguyễn Văn
Tuân Man 25 Kinh 12/12 Farmer
Nguyễn Thị
Vân Women 21 Kinh 12/12 Pupil
Nguyễn Thị
Xoan Women 15 Kinh 10/12 Pupil
10 Nguyễn Văn
Khánh Man 32 Kinh 7/10 Farmer
15,000,000
Phạm Thị The Women 30 Kinh 7/10 Farmer
Nguyễn Thị
Trang Women 10 Kinh 3/12 Pupil
Nguyễn Văn
Sơn Man 5 Kinh
11 Nguyễn Nh
Thẩm Man 48 Kinh 7/10 Farmer Stable
13,400,000
Nguyễn Thị
Thê Women 46 Kinh 7/10 Farmer
Nguyễn Thị
Hoàn Women 19 Kinh 12/12 Farmer
Nguyễn Nh
Hoan Man 13 Kinh 8/12
12 Trần Văn Vỹ Man 48 Kinh 10/10 Farmer Stable
9,800,000
Nguyễn Thị
Bên Women 46 Kinh 7/10 Farmer
Trần Thị Hà Women 20 Kinh 12/12
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
13 Nguyễn Thanh
Bình Man 55 Kinh 7/10 Farmer 23,480,000
Nguyen Hai
Quan Man 30 Kinh 12/12 Farmer
Nguyen Thi
Khuyen Women 23 Kinh 12/12 Farmer
14 Đỗ Thị Bông Women 42 Kinh 10/10 Farmer 21,000,000
Do Thi Giang Women 38 Kinh 10/10 Farmer
Do Van Phuong Man 22 Kinh 4/12 Farmer
15 Nguyễn Thị
Nhuần Women 46 Kinh 7/10 Farmer
5,400,000
Nguyễn Thị
Nhịt Women 78 Kinh Farmer
16 Nguyễn Công
Thuỳ Man 48 Kinh 7/10 Farmer
4,900,000
Nguyễn Thị
Dung Women 46 Kinh 7/10 Farmer
17 Đỗ Minh Tiến Man 47 Kinh 10/10 Farmer 9,000,000
Ngô Thị Đào Women 41 Kinh 12/12 Farmer
Đỗ Thị Hoa Women 26 Kinh 11/12 Farmer
Đỗ Thị Hồng Women 12 Kinh 9/12 Pupil
18 Đỗ Khánh Toàn Man 52 Kinh 9/10 Farmer 14,100,000
Do Thanh Son Man 25 Kinh 12/12 Farmer
Do Duy Huong Man 23 Kinh 12/12 Farmer
Do Thi Lan Women 28 Kinh 12/12 Farmer
Pham Thi Cai Women 48 Kinh 10/10 Farmer
19 Bùi Văn Đức Man 50 Kinh 7/10 Farmer Stable
11,000,000
Bùi Thị Rằm Women 48 Kinh 7/10 Farmer
Bùi Văn Đà Man 17 Kinh 11/12 Pupil
20 Phạm Đức Điệt Man 67 Kinh 5/10 Farmer
2,500,000
Bùi Thị Thợc Women 104 Kinh 3/10 Farmer
Phạm Thị Hng Women 30 Kinh 7/10 Farmer
21 Phạm Duy Tảo Man 66 Kinh 7/10 Farmer Stable
3,000,000
Nguyễn Thị
Tuyến Women 60 Kinh 7/10 Farmer
Phạm Duy
Huống Man 24 Kinh 9/12 Farmer
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
22 Ngô Thị Gái Women 55 Kinh 9/10 Farmer
9,000,000
Trần Thị Sở Women 30 Kinh 12/12 Farmer
Trần Văn
Thuận Man 28 Kinh 10/12 Farmer
Ky Hop commune - Ky Anh district
1 Vũ Văn Truỳ Man 56 Kinh 7/10 Farmer 15.000.000
Phan Thị Luyến Women 52 Kinh 7/10 Farmer 5.000.000
Vũ Văn Ninh Man 26 Kinh Farmer
2 Vũ Thị Xênh Women 54 Kinh 7/10 Farmer 6.000.000
Vũ Thị Liên Women 14 Kinh Pupil
3 Phạm Minh
Quang Man 40 Kinh 9/12 Farmer
6,500,000
Trần Thị Phơng Women 36 Kinh 9/12 Farmer
Phạm Minh
Nhật Man 14 Kinh 9/12 Pupil
Phạm Minh
Duy Man 7 Kinh 5/12 Pupil
4 Nguyễn Văn
Mời Man 45 Kinh 7/10 Farmer
6,500,000
Nguyễn Thị
Nhoa Women 43 Kinh 7/10 Farmer
Nguyễn Thị My Women 22 Kinh 4/10 Farmer
Nguyễn Văn
Quang Man 19 Kinh 12/12 Pupil
Nguyễn Thị
Linh Women 12 Kinh 6/12 Pupil
5 Nguyễn Văn Tơ Man 50 Kinh 7/10 Farmer
7,500,000
Nguyễn Thị
Liễu Women 49 Kinh 7/10 Farmer
Nguyễn Thị
Diệp Women 19 Kinh 12/12 Pupil
Nguyễn Duy
Triều Man 18 Kinh 12/12 Pupil
Nguyễn Thế T Women 11 Kinh 7/12 Pupil
6 Vũ Văn Bấc Man 32 Kinh 12/12 Farmer
6,000,000
Trần Thị Hờng Women 29 Kinh 12/12 Farmer
Vũ Văn Cờng Man 9 Kinh 4/12 Pupil
Vũ Diệu Linh Women 3 Kinh Pupil
7 Trần Văn Thiệu Man 48 Kinh 7/10 Farmer
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
5,000,000
Trần Thị Ngợi Women 48 Kinh 7/10 Farmer
2,000,000
Trần Văn Lỡ Man 24 Kinh 12/12
8 Lý Văn Chinh Man 40 Kinh 12/12 Farmer 14.000.000
Trần Thị Xuyến Women 38 Kinh 12/12 Farmer
Lý Thị Hơng Women 15 Kinh 9/12
Lý Văn Đạt Man 10 Kinh 4/12
9 Bùi Thị Hành Women 22 Kinh 7/12 Farmer
6,000,000
Phạm Văn Hải Man 24 Kinh 7/12 Farmer
Phạm Văn Khải Man 22 Kinh 7/12 Farmer
10 Nguyễn Văn
Du Man 42 Kinh 12/12 Farmer
6,500,000
Phạm Thị Lành Women 39 Kinh 12/12 Farmer
Nguyễn Thị
Diệp Women 17 Kinh 11/12 Pupil
Nguyễn Văn
Dần Man 15 Kinh 9/12 Pupil
11 Đặng Văn
Nghiã Man 50 Kinh 12/12 Farmer Stable
4,000,000
Nguyễn Thị
Huê Women 49 Kinh 7/10 Farmer
Đặng Hồng
Luân Man 26 Kinh 12/12 Farmer
Đặng Thị Lý Women 23 Kinh 12/12 Farmer
12 Trần Văn Ng Man 69 Kinh 7/10 Farmer Stable
14,000,000
Trần Thị Phạm Women 67 Kinh 7/10 Farmer
Trần Văn Bẩy Man 35 Kinh 7/10 Farmer
Nguyễn Thị
Nga Women 28 Kinh 8/12 Farmer
Trần Thị Ngân Women 7 Kinh 1/12 Pupil
Trần Đức Dơng Man 4 Kinh
13 Trần Văn Ng Man 68 Kinh 7/10 Farmer Stable
15,000,000
Trần Thị Phạm Women 67 Kinh 7/10 Farmer
Trần Văn Bẩy Man 35 Kinh 7/10 Farmer
Nguyễn Thị
Nga Women 28 Kinh 8/12 Farmer
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Trần Thị Ngân Women 7 Kinh 1/12 Pupil
Trần Đức Lơng Man 4 Kinh
14 Nguyễn Văn L-
ợng Man 78 Kinh 4/10 Farmer
3,600,000
Phạm Thị Sái Women 78 Kinh 4/10 Farmer
15 Phạm Văn Hội Man 58 Kinh 7/10 Farmer
4,600,000
Nguyễn Thị
Tâm Women 58 Kinh 7/10 Farmer
16 Vũ Văn Trọng Man 32 Kinh 7/10 Farmer
4,300,000
Phạm Thị Lan Women 29 Kinh 7/10 Farmer
17 Đặng Văn
Xuyến Man 37 Kinh 7/10 Farmer Stable
5,000,000
Nguyễn Thị
Bân Women 35 Kinh 7/10 Farmer
Đặng Hồng Sơn Man 11 Kinh 5/12 Pupil
18 Đặng Văn Đinh Man 44 Kinh 7/10 Farmer Stable
10,000,000
Đặng Thị Nga Women 41 Kinh 7/10 Farmer
Đặng Thị Dung Women 22 Kinh 7/12 worker
Đặng Văn Năm Man 17 Kinh 11/12 Pupil
19 Đặng Văn Hoán Man 45 Kinh 7/10 Farmer Stable
12,000,000
Trần Thị Minh Women 42 Kinh 7/10 Farmer
Đặng Thị Thuỷ Women 17 Kinh 10/12 Pupil
Đặng Văn Huy Man 15 Kinh 8/12 Pupil
20 Phạm Thị Thu Women 50 Kinh 7/10 Farmer Stable
7,000,000
Phạm Thị Hơng Women 23 Kinh 9/12 worker
Phạm Đức
Long Man 20 Kinh 12/12 Pupil
21 Vũ Văn Bôn Man 33 Kinh 9/10 Farmer Stable
8,000,000
Phạm Thị Mơ Women 25 Kinh 9/12 Farmer
Vũ Thị ánh Women 5 Kinh
Vũ Thị Bích Women 3 Kinh
22 Phạm Văn Mân Man 40 Kinh 7/10 Farmer Stable
9,500,000
Trần Thị Huề Women 36 Kinh 7/10 Farmer
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Phạm Thị Oanh Women 18 Kinh 11/12 Pupil
Phạm Thị Yến Women 15 Kinh 9/12 Pupil
Phạm Thị
Chung Women 6 Kinh
23 Trần Văn ánh Man 41 Kinh 7/10 Farmer Stable
8,000,000
Nguyễn Thị Bé Women 39 Kinh 7/10 worker
Trần Thị
Nguyệt Women 20 Kinh 12/12 Pupil
Trần Đức Anh Man 16 Kinh 10/12 Pupil
24 Trần Văn Luân Man 42 Kinh 10/10 Farmer Stable
20,000,000
Trần Văn Dân Man 65 Kinh 7/10 Retirem
ent
Trần Thị Nhung Women 63 Kinh 7/10 Farmer
Trần Văn ái Man 10 Kinh 4/12 student
Ky Thuong commune - Ky Anh district
1 Trần Thị Vinh Women 39 Kinh 7/10 Farmer Stable 13,500,000
Nguyễn Văn
Định Man 42 Kinh 10/10
Retirem
ent
Nguyễn Văn
Sáng Man 18 Kinh 12/12 Pupil
Nguyễn Thị
Hoa Women 16 Kinh 9/12 Pupil
2 Trần Văn Vận Man 49 Kinh 6/10 Farmer Stable 14,000,000
Lê Thị Phơng Women 46 Kinh 7/10 Farmer
Trần Văn Huê Man 24 Kinh 7/12 Farmer
Trần Thị Hợi Women 22 Kinh 10/12 Farmer
Ky Tay commune - Ky Anh district
1 Vũ Minh Sơn Man 56 Kinh 7/10 Farmer Stable
6,500,000
Nguyễn Thị
Nha Women 49 Kinh 7/10 Farmer
Vũ Minh T Man 24 Kinh 12/12 worker
2 Trần Thị Tâm Women 45 Kinh 12/12 Farmer Stable
6,000,000
Vũ Huyền
Trang Women 21 Kinh 12/12 Pupil
Vũ Minh Tuấn Man 18 Kinh 12/12 Pupil
3 Nguyễn Văn
Thê Man 40 Kinh 12/12 Farmer Stable
8,500,000
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Phạm Thị Vẻ Women 37 Kinh 7/10 Farmer
Nguyễn Trung
Thành Man 12 Kinh 6/12 Pupil
Nguyễn Thị
Thuý Women 9 Kinh 2/12 Pupil
4 Nguyễn Bé
Mỡi Man 70 Kinh 2/10 Farmer Stable
6,000,000
Trịnh Thị Bùng Women 66 Kinh 3/10 Farmer
5 Phạm Thị Thiều Women 40 Kinh 10/10 Farmer Stable
6,000,000
6 Trịnh Công Tr-
ờng Man 40 Kinh 10/10 Farmer Stable
6,500,000
Nguyễn Thị
Tâm Women 35 Kinh 7/10 Farmer
7 Trần văn Bình Man 38 Kinh 7/12 Farmer Stable
20,500,000
Nguyễn thị
Tiến Women 35 Kinh 7/12 Farmer
Trần văn Nhật Man 16 Kinh 11/12 Pupil
Nguyễn Thị
Tâm Women 13 Kinh 8/12 Pupil
8 Phạm Văn
Thống Man 52 Kinh 7/10 Farmer Stable
18,000,000
Nguyễn Thị Cải Women 47 Kinh 7/10 Farmer
Phạm Văn
Chiến Man 26 Kinh 12/12 worker
9 Đỗ Đức Hiệp Man 46 Kinh 10/10 Farmer Stable
22,000,000
Nguyễn Thị
Hợi Women 40 Kinh 9/10 Farmer
Đỗ Văn Đồng Man 18 Kinh 12/12 Farmer
Đỗ Văn Đờng Man 16 Kinh 9/12 Pupil
10 Nguyễn Bá
Thanh Man 48 Kinh 7/10 Farmer Stable
6,500,000
Bùi Thị Tình Women 49 Kinh 10/10 Teacher
Nguyễn Thị
Huyền Women 12 Kinh 7/12 Pupil
Nguyễn Bá Huy Man 10 Kinh 5/12 Pupil
11 Đinh Thị Huệ Women 50 Kinh 7/10 Farmer Stable
6,000,000
Trịnh Xuân
Quý Man 52 Kinh 7/10 Farmer
Trịnh Thị Đào Women 25 Kinh 7/10 Farmer
Trịnh Xuân Man 18 Kinh 12/12 Farmer
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Nam
Trịnh Xuân Đài Man 14 Kinh 7/12 Pupil
12 Bùi Thị Nhài Women 37 Kinh 7/10 Farmer Stable
6,500,000
Nguyễn Đình
Dơng Man 39 Kinh 7/10 Farmer
Nguyễn Đình
Long Man 16 Kinh 10/12 Pupil
Nguyễn Nh Lan Women 14 Kinh 8/12 Pupil
Nguyễn Kim
Khánh Women 12 Kinh 6/12 Pupil
13 Đinh Văn Lợi Man 37 Kinh 7/10 Farmer Stable 8,000,000
Nguyễn Thị
Thơm Women 34 Kinh 7/10 Farmer
Đinh Văn Hải Man 14 Kinh 7/12 Pupil
14 Hoàng Văn
Chiến Man 57 Kinh Farmer Stable 12,000,000
Nguyễn Thị
Nga Women 55 Kinh Farmer
Hoàng Văn
Minh Women 24 Kinh 9/12 Farmer
15 Lý Văn Lâm Man 58 Kinh Farmer Stable 7,000,000
Nguyễn Thị
Lan Anh Women 49 Kinh 7/10 Farmer
Lý Văn Đạo Man 28 Kinh 9/12 Farmer
Lý Thị Hiền Women 26 Kinh 9/12 Farmer
16 Nguyễn Văn
Huấn Man 44 Kinh 7/10 Farmer Stable
16,000,000
Nguyễn Thị
Lan Women 39 Kinh 7/10
Craftsm
an
Nguyễn Thị H-
ơng Women 17 Kinh 11/12 Pupil
Nguyễn Thị
Linh Women 12 Kinh 6/12 Pupil
17 Phạm Văn Mai Man 64 Kinh 7/10 Farmer Stable
8,000,000
Nguyễn Thị
Lịch Women 60 Kinh 5/10 Farmer
18 Bùi Văn Thoa Man 48 Kinh 7/10 Farmer Stable
21,000,000
Nguyễn Thị Gái Women 47 Kinh 7/10 Craftsm
an
Bùi Thị Trang Women 20 Kinh 12/12 Pupil
Bùi Văn Tuấn Women 17 Kinh 11/12 Pupil
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
19 Trần Văn Then Man 39 Kinh 7/10 Farmer Stable
14,300,000
Trần Thị Ngoan Women 42 Kinh 7/10 Farmer
Trần Văn Chiến Man 10 Kinh 3/12 Pupil
Trần Văn
Thắng Women 8 Kinh 2/12 Pupil
20 Trần Văn Hiệu Man 34 Kinh 9/10 Farmer Stable
23,200,000
Trần Thị Miến Women 30 Kinh 9/10 Farmer
Trần Thị Nhung Women 9 Kinh 3/12 Pupil
21 Phạm Văn
Thuỷ Man 40 Kinh 7/10 Farmer Stable
11,000,000
Phạm Thị Lý Women 38 Kinh 6/10 Farmer
Phạm Thị Lan Women 14 Kinh 8/12 Pupil
Pham Văn
Chung Man 12 Kinh 6/12 Pupil
Ky Nam commune - Ky Anh district
1 Hoàng Văn Lý Man 44 Kinh 10/10 Farmer Stable 19,000,000
Nguyễn Thị Vi Women 40 Kinh 5/10 Farmer
Hoàng văn Tú Man 19 Kinh 12/12 Pupil
Hoàng Thị Dao Women 17 Kinh 11/12 Pupil
2 Phùng Văn
Chung Man 42 Kinh 7/10 Farmer Stable 20,000,000
Nguyễn Thị
Nghĩa Women 40 Kinh 4/10 Farmer
Phùng Văn Hng Man 16 Kinh 10/12 Pupil
Phùng Thị Thao Women 14 Kinh 8/12 Pupil
3 Hoàng Văn
Chính Man 36 Kinh 5/12 Farmer Stable 10,000,000
Vũ Thị Chinh Women 33 Kinh 9/12 Farmer
Hoàng Thị H-
ơng Women 7 Kinh 1/12 Pupil
Hoàng Hải Anh Man 5 Kinh Children
4 Triệu Văn Lang Man 47 Kinh 5/10 Farmer Stable 18,000,000
Nguyễn Thị
Vân Women 46 Kinh 5/10 Farmer
Triệu Văn Doãn Man 20 Kinh 12/12 Student
Triệu Thị Lơng Women 17 Kinh 11/12 Pupil
Ky Lam commune - Ky Anh district
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
1 Nguyễn Văn
Huân Man 55 Kinh 10/10 Farmer Stable 25,000,000
Hồ Thị Lai Women 54 Kinh 10/10 Officer
Nguyễn Văn
Nam Man 24 Kinh 12/12 Officer
Nguyễn Thị
Giang Women 20 Kinh 12/12 Student
2 Nguyễn Xuân
Diệu Man 50 Kinh 7/10 Farmer Stable 22,000,000
Trần Thị Liễu Women 46 Kinh 7/10 Farmer
Nguyễn Thị
Bình Women 22 Kinh 12/12 Pupil
Nguyễn Xuân
Cơng Man 20 Kinh 12/12 Pupil
3 Triệu Văn Thủy Man 42 Kinh 7/10 Farmer Stable 19,000,000
Trần Thị Lý Women 40 Kinh 5/10 Farmer
Triệu Văn Khải Man 16 Kinh 9/12 Farmer
4 Đỗ Trọng Hinh Man 40 Kinh 7/10 Farmer Stable 18,000,000
Nguyễn Thị Tý Women 38 Kinh 5/10 Farmer
Đỗ Trọng Tr-
ờng Man 17 Kinh 11/12 Pupil
Đỗ Thị Thu Man 15 Kinh 9/12 Pupil
Ky Xuan commune - Ky Anh district
1 Nguyễn Văn
Thởng Man 53 Kinh 7/10 Farmer Stable
12,000,000
Nguyễn Thị
Lan Women 50 Kinh 7/10 Farmer
Nguyễn Văn
Trờng Man 28 Kinh 10/12
2 Nguyễn Văn
Kỷ Man 48 Kinh 7/10 Farmer Stable
14,000,000
Phạm Thị
Thơm Women 46 Kinh 7/10 Farmer
Nguyến Văn
Bích Man 22 Kinh 12/12
Nguyễn Thị
Hoa Women 19 Kinh 12/12 student
3 Phạm Văn
Đặng Man 32 Kinh 12/12 Farmer Stable
16,000,000
Phạm Thị Gái Women 28 Kinh 7/12 Farmer
Phạm Văn Đạt Man 6 Kinh 1/12 Pupil
thach ha commune - ha tinh City
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
1 Phạm Văn Đoài Man 68 Kinh 7/10 Farmer Stable
15,000,000
Bùi Thị Hà Women 66 Kinh 6/10 Farmer
Phạm Thị Đông Women 38 Kinh 7/10 Farmer
2 Nguyễn Văn
Mấm Man 56 Kinh 7/10 Farmer Stable
16,000,000
Nguyễn Thị
Duyên Women 52 Kinh 7/10 Farmer
Nguyễn Thị
Thứ Women 22 Kinh 12/12 Farmer
Nguyễn Thị
Bốn Women 17 Kinh 12/12 Farmer
3 Lu Văn Núi Man 52 Kinh 7/10 Farmer Stable 13,000,000
Phạm Thị Rần Women 46 Kinh 7/10 Farmer
Lu Văn Du Man 23 Kinh 12/12 Farmer
4 Phạm Hữu
Ngọc Man 53 Kinh 7/10 Farmer Stable 12,000,000
Phạm Thị Mạc Women 52 Kinh 7/10 Farmer
Phạm Hữu Tr-
ởng Man 19 Kinh 12/12 Farmer
thach Hung commune - ha tinh City
1 Trần Văn Đệ Man 60 Kinh 6/10 Farmer Stable
5,200,000
Nguyễn Thị
Bống Women 56 Kinh 7/10 Farmer
2 Nguyễn Thị
Trạch Women 70 Kinh 4/10 Farmer Stable
4,800,000
Nguyễn Thị
Tần Women 40 Kinh 7/10 Farmer
3 Nguyễn Văn
Tiến Man 43 Kinh 7/10 Farmer Stable
7,200,000
Bùi Thị Viên Women 41 Kinh 7/10 Farmer
4 Nguyễn Huy
Thắng Man 61 Kinh 7/7 Farmer Stable 16,000,000
Phạm Thị Nữ Women 58 Kinh 7/7 Farmer
Nguyễn Huy V-
ợng Man 31 Kinh 12/12 Farmer
Nguyễn Huy
ánh Man 25 Kinh 12/12 Farmer
5 Hoàng Văn Suy Man 40 Kinh 10/10 Farmer Stable 12,000,000
Phạm Thị Mời Women 38 Kinh 7/10 Farmer
Hoàng Văn
Quyết Man 20 Kinh 12/12 Farmer
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Hoàng Thị Yến Women 17 Kinh 12/12 Farmer
Xuan Hai commune - Nghi Xuan district
1 Phạm Bá Dự Man 56 Kinh 7/12 Farmer Stable 13,000,000
Đào Thị Thoa Women 52 Kinh 7/12 Farmer
Phạm Bá Hậu Man 26 Kinh 12/12 Farmer
Phạm Thị Th-
ơng Women 24 Kinh 12/12 Farmer
2 Nguyễn Văn
Nhơn Man 45 Kinh 7/10 Farmer Stable
5,200,000
Nguyễn Thị
Thoa Women 41 Kinh 7/10 Farmer Stable
Nguyễn Thị
Oánh Women 20 Kinh 12/12 Student
3 Trần Văn Quân Man 40 Kinh 10/12 Farmer Stable
12,200,000
Trần Thị Lệ Women 37 Kinh 10/12 Farmer
4 Trần Thị Bảo Women 75 Kinh 4/10 Farmer Stable
9,200,000
Nguyễn Văn
Thành Man 45 Kinh 10/12 Farmer
5 Nguyễn Đức
Long Man 42 Kinh 12/12 Farmer Stable 15,000,000
Hoàng Thị Hiền Women 40 Kinh 9/12 Farmer
Nguyễn Thị
Lành Women 17 Kinh 11/12 Pupil
Nguyễn Thị
Lan Women 14 Kinh 8/12 Pupil
6 Nguyễn Đức
Vịnh Man 48 Kinh 12/12 Officer Stable 12,000,000
Lê Thị Hoa Women 44 Kinh 9/12 Farmer
Nguyễn Thị
Sen Women 20 Kinh 12/12 Farmer
Nguyễn Đức
Việt Man 17 Kinh 12/12 Farmer
7 Phạm Thị Mai Women 57 Kinh 7/12 Farmer Stable 12,000,000
Phạm Văn Hào Man 31 Kinh 9/12 Farmer
Phạm Thị Yến Women 24 Kinh 12/12 Farmer
8 Trần Văn
Thành Man 39 Kinh 10/12 Farmer Stable
9,200,000
Lê Thị Gấm Women 35 Kinh 10/12 Farmer
Trần Văn
Tuynh Man 34 Kinh 10/12 Farmer
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Trần Văn Tuân Man 31 Kinh 10/12 Farmer
Hoàng Thị Yến
Nhi Women 24 Kinh 12/12 Farmer
Trần Thị Phợng Women 20 Kinh 12/12 Farmer
9 Trần Văn Cơn Man 81 Kinh 3/10 Farmer Stable 4.700.000
Nguyễn Thị
Lụa Women 78 Kinh 3/10 Farmer
Nguyễn Thị
Lan Women 63 Kinh 3/10 Farmer
Trần Văn Chính Man 28 Kinh 12/12 Farmer
Nguyễn Thị Ph-
ơng Women 23 Kinh 12/12 Farmer
Xuan Giang commune - Nghi Xuan district
1
Hong
Thin
h
Haml
et
Hồ Văn Ngọc Man 53 Kinh 10/10 Farmer Stable 41,000,000
Nguyễn Thị
Thuỷ Women 52 Kinh 10/10 Farmer
Hồ Văn Hng Man 28 Kinh 12/12 worker
Hồ Văn Hoà Man 25 Kinh 12/12
Hồ Thị Lam Women 19 Kinh 12/12
2 Nguyễn Văn
Sáng Man 45 Kinh 7/10 Farmer Stable
10,800,000
Nguyễn Thị
Ngoan Women 45 Kinh 7/10 Farmer
Nguyễn Thị
Nhuần Women 20 Kinh 12/12 Student
3 Trần Đình Tâm Man 50 Kinh 10/10 Farmer Stable 12,000,000
Phạm Văn
Tuyết Women 43 Kinh 10/10 Farmer
Trần Thị Thuý
Hơng Women 20 Kinh 12/12 Student
Trần Thanh
Bình Man 16 Kinh 10/12 Pupil
4 Nguyễn Thị
Đàn Women 44 Kinh 7/12 Farmer Stable 6,000,000
Bùi Thị Thanh
Hiền Women 16 Kinh 10/12 Pupil
5 Trần Văn Cân Man 75 Kinh 4/10 Farmer Stable 9,000,000
Vũ Thị Thảo Women 74 Kinh 4/10 Farmer
Trần Thị
Nguyệt Women 50 Kinh 7/10 Farmer
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Trần Văn
Nguyên Man 24 Kinh 7/10 worker
6 Trần Thị Côi Women 78 Kinh 3/10 Farmer Stable
8,000,000
Trần Thị Thơ Women 52 Kinh 7/10 Farmer
Trần Thị Liễu Women 44 Kinh 7/10 Farmer
7 Trần Văn Ngân Man 72 Kinh 10/10 Retirem
ent Stable
10,900,000
Trịnh Thị Nhạn Women 76 Kinh 7/10 Farmer
Trần Thị Ngọc Women 39 Kinh 7/10 Farmer
8 Vũ Văn Ly Man 50 Kinh 7/10 Farmer Stable
14,400,000
Trần Thị Lanh Women 49 Kinh 10/10 Farmer
Vũ Vắn Công Man 27 Kinh 9/12 Farmer
9 Nguyễn Văn
Thuần Man 31 Kinh 7/10 Farmer Stable 12,000,000
Phạm Thị Dung Women 25 Kinh 7/10 Farmer
Nguyễn Thị
Quỳnh Women 4 Kinh
10 Nguyễn Văn
Cát Man 52 Kinh 6/10 Farmer Stable 16,000,000
Đặng Thị Luân Women 45 Kinh 7/10 Farmer
Nguyễn Văn
Ninh Man 20 Kinh 12/12 Student
Yen Ho commune - Duc tho district
1 Haml
et 5
Nguyễn Văn
Tân Man 25 Kinh 12/12 Farmer Stable 25,000,000
Trần Thị Long Women 21 Kinh 12/12 Farmer
Nguyễn Thành
Duy Man 2 Kinh
2 Nguyễn Thị
Lớn Women 83 Kinh 4/10 Farmer Stable 10,000,000
Phạm Thị
Chiện Women 50 Kinh 7/10 Farmer
Phạm Thị Bát Women 47 Kinh 7/10 Farmer
3 Vũ Văn Trăm Man 57 Kinh 10/10 Farmer Stable
11,000,000
Trần Thị Nhàn Women 54 Kinh 7/10 Farmer
Vũ Văn Kiên Man 24 Kinh 9/12 Farmer
Trần Thị Huyền N 19 Kinh 12/12 Farmer
4 Trần Văn Thụ Man 57 Kinh 7/10 Farmer Stable
14,000,000
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Vũ Thị Ngọ Women 55 Kinh 9/10 Farmer
Trần Văn Đức Man 28 Kinh 9/12 Farmer
Trần Văn Điệp Man 25 Kinh 9/12 Farmer
Trần Văn Trịnh Man 21 Kinh 9/12 Farmer
5 Vũ Văn Bình Man 56 Kinh 7/10 Farmer Stable
8,000,000
Phạm Thị Trừ Women 54 Kinh 7/10 Farmer
6 Phạm Hữu Ngô Man 40 Kinh 10/12 Farmer Stable 11,800,000
Nguyễn Thị
Thắm Women 39 Kinh 10/12 Farmer
Phạm Thị Thuý Women 19 Kinh 12/12 Student
Phạm Thị
Trang Women 5 Kinh
7 Vũ Đình Thơ Man 60 Kinh 7/10 Farmer Stable 6,000,000
Trần Thị Thanh Women 59 Kinh 7/10 Farmer
Vũ Đình Thắng Man 24 Kinh 12/12 Farmer
8 Vũ Viết Bái Man 42 Kinh 10/12 Farmer Stable 6,000,000
Vũ Thị Lừng Women 42 Kinh 10/12 Farmer
Vũ Viết Huy Man 15 Kinh 9/12 Farmer
Duc thinh commune - Duc tho district
1
Do
Trai
Haml
et
Nguyễn Đình
Sắt Man 42 Kinh 12/12 Farmer Stable 52,000,000
Nguyễn Thị
Trúc Women 39 Kinh 11/12 Farmer
Nguyễn Thị
Oanh Women 17 Kinh 11/12 Pupil
Nguyễn Đình
Hiếu Man 14 Kinh 8/12 Pupil
Nguyễn Thị
Thanh Thảo Women 9 Kinh 3/12 Pupil
2 Vũ Thị Phu Women 46 Kinh 7/10 Farmer Stable 18,000,000
Nguyễn Sỹ
Long Man 50 Kinh 10/10 Farmer
Nguyễn Sỹ
Hiếu Man 25 Kinh 7/12 Farmer
Nguyễn Sỹ
Toản Man 23 Kinh 12/12 worker
Trung Le commune - Duc tho district
1 Haml Phạm Đức Man 52 Kinh 7/10 Farmer Stable 32,000,000
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
et 1 Toàn
Trần Thọ Oanh Women 50 Kinh 7/10 Farmer
Phạm Tú Tài Man 27 Kinh 12/12 Pupil
Phạm thị Hơng Women 23 Kinh 12/12 Student
2 Trần Duy
Thắng Man 56 Kinh 7/10 Farmer Stable 14,000,000
Nguyễn Thị Sai Women 55 Kinh 5/10 Farmer
Trần Duy
Thông Man 21 Kinh 12/12 Student
Trần Văn Việt Man 25 Kinh 12/12 worker
3 Nguyễn Văn Tú Man 55 Kinh 3/10 Farmer Stable 16,000,000
Đặng Thị Hoa Women 55 Kinh 3/10 Farmer
Nguyễn Thị
Dung Women 19 Kinh 12/12 Student
Nguyễn Thị La Women 17 Kinh 10/12 Pupil
4 Trần Văn Minh Man 48 Kinh 7/10 Farmer Stable 17,000,000
Lê Thị Mùi Women 45 Kinh 7/10 Farmer
Trần Văn An Man 22 Kinh 7/12 worker
Trần Thị Ly Women 20 Kinh 12/12 Student
Bui xa commune - Duc tho district
1 Đào Văn Quang Man 33 Kinh 7/10 Farmer Stable 11,000,000
Trần Thị Bích Women 30 Kinh 9/12 Farmer
Đào Văn Anh Man 10 Kinh 4/12 Pupil
Đào Thị Hiền Women 6 Kinh 1/12 Pupil
2 Phạm Văn
Phong Man 48 Kinh 7/10 Farmer Stable 21,000,000
Le Thi Hai Women 44 Kinh 7/10 Farmer
Pham Van
Dung Man 23 Kinh 7/12 Farmer
Pham Thi
Nhung Women 21 Kinh 12/12 Farmer
3 Đào Văn Quang Man 33 Kinh 7/10 Farmer Stable 11,000,000
Tran Thi Bich Women 30 Kinh 9/12 Farmer
Dao Van Anh Man 10 Kinh 4/12 Pupil
Dao Thi Hien Women 6 Kinh 1/12 Pupil
4 Trần Văn Cờng Man 46 Kinh 4/10 Farmer Stable 10,000,000
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Pham Thi Hai Women 46 Kinh 5/10 Farmer
Tran Van Thinh Man 17 Kinh 9/12 Pupil
Tran Thi
Phuong Women 14 Kinh 6/12 Pupil
Duc Thuy commune - Duc tho district
1 Phạm Văn
Phong Man 48 Kinh 7/10 Farmer Stable 21,000,000
Lê Thị Hải Women 44 Kinh 7/10 Farmer
Phạm Văn
Dũng Man 23 Kinh 7/12 Farmer
Phạm Thị
Nhung Women 21 Kinh 12/12 Farmer
2 Nguyễn Văn
Sìn Man 46 Kinh 7/10 Farmer Stable 13,000,000
Nguyen Thi
Tham Women 45 Kinh 7/10 Farmer
Nguyen Van
Manh Man 16 Kinh 9/12 Pupil
Nguyen Van
Ho Man 14 Kinh 7/12 Pupil
Nguyen Van
Sinh Women 11 Kinh 4/12 Pupil
3 Nguyễn Văn
Nông Man 33 Kinh 9/12 Farmer Stable 11,000,000
Le Thi Huan Women 32 Kinh 7/12 worker
Nguyen Van
Bao Man 10 Kinh 4/12 Pupil
Nguyen Thi
Loan Women 8 Kinh 2/12 Pupil
4 Trần Duy
Thắng Man 56 Kinh 7/10 Farmer Stable 14,000,000
Nguyen Thi Sai Women 55 Kinh 5/10 Farmer
Tran Duy
Thong Man 21 Kinh 12/12 Farmer
Tran Van Viet Man 25 Kinh 12/12 Farmer
Duc Long commune - Duc tho district
1 Nguyễn Nam
Thái Man 48 Kinh 7/10 Farmer Stable 15,000,000
Nguyễn Thị
Hồng Women 45 Kinh 2/10 Farmer
Nguyễn Nam
Đức Man 28 Kinh 9/12 Farmer
2 Trần Văn Ph-
ơng Man 40 Kinh 10/10 Farmer Stable 22,000,000
Nguyễn Thị Women 37 Kinh 7/12 Farmer
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Thủy
Trần Văn Phúc Man 15 Kinh 9/12 Pupil
Trần Thị Thúy Women 13 Kinh 7/12 Pupil
3 Phạm Văn Việt Man 37 Kinh 7/12 Farmer Stable 21,000,000
Lê Thị Lan Women 33 Kinh 9/12 Farmer
Phạm Văn
Đông Man 12 Kinh 6/12 Pupil
Phạm Thị An Women 8 Kinh 2/12 Pupil
4 Đào Phúc Văn Man 49 Kinh 12/12 Farmer Stable 20,000,000
Lê Thị Minh Women 47 Kinh 10/10 Farmer
Đào Phúc Bình Man 20 Kinh 12/12 Pupil
Đào Thị Huyền Women 17 Kinh 11/12 Pupil
5 Hoàng Văn
Thông Man 46 Kinh 9/12 Farmer Stable 22,000,000
Trần Thị Lan Women 42 Kinh 5/10 Farmer
Hoàng Văn
Tuấn Man 20 Kinh 12/12 Pupil
Hoàng Thị Bình Women 14 Kinh 8/12 Pupil
Thai Yen commune - Duc tho district
1 Haml
et 10
Nguyễn Văn
Vinh Man 51 Kinh 10/10 Farmer Stable 32,000,000
Hoàng Thị
Hồng Women 47 Kinh 10/10 Farmer
Nguyễn Tuấn
Anh Man 21 Kinh 12/12 Student
Nguyễn Thị
Hoa Women 18 Kinh 12/12 Pupil
2 Trần Văn Cờng Man 46 Kinh 4/10 Farmer Stable 10,000,000
Phạm Thị Hải Women 46 Kinh 5/10 Farmer
Trần Văn Thịnh Man 17 Kinh 9/12 Pupil
Trần Thị Phơng Women 14 Kinh 6/12 Pupil
3 Nguyễn Văn
Sính Man 46 Kinh 7/10 Farmer Stable 13,000,000
Nguyễn Thị
Thắm Women 45 Kinh 7/10 Farmer
Nguyễn Văn
Mạnh Man 16 Kinh 10/12 Pupil
Nguyễn Văn
Hai Man 14 Kinh 8/12 Pupil
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Nguyễn Thị
Sinh Women 11 Kinh 4/12 Pupil
4 Nguyễn Văn
Nông Man 33 Kinh 9/12 Farmer Stable 11,000,000
Lê Thị Huân Women 32 Kinh 7/12 worker
Nguyễn Văn
Bảo Man 10 Kinh 4/12 Pupil
Nguyễn Thị
Loan Women 8 Kinh 3/12 Pupil
Ho Do commune - Loc Ha district
1
Xuan
Dong
Haml
et
Nguyễn Đình
Chú Man 51 Kinh 7/10 Farmer Stable 28,000,000
Phan Thị Hoa Women 46 Kinh 7/10 Farmer
Nguyễn Thị
Yến Women 23 Kinh 12/12 Student
Nguyễn Văn H-
ng Man 17 Kinh 11/12 Pupil
2 Nguyễn Văn
Nghĩa Man 45 Kinh 10/10 Farmer Stable 15,000,000
Nguyen Thi
Nga Women 40 Kinh 10/10 Farmer
Nguyen Thi
Yen Women 19 Kinh 12/12 Pupil
Nguyen Van
Phuc Man 17 Kinh 11/12 Pupil
3 Phạm Văn
Tùng Man 40 Kinh 7/10 Farmer Stable 14,000,000
Nguyen Thi
Loan Women 38 Kinh 7/10 Farmer
Pham Van Ba Man 17 Kinh 10/12 Pupil
Pham Van
Duyet Man 15 Kinh 8/12 Pupil
4 Bùi Văn Quân Man 36 Kinh 1/12 Farmer Stable 11,000,000
Khong Thi Lan Women 35 Kinh 3/12 Farmer
Bui Van Nghi Man 13 Kinh 6/12 Pupil
Bui Van Khu Man 16 Kinh 9/12 Pupil
5 Nguyễn Văn H-
ng Man 47 Kinh 7/10 Farmer Stable 15,000,000
Nguyen Thi
Van Women 45 Kinh 7/12 Pupil
Nguyen Van
An Man 18 Kinh 7/12 Pupil
Nguyen Van Ba Man 17 Kinh 7/12 Pupil
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Nguyen Van
Minh Man 15 Kinh 8/12 Pupil
6 Mã Dình Bốn Man 45 Kinh 7/10 Farmer Stable 15,000,000
Nguyen Thi
Hien Women 40 Kinh 5/10 Farmer
Ma Dinh Dong Man 18 Kinh 7/12 Farmer
Ma Thi Hong Women 16 Kinh 9/12 Pupil
7 Nguyễn Văn
Thái Man 44 Kinh 7/10 Farmer Stable 16,000,000
Nguyen Thi Hai Women 40 Kinh 12/12 Farmer
Nguyen Van
Hung Man 18 Kinh 9/12 Pupil
Nguyen Thi
Thuong Women 16 Kinh 12/12 Pupil
8 Nguyễn Văn
Hùng Man 42 Kinh 7/10 Farmer Stable 19,000,000
Le Thi Hoai Man 40 Kinh 7/10 Farmer
Nguyen Thi
Yen Women 18 Kinh 7/12 Farmer
Nguyen Thi
Loan Women 17 Kinh 11/12 Pupil
9 Nguyễn Thế
Hậu Man 50 Kinh 7/10 Farmer Stable 18,000,000
Nguyen Thi Hai Women 46 Kinh 7/10 Farmer
Nguyen The
Noi Man 22 Kinh 7/12 Farmer
Nguyen The
Han Man 20 Kinh 12/12 worker
10 Bùi Văn Hậu Man 45 Kinh 7/10 Farmer Stable 16,000,000
Nguyen Thi
Vui Women 44 Kinh 7/12 Farmer
Bui Van Vinh Man 16 Kinh 9/12 Pupil
Bui Thi Sang Women 14 Kinh 6/12 Pupil
11 Phạm Thị
Chanh Women 38 Kinh 7/10 Farmer Stable 17,000,000
Dang Ba Hoang Man 40 Kinh 10/10 Farmer
Dang Thi Ly Women 16 Kinh 9/12 Pupil
Dang Ba Dai Man 14 Kinh 6/12 Pupil
12 Nguyễn Văn
Chín Man 47 Kinh 7/10 Farmer Stable 20,000,000
Hoang Thi
Huong Women 44 Kinh 7/10 Farmer
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Nguyen Van
Thuy Man 18 Kinh 12/12 Pupil
Nguyen Thi
Tuyet Women 15 Kinh 9/12 Pupil
Thach My commune - Loc Ha district
1 Đặng Văn H-
ơng Man 50 Kinh 4/10 Farmer Stable 15,000,000
Nguyen Thi
Hoa Women 50 Kinh 5/10 Farmer
Dang Van Ung Man 27 Kinh 8/12 Farmer
Dang Thi Thuy Women 19 Kinh 12/12 Student
Dang Van Hien Man 83 Kinh 2/10 Farmer
2 Nguyễn Văn Tứ Man 55 Kinh 3/10 Farmer Stable 16,000,000
Dang Thi Hoa Women 55 Kinh 3/10 Farmer
Nguyen Thi
Dung Women 19 Kinh 12/12 Farmer
Nguyen Thi La Women 17 Kinh 10/12 Farmer
3 Trần Văn Minh Man 48 Kinh 7/10 Farmer Stable 17,000,000
Le Thi Mui Women 45 Kinh 7/10 Farmer
Tran Van An Man 22 Kinh 7/12 Farmer
Tran Thi Ly Women 20 Kinh 12/12 worker
Mai Phu commune - Loc Ha district
1
Son
Phu
Ham
Let
Nguyễn Văn
Oánh Man 27 Kinh 12/12 Farmer Stable 34,000,000
Phạm Thị Hoè Women 23 Kinh 12/12 Farmer
Nguyễn Văn
Hùng Man 2 Kinh
2 Hà Đức Nghi Man 49 Kinh 5/10 Farmer Stable 20,000,000
Nguyen Thi
Thanh Women 45 Kinh 2/10 Farmer
Ha Duc Trung Man 17 Kinh 7/12 Farmer
Ha Thi Thao Women 15 Kinh 8/12 Pupil
3 Lê Đức Khuyên Man 47 Kinh 9/12 Farmer Stable 18,000,000
Nguyen Thi
Thom Women 44 Kinh 7/10 Farmer
Le Duc Dat Man 19 Kinh 7/12 Farmer
Le Duc Nam Man 17 Kinh 11/12 Pupil
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
4 Phạm Đức Lực Man 48 Kinh 12/12 Farmer Stable 19,000,000
Trinh Thi Hong Women 47 Kinh 5/10 Farmer
Pham Duc
Duong Man 22 Kinh 9/12 Pupil
Pham Thi
Thoan Women 16 Kinh 10/12 Pupil
Duc Thuan commune - Hong Linh town
1 Bloc
k 5 Phạm Văn Vinh Man 59 Kinh 10/10 Farmer Stable 31,800,000
Lê Thị Lý Women 55 Kinh 10/10 Farmer
Phạm Minh
Toàn Man 26 Kinh 12/12 worker
Phạm Thanh
Nghị Man 21 Kinh 12/12 Student
2 Nguyễn Văn
Tuyên Man 52 Kinh 5/10 Farmer Stable 24,000,000
Nguyen Thi Tu Women 52 Kinh 3/10 Farmer
Nguyen Van
Tuyen Man 26 Kinh 8/12 Farmer
Nguyen Thi
Nhung Women 20 Kinh 8/12 Farmer
3 Bùi Đức Hiền Man 50 Kinh 5/10 Farmer Stable 27,000,000
Nguyen Thi
Trang Women 50 Kinh 4/10 Farmer
Bui Thi Han Women 17 Kinh 11/12 Pupil
Bui Thi Hoan Women 16 Kinh 9/12 Pupil
Bui Thi Huong Women 15 Kinh 8/12 Pupil
4 Phan Đức Niên Man 39 Kinh 5/12 Farmer Stable 22,000,000
Hoang Thi Son Women 37 Kinh 7/12 Farmer
Phan Duc
Duong Man 14 Kinh 8/12 Pupil
Phan Thi Nga Women 12 Kinh 6/12 Pupil
5 Trần Thắng Lộc Man 40 Kinh 4/12 Farmer Stable 21,000,000
Vo Thi Oanh Women 37 Kinh 5/10 Farmer
Tran Thang
Tuan Man 15 Kinh 9/12 Pupil
Tran Thi Quyen Women 12 Kinh 6/12 Pupil
6 Nguyễn Đức
Ng Man 44 Kinh 5/10 Farmer Stable 19,000,000
Nguyen Thi
Lien Women 44 Kinh 7/10 Farmer
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Nguyen Duc
Tong Man 22 Kinh 7/12 Farmer
Nguyen Thi
Hien Women 20 Kinh 12/12 Farmer
7 Trịnh Đức Vinh Man 50 Kinh 10/10 Farmer Stable 25,000,000
Nguyen Thi
Man Women 45 Kinh 7/10 Farmer
Trinh Thi Lien Women 17 Kinh 11/12 Pupil
Trinh Duc Tai Man 16 Kinh 10/12 Pupil
Thuan Loc commune - Hong Linh town
1 Haml
et 11 Trần Anh Tuấn Man 55 Kinh 10/10 Farmer Stable 27,900,000
Phạm Thị Huệ Women 55 Kinh 10/10 Farmer
Trần Thanh
Hằng Women 26 Kinh 12/12 worker
Trần Văn Hùng Man 20 Kinh 12/12 Student
2 Lơng Minh
Dũng Man 32 Kinh 5/10 Farmer Stable 15,000,000
Hoang Van
Xuan Man 28 Kinh 5/12 Farmer
Luong Thi Ngo Women 5 Kinh Children
Luong Minh
Bao Man 2 Kinh Children
3 Ngô Thị Hiền Women 42 Kinh 5/10 Farmer Stable 14,000,000
Nguyễn Văn
Trung Man 44 Kinh 7/10 Farmer
Ngô Thị Yến Nữ 15 Kinh 7/12 student
4 Đỗ Đức Long Man 46 Kinh 5/10 Officer Stable 30,000,000
Nguyen Thi
Tien Women 42 Kinh 7/12 Farmer
Do Thi Bach Women 21 Kinh 12/12 Pupil
Do Duc Tung Man 18 Kinh 12/12 Pupil
Trung luong commune - Hong Linh town
1 Bloc
k 10
Nguyễn Văn
Luận Man 61 Kinh 7/10 Farmer Stable 30,400,000
Lê Thị Hồng Women 57 Kinh 10/10 Farmer
Nguyễn Văn
Huynh Man 28 Kinh 12/12 worker
Nguyễn Văn
Thắng Man 26 Kinh 12/12 Officer
Nguyễn Thị Women 21 Kinh 12/12 Student
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Loan
2 Lơng Văn Qúy Man 48 Kinh 5/10 Farmer Stable 19,000,000
Dao Thi Noi Women 43 Kinh 7/10 Farmer
Luong Thi Tiep Women 21 Kinh 12/12 Farmer
Luong Van
Bach Man 18 Kinh 12/12 Pupil
3 Nguyễn Thị
Thuận Women 45 Kinh 5/10 Farmer Stable 18,000,000
Hoang Dang
Son Man 45 Kinh 10/10 Farmer
Hoang Dang
Phuc Man 18 Kinh 12/12 Pupil
Hoang Dang
Nguyen Man 16 Kinh 10/12 Pupil
4 Phan Đức Luận Man 35 Kinh 5/10 Farmer Stable 18,000,000
Nguyen Thi
Hanh Women 33 Kinh 12/12 Farmer
Phan Duc
Nghia Man 13 Kinh 7/12 Pupil
Phan Duc
Khuong Man 10 Kinh 5/12 Pupil
Dau Lieu commune - Hong Linh town
1 Đặng Văn H-
ơng Man 50 Kinh 4/10 Farmer Stable 15,000,000
Nguyen Thi
Hoa Women 50 Kinh 5/10 Farmer
Dang Van Ung Man 27 Kinh 8/12 Farmer
Dang Thi Thuy Women 19 Kinh 12/12 Farmer
2 Vũ Văn Tích Man 46 Kinh 10/10 Farmer Stable 20,000,000
Nguyen Thi
Buong Women 43 Kinh 5/10 Farmer
Luc Van Sy Man 16 Kinh 10/12 Pupil
Luc Thi Thuy Women 14 Kinh 8/12 Pupil
3 Nguyễn Công
Huân Man 44 Kinh 5/10 Farmer Stable 19,000,000
Trinh Thi Dung Women 40 Kinh 6/10 Farmer
Ha Cong Trung Man 17 Kinh 11/12 Pupil
Ha Cong Hieu Man 16 Kinh 10/12 Pupil
4 Hoàng Văn
Viện Man 43 Kinh 12/12 Saler Stable 18,000,000
Nguyen Thi
Tham Women 39 Kinh 5/10 Farmer
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Hoang Van
Thien Man 17 Kinh 11/12 Pupil
Hoang Van
Tien Man 15 Kinh 9/12 Pupil
Son Linh commune - Huong Son district
1 Đinh Công Yến Man 45 Kinh 7/10 Farmer Stable 14,500,000
Ly Thi Ty Women 43 Kinh 7/10 Farmer
Dinh Ngoc Lam Man 20 Kinh 12/12 Farmer
Dinh Kim
Tuyen Women 18 Kinh 12/12 Farmer
2 Hoàng Văn Vấn Man 27 Kinh 12/12 worker Stable 14,000,000
Nguyễn Thị
Luyến Women 22 Kinh 8/12 Farmer
3 Hoàng Văn
Long Man 45 Kinh 9/12 Farmer Stable 15,000,000
Nguyễn Thị
Nội Women 45 Kinh 7/12 Farmer
Hoàng Thị
Lanh Women 21 Kinh 12/12 Farmer
Hoàng Văn Tr-
ơng Man 19 Kinh 12/12 Pupil
4 Nguyễn Văn
Huấn Man 40 Kinh 5/10 Farmer Stable 18,000,000
Nguyễn Thị
Mai Women 40 Kinh 5/10 Farmer
Nguyễn Thị
Trang Women 16 Kinh 9/12 Pupil
5 Triệu Văn Thủy Man 42 Kinh 11/12 Farmer Stable 15,000,000
Phạm Phơng
Anh Women 39 Kinh 9/12 Pupil
Triệu Thị Nga Women 20 Kinh 12/12 Pupil
Triệu Thị Hơng Women 17 Kinh 11/12 Pupil
Son Long commune - Huong Son district
1 Haml
et 5 Trần Thị Châu Women 51 Kinh 10/10 Farmer Stable 42,000,000
Phạm Quang
Thành Man 59 Kinh 10/10 Farmer
Phạm Văn
Hùng Man 27 Kinh 12/12 worker
Pham Tin Dung Man 25 Kinh 12/12
Pham Tin Tai Man 29 Kinh 12/12 worker
Pham Tin
Duong Man 23 Kinh 12/12
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
2 Luong Van
Tuan Man 42 Kinh 5/10 Farmer Stable 24,000,000
Bui Thi Lan Women 40 Kinh 7/10 Farmer
Luong Van
Tuan Man 16 Kinh 9/12 Pupil
Luong Van
Tien Man 14 Kinh 7/12 Pupil
3 Ha Đuc Mao Man 48 Kinh 5/10 Farmer Stable 16,000,000
Le Thi An Women 46 Kinh 7/10 Farmer
Ha Duc Thang Man 17 Kinh 10/12 Pupil
Ha Thi Thuy Women 15 Kinh 8/12 Pupil
4 Luong Van
Song Man 35 Kinh 7/12 Farmer Stable 9,000,000
Ha Thi Nhat Women 36 Kinh 7/12 Farmer
Luong Thi
Huong Women 14 Kinh 6/12 Pupil
5 Hà Đức Mạnh Man 45 Kinh 5/10 Farmer Stable 11,000,000
Nguyen Thi
Tuyet Women 44 Kinh 7/10 Farmer
Ha Duc Quynh Man 24 Kinh 9/12 Farmer
Ha Thi Nhu Women 21 Kinh 12/12 worker
Son Ha commune - Huong Son district
1 Haml
et 4 Nguyễn Thị ánh Women 53 Kinh 10/10 Farmer Stable 10,000,000
Phạm Đức
Cung Man 51 Kinh 10/10 Farmer
Phạm Thị Lụa Nũ 20 Kinh 12/12 Pupil
Phạm Thị Lanh Women 18 Kinh 12/12 Pupil
Phạm Thị
Quỳnh Phơng Women 9 Kinh 3/12
Phạm Nguyễn
Hữu Ước Women 4 Kinh
2 Triệu Văn Lai Man 40 Kinh 5/10 Farmer Stable 16,000,000
Nguyễn Thị
Hợi Women 36 Kinh 5/10 Farmer
Triệu Văn Lợi Man 16 Kinh 9/12 Pupil
3 Trần Văn Nam Man 58 Kinh 12/12 Farmer Stable 20,000,000
Nguyen Thi
Thinh Women 55 Kinh 7/10 Farmer
Tran Van Hoan Man 24 Kinh 7/12 Farmer
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Tran Thi Diep Women 21 Kinh 7/12 Farmer
Son tien commune - Huong Son district
1 Nguyen Thi
Diu Women 53 Kinh 10/10 Farmer Stable 4,300,000
To Quang Đong Man 39 Kinh 12/12 Farmer
Mai Thi Nhai Women 34 Kinh 7/12
To Quang
Manh Man 5 Kinh
To Thi Phuong
Thuy Women 2 Kinh
2 Lu Huu Loi Man 47 Kinh 10/10 Farmer Stable 26,000,000
Ma Thi Cham Women 48 Kinh 7/10 Farmer
Luu Thi Duyen Women 21 Kinh 12/12 Student
Luu Thi Dung Women 20 Kinh 12/12 Student
Luu Thi Diep Women 17 Kinh 11/12 Pupil
Luu Huu Hieu Man 14 Kinh 8/12 Pupil
3 Trần Văn
Thanh Man 42 Kinh 5/10 Farmer Stable 23,000,000
Hoang Thi
Loan Women 41 Kinh 10/10 Farmer
Tran Van Tuan Man 19 Kinh 12/12 Pupil
Nguyen Thi
Trang Women 18 Kinh 12/12 Pupil
4 Trần Văn Hng Man 45 Kinh 5/10 Farmer Stable 22,000,000
Le Thi Hoa Women 40 Kinh 5/10 Farmer
Tran Thi Huong Women 19 Kinh 9/12 Farmer
Tran Van Hao Women 16 Kinh 10/12 Pupil
Tran Thi Lien Women 14 Kinh 8/12 Pupil
5 Trần Văn Nam Man 46 Kinh 5/10 Farmer Stable 15,000,000
Hoang Thi
Hong Women 43 Kinh 7/10 Farmer
Tran Thi Thuy Women 14 Kinh 8/12 Pupil
Tran Thi Van Women 12 Kinh 6/12 Pupil
Tran Thi Anh Women 2 Kinh Children
6 Trần Văn Tiến Man 46 Kinh 5/10 Farmer Stable 16,000,000
Nguyen Thi
Nga Women 44 Kinh 4/10 Farmer
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Tran Van Duc Man 20 Kinh 9/12 Farmer
Tran Thi Trang Women 16 Kinh 10/12 Pupil
7 Trần Văn Thọ Man 46 Kinh 5/10 Farmer Stable 18,000,000
Nguyen Thi
Hoa Women 46 Kinh 5/10 Farmer
Tran Van
Khanh Man 20 Kinh 12/12 Student
8 Trần Văn
Khuôn Man 46 Kinh 5/10 Farmer Stable 19,000,000
Thai Thi Hong Women 43 Kinh 7/10 Farmer
Tran Thi Van Women 24 Kinh 12/12 worker
Tran Van Hai Man 20 Kinh 12/12 Pupil
Tran Van Ha Man 17 Kinh 10/12 Pupil
9 Trần Văn Quý Man 55 Kinh 7/10 Retirem
ent Stable 35,000,000
Nguyen Thi
Tan Women 55 Kinh 3/10 Farmer
Tran Van Thu Man 18 Kinh 9/12 Farmer
Tran Thi Ha Women 16 Kinh 9/12 Pupil
10 Hoàng Thị
Nhót Women 72 Kinh 2/10 Farmer Stable 15,000,000
Hoang Thi Chi Women 37 Kinh 4/12 Farmer
Hoang Thi
Thinh Women 33 Kinh 5/12 Farmer
11 Triệu Xuân Man 42 Kinh 5/10 Farmer Stable 23,000,000
Nguyen Thi
Hoa Women 40 Kinh 3/10 Farmer
Trieu Manh Man 17 Kinh 11/12 Pupil
Son Bang commune - Huong Son district
1 Trần Văn Lãi Man 58 Kinh 7/10 Farmer Stable 20,000,000
Nguyen Thi
Thinh Women 55 Kinh 7/10 Farmer
Tran Van Hoan Man 24 Kinh 7/12 Farmer
Tran Thi Diep Women 21 Kinh 7/12 Farmer
Tran Van Duc Man 19 Kinh 12/12 Pupil
2 Lơng Văn Tình Man 31 Kinh 5/12 Farmer Stable 12,000,000
Ha Thi Dinh Women 28 Kinh 7/12 Farmer
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Luong Van
Thang Man 5 Kinh Children
3 Lơng Văn Tuấn Man 42 Kinh 5/10 Farmer Stable 24,000,000
Bui Thi Lan Women 40 Kinh 7/10 Farmer
Luong Van
Tuan Man 16 Kinh 9/12 Pupil
Luong Van
Tien Man 14 Kinh 7/12 Pupil
4 Hà Đức Mão Man 48 Kinh 5/10 Farmer Stable 16,000,000
Le Thi An Women 46 Kinh 7/10 Farmer
Ha Duc Thang Man 17 Kinh 10/12 Pupil
Ha Thi Thuy Women 15 Kinh 8/12 Pupil
Son Quang commune - Huong Son district
1 Hà Thị Thoa Women 45 Kinh 11/12 Farmer Stable 19,000,000
Ngo Van Nghia Women 46 Kinh 7/10 Farmer
Ngo Van Hieu Man 17 Kinh 11/12 Pupil
Ngo Van Hoa Man 14 Kinh 6/12 Pupil
2 Lơng Văn Song Man 35 Kinh 7/12 Farmer Stable 9,000,000
Ha Thi Nhat Women 36 Kinh 7/12 Farmer
Luong Thi
Huong Women 14 Kinh 6/12 Pupil
3 Phạm Đức
Mạnh Man 45 Kinh 5/10 Farmer Stable 11,000,000
Nguyen Thi
Tuyet Women 44 Kinh 7/10 Farmer
Phạm Duc
Quynh Man 24 Kinh 9/12 Farmer
Phạm Thi Nhu Women 21 Kinh 12/12 worker
4 Trần Văn Qúy Man 48 Kinh 5/10 Farmer Stable 19,000,000
Dao Thi Noi Women 43 Kinh 7/10 Farmer
Trần Thi Tiep Women 21 Kinh 12/12 Farmer
Trần Van Bach Man 18 Kinh 12/12 Pupil
Son Hoa commune - Huong Son district
1 Nguyễn Tiến
Ngọ Man 58 Kinh 10/10 Farmer Stable 8,500,000
Nguyễn Thị
Ngân Women 58 Kinh 10/10 Saler
Nguyễn Thị
Thùy Women 34 Kinh 12/12 Teacher
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Nguyễn Tiến
Thành Man 30 Kinh 12/12 Farmer
2 Nguyễn Thị
Thuần Women 45 Kinh 5/10 Farmer Stable 18,000,000
Hoang Dang
Son Man 45 Kinh 10/10 Farmer
Hoang Dang
Phuc Man 18 Kinh 12/12 Pupil
Hoang Dang
Nguyen Man 16 Kinh 10/12 Pupil
3 Nguyễn Đức
Luận Man 35 Kinh 5/10 Farmer Stable 18,000,000
Nguyễn Thị
Nguyên Women 33 Kinh 12/12 Farmer
Nguyễn Duc
Nghia Man 13 Kinh 7/12 Pupil
Nguyễn Duc
Khuong Man 10 Kinh 5/12 Pupil
Son Hong commune - Huong Son district
1 Haml
et 5 Trần Quốc Việt Man 54 Kinh 7/10 Farmer Stable 29,000,000
Phạm Thị Huê Women 54 Kinh 7/10 Farmer
Trần Giang
Nam Man 30 Kinh 12/12 worker
Trần Mai Chi Women 27 Kinh 12/12
Trần An Pha Man 25 Kinh 12/12
2 Lơng Mạnh
Dũng Man 32 Kinh 5/10 Farmer Stable 15,000,000
Hoang Van
Xuan Man 28 Kinh 5/12 Farmer
Luong Thi Ngo Women 5 Kinh Children
Luong Minh
Bao Man 2 Kinh Children
3 Lê Thị Hiền Women 42 Kinh 5/10 Farmer Stable 14,000,000
Nguyen Van
Trung Man 44 Kinh 7/10 Farmer
Nguyễn Thị
Yến Nữ 15 Kinh 7/12 student
4 Bùi Đức Long Man 46 Kinh 5/10 Officer Stable 30,000,000
Nguyen Thi
Tien Women 42 Kinh 7/12 Farmer
Bùi Thi Bach Women 21 Kinh 12/12 Pupil
Bùi Duc Tung Man 18 Kinh 12/12 Pupil
Ngan Pho areas - Son tay commune - Huong Son district
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
1 Vũ Quang Thao Man 36 Kinh 10/10 Farmer Stable 25,000,000
Nguyễn Thị
Thục Women 34 Kinh 5/10 Farmer
Vũ Thị Hồng Women 12 Kinh 5/12 Pupil
Vũ Quang Toản Man 10 Kinh 3/12 Pupil
2 Trần Văn
Quyền Man 44 Kinh 10/10 Farmer Stable 28,000,000
Nguyen Thi
Thuy Women 40 Kinh 7/10 Farmer
Tran Thi Van Women 21 Kinh 12/12 Student
Tran Van Diep Man 18 Kinh 12/12 Pupil
3 Nguyễn Thị
Tuyết Women 35 Kinh 7/12 Farmer Stable 20,000,000
Le Van Tu Man 13 Kinh 5/12 Pupil
4 Trần Văn Đờng Women 38 Kinh 10/10 Farmer Stable 27,000,000
Duong Thi Bac Man 40 Kinh 5/10 Farmer
Tran Van An Man 18 Kinh 12/12 Pupil
Tran Thi Vui Women 15 Kinh 9/12 Pupil
5 Phạm Thị Ph-
ơng Women 39 Kinh 5/10 Farmer Stable 25,000,000
Nguyen Van
Hung Man 19 Kinh 7/12 Farmer
6 Hoàng Văn Bảy Man 57 Kinh 7/10 Farmer Stable 30,000,000
Dang Thi Van Women 53 Kinh 12/12 Farmer
Hoang Van
Cuong Man 27 Kinh 9/12 Farmer
Hoang Van Tan Man 24 Kinh 12/12 Pupil
Hoang Thi Anh Women 15 Kinh 12/12 Pupil
7 Trần Văn Chín Man 52 Kinh 10/10 Farmer Stable 29,000,000
Tran Thi Dau Women 45 Kinh 5/10 Farmer
Tran Thi Huong Women 18 Kinh 12/12 Pupil
Tran Van
Thanh Man 16 Kinh 10/12 Pupil
8 Tô Ngọc Tuấn Man 44 Kinh 10/10 Farmer Stable 26,000,000
Nguyen Thi
Lan Women 42 Kinh 7/10 Farmer
To Ngoc Binh Man 21 Kinh 10/12 Farmer
To Ngoc Ly Man 18 Kinh 12/12 Pupil
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Huong tho commune - Vu Quang district
1 Lê Thanh Hải Man 58 Kinh 10/10 Farmer Stable 27,500,000
Phạm Thị Lý Women 57 Kinh 10/10 Farmer
Lê Văn Hoàng Man 21 Kinh 12/12
Lê Văn Tuấn Man 28 Kinh 12/12
2 Nguyễn Văn
Tuyến Man 52 Kinh 5/10 Farmer Stable 24,000,000
Nguyen Thi Tu Women 52 Kinh 3/10 Farmer
Nguyen Van
Tuyen Man 26 Kinh 8/12 Farmer
Nguyen Thi
Nhung Women 20 Kinh 8/12 Farmer
3 Bùi Đức Hiền Man 50 Kinh 5/10 Farmer Stable 27,000,000
Nguyen Thi
Trang Women 50 Kinh 4/10 Farmer
Bùi Thị Hân Women 20 Kinh 12/12 Pupil
Bùi Thị Bích Women 16 Kinh 9/12 Pupil
4 Phạm Đức Niên Man 39 Kinh 5/12 Farmer Stable 22,000,000
Hoang Thi Son Women 37 Kinh 7/12 Farmer
Pham Duc
Duong Man 14 Kinh 8/12 Pupil
Pham Thi Nga Women 12 Kinh 6/12 Pupil
Son Tho commune - Vu Quang district
1 Vũ Văn Toàn Man 40 Kinh 7/12 Farmer Stable 18,000,000
Le Thi Dao Women 34 Kinh 7/10 Farmer
Vu Thi Van Women 15 Kinh 8/12 Pupil
Vu Van Nam Man 12 Kinh 5/12 Pupil
2 Vũ Thăng Lộc Man 40 Kinh 4/12 Farmer Stable 21,000,000
Vo Thi Oanh Women 37 Kinh 5/10 Farmer
Vu Thang Tuan Man 15 Kinh 9/12 Pupil
Vu Thi Quyen Women 12 Kinh 6/12 Pupil
3 Lê Đức Ng Man 44 Kinh 5/10 Farmer Stable 19,000,000
Nguyen Thi
Lien Women 44 Kinh 7/10 Farmer
Le Duc Tong Man 22 Kinh 7/12 Farmer
Le Thi Hien Women 20 Kinh 12/12 Farmer
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
4 Phạm Đức Vinh Man 50 Kinh 10/10 Farmer Stable 25,000,000
Nguyen Thi
Man Women 45 Kinh 7/10 Farmer
Pham Thi Tien Women 17 Kinh 11/12 Pupil
Pham Duc Tai Man 16 Kinh 10/12 Pupil
Duc Lien commune - Vu Quang district
1 Lê Văn Lợi Man 50 Kinh 7/12 Saler Stable 18,000,000
Nguyễn Thị
Loan Women 45 Kinh 10/10 Farmer
Lê Thị Ngọc Women 20 Kinh 12/12 Student
Lê Văn Cơng Man 17 Kinh 10/12 Pupil
2 Phạm Đức Nghị Man 49 Kinh 5/10 Farmer Stable 20,000,000
Nguyễn Thị
Thanh Women 45 Kinh 2/10 Farmer
Phạm Đức
Trung Man 17 Kinh 7/12 Farmer
Phạm Thiị Thảo Women 15 Kinh 8/12 Pupil
3 Trần Đức
Khuyến Man 47 Kinh 9/12 Farmer Stable 18,000,000
Nguyễn Thị
Thơm Women 44 Kinh 7/10 Farmer
Trần Đức Đạt Man 19 Kinh 7/12 Farmer
Trần Đức Nam Man 17 Kinh 11/12 Pupil
4 Nguyễn Đức
Lục Man 48 Kinh 12/12 Farmer Stable 19,000,000
Trịnh Thị Hồng Women 47 Kinh 5/10 Farmer
Nguyễn Đức D-
ơng Man 22 Kinh 9/12 Pupil
Nguyễn Thị
Thoan Women 16 Kinh 10/12 Pupil
Duc Bong commune - Vu Quang district
1 Nguyễn Thị Ký Women 50 Kinh 7/10 Farmer Stable 19,000,000
Vũ Văn Quyển Man 50 Kinh 7/12 Farmer
Vũ Thị Thủy Women 23 Kinh 7/12 Farmer
Vũ Thị Hạnh Women 20 Kinh 7/12 Farmer
2 Nguyễn Văn
Nghĩa Man 45 Kinh 10/10 Farmer Stable 15,000,000
Nguyễn Thị
Nga Women 40 Kinh 10/10 Farmer
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Nguyễn Thị
Yến Women 19 Kinh 12/12 Pupil
Nguyễn Văn
Phúc Man 17 Kinh 11/12 Pupil
3 Phạm Văn
Tùng Man 40 Kinh 7/10 Farmer Stable 14,000,000
Nguyễn Thị
Loan Women 38 Kinh 7/10 Farmer
Phạm Văn Ba Man 17 Kinh 10/12 Pupil
Phạm Văn
Duyệt Man 15 Kinh 8/12 Pupil
4 Bùi Văn Quân Man 36 Kinh 1/12 Farmer Stable 11,000,000
Trần Thị Lam Women 35 Kinh 3/12 Farmer
Bùi Văn Nghị Man 16 Kinh 9/12 Pupil
Bùi Văn Kiến Man 13 Kinh 6/12 Pupil
5 Nguyễn Văn
Hùng Man 47 Kinh 7/10 Farmer Stable 15,000,000
Nguyễn Thị
Vân Women 45 Kinh 7/12 Pupil
Nguyễn Văn
An Man 18 Kinh 12/12 Pupil
Nguyễn Văn Ba Man 15 Kinh 9/12 Pupil
Nguyen Van
Minh Man 13 Kinh 7/12 Pupil
Duc giang commune - Vu Quang district
1 Nguyễn Văn
Xuân Man 60 Kinh 5/10 Farmer Stable 21,000,000
Nguyến Thị
Sen Women 55 Kinh 5/10 Farmer
Nguyễn Văn
Toán Man 31 Kinh 7/12 Farmer
Nguyễn Văn
Trung Man 27 Kinh 12/12 Farmer
Nguyễn Văn
Tuyến Man 25 Kinh 12/12 Farmer
2 Lê Đình Bốn Man 45 Kinh 7/10 Farmer Stable 15,000,000
Nguyễn Thị
Hiền Women 40 Kinh 5/10 Farmer
o Man 18 Kinh 12/12 Farmer
Le Thi Hong Women 15 Kinh 9/12 Pupil
3 Nguyễn Văn
Thái Man 44 Kinh 7/10 Farmer Stable 16,000,000
Nguyen Thi Hai Women 40 Kinh 12/12 Farmer
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Nguyen Van
Hung Man 18 Kinh 9/12 Pupil
Nguyen Thi
Thuong Women 16 Kinh 12/12 Pupil
4 Nguyen Van
Hung Man 42 Kinh 7/10 Farmer Stable 19,000,000
Le Thi Hoai Man 40 Kinh 7/10 Farmer
Nguyen Thi
Yen Women 18 Kinh 7/12 Farmer
Nguyen Thi
Loan Women 17 Kinh 11/12 Pupil
Duc Huong commune - Vu Quang district
1 Pham Van Hoa Man 47 Kinh 12/12 Farmer Stable 36,800,000
Le Thi Nguyet Women 44 Kinh 12/12 Farmer
Pham Thi
Nhung Women 21 Kinh 12/12 Pupil
Pham Van
Canh Man 18 Kinh 12/12 Pupil
2 Nguyen The
Hau Man 50 Kinh 7/10 Farmer Stable 18,000,000
Nguyen Thi Hai Women 46 Kinh 7/10 Farmer
Nguyen The
Noi Man 22 Kinh 7/12 Farmer
Nguyen The
Han Man 20 Kinh 12/12 worker
3 Bùi Văn Hải Man 45 Kinh 7/10 Farmer Stable 16,000,000
Nguyen Thi
Vui Women 44 Kinh 7/12 Farmer
Bui Van Vinh Man 16 Kinh 9/12 Pupil
Bui Thi Sang Women 14 Kinh 6/12 Pupil
4 Phạm Thị
Chanh Women 38 Kinh 7/10 Farmer Stable 17,000,000
Dang Ba Hoang Man 40 Kinh 10/10 Farmer
Dang Thi Ly Women 16 Kinh 9/12 Pupil
Dang Ba Dai Man 14 Kinh 6/12 Pupil
5 Nguyễn Văn
Chín Man 47 Kinh 7/10 Farmer Stable 20,000,000
Hoang Thi
Huong Women 44 Kinh 7/10 Farmer
Nguyen Van
Thuy Man 18 Kinh 12/12 Pupil
Nguyen Thi
Tuyet Women 15 Kinh 9/12 Pupil
Sub-project: The Rual Energy Project – Additional Financing – Phase 4 , Ha Tinh Province Resettlement Plan
No.1 Power Construction Consulancy Co,Ltd,
Duc Linh commune - Vu Quang district
1 Đinh Văn
Khuyến Man 61 Kinh 1/12 Farmer Stable 9,000,000
Nguyen Thi
Nham Women 57 Kinh 7/10 Farmer
Dinh Van Hieu Man 22 Kinh 12/12 Student
Dinh Thi
Chung Women 28 Kinh 12/12 Pupil
Dinh Thi Trinh Women 16 Kinh 12/12 Pupil
2 Trần Xuân
Truyền Man 41 Kinh 12/12 Farmer Stable 10,000,000
Bui Thi Thoan Women 42 Kinh 7/10 Farmer
Tran Thi Hien Women 20 Kinh 7/12 Farmer
Tran Thi Yen Women 17 Kinh 11/12 Pupil
3 Phạm Văn
Quang Man 40 Kinh 4/10 Farmer Stable 11,000,000
Dinh Thi Lieu Women 41 Kinh 3/10 Farmer
Pham Thi
Quynh Women 16 Kinh 9/12 Farmer
Pham Thi Mai Women 14 Kinh 9/12 Farmer
Pham Van
Dung Man 5 Kinh Children
No.1 Power Construction Consulancy Co,Ltd,