gcmainebidding.files.wordpress.com...S O L IC IT A T IO N N O.: D W N B Y: C K D B Y: D E S IG N E D...
Transcript of gcmainebidding.files.wordpress.com...S O L IC IT A T IO N N O.: D W N B Y: C K D B Y: D E S IG N E D...
-
SO
LICIT
ATIO
N N
O.:
DW
N B
Y:
CK
D B
Y:
DE
SIG
NE
D B
Y:
DE
SC
RIP
TIO
N
1
D
2 3
C
4 5
A
B
MA
RK
AP
PR.
DA
TE:
SU
BMIT
TE
D B
Y: PL
OT D
AT
E:
DA
TE
MA
RK
DE
SC
RIP
TIO
NA
PP
R.
DA
TE
CO
NT
RA
CT N
O.:
DR
AWIN
G C
OD
E:
IDENTIFICATION
SHEET
®
District
New England
of Engineers
US Army Corps
SIZ
E:
FIL
E N
AM
E:
PL
OT S
CA
LE:
SHEET OF
CO
NC
OR
D,
MA
SS
AC
HU
SE
TTS
NE
W E
NG
LA
ND DIS
TRIC
T
U. S.
AR
MY C
OR
PS O
F E
NGIN
EE
RS
NA
TIC
K,
MA
SS
AC
HU
SE
TTS
U.S.
AR
MY S
OL
DIE
R S
YS
TE
MS C
EN
TE
R
F-4
42-2
0-0
1
B
UIL
DIN
G 2
4
R&
D S
TO
RA
GE F
ACIL
TY,
10/0
9/2
014
W912
WJ-1
5-B-0
001
SYMBOLDESCRIPTION
EXISTING PROPOSED
DOMESTIC WATER LINE
NATURAL GAS LINE
PROCESS LINE
FIRE SERVICE LINE
BOLLARD
STORM DRAIN LINE
WELL WATER SUPPLYLINE
B
DOUBLE CATCH BASIN
SINGLE CATCH BASIN
SANITARY SEWER MANHOLE
STORM DRAIN MANHOLE
ELECTRIC MANHOLE
HYDRANT
T TELEPHONE MANHOLE
MONITORING WELL
GAS VALVE
GAS METER
EOPEDGE OF PAVEMENT
DCB
CONCRETE PAD OR WALK
BITUMINOUS CONCRETE PAVEMENT AREAS
TEMPORARY BENCH MARK
G
G
H
Y D
MW
S
D
W
CB
CB CB
CB
CHAIN LINK FENCE
3/4" CRUSHED GRAVEL
2" TO 4" CRUSHED STONE
E
SANITARY SEWER LINE
WATER VALVE
ELECTRIC TRANSFORMER (UTILITY OWNED)
ELECTRIC TRANSFORMER, 112.5 kVAT1
PIVPOST INDICATOR VALVE
CO SANITARY SEWER CLEANOUT
(FOR PROPOSED: "A" INDICATES TYPE)
UNDERGROUND DUCT BANK, ELECTRIC
4
F-4
42-2
0-0
1_
C-0
01.d
gn
Ex
EMH-1
B
TX
CURBING
4
F-4
42-2
0-0
1_
C-0
01.d
gn
ME
G
AN
SI
D
C-001
M.
GO
DF
RE
Y
C-001
M.
GO
DF
RE
Y
ME
G
AN
SI
D
55
1" = 2
0'
LE
GE
ND A
ND CIVIL N
OT
ES
LE
GE
ND A
ND CIVIL N
OT
ES
55
1" = 2
0'
A A
XW
XG
XSS
XSD
XCD
XE
DWS
IW
F
W
F
G
SS
SD
ES
LEGEND
EXISTING SPOT GRADE ELEVATION
EXISTING SPOT GRADE ELEVATIONx150.00
PROPOSED SPOT GRADE ELEVATIONx
148.50
xTP 148.00
TC 148.50
TOP OF CURB AND TOP OF PAVEMENT
PROPOSED SPOT GRADE ELEVATION AT
1/4" TO 1/2" PEASTONE
xBW 148.00
TW 148.50
TOP OF WALL AND BOTTOM OF WALL
PROPOSED SPOT GRADE ELEVATION AT
CIVIL ABBREVIATIONS
DEMOLITION NOTES:
GENERAL NOTES:
MAXIMUMMAX
LINEAR FOOTLF
POUNDSLBS
FINISHED GRADEFG
FINISH FLOOR ELEVATIONFFE
EDGE OF PAVEMENTEOP
ELEVATIONELEV
DRAIN MANHOLEDMH
DIAMETERDIA
DUCTILE IRONDI
DOUBLE CATCH BASINDCB
CONCRETECONC
CLEAN OUTCO
SINGLE CATCH BASINCB
BOTTOM OF WALLBW
TYPICALTYP
TOP OF PAVEMENTTP
TOP OF WALLTW
TOP OF CURBTC
TEMPORARY BENCH MARKTBM
SQUARE FOOTSF
SEWER MANHOLESMH
POUNDS PER SQUARE INCHPSI
POLYVINYL CHLORIDEPVC
OUTSIDE DIAMETEROD
MINIMUMMIN
OF TRANSPORTATION
MASSACHUSETTS DEPARTMENTMASSDOT
SOIL EROSION AND SEDIMENTATION CONTROL NOTES:
OF OFF SITE. THE EXISTING CATCH BASINS SHALL BE PUMPED AND CLEANED.
SHALL BE REMOVED FROM THE SITE. ALL SEDIMENTATION COLLECTED SHALL BE DISPOSED
9. FOLLOWING COMPLETE SITE RESTORATION AND STABILIZATION, ALL CONTROL MEASURES
STABILIZATION SHALL BE PROVIDED USING STRAW MATTING.
WITH THE CONTRACT DOCUMENTS. DURING THE NON-GROWING SEASON, TEMPORARY
OF FINISH GRADING. PROPOSED VEGETATIVE AREAS SHALL BE RESTORED IN ACCORDANCE
8. ALL DISTURBED AREAS OUTSIDE OF PAVED AREAS SHALL BE RESTORED WITHIN 15 DAYS
MATERIAL STOCKPILES, INCLUDING BUT NOT LIMITED TO TOPSOIL, SAND, AND GRAVEL.
AND WATER EROSION. A TEMPORARY SEDIMENT BARRIER SHALL ENCOMPASS ALL EARTHEN
GROWTH OR MATTED WITH STRAW DURING THE NON-GROWING SEASON TO PREVENT WIND
CONTRACT DRAWINGS. TOPSOIL STOCKPILES SHALL BE STABILIZED WITH VEGETATIVE
DISTURBANCE. TOPSOIL STOCKPILES SHALL BE LOCATED IN ACCORDANCE WITH THE
7. THE CONTRACTOR SHALL STRIP AND STOCKPILE TOPSOIL FROM AREAS OF PROPOSED
MITIGATE AN EMERGENCY CONDITION.
CONTROL MEASURES FOR INSTALLATION AT THE DIRECTION OF THE COR OR TO
6. THE CONTRACTOR SHALL KEEP ON SITE AT ALL TIMES AN ADDITIONAL QUANTITY OF
SEDIMENT AND MUD TRACKED, WASHED, OR DROPPED SHALL BE REMOVED IMMEDIATELY.
AND MUD ONTO PUBLIC RIGHT-OF-WAYS OR OTHER LOCATIONS ON NATICK SSC. ALL
THE SITE AND KEEP IT IN A CONDITION WHICH WILL PREVENT TRACKING OF SEDIMENT
5. THE CONTRACTOR SHALL MAINTAIN THE AREAS OF ENTRANCE AND EXIT TO AND FROM
OUTSIDE OF THE WORK LIMITS.
DRAWINGS. THE CONTRACTOR SHALL PROTECT UNDISTURBED VEGETATIVE AREAS
GRADING LIMITS AND LIMITS OF DISTURBANCE IN ACCORDANCE TO THE CONTRACT
THAT AN AREA IS DISTURBED AND EXPOSED. THE CONTRACTOR SHALL OBSERVE THE
4. THE CONTRACTOR SHALL SCHEDULE WORK SO AS TO MINIMIZE THE PERIOD OF TIME
OR GREATER.
EVERY 14 DAYS AND WITHIN 24 HOURS OF A STORM (RAIN) EVENT OF 1/4-INCH
CONTRACT DOCUMENTS. THE CONTROL MEASURES SHALL BE INSPECTED, AT A MINIMUM,
CONTROL MEASURES TO ENSURE PROPER OPERATIONS AND COMPLIANCE WITH THE
3. THE CONTRACTOR SHALL PERFORM ROUTINE INSPECTION AND MAINTENANCE OF ALL
SENSITIVE AREAS, NATURAL WATER COURSES, OR STORM DRAINAGE SYSTEMS.
THE MINIMUM REQUIREMENTS, AS MAY BE NEEDED TO PROTECT ADJACENT PROPERTIES,
ACTIVITIES AND TO PROVIDE ADDITIONAL CONTROL MEASURES, OVER AND ABOVE
ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE CONTRACTOR'S
OF CONSTRUCTION IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
ENSURE COMPLETE SEDIMENTATION CONTROL ON THE SITE. DURING THE COURSE
CONDITIONS DICTATE, ADDITIONAL CONTROL MEASURES MAY BE NECESSARY TO
CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL
ARE INTENDED TO BE THE MINIMUM REQUIREMENTS TO MEET ANTlCIPATED SITE
2. THE CONTROL MEASURES NOTED HERE AND DEPICTED ON THE CONTRACT DRAWINGS
TO, COMPOST FILTER SOCKS AND SILT SACK TRAPS.
START OF ANY CONSTRUCTION. CONTROL MEASURES INCLUDE, BUT ARE NOT LIMITED
MEASURES (HEREINAFTER REFERRED TO AS "CONTROL MEASURES") PRIOR TO THE
1. THE CONTRACTOR SHALL INSTALL THE SOIL EROSION AND SEDIMENTATION CONTROL
CONSTRUCTION LIMITS OF WORK
ME
TM
ET
CONTACT EXTERIOR BUILDING WALLS OR CONCRETE CURBS.
PREFORMED FIBER EXPANSION JOINTS SHALL BE PROVIDED WHERE SIDEWALKS OR PADS
5. CONCRETE WALKS AND PADS SHALL HAVE A MEDIUM TO FINE TEXTURED BROOM FINISH.
INSTALLATION OF PAVEMENT. ENSURE POSITIVE DRAINAGE IN AREAS TO BE REPAVED.
ADJUSTMENT OF FINAL GRADES MAY BE NECESSARY. INSTALL ALL UTILITIES PRIOR TO
4. PROVIDE A SMOOTH TRANSITION BETWEEN EXISTING PAVEMENT AND NEW PAVEMENT. FIELD
3.
SSC AND THE APPROPRIATE UTILITY COMPANY.
NO ADDITIONAL COST TO THE GOVERNMENT. COORDINATE ALL CONSTRUCTION WITH NATICK
EXISTING UTILITIES SHALL BE REPAIRED ACCORDING TO NATICK SSC'S STANDARDS AT
TAKE CARE TO PROTECT ALL EXISTING UTILITIES. CONTRACTOR CAUSED DAMAGE TO
2. THE CONTRACTOR SHALL VERIFY THE EXACT LOCATION OF ALL EXISTING UTILITIES AND
CONSTRUCTION.
TO BE REPORTED TO THE CONTRACTING OFFICER'S REPRESENTATIVE PRIOR TO STARTING
THE EXISTING CONDITIONS DEPICTED ON THE CONTRACT DRAWINGS. DISCREPANCIES ARE
1. THE CONTRACTOR SHALL VERIFY THAT ACTUAL SITE CONDITIONS ARE CONSISTENT WITH
PRIOR TO THE START OF CONSTRUCTION.
AND REPORT ANY DISCREPANCIES TO THE CONTRACTING OFFICERS REPRESENTATIVE (COR)
13. THE CONTRACTOR SHALL CHECK ALL FINISHED GRADES AND DIMENSIONS IN THE FIELD
ANY DISCREPANCY TO THE COR IMMEDIATELY.
12. CONTRACTOR IS TO ENSURE POSITIVE DRAINAGE FROM ALL DOORS AND RAMPS. REPORT
11. CONTRACTOR IS TO ENSURE PROPER DRAINAGE TO ALL INLETS.
NEW SURROUNDING PAVEMENT.
10. CONTRACTOR SHALL ADJUST ALL UTILITY CASTINGS TO PROVIDE FLUSH ELEVATION WITH
9. INSTALL SAFETY FENCING AS NECESSARY FOR SECURITY, SAFETY AND TRAFFIC PURPOSES.
8. SEE ARCHITECTURAL DRAWINGS FOR EXACT BUILDING DIMENSIONS.
TIE-INS.
OR CRACKING OF EXISTING CONCRETE NEAR THE VICINITY OF UTILITY TRENCHING AND
COST TO THE GOVERNMENT. DAMAGES INCLUDE, BUT ARE NOT LIMITED TO, ANY CHIPPING
PLACE POST-CONSTRUCTION SHALL BE REPLACED WITH LIKE MATERIALS AT NO ADDITIONAL
7. ANY DAMAGE TO EXISTING ASPHALT AND CONCRETE PAVEMENT SCHEDULED TO REMAIN IN
AT NO ADDITIONAL COST TO THE GOVERNMENT.
AND STRUCTURES THAT ARE TO REMAIN. CONTRACTOR CAUSED DAMAGES SHALL BE REPAIRED
6. CONTRACTOR SHALL PROVIDE PROTECTION TO SURROUNDING PAVEMENT, TREES, UTILITIES,
TO ANY EXCAVATION FOR VERIFICATION OF UNDERGROUND UTILITY LOCATIONS.
CONTRACTOR SHALL CALL DIG SAFE AT 1-800-DIG-SAFE NOT LESS THAN 72 HOURS PRIOR
PURPOSES.
6. INSTALL SAFETY FENCING AS NECESSARY FOR SECURITY, SAFETY, AND TRAFFIC
AT NO ADDITIONAL COST TO THE GOVERNMENT.
OFF SITE IN ACCORDANCE WITH FEDERAL, STATE, AND LOCAL REQUIREMENTS AND REGULATIONS
OTHERWISE DIRECTED BY THE CONTRACTING OFFICER. DISPOSE ALL DEMOLISHED MATERIALS
5. ALL DEMOLISHED MATERIALS SHALL BECOME THE PROPERTY OF THE CONTRACTOR UNLESS
POST-CONSTRUCTION AS SPECIFIED UNDER GENERAL NOTE #7.
4. DURING DEMOLITION WORK PROTECT EXISTING ASPHALT AND CONCRETE PAVEMENT TO REMAIN
BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT.
AND STRUCTURES THAT ARE TO REMAIN AFTER DEMOLITION. DAMAGES SHALL BE REPAIRED
3. DURING DEMOLITION WORK THE CONTRACTOR SHALL PROVIDE PROTECTION TO ALL UTILITIES
EXISTING UTILITIES AS SPECIFIED UNDER GENERAL NOTE #3.
2. PRIOR TO DEMOLITION WORK THE CONTRACTOR SHALL VERIFY THE LOCATIONS OF THE
AS SPECIFIED UNDER GENERAL NOTE #1.
1. PRIOR TO DEMOLITION WORK THE CONTRACTOR SHALL VERIFY ACTUAL SITE CONDITIONS
FD-13-1BORING TEST LOCATION AND ID NUMBER
XT T TELEPHONE/DATA
ELECTRIC UNDERGROUND SECONDARY
M. T
ES
SIE
R /S/
M. T
ES
SIE
R /S/
OC
TO
BE
R 2
014
OC
TO
BE
R 2
014
-
Ex
B
B
BB B
148.1
148.2
148.2
148.2
148.2
148.2 148.4
148.2
148.3
148.3
148.3
148.3148.3
148.3
148.3
148.3
148.3
148.3
148.3
148.4
CB
148.4
148.4
CB
148.5
148.5
148.5
148.5
148.5
148.5
CB CB
148.6
148.6
148.6148.7
MW
B
148.7
148.7
148.8
148.8
148.8
148.8
148.8
148.8
148.9
148.9
148.9148.9
B
149.0
149.0
GATE
149
149
149
149
149
149
149.0D
149.0
B
149.0
149.0
149.0
CBCB
149.1
149.1149.1149.1
149.1
149.1
149.1
149.1
149.1
149.1
D
149.2
149.2
B
BASEBALL FIELD
GRASS
GRASS
GRASS
149.2
GRASS
GRASS
COURT
BASKETBALL
PAVEMENT
ASPHALT
PAVEMENT
ASPHALT
PAVEMENT
ASPHALT
PAVEMENT
ASPHALT
PAVEMENT
ASPHALT
PAVEMENT
ASPHALT
W
149.2
149.2
W
149.2
149.2
149.3
149.3
B
149.3149.3
149.3
149.3
149.4
W/ STEEL DOOR
CONC. VAULT
149.3
149.3
149.3
149.3
MW
149.4
149.4
149.4
149.4
149.4
149.4
149.4
149.4
149.4
149.4
149.5
149.5
149.5
149.5
149.5
149.5149.5
BUILDING NO. 93
NEW ADDITION
BUILDING NO. 110
XSD
149.6
149.6
149.7
149.7
149.7
149.7
149.7
CB CB
149.7
149.7
149.8
W
149.8
W
149.8
149.9
149.9
W
S
149.9
149.9
149.9
150.0
150.0
S
150
150
150
151
152
150
150
150.0
150.0
Ex
150.1
D
150.1150.1
150.1
150.1
150.1
H
DY
150.2150.3
150.3
150.3
W
T.O.C.
T.O.C.
T.O.C.
150.9
T.O.C.
151.0
151.0
151.0
151.0
151.4
151.7
151.8
151.8151.9
152.1
152.2
MW
MW
152.5
W
S
GRAVEL
152.7
Ex
W
152.8
152.8
T
152.9
NO. 76
BUILDING
BUILDING NO. T-24
NO. T-26
BUILDING
NO. T-27
BUILDING
152.9
152.8152.9
G
152.9
S
SALT SHED
FD-13-2
FD-13-1
FD-13-3
FD-13-4
153.0
153
153.0
153.0
NO. 94
BUILDING
NO. 77
BUILDING
BUILDING
153.1153.1
153.1
RIM 148.41
CB
RIM 149.14
DMH
24" RCP
RIM 148.45
CB
INV. 142.15
RIM 149.0I
DMH
RIM 148.54
DCB
15"
RC
P
15"
RC
P
INV. 145.11
RIM 149.72
DCB1
24" RCP
15"
RC
P
RIM 149.05
DCB
EOP
EOP
EO
P
EOP
15"
RC
P
12"
RC
P
24" RCP
EO
P4"
DI
4" DI
4"
DI
15"
RC
P
4" DI
6" PVC
6" PVC
4" P
VC
4" PVC
4" PVC
4" P
VC
4" P
VC
4" P
VC
6" P
VC
6" P
VC
6" PVC
INV. 143.46
INV. 144.79 (DCB1)
RIM 150.09
DMH
6" P
VC
4" DI
4"
DI
4" P
VC
EOP
EO
P
EOP
EO
P
EO
P
EOP
TBM Y-5
TBM X
TBM Y
TBM Y-2
153.2
G
W
153.3153.4
S
W
NEW MEDICAL BUILDING
148.3
INV. OUT 146.86
INV. IN 146.87
RIM 152.67
SMH2
INV. 145.57
RIM 152.95
SMH3
INV. 143.55
RIM 149.99
SMH4
INV. OUT 147.58
INV. IN 147.59
RIM 153.49
SMH1
8"
CI
8"
CI
8"
CI
8"
CI
SO
LICIT
ATIO
N N
O.:
DW
N B
Y:
CK
D B
Y:
DE
SIG
NE
D B
Y:
DE
SC
RIP
TIO
N
1
D
2 3
C
4 5
A
B
MA
RK
AP
PR.
DA
TE:
SU
BMIT
TE
D B
Y: PL
OT D
AT
E:
DA
TE
MA
RK
DE
SC
RIP
TIO
NA
PP
R.
DA
TE
CO
NT
RA
CT N
O.:
DR
AWIN
G C
OD
E:
IDENTIFICATION
SHEET
®
District
New England
of Engineers
US Army Corps
SIZ
E:
FIL
E N
AM
E:
PL
OT S
CA
LE:
SHEET OF
CO
NC
OR
D,
MA
SS
AC
HU
SE
TTS
NE
W E
NG
LA
ND DIS
TRIC
T
U. S.
AR
MY C
OR
PS O
F E
NGIN
EE
RS
NA
TIC
K,
MA
SS
AC
HU
SE
TTS
U.S.
AR
MY S
OL
DIE
R S
YS
TE
MS C
EN
TE
R
F-4
42-2
0-0
1
B
UIL
DIN
G 2
4
R&
D S
TO
RA
GE F
ACIL
TY,
10/0
9/2
014
W912
WJ-1
5-B-0
001
NN
0
GRAPHIC SCALE:
1" = 20'
20 20 40
5
F-4
42-2
0-0
1_
C-1
01.d
gn
ME
G
AN
SI
D
1" = 2
0'
C-101
KEY NOTES
1
2
3
4
5
6
7
8
9
REMOVE AND DISPOSE OF RIPRAP
PROVIDE FULL DEPTH SAW CUT
2
2
2
3
1
4
10
6
7
8
9
5
10
5
5
5
10
1
4
10
8
12
M.
GO
DF
RE
Y
Y-2
TEMPORARY BENCHMARKS
TBM NORTHING EASTING ELEV. BENCHMARK LOCATION
N 2931341.63
N 2931349.08
N 2931657.07
E 692512.31 148.64
E 692627.73
E 692749.38
148.67
153.35
DOUBLE CATCH BASIN'S FRAME
NORTHEAST CORNER OF
CHISELED X-CUT ON RIM AT
SINGLE CATCH BASIN'S FRAME
NORTHEAST CORNER OF
CHISELED X-CUT ON RIM AT
MEDICAL WAREHOUSE
CONCRETE PAVEMENT NEAR
MAG NAIL IN EXISTING BITUMINOUS
X
Y
LOT SOUTH OF BUILDING T-27
CONCRETE PAVEMENT OF PARKING
MAG NAIL IN EXISTING BITUMINOUS
152.47E 692762.94N 2931519.84Y-5
INSTALL SILT SACK TRAP IN DOUBLE CATCH BASIN
EXIS
TIN
G C
ON
DITIO
NS,
DE
MO
LITIO
N A
ND
55
ER
OSIO
N A
ND S
EDIM
EN
T C
ON
TR
OL P
LA
N
11
11
12(FABRIC, LINE POSTS, AND HARDWARE)REMOVE AND DISPOSE OF EXISTING CHAIN LINK FENCE
12
REMOVE AND STOCKPILE 1/2-INCH GRAVEL FOR REUSE
REMOVE AND DISPOSE OF EXISTING PIPE BOLLARD
INSTALL SILT SACK TRAP IN SINGLE CATCH BASIN
FOR REINSTALLATIONREMOVE AND STORE EXISTING CHAIN LINK FENCE SYSTEM
13
15
14
REMOVE AND DISPOSE OF BITUMINOUS CONCRETE CURBING
PAVEMENT AND 12" OF SUBBASE (SHADED AREA)REMOVE AND DISPOSE OF BITUMINOUS CONCRETE
ME
T
13
13
14
CONSTRUCTION
LIMITS OF WORK
CONSTRUCTION
LIMITS OF WORK
STOCKPILE AREA FOR TOPSOIL AND SUB-SOILS
15
16
16
1415
(SEE NOTES 5, 6, AND 9)INSTALL TEMPORARY 6' HIGH CHAIN LINK FENCING
(SEE NOTES 5, 8, AND 9)INSTALL TEMPORARY 6' HIGH CHAIN LINK FENCING
CONSTRUCTION LIMITS OF
WORK TO COINCIDE WITH
NOTES 7 AND 8
EXISTING PAVEMENT
17.5' FROM EDGE OF
4
STOCKPILE FOR REUSESTRIP TOPSOIL AND VEGETATION FROM AREA AND
TO POSITION AS NOTED UNDER KEY NOTE 15.
10. AFTER 31 AUGUST, TEMPORARY FENCING MAY BE RELOCATED
BACK TO FINISHED GRADE AND SODDED FOR BALL FIELD USE.
BETWEEN 1 MAY AND 31 AUGUST. AREA SHALL BE BROUGHT
BETWEEN KEY NOTES 15 & 16 SHALL NOT REMAIN DISTURBED
TEMPORARY FENCING (SEE NOTES 6, 7, AND 8). THE AREA
REQUIRED FOR THE ERECTION AND LOCATION OF THE
9. COORDINATE THE WORK TO COMPLY WITH THE RESTRICTIONS
LOCATION.
READJUST SILT SOCK TO COINCIDE WITH TEMPORARY FENCE
REMAIN IN PLACE ONLY FROM 1 MAY TO 31 AUGUST.
8. PORTION OF TEMPORARY FENCING SHALL BE ERECTED AND
REMAIN IN PLACE ONLY FROM 1 SEPTEMBER TO 30 APRIL.
7. PORTION OF TEMPORARY FENCING SHALL BE ERECTED AND
THROUGHOUT DURATION OF THE PROJECT.
6. PORTION OF TEMPORARY FENCING TO REMAIN IN PLACE
PLATFORMS.
TYPE; IT SHALL BE PANEL FENCING WITH FREE STANDING
5. TEMPORARY FENCING SHALL NOT BE OF THE IN-GROUND
MASSACHUSETTS," DATED NOV 02, 2012.
INSTITUTE FOR ENVIRONMENTAL MEDICINE, NATICK,
"MEDICAL WAREHOUSE - BUILDING 23, US ARMY RESEARCH
TAKEN FROM SHEET C-3.0 OF THE PLAN SET TITLED
AND DUCT BANKS SHOWN ARE APPROXIMATE ONLY AND ARE
4. LOCATION OF EXISTING UNDERGROUND ELECTRICAL LINES
3. ELEVATIONS SHOWN REFERENCE NAVD 88, U.S. FEET.
STATE PLANE COORDINATE SYSTEM (NAD 83), U.S. FEET.
2. COORDINATES SHOWN REFERENCE THE MASSACHUSETTS
U.S. ARMY CORPS OF ENGINEERS SURVEY.
1. EXISTING CONDITIONS ARE FROM A NOVEMBER 2013
NOTES:
(SEE NOTES 5, 7, 9 AND 10)INSTALL TEMPORARY 6' HIGH CHAIN LINK FENCING
INSTALL 12" DIAMETER COMPOST FILTER SOCK
M. T
ES
SIE
R /S/
OC
TO
BE
R 2
014
-
B
B
BB B
B
B
GATE
B
B
B
BUILDING NO. 93
NEW ADDITION
BUILDING NO. 110
NO. 76
BUILDING
BUILDING NO. T-24
NO. T-26
BUILDING
NO. T-27
BUILDING
SALT SHED
NO. 94
BUILDING
NO. 44
BUILDING
NO. 77
BUILDING
BUILDING
NEW MEDICAL BUILDING
FFE = 151.75
BUILDING 24
PROPOSED WAREHOUSE
BB
B
B
SO
LICIT
ATIO
N N
O.:
DW
N B
Y:
CK
D B
Y:
DE
SIG
NE
D B
Y:
DE
SC
RIP
TIO
N
1
D
2 3
C
4 5
A
B
MA
RK
AP
PR.
DA
TE:
SU
BMIT
TE
D B
Y: PL
OT D
AT
E:
DA
TE
MA
RK
DE
SC
RIP
TIO
NA
PP
R.
DA
TE
CO
NT
RA
CT N
O.:
DR
AWIN
G C
OD
E:
IDENTIFICATION
SHEET
®
District
New England
of Engineers
US Army Corps
SIZ
E:
FIL
E N
AM
E:
PL
OT S
CA
LE:
SHEET OF
CO
NC
OR
D,
MA
SS
AC
HU
SE
TTS
NE
W E
NG
LA
ND DIS
TRIC
T
U. S.
AR
MY C
OR
PS O
F E
NGIN
EE
RS
NA
TIC
K,
MA
SS
AC
HU
SE
TTS
U.S.
AR
MY S
OL
DIE
R S
YS
TE
MS C
EN
TE
R
F-4
42-2
0-0
1
B
UIL
DIN
G 2
4
R&
D S
TO
RA
GE F
ACIL
TY,
10/0
9/2
014
W912
WJ-1
5-B-0
001
NN
0
GRAPHIC SCALE:
1" = 20'
20 20 40
6
F-4
42-2
0-0
1_
C-1
02.d
gn
ME
G
AN
SI
D
1" = 2
0'
C-102
M.
GO
DF
RE
Y
17.5'
51.0'
12.0' 29.0' 12.0'
47.2'
50.8'
15.4'
19.9'
16.0'
72.2'
13.0'
5.0'
5.0'
15.2'
15.0'
19.6' 17
.3'
42.2'
1
2
3
4
5
6
7
8
9
10
9
NEW BITUMINOUS CONCRETE PAVEMENT
1
2
VERTICAL GRANITE CURB WITH 6" REVEAL
DEPRESSED CURB
6' CURB TRANSITIONS
6
4
7
5
3
17.5' BY 29.0' CONCRETE LOADING RAMP
1
6
1
7
4' WIDE CONCRETE SIDEWALK WITH 2.0% MAX CROSS SLOPE
75
13
9
12.6'
23.8'
15.8' 12.5'
10
SUBSURFACE STORMWATER INFILTRATION SYSTEM
11
11
KEY NOTES
55
LA
YO
UT A
ND M
AT
ERIA
LS P
LA
N
12
14
12PRECAST CONCRETE CURBING
SEGMENTAL BLOCK RETAINING WALL
12
4
3" THICK PAD OF 1/2" PEASTONE FILL OVER FILTER FABRIC
14
14.6'
PAVEMENT (TYP)
LIMITS OF NEW
8
13
13 PRECAST CONCRETE STAIRS WITH 5' BY 5' PLATFORM
6.0'
4.4'
4.8'
9.4'
15.0' BY 17.5' CONCRETE LOADING RAMP
NORTHING EASTING
N 2931523.4
N 2931526.0
N 2931430.5
N 2931433.1
BUILDING CORNER
NORTHWEST
NORTHEAST
SOUTHWEST
SOUTHEAST
BUILDING CORNER COORDINATES
FOR BUILDING CORNER COORDINATES
REFER TO TABLE (THIS SHEET)
BUILDING CORNER (TYP OF 4);
SEE NOTE 3, BELOW
SEE NOTE 3, BELOW
SEE NOTE 3, BELOW
SEE NOTE 3, BELOW
COMMENTS
E 692625.7
E 692678.6
E 692630.2
E 692683.2
STEEL PIPE BOLLARDS WITH BOLLARD SLEEVES (TYP OF 4)
ME
T
CLARITY. REFER TO SHEET C-103.
4. CONSTRUCTION LIMITS OF WORK NOT SHOWN FOR
OF THE FOUNDATION WALL.
3. COORDINATES ARE TAKEN FROM THE OUTSIDE CORNER
SHEET C-101 ARE NOT SHOWN.
2. FOR CLARITY, ITEMS SHOWN TO BE DEMOLISHED ON
THE OUTSIDE FACE OF THE FOUNDATION WALL.
1. ALL DIMENSIONS FROM BUILDING ARE TAKEN FROM
NOTES:
6
REFER TO STRUCTURAL SHEET S-3025'4" X 10'-3" CONCRETE PAD (ELECTRICAL EQUIPMENT);
6
4
535.2'
8
M. T
ES
SIE
R /S/
OC
TO
BE
R 2
014
-
150.20
CO
W
150
151
150
152
150
149
BW 150.00
FFE = 151.75
BUILDING 24
PROPOSED WAREHOUSE
BW 149.20±
BREAK IN
SLOPE
151
BB
B
B
148.90148.70
152.85
TOC 151.66
TP 150.30
TP 150.20
TOC 151.75
151.
45
151.
39
TC 1
51.6
6
TP 1
51.1
6
TC 1
51.6
6
TP 1
51.1
6
151.
08
150.41
151.75
151.08
150.60
150.70
150.80
150.60
151.61
151.41
151.61
TW 152.91
BW 150.00
ELEVATION
MATCH EXISTING
1%
1%
150.41
TC 1
51.6
6
TP 1
51.1
6
D
TP 151.16
TC 151.66
151.
08
TW 152.91
TP 152.32
TC 152.82
TC 152.11
TP 151.61
TW 150.50
151.75
149.
00
149.
00
149.
00
151.41
ELEVATION
MATCH EXISTING
151.75
ELEVATION
MATCH EXISTING
150.90
152.95
148.50
148.
50
148.
50
Ex
B
B
BB B
148.1
148.2
148.2
148.2
148.2
148.2 148.4
148.2
148.3
148.3
148.3
148.3148.3
148.3
148.3
148.3
148.3
148.3
148.3
148.4
CB
148.4
148.4
CB
148.5
148.5
148.5
148.5
148.5
148.5
CB CB
148.6
148.6
148.6148.7
MW
B
148.7
148.7
148.8
148.8
148.8
148.8
148.8
148.8
148.9
148.9
148.9148.9
B
149.0
149.0
GATE
149
149
149
149
149
149
149.0D
149.0
B
149.0
149.0
149.0
CBCB
149.1
149.1149.1149.1
149.1
149.1
149.1
149.1
149.1
149.1
D
149.2
149.2
B
BASEBALL FIELD
GRASS
GRASS
GRASS
149.2
GRASS
GRASS
COURT
BASKETBALL
PAVEMENT
ASPHALT
PAVEMENT
ASPHALT
PAVEMENT
ASPHALT
PAVEMENT
ASPHALT
PAVEMENT
ASPHALT
PAVEMENT
ASPHALT
W
149.2
149.2
W
149.2
149.2
149.3
149.3
B
149.3149.3
149.3
149.3
149.4
W/ STEEL DOOR
CONC. VAULT
149.3
149.3
149.3
149.3
MW
149.4
149.4
149.4
149.4
149.4
149.4
149.4
149.4
149.4
149.4
149.5
149.5
149.5
149.5
149.5
149.5149.5
BUILDING NO. 93
NEW ADDITION
BUILDING NO. 110
XSD
149.6
149.6
149.7
149.7
149.7
149.7
149.7
CB CB
149.7
149.7
149.8
W
149.8
W
149.8
149.9
149.9
W
S
149.9
149.9
149.9
150.0
150.0
S
150
150
150
151
152
150
150
150.0
150.0
Ex
150.1
D
150.1150.1
150.1
150.1
150.1
H
DY
150.2150.3
150.3
150.3
W
T.O.C.
T.O.C.
T.O.C.
150.9
T.O.C.
151.0
151.0
151.0
151.0
151.4
151.7
151.8
151.8151.9
152.1
152.2
MW
MW
152.5
W
S
GRAVEL
152.7
Ex
W
152.8
152.8
T
152.9
NO. 76
BUILDING
BUILDING NO. T-24
NO. T-26
BUILDING
NO. T-27
BUILDING
152.9
152.8152.9
G
152.9
S
SALT SHED
153.0
153
153.0
153.0
NO. 94
BUILDING
BUILDING
153.1153.1
153.1
RIM 148.41
CB
RIM 149.14
DMH
24" RCP
RIM 148.45
CB
INV. 142.15
RIM 149.0I
DMH
RIM 148.54
DCB
15"
RC
P
15"
RC
P
INV. 145.11
RIM 149.72
DCB1
24" RCP
15"
RC
P
RIM 149.05
DCB
15"
RC
P
12"
RC
P
24" RCP
4"
DI
4" DI
4"
DI
15"
RC
P
4" DI
6" PVC
6" PVC
4" P
VC
4" PVC
4" PVC
4" P
VC
4" P
VC
4" P
VC
6" P
VC
6" P
VC
6" PVC
INV. 143.46
INV. 144.79 (DCB1)
RIM 150.09
DMH
6" P
VC
4" DI
4"
DI
4" P
VC
TBM Y-5
TBM X
TBM Y
TBM Y-2
153.2
G
W
153.3153.4
S
W
NEW MEDICAL BUILDING
148.3
INV. OUT 146.86
INV. IN 146.87
RIM 152.67
SMH2
INV. 145.57
RIM 152.95
SMH3
INV. 143.55
RIM 149.99
SMH4
INV. OUT 147.58
INV. IN 147.59
RIM 153.49
SMH1
8"
CI
8"
CI
8"
CI
8"
CI
SO
LICIT
ATIO
N N
O.:
DW
N B
Y:
CK
D B
Y:
DE
SIG
NE
D B
Y:
DE
SC
RIP
TIO
N
1
D
2 3
C
4 5
A
B
MA
RK
AP
PR.
DA
TE:
SU
BMIT
TE
D B
Y: PL
OT D
AT
E:
DA
TE
MA
RK
DE
SC
RIP
TIO
NA
PP
R.
DA
TE
CO
NT
RA
CT N
O.:
DR
AWIN
G C
OD
E:
IDENTIFICATION
SHEET
®
District
New England
of Engineers
US Army Corps
SIZ
E:
FIL
E N
AM
E:
PL
OT S
CA
LE:
SHEET OF
CO
NC
OR
D,
MA
SS
AC
HU
SE
TTS
NE
W E
NG
LA
ND DIS
TRIC
T
U. S.
AR
MY C
OR
PS O
F E
NGIN
EE
RS
NA
TIC
K,
MA
SS
AC
HU
SE
TTS
U.S.
AR
MY S
OL
DIE
R S
YS
TE
MS C
EN
TE
R
F-4
42-2
0-0
1
B
UIL
DIN
G 2
4
R&
D S
TO
RA
GE F
ACIL
TY,
10/0
9/2
014
W912
WJ-1
5-B-0
001
E
E
T
T
ES
E
# 93
# 11
0
# 27
NN
0
GRAPHIC SCALE:
ME
G
AN
SI
D
1" = 20'
20 20 40
7
1" = 2
0'
C-103
F-4
42-2
0-0
1_
C-1
03.d
gn
M.
GO
DF
RE
Y
1
2
3
4
5
6
7
8
9
10
11
KEY NOTES
3
2
1
4
65
7
9
10
12
14
15
13
11
MARKED "WATER" USING RAISED LETTERSNEW CURB STOP AND CURB BOX; CURB BOX LID SHALL BE
DRAWINGSNEW DOWNSPOUT (TYPICAL OF 4); REFER TO ARCHITECTURAL
12
13
13
13
148
LIMITS OF NEW BITUMINOUS CONCRETE PAVEMENT
15
15
RIM EL. 148.70
INVERT EL. AT BUILDING = 145.10
INVERT EL. AT EXISTING MANHOLE = 144.10
GR
ADIN
G,
DR
AIN
AG
E,
55
AN
D U
TILIT
Y P
LA
N
INVERT IN EL. = 144.92
SUMP EL. = 144.48
INVERT OUT EL. = 144.65
INVERT OUT EL. = 144.65
16
16
16
18
17
19
19
19
18 ELECTRICAL EQUIPMENT (REFER TO ELECTRICAL DRAWINGS)
17
17
17
MIDDLE RAIL AND FABRICREINSTALL EXISTING CHAIN LINK FENCE POSTS, TOP RAILS,
MAIN WITH CORPORATION STOP TAPTIE NEW 1 1/4" DIA WATER SERVICE INTO EXISTING WATER
NEW DRAIN MANHOLE (SEE DETAIL ON SHEET C-502)NEW 6" DIA DRAIN LINE FROM EACH DOWNSPOUT TO
CONTRACTOR RESPONSIBLE FOR TRENCHING AND BACKFILLINGNEW GAS LINE (SIZE, TYPE, & INSTALL BY NSTAR GAS CO.)
(REFER TO DETAIL ON SHEET C-503)SEWER MANHOLE USING RUBBER BOOT WITH WATER TIGHT SEALTIE NEW 4" DIA SANITARY SEWER LINE INTO EXISTING
(REFER TO DETAIL ON SHEET C-503)NEW 4" DIA SEWER CLEANOUT (CO) WITH THREADED CAP
(REFER TO DETAIL ON SHEET C-503)4" DI WATER MAIN TO WAREHOUSE FOUNDATION WALLNEW 1 1/4" DIA DOMESTIC WATER SERVICE FROM EXISTING
(REFER TO DETAIL ON SHEET C-502)COVER SHALL BE MARKED "DRAIN" USING RAISED LETTERSNEW DRAIN MANHOLE WITH NEW MANHOLE COVER AND FRAME;
(REFER TO DETAIL ON SHEET C-502)9 PLASTIC CHAMBERS, GEOTEXTILE FABRIC, AND STONENEW SUBSURFACE STORMWATER INFILTRATION SYSTEM USING
(REFER TO DETAIL ON SHEET C-502)PIPES WITH EACH FROM HEADER OR MANHOLE TO CHAMBERNEW 6" DIA HEADER FROM MANHOLE WITH THREE 6" DIA INLET
(REFER TO DETAIL ON SHEET C-502)NEW OBSERVATION PORT (TYPICAL OF 3)
WALL; TIE INTO EXISTING MAIN WITH SELF-TAPPING SLEEVEEXISTING CAST IRON FIRE MAIN TO WAREHOUSE FOUNDATIONINSTALL NEW 8" DIA FIRE PROTECTION SERVICE LINE FROMLIMITS OF WORK
CONSTRUCTION
LIMITS OF WORK
CONSTRUCTION
NEW POWER LINE
PLAN FOR CONTINUATION OF
REFER TO ELECTRICAL SITE
THE START OF CONSTRUCTIONCONTRACTOR SHALL CONFIRM EXISTING INVERTS PRIOR TOFROM EXISTING SEWER MANHOLE TO NEW FOUNDATION WALL;NEW 4" DIA SANITARY SEWER LINE, 50 LF AT 2.0% SLOPE
ME
T
20
20
20
20
16
16
CONDITIONS, LOAMED, AND SEEDEDAREA TO BE REESTABLISHED TO PRECONSTRUCTION
21
21
NOTE 6 ON SHEET C-101SPREAD AND GRADE STOCKPILED GRAVEL; REFER TO KEY
19
"UTILITY TRENCH PATCH DETAIL" ON SHEET C-501)AND RESTORATION OF EXISTING ASPHALT (REFER TO DUCTBANKS.) PROVIDE BEDDING, BACKFILL, COMPACTION,DETAIL" ON SHEET E-502 FOR REQUIRED WIDTH OF "TYPICAL REINFORCED CONCRETE DUCTBANK CONSTRUCTIONOF 24 INCHES PLUS WIDTH OF DUCTBANK; REFER TO SHALL BE SAWCUT TO PROVIDE FOR A TOTAL TRENCH WIDTHCONDUIT AND MANHOLES. EXISTING ASPHALT PAVEMENT PROVIDE TRENCHING FOR ELECTRICAL AND COMMUNICATION
22
22
EMH-1
EMH-3
NOTE 20 AND ELECTRICAL DRAWINGS)COMMUNICATION CABLE AND DUCTBANK (REFER TO KEY
BANK (REFER TO KEY NOTE 20 AND ELECTRICAL DRAWINGS)ELECTRICAL MANHOLE AND/OR ELECTRICAL CABLE AND DUCT-
23
23
OF SIDEWALK AT ELEVATION 152.91±TOP OF STAIR PLATFORM, TOP OF WALL, AND BACKSIDE
M. T
ES
SIE
R /S/
EMH-2
OC
TO
BE
R 2
014
-
SO
LICIT
ATIO
N N
O.:
DW
N B
Y:
CK
D B
Y:
DE
SIG
NE
D B
Y:
DE
SC
RIP
TIO
N
1
D
2 3
C
4 5
A
B
MA
RK
AP
PR.
DA
TE:
SU
BMIT
TE
D B
Y: PL
OT D
AT
E:
DA
TE
MA
RK
DE
SC
RIP
TIO
NA
PP
R.
DA
TE
CO
NT
RA
CT N
O.:
DR
AWIN
G C
OD
E:
IDENTIFICATION
SHEET
®
District
New England
of Engineers
US Army Corps
SIZ
E:
FIL
E N
AM
E:
PL
OT S
CA
LE:
SHEET OF
CO
NC
OR
D,
MA
SS
AC
HU
SE
TTS
NE
W E
NG
LA
ND DIS
TRIC
T
U. S.
AR
MY C
OR
PS O
F E
NGIN
EE
RS
NA
TIC
K,
MA
SS
AC
HU
SE
TTS
U.S.
AR
MY S
OL
DIE
R S
YS
TE
MS C
EN
TE
R
F-4
42-2
0-0
1
B
UIL
DIN
G 2
4
R&
D S
TO
RA
GE F
ACIL
TY,
10/0
9/2
014
W912
WJ-1
5-B-0
001
C-501
ME
G
AN
SI
D
8
1:1
F-4
42-2
0-0
1_
C-5
01.d
gn
O.D.
PIP
ECOMPACTED SUBGRADE
MIN
12"
SUBBASE
EXISTING
6"
8"
12"
12"
FLUSH WITH APRON
BITUMINOUS PAVEMENT
12"
WORK AREA
3"-4"
UNPAVED
W = O.D. + 2'
(3' MIN)
6" MIN
6" MIN
6" MIN
LIFTS USING A HAND TAMPER
COMPACTED IN 6" MAXIMUM
3/4" CRUSHED STONE FILL
SAFETY MANUAL
AS REQUIRED PER THE USACE
PROVIDE SHEETING AND SHORING
LIMIT OF TRENCH EXCAVATION;
SURFACE (TYP)
EXISTING PAVED
12"
PAVED
12"
UTILITY TRENCH DETAIL
REFER TO TYPICAL
PAVEMENT
EXISTING BITUMINOUS
(MATCH EXISTING)
RESTORED PAVEMENT
2" TOP COURSE
2" BINDER COURSE
SUBBASE
GRADED CRUSHED STONE
12" COMPACTED DENSE
TYPICAL BITUMINOUS PAVEMENT DETAIL
PAVEMENT JOINTING DETAIL SUBGRADECOMPACTED
DETAIL
BITUMINOUS PAVEMENT
REFER TO TYPICAL
AND SEED
4" LOAM
TYPICAL UTILITY TRENCH DETAIL
FLOWABLE FILL
12" OF
SEAL JOINT (TYP)
SAWCUT AND
UTILITY TRENCH PATCH DETAIL
DE
TAIL
PA
VE
ME
NT
BIT
UMIN
OU
S
SE
E
TY
PIC
AL
DETAIL
PAVEMENT
BITUMINOUS
SEE TYPICAL
COMPOST FILTER SOCK DETAIL
SOCK
COMPOST FILTER
PROTECTED AREA
STAKE (SEE NOTE 2)
2" x 2" WOODENCOMPACTOR (4 PASSES MIN.)
LB VIBRATORY PLATE
MAX LIFTS USING A 75
ORDINARY FILL IN 12"
COMPACTED GRAVEL OR
CIVIL D
ET
AIL
S 1
M.
GO
DF
RE
Y
6" REVEAL
6"
6"
CONCRETE SIDEWALK AND CURBING DETAIL
NOT TO SCALE
6"
CONCRETE SIDEWALK
4" MIN THICKNESS
UNDISTURBED SUBGRADE
COMPACTED OR
GRANITE CURB
VERTICAL
GRAVEL BASE
PROCESSED
8" COMPACTED
6"
THE EDGE OF PAVEMENT.
4. COMPACTED SUBBASE TO EXTEND 12-INCHES MINIMUM BEYOND
CONFORM TO MASSDOT SECTION M2.01.7.
3. COMPACTED DENSE GRADED CRUSHED STONE BASE COURSE TO
SECTION M3.11.03, TABLE A.
2. BITUMINOUS CONCRETE TOP AND BINDER COURSES: MASSDOT
MASSDOT STANDARDS SPECIFICATIONS FOR HIGHWAYS AND BRIDGES.
1. MATERIALS AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH
NOTES:
CRADLE
CONCRETE
OF SIDEWALK)
(SET 2" BELOW TOP
WELDED WIRE FABRIC
6X6-W1.4XW1.4
BUIL
DIN
G
WA
LL
AND JOINT SEALANT
PREMOLDED JOINT FILLER
SLOPE
(SEE NOTE 4)
GRADE
FINISHED PAVEMENT
NO
TE 1
SE
E
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
COAT
ASPHALT EDGE AND APPLY TACK
ELEVATION, POWERWASH EXISTING
SAWCUT, EXCAVATE TO SUBGRADE
AND SEAL JOINT
APPLY TACK COAT,
EXISTING ASPHALT,
COURSE, POWERWASH
SAWCUT, REMOVE TOP
GRANITE CURB
TYPICAL VERTICLE
PAVEMENT LINE
CRB
GRANITE TRANSITION
FINISHED GRADE
6'
FLUSH CURB
TRANSITIONAL CURB DETAIL
VERTICAL GRANITE
NOT TO SCALE
DRAINAGE GRATE
OVERFLOW BYPASS (TYP)
RETRIEVAL SYSTEM (TYP)
SILT TRAP SACK
DRAINAGE GRATE
GRATE FRAME
OVERFLOW BYPASS
WATER
FILTERED
SILT TRAP SACK
AND DEBRIS
SEDIMENT
COMPOST FILTER SOCK.
ENTIRE LINEAR LENGTH OF
SPACED EVERY 10' ALONG
2. WOODEN STAKES SHALL BE
ALONG ITS ENTIRE LENGTH.
CONTACT WITH THE GROUND
SOCK SHALL BE IN FULL
1. BOTTOM OF COMPOST FILTER
NOTES:
NOT TO SCALE
NOT TO SCALE
TRIM AS NEEDED
5" MAX
BASIN STRUCTURE
EXISTING CATCH
4'
WID
E
(SPACED AT EVERY 16' O.C.)
TRANSVERSE EXPANSION JOINT
(SPACED AT EVERY 4' O.C.)
TRANSVERSE CONTROL JOINT
4'-0" (TYP)4'-0" (TYP)
3/8"
4"
4'-0" (TYP)4'-0" (TYP)
16'-0"
C.J.
E.J.
C.J.
C.J.
C.J.
E.J.
1/2"
PLAN
CONTROL JOINT (C.J.)
TRANSVERSE
EXPANSION JOINT (E.J.)
TRANSVERSE
1"JOINT SEALANT
FILLER
PREMOLDED JOINT
FULL DEPTH AND WIDTH OF SIDEWALK.
EXPANSION JOINTS EVERY 16 FEET ON CENTER. JOINTS SHALL BE STRAIGHT AND BE
5. PROVIDE TRANSVERSE CONTROL JOINTS AT EVERY 4 FEET ON CENTER AND TRANSVERSE
4. SLOPE SHALL BE AT LEAST 1.5% (MIN) AND NO MORE THAN 2.0% (MAX).
BROOM FINISH SHALL RUN PERPENDICULAR TO THE CURBING.
3. THE SIDEWALK SURFACE SHALL BE A LIGHTLY BROOM FINISHED TO BE SLIP RESISTANT.
HAVE BEEN FORCED OUT OF THE JOINTS.
AFTER POINTING, CURB STONES SHALL BE CLEANED OF ALL EXCESS MORTAR THAT MAY
WITH CEMENT MORTAR AND NEATLY POINTED ON THE TOP AND FRONT EXPOSED PORTIONS.
2. JOINTS BETWEEN CURB STONES (BOTH FRONT AND BACK) SHALL BE CAREFULLY FILLED
1. SEE TYPICAL BITUMINOUS PAVEMENT DETAIL.
NOTES:
17"-19"
55
ME
T
SILT TRAP SACK (INLET PROTECTION) DETAIL
WATER FLOW RATE = 60 GPM/FT.
OPENING SIZE (AOS) = 40 US STD. SIEVE; PERMITTIVITY = 0.05 SEC-1; AND
2. REQUIRED PROPERTIES: PUNCTURE = 120 LBS; UV RESISTANCE = 80%; APPARENT
INSECTS.
LIGHT. FABRIC SHALL ALSO BE RESISTANT TO SOIL CHEMICALS, MILDEW, AND
MONOFILAMENT FABRIC STABILIZED TO RESIST DEGRADATION DUE TO ULTRAVIOLET
1. GEOTEXTILE SHALL BE A BLACK NON-BIODEGRADABLE POLYPROPYLENE WOVEN
NOTES:
SLOPE
(MIN)
(MIN)
HAUNCH DETAIL FOR CONCRETE LOADING RAMP
RAMP
CONCRETE
4000 PSI
(SEE NOTE 1)
BETWEEN FOUNDATION WALL AND EDGE OF CONCRETE LOADING RAMP.
2. A PREMOLDED JOINT FILLER AND JOINT SEALANT SHALL BE USED
LONGITUDINAL AND TRANSVERSE SLOPES ALONG RAMPS.
1. REFER TO SHEET C-103 FOR SPOT ELEVATIONS TO DETERMINE
NOTES:
FABRIC
WELLDED WIRE
6X6-W2.9XW2.9
3" MIN
M. T
ES
SIE
R /S/
OC
TO
BE
R 2
014
-
SO
LICIT
ATIO
N N
O.:
DW
N B
Y:
CK
D B
Y:
DE
SIG
NE
D B
Y:
DE
SC
RIP
TIO
N
1
D
2 3
C
4 5
A
B
MA
RK
AP
PR.
DA
TE:
SU
BMIT
TE
D B
Y: PL
OT D
AT
E:
DA
TE
MA
RK
DE
SC
RIP
TIO
NA
PP
R.
DA
TE
CO
NT
RA
CT N
O.:
DR
AWIN
G C
OD
E:
IDENTIFICATION
SHEET
®
District
New England
of Engineers
US Army Corps
SIZ
E:
FIL
E N
AM
E:
PL
OT S
CA
LE:
SHEET OF
CO
NC
OR
D,
MA
SS
AC
HU
SE
TTS
NE
W E
NG
LA
ND DIS
TRIC
T
U. S.
AR
MY C
OR
PS O
F E
NGIN
EE
RS
NA
TIC
K,
MA
SS
AC
HU
SE
TTS
U.S.
AR
MY S
OL
DIE
R S
YS
TE
MS C
EN
TE
R
F-4
42-2
0-0
1
B
UIL
DIN
G 2
4
R&
D S
TO
RA
GE F
ACIL
TY,
10/0
9/2
014
W912
WJ-1
5-B-0
001
9
SEE THE TABLE OF ACCEPTABLE FILL MATERIALS
LIFTS TO 95% STANDARD PROCTOR DENSITY.
MIXTURES,
-
SO
LICIT
ATIO
N N
O.:
DW
N B
Y:
CK
D B
Y:
DE
SIG
NE
D B
Y:
DE
SC
RIP
TIO
N
1
D
2 3
C
4 5
A
B
MA
RK
AP
PR.
DA
TE:
SU
BMIT
TE
D B
Y: PL
OT D
AT
E:
DA
TE
MA
RK
DE
SC
RIP
TIO
NA
PP
R.
DA
TE
CO
NT
RA
CT N
O.:
DR
AWIN
G C
OD
E:
IDENTIFICATION
SHEET
®
District
New England
of Engineers
US Army Corps
SIZ
E:
FIL
E N
AM
E:
PL
OT S
CA
LE:
SHEET OF
CO
NC
OR
D,
MA
SS
AC
HU
SE
TTS
NE
W E
NG
LA
ND DIS
TRIC
T
U. S.
AR
MY C
OR
PS O
F E
NGIN
EE
RS
NA
TIC
K,
MA
SS
AC
HU
SE
TTS
U.S.
AR
MY S
OL
DIE
R S
YS
TE
MS C
EN
TE
R
F-4
42-2
0-0
1
B
UIL
DIN
G 2
4
R&
D S
TO
RA
GE F
ACIL
TY,
10/0
9/2
014
W912
WJ-1
5-B-0
001
F-4
42-2
0-0
1_
C-5
03.d
gn
AROUND CURB BOX
WRAP TRACING WIRE
EXISTING WATER MAIN
COATED TRACING WIRE
CORPORATION STOP
CURB STOP
WITH ROD
CURB BOX
PRECAST BLOCK
16" X 8" X 4"
AROUND CURB STOP
WIRE AND TAPE
WRAP BARE TRACING
4'
MIN
CO
VE
R
FINISHED PAVEMENT GRADE
DIRECT CONNECTION
5'
MIN
CO
VE
R
MARKED "WATER"
CURB BOX LID
STOP
TO CORPORATION
BARE TRACING WIRE
WRAP AND TAPE
WATER SERVICE CONNECTION DETAILNOT TO SCALE
SEE NOTE 2
SERVICE LINE
1" WATER
GOOSENECK
NOT TO SCALE
DRAINAGE AGGREGATE
12" THICK (MINIMUM)
COMPACTED SUBGRADE
RUBBER BOOT
STEEL CLAMP
STAINLESS
SEWER PIPEGROUT
NON-SHRINK
MANHOLE
EXISTING SEWER
CORED HOLE
WATERTIGHT SEAL
NOT TO SCALE
SEWER PIPE TIE-IN TO EXISTING MANHOLE
DRAIN PIPE
4" PERFORATED
OUTLET PIPE
INVERT TO EXISTING
PROVIDE BRICK
PLUMBING.
2. CONTINUE WATER SERVICE TO BUILDING AND TIE INTO INTERIOR
AND CURB STOP AND FROM CURB STOP TO BUILDING.
1. WATER SERVICE LINE SHALL BE SEAMLESS BETWEEN WATER MAIN
NOTES:
NOT TO SCALE
DRAIN OUTLET DETAIL
12"
MIN
DRAINAGE AGGREGATE
12" THICK (MINIMUM)
BUIL
DIN
G
WA
LL
S
Flow
SEWER MANHOLE
6" SEWER PIPE TO
NOT TO SCALE
SEWER CLEANOUT DETAIL
RECESSED PLUG AND CAP
CAST IRON CLEANOUT
8"
6"
2" 2"16"
SAND CUSION
SLEEVE
8" PVC PIPE PIPE RISER
6" SEWER
AND JOINT SEALANT
PREMOLDED FILLER
(SEE DETAIL ON C-501)
CONCRETE SIDEWALK
SIDEWALK
CONCRETE
CLEANOUT FRAME
CAST/DUCTILE IRON
CLEANOUT COVER
CAST/DUCTILE IRON
BUILDING
SEWER TO
5510
CIVIL D
ET
AIL
S 3
C-503
ME
G
AN
SI
D
M.
GO
DF
RE
Y
1:1
12"
PEASTONE
3'-
6"
6"
5'-
0"
6"
BOLLARD DETAIL
1"
OF CONCRETE
ROUNDED TOP
3"
4"
18"
FINISHED GRADE
6"
PRECAST CONCRETE CURB
WASHED PEASTONE
1/4" - 1/2" DOUBLE-
SAND BEDDING
FILTER FABRIC
SUBGRADE
NOT TO SCALE
PEASTONE AREA DETAIL
6" 6"7" SUBGRADE
ROUNDED TO SUB-ROUNDED AGGREGATE
AND WITH A WATER FLOW OF NO LESS THAN 120 GPM/SQ FT.
3. FILTER FABRIC: 4.5 OZ. NON-WOVEN, NEEDLE PUNCHED,
AND CONFORMING TO ASTM C33.
FREE OF ORGANICS
2. PEASTONE: CLEAN AND GRADED, RIVER-RUN WASHED,
NO. 4 US STANDARD SIEVE AND CONFORMING TO ASTM C33.
1. SAND: CLEAN AND GRADED, WASHED SAND, ALL PASSING A
NOTES:
NOT TO SCALE
SERVICE LINE
WATER
OVERHEAD DOORS
CONCRETE APRON ATFINISHED GRADE
PIPE FILLED WITH CONCRETE
SCH 40 GALVANIZED STEEL
8" NOM OD X 9'-0" LONG
6" MIN (TYP)
DETAIL, THIS SHEET)
(SEE DRAIN OUTLET PIPE
PIPE WITH FILTER SOCK
4" DIA PERFORATED DRAIN
BACKFILL SOIL
LEVELING PAD
6" THICK (MINIMUM)
BACKFILL SOIL
BACKFILL SOIL
SEE NOTE 1
DETAIL, THIS SHEET)
(SEE DRAIN OUTLET PIPE
AT EVERY 30' ON CENTER
4" DRAIN OUTLET PIPE
WALL UNIT (TYP)
SEGMENTAL RETAINING
30' ON CENTER
OPEN JOINT AT
MASONRY ADHESIVE)
WALL UNIT WITH
OF SEGMENTAL RETAINING
CAP UNIT (ADHERE TO TOP
STEEL PIPE
8" NOM OD SCH 40
DIAMETER SIZED TO FIT
BOLLARD COVER; COVER
FOOTING
24" DIA CONCRETE
SHALL HAVE ULTRAVIOLET AND ANTISTATIC ADDITIVES.
1/4-INCH. THE PLASTIC
THE INSTALLATION OF THE BOLLARD COVERS.
GALVANIZED COATING SHALL BE ACCEPTED BY THE COR PRIOR TO
GALVANIZED COATING HAS BEEN SCRATCHED AND/OR DAMAGED. THE
A ZINC-RICH PRIMER AT ALL AREAS ALONG THE PIPE WHERE THE
SHALL PROVIDE TOUCH-UP PAINT ON GALVANIZED SURFACES USING
AFTER INSTALLATION OF THE PIPE BOLLARDS THE CONTRACTOR
WITH ASTM A123.
THICKNESS OF 2.0 OUNCES/SQUARE FEET AND BE IN COMPLIANCE
COATING WITH A MINIMUM
HOT-DIP GALVANIZED FINISH
PIPE FOR BOLLARDS: ASTM A53, GRADE B, SCHEDULE 40,
6. CONCRETE FOOTING: 4000 PSI AT 28 DAYS.
CONCRETE RAMP.
5. BOTTOM OF BOLLARD COVER SHALL SIT FLUSH WITH TOP OF
AND HAVE A NOMINAL WALL THICKNESS OF
4. THE BOLLARD COVER SHALL BE YELLOW AND MADE OF HDPE PLASTIC
3.
2. GALVANIZED FINISH SHALL BE A ZINC
.
1. STEEL
NOTES:
3/4"
WALL UNIT (TYP)
SEGMENTAL RETAINING
(TYP AT EACH RISE)
3/4-INCH SETBACK
TYP OF 2 (MIN) PER UNIT
SHEAR CONNECTION PIN;
ME
T
SEGMENTAL BLOCK RETAINING WALL
RETAINING WALL" FOR INFORMATION ON WALL AND SOIL MATERIALS.
3. REFER TO SPECIFICATION SECTION 32 32 23, "SEGMENTAL CONCRETE BLOCK
DETAIL" ON SHEET C-501.
2. PAVEMENT OR TURF. FOR PAVEMENT, SEE "TYPICAL BITUMINOUS PAVEMENT
BREAKS IN GRADE.
1. INSTALL WALL PER MANUFACTURER'S SPECIFICATIONS. STEP WALL AT
NOTES:
M. T
ES
SIE
R /S/
OC
TO
BE
R 2
014
-
DW
N B
Y:
CK
D B
Y:
DE
SIG
NE
D B
Y:
DE
SC
RIP
TIO
N
1
D
2 3
C
4 5
A
B
MA
RK
AP
PR.
DA
TE:
SU
BMIT
TE
D B
Y: PL
OT D
AT
E:
DA
TE
MA
RK
DE
SC
RIP
TIO
NA
PP
R.
DA
TE
CO
NT
RA
CT N
O.:
DR
AWIN
G C
OD
E:
IDENTIFICATION
SHEET
®
District
New England
of Engineers
US Army Corps
SIZ
E:
FIL
E N
AM
E:
PL
OT S
CA
LE:
SHEET OF
CO
NC
OR
D,
MA
SS
AC
HU
SE
TTS
NE
W E
NG
LA
ND DIS
TRIC
T
U. S.
AR
MY C
OR
PS O
F E
NGIN
EE
RS
10/0
9/2
014
SO
LICIT
ATIO
N N
O.:
F-4
42-2
0-0
1
W912
WJ-1
5-B-0
001
BUIL
DIN
G 2
4
R&
D S
TO
RA
GE F
ACIL
TY,
NA
TIC
K,
MA
SS
AC
HU
SE
TTS
U.S.
AR
MY S
OL
DIE
R S
YS
TE
MS C
EN
TE
R
E-5025553
DS
H
AN
SI
D
JE
ANIN
E C
LIN
E
F-4
42-2
0-0
1_E-5
02.d
gn
1:1
12" x 12" x 10" DEEP
SUMP
DUCT ENTRANCE. LOCATION TO BE
AS INDICATED
PLAN
A
B8"
A A
CONCRETE OR BLACK
TOP ROADWAY
SLOPE 1:40 TO SUMP
GROUND ROD & CLAMP
DUCT ENTRANCE
FOR MANHOLE FRAME & COVER, SEE FED.
SPEC. A-A-60005, FIG. 1, SIZE 30A AND
FIG. 8, SIZE 30A, RESPECTIVELY
BRICK COLLAR LINED UP WITH
CEMENT MORTAR
8"
10"
B
#5 @ 6" EW, T&B
#4 @ 6" EW EF
#4 @ 6" T&B
C
8"
8"
8"
8"
LAP REINF. 24" (TYP.)
6" MIN.
NOTES:
MANHOLE AND COVERS ARE DESIGNED
FOR MAXIMUM WHEEL LOAD IN
ACCORDANCE WITH AASHTO HS20-44.
FOR DETAILS OF CABLE RACKS,
DUCT ENTRANCE AND PULLING-IN
IRONS, SEE PLATE UG-7.
MINIMUM CONCRETE COMPRESSIVE
STRENGTH SHALL BE 3000 PSI.
1.
2.
3.
CONSTR. JTS. (TYP.)
WATERSTOP AT ALL
MANHOLE DIMENSIONS
TYPE
4
3
6'-0"
6'-0"
A
8'-0"
6'-0"
B C (AT HIGH PT.)
6'-6"
6'-6"
6"
L3 1/2 X 3 1/2 X 1/4
ST3 X 6.25
L7 X 4 X 3/8 X 9" LONG
SUMP
SLOPE FL. TO
IRON
1'-0"
A
L 6 X 3 1/2 X 5/16
1/4"
6" X 3/8" X 4'-6" PL
PAVING
3"
6"
10" A 10"
E.F. SIDES & BOTTOM
#4 @ 12" E.W. &
SECTION A-A
A
1'-0"
6"
10"
A
10"
L7 X 4 X 3/8 X 9" LONG
W8 X 40 REMOVABLE
SECTION B-B
1'-0"X1'-0"X6"
SUMP
& CLAMP
GROUND ROD
BOTTOM
E.F. SIDES &
#4 AT 12" E.W.
O.C.
ANCHOR @ 1'-6"
1 1/4" X 1/8"
PAVING OR GRADE1/2" P.E.J. ALL AROUND
SECTION C-C
3/16T
ST 3 X 6.25 L 3 1/2X3 1/2X1/4 ANCHOR @ 1'-6"
1 1/4" X 1/8
2"
4"
3"
1"
6"6"
3"
C
C
7"9"
THE PROJECT DRAWING
TO BE AS INDICATED ON
DUCT ENTRANCE. LOCATION
B
B
AA
3" X 3/8" X 8" PL
REMOVABLE W 8 X 40
SUMP
AT 6" O.C.
3" X 3/8" X 4'-6" PL
& COVER
HINGE-WELDED TO FRAME
AT 6" O.C.
PL
PLAN
DIMENSIONSHANDHOLE
4
TYPE
3
4'-0"
3'-0"
A
(SEE NOTE 4)#4 @ 12"
E.W. & E.F.
1/2" PL
VARIES
NOTES:
ENTRANCE OF DUCTS INTO HANDHOLE MAY
BE MADE ON SIDE FACES OR CORNERS
AS REQUIRED.
FOR DETAILS OF CABLE RACKS, DUCT
ENTRANCE AND PULLING-IN IRONS,
SEE PLATE UG-7.
HANDHOLE AND COVER IS DESIGNED FOR
MAXIMUM SINGLE WHEEL LOAD OF
50,000 LB. OR DUAL WHEEL LOAD OF
90,000 LB.
COVER SHALL BE MADE OF STRUCTURAL
STEEL CONFORMING TO ASTM A 36/A 36M.
MINIMUM COMPRESSIVE STRENGTH OF
CONCRETE SHALL BE 3000 PSI.
1.
2.
3.
4.
5.
NOTE: STIFFENERS SHOWN
TYP. BOTH SIDES
TYPE 3, 1'-1"
TYPE 4, 1'-7" O.C.
WATERSTOP AT ALL
CONSTR. JTS. (TYP.)
SECTION A-A
N.T.S.
N.T.S.
STANDARD ELECTRICAL MANHOLE (TRAFFIC)
STANDARD ELECTRICAL HANDHOLE (TRAFFIC)
ELE
CT
RIC
AL D
ET
AIL
S 2
#4 REBAR @ 18" O.C. IN PAIRS (TYP.)
CONTINUOUS #5 REBAR @ 7 1/2" TOP,
FINISH GRADE
MINIMIZE SHEARING.
VERTICAL WALLS, UNLESS APPROVED BY ENGINEER.
BACKFILL DUCTS WITH SELECT FILL. BACKFILL TRENCH BANK IN LAYERS AFTER CONCRETE HAS SET.
CONCRETE CONSTRUCTION JOINTS SHALL NOT BE SPACED LESS THAN 40 FEET O.C.
STEEL REINFORCING RODS SHALL BE INTERFACED WITH BUILDING FOUNDATION AND MANHOLE WALLS TO
CONCRETE ENVELOPE SHALL BE POURED IN FORM. DO NOT USE THE SIDES OF THE TRENCH TO FORM THE
7.
6.
8.
5.
NOTES:
3.
2.
1.
AND/OR ROW OF CONDUIT PROVIDE AN ADDITIONAL #5 REBAR SPACED AS NOTED ABOVE.
BOTTOM AND SIDES. THIS IS A TYPICAL EXAMPLE OF DUCT BANK CONSTRUCTION. FOR ADDITIONAL COLUMN
DUCT BANK SHALL BE ENCASED IN CONCRETE WITH A LEAST THREE INCHES OF CONCRETE AT THE TOP,
PER SQUARE INCH. THE SLUMP SHALL BE AT THE UPPER END OF THE RANGE, PREFERABLY 7 TO 8 INCHES.
THE CONCRETE SHALL INCORPORATE 3/8" AGGREGATE WITH A NOMINAL COMPRESSIVE STRENGTH OF 2,500 LBS.
DISLODGE THE SPACERS.
INTO THE TRENCH IS MINIMAL. POUR THE CONCRETE SLOWLY AND DISTRIBUTE IT EVENLY SO AS NOT TO
WHEN PLACING CONCRETE AROUND CONDUITS ADJUST THE DELIVERY CHUTE SO THE FALL OF THE CONCRETE
OF REBAR STAKES AND HOLD DOWN BARS SHOULD BE USED PER 20 FEET OF DUCT BANK. THE 3" EXTENSION
FLOTATION IS CAUSED BY DUCT BUOYANCY AND CHURNING OF THE CONCRETE DURING THE POUR. FOUR SETS
THE REBAR STAKES AND HOLD DOWN BARS ARE REQUIRED TO PREVENT THE FLOTATION OF THE DUCT BANK.
CIVIL ENGINEER.
IT SHOULD HAVE JUST ENOUGH SLUMP TO FLOW TO THE BOTTOM OF THE DUCT BANK AND YET NOT BE
SO WET AS TO CAUSE THE CONDUITS TO FLOAT EXCESSIVELY. COORDINATE EXACT REQUIREMENTS WITH
OF THE REBAR ABOVE THE DUCTS IS TO BE USED AS A CONCRETE GAUGE.
4.
SEE NOTE #2
6" PLASTIC WARNING TAPE
SEE NOTE #9
SEE NOTE #6
0.5" DIA (APPROX.) HOLES
HOLD DOWN BAR. ANGLE IRON WITH
(MIN.)
3"
(MIN.)
7 "12
3" (MIN.) 7 " (MIN.)21
30"
(MAX.)
3"
(MIN.)
12"
(MIN.)
CL
LC
LC
PLASTIC WARNING TAPE SHALL BE "EXTRA-STRETCH" 6" WIDE AS MANUFACTURED BY TERRA-TAPE, DIVISION9.
OF REEF INDUSTRIES OR APPROVED EQUAL. COLOR CODE SHALL BE AS FOLLOWS; RED-ELECTRIC, ORANGE-
COMMUNICATIONS. IMPRINTED TEXT SHALL IDENTIFY DUCT BANK SERVICE. UTILIZE NON-DETECTABLE TAPE FOR
ELECTRIC DUCTS AND METALLIZED DETECTABLE TAPE FOR COMMUNICATION DUCTS.
24"
(MIN.)
REQUIRED FOR SERVICE ENTRANCE DUCTBANK ONLY. REFER TO BUILDING GROUNDING ELECTRODE DETAIL.10.
BOTTOM & SIDES. SEE NOTE #1.
#4 REBAR @ 18" O.C. IN PAIRS (TYP.)
CONTINUOUS #5 REBAR @ 7 1/2" TOP,
FINISH GRADE
MINIMIZE SHEARING.
VERTICAL WALLS, UNLESS APPROVED BY ENGINEER.
BACKFILL DUCTS WITH SELECT FILL. BACKFILL TRENCH BANK IN LAYERS AFTER CONCRETE HAS SET.
CONCRETE CONSTRUCTION JOINTS SHALL NOT BE SPACED LESS THAN 40 FEET O.C.
STEEL REINFORCING RODS SHALL BE INTERFACED WITH BUILDING FOUNDATION AND MANHOLE WALLS TO
CONCRETE ENVELOPE SHALL BE POURED IN FORM. DO NOT USE THE SIDES OF THE TRENCH TO FORM THE
7.
6.
8.
5.
3.
2.
1.
AND/OR ROW OF CONDUIT PROVIDE AN ADDITIONAL #5 REBAR SPACED AS NOTED ABOVE.
BOTTOM AND SIDES. THIS IS A TYPICAL EXAMPLE OF DUCT BANK CONSTRUCTION. FOR ADDITIONAL COLUMN
DUCT BANK SHALL BE ENCASED IN CONCRETE WITH A LEAST THREE INCHES OF CONCRETE AT THE TOP,
PER SQUARE INCH. THE SLUMP SHALL BE AT THE UPPER END OF THE RANGE, PREFERABLY 7 TO 8 INCHES.
THE CONCRETE SHALL INCORPORATE 3/8" AGGREGATE WITH A NOMINAL COMPRESSIVE STRENGTH OF 2,500 LBS.
DISLODGE THE SPACERS.
INTO THE TRENCH IS MINIMAL. POUR THE CONCRETE SLOWLY AND DISTRIBUTE IT EVENLY SO AS NOT TO
WHEN PLACING CONCRETE AROUND CONDUITS ADJUST THE DELIVERY CHUTE SO THE FALL OF THE CONCRETE
OF REBAR STAKES AND HOLD DOWN BARS SHOULD BE USED PER 20 FEET OF DUCT BANK. THE 3" EXTENSION
FLOTATION IS CAUSED BY DUCT BUOYANCY AND CHURNING OF THE CONCRETE DURING THE POUR. FOUR SETS
THE REBAR STAKES AND HOLD DOWN BARS ARE REQUIRED TO PREVENT THE FLOTATION OF THE DUCT BANK.
CIVIL ENGINEER.
IT SHOULD HAVE JUST ENOUGH SLUMP TO FLOW TO THE BOTTOM OF THE DUCT BANK AND YET NOT BE
SO WET AS TO CAUSE THE CONDUITS TO FLOAT EXCESSIVELY. COORDINATE EXACT REQUIREMENTS WITH
OF THE REBAR ABOVE THE DUCTS IS TO BE USED AS A CONCRETE GAUGE.
4.
SEE NOTE #2
6" PLASTIC WARNING TAPE
SEE NOTE #9
SEE NOTE #4.
SEE NOTE #6
0.5" DIA (APPROX.) HOLES
HOLD DOWN BAR. ANGLE IRON WITH
(MIN.)
3"
(MIN.)
7 "12
3" (MIN.) 7 " (MIN.)21
30"
(MAX.)
3"
(MIN.)
12"
(MIN.)
CL
LC
LC
PLASTIC WARNING TAPE SHALL BE "EXTRA-STRETCH" 6" WIDE AS MANUFACTURED BY TERRA-TAPE, DIVISION9.
OF REEF INDUSTRIES OR APPROVED EQUAL. COLOR CODE SHALL BE AS FOLLOWS; RED-ELECTRIC, ORANGE-
COMMUNICATIONS. IMPRINTED TEXT SHALL IDENTIFY DUCT BANK SERVICE. UTILIZE NON-DETECTABLE TAPE FOR
ELECTRIC DUCTS AND METALLIZED DETECTABLE TAPE FOR COMMUNICATION DUCTS.
24"
(MIN.)
REQUIRED FOR SERVICE ENTRANCE DUCTBANK ONLY. REFER TO BUILDING GROUNDING ELECTRODE DETAIL.10.
SYSTEM DETAIL. SEE NOTE #10.
BUILDING GROUNDING ELECTRODE
GROUND CONDUCTOR. REFER TO
SCHEDULES FOR SIZE.
DUCTBANK SECTIONS AND
SPECIFICATION FOR TYPE AND
ELECTRICAL DUCT. REFER TO
BE STAGGERED VERTICALLY.
HORIZONTALLY ONLY. SPACERS SHALL
SPACERS SHALL BE INTERLOCK
CONDUIT SPACERS, 5'-0" ON CENTER.
N.T.S.
TYPICAL REINFORCED CONCRETE DUCTBANK CONSTRUCTION DETAIL
CONDUIT IDENTIFICATION SCHEDULE
1
2
4" SCHED 80 PVC - EMPTY WITH PULL ROPE
3
S
N.T.S.
DUCTBANK SECTIONS
SECTION A-A
1
SECTION D-D
S S
S S
2" SCHED. 80 PVC WITH PULL ROPE
SECTION B-B
S S
2 2
NOTES.
DUCT BANK ROUTING REQUIREMENTS AND
REFER TO SITE PLAN E-101 FOR ALL2.
THIS SHEET FOR ADDITIONAL INFORMATION.
DUCTBANK CONSTRUCTION DETAIL" ON
SEE "TYPICAL REINFORCED CONCRETE1.
NOTES:
11.REFER TO DRAWING C-501 FOR UTILITY TRENCH DETAIL.
DR
D
DA
VID D
ES
CO
TE
AU
X /S/
SECTION C-C
3S
PULL ROPE FOR NSTAR FEEDER
4" SCHED 80 PVC - EMPTY WITH
FIRE PUMP FEED
2" SCHED 80 PVC - 3-4AWG; 1-3AWG GND
OC
TO
BE
R 2
014
-
DW
N B
Y:
CK
D B
Y:
DE
SIG
NE
D B
Y:
DE
SC
RIP
TIO
N
1
D
2 3
C
4 5
A
B
MA
RK
AP
PR.
DA
TE:
SU
BMIT
TE
D B
Y: PL
OT D
AT
E:
DA
TE
MA
RK
DE
SC
RIP
TIO
NA
PP
R.
DA
TE
CO
NT
RA
CT N
O.:
DR
AWIN
G C
OD
E:
IDENTIFICATION
SHEET
®
District
New England
of Engineers
US Army Corps
SIZ
E:
FIL
E N
AM
E:
PL
OT S
CA
LE:
SHEET OF
CO
NC
OR
D,
MA
SS
AC
HU
SE
TTS
NE
W E
NG
LA
ND DIS
TRIC
T
U. S.
AR
MY C
OR
PS O
F E
NGIN
EE
RS
10/0
9/2
014
SO
LICIT
ATIO
N N
O.:
F-4
42-2
0-0
1
W912
WJ-1
5-B-0
001
BUIL
DIN
G 2
4
R&
D S
TO
RA
GE F
ACIL
TY,
NA
TIC
K,
MA
SS
AC
HU
SE
TTS
U.S.
AR
MY S
OL
DIE
R S
YS
TE
MS C
EN
TE
R
E-5035554
DS
H
AN
SI
D
JE
ANIN
E C
LIN
E
F-4
42-2
0-0
1_E-5
03.d
gn
1:1
HTTP://WWW.WBDG.ORG/CCB/BROWSE_CAT.PHP?O=78&C=232
ALTERNATIVELY, TYPE IN THE FOLLOWING ADDRESS IN INTERNET EXPLORER: B.
> NAVFAC CADD DETAILS.RESOURCES
NAVFAC CADD > CADD LIBRARY > CCB > DOCUMENTS & REFERENCES > HOME FOLLOW:
THE FILE IS LOCATED ON THE "NAVFAC CADD DETAILS" PAGE. TO NAVIGATE TO THIS LOCATION, A.
) FOR USE IN A LABEL MAKING MACHINE.WWW.WDBG.ORG
A DOWNLOADABLE WINDOWS METAFILE IS AVAILABLE ON THE WHOLE BUILDING DESIGN GUIDE WEBSITE (5.
6" 4" OUTDOOR
3" 2" INDOOR
WIDTHHEIGHTEQUIPMENT TYPE
THE SIZE OF THE LABEL SHALL BE:4.
BEFORE EXAMINATION, ADJUSTMENT, SERVICING, OR MAINTENANCE OF THE EQUIPMENT.
THE LABEL SHALL BE LOCATED ON THE EQUIPMENT TO BE CLEARLY VISIBLE TO QUALIFIED PERSONS 3.
THE LABEL FORMAT AND TEXT SHALL BE IN ACCORDANCE WITH THE FIGURE.2.
HAZARDS.
PROVIDE SELF-ADHESIVE VINYL LABEL TO AFFIX TO ELECTRICAL EQUIPMENT TO WARN OF ARC FLASH 1.
NOTES:
WIDTH
HEIGHT
WALL OF MANHOLE
TYPICAL CABLE RACK TYPICAL DUCT ENTRANCE
DUCT
INSIDE FACE
OF MANHOLE
3"
DETAIL OF PULLING-IN IRON
7" MIN.
7" MIN.
8 3/8"
9"
CAST IN PLACE
3"
1 1/2"
CONCRETE WALL
LOCKWASHER
FILLET WELD
6 1/2" X 2 1/2" X 3/16" PLATE
ALTERNATE METHOD
CL
(MIN)
2 1/2" RAD
13/16"
3/16"4"
NOTE
ALL METAL PARTS SHALL
BE HOT DIP GALVANIZED
N.T.S.
N.T.S.
ARC FLASH WARNING LABEL
CABLE RACK AND DUCT ENTRANCE
PULLING-IN IRONS
ELE
CT
RIC
AL D
ET
AIL
S 3
DR
D
DA
VID D
ES
CO
TE
AU
X /S/
OC
TO
BE
R 2
014
-
G-001G-002LS-101C-001C-101C-102C-103C-501C-502C-503S-001S-101S-102S-301S-302S-501A-001A-101A-102A-103A-104A-201A-202A-301A-401A-402A-403A-501A-502A-503A-504A-505A-601FA-101FA-601FX-001FX-101P-001P-101P-601M-001M-101M-501M-601M-701E-001E-101E-102E-103E-104E-105E-501E-502E-503E-601