» Jurisdiction must have a FEMA approved PDM plan to apply. » All regular projects must have a Benefit Cost Analysis completed with a Benefit Cost Ratio of 1.0 or higher. (with the exception of acquisition’s of $276, total project costs; elevations $150, total project costs.) » All regular projects must go through an environmental review with consultation from State and Federal stakeholders.

Transcript of -Pre Disaster Mitigation (PDM) -Hazard Mitigation Grant (HMGP) -Flood Mitigation Assistance (FMA)/...

Page 1: -Pre Disaster Mitigation (PDM) -Hazard Mitigation Grant (HMGP) -Flood Mitigation Assistance (FMA)/ Repetitive Flood Claims (RFC)/ Severe Repetitive Loss.
Page 2: -Pre Disaster Mitigation (PDM) -Hazard Mitigation Grant (HMGP) -Flood Mitigation Assistance (FMA)/ Repetitive Flood Claims (RFC)/ Severe Repetitive Loss.

- Pre Disaster Mitigation (PDM)Pre Disaster Mitigation (PDM)- Hazard Mitigation Grant (HMGP)Hazard Mitigation Grant (HMGP)- Flood Mitigation Assistance (FMA)/ Flood Mitigation Assistance (FMA)/

Repetitive Flood Claims (RFC)/ Severe Repetitive Flood Claims (RFC)/ Severe Repetitive Loss (SRL)Repetitive Loss (SRL)

Page 3: -Pre Disaster Mitigation (PDM) -Hazard Mitigation Grant (HMGP) -Flood Mitigation Assistance (FMA)/ Repetitive Flood Claims (RFC)/ Severe Repetitive Loss.

» Jurisdiction must have a FEMA approved PDM plan to apply.

» All regular projects must have a Benefit Cost Analysis completed with a Benefit Cost Ratio of 1.0 or higher. (with the exception of acquisition’s of $276,000.00 total project costs; elevations $150,000.00 total project costs.)

» All regular projects must go through an environmental review with consultation from State and Federal stakeholders.

Page 4: -Pre Disaster Mitigation (PDM) -Hazard Mitigation Grant (HMGP) -Flood Mitigation Assistance (FMA)/ Repetitive Flood Claims (RFC)/ Severe Repetitive Loss.

» National annual competitive fund to mitigate natural disasters before an incident

» Must hold FEMA approved PDM Plan» Up to $3 million per project max Federal» 75% Fed Share – 25% local match (cash/soft/ in kind)» Projects must go through a comprehensive

environmental review and be completed 3 years after sub award is awarded.

» 2015 appropriation $25 Million » 90 day application period

Page 5: -Pre Disaster Mitigation (PDM) -Hazard Mitigation Grant (HMGP) -Flood Mitigation Assistance (FMA)/ Repetitive Flood Claims (RFC)/ Severe Repetitive Loss.

» A Post-Disaster program: three categories for applicants 5%, 7%, regular projects.

» Dollars awarded based on total disaster damages (15% of the total disaster damages, that is what makes up the 75% federal share)

» Applications are reviewed at region 8 by people who know the state well.

» The state has more control over this grant program. » 1 year application period from the date the disaster was

declared. (FEMA is requesting that we complete applications and submit them as soon as possible)

Page 6: -Pre Disaster Mitigation (PDM) -Hazard Mitigation Grant (HMGP) -Flood Mitigation Assistance (FMA)/ Repetitive Flood Claims (RFC)/ Severe Repetitive Loss.

» The Biggert-Waters Flood Insurance Reform Act of 2012 eliminated the Repetitive Flood Claims and Severe Repetitive Loss programs and made the following significant changes to the FMA program:

» The development or update of mitigation plans shall not exceed $50,000 Federal share to any Applicant or $25,000 Federal share to any sub recipient and

» There is no longer a restriction that a planning grant can only be awarded not more than once every 5 years to a State or community.

» Congress appropriation 2015 $150 million» 90 day application period

Page 7: -Pre Disaster Mitigation (PDM) -Hazard Mitigation Grant (HMGP) -Flood Mitigation Assistance (FMA)/ Repetitive Flood Claims (RFC)/ Severe Repetitive Loss.

» HMGP: has to be a Presidential disaster declaration for state to receive these funds. We do not have large disasters like the costal communities. This grant funding is usually very small for Montana, and we have had not had disasters since 2014 flooding.

» PDM: last few years the budget has been significantly cut from 2010 when $100 million was appropriated to 2015 when $25 million was appropriated. This makes it difficult to compete for such a small amount of money. Application times have also reduced. 180 days was the application time. Now reduced to 90 days. This makes compiling a detailed application difficult.

» FMA : FEMA has made it to where they will not accept acquisition or elevation of any structures other than SRL/ RL. This limits Montana on applications since we have very few SRL/ RL.

Page 8: -Pre Disaster Mitigation (PDM) -Hazard Mitigation Grant (HMGP) -Flood Mitigation Assistance (FMA)/ Repetitive Flood Claims (RFC)/ Severe Repetitive Loss.
Page 9: -Pre Disaster Mitigation (PDM) -Hazard Mitigation Grant (HMGP) -Flood Mitigation Assistance (FMA)/ Repetitive Flood Claims (RFC)/ Severe Repetitive Loss.
Page 10: -Pre Disaster Mitigation (PDM) -Hazard Mitigation Grant (HMGP) -Flood Mitigation Assistance (FMA)/ Repetitive Flood Claims (RFC)/ Severe Repetitive Loss.

More information on ineligible activities in the 2015 HMA guidance

Page 11: -Pre Disaster Mitigation (PDM) -Hazard Mitigation Grant (HMGP) -Flood Mitigation Assistance (FMA)/ Repetitive Flood Claims (RFC)/ Severe Repetitive Loss.

» $984,000.00 local match? No problem: Montana FWP Future Fisheries Improvement Program, Charlotte Martin Foundation, Montana Coal Board, Little Big Horn College & Crow Agency Schools (labor), Montana Trout Foundation, Office of Public Safety, Five Star Restoration Matching Grant Program, DNRC Reclamation and Development Grant, Montana Fish & Wildlife Conservation Trust, Fish America Association Conservation Grant Program

Page 12: -Pre Disaster Mitigation (PDM) -Hazard Mitigation Grant (HMGP) -Flood Mitigation Assistance (FMA)/ Repetitive Flood Claims (RFC)/ Severe Repetitive Loss.
Page 13: -Pre Disaster Mitigation (PDM) -Hazard Mitigation Grant (HMGP) -Flood Mitigation Assistance (FMA)/ Repetitive Flood Claims (RFC)/ Severe Repetitive Loss.

2009 PDM grant Federal Share $2,280,000.00

Before

After

Page 14: -Pre Disaster Mitigation (PDM) -Hazard Mitigation Grant (HMGP) -Flood Mitigation Assistance (FMA)/ Repetitive Flood Claims (RFC)/ Severe Repetitive Loss.

Before

After

DR-1767 (HMGP)Federal Share $142,411.00

Page 15: -Pre Disaster Mitigation (PDM) -Hazard Mitigation Grant (HMGP) -Flood Mitigation Assistance (FMA)/ Repetitive Flood Claims (RFC)/ Severe Repetitive Loss.

Before

After

2011 PDM grant Federal Share $1,191,304.00

Page 16: -Pre Disaster Mitigation (PDM) -Hazard Mitigation Grant (HMGP) -Flood Mitigation Assistance (FMA)/ Repetitive Flood Claims (RFC)/ Severe Repetitive Loss.

Before

Page 17: -Pre Disaster Mitigation (PDM) -Hazard Mitigation Grant (HMGP) -Flood Mitigation Assistance (FMA)/ Repetitive Flood Claims (RFC)/ Severe Repetitive Loss.

After

Page 18: -Pre Disaster Mitigation (PDM) -Hazard Mitigation Grant (HMGP) -Flood Mitigation Assistance (FMA)/ Repetitive Flood Claims (RFC)/ Severe Repetitive Loss.

“We can’t prevent the next flood, but we can mitigate it.” Kent Atwood

State Hazard Mitigation OfficerThe “SHMO”

[email protected]

Nadene Wadsworth Deputy State Hazard Mitigation Officer

The “DSHMO” 324-4785

[email protected]