Background of DEHA
Established in 2006, DEHA has been shaped based
on a collaboration between Department of Disaster
& Emergency Health at the I.R.Iran's National
Institute of Health Research and Department of
Disaster Public Health at the School of Public
Health of Tehran University of Medical Sciences
and is the main partner of Ministry of Health &
Medical Education on the subject.
Mission statement of DEHA
Disaster & Emergency Health (DEH)
Academy is established to enhance Iran’s
health system capacity in terms of qualified
human resources and evidence-based
decision making in emergencies and
disasters' mitigation, preparedness,
response and recovery.
Risk خطر
هؼبی ث ک آهذ risicare ایتبلیبیی کلو اص خطش اژ.اعت داؽتي جشأت
The word ‘risk’ derives from the early Italian risicare, which
means ‘to dare’. In this sense, risk implies a choice rather than a
fate
Risk خطر
یب دادى دعت اص ادتوبل یک ثؾش بی فؼبلیت و هبذ) اعت اسصػ ثب ثشایؼ ک چیضی آسدى ثذعت
.داسد (غیش اجتوبػی هلؼیت ؽغل، پل، عالهتی،
Risk خطر
:دس تؼشیف خطش د ثؼذ هغتتش اعتادتوبل لع هخبطش
ػذم لطؼیت دس صهبى یب ؽذت ػاسك ثذ هخبطش
سه سوال در رابطه با خطر
(هذت؟ چ اص ش) دذ؟ هی سر فشکبغی چ ثب هخبطش(اعت؟ ثضسگ ػاسك چمذس) چیغت؟ هخبطش ػاسك تذت بی آدم) چیغت؟ خطش اص هؼشك دس جبهؼ ادساک
ثیذ؟ هی سا خطش چگ تبثیش
گیشی اذاص ثب داسد آثبسی ک چیضی لع ادتوبل.ؽد هی گیشی اذاص سخذاد ادتوبل ػاسك
Risk خطر
Risk Management
Risk Identification
Risk Analysis
Risk Perception
Risk Assessment
Risk Acceptance
Risk Reduction
Risk Communication
Risk Transfer
Disaster Risk Managementمذیریت خطر بالیا
بی جج ثش ثالیب خطش هذیشیت ثذث دس ػول دس بی جج ث تب گشدد هی تبکیذ (دادى اصدعت) هفی خطش هذیشیت تیج الجت .(آسدى دعت ث) هثجت ثیي تؼبدل دس هثجت بی جج ث کوک ثالیب
.اعت آسدى ثذعت دادى اصدعت
Risk Management بالیا مذیریت خطر
اجتوبػی، فبکتسبی گشفتي ظش دس فشآیذ هطشح خطش تذلیل دس ک عیبعی التقبدی
لجل لبثل آعیت عطخ کشدى هؾخـ ؽذ هی ک الذاهبتی خقؿ دس تقوین سخذاد یک
..گیشد اجبم ثبیذ آعیت سعبذى دذالل ث ثشای
هذیشیتی، تذاثیش اص اعتفبد عیغتوی فشآیذ تب ب ظشفیت ػولیبتی هبستبی عبصهبی
گشدد بدی عیبعتب ب اعتشاتژی یک صیبجبس آثبس تب یبثذ گغتشػ ب ظشفیت.گشدد کن ثال ادتوبل هخبطش
UNISDR 2009, http://www.unisdr.org/eng/terminology/terminology-2009-eng.html
www.sums.ac.ir/~moradij/wp
Risk Management مذیریت خطر بالیا
Risk Identificationخطر شناسایی
تاذ هی چیضی چ ایک کشدى هؾخـ فشآیذچگ؟ چشا ثیبفتذ اتفبق
Risk Acceptanceخطر قبول کردن
خطش یک ػاسك ادتوبل لجل ثشای آگبب تقوینهؾخـ
Risk Analysisخطر تحلیل
ثشای هجد اطالػبت اص عیغتوبتیک اعتفبد دذ هی سر هذت چ اص ش سخذاد یک ایک تؼییي
اعت؟ چمذس آى ػاسك ؽذت
Risk Assessmentارزیابی خطر
همبیغ ثشسعی ثب خطشب ثذی ستج فشآیذ هؾخـ، اعتبذاسدبی اعبط ثش خطش عطح.دیگش هؼیبس ش یب ذف خطش عطخ
Risk Communication رسانی خطر اطالع
ثیي ظشات اطالػبت تجبدل تؼبهلی فشآیذ یک دس دسگیش عبصهببی ب گش افشاد و
پزیشػ لبثلیت ؽذت ؽکل، هبیت، خقؿخطش
Risk Reduction کاهش خطر
ثشای هذیشیتی افل هبعت سؽبی اص اعتفبد یب آى ػاسك یب هخبطش لع ادتوبل کبؼ
شد
Risk Perception ادراک خطر
ظش دس خطشات ثشای هخبطجبى ک اویتی یبصب، ثیبى سی اص ادساک ایي .اذ گشفت.ؽد هی هؾخـ ب گشای ظشات مط
Risk Transfer جابجایی خطر
اص دیگشاى ث خغبست هیضاى یب هغلیت جبثجبیی .دیگش بی سػ یب ثیو لشدادب، لایي، طشیك
اتمبل ث تاذ هی وچیي خطش جبثجبیی دیگش جبی ث خطش اص ثخؾی یب و فیضیکی.گشدد اطالق
MULTI-WAY
RISK
COMMUNI-
CATION
Hazard
Identification
and Hazard
Prioritisation
Risk
Assessment
Including Risk
Characteris-
ation
Policy
Decision
(open and
explicit)
Policy
Implementation
Policy
Evaluation
What is the strategic/ organisational context?
What is the risk context?
What is the structure? /What are the criteria?
What & How it can happen?
Determine likelihood & consequences
Establish level of risk
Compare against criteria/Set priorities
Instigate public awareness programmes
Evaluate treatme options against risk
communication strategy
Identify treatment options
Evaluate technical treatment options
Prepare/Implement treatment plans
RISK
C
O
M
M
U
N
I
C
A
T
I
O
N
M
O
N
I
T
O
R
AND
R
E
V
I
E
W
Risk assessment: خطرارزیابی
خطش گیشی اذاص تفیف عیغتوبتیک فشآیذ خطش هذبعج آى دیگش بم) هخبطشات ثب هشتجط.اعت
www.sums.ac.ir/~moradij/wp
Disaster Risk estimation
ب داد صهبى، اػتجبس،) هبثغ اعبط ثش تاذ هی سیغک اسصیبثی:ؽد اجبم تش پیچیذ (...
R= f( PH)×(Hman + Hnat)(Vnat +a1 +a2 + b1+ b2)
Rس هؼشك خطش چ آعیجی سا تذویل هی کذد جبهؼ ادتوبل ایي ك یك ثال ث .H یك ػبهل آعیت سعبى ،PHتوبل سخذاد یك ثال ك لع آى هجش ث ایجبد آعیت ؽداد
Hman جض اغبی هغئل آعیت ایجبد ؽذ ،Hnat جض طجیؼی هغئل آعیت ایجبد ؽذVnat آعیت پزیشی طجیؼی
A1 ػاهل تؾذیذ كذ ی آعیت پزیشی ،a2 ػاهل ایجبدتخفیف دس اثشات هخشة ػاهل آعیتػاهل تمیت كذ دس هذیشیت ثال B2، ػاهل تضادن كذ ثب هذیشیت ثال B1، سعبى
Risk Assessment
Planning ریسی برنامه
اجشای ؽتي ثب ؽشع خطش اسصیبثی ثب سیضی ثشبه آسدى ثذعت آى پبیؼ اسصیبثی ثب اداه آى
.یبثذ هی پبیبى ب آهخت دسط
WHO
MPHR5
هؾخـ کشدى هخبطش 1.
(مؾ پ ثذی)تؼیي گغتشدگی هخبطش 2.
هؾخـ کشدى جبهؼ دس هؼشك هخبطش3.
ثیی ػاسك هخبطش ثش جبهؼ دس صهبى هؾخـ پیؼ4.
بی جبهؼ دس همبثل هخبطش پزیشی تذلیل آعیت5.
بی جبهؼ ثشای همبثل ثب هخبطش هؾخـ کشدى ظشفیت6.
جلگیشی یب کبؼ اثش )اتخبر تذاثیشی ثشای کبؼ خطش 7.(عبصی هخبطش، کبؼ آعیت پزیشی ظشفیت
مراحل تحلیل خطر
Hazard Identification
Hazardprobability
HazardImpact
Vulnerability Analysis
Example:
Country X has a history of flooding
Example:
Due to unusual weather patterns, Country X is at risk of large scale flooding this year
Example:
- Up to 1.5 million people will be affected
- schools will be destroyed
Example:
-low preparedness
– weakness of early warning mechanism
Hazard analysis
Disaster Risk Assessment
Hazard Assessment ارزیابی خطر
هخبطش( فشکبظ)تج ث عاثك ثغبهذ
طوفان ساحلي سيل خشكسالي سيل سونامي
سال قبل5 سال قبل25 سال قبل10 سال قبل 40 سال قبل 250
www.sums.ac.ir/~moradij/wp
High risk = AAA & AA & BBB
Probability Level
CatastrophicA
MajorB
ModerateC
3 AAA BBB CCC
2 AA BB CC
1 A B C
Moderate risk = A & BB & CCC
Low risk = C & B & CC
شذت مخاطره
احتمال وقىع
www.sums.ac.ir/~moradij/wpWHO
ؽذت هخبطش( فشکبظ)تج ث عاثك ثغبهذ
www.sums.ac.ir/~moradij/wp
Risk Assessment
Hazard Probability Impact capacity total
www.sums.ac.ir/~moradij/wp
Risk= Probability× [Impact+ Capacity(-)]
Risk Assessment ارزیابی خطر
www.sums.ac.ir/~moradij/wp
www.sums.ac.ir/~moradij/wp
www.sums.ac.ir/~moradij/wp
گیری نیاز بو ابسار داریم برای انذازه
We need a tool for Risk Assessment
www.sums.ac.ir/~moradij/wp
فهرست کتاب ارزیابی خطر بیمارستانی دکتر اردالن
Hazard Identification / Hazard probability
Vulnerability Analysis
Vulnerability Analysisای ارزیابی ایمنی غیر سازه
Vulnerability Analysisارزیابی ایمنی سازه ای
Summary of Disaster Risk in N Hospitals
Component Score
Hazard probability 0.70
Functional readiness 33.6
Nonstructural vulnerability 70.8
Structural vulnerability 88.0
Risk score 0.3
Risk class 7
Risk score
(maximum)
Risk score
(minimum)Risk class
1/000/8010
0/790/609
0/590/408
0/390/207
0/190/006
-0/01-0/205
-0/21-0/404
-0/41-0/603
-0/61-0/802
-0/81-1/001
واژه هاي پايه در كاهش خطر باليا: واژه شناسي. اردالن ع•
References منابع
www.sums.ac.ir/~moradij/wp
Photo credits: Different site from www.bing.com
Britton NR. MANAGING COMMUNITY RISKS. 1998. 2nd Ed. Available from:
http://www.training.fema.gov/EMIWeb/edu/docs/hram/Session 06-1 - Handout - Managing Community Risks.pdf